DISEO DE MURO EN VOLADIZO

PROYECTO: MEJORAMIENTO DE SERVICIOS DE INFORMACION TURISTICO EN EL DEPARTAMENTO DE HUANCAVELICA


* DATOS GENERALES DE DISEO:

Densidad del concreto (c) =


Esfuerzo del Terreno () =
Cohesion (C1)=

2400.00 Kg/m3
15000.00 Kg/m2
0.00 Kg/m2

Cohesion (C2)=

0.00 Kg/m2

Densidad del Terreno (1) =

1880.00 Kg/m3

Densidad del Terreno (2) =

1880.00 Kg/m3

Angulo (1) =

35.00

Angulo (2) =
H=
=

35.00
3.00 m
0.00

I. PREDIMENSIONAMIENTO

= 30 .

h1

C1

h2
1

H
= 0.1
D

h3

= 0.1

= (0.5 0.7)
Dimensiones:
H=
fc=
B=
C=
D=
h1 =

3.00 m.
0.45
1.35 m.
0.20 m.
1.00 m.
0.00 m.

h2 =

2.60 m.

fc2=
fc3=
fc4=

0.13 m.
0.27 m.
0.07 m.
.

h3= 2

h3 =

= 3
= 4

a=
b=
c=

0.40 m.
0.00 m.
0.20 m.
1.15 m.

altura del muro


< 1.53 m. (5 ft)
3.05 m. (10 ft)
6.10 m. (20 ft)
>9.15 m. (30 ft)
usar:

Hs
1.68 m. (5.5 ft)
1.22 m. (4.0 ft)
0.76 m. (2.5 ft)
0.61 m. (2.0 ft)
1.68

* Sobrecarga Vehicular:

=
1

qs =

3158.40 Kg/m (por metro lineal de muro)

Ws=
* Presion activa de Rankine:

1
= 1 ()2
2

4263.84 Kg.

3 = 0.1
c

C2

1= 35.00
= 0.00

Segn tabla:

= cos

ka= 0.271
Pa=

cos 2 2
cos + 2 2

2292.58 Kg.

Pv=

0.00 Kg.

PH=

2292.58 Kg.

II. FACTOR DE SEGURIDAD CONTRA VOLTEO


Elemento
1
2
3
4
5
6
7

Fuerza
1249.92
0.00
1283.04
5629.85
0.00
0.00
4263.84
S V = 12426.65 Kg.

Brazo Mos
Momentos
0.10
124.99
0.00
0.00
0.68
866.05
0.78
4363.13
0.97
0.00
1.35
0.00
0.68
2878.09
S MR = 8232.27 Kg-m

MO= 2292.58 Kg-m

* Momento por presion activa:


* Factor de seguridad contra volteo:

FS (volteo)= 3.59

> 2

* Por lo tanto:

OK

III. FACTOR DE SEGURIDAD CONTRA DESLIZAMIENTO.

1 2 + 2 2 +

=
K1=K2= 2/3

1
2 + 22
2 2

Kp = 1.000
D = 1.00 m
Pp= 940.007 Kg/m
FS (deslizamiento) =

2.75

> 1.5

* Por lo tanto:

OK

IV. FACTOR DE SEGURIDAD CONTRA LA FALLA POR CAPACIDAD DE CARGA

e=

0.197 m

<

* Entonces

OK

6
1

, =

q punta =

17265.16 Kg/m2

q talon =

1144.69 Kg/m2

* Capacidad de carga ultima del suelo :

1
= 2 + + 2
2

= 2 45 +

Nc= 46.12
Nq= 33.30
N= 48.03
q= 1880.00 Kg/m2
B= 0.956 m

= ( 1)

= 2( + 1)

Fcd = 1.418427329
Fqd= 1.266377878
Fd= 1

= = 1

= 1

90

cos

10.45288844

Fci=Fqi=

0.781202834

Fi=

0.491886274

qu= 63807.24 Kg/m2


FS (capacidad de carga) =

3.70

( ) > 3

* Por lo tanto:

OK

V. DISEO DE LA PANTALLA VERTICAL

1
= 1 ()2
2

* Carga por empuje activo


Ea =

254.73 Y

* Momento de empuje activo


Ma=
Y(m)
1.00
1.50
2.00
2.50
3.00

Y
3

M = () /3

H2

84.91 Y3
V u (Kg)

M u (Kg-m)

407.57
917.03
1630.28
2547.31
3668.12

135.86
458.52
1086.85
2122.76
3668.12

Y =H 2 - 6cm

Y= 2.54 m.

