Choose the best answer or answers for each question.



Question 1 of 25.
While reviewing a welders qualifications you see documentation of their log showing they had not
welded with GMAW since Aug. 3, 2006. A failed retest is in the file, dated Feb 12, 2007. The final document
in the file shows they passed the retest on Feb. 13, 07.


The February 13th test is accepted if it was two welds of each type and position that the welder failed in the
first test.

the welder did not need to take the first retest

the welder is acceptable

the welder is not acceptable

Mark for follow up


Question 2 of 25.
While observing UT testing a discontinuity is detected. As the UT operator moves his probe around the
discontinuity the indication remains unchanged. The UT has most likely detected:


incomplete fusion

porosity

hollow bead

crack

Mark for follow up


Question 3 of 25.
While observing UT testing a discontinuity is detected. As the UT operator moves his probe the indication
has a maximum reflection from only one angle and the indication changes with angular movements of the
probe. The UT has most likely detected:


elongated slag

widely spaced porosity

crack

inadequate joint penetration

Mark for follow up


Question 4 of 25.
Which of the following is not a qualification requirement for NDE Level II personnel?


Have written and practical examinations for use of equipment and procedures.

Have at least three months experience with procedures for examination of welds.

Be certified by the Level III.

Have at least six months experience on the same or similar equipment.

Mark for follow up


Question 5 of 25.
What is the maximum size discontinuity appearing on X-ray allowed for Cyclically Loaded Non-tubular
Tension Weld with an E - weld size of (20mm)?


3/16 (5mm)

5/16 (8mm)

(12mm)

(6mm)

Mark for follow up


Question 6 of 25.
Prior to this job, the shop approved E90XX Electrodes during the night shift with the temperature at 16C
(60F) and heavy fog. You are now observing the welder, who has had a quiver (non-heated) full of E90XX
electrodes on his belt for 2 hours while he has been working on 3.5 (62mm) materials. Fog set in about 3
hours ago and the temperature has been 65F (18.5C) all day long. What process is acceptable?


Welder may use these electrodes for another 2 hours.

Welder may make the weld but shall have the weld heat treated for a holding time of 2.5 hours.

Must bake the electrodes for at least 2 hours at between 500F (260C) and 800F (430C).

Must bake the electrodes for at least 1 hour at between 500F (260C) and 800F (430C).

Mark for follow up


Question 7 of 25.
For AWS D1.1 which of the following IS/ARE LIMITATION/S of the code?

Steels with a minimum specified yield strength greater than 100ksi (690 MPa)

Steels less than 1/8 in (3 mm) thick

Vessels and piping

Base metals other than carbon or low-alloy steels

Mark for follow up


Question 8 of 25.
In the review of the Weld Design on a 2 (51mm) Tubular Connection you see this symbol, r. What does
this stand for?


corner radius of rectangular hollow sections

root opening

radius of branch

effective radius intersection

Mark for follow up


Question 9 of 25.
The standard UT Reference Standard for D1.1 is the IIW UT reference block, however other reference
blocks may be used. Which of the following are acceptable?

DSC Block Type

SC Block Type

Corner Block Type

DC Block Type

Mark for follow up


Question 10 of 25.
For SS 1008, grade 30, measuring 2 (50.8mm) and using SMAW, what is the minimum preheat and inter-
pass temperature?


225 degrees F (110C)

300 degrees F (150C)

150 degrees F (65C)

None of the above

Mark for follow up


Question 11 of 25.
While observing UT testing a discontinuity is detected. As the UT operator moves his probe the indication
has a maximum spike, then multiple spikes as the probe is moved. The UT has most likely detected:


crack

aligned porosity

hollow bead

elongated slag

Mark for follow up


Question 12 of 25.
Single-Pass Fillet Welds, up to which of the following sizes, may not be made using any of the filler
metals for Group II base metals?


GMAW - 5/16 in (8 mm)

FCAW - 5/16 in (8 mm)

SMAW - 5/16 in (8 mm)

SAW - 5/16 in (8 mm)

Mark for follow up


Question 13 of 25.
What is the highest allowed mandatory moisture content (dew point) for shielding gas?


