28 GI PIPES
50MM Dia GI Pipe Mtrs 150 350.00 52500.00
100MM Dia GI Pipe Mtrs 200 800.00 160000.00
50MM Dia GI Long Radius Bend Nos 40 190.00 7600.00
100MM Dia GILong Radius Bend Nos 45 300.00 13500.00
63A 3 Phase Welding socket No. 1 700.00 700.00
30 Chain link mesh for fencing RM 360 1120.00 403200.00
29 Design, Engineering, / Testing LS
TOTAL 57287418.00
132/33 KV, 2 x 50 MVA Substation, Bajana - ERECTION / LABOUR
Sl.
Description Unit Qty Unit Rate Amount
No.
1 Power Transformers : 132 / 33 KV, 50 MVA, Nos 2 196500 393000.00
Delta /Star, DY11, 3Ph, 50Hz, Core type winding
with OLTC, RTCC Panel etc.,
2 SF6 Circuit breaker: 145 KV, 3150A, 40KA Nos 3 13500 40500.00
Class with semi-pneumatic /pneumatic.
3 33KV SF6 Circuit breaker Nos 10 6740 67400.00
4 Isolators: Isolators including Marshalling box
132KV, 3000 A, 40 KA Class Double Break
manually operated isolators
a) Upright mounting type with earth switch. Nos 1 6740 6740.00
b) Upright mounting type with out earth switch. Nos 4 6180 24720.00
5 33 KV Isolator: double break 800A, 25KV capacity
a) Upright mounting type with earth switch. Nos 8 3930 31440.00
b) Upright mounting type with out earth switch. Nos 18 3560 64080.00
6 Current transformers:
i) 132 KV,C.T Nos 9 6180 55620.00
ii)33KV CT including for metering Nos 54 3150 170100.00
(iii)33 KV NCT: 500/1A for REFR protection with Nos 2 2810 5620.00
regid bimatalic terminal connector suitable for G.I
flat of size 50 x 6 mm
7 Voltage Transformers : - 132 KV PT Nos 9 6180 55620.00
b) 33KV PT including for metering & Bus Nos 30 3150 94500.00
8 Surge Arrestors:
i) 120KV, 10KA, Class - III Nos 9 3930 35370.00
ii) 30 KV, 10KA, Station Class. Nos 30 2020 60600.00
9 Simplex type control and relay panel
complete as per specifications :
a) For Power Transformers 50 MVA 132/33KV + Nos 3 11230 33690.00
Bus protection
b) For 132KV Transmission lines Nos 1 9540 9540.00
c) 33 KV side Transformer + Feeder CRP - Nos 10 6740 67400.00
10 a) Hot dip galvanized GI Structure for towers MT 58 5620 325960.00
and equipments as per standards.
b)33 KV side RSJ Poles MS Painted with cross arms MT 24.5 13470 330015.00
etc complete for 8 Nos 33 KV feeders
c) Fastners (Bolts and Nuts) for structues. MT 4.2 3370 14154.00
11 ACSR Conductor / Bus Stringing :
a) Drake ACSR Mtrs 900 17 15300.00
b) Coyote ACSR Mtrs 1000 12 12000.00
ii) GSS Earth wire : 7/3.15mm Steel with Mtrs 450 6 2700.00
clamps/ Lugs etc.
12 Insulators :
i) Post insulators solid core 132KV Class Nos 12 2250 27000.00
ii) Post insulators solid core 33KV Class Nos 15 1130 16950.00
13
11KV 120KN Disc insulators with hardware:
28 GI PIPES
50MM Dia GI Pipe Mtrs 150 28 4200.00
100MM Dia GI Pipe Mtrs 200 34 6800.00
50MM Dia GI Long Radius Bend Nos 40 22 880.00
100MM Dia GILong Radius Bend Nos 45 28 1260.00
63A 3 Phase Welding socket No. 1 115 115.00
30 Chain link mesh for fencing RM 360 85 30600.00
29 Design, Engineering, / Drawing LS 673500 673500.00
30 Testing & conducting pre commissioning LS 280000 280000.00
tests
30 Drawing approval and approval from 785000 785000.00
CEIG / GETCO.
TOTAL 4607079.00
132/33 KV, 2 x 50 MVA Substation, Bajana - CIVIL WORK
Sl.
Description Unit Qty Unit Rate Amount
No.
1 Site Levelling:
66KV Station shall be maintained at
one level The excess quantity of the
soil due cutting during levelling of the
land, soil excavated for the cable Cmtr 1400 280 392000.00
duct/foundation of the equipments
shall be used for pitching along the
boundary/beyond the boundary of the
2 station
Foundations:
Engineering supply of all labour,
material & construction of cement
concrete footings of any depth,
pedestals including the cost of
excavation, concreting, cement,
reinforcement steel if required for all
works, grouting, underpinning etc., for
the following :
Sl.
No. Unit Rate
Description Unit Qty Amount
inc Tax
TOTAL 8747400.00
132/33 KV, 2 x 50 MVA Substation, with 8 Nos 33 KV
feeders in Bajana, Khambalia, Jam Nagar Dist
FINAL - ABSTRACT
Note :
Supply rates are inclusive of duties & taxes, delevery Ex- Project site
For Erection & Civil works : Service tax prevailing at the time of billing