Project:- Proposed Residential Colony "Impact Regency" at G.T. Road Bey-Pass Vill.

Vallah Amritsar NOTICE INVITING TENDERS Sealed item rate tenders are invited on behalf of The Tender shall be in the Proposed Residential Colony "Impact Regency" at G.T. Road Bey-Pass Village Vallah Amritsar prescribed form. The tendered work shall be completed the schedule given in the Special Conditions of the Contract. Tender documents consisting of Specifications, Schedule of Quantities of various items of works to be executed, Conditions of Contract & Terms of greement can be obtained from the rchitects !ffice M/s SJS Consultants !"#$e% &odel T'()$ mritsar "#un$ab% The Site can be examined during working hours on an' da'. The tender document will be on sale between 1( ) to * #) from +++++++++++++++++++++++++++++++++ -t shall be the responsibilit' if intending tenders to ensure the collection of tender documents within the stipulated time and for submitting their tenders within the prescribed date and time. .o complaints whatsoever shall be entertained in this regard. Tenders dul' completed, super scribed and sealed will be received up to 0.(( #) on ++++++++++++++++++++++++++ in the regd. offices of the Consultant. The tender Opening Date & Time ill !e "on#e$ed !$ the representati#e o% Client/&r"hite"t/Consultant' Tender shall submit the tender which satisfies each and ever' condition laid down in this notice, failing which, the Tender will be liable to be re$ected. The Client does not bind himself to accept the lowest, or an' Tender, or to give an' reasons for his decision. The Client reserves to himself the right of accepting the whole or an' part of the Tender and Tender shall be bound to perform the same at his 3uoted rates. This notice of tender shall form a part of the contract. ll communications shall be in 5nglish or 6indi. The validit' of the Tender for acceptance b' the Client shall be up to 1/ da's from the date of opening of the Tenders. 7or Client 8 rchitects

. . 1.
.

&. ,.

/.

1. *. 2. 4. 1(. 11.

Signature

Architects:- SJS Consultants

"

Consultants: PDS Consultants

Project:- Proposed Residential Colony "Impact Regency" at G.T. Road Bey-Pass Vill.Vallah Amritsar Te"hni"al Condition o% Contra"t %or (lum!ing )or*s +' SCO(E O, )OR-

7ollowing is the detail of scope of work included in this Tender. a% -nstallation of #umps in the 9.:.Tank complete as re3uired starting from suction line from underground tank to distribution ;ing )ain <all =alves, ..;.=, 5lect+ #anel & >iring for )otor .ecessar' 7oundation work for #umps, Supports for #iping <ends, Tee?s @ead ends, Tail pcs. =alves, =essel etc. as re3uired. Aa'ing of Sewerage , @rainage, @omestic >ater Suppl' & :arden 6'drant Aines should be as approved make & 3ualit'. Supports for vertical86oriBontal risers8vertical pipes. #ainting etc. as re3uired. #ump & e3uipments, accessories and fitting as re3uired. -nstallation, testing and commissioning of the entire installations to the satisfaction of emplo'er, Consultant and rchitects )anual operated 5lectrical @riven S'stem. )aintaining the installation minimum for a period of 1 )onth from the date of commissioning and imparting training to the workers8staff as asked for maintaining the installations as per -S re3uirement and exercising. 5arth pits & earth strip for earthing the bod' of the motors is being provided b' the 5lectrical Contractor. SC/EME0

b% c% d% e% f% g%

h% .'

The Complete <uilding is being provided with following arrangements. a% b% c% d% e% 9nderground tank of capacit' of ade3uate capacit' with ll the arrangements . )anual operated as well as automatic operated pump ;aw >ater Aifting S'stem. Tube well ;ain >ater

Architects:- SJS Consultants

Consultants: PDS Consultants

Project:- Proposed Residential Colony "Impact Regency" at G.T. Road Bey-Pass Vill.Vallah Amritsar 1' INST&22&TION SC/EM&TIC The installation shall confirm to the schematic line diagram attached in the shape of drawings for pump house. =ertical riser8@ Comer and #ipe la'out drawing for building attached along with Tender #apers. Since the genc' executing the $ob is responsible for obtaining the .!C from the Aocal uthorities, deviation, if an', with respect to the scheme and drawing attached ma' be brought out clearl' in the Tender #aper while 3uoting for the $ob. 3' S(ECI,IC&TIONS

,.1.1 >ork under #lumbing Services installation shall be carried out strictl' in accordance with specifications attached with the tender. ,.1.0 -tems not covered under these specifications due to an' ambiguit' or misprints, or additional works, the work shall be carried out as per specifications or the latest ..<.C. manual up to date amendments as applicable in the work. 4' E5EC6TION O, )OR-

/.1.1 The Contractor should visit and examine the site of work and satisf' himself as to the nature of the existing roads and other means of communication and other details pertaining to the work and local conditions and facilities for obtaining his own information on all matters affecting the execution of work. .o extra charge made in conse3uence of an' misunderstanding, incorrect information on an' of these points or on ground of insufficient description will be allowed. /.1.0 The work shall be carried out in conformit' with the plumbing drawings and within the re3uirements of rchitectural, 5lectrical and other specialiBed Services drawings. /.1.& The Contractor shall cooperate with all trades and agencies working on the site. 6e shall make provision for hanger8support, sleeves, structural openings and other re3uirements well in advance to prevent hold up of progress of the construction schedule. /.1., !n award of the work, Contractor shall submit a schedule of construction in the form of a #5;T chart or < ; chart for approval of the 5mplo'er8 rchitect8 Consultant. ll dates and time schedule agreed upon should be strictl' adhered to, within the stipulated time of completion8commissioning along with the specified phasing, if an'. 7' Dra ings

1.1.1 @rawings are diagrammatic but shall be followed as closel' as actual construction permits. n' deviations made shall be in conformit' with the rchitectural and other services drawings and sub$ect to the consent of consultant8emplo'er
Architects:- SJS Consultants * Consultants: PDS Consultants

Project:- Proposed Residential Colony "Impact Regency" at G.T. Road Bey-Pass Vill.Vallah Amritsar 1.1.0 rchitectural drawings shall take precedence over #lumbing drawing or other services drawings as to all dimensions. 1.1.& Contractor shall verif' all dimensions at site and bring to the notice of the Site 5ngineer8Consultant all discrepancies or deviations noticed. @ecision of the Site 5ngineer8Consultant85mplo'er shall be final. 1.1., Aarge siBe details and manufacturers dimensions for materials to be incorporated shall take precedence over small+scale drawings. 1.1./ n' drawings issued b' the rchitects8 Consultant for the work are the propert' of the rchitects8 Consultant and shall not be lent, reproduced or used on an' works other intended without the written permission of the rchitects8 Consultant. Inspe"tion and testing o% materials

8'

Contractor shall be re3uired to produce if re3uired manufacturers test certificate for the particular f materials supplied b' him. The tests carried out shall be as per the relevant -ndian Standards. 9' 2.1.1 2.1.0 Metri" "on#ersion ll dimensions and siBes of materials and e3uipment given in the tender document are commercial metric siBes. n' weights, or siBes given in the tender having changed due to metric conversion, the nearest e3uivalent siBes accepted b' -ndian Standards shall be acceptable without an' additional cost. Re%eren"e dra ing

:'

4.1.1 Contractor shall maintain one set of all drawings issued to him as reference drawings. These shall not be used on site. ll+important drawings shall be mounted on boards and placed in racks indexed. .o drawings shall be rolled. 4.1.0 ll corrections, deviations and change made on the site shall be shown on these reference drawings for final incorporation in the completion drawings. ll changes to be made shall be initialled b' the Consultant or rchitects. Shop dra ings

+;'

Shop drawings shall be submitted under following conditionsC + a% b% c% ++' Showing an' changes in la'out in the #lumbing drawings. 53uipment la'out, piping and wiring diagram. )anufacturer or Contractor?s fabrication drawings for an' materials or e3uipment supplied b' him.

