You are on page 1of 7

Generated by Jive on 2014-07-02+02:00

1
Basic Steps to Create Dymanic Modification
Rule
Process:

Quality Management --> Inspection Planning--> Basic data--> Sample --> Dynamic modification Rule
(QDR1)
DMR is basically used to vary the inspection scope.
DMR can define in 1. Task list at header level
2. Task list at characteristic level
3. Inspection setup of the material master at
inspection type level
E.g:
Normal inspect(5 lots(A*)) --> skip(10lots(A*))--> Reduced inspect(1 lot(A*))--> skip(10lots(A*))
skip(10lots(R*))--> Tighten inspect(5 lot(A*))--> Normal inspect(5
lots(A*))
A- Lot Accept
R- Any one Lot Reject
Basic Steps to Create Dymanic Modification Rule
Generated by Jive on 2014-07-02+02:00
2
Select option Dynamic modification rule is created for usage decision /At lot creation.
Assign stage, required inspection severity, enter short text and tick on Initial Inspection Stage(ISt) )/Skip stage.

Basic Steps to Create Dymanic Modification Rule
Generated by Jive on 2014-07-02+02:00
3
Normal inspection:
Skip Stage:
Max.skip duration is in days :

This field is used in the following ways:

To determine the current inspection stage at sample determination
When the quality level is updated
Basic Steps to Create Dymanic Modification Rule
Generated by Jive on 2014-07-02+02:00
4
The system first checks the number of skips and then the skip duration.

Inspection lot creation
At sample determination for a lot, if the number of allowed skips has not yet been reached, but the maximum
skip duration has been reached or exceeded, the next stage in the sequence for accepted lots is taken as
the current stage for the inspection lot. If this stage is another skip, then the next stage in the sequence for
a rejected lot is taken as the current inspection stage. This means that the current inspection lot is due for
inspection as a result of the maximum skip duration, although the quality level contains a skip as the next
inspection stage.
Update of the quality level
The quality level is updated either at lot creation or when the usage decision is made. The update occurs
independently of sample determination for an inspection lot (even if dynamic modification takes place at lot
creation) and always occurs after the current inspection stage has been determined for the inspection lot.
If the maximum skip duration has been reached or exceeded, when the quality level is updated, the system
calculates the next inspection stage for the quality level of an accepted lot based on the same algorithm. This
means that the following stage in the sequence for accepted lots is used as the next inspection stage. If this
stage is a skip, the following stage in the sequence for a rejected lot is taken as the inspection stage for the
quality level. Since this stage usually specifies an inspection, the next inspection lot is to be inspected.
Tighten inspection:
Basic Steps to Create Dymanic Modification Rule
Generated by Jive on 2014-07-02+02:00
5
Reduced inspection:

Basic Steps to Create Dymanic Modification Rule
Generated by Jive on 2014-07-02+02:00
6
We can assign DMR in
1. Task list at header level
2. Task list at characteristic level
3. Inspection setup of the material master at
inspection type level
We can review/change Quality level for DMR by using T.code QDL1/QDL2/QDL2
Basic Steps to Create Dymanic Modification Rule
Generated by Jive on 2014-07-02+02:00
7



Thank You

You might also like