You are on page 1of 6

CAREER TECHNICAL EDUCATION FACILITIES PROGRAM COST ESTIMATE GUIDELINE

SCHOOL DISTRICT SCHOOL NAME ARCHITECT FIRM PREPARED BY APPLICATION NUMBER:


Category Plan Location Item Quantity Unit Unit Cost Architect's Estimate

5-DIGIT DISTRICT CODE: COUNTY: DATE OF ESTIMATE: SIGNATURE: Estimate Reference


Saylor Publications, Inc. Current Construction Costs

Comments

Construction Specification Institute


Division 1 General Requirements
a General Conditions General Conditions Mobilization, On & Off Non-Distributable Labor Permits, Licenses &Structures Fees Temporary Utilities, & Fences Equipment Rental Other General Conditions District may itemize General Conditions or Apply a percentage to the estimated subtotal of construction costs. $0 $0 $0 $0 $0 $0 $0 $0 $0 Sub Total $0

Division 2 Site Work


a Site work Site Demolition: General Building Demolition: Excavation, Fill & Grading: Piling Caissons & Drilling Shoring & Bulkheading Site Utilities Storm Drainage & Sanitary Sewer Water, Steam & Gas Distribution Valves & Specialties Mechanical Utilities, Accessories Miscellaneous Site Equipment Electrical Distribution, Underground General Site Work, Paving & Walks Miscellaneous Site Improvements Irrigation, Sprinkler Head Systems Landscaping Sub Total $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0

Page 1

CAREER TECHNICAL EDUCATION FACILITIES PROGRAM COST ESTIMATE GUIDELINE

APPLICATION NUMBER:
Category Plan Location Item Quantity Unit Unit Cost Architect's Estimate

Estimate Reference
Saylor Publications, Inc. Current Construction Costs

Comments

Division 3 Concrete
a Precast Concrete Specialty Concrete Excavation & Backfill Concrete Forms Foundation forms Footing Forms Forms, Slab on Grade Reinforcing steel Concrete placement Slab Finishes Vertical surface Finishes Insulating Decks Fiber Deck Sub Total $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0

Division 4 Masonry
a Brick Masonry Concrete Unit Masonry Sub Total $0 $0 $0 $0

Division 5 Metals
a Structural Steel Decking & Siding Misc Iron Sub Total $0 $0 $0 $0 $0

Division 6 Carpentry
a Rough Carpentry Vertical Framing, Walls Horizontal Framing Misc. Framing & Materials Sheathing Carpentry Specialties Finish Carpentry Beams, trusses Stairs, Wood Rough Hardware Sub Total $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0

Page 2

CAREER TECHNICAL EDUCATION FACILITIES PROGRAM COST ESTIMATE GUIDELINE

APPLICATION NUMBER:
Category Plan Location Item Quantity Unit Unit Cost Architect's Estimate

Estimate Reference
Saylor Publications, Inc. Current Construction Costs

Comments

Division 7 Thermal & Moisture Protection


a Waterproofing Thermal & Sound Insulation Roofing Composite Building Panels Sheet metal & Fabricated Skylights Architectural Sheet Metal Caulking & Sealants Sub Total $0 $0 $0 $0 $0 $0 $0 $0 $0

Division 8 Doors, Windows & Glass


a Hollow Metal Doors & Frames Wood Doors & Frames Wood Garage Doors Wood Door Specialties Special Doors Vinyl, Windows & Doors Aluminum, Windows & Doors Wood Windows & Doors Finish & Hardware Glass & Glassing Curtain Walls Sub Total $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0

Division 9 Finishes
a Studs Furring Lathing Plaster & Lath Gypsum Wall board, Studding & Furring Gypsum Wall board, Secularities Ceramic Tile Terrazzo Acoustic Treatment Wood Flooring Resilient Flooring Painting & Wall covering Plastic & Factory Finish Wall Surfaces Sub Total $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0

Page 3

CAREER TECHNICAL EDUCATION FACILITIES PROGRAM COST ESTIMATE GUIDELINE

APPLICATION NUMBER:
Category Plan Location Item Quantity Unit Unit Cost Architect's Estimate

