PROPOSED ALTERATIONS AND ADDITIONS (RELOCATION OF EXISTING ORA) TO EXISTING 1ST STOREY AT RIVERSIDE POINT

PHASE 1 - RELOCATION OF ORA


TENDER DRAWINGS
10 Dec 2013

PROPOSED ALTERATIONS AND ADDITIONS (RELOCATION OF EXISTING ORA) TO EXISTING 1ST STOREY AT RIVERSIDE POINT

TENDER - SCOPE OF WORKS


1.To install composite timber decking (as specified BASE & OPTION TENDER) and 4 nos of square bar stainless steel railings (in non-directional hairline finish), as per architects specs and drawings, for proposed ORA areas; 2. To submit method statement if any hacking works required and to include hacking works at existing steps for timber decking installation, if required, to achieve the leveling as stated in the tender drawings at proposed ORA areas. 3. To include erection of hoarding to segregate the construction site with promenade and existing ORA area abutting to the building, during construction. 4. To include PEs endorsement for the installation for composite timber decking. 5. To make good of all the interfacing installation works (existing steps to proposed composite timber decking); to include touch-up works to existing planters (2nos of planters each block East & West) and to repair all associated works affected. 6. Actual measurements to be verified on site; Shopdrawings (incl. proposed installation details, i.e. steel support to higher platform, etc) to be approved by architect before any commencement of works; 7. Contractor to take note on the authorities requirement stated in the tender drawings, i.e. clearance of 6M width for hardstanding from the edge of proposed composite timber decking to the edge of existing bollards, as indicated on drawings; 8. To submit specification and samples of composite timber for Architects selection/ approval prior to any procurement of material; 9. To include mock-up for composite timber deck installation: a. Depth of any of the proposed ORA (i.e. one-piece timber plank length) x 1.5m; b. Termination edge of proposed composite timber decking/ detail treatment to exposed edges/ termination to existing planters.

PHASE 1 PROPOSED ORA AREA (Relocation of ORA) Installation of composite timber decking; Installation of s/s square bar railing at sides; Make good of steps/ existing planter, if applicable

OPTION TENDER WEST WING


Proposed ORA (WEST) Proposed timber deck to Architects specification [2.4m width (upper) + 2.5/3.7m width (lower)]

BASE TENDER EAST WING


Proposed ORA (EAST) Proposed timber deck to Architects specification [3.2m width (upper) + 2.2/4.2m width (lower)]

PHASE 1 - RELOCATION OF ORA BASE TENDER EAST WING

SINGAPORE RIVER PROPOSED ORA (BASE-EAST WING) - ORA lower deck 2.2/4.2m width at 160mm height (1st step) -ORA upper deck 3.2m width same level with covered walkway 1600 (L)x900 (H)x50mm square barS/S staircase railing in nondirectional hairline finish, to Architects specs/ approval

Proposed composite timber deck (Culture twinfinish deck plank or approved equivalent); Colour to architects selection/ approval; Proposed timber plank in one-piece, with required spacing of Balau timber/ steel support below. 1600 (L)x900 (H)x50mm square barS/S staircase railing in non-directional hairline finish, to Architects specs/ approval Deck drop difference of 640mm (4 steps)

1.3m width Passageway (existing steps to make good) 1.3m width Passageway (existing steps to make good) Existing Planters (2 nos) to make good, if applicable
NOTE: ACTUAL MEASUREMENTS TO BE VERIFIED ON SITE; SHOPDRAWINGS TO BE APPROVED BY ARCHITECT BEFORE ANY COMMENCEMENT OF WORKS.

Proposed composite timber deck (Culture twinfinish deck plank or approved equivalent); Colour to architects selection/ approval; Proposed timber plank in one-piece, with required spacing of Balau timber / steel support below.
Deck drop difference of 640mm (4 steps)

PHASE 1 - RELOCATION OF ORA OPTION TENDER WEST WING

Proposed composite timber deck (Culture twinfinish deck plank or approved equivalent); Colour to architects selection/ approval; Proposed timber plank in one-piece, with required spacing of Balau timber/ steel support below.