-30F or -30 C

-40F or -40 C

-60F or -60 C

40F or 40 C

Mark for follow up


Question 14 of 25.
Is it true that for equal fillet weld sizes, when one member makes an angle with the other member greater
than 105 degrees, the leg length (size) is of greater significance than the effective throat?
True False



Mark for follow up


Question 15 of 25.
While reviewing a radiographic film, you see a symbol B on the film. What is the significance of that?

This is the other end pipe weld x-ray

Backscatter radiation

Backing material present

Film is unacceptable

Mark for follow up


Question 16 of 25.
You are reviewing a shop accepted RT of a (20mm) weld bead, in a statically loaded channel skid
member, with the following conditions: RT film shows a (12mm) elongated discontinuity, 1-7/16
(36.5mm) from the edge of the plate. Do you agree with the shops decision to accept this discontinuity?


Yes

No

Depends on the WPS

Cannot be determined from a radiograph

Mark for follow up


Question 17 of 25.
Which of the following conditions would be CAUSE FOR REJECTING low-hydrogen electrodes E-70XX for
use at any time?

Electrodes were in the shop, in an unheated quiver, for 4.25 hours, they have been baked for 2.5 hours at
650 degrees F (343C), and placed in a holding oven at 250 degrees F (120C).

Hermetically sealed container arrives by UPS with a hole in the bottom.

Electrodes were in quiver which was open to a rain water roof leak for 30 minutes.

Electrodes had been checked out 2 times and returned after 9 hours each time, then baked for 4 hours at
800 degrees F (430C) between uses and placed in the holding oven at 300 degrees (149C) till next use.

Electrodes had been checked out 4 times and returned after 3 hours each time, then placed in the oven at a
holding temperature of 250 degrees (120C) for 4 hours between uses.

Mark for follow up


Question 18 of 25.
AWS D1.1 allows some degree of departure from the variables used to qualify a WPS. However, departure
from variables which affect the mechanical or chemical composition of material properties or soundness
of the weldment are not allowed without?


re-qualification approval

client approval

manufacturer approval

engineers approval

Mark for follow up


Question 19 of 25.
Discontinuities observed in X-rays shall be evaluated on the basis of being either elongated or rounded.
True False



Mark for follow up


Question 20 of 25.
Your project drawing shows that there will be carbon structural steel to be welded with the following
thickness, 1/16 (1.57 mm) plate to 1/8 (3 mm) plate. Which code should be used?


AWS D1.6

AWS D1.3

AWS D1.1

None of the above

Mark for follow up


Question 21 of 25.
Based on the information given, for CVN testing which of the following is not true?

When the requirements of a test are not met, one re-test may be performed.

For material measuring 9/16 (11mm) the test specimen shall be 10X10mm.

For the above specimen, with a min. yield of 52ksi (358Mpa), the minimum Average absorbed energy
should be 20ft-lbf (27J).

For the normal 3 specimen CNV, the individual values are acceptable as recorded, 21, 17 & 14ft-lbf ( 28.5,
23, 19 J)

The test may have 5 specimens which are averaged to reduce the scatter associated with CVN testing.

Mark for follow up


Question 22 of 25.
You have witnessed the torque testing on a galvanized stud measuring 5/8 (15.9mm) with a META of
0.226sq.in. (145.8sq.mm) with 11 threads per inch. The weld failed at 104.8lb-(142.09J). Is this an
acceptable result?
Yes No



Mark for follow up


Question 23 of 25.
What is the Rotation of Face for a horizontal Grove Weld WPS?


80 to 150 degrees

80 to 280 degrees

0 to 80 degrees

280 to 360 degrees

Mark for follow up


Question 24 of 25.
Which of the following are correct statements concerning the handling of X-rays by the Contractor for the
Owner?


A full set of the accepted product film shall be delivered to the Owner upon completion of the work.

Contractor may dispose of the film after one full year.

Contractor does not have to keep film once he delivers a full set to the Owner.

All of the above

None of the above

Mark for follow up


Question 25 of 25.
2 each 30 (762mm) X 0.500W (12.7mm) and 3 each 30 X 0.375W (9.525mm)pipe pups are being single
side welded in place with the following conditions: There are 2 each 0.500W pups, one 34 long joined to
the other one which is 32 long which is joined to a 35 long 0.375W pup. Is this allowed by the code?
Yes No



Mark for follow up