You are on page 1of 5

Self Review by Employee-2013

1. Nature and Scope:


As involved in Tower-C (Finishings) and In charge of Tower-D (Finishings) in PBEL CITY Project Phase-2.
1) As Self responsible for the Finishing activities (Block Work, Palstering,Wooden Joinerys,Upvc works,Kotah
stone,cladding & Granite works,Railing works and Total Building External painting works) of Tower-C and (Block
Work, Palstering,Painting,Water proofing, Wooden Joinerys, Kotah stone,cladding & Granite works,Railing works
and Tiling works) Of Tower-D activities .
2) As self also taken additional Responsibility at PBEL CITY Project Phase-2- of Cladding & Granite works, VDF
Concreting works and Kotah stone works at Tower-C Basement Floor area.
3) The Total flats area of Tower-C & Tower-D (finishings ) consist of 114 no's of 3BHK flats and 84 no's of 2BHK
flats in Tower- D its having 1000-1500 sft built up area, to be Handing Over to Client within schedule time with
customer satisfaction.
4) Preparation of monthly S/c Bills and Daily Progress Reports by quantifying the progress of various activities at
site and simultaneously we are conducting training programmes to contractors, supervisors and workmen to timely
completion of work as per our schedules with Quality Manner.
5) My Responsibilities is to complete all this finishing activities (Block Work, Plastering, Painting, Wooden
joinerys,Upvc works,Kotah & Granite works, Tiling works ,Water proofing & Railing works) within timely
completion with customer satisfaction.
6) Co-ordinating with various service agencies and clients to timely complete with safe man hour and quality work
with all aspects with customer satisfaction in all areas.
2. Achievements (Quantitative/ Measurable):
1) Executed 10550 sqm of Block Work for tower-c in short period of Three months Achieved a Planned
invoice of 75 Lacs. Against the Projected / Planned cumulative invoice of 1Cr.in phase-2.
2) Executed 11680 sqm of Plastering tower-c within a stipulated period of Two months Achieved a Planned
invoice of 15 Lacs. Against the Projected / Planned cumulative invoice of 40 Lacs. in phase-2.
3) Executed 3500 sqm of Painting works of (putty with grinding) tower-d in phase-2.
4) Executing water proofing works for tower-c Toilet sunkans (516 no's) and Balconys (214 no's ) for 100%
leak proof in do short period of Targeted time in phase-2.
5) Executed 750 sqm of Cladding works (granite & stone ) for ICICI BANK SITE within stipulated period of
one month Achieved a invoice of 55 Lacs in ICICI site.
6) Executed fabrication and fixing of staircase and balcony hand rails line with structure do short period of
Targeted time in phase-2.
7) Contributed for 11.9 million safe man hours by strictly following and ensuring our safety IMS norms.
8) Executed 450 sqm of water proofing works (Miscellaneous) for ICICI BANK SITE within stipulated period
of Twenty days.
9) Executed 375 cum of R.C.C and S.C.C for tower-d and podium areas within a targeted period Achieved a
invoice of 48 Lacs in phase-2.
10) Executed 1000 cum of back filling entire podium and tower-d within within a targeted period Achieved a
invoice of 4 Lacs in phase-2.
3.Achievements (Qualitative):
Ensured 100% quality as per our QMS to achieve all Finishings (Block Work, Plastering, Painting, Water
proofing & Railing works) Granite works & Excavation, backfilling and concreting works.
1) Managed the entire Excavation and backfilling activity in proper co-ordination with various service
activities thereby avoiding reworks.
2) Executing the entire concreting works for tower-d and podium finish buildings to 100% client satisfaction.
3) Ensuring 100% quality and safety in all activities executed as per our norms as well as client requirements.
4) Motivating and trained sub-ordinates (Junior level staff, supervisors & workmen) by organising regular
training sessions on various finishing and structure activities with our quality quantity and cost our
standards.
5) Executing the Finishing works for Tower-c building with client requirement to 100% customer
satisfaction.
6) Acheived 85% conquas concretes.
7) Added 50% value to monthly invoice of continuously upto two months, on executing finishing work
activities at ICICI Bank Project. (cladding, painting and water proofing works)
8) Analyzed the productivity with Ensured 100% quality as per our QMS to achieve of all various major
activities like Concrete, Back filling, Finishing works etc., 100% client satisfaction.
4.My Strengths:
1) Dedication in work
