Date Time Meeting Present 20th January 2014 2pm 4pm The meeting was organised by the project manager (Utsav Dhakal) Client: Harith Mbos Senior Manager: Dean Walker Peer reviewer x2- Daniel Coutinho, Abraham Smith End User x2- Tomas Taujanskas, Abimbola Osidele Subject Handover and Final Review
Matters arising
Handover Presentation
Final Review
This section is the main purpose of the meeting focusing on the subject of the meeting the final review of the Multimedia Product, the subject of the meeting was based on the review of both the project throughout the entire time from the initial brainstorm to the final testing of the final product covering all areas of development and also all methods of communication outside of meetings, the second area that is being reviewed and the main purpose of this meeting is the final multimedia product. The review is to see how well the Stakeholders preformed their roles in the project most importantly focusing on how well the product was carried out by the Project Manager (Myself), additional to this the review will highlight the resources used and whether or not they were the correct resources to used and whether or not they were used to their maximum potential. I started the final review by presenting the final version of the product. This way they all would be able to navigate around the multimedia product one last time so that they will have clear evidence of what to review. I then gave a final explanation of the product for each of the members around the product showing every detail of every page and also showing them the final deliverable of the project. I talked on brief on basic technical user guide of how to install. During the process of talking I showed everyone how I was able to uses action script to create more interactive features in the multimedia product. After this section of the meeting took place the I then proceeded to the topic of reviewing the entire project the main purpose of the meeting, to being this the Client (Harith Mbos) firstly handed out to all the stakeholders a copy of the evaluation of our performance, explaining to all the members of the meeting that this was an overall evaluation of the product as well as my performance throughout the project. The Senior Manager was the last to give his comments of the overall review of the project. After all members of the meeting had given their views of the Project Manager and the project as a
I thank all the stake holder on the success of the project. All their hard work was not missed out each and every feedback was taken into consideration and I kindly respect on their contribution and input towards the project to make it a huge success.