Professional Documents
Culture Documents
Q01009.pptx
The citizens of Sioux Falls have been talking about building an indoor aquatics facility since 1951. In their last conversation, they spoke loud and clear.
FOCUSING on LOCATION
Spellerberg Park
18-Acre Community Park 3 acres for indoor pool complex and parking 15 acres of parkland remains available for the community to enjoy
Spellerberg Park
Picnic/playground area retained Usable green space in north 1/3 retained Tennis courts relocated on site Sand volleyball courts relocated and consolidated Walkways retained through entire park Sledding hill retained and enhanced with convenient parking
FOCUSING on DESIGN
Design/Construction
Design/Construction
Design/Construction
Design/Construction
Design/Construction
Design/Construction
FOCUSING on ACCESS
Parking
An average of 250 parking spaces needed per day for swim meets
Parking spaces on site = 203 On-street parking = 64 (park side of street only) Total = 267
Exceeds parking needs for swim meets without using neighborhood street parking Adequately meets daily parking needs
Analysis performed by the City Traffic Engineer
Traffic
Existing Spellerberg Pool = 73 vehicles per day Indoor facility = 74 vehicles per day Traffic is spread out over a longer period of time throughout the day and over the course of the year compared to the existing pool.
Analysis performed by the City Traffic Engineer
Traffic
Projected
Western Avenue 18th to 22nd 22nd to 26th 26th to 33rd 22nd Street Kiwanis to Western Western to Lake 26th Street Kiwanis to Western Western to Lake
GPS receivers installed on Western Avenue signals from 15th Street to 37th Street Possible timing and/or phasing changes
FOCUSING on PARTNERSHIP
Public/Private Partnerships
Multiple naming opportunities will be explored to offset some of the operational costs Opportunities could include:
Title sponsor naming rights (building naming) Pouring/concession sponsors Pool naming Room naming Scoreboards/timing system naming Other naming and sponsorship opportunities
Schedule/Timeline
Organize project team: MayJuly Select professional services Owners representative Architect/engineering Construction management (at risk methodology) Design development: Julyspring 2015 Construction: spring 2015summer 2016 Open: fall 2016
LOCATION
LOCATION DESIGN