Completion dra ings


! Consultants: PDS Consultants

Architects:- SJS Consultants

Project:- Proposed Residential Colony "Impact Regency" at G.T. Road Bey-Pass Vill.Vallah Amritsar 11.1 !n completion of work, contractor shall submit one complete set of original tracings and two prints of Das builtE drawings to the #ro$ect )anager. These drawings shall have the following information. a% ;un of all piping, diameters on all floors, vertical stacks and location of external services. b% ;un of all #lumbing lines with diameters, locations of control valves, access panels. c% Aocations of all mechanical e3uipment with la'out and piping connections. .o completion certificate shall be issued unless the above drawings are submitted. 7urther, sum of ;s. /,(((.(( shall be deducted in case the Contractor does not submit the same. 11.0 Contractor shall provide !ne sets of catalogues, service manuals if re3uired manufacturer?s drawings, performance data and list of spare parts together with the name and address of the manufacturer for all electrical and mechanical e3uipment provided b' him. ll Dwarrant' cardsE given b' the manufacturers shall be handed over to the 5mplo'er. Contra"tor <s rates

11.& +.'

11.1.1 ;ates 3uoted in this tender shall be inclusive of cost of materials, labour, supervision, erection, tools, plant, scaffolding, service connections, transport to site, octoroi and levies, breakage, wastage and all such expenses as ma' be necessar' and re3uired to completel' do all the items of work and put them in a working condition. 11.1.0 ;ates 3uoted are for all heights and depths and in all positions as ma' be re3uired for this work. 11.1.& ll rates 3uoted are inclusive or cutting holes and chases in walls and floors and making good the same with cement mortar8concrete8 water proofing of appropriate mix and strength as directed b' #ro$ect )anager. Contractor shall provide holes, sleeves, recesses in the concrete and masonr' work as the work proceeds. 11.1., The Contractor shall furnish the vouchers & test certificates to prove that the materials are as specified and to indicate that the rates at which the materials are purchased in order to workout the rate anal'sis of non tendered items which he ma' be called upon to carr'out. +1' Testing

1&.1.1 #iping and drainage works shall be tested as specified under the relevant clauses of the specifications.
Architects:- SJS Consultants + Consultants: PDS Consultants

Project:- Proposed Residential Colony "Impact Regency" at G.T. Road Bey-Pass Vill.Vallah Amritsar 1&.1.0 Tests shall be performed in presence of the Site 5ngineer8 Consultant. 1&.1.& ll materials and e3uipment found defective shall be replaced and whole work tested to meet the re3uirements of the specifications. 1&.1., Contractor shall perform all such tests as ma' be necessar' and re3uired b' the local authorities to meet municipal or other b'e+laws in force. 1&.1./ Contractor shall provide all labour, e3uipment and materials for the performance of the tests. +3' Site "learan"e and "leanup

1,.1.1 The contractor shall, from time to time, clear awa' all debris and excess materials accumulated at the site. 1,.1.0 fter the fixtures, e3uipment and appliances have been installed and commissioned, contractor shall clean+up the same and remove all plaster, paints, stains, stickers and other foreign matter or discoloration leaving the same in a read' to use condition. 1,.1.& !n completion of all works, contractor shall demolish all stores, remove all surplus materials and leave the site in a broom clean condition, failing which the same shall be done at Contractor?s risk and cost. +4' 1/.1 Re"o#er$ o% "ost %or materials issued to Contra"tors %ree o% "ost -f an' materials issued to the Contractor, free of cost, are damaged or pilfered, the cost of the same shall be recovered from the contractor on the basis or actual cost to owner which shall include all freight and transportation, excise dut', sales tax, !ctroi, import dut' etc, plus 1(F. The decision on the actual cost given b' the 5mplo'er shall be final and binding on the Contractor. Cutting o% ater proo%ing mem!rane

+7' 11.1

.o walls terraces shall be cut for making and opening after waterproofing has been done without approval of Site 5ngineer8 rchitects. Cutting of water proofing membrane shall be done ver' carefull' so as other portion of water proofing is not damaged. !n completion of work at such place the water proofing membrane shall be made good and ensured that the opening8 cutting is made full' water proof as per specifications and details of water proofing approved b' rchitects. Cutting o% stru"tural mem!ers .o structural member shall be chased or cut without the permission of the #ro$ect )anager. Materials supplied !$ emplo$er
, Consultants: PDS Consultants

+8' 1*.1 +9'

Architects:- SJS Consultants

Project:- Proposed Residential Colony "Impact Regency" at G.T. Road Bey-Pass Vill.Vallah Amritsar 12.1 The Contractor shall verif' that all materials supplied b' the 5mplo'er conform to the specifications of the relevant item in the tender. n' discrepanc' found shall be brought to the notice of the Site 5ngineer. +:' 14.1 Materials 9nless otherwise specified and expressl' approved in writing b' the 5mplo'er, onl' materials of makes and specification as mentioned in the list of approved makes attached with the specifications shall be used

TEC/NIC&2 S(ECI,IC&TIONS ,OR (26M=ING )OR-S 1. (ipes i% ll pipes within and outside the building in exposed location and shafts including connections buried under floor shall be ##;!=5@ ) G5 !7 pipes & 7ittings.

0. (ipe ,ittings a% #ipe fittings means tees, elbows, couplings, 9nions, reducers etc. and all such connecting devices that are need to complete the piping work in its totalit'.
Consultants: PDS Consultants

Architects:- SJS Consultants

Project:- Proposed Residential Colony "Impact Regency" at G.T. Road Bey-Pass Vill.Vallah Amritsar b% Screwed fittings shall be approved t'pe malleable with reinforced ring on all edges of the fitting suitable for screwed $oints.

&. (ipe Jointing0 &.1 7langed 7langed $oints shall be provided on C Straight runs not exceeding 0/+&( m on pipelines of 1/mm dia and above and as directed b' #ro$ect )anager. 7or $ointing all t'pes of valves, apparatus pump, connections with other t'pes of pipes, to water tanks and other places necessar' and re3uired as good for engineering practice. 7langed shall be as per Table 5 of -S specification with appropriate number of S.S. nuts and bolts, & mm neoprene gasket complete as per relevant specifications &.0 9nions #rovide approved t'pe of unions on pipelines /(mm dia and below in similar places as specified for flanges. E>"a#ation ,.1 5xcavation for pipe lines shall be in open trenches to levels and grades shown on the drawings or as re3uired at site. #ipelines shall be buried with a minimum cover of 1.( meter or as shown on drawings.

,.0 ,.& ,., 4 a%

>herever re3uired contractor shall support all trenches or ad$oining structures with ade3uate timber supports. !n completion of testing in the presence of the #ro$ect )anager and pipe protection, trenches shall be refilled with same excavated earth and consolidated. Contractor shall dispose off all surplus earth within a lead of /( m or as directed b' the #ro$ect )anager. &n"hor Thrust !lo"*s Contractor shall provide suitabl' designed anchor blocks in cement concrete to encounter excess thrust due to water hammer & high pressure.
. Consultants: PDS Consultants

Architects:- SJS Consultants

Project:- Proposed Residential Colony "Impact Regency" at G.T. Road Bey-Pass Vill.Vallah Amritsar b% Thrust blocks shall be provided at all bends, tees and such other location as determined b' the #ro$ect )anager. c% 5xact location, design, siBe and mix of the concrete blocks shall be as shown on the drawings or as directed b' the #ro$ect )anager prior to execution of work. 1. Gun Metal #al#es =alves of /( mm dia and below shall be heav' dut' gunmetal <all valves conforming to -S **2 class -- with female screwed ends. *. Cast Iron !utter%l$ Val#es' ll valves 1/ mm dia and above shall be C- butter fl' valves of class #. 1.( conforming to -S /&10 with C- bod', but rubber seat and teflon seal. 2. Non?return Val#e .on+return valves shall be C- double flanged with C- bod' and :un metal internal parts conforming to -S /&10. : (ipe prote"tion a% ll pipes above ground and in exposed location shall be painted with one coat of red oxide primer and two or more coats of s'nthetic enamel paint of pproved colour. >here specified, pipes buried in floors or below ground shall be protected against corrosion b' the application of #H# C! T as specified in schedule of 3uantities.

b%

1,.

