You are on page 1of 5

1.

2.
3.
4.
5.
6.

7.

8.

9.
10.
11.
12.
13.
14.
15.
16.

17.
18.

19.
20.

AACE International Recommended Practice No. 29R03, Forensic Schedule Analysis


TCM Framework: 6.4 Forensic Performance Assessment, AACE International
RecommendedPractices,2007.(A02)
AACE International Recommended Practice No. 52R06, Time Impact Analysis As
AppliedInConstruction,AACEInternationalRecommendedPractices,2006.(A03)
A. A. Kwakye, Construction Project Administration in Practice, Longman Group
Limited,January1997.(A19)
Barry B. BrambleandMichaelT.Callahan,ConstructionDelayClaims, Third Edition,
ASPENSPublishers,2000.(A17)
Brian Eggleston, Liquidated Damages and Extension of time: In Construction
Contracts,ThirdEdition,WileyBlackwell,2009.(A31)
Bruce Evans Hallock, and Pradip M. Mehta, The Great DebateTIA vs WINDOWS A
Better Path for Retrospective Delay Analysis?, CDR.04, AACE International
Transactions,2007.(A40)
Cheryl Simple, Francis T. Hartman, and George Jorge, Construction Claims and
Disputes: Causes and Cost/Time Overruns, Journal of Construction Engineering and
Management,Vol.120,No.4,June,1996.(A11)
Chris Carson, and Paul Beckwith, Preparing & Analyzing a Prospective
Contemporaneous Time Impact Analysis, Alpha Corporation and Regency Centers,
August9,2007.(A34)
Damien Keogh, Successful Delay and Disruption Claims: Presenting the Claim, Irish
ConstructionMagazine,May,2005.(A38)
David A. Norfleet, Understanding Construction Schedule Delays, Professional
InvestigativeEngineers,2004.(A42)
Dennis F. Turner, Building Contract Disputes: Their Avoidance and Resolution,
SecondImpression,LongmanPublisher,1990.(A01)
Dr.SatishB.Mohan,andMr.KhalidS.AlGahtani,CurrentDelayAnalysisTechniques
andImprovements,PS201,AACEInternationalTransactions,2006.(A21)
Evans M. Barba, Prospective and Retrospective Time Impact Analysis,
Thomson/West,BarbaConsultingInc.,No.20057,July,2005.
Gary H. Jentzen, Robin A. Collins, and Dr. Gui Ponce de Leon, Estimating Delay
Damages,C&C.1,AACEInternationalTransactions,1996.(A27)
GeorgeE.Baram,ConcurrentDelaysWhatAreTheyandHowtoDealWithThem?,
CDR.07,AACEInternationalTransactions,2000.(A10)
G.K.Killing,W.Kootchar,R.MacAfee,andF.EdumFotwe,ConstructionContractors'
ClaimProcessFramework,JournalofConstructionEngineeringandManagement,Vol.
127,No.4,July/August,2001.(A13)
Hamed A. AlSaggaf, The Five Commandments of Construction Project Delay
Analysis,CostEngineering,Vol.40,No.4,April1998.(A39)
HyunSo Lee, HanGunk Ryu, JungHo Yu, and JadeJun Kim, Method for Calculating
ScheduleDelayConsideringLostProductivity,JournalofConstructionEngineeringand
Management,November,2005.(A32)
JamesG.ZackJr.,ButForSchedulesAnalysisandDefense,CostEngineering,Vol.
43,No.8,August,2001.(A05)
JamesG.ZackJr.,PacingDelaysThePracticalEffect,CostEngineering,Vol.42,No.7,
July,2000.(A33)
240

