Proposed Hotel Redevelopment oI 15-16 Connaught Road West Design Calculation oI Tower Crane Climbing Date: 2 / 4 / 2014 Contents Description I. Introduction Due to the site condition, the tower crane will need wall supports at each 4 storeys Ior climbing. Shear walls W2 and W6 and the linked beam thus need to be checked to sustain the reaction Iorce.
Proposed Hotel Redevelopment oI 15-16 Connaught Road West Design Calculation oI Tower Crane Climbing Date: 2 / 4 / 2014 Contents Description I. Introduction Due to the site condition, the tower crane will need wall supports at each 4 storeys Ior climbing. Shear walls W2 and W6 and the linked beam thus need to be checked to sustain the reaction Iorce.
Proposed Hotel Redevelopment oI 15-16 Connaught Road West Design Calculation oI Tower Crane Climbing Date: 2 / 4 / 2014 Contents Description I. Introduction Due to the site condition, the tower crane will need wall supports at each 4 storeys Ior climbing. Shear walls W2 and W6 and the linked beam thus need to be checked to sustain the reaction Iorce.
Proposed Hotel Redevelopment of
NO. 15-16 Connaught Road West
Design Calculation
of
Tower Crane Climbing
Date: 2/4/2014Contents
Description page
I. Design Brief 1
A, Introduction
B. Design Infromation
C. Design Code/reference:
IL. Plan, Section & Details
IML. Design Calculation
Appendix A - Manufacturer's Design Calculation of Tower Crane Internal ClimbingI Design Brief:
A. Introduction
Due to the site condition, the tower crane LPT100-H8 will need wall supports at each 4 storeys
for climbing. Shear walls W2 & WG and the linked beam thus need to be checked
to sustain the reaction force,
B. Design Code/reference:
B.1 Structural Use of Concrete, Hong Kong,2004
B.2 Structural Use of Steel, Hong Kong,2005
B.3 Code of Practice on Wind Effect in Hong Kong, 2004