(ipe support ll pipe clamps and supports shall be mild steel. >hen fabricated from chill' make :.-. Clamps, :.-. Threaded ;ods & @ash 7asteners. #ipes shall be hung b' means of expandable anchor fasteners of approved make and design. The hangers and clamps shall be fastened b' means of galvanised nuts and bolts. The siBe8diameter of the anchor fasteners and the clamp shall be suitable to carr' the weight of water filled pipe and dead weight normall' encountered.

+4

Testing ll >ater suppl' piping in the s'stem shall be tested to a h'drostatic pressure of 2 Gg8s3cm without drop in pressure for at least for 1( hours.

Architects:- SJS Consultants

Consultants: PDS Consultants

Project:- Proposed Residential Colony "Impact Regency" at G.T. Road Bey-Pass Vill.Vallah Amritsar ;ectif' all leakages, make ad$ustment and retest as re3uired and directed. Measurement 11.1 ll C.-.86@#5 pipes shall be measured per linear meter of the finished length and shall include all fittings, flanges, welding, $ointing, clamps for fixing to walls or hangers, anchor fasteners, painting and testing complete in all respect. <utterfl' valves, check valves, are measured b' numbers and shall include all items necessar' and re3uired for fixing and as given in the specifications and schedule of 3uantities.

11.0

S(ECI&2 CONDITIONS O, CONTR&CT 1. a% b% c% d% e% TIME SC/ED62E @ate of commencement @uration of Contract :race #eriod 6anding !ver @efects Aiabilit' #eriod C C C C : Ban4 ga2renty o5 Rs. #+6#66678 2p to 3e5ect lia9ility period C >ithin 1/ da's from the date of award 10( da's C 1( da's .ext da' of completion 1 )onths from the date of virtual completion.

f% 5arnest )one' g0 1ec2rity 3eposit 0.

SC/ED62E O, (&@MENT

a% 1( F value of order shall be given as )obilisation advance.


Architects:- SJS Consultants "6 Consultants: PDS Consultants

Project:- Proposed Residential Colony "Impact Regency" at G.T. Road Bey-Pass Vill.Vallah Amritsar b% /( F value of agreed rates of the respective item on receipt of material re3uired under the item sub$ect to verification and satisfaction of Consultant8 #ro$ect 5ngineer. c% 0( F of agreed accepted rates under the item on installation at site to the satisfaction of Consultant8 #ro$ect 5ngineer after ad$usting the advance on proretta basis. d% 1/F on testing of the s'stem as installed to the satisfaction of Consultant8 #ro$ect 5ngineer. e% <alance /F on 6anding over after testing commissioning and satisfaction of the client. &. RETENTION MONE@

a% / F of the securit' shall be deducted from 5ach ;. . bills & from the same 0./F of total sum shall be released on completion of defect liabilit' period & " <alance /F+ 0./F shall be released along with final bill. ,. TENDER V&2IDIT@ 1/ da's from the date of opening of the T5.@5; 4' 2IA6ID&TED D&M&GES/(EN&2T@ ,OR DE2&@ IN (ROGRESS O, )OR/F of the C!.T; CT S9) of ;s./,(((8+ "whichever is higher%, for ever' week of dela' in progress of work from the agreed #ert Chart, sub$ect to a maximum of 1(F of the value of work executed. This amount shall be deducted from the -nterim <ills or other @eposits8:uarantees etc.

1.

(RICE V&RI&TION/ESC&2&TION The rates 3uoted b' the Tendered shall not be sub$ect to an' price ad$ustments. The rates shall be on D7irm #riceE basis for the entire duration of the Contract. .o escalation will be allowed either on material or on labour for an' reasons whatsoever. E2ECTRICIT@ &ND )&TER The contractor shall arrange the distribution himself -n case of non+availabilit' of the same at a later date the Contractor shall make arrangement for the alternate source "such as generator for 5lectricit' and Tankers etc. for water% and nothing shall be reimbursed b' the 5)#A!H5;.

*.

2.

T&5ES &ND D6TIES The Contractor shall be responsible for the pa'ment, what soever pa'able, at his own cost, all taxes, import duties, tools, octoroi etc. on all material and articles

Architects:- SJS Consultants

""

Consultants: PDS Consultants

Project:- Proposed Residential Colony "Impact Regency" at G.T. Road Bey-Pass Vill.Vallah Amritsar that he ma' use for his work. Tax deduction at source will be deducted as per the -ncome Tax ;ules as applicable. 4. IS CODES -n case of an' Class of work for which there is no such specs. ;elevant -S Codes, manufacturer?s specs. and instructions of the rchitect shall be followed. The rchitect shall be free to choose an' of the specifications mentioned above. 1(. DR&)INGS 5ver' Tender shall return the set of detailed drawing enclosed with Tender, dul' signed. 6owever, the successful tender would be supplied two sets of drawings free of cost, but subse3uent prints will be charged ;s.0/8+ per unit. 11. S&M(2ES The samples for feasible item8accessor'8fixture, re3uired for 7ire suppression works, shall be made8procured as per instruction, and submitted for the approval of the rchitect. The approved samples shall be kept and preserved on site at all times. ll procurement thereafter shall be based on these approved samples and the contractor will be re3uired to perform all work under this Contract in accordance with these approved samples. The rchitect reserves the right to modif'8alter an' details8material. The contractors shall not be paid an' extra amount on this account.

10.

E5TR& ITEMS #ercentage of !verhead and #rofits in respect of extra items will be based on the basic cost of materials, taxes, cartage, labour etc. and 0(F shall be paid towards overheads and contractor?s profit. Suppl' and installation of extra items, if an', re3uired shall be sub$ect to prior approval of its rate and make b' the 5mplo'er8Consultant.

1&.

&DDEND&/CORRIGEND& ddenda8Corrigenda to the T5.@5; documents ma' be issued prior to the date of opening of the T5.@5; to clarif' or to the effect modification in the design of C!.T; CT terms. The Tender shall suitabl' take into consideration such addenda8corrigenda while submitting this T5.@5;. 5ach addenda8corrigenda will be issued in triplicate. The Tender will return the duplicate cop' of the addenda8corrigenda dul' signed in confirmation of its documents and retain the third cop' for his reference stamped on each page b' the Tender and shall become part of the T5.@5; documents.

1,r.

