1.0 P!RPOSE

RO!ND DRAINA E & SANITAR" APPLIAN#ES.

To establish & maintain a procedure for carrying out tasks in relation to above ground drainage & installation of sanitary appliances. 2.0 S#OPE This procedure shall be applicable to basic workmanship criteria for above ground drainage & sanitary appliances undertaken by the Company. 3.0 3.1 3.2 3.3 RE$EREN#ES !"#0$0 !"#100 '( )000 * "art+13 %ocument & %ata Control. &nspection & Testing. Code of "ractice for !bove ,round %rainage & (anitary !ppliances.

-.0 -.1 -.2 -.3

DE$INITIONS Company uality 1ngineer %iscipline 1ngineer ./0 2ominated uality 1ngineer at (ite.

Company designated "lumbing 1ngineer as decided by the 3anagement and assigned with the responsibility of managing electrical part of the "ro4ect. !crylonitrile 'utadiene (tyrene. 3odified 5nplasticised "olyvinyl Chloride. "olyethene. "olypropylene. "olyvinyl Chloride. 5nplasticised "olyvinyl Chloride. :igh density "olyethene.
%!T1* =anuary 27> 2001

-.-.$ -.7 -.8 -.) -.9 -.10

!'( 35"6C "1 "" "6C 5"6C :%"1

3 & 1 3(T+ 073; <16 0

Xyz COMPANY METHOD STATEMENT M & E NO.: M & E MST- 063/ REV 0 TITLE: ABOVE

Page % of 5

RO!ND DRAINA E & SANITAR" APPLIAN#ES.

$.0 $.1 $.1.1

PRO#ED!RE Responsibility The responsibility for carrying out this 3ethod (tatement shall be that of the %iscipline 1ngineer; ?oremen> unless otherwise specifically mentioned in this procedure. The uality 1ngineer; %iscipline 1ngineer; ?oremen shall be responsible for inspection & testing. Installation 6erify position of walls> floors> openings & levels against installation layout. 1nsure the following*

$.2 $.2.1 $.2.2

drainage and

6ertical stacks are in plumb. 'ranches are laid to uniform & specified gradient. Connection point at below ground drainage has been installed. !de@uate clearance has been provided for pipes which need painting.

$.2.3 $.2.$.2.$ $.2.7 $.2.8

1nsure ends of pipe are cut s@uare> burr removed & bores are clean before 4ointing. "lastic or ,& pipes shall not be bent. Copper pipes shall be bent on a bending machine and ensure rippling> throating & reduction of bore is avoided. ?ittings shall not be fabricated on site unless specified. ?iAing of "ipes 1nsure clamps & fiAing devices are as approved by the Customer and maAimum spacing between them are as follows*

SPA#IN MATERIAL DIA&''( VERTI#AL STA#)S "6C &


3 & 1 3(T+ 073; <16 0

LO*

RADIENT PIPES 0.$ m


%!T1* =anuary 27> 2001

32+-0

1.2 m

Xyz COMPANY METHOD STATEMENT M & E NO.: M & E MST- 063/ REV 0 TITLE: ABOVE

Page 3 of 5

RO!ND DRAINA E & SANITAR" APPLIAN#ES.

"B!(T&C

$0 8$+100 1$0 2) 32+-0 $0 7$+100 2$ 32 -0+$0 7$+8$ 100 !ll (iDes

1.2 m 1.) m 1.) m 2.- m 3.0 m 3.0 m 3.8 m 3.0 m 3.0 m 3.8 m -.7 m -.7 m 3.0 m

0.7 m 0.9 m 1.2 m 2.0 m 2.$ m 2.8 m 3.0 m 2.- m 2.8 m 3.0 m 3.8 m -.0 m 3.0 m

CC""1<

,&

C!(T &<C2 $.2.)