* El espesor de la pantalla F(y) vara desde "c" hasta "B" cm, de la siguiente manera, en cm:
F(Y) = ( c 1 /Y x Y )+ c 1 =
0.0000 Y + c1
* La altura til es variable d(y), se determina para un recubrimiento del concreto en la pantalla de 5 cm.
d(Y) = F(Y) - 5 cm
* El corte mximo resistente del concreto vara con la altura de la pantalla:
f'c = 210 kg/cm
bw = 100 cm
fy = 4200 kg/cm
Vc =0.75 x0.53 f'c x bw x d(Y) =

* Cortante del concreto

576.03 Y

El acero de refuerzo mnimo vara con la altura de la siguiente manera: Asmin = 0.0018x bw x F(Y)
Asmin = 0.18 cm2
En la tabla siguiente se indican los valores de solicitaciones mximas de corte y momento, espesor
de la pantalla, altura til, corte mximo resistente, acero mnimo, acero requerido, para diferentes
valores de Y, que varan desde 1 m hasta Y m con secciones a cada 50 cm.
Y(m)
1.00
1.50
2.00
2.50
3.00

F(y) m
0.20
0.20
0.20
0.20
0.20

d(y) cm
15.00
15.00
15.00
15.00
15.00

Y(m)
1.00
1.50
2.00
2.50
3.00

Vc
8640.48
8640.48
8640.48
8640.48
8640.48

Vc>Vu
cumple
cumple
cumple
cumple
cumple

As min (cm 2 )
2.70
2.70
2.70
2.70
2.70

As (cm 2 )
0.24
0.82
1.95
3.86
6.84

As a usar (cm 2 )
2.70
2.70
2.70
3.86
6.84

Diametro
3/8"
1/2"

Area
0.71
1.27

5/8"
3/4"
1"
Area a usar

1.99
2.84
5.07
1.27 cm2

Diametro
3/8"

Area
0.71

1/2"
5/8"
3/4"
1"
Area a usar

1.27
1.99
2.84
5.07
1.27 cm2

Diametro
3/8"

Area
0.71

1/2"
5/8"
3/4"
1"
Area a usar

1.27
1.99
2.84
5.07
0.71 cm2

Diametro
3/8"
1/2"

Area
0.71
1.27

5/8"
3/4"
1"
Area a usar

1.99
2.84
5.07
0.71 cm2

* Distribucion de acero en pantalla (cara interior)


* Tramo 0 - 1 m

(Predomina el acero de requerido)

As requerido=
Espaciamiento=

6.84 cm2
18.57 cm
Usar 1/2 @ 0.20 m

Por lo tanto:
* Tramo 1-6 m

(Predomina el acero minimo)

As requerido=
Espaciamiento=

2.70 cm2
47.04 cm
Usar 5/8 @ 0.25 m

Por lo tanto:

* Acero Horizontal

(Acero de contraccion y temperatura)

As temp=
Espaciamiento=

2.70 cm2
26.30 cm
Usar 5/8 @ 0.20 m

Por lo tanto:

* Distribucion de acero en pantalla (cara exterior )


* Se colocara el acero de contraccion y temperatura:
As temp=
Espaciamiento=

2.70 cm2
26.30 cm
Usar 5/8 @ 0.20 m

Por lo tanto:

VI. DISEO DEL PIE y TALON:

1
1

C1

H3

2
2
C2

m
2-2
1-1

max

6.1. DISEO DEL PIE:

* Peso propio del pie:


P.P.pie = 0.00 Kg
Bp= 0.00 m
Mom. ppp= 0.00 Kg-m
* Reaccion del suelo:
max= 1.73 Kg/cm2
min= 0.11 Kg/cm2
1-1= 1.73 Kg/cm2
Fuerza en 1-1= 0.00 Kg
* Fuerza Resultante= 0.00 Kg
Para determinar el momento, dividimos en fig, geometricas (Triangular y Rectangular)
a) Diagrama Triangular:
Fuerza D.T.= 0.00 Kg
Brazo Pal.= 0.00 m
Momento D.T. = 0.00 Kg-m

1-1

D.R.

b) Diagrama Rectangular:
D.T.