O=SRV&NCE O, 2&=O6R 2&)S


" Consultants: PDS Consultants

Architects:- SJS Consultants

Project:- Proposed Residential Colony "Impact Regency" at G.T. Road Bey-Pass Vill.Vallah Amritsar -n addition to the observance of provisions in various clauses of :eneral Conditions of Contract, the following provisions will hold well. The C!.T; CT!; shall be liable to make all pa'ment to his emplo'ees in compliance with labour laws. -f the 5)#A!H5; as I#;-.C-# A 5)#A!H5;E is held liable to pa' an' contribution etc. in respect of the emplo'ees of the C!.T; CT!;, under the 5.S.-. ct or an' other legislation of :overnment or court decision, them the latter would reimburse all such amounts 8 contributions so paid, to the 5)#A!H5;. 11. (ROC6RMENT O, M&TERI&2S The 3uantities set out in the <!Q?s are estimated 3uantities for the work, and the' are not to be taken as actual or correct 3uantities of the work to be executed b' the Contractor in fulfilment of his obligations under the Contract. The Contractor shall procure the materials based on his own assessment of this re3uirement at site, for timel' execution of work. The contractor shall not be paid an' extra amount for excess materials thus brought to the site, conse3uent of an' miss understanding8 calculation on the part of the Contractor. 1*. VIRT6&2 COM(2ETION The Contractor shall hand over the S-T5 to the 5)#A!H5; after completing all works as envisaged in the !.CT; CT and additions8 deletions therein. The works shall be deemed to have been virtuall' completed onl' after all defects in material 3ualit' and workmanship etc. occurring before the date of handover to the emplo'er, have been satisfactoril' set right. The certificate of =irtual Completion shall not be issued nor shall the work be considered complete till the Contractor has removed from the premises on which the work has been executed and its surroundings, all scaffolding, sheds, surplus materials "except such which are re3uired for rectification of defects if an'% rubbish and debris, and cleaned the floors, commissioned all electrical points, oiled locks and fastenings, and handed them over to the !wner or his representative and made the whole installation fit for immediate use, to the complete satisfaction of the rchitect. 12. DR&)INGB INSTR6CTIONSB ME&S6RMENTS ll work shall be done according to the drawings and instructions of the rchitect8his authorities representative and the Contractor shall arrange to test materials and 8or portions of the works at his own cost in order to prove their soundness and sufficienc'. -f after an' such test and in the opinion of the rchitect8his authorised ;epresentative, an' work or portion of work is found to be defective or unsound, the Contractor shall pull down and re+execute the same at his own cost. @efective materials shall be removed from the site within one week of receipt to of instruction for the same.

Architects:- SJS Consultants

"*

Consultants: PDS Consultants

Project:- Proposed Residential Colony "Impact Regency" at G.T. Road Bey-Pass Vill.Vallah Amritsar

SECTION ? I &'
1. 0 "."

E5TERN&2 )&TER S6((2@ /D(E C(I(ES &ND ,ITTING


HIGH DENSITY POLYTHENE PIPES

6igh @ensit' #ol'thene #ipe "6@#5% for >ater Suppl' shall be confirming to -SC ,42, with pressure rating #. 11 or as specified in bill of Qt'. 1.2 Laying and Jointing of HDPE Pipes Aa'ing and $ointing of the pipes shall be done as specified in -S ,42,. >hile la'ing the pipe in trenches the bed of the trench should be level and free from sharp edged stones. >hile la'ing in rock' areas suitable bed of sand or gravel should be provided. The initial back fill about 1( to 1/ cm above the pipe should be fine sand or screened excavated material. >here hard rock is met with, bed concrete )+1((, 1/ cm shall be provided, before putting in the soft sand8gravel. Jointing of two pipes shall be done through <9TT+>elding. The method of butt+ welding shall be as belowC a% The ends of the pipes to be $oined are cut verticall' at right angles with a fine toothed saw and trimmed with a file to make both ends smooth so that the pipes when pressed together are without leaving an' gap.

Architects:- SJS Consultants

"!

Consultants: PDS Consultants

Project:- Proposed Residential Colony "Impact Regency" at G.T. Road Bey-Pass Vill.Vallah Amritsar b% <oth the inside and outside surfaces of the ends of the pipes are scraped "up to about KE from the end% with a sharp scraper to remove the thin oxidiBed la'er. c% -t is necessar' to see that there are no extraneous particles of dust, mud, grease, pol'eth'lene powder etc. at the $oining portion of the pipes. d% n electrical 65 T )-;;!; "6ot #late% is used for heating the ends of the pipes. The pipes are pressed flush against the flat surface of the 6eat )irror, one on each side horiBontall', and held in that position under slight pressure. The 6eat )irror is maintained at a stead' temperature of 0(( deg C. with the help of T65;)!ST T. fter a while, a slight rim is formed at the ends of the pipes both inside and outside. >hen a rim of about 181(E to 182E is formed, the pipes are pulled apart and the 6eat )irror is 3uickl' withdrawn. Then the two ends of the pipes are brought together face to face so that the molten portions come into contact with each other. Then the pipes are drawn back ver' slightl' "without separating the $oined molten portion% and then again the pipes are pressed together with a moderate pressure of about "1 to 1./ kg8cm s3%. This ensures that an' air bubbles are s3ueeBed out. The pipes are held in that position until the pipe+$oint cools off naturall' in atmospheric air. >hen a perfect $oint is made, the rims cohere in such a wa' that there is onl' a ver' fine slight depression between the two rims. -f the top surface of the rim is too flat, it will be because the pipe is overheated. -f there is too much of depression "groove% between the rims, the pipe is under+heated. The rims should not be cut off or erased from the $oints. lso, correct alignment of the pipes will help in $oining the pipes perfectl', as otherwise there will be reduction in the area of the $oining surface rendering the $oint weak and imperfect. B. DUCTILE IRON PIPES FOR DRAINA E #roviding and la'ing @ouble 7langed "Screwed 8 >elded% Centrifugall' "Spun% @uctile -ron #ipes of Class G + 4 conforming to -S C 2&04 C
."

ll drainage lines passing under building, floors and roads with heav' traffic, in exposed position above ground e.g. service floor and basement ceiling shall be cast iron pipes. #osition of such pipes shall generall' be shown on the drawings. #ipes for water suppl' mains where specified shall be @uctile iron pipes, of class G+4, conforming to -.SC 2&04. Qualit' certificates shall be furnished. 7ittings and -nspection Chambers

0.0 0.&

"a% 7ittings used for @.-. drainage pipe shall conform to -.SC 2&04. >herever possible $unction from branch pipes shall be made b' a IH tee?. "b% Cleanout plugs shall be provided on head of each drain and at location indicated on plans or directed b' 5ngineer+in+Charge 8 !wner. Cleanout plugs shall be of siBe matching the full bore of the pipe. #lugs shall be made out with :.-. coupling caulked into the socket of the pipe or fittings. The end shall be provided with a brass screwed plug with suitable ke' for opening.
Architects:- SJS Consultants "+ Consultants: PDS Consultants

Project:- Proposed Residential Colony "Impact Regency" at G.T. Road Bey-Pass Vill.Vallah Amritsar
.! La in !

"c%

ll @uctile iron pipes and fittings shall be $ointed with best 3ualit' soft #ig Aead "conforming to -SC *20% which shall be free from impurities. -n wet trenches $oints shall be made from Aead >ool. .othing extra will be paid for Aead >ool $oints. @epth of pig lead and weight for $oints shall be as given in -.S. code.

"d% The spigot of pipe or fittings shall be centered in the ad$oining socket b' caulking. Sufficient turns of tarred gaskin to leave unfilled the re3uired depth of socket for depth of ,/mm when the gaskin has been caulked tightl' home. Jointing ring shall be placed round the barrel and against the face of the socket. )olten #ig Aead shall then be poured to fill the remainder of the socket. This shall then be done in one pouring. The lead shall then be solidl' caulked with suitable tools and hammers weighting not less than 0 kg. "e% 7or lead wool $oints the socket shall be caulked with tarred gaskin, as explained above. The lead wool shall be inserted into the sockets and tightl' caulked home skein b' :askin with suitable tools and hammers of not less than 0 kg weight until $oint is filled.

.+

Tes ti n !

