Professional Documents
Culture Documents
1 A POWER TRANSFORMERS
B I) CIRCUIT BREAKERS
D VOLTAGE TRANSFORMERS
1) 245KV CVT, 8800 PF, one phase CVT with 3
Nos. 4.11
secondaries.
33 KV, Isolators.
5 a) 33 KV, 800 A, 25 KA Upright with Earth Switch Set 0.76
complete metallic portion with insulator
b) 33 KV, 800 A, 25 KA Upright without Earth Switch (live
Set 0.70
point height 3750mm)
c) 33 KV, 800 A, 25 KA Upright without Earth Switch (live
Set 0.76
point height 4750mm)
G I) BATTERY SETS (Tubular)
i) 48 V, 100 AH Set 0.36
vii) AC distrubution Box Single joint type for Stn Nos. 0.53
ii) 123 KV, 20 MVAR (Double star, double bank of 4x5 1793384+41068=1
Set
MVAR) 834452
267151+26587=29
vi) 12.1KV 2.9 MVAR star connected Capacitor bank Set
3702
428126+9587
vii) 12.1KV 5.8 MVAR star connected Capacitor bank Set
=437713
230377+6778=237
viii) 12.1KV 2.5MVAR star connected Capacitor bank Set
146
11475+600 =
i) Meter box suitable for fixing 6 ETV meters Nos.
12075
ii) Meter box suitable for fixing 4 ETV meters Nos. 6750+600 = 7350
iii) Meter box suitable for fixing 3 ETV meters Nos. 4725+420 = 5145
As per respective
a) 9 Mtr. Long Nos.
ESCOMs rate
As per respective
b) 9.5 Mtr. Long, 350Kgs working load Nos.
ESCOMs rate
iii) CLAMPS
220KV Side
a) Rigid Type Nos. 1024+77=1101
b) Expansion Type Nos. 3810+289=4099
c) Sliding Type Nos. 1024+81=1105
Amount in
Rs
Sl. No. Description of material Unit
220KV 800A/
0.5mH
9 TELECOMMUNICATION EQUIPMENTS
A Wave Trap
M OH Cables (Unshielded)
h) Secretarial Plan 103 P.B. telephone (1 Main & 1 Extn) Per Set 2080
i) Secretarial Plan 103 P.B. telephone (1 Main & 2 Extn) Per Set 4500
1) 20 pair Mtrs. 88
35) Wall mounting type holder for Hydrometer Nos. (1) 100
36) Earth resistance tester Nos. (1) 5400
37) Arc welding machine (10 KVA) Nos. (1) 23650
38) Thermometer with wall mounting holder Nos. (1) 210
39) Rubber appron Nos. (1) 350
40) Pippette Nos. (1) 350
41) Protective Goggle Nos. (1) 350
42) Acid Resisting jars (4 print capacity) Nos. (1) 375
43) Rubber shoes knee height Pairs (1) 419
44) Glass Funnel Nos. (1) 105
45) Hickery rods Nos. (1) 1577
11 A HARDWARE
Single Tension
1 Clamps with arcing Nos. 1708 847 718 488 437
horns
Double Tension
2 Clamps with arcing Nos. 3080 2136 1967 1751 -
horns
Single Suspension
3 Clamps with arcing Nos. 1146 899 849 588 471
horns
Double Suspension
4 Clamps with arcing Nos. 2078 1788 1668 1395 -
horns
Pre-formed Armour
7 Nos. 1603 508 407 261 -
Rods
Automatic Come -
10 Nos. 3874 3722 3722 3722 1748
along Clamp
Appx. Unit
weight in
Sl. No Specifications MT(Add 5% Unit
towards GI
Bolts & Nuts )
ii) Station Structure Tower - ITI with peak with 2.5 meter extn. 0.98 Nos.
ii) Station Structure Tower - 6T3 with peak with 5 meter extension 1.379 Nos.
b) 110KV Isolators
c) 66KV Isolators
d) 33KV Isolators
i Live Point Height 4750mm 0.32 Nos.
ii) Live Point Height 3750mm 0.24 Nos.
Appx. Unit
weight in
Sl. No Specifications MT(Add 5% Unit
towards GI
Bolts & Nuts )
2) Current Transformers:
a) For 220KV CTs & NCTs 0.15 Nos.
b) For 110KV CTs & 11KV NCTs 0.18 Nos.
c) For 66KV CTs & NCTs and 11KV NCTs 0.19 Nos.
d) For 33KV CTs and NCTs 0.142 Nos.
3) Voltage Transformers /CVTs
a) For 220KV VTs & CVTs 0.18 Nos.
b) For 110KV CTs 0.15 Nos.
c) For 66KV VTs 0.2 Nos.
d) For 33KV VTs 0.142 Nos.
4) Surge Arresters
a) For 100MVA, Transformer both on 220KV & 110/66KV Side 0.22 Nos.
f) 9KV, 5KVA lightning Arrestor (Metal oxide type) Nos. 597+16 = 613
d) Special Cable terminating tower type for 66Kv Add 5% towards Bolts &
5.13MT
Cable end termination Nuts
h) Fabricated,galvanisedSteel Mounting
Add 5% towards Bolts &
Supporting Structure for 220 KV Cable end 0.14 MT
Nuts
termination/
11KV Joints and Pot heads
14
Heat Shrinkable type transition jointing kit
A
for XLPE Cable
i) 3 x 95 Sq.mm Nos. 13040
ii) 3 x 240 Sq.mm Nos. 14085
d) Stand type