You are on page 1of 8

PROYECTO: MEJORAMIENTO Y EQUIPAMIENTO DE LA IEI N 059 DEL BARRIO EL CARMEN, DISTRITO DE LA UNION, PROVINCIA DE PIURA PIURA CALCULO JUSTIFICATIVO

O DE DEMANDA MAXIMA T.G.


AREA x CARGA m2 x w/m2 POTENCIA INSTALADA Vatios TD-01 ADMINSTRACION VEREDAS TD-02 3 AULAS + SS-HH VEREDAS TD-03 3 AULAS + SS-HH VEREDAS TD-04 SALON DE USO MULTIPLE VEREDAS SS-HH TD-05 VEREDAS ALUMBRADO DE EXTERIORES TD-06 COCINA VEREDAS TD-07 ELECTROBOMBA ALUMBRADO (2 x 1,050) (2 x 100) 1,818.58 39,747 62.45 67.95 163.87 156.85 163.87 156.85 109.37 259.32 24.17 30.51 551.94 15.30 56.13 x x x x x x x x x x x x x 50 10 50 10 50 10 50 10 50 10 10 50 10 2,100 200 2,300 0.50 1.00 23,728 10,241 17.3 1,250 1.00 1,250 2.1 1,326 0.58 769 0.40 308 0.5 7,033 0.58 4,079 0.40 1,632 2.8 8,062 0.62 4,090 0.40 1,636 2.8 9,762 0.62 5,664 0.40 2,266 3.8 9,762 0.62 5,664 0.40 2,266 3.8 3,802.00 POTENCIA FACTOR DE INSTALADA DEMANDA ELECTROBOMBA PROMEDIO Vatios 0.62 DEMANDA Vatios 2,211 0.40 FACTOR DE SIMULTANEI DAD MAXIMA DEMANDA Vatios 884 INTENSIDAD Amperios 1.5

TABLEROS

DESCRIPCION

AREA MAYOR A 900 M2.

APLICANDO FACTORES DE DEMANDA FACTOR DE DEMANDA PROMEDIO 0.75 0.5 0.62 Demanda Mxima Proyectada kW 10,241 Demanda Existente kW 1,000 Demanda Total kW 11,241

CARGA BASICA W/M2

21.86

AREA (m2)

w / m2.

VATIOS

900 919

21.86 21.86

14,752.84 10,038.27 24,791.11

PROYECTO: MEJORAMIENTO Y EQUIPAMIENTO DE LA IEI N 059 DEL BARRIO EL CARMEN, DISTRITO DE LA UNION, PROVINCIA DE PIURA PIURA

CALCULO JUSTIFICATIVO DE DEMANDA MAXIMA TD-01


POTENCIA INSTALADA POTENCIA FACTOR DE INSTALADA ELECTROBOMBA DEMANDA PROMEDIO Vatios MAXIMA DEMANDA

TABLEROS

DESCRIPCION

AREA x CARGA m2 x w/m2

DEMANDA

FACTOR DE SIMULTANEIDAD

INTENSIDAD

Vatios

Vatios

Vatios

Amperios

TD-01

ADMINISTRACION VEREDAS

62.45 67.95

x x

50 10

3,802.00

0.58

2,211

0.40

884

1.5

TD-01

PROYECTO: MEJORAMIENTO Y EQUIPAMIENTO DE LA IEI N 059 DEL BARRIO EL CARMEN, DISTRITO DE LA UNION, PROVINCIA DE PIURA PIURA

CALCULO JUSTIFICATIVO DE DEMANDA MAXIMA TD-02


POTENCIA INSTALADA Vatios 2 AULAS + SS-HH TD-02 VEREDAS POTENCIA FACTOR DE INSTALADA ELECTROBOMBA DEMANDA PROMEDIO Vatios MAXIMA DEMANDA Vatios

TABLEROS

DESCRIPCION

AREA x CARGA m2 x w/m2

DEMANDA

FACTOR DE SIMULTANEIDAD

INTENSIDAD

Vatios

Amperios

163.87 156.85

x x

50 9,762 10 0.58 5,664 0.40 2,266 3.8

T-02

PROYECTO: MEJORAMIENTO Y EQUIPAMIENTO DE LA IEI N 059 DEL BARRIO EL CARMEN, DISTRITO DE LA UNION, PROVINCIA DE PIURA PIURA