"f%

ll lengths of the sewer and drain shall be full' tested for water tightness b' means of water pressure maintained for not less than &( minutes. Testing shall be carried out from manhole. ll pipes shall be sub$ected to a test pressure of at least 1./ meter head of water. The test pressure shall, however, not exceed 1./ meter head at an' point. The pipes shall be plugged preferabl' with standard design rubber plugs on both ends. The upper end shall, however, be connected to a pipe for filling with water and getting the re3uired head. The tolerance figure of two liters per centimeter of dia per kilometer ma' be allowed during a period of ten minutes. Subsidence of the test water ma' be due to one or more of the following causesC bsorption b' pipes and $oints

"g%

"h% Sweating of pipe or $oints "i% Aeakage at $oints or from defective pipes

T6=E )E22 )&TER S6((2@ DG'I'C(I(ES &ND ,ITTING C' (I(ING S@STEM' The piping s'stem consists of heav' class galvanised iron pipes and fittings conforming to -SC10&4. The siBes and makes is specified in the Schedule of Quantities.

Architects:- SJS Consultants

",

Consultants: PDS Consultants

Project:- Proposed Residential Colony "Impact Regency" at G.T. Road Bey-Pass Vill.Vallah Amritsar !utside the building the piping shall be installed at least 1m below the finished grade level. 1' &.1 (I(ING M&TERI&2 Gal#anised Iron (ipes The pipes shall be galvanised mild steel welded "5;>% or "67>% screwed and socketed conforming to the re3uirements of -SC10&4. The :alvanising shall conform to -SC,*&1, the Binc coating shall be uniform, adherent reasonabl' smooth and free from such imperfections as flux. ash and drops inclusions, bare patches, black spots, pimples, lumpiness, runs, rust strains, bulk' white deposits and blisters. The pipes and sockets shall be cleanl' finished, well galvanised in and out and free from cracks, surface flaws laminations and other defects. ll screw threads shall be clean and well cut. The ends shall be cut cleanl', and s3uare with the axis of the pipe. The fittings shall be malleable iron and compl' with all the re3uirements that of pipes. The siBes of pipes and fitting is specified in the schedule of 3uantities. &.0 Val#es & Controls ll valves "gate, globe, check, safet'% shall be of gun metal suitable for the particular service as called for . ll valves shall be of the particular dut' and design as called for. =alves shall either be of screwed t'pe or flanged t'pe, as specified, with suitable flanges and non+corrosive bolts and gaskets. Tail pieces as re3uired shall be supplied alongwith valves. :ate, globe and check valves shall conform to -ndian Standard -SC**1 and non+return valves and swing check t'pe reflux to -SC/&10. Sluice valves, where called for shall be flanged sluice valves of cast iron bod'. The spindle, wall seat and wedge nuts shall be gunmetal. The' shall generall' have non+rising spindle and shall be of the particular dut' and design called for. The valves shall be supplied with suitable flanges, non+corrosive bolts and asbestos fire gaskets. Sluice valves shall conform to -ndian standard -SC*2( and -SC04(1. <all valves with floats to be fixed in storage tanks shall consist of cast brass lever arm having copper balls "01 S>:% screwed to the arm integrall'. The copper ball shall have bronBe welded seams. The closing8opening mechanism incorporating the position and c'linder shall be non+corrosive metal and include washers. The siBe and construction of ball valves and float shall be suitable for desired working pressure operating the suppl' s'stem. >here called for brass valves shall be supplied with brass hexagonal back nuts to secure them to the tanks and a socket to connect to suppl' pipe. ,. 2a n /$drants
"Consultants: PDS Consultants

Architects:- SJS Consultants

Project:- Proposed Residential Colony "Impact Regency" at G.T. Road Bey-Pass Vill.Vallah Amritsar Aawn h'drants shall be of 0(mm siBe unless otherwise indicated. ll h'drants shall be provided with gate valves and threaded nipple to receive hose pipes. Aawn h'drant valves shall be of approved make and design. >here specified lawn h'drants shall be located in masonr' chambers of appropriate siBe. /. Jointing o% GI pipes :alvaniBed iron pipes shall be $ointed with threaded and socket $oints, using threaded fittings. Care shall be taken to remove an' burr from the end of the pipes after threading. >hite lead or an e3uivalent $ointing compound of proprietar' make shall be used, according to the manufacturer?s instructions, with a grommet of a few strands of fine 'arn while tightening. Compounds containing red lead shall not be used because of the danger of contamination of water. n' threads exposed after $ointing shall be painted with bituminous paint to prevent corrosion. #ipes and $oints laid for water suppl' shall be tested to a pressure of * Gg. per S3. cm. 1. Jointing o% )ater ,ittings 9nless otherwise specified all :unmetal fittings such as gate, globe, check & safet' valves shall be fitted in pipe line in workman like manner. .ecessar' unions shall be provided on both ends of the valves for eas' replacement. The $oints between fittings and pipes shall be leak+proof when tested to a pressure. The defective fittings and $oints shall be replaced or redone. *. Installation o% )ater Meter and Stop Co"* The :.- lines shall be cut to the re3uired lengths at the position where the meter and stop cock are re3uired to be fixed. Then end at the pipe shall be threaded. The meter and stop cock shall be fixed in a position b' means of connecting pipes, :- $am nut and socket etc. The stop cock shall be fixed near the inlet of the water meter. The paper disc inserted in the ripples of the meter shall be removed. nd the meter installed exactl' horiBontal or vertical in the flow line in the direction shown b' the arrow cast on the bod' of the meter. Care shall be taken that the factor' seal of the meter is not disturbed. >herever the meter shall be fixed to a newl' fitted pipe line, the pipe line shall have to be completel' washed before fitting the meter. 2. TESTING0 ll external water suppl' pipe shall be tested b' h'drostatic pressure of 1./ times the working pressure or *./ Gg8S3.cm whichever is more. #ressure shall be maintained for a period of at least 12( minutes without an' drop in the pressure after fixing at site.

Architects:- SJS Consultants

".

Consultants: PDS Consultants

Project:- Proposed Residential Colony "Impact Regency" at G.T. Road Bey-Pass Vill.Vallah Amritsar -n addition to the sectional testing carried out during the construction. Contractor shall test the entire installation after connections to the h'dropneumatic s'stem or pumping s'stem. 6e shall rectif' all leakages, and shall replace all defective materials in the s'stem. n' damage done due to careless will has to be replaced b' the contractor. The initial back fill shall be placed evenl' in a la'er of about 1((mm thick. This shall be properl' consolidated and this shall be continued till there is a cushion of at least &((mm of cover over the pipe. The $oint or coupling during the testing of mains shall be left exposed for inspection before cover+up, sufficient back fill shall be placed on the pipe to resist the movement due to pressure while testing. -n this wa' if an' error if workmanship will be found shall immediatel' corrected at a minimum cost.

4.

M&SONR@ C/&M=ER0 ll masonr' chambers for stop cocks, sluice valves and meter etc. shall be built as per supplied drawings. The excavation for chambers shall be done true to dimension and level indicated on plans or as directed b' the @eveloper?s ;epresentative. Concrete shall be of cement concrete 1C&C1 "1 cementC& fine sandC1 graded stone aggregate ,(mm nominal siBe%. <rick shall be in 0nd class bricks in cement mortar 1C/ "1 cementC/ fine sand%. #lastering not less than 10mm thick shall be done in cement mortar 1C& "1 cementC& coarse sand% finished with a floating coat of neat cement.

1(.

ME&S6REMENTS0 ll :.-. pipes below ground shall be measured per linear meters "to the nearest cm% and shall be inclusive of all fittings e.g. coupling, tees, bends, elbows, unions, deduction for valves shall be made rate 3uoted shall be inclusive of all fittings.

