DESIGN DRAWINGS

45 DESIGN DRAWINGS
FIRST FLOOR PLAN
1. Entry & Bus Canopy
2. Indoor Plaza
3. Atrium
4. Trellis / Column Forest
5. Greenhouse & Deck
6. Library & Deck
7. Environmental Laboratories
8. Laboratory Deck
9. Boat Float
10. Academic Classrooms
11. Mechanical
12. Faculty Lounge
13. Administration
14. Guidance
15. Gym
16. Boilers & Chillers
17. Refuse
18. Revolving Shelf
19. Pond

DESIGN DRAWINGS 46
1

15

14
13

KEY

Common Area

2 Down
17

11 11 11 11

10 18 10 10 18 10 10 12 10 18 10
16

Down

3 Open to Above Open to Above 3


Open to Above
6
5

18 7
7 18 7 7 18 7
11 11
11 7 18
2
11

8 8

19

4 9

FIRST FLOOR PLAN


0’ 10’ 20’ 30’ 40’ 50’ 100’

47 DESIGN DRAWINGS
SECOND FLOOR PLAN
1 Entry & Bus Canopy Below
2 Indoor Plaza & Entry Spine Below
3 Atrium
4 Greenhouse Below
5 Music
6 Library
7 Art
8 Deck
9 Academic Classroom
10 Octagonal Classroom
11 Mechanical
12 Student Dining
13 Faculty Dining
14 Gym Below
15 Kitchen
16 Multipurpose
17 Multipurpose Lounge
18 Faculty Lounge

DESIGN DRAWINGS 48
1

14
2

KEY

Common Area

11

18 16 17 9 9 10 9 9

Open to Below 3 Open to Below Open to Below 3 6

15 12 13 7 7 5 5
4 11 11
2

8 8

SECOND FLOOR PLAN


0’ 10’ 20’ 30’ 40’ 50’ 100’

49 DESIGN DRAWINGS
ROOF PLAN
1 Entry & Bus Canopy
2 Entry Spine
3 Atrium Skylight (Photovoltaics)
4 Photovoltaic Array
5 Greenhouse
6 Library & Skylight
7 Octagonal Classroom
8 Plaza Skylights
9 Rooftop Entry
10 Gym

DESIGN DRAWINGS 50
1 1

10

10

2 8

8
9 7

9 6
5
3 3

4
4

ROOF PLAN
0’ 10’ 20’ 30’ 40’ 50’ 100’

51 DESIGN DRAWINGS
Operable ventilation louver

Double pane fixed glazing


Glue laminated wood truss

Operable ventilation
louvers

Clerestory window band

Sound absorbing concrete masonry unit wall

LOCKER ROOM
GYM

SECTION 1

0’ 10’ 20’ 30’ 40’ 50’

DESIGN DRAWINGS 52
Operable ventilation louver

Glued laminated timber frame


Aluminum framed low - e tinted glass
Site cast concrete structure

Drainage chain

Operable ventilation louver


Operable ventilation louver
PLAZA

53 DESIGN DRAWINGS
Glued laminated wood beam

Transluscent photovoltaic array


Site cast concrete structure Operable ventilation louver

Clerestory window

Low - E fixed double


glazing

MULTIPURPOSE DINING Low - E fixed double glazing

Operable ventilation louver


Hopper windows

Ventilation louver
Laboratory doors with
ACADEMIC ATRIUM LABORATORY hopper windows
12” thermal mass floor
Ventilating cavity wall

Existing grade line

SECTION 2

0’ 10’ 20’ 30’ 40’ 50’

DESIGN DRAWINGS 54
Operable ventilation louvers

Green tinted glass skylight

Site cast concrete structure

Double glazed awning windows

SECTION 3

0’ 10’ 20’ 30’ 40’ 50’

55 DESIGN DRAWINGS
Operable Ventilation Louver

Sept 15 Dec 21

Sept 15 Dec 21

OCTAGONAL CLASSROOM ART


17’- 6” 13’ - 6”
Sept 15 Dec 21

ROOF DECK

LABORATORY

13’ - 6”
ACADEMIC ATRIUM 13’ - 6”

POND

SECTION 4

0’ 10’ 20’ 30’ 40’ 50’

DESIGN DRAWINGS 56
AXONOMETRIC SECTION

0’ 10’ 20’ 30’ 40’ 50’

57 DESIGN DRAWINGS
16’

ATRIUM BEYOND

ENTRY SPINE
36’

COLUMN FOREST / TRELLIS

POND

SECTION 5

0’ 10’ 20’ 30’ 40’ 50’

DESIGN DRAWINGS 58
Glulaminated roof beam

Site cast concrete

ENTRY SPINE ENTRY BUS CANOPY

59 DESIGN DRAWINGS
WEST ELEVATION
0’ 10’ 20’ 30’ 40’ 50’

DESIGN DRAWINGS 60
EAST ELEVATION
0’ 10’ 20’ 30’ 40’ 50’

61 DESIGN DRAWINGS
SOUTH ELEVATION
0’ 10’ 20’ 30’ 40’ 50’

DESIGN DRAWINGS 62
63 DESIGN DRAWINGS