Fuerza D.R.= 0.00 Kg


Brazo Pal.= 0.00 m
Momento D.R. = 0.00 Kg-m

ma

* Momento r.r.s.= 0.00 Kg-m


1) Diseo por cortante:
* Corte resistente del concreto:

Vc= 30414.50 Kg
Vu/= 0.00 Kg

* Corte ultimo:
* Por lo Tanto:

>

OK

2) Diseo por flexion:


* Distribucion de acero en pie (perpendicular a la pantalla):
Diametro

Area

As=

0.01 cm2

3/8"

0.71

AS min=

7.13 cm2

1/2"

1.27

A a usar=

7.13 cm2
17.82 cm

Espaciamiento=

1/2 @ 0.15 m

Por lo tanto:

5/8"
3/4"
1"
area a usar

1.99
2.84
5.07
1.27 cm2

Diametro
3/8"
1/2"
5/8"
3/4"
1"
area a usar

Area
0.71
1.27
1.99
2.84
5.07
1.27 cm2

* Acero de contraccion y temperatura (Horizontal)


As=
Espaciamiento=

7.13 cm2
17.82 cm

Por lo tanto:

1/2 @ 0.15 m

6.2. DISEO DEL TALON


* Peso propio del talon:
P.P.talon = 1092.96 Kg
Brazo de palanca = 0.58 m
Mom. ppt= 628.45 Kg-m
* Relleno encima del talon:
P relleno= 5629.85 Kg
Brazo de palanca = 0.58 m
Mo. Relleno= 3237.16 Kg-m
* Reaccion del suelo:
max= 1.73 Kg/cm2
min= 0.11 Kg/cm2
2-2= 1.49 Kg/cm2

Fuerza en 2-2= 9212.44 Kg


* Fuerza Res. del talon=
2489.63 Kg
Para determinar el momento, dividimos en fig, geometricas (Triangular y Rectangular)
a) Diagrama Triangular:
Fuerza D.T.= 7896.04 Kg
Brazo Pal.= 0.38 m
Momento D.T.= 3026.82 Kg-m

D.R.
D.T.

b) Diagrama Rectangular:

min

2-

Fuerza D.R.= 1316.40 Kg


Braz pal.= 0.58 m
Momento D.T.= 756.93 Kg-m
* Mom. Res.= 81.87 Kg-m
1) Diseo por cortante:

Vc= 30414.50 Kg

* Corte resistente del concreto:

Vu/= 3319.51 Kg

* Cortante ultima:
* Por lo Tanto:

>

OK

2) Diseo por flexion:


* Distribucion de acero en pie (perpendicular a la pantalla):
As=

0.06 cm2

AS min=

7.13 cm2
18.10 cm

Espaciamiento=
Por lo tanto:

1/2 @ 0.15 m

Diametro

Area

3/8"

0.71

1/2"
5/8"
3/4"
1"
area a usar

1.27
1.99
2.84
5.07
1.29 cm2

* Acero de contraccion y temperatura (Horizontal)


Diametro
As=
Espaciamiento=
Por lo tanto:

7.13 cm2
17.82 cm
1/2 @ 0.15 m

3/8"
1/2"
5/8"
3/4"
1"
area a usar

Area
0.71
1.27
1.99
2.84
5.07
1.27 cm2

DISEO DE MURO EN VOLADIZO


PROYECTO: MEJORAMIENTO DE SERVICIOS DE INFORMACION TURISTICO EN EL DEPARTAMENTO DE HUANCAVELICA
* DATOS GENERALES DE DISEO:

Densidad del concreto (c) =


Esfuerzo del Terreno () =
Cohesion (C1)=

2300.00 Kg/m3
8200.00 Kg/m2
1200.00 Kg/m2

Cohesion (C2)=

1200.00 Kg/m2

Densidad del Terreno (1) =

1230.00 Kg/m3

Densidad del Terreno (2) =

1230.00 Kg/m3

Angulo (1) =

35.00

Angulo (2) =
H=
=

35.00
3.00 m
0.00

I. PREDIMENSIONAMIENTO

= 30 .

h1

1
1

C1

h2
1

H
= 0.1

h3

O
b

= 0.1

B
= (0.5 0.7)
Dimensiones:
H=
fc=
B=
C=
D=
h1=

3.00 m.
0.4
1.20 m.
0.20 m.
0.60 m.
0.00 m.

fc2=
fc3=
fc4=

0.13 m.
0.25 m.
0.07 m.
.

h3= 2
= 3
= 4

altura del muro


< 1.53 m. (5 ft)
3.05 m. (10 ft)
6.10 m. (20 ft)
>9.15 m. (30 ft)
usar:

Hs
1.68 m. (5.5 ft)
1.22 m. (4.0 ft)
0.76 m. (2.5 ft)
0.61 m. (2.0 ft)
1.68

* Sobrecarga Vehicular:

=
1

qs=
Ws=

2066.40 Kg/m (por metro lineal de muro)


1859.76 Kg.

h2=

2.60 m.

h3=

0.40 m.
0.30 m.
0.20 m.
0.70 m.

a=
b=
c=

3 = 0.1
c

C2

* Presion activa de Rankine:

1
= 1 ()2
2
1= 35.00
= 0.00

Segn tabla:

= cos

ka= 0.271
Pa =

cos 2 2
cos + 2 2

1499.93 Kg.

Pv =

0.00 Kg.

PH=

1499.93 Kg.

II. FACTOR DE SEGURIDAD CONTRA VOLTEO


Elemento
1
2
3
4
5
6
7

Fuerza
1195.08
0.00
1109.52
2236.88
0.00
0.00
1859.76
S V = 6401.24 Kg.

Brazo Mos
Momentos
0.40
478.03
0.30
0.00
0.60
665.71
0.85
1901.35
0.97
0.00
1.20
0.00
0.75
1394.82
S MR = 4439.91 Kg-m

MO= 1499.93 Kg-m

* Momento por presion activa:


* Factor de seguridad contra volteo:

FS (volteo)= 2.96
> 2

* Por lo tanto:

OK

III. FACTOR DE SEGURIDAD CONTRA DESLIZAMIENTO.

1 2 + 2 2 +

=
K1=K2= 2/3

1
2 + 22
2 2

Kp = 1.000
D = 0.60 m
Pp= 2080.440 Kg/m
FS (deslizamiento) =

3.87
> 1.5

* Por lo tanto:

OK

IV. FACTOR DE SEGURIDAD CONTRA LA FALLA POR CAPACIDAD DE CARGA

e=

0.141 m

<

* Entonces
, =

OK

6
1

q punta =

9087.54 Kg/m2

q talon =

1581.19 Kg/m2

* Capacidad de carga ultima del suelo :

1
= 2 + + 2
2

= 2 45 +

= ( 1)

= 2( + 1)

Nc= 46.12
Nq= 33.30
N=
q=
B=
Fcd =

48.03
738.00 Kg/m2
0.919 m
1.261276767

Fqd= 1.166333186
F d= 1

= = 1

90

cos

= 1

13.18755444

Fci=Fqi=

0.728413802

Fi=

0.388394107

qu= 72956.89 Kg/m2


FS (capacidad de carga) =

8.03
( ) > 3

* Por lo tanto:

OK
c

V. DISEO DE LA PANTALLA VERTICAL


1
= 1 ()2
2

* Carga por empuje activo


Ea =

166.66 Y

* Momento de empuje activo


Ma =
Y(m)
1.00
1.50
2.00
2.50
3.00

Y
3

M = () /3
H2

55.55 Y3
V u (Kg)

M u (Kg-m)