Architects:- SJS Consultants

"/

Consultants: PDS Consultants

Project:- Proposed Residential Colony "Impact Regency" at G.T. Road Bey-Pass Vill.Vallah Amritsar SECTION ? II E5TERN&2 SE)&GE & DR&IN&GE DIS(OS&2 +' 1.1 (I(ING M&TERI&2 RCC (ipes ll underground storm water drainage pipes and sewer lines where specified "other than those specified % shall be centrifugal spun ;CC pipes .#0 for general and .#& where road crossing. #ipes shall be true and straight with uniform bore throughout. Cracked, warped pipes shall not be used on the work. ll pipes shall be tested b' the manufacturer and the Contractor shall produce, prior to use on site, a certificate to that effect from the manufacturer. The pipes shall be with or without reinforcement as re3uired and of the class as specified. These shall conform to -SC,/2 L 14*1. The reinforced cement concrete pipes shall be manufactured b' centrifugal "or spun% process. ll pipes shall be true to shape, straight, perfectl' sound and free from cracks and flaws. The external and internal surface of the pipes shall be smooth and hard. The pipes shall be free from defects resulting from imperfect grading of the aggregate mixing or molding. The pipes shall be ;.C.C. light dut', .#0 and .#& t'pe. 1.0 2a$ing0 ;.C.C. spun pipes shall be laid on cement concrete bed of cradles as specified and shown on the detailed drawings. The cradles ma' be precast and sufficientl' cured to prevent cracks and breakage in handling. The invert of the cradles shall be left 10mm below the invert level of the pipe and properl' placed on the soil to prevent an' disturbance. The pipe shall then be placed on the bed concrete or cradles and set for the line and gradient b' means of sight rails and boning rods, etc. Cradles or concrete bed ma' be omitted, if directed b' the @eveloper?s ;epresentatives. 1.& Jointing0 ERegid Spigot and So"*et JointF0 6emp rope soaked in neat cement wash shall be passed round the $oint and inserted in it b' means of caulking tool. )ore skein of 'arn shall be added and rammed home. Cement mortar with one part of cement and one part of sand and with minimum water content but on no account soft or slopp', shall be carefull' inserted, punched and caulked into the $oint and more cement mortar added until

Architects:- SJS Consultants

Consultants: PDS Consultants

Project:- Proposed Residential Colony "Impact Regency" at G.T. Road Bey-Pass Vill.Vallah Amritsar the space of the $oint has been filled completel' with tightl' caulked mortar. The $oint shall then be finished off neatl' outside the socket at an angle of ,/ deg. 1., Curing0 The $oint shall be cured for at least seven da's. ;efilling at $oints will be permitted onl' on satisfactor' completion of curing period. 1.1.2 Cement Con"rete %or (ipe Supports0 9nless otherwise directed b' the @eveloper?s ;epresentative cement concrete for bed, all round or in haunches shall be laid as followsC 9pto 1./m @epth "/?% #ipes in open ground "no sub soil water% #ipes in sub soil water #ipes "in all Conditions% #ipes under ;oad or building all round "1C/C1(% all round "1C&C1% all round "1C&C1% all round "1C&C1% 9pto &m depth "1(?% in haunches "1C&C1% in haunches "1C&C1% in haunches "1C&C1% all round "1C&C1% <e'ond &m depth "1(?% all round "1C/C1(% in haunches "1C&C1% in haunches "1C&C1% all round "1C&C1%

#ipes ma' be supported on brick masonr' or precast ;CC or in situ cradles. Cradles shall be as shown on the drawings. #ipes in loose soil or above ground shall be supported on brick or stone masonr' pillars as shown on the drawings. Measurement0 5xcavationC )easurement for excavation of pipes trenches shall be made per linear meter. Trenches shall be measurement between outside walls of manholes at top and the depth shall be the average depth between the two ends to the nearest cm. The rate 3uoted shall be for a depth upto 1./ meter or as given in the <ill of Quantities.

Architects:- SJS Consultants

"

Consultants: PDS Consultants

Project:- Proposed Residential Colony "Impact Regency" at G.T. Road Bey-Pass Vill.Vallah Amritsar #a'ment for trenches more than 1./m in depth shall be made for extra depth as . . given in the <ill of Quantities and above the rate for depth upto 1./m. #ipes shall be measured for the length of the pipe line per linear meter i.e.C . . Aength between manholes shall be recorded from inside of one manhole ot inside of other manhole. Aength between gull' trap and manhole shall be recorded between socket of pipe near gull' trap and inside of manhole.

1.1.2 Stone are (ipes Stoneware pipes, where used, shall be perfectl' salt glaBed, sound, free from cracks, deformities and imperfections in glaBing. The' shall be c'lindrical, straight and of standard nominal diameter, length and depth of socket. The' will be made of hard burnt stoneware of dark gre' colour and thoroughl' glaBed and shall give a sharp clear note when struck with a light hammer. The pipe shall conform to the re3uirements of -ndian Standards -SC1/1 and the siBes and make specified in the schedule of Quantities. 1.1.1( Cast Iron Manhole Co#er and ,rame The Cast -ron )anhole Cover and 7rame shall conform to -SC1*01 and the grade and t'pes have been specified in the schedule of 3uantities. The cover and frames shall be cleanl' cast and the' shall be free from air and sand holes and from cold shuts. The' shall be neatl' dressed and carefull' trimmed. ll castings shall be free from voids whether due to shrinkage, gas inclusion or other causes. Covers shall have a raised checkered design on the top surface to provide an ade3uate non+slip grip. The siBes of covers specified shall be taken as the clear internal dimensions of the frame. The covers and frames shall be coated with a black bituminous composition. The coating shall be smooth and tenacious. -t shall not flow when exposed to a temperature of 1& C and shall not brittle as to chip off temperature of ( C. 1.1.11 S,RC Manhole Co#er and ,rame The Cast -ron )anhole Cover and 7rame shall conform to latest -S specifications and the grade and t'pes have been specified in the schedule of 3uantities. The cover and frames shall be cleanl' cast and the' shall be free from air and sand holes and from cold shuts. The' shall be neatl' dressed and carefull' trimmed. ll castings shall be free from voids whether due to shrinkage, gas inclusion or other causes. Covers shall have a raised checkered design on the top surface to provide an ade3uate non+slip grip. The siBes of covers specified shall be taken as the clear internal dimensions of the frame.
Architects:- SJS Consultants Consultants: PDS Consultants

Project:- Proposed Residential Colony "Impact Regency" at G.T. Road Bey-Pass Vill.Vallah Amritsar .' TRENC/ES ,OR (I(ES &ND DR&INS 0.1 General ll the material shall be new of best 3ualit' conforming to specifications and sub$ect to the approval of the rchitects. @rainage lines shall be laid to the re3uired gradients and profiles. ll drainage work shall be done in accordance with the local municipal b'+laws. Contractor shall obtain necessar' approval and permission for the drainage s'stem from the municipal or an' other competent authorit'. Aocation of all manholes, catch basins etc shall be gotten confirmed b' the rchitects before the actual execution of work at site. ll work shall be executed as directed b' the rchitects. 0.0 &lignment and Grade The storm water drainage pipes shall be carefull' laid to levels and gradients shown in the plans and sections but sub$ect to modifications as shall be ordered b' the rchitects from time to time to meet the re3uirements of the works. :reat care shall be taken to prevent sand etc. from entering the pipes. The pipes between two manholes shall be laid trul' in straight lines with+out vertical or horiBontal undulations. The bod' of the pipes shall for its entire length rest on an even begin the trench and places shall be excavated to receive the collar for the purpose of $ointing. .o deviations from the lines, depths of cuttings or gradients called for on the drawings shall be permitted without the written approval of the rchitect. ll pipes shall be laid atleast 1(cms below the finished ground level or as called for on the drawings. 0.& Setting out Tren"hes The contractor shall set out all trenches, )anholes, chambers and such other works to true grades and alignments as called for. 6e shall provide the necessar' instruments for setting out and verification of the same. ll trenches shall be laid to true grade and in straight lines and as shown on the drawings. The trenches shall be laid to proper levels b' the assistance of boning rods and sight rails which shall be fixed at intervals not exceeding 1( meters or as directed b' the rchitect. 0., Tren"h E>"a#ation The trenches for the pipes shall be excavated with bottoms formed to level and gradients as shown on the drawings or as directed b' the rchitect. -n soft and filled in ground the rchitect ma' re3uire the trenches to be excavated to a greater depth then the shown on the drawings and to fill up such additional excavation with concrete "1C,C2% consolidated to bring the excavation to the re3uired levels as shown on the drawings.

