Substation Automation and Protection Training

PCM 600 Introduction and Overview Connectivity Packages Navigator and Wizard

ABB Power Technologies AB, 2007 2007-09-06 1

Substation Automation and Protection Training

PCM 600

ABB Power Technologies AB, 2007 2007-09-06 2

Substation Automation and Protection Training

PCM600 FAQ DATABASE (KNOWLEDGE BASE)

ABB Power Technologies AB, 2007 2007-09-06 3 Substation Automation and Protection Training

.a t l u a f e d x / p k s s a e . d In p l g e o h L r / k la s o e /p d 5 p l 5 e . h 7 r 8 la 1 . o 7 /p 2 0 2 . 8 8 4 3 0 0 /1 / 0 : 0 p s htt e s / / p: t t h
2007-09-06 4 Substation Automation and Protection Training

x p s

ABB Power Technologies AB, 2007

PCM 600 FAQ DATABASE (KNOWLEDGE BASE)

ABB Power Technologies AB, 2007 2007-09-06 5

Substation Automation and Protection Training

PCM 600 FAQ DATABASE (KNOWLEDGE BASE)

ABB Power Technologies AB, 2007 2007-09-06 6

Substation Automation and Protection Training

PCM 600 FAQ DATABASE Update Notice e-mail

ABB Power Technologies AB, 2007 2007-09-06 7

Substation Automation and Protection Training

PCM 600 OVERVIEW


ABB Power Technologies AB, 2007

2007-09-06 8

Substation Automation and Protection Training

PCM 600 Tool Components

ABB Power Technologies AB, 2007 2007-09-06 9

Substation Automation and Protection Training

PCM 600 Engineering/Design

ABB Power Technologies AB, 2007 2007-09-06 10

Substation Automation and Protection Training

PCM 600 Application Configuration

ABB Power Technologies AB, 2007 2007-09-06 12

Substation Automation and Protection Training

PCM 600 Application Configuration


CAP CAP531 531IS ISTHE THEMASTER MASTERSUBTOOL SUBTOOLWITHIN WITHINPCM PCM600 600
START THE ENGINEERING FROM CAP 531 !

CAP CAP531 531MAKES MAKESUSE USEOF OFTHE THEFULL FULLFLEXIBILITY FLEXIBILITYIN INIED IED670 670
START CONFIGURATION FROM SCRATCH !

CAP CAP531 531MAKES MAKESUSE USEOF OFUSER USERFRIENDLY FRIENDLYIED IED670 670
ABB Power Technologies AB, 2007

START CONFIGURATION FROM A TEMPLATE!

2007-09-06 14

Substation Automation and Protection Training

PCM 600 CAP 531 & PCM 600/CAP 540

CAP CAP 531 531 SERVES SERVES PCM PCM 600 600 and and CAP CAP 540 540

ABB Power Technologies AB, 2007

FIRST FIRST INSTALL INSTALL CAP CAP 540 540 THEN THEN INSTALL INSTALL PCM PCM 600 600 !!

2007-09-06 15

Substation Automation and Protection Training

PCM 600 CAP 531 & PCM 600/CAP 540

ABB Power Technologies AB, 2007 2007-09-06 16

Substation Automation and Protection Training

PCM 600 Signal Matrix

CAP 531
ABB Power Technologies AB, 2007

APPLICATION CONFIGURATION (HW INDEPENDENT)

2007-09-06 18

Substation Automation and Protection Training

PCM 600 Parameter Setting

ABB Power Technologies AB, 2007 2007-09-06 19

Substation Automation and Protection Training

PCM 600 Graphical Display Editor

ABB Power Technologies AB, 2007 2007-09-06 21

Substation Automation and Protection Training

PCM 600 IED Users

ABB Power Technologies AB, 2007 2007-09-06 22

Substation Automation and Protection Training

PCM 600 IEC 61850 Engineering PCM 600 CCT

ABB Power Technologies AB, 2007

PCM 600/Navigator: Export SCL-file CCT: Import SCL-file CCT: Engineer horizontal and vertical communication CCT: Export SCL-file PCM 600/Navigator: Import SCL-file IEC 61850 information are now in PCM 600/SMT PCM 600/SMT: Write to IED IED: Sending and receiving information according to IEC 61850

2007-09-06 24

Substation Automation and Protection Training

PCM 600 Testing/Commissioning

ABB Power Technologies AB, 2007 2007-09-06 25

Substation Automation and Protection Training

PCM 600 Disturbance Handling

ABB Power Technologies AB, 2007 2007-09-06 26

Substation Automation and Protection Training

PCM 600 Event Viewer

ABB Power Technologies AB, 2007 2007-09-06 27

Substation Automation and Protection Training

PCM 600 Signal Monitoring

ABB Power Technologies AB, 2007 2007-09-06 28

Substation Automation and Protection Training

PCM 600 Components


Project Manager Application Configuration (CAP531) Signal Matrix (SMT) Parameter Setting (PST) Graphical Display Editor (GDE) IED Users (only from IED version 1.1) SCL file export/import Monitoring (MON) Event Viewer (EV) Disturbance Handling (DH) Task Scheduler (Scheduler)


ABB Power Technologies AB, 2007


2007-09-06 29 Substation Automation and Protection Training

HOW MANY PCM 600 ?

