ENGINEERING - PIPING
REGION: AMERICAS APPROVED BY (Process Owner): David Towell
NUMBER: FUNCTION:
WP-AM-OFF-EN-PI201
PIPING PROJECT REVISION BY: N/A A C T I V I T Y
Client
Other
Piping Discipline
PROJECT SET-UP WPID Review PEP & budgets with the Piping Dept.
Project Management
Project Controls
Other Disciplines
Process Engineering
Document Control
Materials Control
Procurement
Construction
START STAGE 1
Start Level 1
Develop 3D Equip. Model. Begin Plot Plan Define Metallurgy Start PMCs (Piping Material Class. Supply Design Condition
Start General Piping Specifications Establish PEGS Database Rqmnts. Numbering & Format
Develop P&IDs
Provide Input
PEGS DATABASE EQUIP. REPORT Incopr. WBS into Schedule Establish Weight Control Plan
Establish/Define Admin Activities, Schedule Meeting Project Reports, Personnel Eval. 212366422.xls.ms_office Paper copies of this Process Map are UNCONTROLLED. Please refer to the KBR MS website for the current version Page 1 of 18
ENGINEERING - PIPING
REGION: AMERICAS APPROVED BY (Process Owner): David Towell
NUMBER: FUNCTION:
WP-AM-OFF-EN-PI201
PIPING PROJECT REVISION BY: N/A A C T I V I T Y
Client
Other
Piping Discipline
Project Management
Project Controls
Other Disciplines
Process Engineering
Document Control
Materials Control
Procurement
Construction
Establish Document Control Plan for Internal / NonDeliverables Department Procedures Establish EA Plan with Scheduled Audits
Input
Develop Equipment Location Drawings. Maintenance Requirements - Oper. Aides - Hazardous Area Classification - Drop Zones - Blast/Fire Walls, etc.
Input
Input
Input
Input
Review/Update Work Area Breakdowns Setup/Establish IPMS Work Pkgs. Update IPMS Primerva Track/Report Schedule & Budget Schedule Level 3 Develop./Refine Provide Input Preliminary issue of PMC's Participate in Line List Develop and Speciality item input Process Metallurgy Input Input to Schedule Development Input to Schedule Development Input to Schedule Development Input to Schedule Development Input to Schedule Development
Extract Preliminary Line List & Specialty Item List Define Critical Lines for Stress Analysis
212366422.xls.ms_office
Paper copies of this Process Map are UNCONTROLLED. Please refer to the KBR MS website for the current version
Page 2 of 18
ENGINEERING - PIPING
REGION: AMERICAS APPROVED BY (Process Owner): David Towell
NUMBER: FUNCTION:
WP-AM-OFF-EN-PI201
PIPING PROJECT REVISION BY: N/A A C T I V I T Y
Client
Other
Piping Discipline
Issue Pipe Support Standards
Project Management
Project Controls
Other Disciplines
Process Engineering
Document Control
Materials Control
Procurement
Construction
Start Formal Studies of Major Piping Valves with Operating & Equipment Access
Prove Equipment Location Model from Layout Route Major Piping (8" or larger) Point / Point in Model
PEGS Data
Construction Reviews
Review Equipment Location Model & Piping Config. Make adjustments re-route major piping as required Issue ELO for IDC Setup Drawings for Plot Plans & General Arrangement
IDC ELO
IDC ELO
Paper copies of this Process Map are UNCONTROLLED. Please refer to the KBR MS website for the current version
ENGINEERING - PIPING
REGION: AMERICAS APPROVED BY (Process Owner): David Towell
NUMBER: FUNCTION:
WP-AM-OFF-EN-PI201
PIPING PROJECT REVISION BY: N/A A C T I V I T Y
Client
Other
Piping Discipline
Project Management
Project Controls
Other Disciplines
Process Engineering
Document Control
Return IDC Comments
Materials Control
Procurement
Construction
Review Review / Approve Perform STAGE 1 Model Review Approve Weight Report Provide List of Design Changes Evaluate Scope / coast Changes Analyze Cost & Schedule Impact
Review
Review
Review
Update Weight Control Report & CG Provide Additional Design Changes Update Equipment & Process Info.
