Professional Documents
Culture Documents
o
= (f
ck
)
1/2
10
-3
= (30)
1/2
10
-3
= 0.0055
o <
Structural system = simply supported beam , K = 1,0
(L/d)
basic
= 1.0[11+2.9] = 13.9
Modification factor
i. Flange beam, b
eff
/b
w
= 1950/250 = 7.6 : 0.8
ii. Beam span, 7.5 > 7 m ; = 7/7.5 = 0.93
iii. As
prov
/As
req
= 1571/1555 = 1.01
(L/d)
allow
= (L/d)
basic
x modification factor
= 13.9 *0.8*0.93*1.01
= 10.44
4 Marks
FAKULTI KEJURUTERAAN AWAM & SUMBER ALAM
UNIVERSITI MALAYSIA PAHANG
REFERENCE CALCULATION MARKS
(L/d)
actual
= L/d = 7500/400 = 18.75
(L/d)
actual
= 18.75 > (L/d)
allow
Deflection failed!
Solution
i. Increase steel reinforcement at tension zone
ii. Increase beam size, especially height of beam
iii.
2 Marks
Detailing
2 Marks