The citizens of Sioux Falls have been talking about building an indoor aquatics facility since 1951. In their last conversation, they spoke loud and clear.

Now Is the Time to Build Our Public Indoor Aquatics Facility

The Proposed Plan


Centrally located in Sioux Falls at Spellerberg Park Multipurpose indoor aquatics facility with something for everyone Very positive impact on Sioux Falls and the neighborhood Will be constructed without incurring debt Private/public partnerships save taxpayer dollars by offsetting operational expenses Groundbreaking spring 2015 Ribbon cutting fall 2016

FOCUSING on LOCATION

Aquatic Facilities Master Plan


Replace existing Spellerberg pool with indoor aquatic facility Top priority due to current condition of Spellerberg pool Indoor facility would meet immediate need for year-round programming Replacement with a new outdoor facility is not recommended at this site Centrally located to serve the entire community (Counsilman-Hunsaker and Associates 2013)

Election Results: Initiated Measure 2


A vote YES is for the construction of an outdoor pool complex at Spellerberg Park. A vote NO is against the construction of an outdoor pool complex at Spellerberg Park. Yes . . . . . . . . 9,224 (29.37%)

No. . . . . . . . . 22,177 (70.63%)


32.90% Voter Turnout Overall

Spellerberg Park
18-Acre Community Park 3 acres for indoor pool complex and parking 15 acres of parkland remains available for the community to enjoy

Spellerberg Park
Picnic/playground area retained Usable green space in north 1/3 retained Tennis courts relocated on site Sand volleyball courts relocated and consolidated Walkways retained through entire park Sledding hill retained and enhanced with convenient parking

FOCUSING on DESIGN

Design/Construction

Design/Construction

Design/Construction

Design/Construction

Design/Construction

Design/Construction

FOCUSING on ACCESS

Parking
An average of 250 parking spaces needed per day for swim meets
Parking spaces on site = 203 On-street parking = 64 (park side of street only) Total = 267

Exceeds parking needs for swim meets without using neighborhood street parking Adequately meets daily parking needs
Analysis performed by the City Traffic Engineer

Traffic
Existing Spellerberg Pool = 73 vehicles per day Indoor facility = 74 vehicles per day Traffic is spread out over a longer period of time throughout the day and over the course of the year compared to the existing pool.
Analysis performed by the City Traffic Engineer

Traffic
Projected

Western Avenue 18th to 22nd 22nd to 26th 26th to 33rd 22nd Street Kiwanis to Western Western to Lake 26th Street Kiwanis to Western Western to Lake

2000 10,200 13,000 13,300 6,100 7,200 5,900 9,600

2013 12,200 12,900 11,900 5,500 7,300 5,100 7,400

2035 13,300 14,000 13,000 6,300 8,100 4,600 6,900

GPS receivers installed on Western Avenue signals from 15th Street to 37th Street Possible timing and/or phasing changes

FOCUSING on the TAXPAYER DOLLAR

Project Financing Plan


$19.4 million: estimated project costs Proposed project funding: $ 6.4 million.Cash in 2014 budget 11.2 million.Unobligated from 2013 1.8 million.Previously programmed for project $ 19.4 millionTotal

Project Financing Plan


Conservative Approach Debt-free facility on opening day Avoids the use of long-term debt No long-term debt = savings of $4.0$4.5 million Savings means more for other capital needs Does not use property taxes Does not use 1st penny sales taxes Maintains Citys strong financial position

Facility Operating Budget


Estimated at $700,000 annually Private funding (naming rights, sponsorships)targeted to fund operations Included in General Fund reserve forecast No reduction to Parks and Recreation programs or services

FOCUSING on PARTNERSHIP

Public/Private Partnerships
Multiple naming opportunities will be explored to offset some of the operational costs Opportunities could include:
Title sponsor naming rights (building naming) Pouring/concession sponsors Pool naming Room naming Scoreboards/timing system naming Other naming and sponsorship opportunities

FOCUSING on the FUTURE

Schedule/Timeline
Organize project team: MayJuly Select professional services Owners representative Architect/engineering Construction management (at risk methodology) Design development: Julyspring 2015 Construction: spring 2015summer 2016 Open: fall 2016

LOCATION

LOCATION DESIGN

LOCATION DESIGN ACCESS

LOCATION DESIGN ACCESS TAXPAYER DOLLAR

LOCATION DESIGN ACCESS TAXPAYER DOLLAR PARTNERSHIP

LOCATION DESIGN ACCESS TAXPAYER DOLLAR PARTNERSHIP FUTURE

LOCATION DESIGN ACCESS TAXPAYER DOLLAR PARTNERSHIP FUTURE

LOCATION DESIGN ACCESS TAXPAYER DOLLAR PARTNERSHIP FUTURE

Its All Coming Into Focus:

Our New Indoor Aquatics Facility at Spellerberg Park

You might also like