2) Self confidence
3) Punctuality
4) Ability to lead team effectively
5) Positive approach
6) Hard working
7) Motivating with training sessions at site level
8) Ability to achieve the task within stipulated time
9) Mobilisation of Resources.
5.Areas I would like to Improve:
1) L&T form work is the area, where scope of improvement is felt
2) Construction management programm with new techniques
3) Project programming planning aspects
4) Interpersonal skills
5) Construction Planning & Control system
Self Review by Employee-2011
1.Nature and Scope:
As a Tower- in-charge of Tower-D in PBEL CITY project phase-2. Self responsible for the structure activities of
tower-d and podium consists of Excavation, Back filling, concreting and water proofing works consists areas
of TOWER-D area of 1800 sq m and PODIUM area of 2500 sq m. self also involved in phase -1 TOWER-A of
Tiling, water proofing, wooden joineries,Granite works,Fabrication and cladding works. The total flats in
Tower- A its having 1000-1300 sft builtup area. My Responsibilities is to complete all this finishing and
structure activities of towers and podium by co-ordinating with various service agencies and clients to timely
complete with safe man hour and quality work with all aspects.
2.Achievements (Quantitative/ Measurable):
1) Executed 2500 cum of back filling entire podium and 5600 cum of back filling tower-d within a stipulated period
of five months in phase-2.
2) Executed 2000 cum of P.C.C,R.C.C AND S.C.C for tower-d and podium areas within a targeted period in phase-
2.
3) Executed 2000 sqm of water proofing for S.T.P and Water tanks for 100% leak proof in short period of two
months in phase-2.
4) Executed 1.1 lac sft of Vitrified and ceramic tiles work within stipulated period of two months in phase -1.
5) Execute fabrication and fixing of staircase hand rails line with structure completion in phase-1.
6) Contributed for 7.2 million safe man hours by strictly following and ensuring our safety IMS norms.
3.Achievements (Qualitative):
Ensured 100% quality as per our QMS to achieve all backfilling,concreting,tiling work and water proofing
works.
1) Managed the entire backfilling activity in proper co-ordination with various service activities thereby
avoiding re- works.
2) Executingthe entire concreting and water proofing works for tower-d and finish buildings to 100% client
satisfaction.
3) ensuring 100% quality and safety in all activities executed as per our norms as well as client requirements.
4. Acheives 85% conquas concretes
4.My Strengths:
1) positive approach
2) Dedication in work
3)Ability to lead team effectively
4) Self confidence
5.Areas I would like to Improve:
1) L&t form work, is the area, where scope of improvement is felt.
2) project programming planning aspects.
3)construction management program m with new techniques.
Self Review by Employee-2010
1.Nature and Scope:
As a finishing engineer in M/S PBEL project and reported to construction manager. Iam in-charge for the finishing
activities of tower-A consists of all Tiling, Water proofing, Wooden joineries, Granite, Fabrication and Cladding
works consists of 205 nos of 2BHK flats each having 1000-1300 sqft builtup area. My responsibilities is to complete
all this finishing activities of Tower by co-ordinating with various service agencies and timely hand over to clients
with safe menour quality work
2.Achievements (Quantitative/ Measurable):
1)Executed 2.8 lac sft of Vitrified and ceramic tiles work within a stipulated period of five months.
2)Executed 32000 sft of Crystallisation water proofing for toilets and balconies for 100% leak proof in a short
period of four months.
3)Executed fabrication and fixing of staircase hand rail in line with structure completion, there by avoiding
temporary hand rails as safety intiative
4) Executed 400 sqm of granite works for toilets and kitchen paltforms and balcony copings and lift cladding
areas
3.Achievements (Qualitative):
1)Ensured 100% quality as per our QMS to achieve 2.8lac sft Vitrified and Ceramic tiles.
2)Added 50% value to monthly invoice continuously upto 5 months, on executing major finishing activities.
3)Contributed for 5 million safe man hours by strictly following and ensuring our safety IMS norms.
4)Developing sub-ordinates by organising regular training sessions on various finishing activities
4.My Strengths:
1) Positive approach
2) Self confidence
3) Ability to lead team effectively
5.Areas I would like to Improve:
1) Planning Aspects
2) Construction Management