PROPOSED ORA (OPTION-EAST WING) - ORA lower deck 2.5/3.7m width at 170mm height (1st step) -ORA upper deck 2.4m width same level with covered walkway

Deck drop difference of 640mm (4 steps)

1600 (L)x900 (H)x50mm square barS/S staircase railing in nondirectional hairline finish, to Architects specs/ approval 1.3m width Passageway (existing steps to make good)

1600 (L)x900 (H)x50mm square barS/S staircase railing in nondirectional hairline finish, to Architects specs/ approval

Existing Planters (2 nos) to make good, if applicable 1.3m width Passageway (existing steps to make good)

NOTE: ACTUAL MEASUREMENTS TO BE VERIFIED ON SITE; SHOPDRAWINGS TO BE APPROVED BY ARCHITECT BEFORE ANY COMMENCEMENT OF WORKS.

PHASE 1 Proposed ORA Area Installation of composite timber decking; Make good of steps/ existing planter, if applicable

Proposed composite timber deck (Culture twinfinish deck plank or approved equivalent); Colour to architects selection/ approval; Proposed timber plank in one-piece, with required spacing of Balau timber / steel support below.
Deck drop difference of 680mm (4 steps)

PHASE 1 PROPOSED ORA AREA (Relocation of ORA) Installation of composite timber decking; Installation of s/s square bar railing at sides; Make good of steps/ existing planter, if applicable EXISTING PLANTER TO BE RETAINED/ MADE GOOD, IF APPLICABLE

680

170

PROPOSED COMPOSITE TIMBER DECK (CULTURE TWINFINISH DECK PLANK OR APPROVED EQUIVALENT, COLOUR TO ARCHITECTS SELECTION/ APPROVAL); FIXING TO DETAIL AT 1ST STEP HEIGHT & SAME LEVEL AS COVERED WALKWAY LEVEL

DETAILS & SPECIFICATION

PROPOSED COMPOSITE TIMBER DECKING


Specification - CULTURE TwinFinish Deck Plank

(or approved equivalent)

Source from Kianson Pte. Ltd

Made from Recycled Hard Wood Fiber Dust (40-60%), Virgin Polymer High Density Polyethylene (25-60%) & Zinc Stearate (1-10%). **Green Mark Eligible** Designed and engineered in Ohio, The United States of America. 25-year limited warranty for Residential & 10-year limited warranty for Commercial. Guaranteed against termites, checking, splitting, decay, rotting and splintering, warping. Fade less: Ultra-Violet protection additives reduce harmful fading effects of the sun. Provide consistent beautiful coloured surface with no colour patches within each board,from board to board and lot to lot. Remain Comfortable: uses highly reflective, inorganic colour pigments to minimize the absorption of suns energy and heat build-up. Available in Redwood, Cedar and Grey, Chestnut Installs like traditional wood planks Water absorption rate between 1.0 % to 2.0% Slip Resistant Uses Board Walk, Timber Deck, Marina Deck, Benches.

INSTALLATION OF PROPOSED COMPOSITE TIMBER DECK Installation like traditional wood planks

PHASE 1 PROPOSED ORA AREA (Relocation of ORA) Installation of composite timber decking; Installation of s/s square bar railing at sides; Make good of steps/ existing planter, if applicable

138 (W) x 25 thk mm proposed composite timber

Proposed Composite Timber CULTURE TwinFinish Deck Plank

SCHEMATIC SECTION PROPOSED COMPOSITE TIMBER DECK INSTALLATION NTS

140 (W) x 25 thk mm proposed composite timber

Source from Kianson Pte. Ltd

PLAN TO SHOW SPACING OF BALAU SUPPORT (BELOW) - NOT TO DECK NAILS AT DECK SURFACE

Proposed composite timber deck (culture twinfinish deck plank or approved equivalent); Colour to architects selection/ approval; Proposed timber plank in one-piece, with required spacing of Balau timber (lower)/ steel support (upper) below.

NOTE: TO INCLUDE PES ENDORSEMENT FOR THE INSTALLATION FOR COMPOSITE TIMBER DECKING

RAILING DETAILS/ INSTALLATION (2 nos each at East & West Wing)

100

50x50mm square bar s/s handrail in non-directional hairline finish; Supported by 50x50mm square bar balustrade in s/s in nondirectional hairline finish; Mounted onto existing steps in stone finishes.

Level of upper platform (in front)

50 900

50
Level of lower platform

Existing concrete steps in stone finish

900

150

Photo reference sample

PART SECTION OF PROPOSED ORA AT EAST WING


SECTION B-B NTS

EXISTING SITE PHOTOS


PHASE 1 PROPOSED ORA AREA (Relocation of ORA) Installation of composite timber decking; Installation of s/s square bar railing at sides; Make good of steps/ existing planter, if applicable

(EAST WING)

(WEST WING)