21. JesusM.DeLaGarza,MichaelC.Vorster,andCordellM.Parvin,TotalFloatTradedas
Commodity, Journal of Construction Engineering and Management, Vol. 117, No. 4,
December,1991.(A41)
22. John C. Livengood, Retrospective TIAs: Time to Lay Them to Rest, CDR.08, AACE
InternationalTransactions,2007.(A37)
23. Jonathan Jingsheng Shi, S. O. Cheung, and David Arditi, Construction Delay
Computation Method, Journal of Construction Engineering and Management,
January/February,2002.(A18)
24. Joseph s. Ream, Delay Analysis: A Systematic Approach, Cost Engineering, Vol. 31,
No.2,February,1989.(A47)
25. Keith Pickavance, Delays and Disruption In Construction Contracts, Second Edition,
LLPLondonHonkongInc.,2002.(A23A25)
26. LeeSchumacher,QuantifyingandApportioningDelayonConstructionProjects,Cost
Engineering,Vol.37,No.2,February,1995.
27. Luigi Di Paola and Paolo Spanu, Concurrent Delays, The International Construction
LawReview,p.373585,2006.(A09)
28. Mark Boe, Identifying Concurrent Delay, New from CPMI on Construction Claims
AnalysisandResolution,2004.(A30)
29. Michael S. Simon, Construction Contracts and Claims, Publisher McGrawHill (Tx)
(April1979).(A15)
30. Mikhail Chester and Chris Hendrickson, Cost Impacts, Scheduling Impacts, and the
Claims Process During Construction, Journal of Construction Engineering and
Management,Vol.131,No.1,January,2005.(A20)
31. Nagui I. Raid, David Aridity, and Jamshid Mohammadi, Integrated System for
Managing OwnerDirected Project Acceleration, Journal of Construction Engineering
andManagement,Vol.120,No.1,March,1994.(A45)
32. Ossama A. Hosny, An Artificial Neural Network Approach for Predicting Effect of
ClaimsonProjectTimeandCost,Engng.Res.Jour,Vol.106,PP.C88C106,August,2006.
(A43)
33. Robert B. McCullough and Satinder Singh Baweja, Identifying As Built Completion
Drivers,PS.14,AACEInternationalTransactions,2006.(A29)
34. RogerGibson,Analysisofprojectdelaytheoreticalorinterrogationofthefacts?,
GibsonConsultingLtd.,June,2003.(A04)
35. Roy L. Wilson, Prevention and Resolution of Construction Claims, Journal of the
ConstructionDivision,ProceedingsoftheAmericanSocietyofCivilEngineers,Vol.108,
No.C03,ASCE,September,1982.(A35)
36. R. Max Wideman, Construction Claims Identification, Communication & Record
Keeping,TUNS/RevaySeminar,AEWServices,Vancouver,BC,2001.(A12)
37. JimmieW.Hinze,ConstructionContracts,SecondEdition,PublisherMcGrawHill,Inc.,
2009.(A14)
38. Sabah Alkass, Mark Mazerolle and Frank Harris, Construction delay analysis
techniques,ConstructionManagementandEconomics,Vol.14,p.375394,1996.
39. Saleh Mubarak, Construction Project Scheduling and Control, Pearson Prentice Hall
2005.(A07)

241

40. Saied Kartam, Generic Methodology for Analyzing Delay Claims, Journal of
Construction Engineering and Management, Vol. 125, No. 6, November/December,
1999.(A28)
41. SevtalanaLyasko,DailySpecificAsBuiltinAsPlannedvs.AsBuiltScheduleAnalysis,
CostEngineeringVol.50,No.3,March2008.
42. SocietyofConstructionLaw,SCLDelayandDisruptionProtocolPrintmost(Southern)
Ltd.,March,2003.(A36)
43. Stephen Scott, Delay Claims in U.K. Contracts, Journal of Construction Engineering
andManagement,Vol.123,No.3,September,1997.(A24)
44. TarekHegazyandChuiZhang,DailyWindowsDelayAnalysis,JournalofConstruction
EngineeringandManagement,Vol.131,No.5,May1,2005.(A22)
45. TheWorldBankandtheInternationalFinanceCorporation(IFC),DoingBusiness2010
Egypt, Arab Republic, The International Bank for Reconstruction and Development /
TheWorldBank,2009.(A44)
46. Thomas F. Peters, Dissecting the Doctrine of Concurrent Delay, CDR.01, AACE
InternationalTransactions,2003.(A26)
47. Vera A. Lovejoy, Claims Schedule Development and Analysis: Collapsed AsBuilt
SchedulingforBeginners,CostEngineering,Vol.46,No.1,January,2004.(A08)
48. VincentPowellSmith and MichaelFurmston, ABuilding ContractCasebook,Second
Edition,GrandaPublishing,1990.
49. William Schwartzkopf and John J. McNamara, Calculating construction Damages,
SecondEdition,ASPENPublishers,Update2010.(A06)
50. YoungjaeKim,KyungraiKim,andDongwooShin,DelayAnalysisMethodUsingDelay
Section,JournalofConstructionEngineeringandManagement,November,2005.(A
51. ZartabQ.Zafar,ConstructionProjectDelayAnalysis,CostEngineering,Vol.38,No.3,
March,1996.

242

:

.
:

.
:
):(A

.
):(B

.
):(C

.
):(D
. .


.
.

.

.
.
.
Visual Basic

.
:
:

.
:


.
.
:

.
4

You might also like