Input IT Set-up Matmam Start Baseline MTO Effort Extract Valve List from PEGS Data Base Continue P&ID Develop Support Continue P&ID Develop
Input
Input
System Verification & Check. Insure all Systems & Tools are Located and Functional
Establish Model Tracking Tools Issue PMC's for IDC and issue General Piping Specs. Review Review Review Return Update PMCS or Specs & Issue for Client Approval Distribute
212366422.xls.ms_office
Paper copies of this Process Map are UNCONTROLLED. Please refer to the KBR MS website for the current version
Distribute
Page 4 of 18
ENGINEERING - PIPING
REGION: AMERICAS APPROVED BY (Process Owner): David Towell
NUMBER: FUNCTION:
WP-AM-OFF-EN-PI201
PIPING PROJECT REVISION BY: N/A A C T I V I T Y
Client
Other
Piping Discipline
Specs & Issue for Client Approval
Project Management
Project Controls
Other Disciplines
Process Engineering
Document Control
Distribute
Materials Control
Procurement
Construction
Review / Approve For Info For Info For Info Return Comments
Incorporate Comments
START STAGE 2
Provide Mech data & Equipment List. Provide Electrical Equipment Data
Establish / Confirm Pipe N/S E/W Pipe Runs for Each Oper. Level
Input
Input Update Major Pipe Routing & Continued Point / Point Routing for Balance of Piping
Set-up drawings for Piping Orthos (as needed) Issue PMC's for Design Issue Piping Gen. Specs. for Design
Update input & config. to P&ID's. Add Additional Line numbers value, Specialty Item Tags
Update P&ID's
Paper copies of this Process Map are UNCONTROLLED. Please refer to the KBR MS website for the current version Conduct P&ID HAZOP
Page 5 of 18
ENGINEERING - PIPING
REGION: AMERICAS APPROVED BY (Process Owner): David Towell
NUMBER: FUNCTION:
WP-AM-OFF-EN-PI201
PIPING PROJECT REVISION BY: N/A A C T I V I T Y
Client
P&ID HAZOP Reviews
Other
Piping Discipline
Project Management
Input
Project Controls
Other Disciplines
Input
Process Engineering
Conduct P&ID HAZOP Reviews
Document Control
Materials Control
Procurement
Construction
Participate in HAZOP Reviews Issue Comments to Draft Update weights & COG
Update PEGS
Begin MTO updates based on 3D Model Begin Valve Selection for purchase Provide Technical Assistance Specify Specialty Items IDC Specialty Items Incorporate IDC Comments Define and Document Checking Procedures Technical Input to Eval. Bid Packages Verify Inline Instr. Input from N-Tools
Prepare Inquiry Pkgs. For: - Bulk Material - Gen ser. Vivs - Specialty Vivs & Distribute
Review
Review Distribute
Issue P.O.'s
Input
Input
Input
Input
Define all External Design Interfaces (if required) Set up ISO drawings and verify extractions Define all Supplier interfaces & KBR Paper copies of this Process Map are UNCONTROLLED. Please refer to the KBR MS website for the current version Resp. to be shown on
212366422.xls.ms_office
Page 6 of 18
ENGINEERING - PIPING
REGION: AMERICAS APPROVED BY (Process Owner): David Towell
NUMBER: FUNCTION:
WP-AM-OFF-EN-PI201
PIPING PROJECT REVISION BY: N/A A C T I V I T Y
Client
Other
Piping Discipline
Set up ISO drawings and verify extractions
Project Management
Project Controls
Other Disciplines
Process Engineering
interfaces & KBR Resp. to be shown on KBR P&ID with line nos.
