You are on page 1of 4

Eng.

Mohamed Mahfouz Khyr Allah


Massaken EL-khazl factory, kom Hamada, El Behiera, Egypt

Mobile no: 00201000471396 : 00201140386684 mmahfouz11@yahoo.com

OBJECTIVE

More than (9) Years experiences in combined cycle power plants.


Seeking an engineering position in power plants (commissioning and start-up or operation departments) improving my abilities and change my life level for better.

EDUCATION

B. Sc. in Mechanical Power & Energy Engineering 2001, Alexandria University General grade: good (74.3 %)

CHRONOLOGICAL EXPERIENCE RECORD


Date Position Company Location From May 2011 up-to-date

GE

Gas turbine Commissioning & startup engineer

KHARAFI NATIONAL DAMIETTA simple cycle power plant 500MW (4x125MW), Egypt

Responsibilities:
Commissioning and testing for GT. Initial gas turbine start up. Operation GT during reliability and performance test.

Date Position Company Location

From March 2010 to February 2011

HRSG Commissioning & startup engineer


EL-ATF combined cycle power station 750MW (2x2x1), Behira, Egypt

Responsibilities:
Commissioning and testing for large capacity HRSG. Operation of HRSG during steam blow activities. Initial HRSG start up. Operation large capacity HRSG during reliability and performance test.

Very good knowledge with yokogawa DCS system version CENTUM CS3000
1 of 4

Position Company Location

Senior Shift Charge Engineer.


Middle Delta Electricity Production Company (MDEPCO) Nubaria combined cycle (3x 750 Mw) power station

Responsibilities: 1. Two Modules Each Module Consists Of : a) Two combustion gas turbine 250 mw type V94.3a b) Two horizontal type heat recovery steam HRSG c) One Mitsubishi steam turbine 250MW type TC2F HP , IP AND LP steam lines 2. One Module Consists Of : a) Two GE b) Two c) One 3. 4. 5. 6. CTG 250 MW type (9FA) horizontal type heat recovery steam HRSG steam turbine 250 MW

220 kV switch yard 500 kV switch yard Four tie transformers 500/220 kV Medium (6.3 kV) and low (400 v) voltage switch gear Besides I do training courses for new engineers and technical.
Position Company Location

Commissioning & startup engineer


Middle Delta Electricity Production Company (MDEPCO) Nubaria combined cycle (3x 750 Mw) power station

Responsibilities:
Mitsubishi Steam Turbine (2 x 250 MW) Commissioning, start-up, performance,

reliability tests and operation. GE combustion gas turbine 250 MW type 9FA Commissioning, start-up,

performance, reliability tests and operation. Siemens Gas Turbine (4x250 MW) Type V94.3A. Commissioning, start-up,

performance, reliability tests and operation.

Position Company Location

Construction engineer
Middle Delta Electricity Production Company (MDEPCO) Nubaria combined cycle (3x 750 Mw) power station

Responsibilities: Responsible of reviewing all technical submittals and inspection types of valves and pumps as TERMOMECHANICA and KSB pumps.
2 of 4

TRAINING COURSES
1. On-Shore Basic Training for GE
GE in Nubaria Power Station. Gas Turbine V. 9FA (5 weeks) under the direction of

2. Training course in Japan (2 weeks), under the direction of Mitsubishi Heavy Industries
Ltd. Nagasaki Shipyard & Machinery Works, covered the following:
General description of STG

Turbine governing system. Operation of steam turbine. DEH control. ATS control. Turbine Inter lock. Turbine Control System. Auxiliary Equipment control. MHI Factories tours.

Surface condenser. Gland steam condenser & fan. Lube oil cooler. Condenser vacuum pump. Lube cleaning system. Debris filter. Condenser water vacuum pump.

3. Training Course in Japan (Kobe and Takasago), (2 weeks), under the direction of
Mitsubishi Electric Corporation Energy Systems Center, Operation for Generator & Generator Auxiliary Systems. Maintenance for Generator & Generator Auxiliary Systems. Generator Design & Structure. Generator Auxiliary Systems. Generator Excitation Systems. Generator Protection & Control Systems. covered the following:

4. On-Shore in Nubaria Power Station (2 weeks), under the direction of Mitsubishi Electric
Corporation Energy Systems Center, covered the following: Generator Design & Structure. Generator Auxiliary Systems. Maintenance for Generator & Generator Auxiliary Systems. Operation for Generator & Generator Auxiliary Systems.

5. On-Shore in Nubaria Power Station, under the direction of Mitsubishi Heavy Industries,
covered the following: Steam Turbine Gland Sealing and Vacuum up test. Steam Turbine Rolling and Speed up test. By Pass Operation. No Load Operation, Part Load & Full Load Operation. 25%, 50%, 75% and 100% Load Rejection test. Normal Operation & Trouble Shooting.

3 of 4

6. Basic Operation Training for Gas Turbine V.94.3A (12 days), under the direction of
Siemens PG Gas Turbine. Plant operation in Damanhour, covered the following: Introduction to the plant. Electrical and I&C part.

7. Operation and Maintenance of Combined Cycles (1 month), Damanhour, by West Delta


Production Company (WDEPCO).

8. Another Training Course at Nubaria Power Station Site in:


Service & Instrument Air Compressors by Initec Energia. Service, raw and closed cooling pumps by KSB.

9. Continuous Emission Monitoring Control System, ALTEC Environment Technology - USA,


held in Nubaria Power Station (4 days).

SKILLS Language : Arabic (mother tongue)


English (very good)

Computer skills : MS- office (word, excel, power point, ms project) and internet
applications

PERSONAL DATA Date of birth Marital status Nationality Passport no. Date of Issue Date of Expiry : 31 th March 1979 : Married (2 Children) : Egyptian : 2690376 : 17 th August 2004 : 16 th August 2013

4 of 4