CALCULO JUSTIFICATIVO DE DEMANDA MAXIMA TD-03


POTENCIA INSTALADA Vatios 2 AULAS + SS-HH TD-03 VEREDAS POTENCIA FACTOR DE INSTALADA ELECTROBOMBA DEMANDA PROMEDIO Vatios MAXIMA DEMANDA Vatios

TABLEROS

DESCRIPCION

AREA x CARGA m2 x w/m2

DEMANDA

FACTOR DE SIMULTANEIDAD

INTENSIDAD

Vatios

Amperios

163.87 156.85

x x

50 9,762 10 0.58 5,664 0.40 2,266 3.8

TD-03

PROYECTO: MEJORAMIENTO Y EQUIPAMIENTO DE LA IEI N 059 DEL BARRIO EL CARMEN, DISTRITO DE LA UNION, PROVINCIA DE PIURA PIURA

CALCULO JUSTIFICATIVO DE DEMANDA MAXIMA TD-04


POTENCIA INSTALADA Vatios USOS MULTIPLES TD-04 VEREDAS . TD-04 POTENCIA FACTOR DE INSTALADA ELECTROBOMBA DEMANDA PROMEDIO Vatios MAXIMA DEMANDA Vatios

TABLEROS

DESCRIPCION

AREA x CARGA m2 x w/m2

DEMANDA

FACTOR DE SIMULTANEIDAD

INTENSIDAD

Vatios

Amperios

109.37 259.32

x x

50 8,062 10 0.58 4,665 0.40 1,866 3.2

PROYECTO: MEJORAMIENTO Y EQUIPAMIENTO DE LA IEI N 059 DEL BARRIO EL CARMEN, DISTRITO DE LA UNION, PROVINCIA DE PIURA PIURA

CALCULO JUSTIFICATIVO DE DEMANDA MAXIMA T.D-05


POTENCIA INSTALADA Vatios SS-HH TD-05 VEREDAS ALUMBRADO DE EXTERIORES 24.17 30.51 551.94 x x x 50 10 10 7,033 0.58 4,090 0.40 1,636 2.8 POTENCIA FACTOR DE INSTALADA ELECTROBOMBA DEMANDA PROMEDIO Vatios MAXIMA DEMANDA Vatios

TABLEROS

DESCRIPCION

AREA x CARGA m2 x w/m2

DEMANDA

FACTOR DE SIMULTANEIDAD

INTENSIDAD

Vatios

Amperios

TD-05

PROYECTO: MEJORAMIENTO Y EQUIPAMIENTO DE LA IEI N 059 DEL BARRIO EL CARMEN, DISTRITO DE LA UNION, PROVINCIA DE PIURA PIURA

CALCULO JUSTIFICATIVO DE DEMANDA MAXIMA T.D-06


POTENCIA INSTALADA Vatios COCINA TD-06 VEREDAS 56.13 x 10 15.30 x 50 1,326 0.58 771 0.40 309 0.5 POTENCIA FACTOR DE INSTALADA ELECTROBOMBA DEMANDA PROMEDIO Vatios DEMANDA MAXIMA DEMANDA Vatios INTENSIDAD

TABLEROS

DESCRIPCION

AREA x CARGA m2 x w/m2

FACTOR DE SIMULTANEIDAD

Vatios

Amperios

TD-06

PROYECTO: MEJORAMIENTO Y EQUIPAMIENTO DE LA IEI N 059 DEL BARRIO EL CARMEN, DISTRITO DE LA UNION, PROVINCIA DE PIURA PIURA

CALCULO JUSTIFICATIVO DE DEMANDA MAXIMA T.D-07


POTENCIA INSTALADA Vatios ELECTROBOMBA TD-07 ALUMBRADO (2 x 100) 200 2,300 1.00 (2 x 1,050) POTENCIA FACTOR DE INSTALADA ELECTROBOMBA DEMANDA PROMEDIO Vatios 2,100 0.50 1,250 1.00 1,250 2.1 MAXIMA INTENSIDAD FACTOR DE DEMANDA SIMULTANEIDAD Vatios Amperios

TABLEROS

DESCRIPCION

AREA x CARGA m2 x w/m2

DEMANDA

Vatios

You might also like