Document Control
Materials Control
Procurement
Construction
Resolve all clashes Review / Approve Perform STAGE 2 Model Review Review Review Review Review
START STAGE 3
Perform 30 - 35% Engineering Assurance Audit
Resolve STAGE 2 Review Comments Finalize: - Framing & Supports - Inline Instr. - Cable Trays - Loss control - Process
Perform & Incorporate Final Stress Review Comments Route all L.B. FireWater Piping in Model
Extract ISO's for Engr'g Review of Lines/Suppts. For the Sys. not formerly analyzed
Complete L.B. Pipe Supports & Request all additional Trimmer Steel
Conduct Discipline Check of Model Content & Design Review Design basis information Status 212366422.xls.ms_office
Paper copies of this Process Map are UNCONTROLLED. Please refer to the KBR MS website for the current version
Page 7 of 18
ENGINEERING - PIPING
REGION: AMERICAS APPROVED BY (Process Owner): David Towell
NUMBER: FUNCTION:
WP-AM-OFF-EN-PI201
PIPING PROJECT REVISION BY: N/A A C T I V I T Y
Client
Other
Piping Discipline
Project Management
Project Controls
Other Disciplines
Process Engineering
Document Control
Materials Control
Procurement
Construction
Establish Plan to Place and Remove Holds Perform 65-70% Eng. Assurance Audit Insure Model Completeness
Perform Formal STAGE 3 Review Review Approve Resolve STAGE 3 Comments Complete ISO Extraction & Checks Begin Issue L.B. ISO to Fab.
Review
Review
Review
Review
START STAGE 4
Complete Level Bridels & Misc. Equip. Trim Complete Loss Control Piping Extract check & Issue Remaining Isometrics Perform Final E.A. Audit Submit De-staffing Plan & Personnel Receive Personnel Evaluation Extract & Issue Final Documents Plot Plan, GA's Orthos. Document Lessons Learned
212366422.xls.ms_office
Paper copies of this Process Map are UNCONTROLLED. Please refer to the KBR MS website for the current version
Page 8 of 18
ENGINEERING - PIPING
REGION: AMERICAS APPROVED BY (Process Owner): David Towell
NUMBER: FUNCTION:
WP-AM-OFF-EN-PI201
PIPING PROJECT REVISION BY: N/A A C T I V I T Y
Client
Other
Piping Discipline
Document Lessons Learned Participate in Project Close out Procedures
Project Management
Project Controls
Other Disciplines
Process Engineering
Document Control
Materials Control
Procurement
Construction
212366422.xls.ms_office
Paper copies of this Process Map are UNCONTROLLED. Please refer to the KBR MS website for the current version
Page 9 of 18
PM-GL-OFF-EN-217 PM-GL-OFF-EN-218
PM-GL-OFF-EN-229
PM-GL-OFF-EN-211
PM-GL-OFF-EN-228
PM-GL-OFF-EN-257
PM-GL-OFF-EN-201
212366422.xls.ms_office
Paper copies of this Process Map are UNCONTROLLED. Please refer to the KBR MS website for the current version
Page 10 of 18
PM-GL-OFF-EN-203
PM-GL-OFF-EN-222
PM-GL-OFF-EN-236
PM-GL-OFF-EN-204
212366422.xls.ms_office
Paper copies of this Process Map are UNCONTROLLED. Please refer to the KBR MS website for the current version
Page 11 of 18
PM-GL-OFF-EN-202
PM-GL-OFF-EN-222
212366422.xls.ms_office
Paper copies of this Process Map are UNCONTROLLED. Please refer to the KBR MS website for the current version
Page 12 of 18
PM-GL-OFF-EN-217 PM-GL-OFF-EN-218
PM-GL-OFF-EN-228
PM-GL-OFF-EN-218
PM-GL-OFF-EN-211
212366422.xls.ms_office
Paper copies of this Process Map are UNCONTROLLED. Please refer to the KBR MS website for the current version
Page 13 of 18
PM-GL-OFF-EN-229
PM-GL-OFF-EN-228
212366422.xls.ms_office
Paper copies of this Process Map are UNCONTROLLED. Please refer to the KBR MS website for the current version
Page 14 of 18
PM-GL-OFF-EN-260 PM-GL-OFF-EN-254
212366422.xls.ms_office
Paper copies of this Process Map are UNCONTROLLED. Please refer to the KBR MS website for the current version
Page 15 of 18
PM-GL-OFF-EN-257
212366422.xls.ms_office
Paper copies of this Process Map are UNCONTROLLED. Please refer to the KBR MS website for the current version
Page 16 of 18
PM-GL-OFF-EN-222 PM-GL-OFF-EN-208
212366422.xls.ms_office
Paper copies of this Process Map are UNCONTROLLED. Please refer to the KBR MS website for the current version
Page 17 of 18
212366422.xls.ms_office
Paper copies of this Process Map are UNCONTROLLED. Please refer to the KBR MS website for the current version
Page 18 of 18