You are on page 1of 14

INSTALLATION AND COMMISSIONING CHECKLIST

HUAWEI PTN1900 MODEL NETWORK 3G







Version 5 HUAWEI Confidential Page1, Total14





Installation and Commissioning
Checklist PTN1900


NETWORK EQUIPMENT INFORMATION
NAME PTN1900
MODEL PTN1900
ROOM
CITY
PO Number

Huawei Internal Contract
Number




INSTALLATION AND COMMISSIONING CHECKLIST
HUAWEI PTN1900 MODEL NETWORK 3G





Version 5 HUAWEI Confidential Page2, Total14

DISTRIBUTE PTN1900 GENERAL INFORMATION

CABINETS AND EQUIPMENTS INSTALLED
Board Slot ESN
















CABINET INSTALLATION
CONCRETE ESD-FLOOR











INSTALLATION AND COMMISSIONING CHECKLIST
HUAWEI PTN1900 MODEL NETWORK 3G





Version 5 HUAWEI Confidential Page3, Total14

CHAPTER I
HARDWARE INSTALLATION PROTOCOL
1. CABINET INSTALLATION INSPECTION

1.1
No parts on the cabinets are damaged or detached. No cables are
damaged or snapped
NO YES N/A

1.2 Verify that the equipment metal supports dont have oxide trace NO YES N/A

1.3
Equipment installed according to the TSS and/or customer
recommendations.
NO YES N/A

1.4
The supports are positioned and spaced in accordance with the drawing of
the installation holes. (This item applies to the cabinet installation on the
ESD floor.)
NO YES N/A

1.5
All supports are fixed to the floor correctly. (This item applies to the cabinet
installation on the ESD floor.)
NO YES N/A

1.6
All components of the supports are installed correctly. (This item applies to
the cabinet installation on the ESD floor.)
NO YES N/A

1.7
All floor holders are installed at the same height. (This item applies to the
cabinet installation on the ESD floor supported by floor holders.)
NO YES N/A

1.8
Each cabinet is well insulated from the support or the floor.
NO YES N/A

1.9
All plastic boards are installed on the top and bottom of the cabinets.
NO YES N/A

1.10
All cabinet accessories are installed, including front door, back door, and
side doors.
NO YES N/A

1.11
The row labels, column labels, and product labels are attached to the
specified positions.
NO YES N/A

1.12
The ESD wrist strap is connected to the ESD bonding point on the cabinet.
NO YES N/A

1.13
All connecting plates are installed for combining cabinets.
NO YES N/A

1.14
Insulation is performed for shockproof parts between multiple rows of
cabinets.
NO YES N/A



INSTALLATION AND COMMISSIONING CHECKLIST
HUAWEI PTN1900 MODEL NETWORK 3G





Version 5 HUAWEI Confidential Page4, Total14

1.15
All bolts are fixed with flat washers and spring washers in a correct order.
NO YES N/A

1.16
The cabinets are stable and orderly.
NO YES N/A

1.17
All the adjacent cabinets stand side by side in a straight line.
NO YES N/A

1.18
The cabinet its correctly aligned
NO YES N/A

1.19
All cabinet side doors facing the aisle are aligned with the error less than 5
mm.
NO YES N/A

1.20
The surfaces of the cabinets are clean without any fingerprint or smudge.
There is no dust, excessive cable tie ends or other sundries either inside or
outside each cabinet.
NO YES N/A

1.21
All kinds of labels are correct, legible and intact.
NO YES N/A

1.22
The front and back doors of the cabinets are easy to open or close.
NO YES N/A

1.23
The modules in one cabinet are aligned from the top down.
NO YES N/A

1.24
All the filler panels are installed.
NO YES N/A

1.25
All Subracks are installed in proper positions, and their DIP switches are
properly set.
NO YES N/A

1.26
No paint is detached.
NO YES N/A









INSTALLATION AND COMMISSIONING CHECKLIST
HUAWEI PTN1900 MODEL NETWORK 3G





Version 5 HUAWEI Confidential Page5, Total14

2. CABLE INSTALLATION INSPECTION
2.1 Power and PGND cables
2.1.1
The -48 V power cables are blue, the PTN1900 power cables are black,
and the PGND cables are green and yellow. The power cables shall
meet the field requirements.
NO YES N/A

2.1.2
All the core wires of the power cables and PGND cables are made of
copper.
NO YES N/A

2.1.3
No power cable or PGND cable is damaged or snapped.
NO YES N/A

2.1.4
No welding point exists in the power cables and PGND cables.
NO YES N/A

2.1.5
No breaking device such as the switch or fuse exists in the electric
connection of the grounding system. NO YES N/A

2.1.6
The power cables and PGND cables of extra length are trimmed rather
than coiled.
NO YES N/A

2.1.7
The grounding bars and PGND bars are finally connected to one
grounding conductor.
NO YES N/A

2.1.8
The PGND cable of the PDB is connected to the positive pole of the DC
power distribution panel which is then grounded with a cable whose
cross-sectional area meets the requirement.
NO YES N/A