Architects:- SJS Consultants

Consultants: PDS Consultants

Project:- Proposed Residential Colony "Impact Regency" at G.T. Road Bey-Pass Vill.Vallah Amritsar ll excavation shall be properl' protected where necessar' b' suitable timbering, piling and sheeting as approved b' the rchitect. ll timbering and sheeting when withdrawn shall be done graduall' to avoid falls. ll cavities be ade3uatel' filled and consolidated. .o blasting shall be allowed without prior approval in writing from the rchitect. >here allowed it shall be carried out under thorough and competent supervision, with the written permission of the appropriate authorities taking full precaution connected with the blasting operations. ll excavated earth shall be kept clear of the trenches to a distance e3ual to */ cms. 0./ O!stru"tion o% Roads The contractor shall not occup' or obstruct b' his operation more than one half of the width of an' road or street and sufficient space shall then left for public and private transit, 6e shall remove the materials excavated and bring them back again when the trench is re3uired to be refilled. The contractor shall obtain the consent of the rchitect in writing before closing an' road to vehicular traffic and the foot walks must be clear at all times. 0.1 (rote"tion o% (ipes et"' ll pipes, water mains, cables etc, met in the course of excavation shall be carefull' protected and supported. Care shall be taken not to disturb the cables, the removal of which shall be arranged b' the contractor with the written consent from the !wner. 0.* Tren"h =a"* ,illing ;efilling of the trenches shall not be commenced until the length of pipes therein has been tested and approved. ll timbering which ma' be withdrawn safel' shall be removed as filling proceeds. >here the pipes are unprotected b' concrete hunching selected fine material shall be carefull' hand+packed around the lower half of the pipes so as to buttress them to the sides of the trench. The refilling shall then be continued to 1/(mm over the top of the pipe using selected fine hand picked material, watered and rammed on both sides of the pipes with a wooden hammer. The process of filling and tamping shall proceed evenl' in la'ers not exceeding 1/(mm thickness, each la'er being watered and consolidated so as to maintain an e3ual pressure on both sides of the pipe line. -n gardens and fields the top soil and turf if an', shall be carefull' replaced. 0.2 Contra"tor to ensure Settlement and Damages The contractor shall at his own costs and charges, make good promptl' during the whole period for the works in hand, an' settlement that ma' occur in the surfaces of roads, beams, foot+paths, gardens, open spaces etc. whether public or private caused b' his trenches or b' his other excavations and he
Architects:- SJS Consultants ! Consultants: PDS Consultants

Project:- Proposed Residential Colony "Impact Regency" at G.T. Road Bey-Pass Vill.Vallah Amritsar shall be liable for an' accident caused thereb'. 6e shall also, at his own expense and charges, repair and make good and damage done to building and other propert'. -f in the opinion of the rchitects he fails to make good such works with all practicable dispatch, the rchitect shall be at his libert' to get the work done b' other means and the expenses thereof shall be paid b' the contractor or deducted from an' mone' that ma' be or become due to him or recovered from him an' other manner according to the law of the land. The contractor shall at his own costs and charges provide places for disposal of all surplus materials not re3uired to be used on the works. s each trench is refilled in the surplus soil shall be immediatel' removed, the surface properl' restored and roadwa's and sides left clear. 0.4 Remo#al o% ater %rom Se erB tren"h et"

The contractor shall at all times during the progress of work keep the excavations free from water which shall be disposed b' him in a manner as will neither cause in$ur' to the public health nor to the public or private propert' nor to the work completed or in progress nor to the surface of an' road or streets, nor cause an' interference with the use of the same b' the public. -f an' excavation is carried out at an' point or points to a greater width than the specified cross section of the sewer with its envelope, the full width of the trench shall be filled with concrete b' the contractor at his own expense and to the re3uirements of the rchitects. 1'; TESTING ll lengths of the sewer and drain shall be carefull' tested for water tightness b' means of water pressure maintained for not less than &( minutes. Testing shall be carried out from manhole to manhole. ll pipes shall be sub$ect to a test pressure of 1./ meter head of water. The test pressure will however, not exceed 1 meters head at an' point. The pipes shall be plugged preferabl' with standard design plugs or with rubber plugs on both sides, the upper end shall, however, be connected to a pipe for filling with water and getting the re3uired head poured at one time. Sewer lines shall be tested for a straightness b' C i% -nserting a smooth ball 10mm less than the internal diameter of the pipe. -n the absence of obstructions such as 'arn or mortar pro$ecting at the $oints the ball should roll down the invert of the pipe and emerge at the lower end. )eans of a mirror at one end and a lamp at the other end. -f the pipe is straight the full circle of light will be seen otherwise obstructions or deviations will be apparent. The contractor shall give a smoke test to the drain and sewer at his own expense and charges, if directed b' the rchitect. test register shall be maintained which shall be signed and dated b' contractor, rchitect and representative of consultants.
+ Consultants: PDS Consultants

ii% iii% iv%

Architects:- SJS Consultants

Project:- Proposed Residential Colony "Impact Regency" at G.T. Road Bey-Pass Vill.Vallah Amritsar 4'; CONSTR6CTION O, M&N/O2E >here manholes are to be constructed, the excavation, filling back and ramming, disposal of surplus earth, preparation of bottom and sides etc. shall be carried out as described earlier under trench excavation. )anhole shall be siBed and depths as called for in the drawings and Schedule of Quantities. The manhole shall be built on a base concrete 1C0C, of 1/(mm thickness for manholes upto 1/((mm depth and 0/(mm thickness for manholes from 1/(( to 0/((mm depth and &((mm thickness manholes of depth greater than 0/((mm. ;einforcement as shown shall be provided in the base slabs. The walls shall be of brick work of thickness as shown in drawings built in cement mortar 1C/. The $oints of brick work shall be raked and plastered internall' and externall' with cement plaster 1C& to a thickness of 0(mm and finished with a coat of neat cement. -n the bottom of the manholes, semi circular channels of the same diameter as the pipes shall be provided. bove the horiBontal diameter the sides of channel shall be extended verticall' to the same level as the crown of the outgoing pipe and the top edge shall be suitabl' rounded off. The branch channels shall also be similarl' constructed with respect to the benching but at their $unction with the main channel an appropriate fall suitabl' rounded of in the direction of flow in the main channel shall be given. ;ungs of cast or mild steel of suitable dimensions shall be provided in all manholes over 2((mm depth. These rungs shall be set at &(cms interval in two vertical runs at &2(mm apart horiBontall'. The top rung shall be ,/(mm below the manhole cover. 9nless otherwise mentioned, manholes shall be constructed to re3uirements of -ndian Standard -SC,111 "#art -%. ll manholes shall be constructed so as to be water tight under test. ll angles shall be rounded to a */mm radius with cement plaster 0(mm thick. The benching at the side shall be carried up in such manner as to provide no lodgment for an' splashing in case of accidental flooding. )anhole cover with frame shall be S7;C of an approved make. The covers and frame shall generall' be double seal as specified in the Schedule of Quantities. /.0 Measurements0 )anhole shall be measured in numbers as indicated in the <ill of Quantit'. The depth of manhole shall be measured from invert of channel to the top of manhole shall be measured from invert of channel to the top of manhole cover. Quoted rate shall cover the range of M (.0, meter on the depth specified in schedule and also the cost of items specified in the <ill of Quantities and Specifications viB. )anhole with depth greater than specified under the main item shall be paid for under N5xtra @epth? and shall include all items as given for manholes depth will be measured to the nearest cm. @epth of the manholes shall be measured from top of the manhole cover to bottom of channel. <ed concrete.
Architects:- SJS Consultants , Consultants: PDS Consultants

Project:- Proposed Residential Colony "Impact Regency" at G.T. Road Bey-Pass Vill.Vallah Amritsar < <rick work. C @ 5 7 : 6 J G #lastering. ;.C.C. top slab, benching and channeling including drop connections. Suppl' and fix foot rests. Geeping holes and embedding pipes for all the connections. 5xcavation, refilling, necessar' de watering and disposing off surplus soil to a place as directed b' clients ;epresentative. Curing. Cost of frame and cast iron cover including reinforcement, angle frame and embedding the frame in concrete bed. Testing. @e+watering of chambers.