266.65
599.97
1066.62
1666.59
2399.89

88.88
299.99
711.08
1388.82
2399.89

Y =H 2 - 6cm

Y= 1.998

* El espesor de la pantalla F(y) vara desde "c" hasta "B" cm, de la siguiente manera, en cm:
F(Y) = ( c 1 /Y x Y )+ c 1 =
0.0000 Y + c1
* La altura til es variable d(y), se determina para un recubrimiento del concreto en la pantalla de 5 cm.
d(Y) = F(Y) - 5 cm
* El corte mximo resistente del concreto vara con la altura de la pantalla:
f'c = 210 kg/cm
bw = 100 cm
fy = 4200 kg/cm
* Cortante del concreto

Vc =0.75 x0.53 f'c x bw x d(Y) =

576.03 Y

El acero de refuerzo mnimo vara con la altura de la siguiente manera: Asmin = 0.0018x bw x F(Y)
Asmin = 0.18 cm2
En la tabla siguiente se indican los valores de solicitaciones mximas de corte y momento, espesor
de la pantalla, altura til, corte mximo resistente, acero mnimo, acero requerido, para diferentes
valores de Y, que varan desde 1 m hasta Y m con secciones a cada 50 cm.

Y(m)
1.00
1.50
2.00
2.50
3.00

F(y) m
0.20
0.20
0.20
0.20
0.20

d(y) cm
15.00
15.00
15.00
15.00
15.00

Y(m)
1.00
1.50
2.00
2.50
3.00

Vc
8640.48
8640.48
8640.48
8640.48
8640.48

Vc>Vu
cumple
cumple
cumple
cumple
cumple

As min (cm 2 )
2.70
2.70
2.70
2.70
2.70

As (cm 2 )
0.16
0.53
1.27
2.50
4.39

As a usar (cm 2 )
2.70
2.70
2.70
2.70
4.39

Diametro
3/8"
1/2"

Area
0.71
1.27

5/8"
3/4"
1"
Area a usar

1.99
2.84
5.07
1.27 cm2

Diametro
3/8"

Area
0.71

1/2"
5/8"
3/4"
1"
Area a usar

1.27
1.99
2.84
5.07
1.27 cm2

Diametro
3/8"

Area
0.71

1/2"
5/8"
3/4"
1"
Area a usar

1.27
1.99
2.84
5.07
1.99 cm2

Diametro
3/8"
1/2"

Area
0.71
1.27

5/8"
3/4"
1"
Area a usar

1.99
2.84
5.07
1.99 cm2

* Distribucion de acero en pantalla (cara interior)


* Tramo 0 - 1 m
As requerido=
Espaciamiento=
Por lo tanto:
* Tramo 1-6 m
As requerido=
Espaciamiento=
Por lo tanto:

* Acero Horizontal
As temp=
Espaciamiento=
Por lo tanto:

(Predomina el acero de requerido)


4.39 cm2
28.95 cm
Usar 5/8 @ 0.10 m

(Predomina el acero minimo)


2.70 cm2
47.04 cm
Usar 5/8 @ 0.20 m

(Acero de contraccion y temperatura)


2.70 cm2
73.70 cm
Usar 5/8 @ 0.20 m

* Distribucion de acero en pantalla (cara exterior )


* Se colocara el acero de contraccion y temperatura:
As temp=
Espaciamiento=
Por lo tanto:

2.70 cm2
73.70 cm
Usar 5/8 @ 0.20 m

VI. DISEO DEL PIE y TALON:

1
1
C1

H3

2
2
C2

m
2-2
1-1
max

6.1. DISEO DEL PIE:


* Peso propio del pie:
P.P.pie = 277.38 Kg
Bp= 0.15 m
Mom. ppp= 41.61 Kg-m
* Reaccion del suelo:
max= 0.91 Kg/cm2
min= 0.16 Kg/cm2
1-1= 0.72 Kg/cm2
Fuerza en 1-1= 2444.77 Kg
* Fuerza Resultante= 2167.39 Kg
Para determinar el momento, dividimos en fig, geometricas (Triangular y Rectangular)
a) Diagrama Triangular:
Fuerza D.T.= 281.49 Kg
Brazo Pal.= 0.20 m
Momento D.T. = 56.30 Kg-m

1-1

D.R.

b) Diagrama Rectangular:
D.T.

