Wednesday, April 16
th
, 2014
No. : 105/Ext/GW/IV/14
Subject : Sarulla Soil Investigation
PT Dwi Agung Sentosa Pratama
Ruko Regia Boulevard GB / RB2-52
Jl. Graha Bintaro - Bintaro Jaya
Tanggerang
Dear Mr. Agung,
Regarding to the soil investigation plan of Sarulla well pad that is proposed by Dyfco,
here our comments and recommendations:
1. Based on your information, Dyfco proposed two points of CPT and one point of hand
bor at each location. In general, CPT and hand bor has penetration limitation
especially hand bor. Maximum CPT penetration depth is about 20.0 m and the test
will be stopped if the manometer reading reached 250.0 kg/cm
2
. We are unable to
obtain information whether the end of the penetration of the stiff lens, boulder, or
the bearing layer. CPT test should be done to obtain the quality of fill construction.
2. Since the limitation of CPT and hand bor, it is highly recommended to conduct
technical drilling combined with standard penetration test (SPT) and undisturbed
sampling (UDS). The drilling should be conduct through the existing surface and
reach the bearing layer. SPT should be conducted with 1.5 m interval at each
boreholes. From technical drilling the soil stratification and consistency of the project
site will be obtain.
3. To determined the type and quantity of field testing, additional data are needed as
follows:
a) Existing and final topographic maps (cross section included)
b) Layout plan of well pad (include location of the drilling rig, mud pond, etc)
c) The existing geotechnical investigation data before fill construction conducted
d) Laboratory test of fill material (index properties, compaction, and CBR test)
4. To analysis and provide recommendation, additional data are needed as follows:
a) Fill construction method of well pad area
b) Quality control report during fill construction
Please do not hesitate to contact us if you have any question regarding Sarulla soil
investigation.
Your sincerely,
Freddy Gunawan
GW & Associates
Jl. Mulyasari II No. 12
Bandung 40163 Indonesia
Telp./Faks 022-2009367
Email :
geoteknik2005@gwgeo.com
Website: www.gwgeo.com
1
Wednesday, April 16
th
, 2014
No. : 105/Ext/GW/IV/14
Subject : Sarulla Soil Investigation
PT Dwi Agung Sentosa Pratama
Ruko Regia Boulevard GB / RB2-52
Jl. Graha Bintaro - Bintaro Jaya
Tanggerang
Dear Mr. Agung,
Regarding to the soil investigation plan of Sarulla well pad that is proposed by Dyfco,
here our comments and recommendations:
1. Based on your information, Dyfco proposed two points of CPT and one point of hand
bor at each location. In general, CPT and hand bor has penetration limitation
especially hand bor. Maximum CPT penetration depth is about 20.0 m and the test
will be stopped if the manometer reading reached 250.0 kg/cm
2
. We are unable to
obtain information whether the end of the penetration of the stiff lens, boulder, or
the bearing layer. CPT test should be done to obtain the quality of fill construction.
2. Since the limitation of CPT and hand bor, it is highly recommended to conduct
technical drilling combined with standard penetration test (SPT) and undisturbed
sampling (UDS). The drilling should be conduct through the existing surface and
reach the bearing layer. SPT should be conducted with 1.5 m interval at each
boreholes. From technical drilling the soil stratification and consistency of the project
site will be obtain.
3. To determined the type and quantity of field testing, additional data are needed as
follows:
a) Existing and final topographic maps (cross section included)
b) Layout plan of well pad (include location of the drilling rig, mud pond, etc)
c) The existing geotechnical investigation data before fill construction conducted
d) Laboratory test of fill material (index properties, compaction, and CBR test)
4. To analysis and provide recommendation, additional data are needed as follows:
a) Fill construction method of well pad area
b) Quality control report during fill construction
Please do not hesitate to contact us if you have any question regarding Sarulla soil
investigation.
Your sincerely,
Freddy Gunawan
GW & Associates
Jl. Mulyasari II No. 12
Bandung 40163 Indonesia
Telp./Faks 022-2009367
Email :
geoteknik2005@gwgeo.com
Website: www.gwgeo.com
1
Wednesday, April 16
th
, 2014
No. : 105/Ext/GW/IV/14
Subject : Sarulla Soil Investigation
PT Dwi Agung Sentosa Pratama
Ruko Regia Boulevard GB / RB2-52
Jl. Graha Bintaro - Bintaro Jaya
Tanggerang
Dear Mr. Agung,
Regarding to the soil investigation plan of Sarulla well pad that is proposed by Dyfco,
here our comments and recommendations:
1. Based on your information, Dyfco proposed two points of CPT and one point of hand
bor at each location. In general, CPT and hand bor has penetration limitation
especially hand bor. Maximum CPT penetration depth is about 20.0 m and the test
will be stopped if the manometer reading reached 250.0 kg/cm
2
. We are unable to
obtain information whether the end of the penetration of the stiff lens, boulder, or
the bearing layer. CPT test should be done to obtain the quality of fill construction.
2. Since the limitation of CPT and hand bor, it is highly recommended to conduct
technical drilling combined with standard penetration test (SPT) and undisturbed
sampling (UDS). The drilling should be conduct through the existing surface and
reach the bearing layer. SPT should be conducted with 1.5 m interval at each
boreholes. From technical drilling the soil stratification and consistency of the project
site will be obtain.
3. To determined the type and quantity of field testing, additional data are needed as
follows:
a) Existing and final topographic maps (cross section included)
b) Layout plan of well pad (include location of the drilling rig, mud pond, etc)
c) The existing geotechnical investigation data before fill construction conducted
d) Laboratory test of fill material (index properties, compaction, and CBR test)
4. To analysis and provide recommendation, additional data are needed as follows:
a) Fill construction method of well pad area
b) Quality control report during fill construction
Please do not hesitate to contact us if you have any question regarding Sarulla soil
investigation.
Your sincerely,
Freddy Gunawan
GW & Associates