SECTION ? III (6M(S &ND &SSOCI&TED )OR-S (6M(S C&(&CIT@0 >ater flow capacit' and head of the pumps shall be in accordance re3uirements of schedule of 3uantities.
Architects:- SJS Consultants -

with the

Consultants: PDS Consultants

Project:- Proposed Residential Colony "Impact Regency" at G.T. Road Bey-Pass Vill.Vallah Amritsar (6M(S #ump shall be coupled end+suction design directl' connected to motor. The pump shall have C.-. bod'. -mpeller shall be <ronBe8:unmetal, h'draulicall' balanced and ke'ed to shaft. Stuffing boxes shall be integral with casing and water sealed. Shaft sleeve shall be of gun metal extending through stuffing boxes, integral with casing and water sealed. Shaft sleeve shall be of gun metal extending through stuffing boxes. MOTOR0 )otors shall be of a siBe suitable for the pump. <ase shall be cast iron, drip and splash proof, designed as integral part of pump. )otor shall be suitable for ,1/ M 1(F volts, & #hase, /( c'cles C power suppl'. INST&22&TION0 #ump shall be installed on a concrete foundation as shown in approved for construction shop drawings. 26=RIC&TION0 9pon installation of the complete s'stem and before testing, the pumps shall lubricated in strict accordance with the manufacturer?s instructions. (6M( &2IGNMENT0 ll pumps prior to testing shall be aligned with a dial gauge to a maximum run out or face out of (.(/mm. (6M( ,INIS/ES0 ll pumps, motors and bases shall be supplied with approved finish. Shop coats of paint that have become marred during shipment or erection shall be cleaned off with mineral spirits, wire brushed and spot primed over the affected areas, then coated with enamel paint to match the original finish. (ER,ORM&NCE D&T&0 #ump performance curves and power consumption with operating points clearl' indicated shall be submitted and verified at the time of testing and commissioning of the installation. TESTING0 #ump performance shall be computed from the pump curves provided b' manufacturer. S6=MERSI=2E S6M( (6M(S
Architects:- SJS Consultants . Consultants: PDS Consultants

be

Project:- Proposed Residential Colony "Impact Regency" at G.T. Road Bey-Pass Vill.Vallah Amritsar #umps, where used, shall operate with high water level in sump and stop at low water level b' means of an electronic level controller. &.1.1 #umps for drainage shall be single stage, single entr'. &.1.0 #ump shall be C.-. casing and C.-. two vane open t'pe with a d'namicall' balanced impeller connected to a common shaft of the motor. The vane for sewage pump will be open t'pe, while for drainage pump, etc. it will be of semi open t'pe. &.1.& Stuffing box shall be provided with mechanical seals. &.1., 5ach pump shall be provided with air cooled s3uirrel cage induction motor suitable for ,1/ volts, & phase, /( 6B .C. power suppl'. &.1./ 5ach pump shall be provided with inbuilt li3uid level operating the pump between predetermined levels. controller for

&.1.1 The pumping set shall be for stationar' application and shall be provided with pump connector unit. The deliver' pipe shall be $oined to the pump through a rubber diaphragm, and bend and guide pipe for eas' installation. &.1.* #ump shall be provided with all accessories and devices necessar' and re3uired for the pump to make a complete working s'stem.

,.

A5=5A C!.T;!AA5; #rovide and install low voltage transistorised level controllers as specified below. 5ach level controller shall be provided with re3uired number of #=C sheathed stainless steel probes. . ll sumps shall be provided with two pumps, one running and one standb'. The pump panel shall be provided with an uto8!ff8)anual and a pump selector switch. t high water level conditions the pump selected b' the selector switch will first start automaticall'. -f for some reason the level continues to rise, the second pump would start automaticall' at extra high level. -f for some reason the level of water in the sump continues to rise then a third sensor would provide an audio visual alarm at specified point.

=-<; T-!. 5A-)-. T!;S #rovide on all suction and deliver' lines double flanged rein+forced neoprene flexible pipe connectors. Connectors should be suitable for a working pressure
Architects:- SJS Consultants / Consultants: PDS Consultants

Project:- Proposed Residential Colony "Impact Regency" at G.T. Road Bey-Pass Vill.Vallah Amritsar of each pump. Aength of the connector shall be as per manufacturers details. 7lexible connector shall of approved make onl'.

2IST O, &((ROVED M&TERI&2 IN ORDER O, (RE,ER&NCE a% ll materials and product used in the works shall conform to the relevant standards 8 specification and shall be of approved make and design. list of approved manufacture 8 vendors is given herein below. The approval of a manufacture 8 vendor shall be given onl' after review of the sample 8 specimen b' the 5ngineer+-n+Charge. The complete s'stem and installation shall be in conformit' with the D pplicable Codes Standards and #ublicationE.

b% Aist of pproval makes for #roduct, )aterials and specialist agencies is given below. !ther e3uivalent manufacture ma' be considered with prior approvalO however the decision of the 5ngineer+-n+Charge shall be final. c% The Contractor while 3uoting shall 3uote for first make onl'. 6owever at the time of execution, if first make is not available, then the other makes ma' be considered with prior approval from 5ngineer -n charge8 Consultant8 rchitects. 6owever the decision of the 5ngineer+-n+Charge shall be final.
Architects:- SJS Consultants *6 Consultants: PDS Consultants

Project:- Proposed Residential Colony "Impact Regency" at G.T. Road Bey-Pass Vill.Vallah Amritsar
S'No' Item Des"ription ,irst (re%eren"es Other (re%eren"es

(I(E & ,ITTING (VC /G'I'


1 0 & , / 1 * 2 4 1( 11 10 1& 1, :.-. #ipes 10&48&/24 -S J-.@ A 6-SS ; !;-#A ST 6@#5 pipes and 7ittings :arden -rrigation S'stem J -. :.-.7ittings ")alleable cast Q!A!T! iron% Check =alves "@ual #late Q!A!T! t'pe% Q!A!T! <utterfl' =alve Stoneware #ipes & :ull' + -S 1/1 ;CC #ipes -S ,/2 C.-. )anhole cover & frame -S 1*01 )anhole Covers & 7rame S7;C nti corrosive tape for pipe protection nticorrosive <itumastic #aint . .@ #; : T.5C! 8).S.#ipes T T 8#; G S6 S9;H J -.8#;-.C587-.!A5P J -.86 ;=5A @;#89.-G -#8 @9C! -#8 @9@C! -SS9#5; >-;58-S.5C!8S;-78SG78;-7

E5TERN&2 (I(E & ,ITTING

GG )anholes
#H#G!T5 -S-

GG )anholes or 53uivalent
) G#!AHG!T5

#ump 7or >ater Suppl'


ir dmittance valves

Gro2nd5oss
)c A#-.5

(ilo 7 :1B7:I;'1:AR
ST9@!;