Fuerza D.R.= 2163.29 Kg


Brazo Pal.= 0.15 m
Momento D.R. = 324.49 Kg-m

ma

* Momento r.r.s.= 226.59 Kg-m


1) Diseo por cortante:
* Corte resistente del concreto:

Vc= 30875.33 Kg
Vu/= 2889.86 Kg

* Corte ultimo:
* Por lo Tanto:

>

OK

2) Diseo por flexion:


* Distribucion de acero en pie (perpendicular a la pantalla):
Diametro

Area

As=

0.16 cm2

3/8"

0.71

AS min=

7.24 cm2

1/2"

1.27

A a usar=

7.24 cm2
17.55 cm

Espaciamiento=
Por lo tanto:

1/2 @ 0.15 m

5/8"
3/4"
1"
area a usar

1.99
2.84
5.07
1.27 cm2

* Acero de contraccion y temperatura (Horizontal)


As=
Espaciamiento=

Por lo tanto:

7.24 cm2
17.55 cm

1/2 @ 0.15 m

Diametro
3/8"
1/2"
5/8"
3/4"
1"

Area
0.71
1.27
1.99
2.84
5.07

area a usar

1.27 cm2

6.2. DISEO DEL TALON


* Peso propio del talon:
P.P.talon = 647.22 Kg
Brazo de palanca = 0.35 m
Mom. ppt= 226.53 Kg-m
* Relleno encima del talon:
P relleno= 2236.88 Kg
Brazo de palanca = 0.35 m
Mo. Relleno= 782.91 Kg-m
* Reaccion del suelo:
max= 0.91 Kg/cm2
min= 0.16 Kg/cm2
2-2= 0.60 Kg/cm2
Fuerza en 2-2= 2639.38 Kg
* Fuerza Res. del talon=
-244.72 Kg
Para determinar el momento, dividimos en fig, geometricas (Triangular y Rectangular)
a) Diagrama Triangular:
Fuerza D.T.= 1532.55 Kg
Brazo Pal.= 0.23 m
Momento D.T.= 357.59 Kg-m

D.R.
min

D.T.

b) Diagrama Rectangular:
2-

Fuerza D.R.= 1106.83 Kg


Braz pal.= 0.35 m
Momento D.T.= 387.39 Kg-m
* Mom. Res.= 264.45 Kg-m
1) Diseo por cortante:

Vc= 30875.33 Kg

* Corte resistente del concreto:

Vu/= -326.29 Kg

* Cortante ultima:
* Por lo Tanto:

>

OK

2) Diseo por flexion:


* Distribucion de acero en pie (perpendicular a la pantalla):
As=

0.18 cm2

AS min=

7.24 cm2
17.55 cm

Espaciamiento=
Por lo tanto:

1/2 @ 0.15 m

Diametro

Area

3/8"

0.71

1/2"
5/8"
3/4"
1"
area a usar

1.27
1.99
2.84
5.07
1.27 cm2

* Acero de contraccion y temperatura (Horizontal)


Diametro
As=
Espaciamiento=
Por lo tanto:

7.24 cm2
0.18 cm
1/2 @ 0.15 m

3/8"
1/2"
5/8"
3/4"
1"
area a usar

Area
0.71
1.27
1.99
2.84
5.07
1.27 cm2

VII. BIBLIOGRAFIA
1. BRAJA M. DAS, Prinipios de Ingenieria de Cimentaciones, Mexico, 2001, 4ta Edicion.
2. TEODORO E. HARMSEN, Diseo de Estructuras de Concreto Armado, Fondo Editorail PUCP, 3 ra Edicion.

3. ING. ROBERTO MORALES MORALES, Diseo en Conreto Armado, Fondo editorial ICG, ACI-318
4. Ministerio de Vivienda Construccion y saneamiento, Reglamento Nacional de edificaciones, Lima, Junio del 2006

2.43

You might also like