2.1.9
The grounding bar of the PDB is well connected to the grounding bar
provided by the customer.
NO YES N/A

2.1.10
The output current values of the PDB and the DC power distribution
panel meet the requirements.
NO YES N/A


2.1.11
All power cables and PGND cables are not short-circuited or reversely
connected.
NO YES N/A

2.1.12
The OT terminals of the power cables and PGND cables are welded or
crimped securely.
NO YES N/A

2.1.13
The bare wires and lug handles at the OT terminals are tightly wrapped
up using insulating tapes or heat-shrinkable tubes.
NO YES N/A

2.1.14
All OT terminals are equipped with the flat washers and spring washers
and the terminals are in good contact with the flat washers and the
spring washers.
NO YES N/A

2.1.15
The power cables and PGND cables connecting the power distribution
box with the functional modules, and the PGND cables connecting the
NO YES N/A



INSTALLATION AND COMMISSIONING CHECKLIST
HUAWEI PTN1900 MODEL NETWORK 3G





Version 5 HUAWEI Confidential Page6, Total14

modules with the grounding bar are all correctly installed and have
satisfactory contact.
2.1.16
The front, back, and side doors are respectively connected to the
grounding bolts on the lower enclosure of the cabinet through the 6 mm
2

green and yellow cables.
NO YES N/A

2.1.17
The power cables and PGND cables are bound separately from other
cables.
NO YES N/A

2.1.18
The power cables and PGND cables are laid straight and bound orderly
in the cabinets or in the PDB. Each switch on the PDB is marked with
the number of the corresponding cabinet.
NO YES N/A

2.1.19
Engineering labels are attached to both ends of each power cable or
PGND cable.
NO YES N/A

2.1.20
The power cable of the alarm box laid on a wall is in a PVC trough.
NO YES N/A

2.1.21
Power Test.
NO YES N/A


3. SIGNAL CABLE INSTALLATION INSPECTION

2.2.1
The signal cables are routed in accordance with the engineering design.
NO YES N/A

2.2.2
No welding point exists in the signal cables.
NO YES N/A

2.2.3
No signal cable is damaged or snapped.
NO YES N/A

2.2.4
The signal cable connectors are intact and installed correctly.
NO YES N/A

2.2.5
The signal cables are laid out for the convenience of maintenance and
expansion.
NO YES N/A

2.2.6
The signal cables routed on a cable ladder are bound on the cross stays
using cable ties. The signal cables routed in a cable trough need not be
bound. However, they are laid out neatly without tangling and do not run
out of the trough. They are bound as a whole at the entrance and exit of
the trough and at the turning points.
NO YES N/A



INSTALLATION AND COMMISSIONING CHECKLIST
HUAWEI PTN1900 MODEL NETWORK 3G





Version 5 HUAWEI Confidential Page7, Total14

2.2.7
Proper surplus length is reserved for the signal cables near connectors for easy
inserting and pulling of the connectors. NO YES N/A

2.2.8
Proper extra length is reserved for the signal cables at turning points.
The turning radius meets the requirement.
NO YES N/A

2.2.9
Leave the signal cables a little slack near the cable holes in the cabinet.
NO YES N/A

2.2.10
Proper surplus length is reserved for the signal cables at the point where
they are led down from the cable rack.
NO YES N/A

2.2.11
The cables whose connectors are far away from the cable entrance are
arranged at the external side of the cable bundle, while those near the
entrance are arranged at the internal side of the cable bundle. The trunk
cables are laid out smoothly without any tangling.
NO YES N/A

2.2.12
The signal cables connected to the left part of the subrack are led out of
the subrack from the left. Similarly, the signal cables connected to the
right part of the subrack are led out of the subrack from the right.
NO YES N/A

2.2.13
The optical cables must be sheathed using corrugated pipes at outsides
of cabinets. Both ends of the pipes must be fastened. The edges are
smooth or be processed for cutting prevention.
NO YES N/A

2.2.14
The optical cables are not tensed or tangled at turning points. The
optical cables in pairs are laid out neatly and bound to the extent that the
optical cables can just move freely in the cable ties.
NO YES N/A

2.2.15
No other cables are laid on the optical cables.
NO YES N/A

2.2.16
The extra optical cables are coiled up in the optical cable box at the back
of the cabinet
NO YES N/A

2.2.17
The connectors of the optical cables that are laid but not in use are
covered with protective caps.
NO YES N/A

2.2.18
The signal cable of the alarm box laid on a wall is in a PVC trough. The
extra part of the cable is coiled up and placed beneath the floor beside
the alarm box or on the cable ladder.
NO YES N/A

2.2.19
The signal cables are bound separately from the power cables.
NO YES N/A

2.2.20
The signal cables are bound and arranged neatly and closely. The cable
ties are spaced evenly. The tips of the cable ties point to the same
direction.
NO YES N/A