ABB Power Technologies AB, 2007 2007-09-06 30

Substation Automation and Protection Training

PCM 600 Engineering Engineering Pro

ABB Power Technologies AB, 2007 2007-09-06 31

Substation Automation and Protection Training

PCM 600 &


ABB Power Technologies AB, 2007

CONNECTIVITY PACKAGES
2007-09-06 32 Substation Automation and Protection Training

PCM 600 High Level Architecture


PCM 600 (installation) consists of the basic services and tool components IED and protocol knowledge is provided by IED and Communication Connectivity Packages
Setting Tool DR Tool DisplayEditor SignalMatrixTool SQL Server, MSDE

Tool Modules PCM Framework

ABB Power Technologies AB, 2007

IED Connect. Pack. 1

IED Connect. Pack. 1

LON Connectivity Package

SPA Connectivity Package

IEC61850 Communication Connectivity Package

Conn.Packages

LON bus
2007-09-06 33 Substation Automation and Protection Training

SPA bus

IEC61850 bus

PCM 600 Installation

PCM 600 Connectivity Package for an IED or IED family


ABB Power Technologies AB, 2007

Data signal description Parameters description Protocol addresses Documentation IED interface modules, e.g. for disturbance file handling IED description according to IEC 61850

2007-09-06 34

Substation Automation and Protection Training

PCM 600 Connectivity Package Manager

This program is used for integrating the Connectivity Packages with PCM 600 It is launched from a shortcut that is created in the desktop by installation of the PCM 600


ABB Power Technologies AB, 2007

2007-09-06 35

Substation Automation and Protection Training

PCM600 NAVIGATOR THE WIZARD


ABB Power Technologies AB, 2007

2007-09-06 36

Substation Automation and Protection Training

PCM 600 Open/Manage Project

ABB Power Technologies AB, 2007 2007-09-06 37

Substation Automation and Protection Training

PCM 600 Navigator Different methods for entering new objects in Project Structure

ABB Power Technologies AB, 2007 2007-09-06 38

Substation Automation and Protection Training

PCM 600 The Configuration Wizard After the object has been entered, the Wizard starts up to help you define the IED:

ABB Power Technologies AB, 2007 2007-09-06 39

Substation Automation and Protection Training

PCM 600 The Configuration Wizard Defining the IED.

DEPENDING ON THE CHOSEN PROTOCOL, YOU WILL HAVE TO DEFINE COMMUNICATION PARAMETERS

ABB Power Technologies AB, 2007 2007-09-06 40

Substation Automation and Protection Training

PCM 600 The Configuration Wizard Define the IED

ABB Power Technologies AB, 2007 2007-09-06 41

Substation Automation and Protection Training

PCM 600 The Configuration Wizard WHAT IS ASSOCIATED TO THIS ICON? - Which protection / control functions? - Which Hardware?

IT DEPENDS ON THE ANSWER YOU GAVE HERE:


ABB Power Technologies AB, 2007

2007-09-06 42

Substation Automation and Protection Training

PCM 600 The Configuration Wizard

ABB Power Technologies AB, 2007

SW: ALL FUNCTIONALITY YOU CAN HAVE IN THE CHOSEN IED. EVEN FUNCTIONS THAT HAVE NOT BEEN ORDERED. HW: NOTHING
2007-09-06 43 Substation Automation and Protection Training

SW: ONLY WHAT YOU HAVE ORDERED HW: ONLY WHAT YOU HAVE ORDERED

PCM 600 The Configuration Wizard

YOU NEED TO SYNCHRONIZE THE HW AND SW LIBRARY IN PC M600 WITH THE DEVICE (Upload Options and Function Selector from CAP531) OR: YOU NEED TO BE CAREFUL AND USE ONLY FUNCTIONS THAT YOU KNOW ARE ORDERED! NEEDS ON-LINE SYNCHRONISATION
2007-09-06 44 Substation Automation and Protection Training

AFTER THE ORDER SPECIFIC FILE HAS BEEN LOADED, PCM 600 LIBRARY MATCHES IED LIBRARY! YOU HAVE DONE AN OFF-LINE SYNCHRONISATION NO NEED FOR ON-LINE SYNCHRONISATION