<ain water gutters shall be laid at a fall of 1 * 3$0 or as agreed contractually with 2$ mm A $ mm brass screws at 1 m spacing or as agreed with the uality 1ngineer; as per Contract (pecifications. 1nsure eApansion 4oints are provided as per the drawing. (leeving & packing shall be provided around all pipes passing through walls> floors or roofs> as specified. 1nsure access points at following locations are provided as specified*

$.2.9 $.2.10 $.2.11

!t !t !t !t !t

connections to below ground drains. changes in the direction of stacks. changes in direction of horiDontal run. ends of branches receiving multiple appliances. other points re@uired for testing ; rodding.

$.3 $.3.1

Jointing 5se of (olvent Cements for "lastic "ipes


5se specified 4ointing material. (olvent cement shall be kept away from naked flame. ?oreman shall verify that the room is well ventilated. 3anufacturerEs instructions for compatible materials shall be adhered to. Check solvent cement container for eApiry date.
%!T1* =anuary 27> 2001

3 & 1 3(T+ 073; <16 0

Xyz COMPANY METHOD STATEMENT M & E NO.: M & E MST- 063/ REV 0 TITLE: ABOVE

Page + of 5

RO!ND DRAINA E & SANITAR" APPLIAN#ES.

$.3.2

<ing (eals 6erify seal & lubricant are appropriate and the same shall be as recommended by the manufacturer ; supplier of pipe system.

$.3.3

!ssembling "ipes 1nsure the following*


=oint surfaces are cleaned immediately before assembly. 3aterial is as specified. "ipes are pushed fully home before tightening or 4ointing. ?or ring or push tight seal> pipe is withdrawn 10 mm after pushing home. Capillary soldering of copper pipes is done by eAperienced plumber. ?or plastic pipes> following methods shall be used. e.g. "6C> 35"6C> !'( + (olvent cement & ring seals. "1> "" + Compression fittings> fusion welding & ring seals.

$.$.-.1

Sanitary Appliances 1nsure discharge pipes & water supply pipes are fiAed before installing sanitary fitting. 5nions detachable pipes or braided hoses shall be provided between appliances> traps & pipes. ?iAing !ppliances

$.-.2

!ppliances are securely fiAed. 3anufacturerEs fiAing instructions are followed. ?or wet condition copper alloy or stainless fiAings are used. !ppliance is not embedded in wall or plastered unless specified. (upply & discharge pipe work is not used to support or fiA appliance. (eating is even & level> on hard floor> proper bedding is used F3ortar 1 cement * 7 sand 20 mm thick maAimumG and sealed with mastic sealant.

$.-.3

(ealant 1nsure sealant are of appropriate make> type & colour. 'ackground finishing are complete> a neat smooth surface are obtained to get a water tight 4oint.

$.$ $.$.1 $.$.2

Protection Hhen using blow torches or similar apparatus> ensure ade@uate safety precautions are taken. Hhen painting is re@uired> ensure it is compatible with background & ensure the following*
%!T1* =anuary 27> 2001

3 & 1 3(T+ 073; <16 0

Xyz COMPANY METHOD STATEMENT M & E NO.: M & E MST- 063/ REV 0 TITLE: ABOVE

Page 5 of 5

RO!ND DRAINA E & SANITAR" APPLIAN#ES.

!ll ferrous piping & fittings are painted. !ll eAposed 5"6C pipes are painted> if they stand sunlight as re@uired by the Contract.

$.$.3

!ll completed pipe work & eAisting services shall be protected from damage during all stages of construction and maintenance. 1Aposed ends> branches & access points shall be covered with ade@uate fittings. ,utters & in process drains and pipe work shall not be used to support scaffold or ladders. "rotective covering on sanitary items shall be retained up to hand over> replace appliances found chipped or defective during final inspection. 1nsure nobody stands on appliances and nobody prematurely uses the appliances. <ooms shall be kept locked after fiAing appliances. DO#!MENTATION / RE#ORDS !bove ,round %rainage & (anitary !ppliances installation check sheet. !bove ,round %rainage :ydro Test; Beak Test <eports 3&1 3&1 3&1 C#?orm+ 073a+01; <16. 0. C#?orm+ 073b+01; <16. 0. C#?orm+ 073+02; <16. 0.

$.$.$.$.$ $.$.7

7.0 7.1 7.2 7.3

3 & 1 3(T+ 073; <16 0