Estimate Reference
Saylor Publications, Inc. Current Construction Costs

Comments

Division 10 Specialties
a Chalk & Tack Boards Toilet Partitions & Compartments Partitions Toilet Accessories Misc. Building Specialties Sub Total $0 $0 $0 $0 $0 $0

Division 11 CTE Program Equipment to be supplied on separate sheet.


a Sub Total $0

Division 12 Furnishings
Blinds & Shades Cabinets & Plastic Laminated Plastic Tops Laminated & Simulated Marble Tops Carpets Draperies & Curtains Other Sub Total $0 $0 $0 $0 $0

Indicate F&E included in a construction contract (i.e., built-in equipment)

$0 Must Provide a Description of "Other" $0

Division 13 Special Construction


Special Construction Prefabricated Structures Sub Total $0 $0 $0 $0

Division 14 Conveying Systems


Conveying Systems Sub Total $0 $0 $0

Division 15 Mechancial
Equipment Fixtures Piping Valves & Specialties Insulation, Piping Miscellaneous Plumbing Specialties Medical & Laboratory Equipment & Pipe Fees, Permits & Sterilization Industrial Piping Insulation HVAC Equipment, Furnaces Equipment, Hot Water & Steam Boilers $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0

Page 4

CAREER TECHNICAL EDUCATION FACILITIES PROGRAM COST ESTIMATE GUIDELINE

APPLICATION NUMBER:
Category Plan Location Item Equipment, Heating Cooling & Cooling Equipment, Combinations Auxiliary heating & Cooling Equipment Air Handling Equipment, Primary Distribution, Terminal Equipment Miscellaneous Equipment Controls Duct Work, Grills & Registers Piping & Insulation Fittings Valves & Specialties Insulation, Piping Fire Protection Systems Quantity Unit Unit Cost Architect's Estimate $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 Sub Total $0

Estimate Reference
Saylor Publications, Inc. Current Construction Costs

Comments

Division 16 Electrical
Total Electrical , Buildings Electrical Cost, Work In-Place, Prelim Estimates Main Switchboards, 600v, Service & Distribution Distribution Panels to 600v Transformers Raceway & Wire, Combined Under floor Distribution Systems LightingCircuit Fixtures, In-Place Branch Runs, Sp Purpose Conduit & Wire Signal & Communications Systems Branch Circuit Outlets & Devices Fees, Permits, Testing Equipment, Unit Substations Equipment, Switchgear & Transformers Equipment, High Voltage Transformers Service Sections Combination Service & Distribution, Switchboards Motor Control 600v Centers Panelboards, Max, Bolt-On Breakers Transformers, Dry, Low Voltage Panelboards For Bolt-On Breakers, 1240/240v, 1ph, 3wLug & Circuit Load Circuits, Main Breaker Types, 240v Max Plug-In Circuit Breakers, Type So Special Gear PVC, RSC, IMC& &AL ALCondit Raceway PVC,RSC,IMC, Term, Elbows & Fittings ENT Raceway, Terminations & Elbows $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0

Page 5

CAREER TECHNICAL EDUCATION FACILITIES PROGRAM COST ESTIMATE GUIDELINE

APPLICATION NUMBER:
Category Plan Location Item ENT MI Cable & Terminations Special Raceway Assembly Systems Conductor Only Busways Lighting Fixtures Electric & Signal Devices Communication, Intercom, Public Address Special Hospital Systems Soft Wire Systems, 3 Wire Energy & Building Management Systems Quantity Unit Unit Cost Architect's Estimate $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 Sub Total $0

Estimate Reference
Saylor Publications, Inc. Current Construction Costs

Comments

Estimate Sub-total General Conditions (includes Soft Costs) General Requirements, Overhead & Profit, Bonds Design Fees Inspection Escalation DSA fees Contingency Estimate Sub-Total Equipment Total (Division 11) 9% 9% 8% 1% 4% 0.7% 10.0%

$0 $0 $0 $0 $0 $0 $0 $0 $0 $0
The percentage is allowed in lieu of all Division 1 line items from above. If Division 1 is completed, then this section will automatically populate with "N/A".

Cost Estimate Total $0 * All percentages are compounded and apply to all Divisions, excluding Division 11- Equipment. * Percentages are based on the industry standards in the Saylor Publications Guide and represent the maximum amount typically allowed.

Page 6