Planed Activity Quantity Calculation

BOM Explosion ( 4 Level)




CS02 Routing


Rout 2

Rout3

Rout 4


Now Plan in MD61 (This is version independent i.e data from all the
version flows while running MD02)



MD02


MD04

Check the plan order



We had SFG stock of 90 units so planed order was created for 1910

Here planed order has been created based on requirement at upper
level of the BOM

System care for stock & QM stock Both other than requirement at
higher level.(1895)
KSPP




Now Run KPSI


Result in KP26


After this Run KSPI to calculate the Planed activity rate


Now you have to delete the MD 61 Planning data


MD02


MD04

KSPP

Now repeat the cycle with planning in MD61







Challenges to get planed activity based on activity time in routing

1) NO stock of FG/SFG should be there in the system because
system considers the existing stock (all FG & SFG) in the
system at the time of creating planed order based on budgeted
quantity in MD61.In case of any existing stock the planed
production order quantity calculated by MRP run gets adjusted
to that extent.

2) Once the activity is calculated take out the details of activity
consumtion out of system (KPSI) & reverse the process
3) Planed order creation by above process automatically
generates PR . In prodction environment repeating this would
remove the required PR from previous MRP run also.
4) It would be adviceable to do this exercise in quality environment
& update the results of the same in production server
5) Routing Data may change based on production plan (Capacity
utilisation). This process should be executed with latest routing
data to minimise the variance of activity quantity at cost center
6) In Production environment Cost Controller must check
Production order completion details & COGI details to confirm
that all the activity quantity has be properly recorded.
7) MD61 is being used by PP to do three weeks planning and all
other activity are attached to this.This is the reason we need to
reverse the budgeted data once activity quantity is calculated


1) Quality server to be available each year ( Feb)
2) IT to transfer live data from production to quality server
3) Mass Teco of existing production order
4) Make stock all FG & SFG to zero
5) Upload the Annual Monthly budget quantity in MD61
6) Run MD02 to calculate for MRP Run, Planed order based on
BOM & routing
7) KSPP to calculate the plan activity per cost center
8) KSPI/ KP26 to update the planed price

RM price to be update for cost calculation in quality environment