INSTALLATION AND COMMISSIONING CHECKLIST
HUAWEI PTN1900 MODEL NETWORK 3G





Version 5 HUAWEI Confidential Page8, Total14

2.2.21
The extra parts of the cable ties are fully cut off.
NO YES N/A

2.2.22
The identifiers (labels) attached to both ends of the signal cables are
legible. They are attached neatly and point to the same direction.
NO YES N/A


3. Field Cleanliness Installation Inspection

3.1
In the equipment room, no packing cartons, cases, or boards are
randomly placed. The articles in the equipment room are in their own
places.
NO YES N/A

3.2
There are no cable ties or other sundries in the cable racks (troughs), at
the bottom of the cabinets, or around the cabinets.
NO YES N/A

3.3
There are no cable tie cuts or other sundries under the floor. The ESD
floor, if available for the equipment room, is clean and in good condition.
(This item applies to the cabinet installation on the ESD floor).
NO YES N/A













INSTALLATION AND COMMISSIONING CHECKLIST
HUAWEI PTN1900 MODEL NETWORK 3G





Version 5 HUAWEI Confidential Page9, Total14

CHAPTER II
COMMISSIONING TEST PROTOCOL
Item Requirements Check Result
Software
Commissi
oning
NE login NE can be loged in normally
NO YES N/A

Software Version
Check
all boards necessary for software has loaded
software
NO YES N/A

NE ID each NE has a unique ID
NO YES N/A

NE IP each NE has assign an IP address
NO YES N/A

NE name name for the NE
NO YES N/A

Date the date is correct
NO YES N/A

Time the time is correct
NO YES N/A

Start
Performance
Monitor
start 15m and 24h performance monitor
NO YES N/A

VLAN ID for
inband DCN
a VLAN ID is necessary for inband DCN
NO YES N/A

Bandwidth for
inband DCN
Specify the bandwidth for inband DCN
NO YES N/A

Port DCN Enabling the Port DCN to support inband DCN
NO YES N/A

Testing Cable
Connections
the cable must be connected correctly
NO YES N/A

Testing fiber
Connections
the fiber must be connected correctly
NO YES N/A

Testing the Mean
Launched
Optical Power of
Optical
Interfaces
the mean launched optical power is in the
normal range
NO YES N/A



INSTALLATION AND COMMISSIONING CHECKLIST
HUAWEI PTN1900 MODEL NETWORK 3G





Version 5 HUAWEI Confidential Page10, Total14

Testing the
Received Optical
Power of Optical
Interfaces
the received optical power of optical interface
is in the normal range, no bit errors appears
NO YES N/A



A
Optical receiver Sensitivity
NO YES N/A

B
Redundancy power board
NO YES N/A

C
Synchronization switching time
NO YES N/A

D
Suitable board distribution
NO YES N/A

E
Correct Board Type
NO YES N/A











INSTALLATION AND COMMISSIONING CHECKLIST
HUAWEI PTN1900 MODEL NETWORK 3G





Version 5 HUAWEI Confidential Page11, Total14

CHAPTER III
DOCUMENTATION


Item
N
DOCUMENTS Date

























PERSON IN CHARGE NAME SIGNATURE
NEXTEL
HUAWEI
EXECUTION DATE VERSIN: 5



INSTALLATION AND COMMISSIONING CHECKLIST
HUAWEI PTN1900 MODEL NETWORK 3G





Version 5 HUAWEI Confidential Page12, Total14

Hardware and Commissioning Pending List
This report will be prepared with the acceptance Certificate to list all the pending issues
to be solved.


Network Element : Room
PTN1900

Item
N
Fault Description
Fault
Category
(1, 2 , 3 , 4)
Cleaned
By
HUAWEI
Accepted
By
NEXTEL
























PERSON IN CHARGE NAME SIGNATURE
NEXTEL
HUAWEI
EXECUTION DATE VERSIN: 5



INSTALLATION AND COMMISSIONING CHECKLIST
HUAWEI PTN1900 MODEL NETWORK 3G





Version 5 HUAWEI Confidential Page13, Total14

HARDWARE AND COMMISSIONING ACCEPTANCE
CERTIFICATE
This document certifies that equipments passed the inspection according internal order.

Network Element

PTN1900

Room

PO Number
Contract Name
Huawei Internal Contract Number


Comments:


Inspection Date :


Customer :
Nextel del Per S.A.

Company:
Huawei del Per S.A.C.

Name: Name:
Title: Title:
Signature :


Signature:



Place & Date : Place & Date:


INSTALLATION AND COMMISSIONING CHECKLIST
HUAWEI PTN1900 MODEL NETWORK 3G





Version 5 HUAWEI Confidential Page14, Total14

HARDWARE AND COMMISSIONING FINAL ACCEPTANCE
CERTIFICATE
This document certifies that equipments passed the inspection according internal order.
Network Element

PTN1900

Room
PO Number
Contract Name
Huawei Internal Contract Number


Comments:


Customer :
NEXTEL DEL PER S.A.

Company:
HUAWEI DEL PER S.A.C.

Name:


Name:


Title:

Title:

Signature :


Signature:



Place & Date :
Lima, , 2012
Place & Date:
Lima, , 2012