Checklist for Sample Distribution Board Status Remarks
After approval the materials of switch gear Contractor must submit sample for final approval. Contractor should be notified by the following: 1. Ensure that IP rating as per the approved submittal and color of enclosure should be approved by Architect Engineer. 2. ype of hinge should be metallic. !. Identification with ferrules for all wiring inside "#. $. Identification engraved label below %C# brea&ers and %ain incomer' E(C#' Contractor timer' relay ) etc. *. All internal wiring should be si+ed according to brea&ers rating and bear the 1,*-C. .. Crimping for wires should be done properly for above .mm wires and above. /. All components for "# from single manufacturer according to 0pecification and approval of submittal materials. 1. 0hort circuit rating of brea&er should be 1, &A as per approved drawings and specification. 2. 0topper in both end of rows and blan& cover for all space between brea&ers. 1,. 34 relay for all A5C e6uipment refer to Authority re6uirement if 7window A5C or split unit5duct8 is available. 11. (oad schedule to be included and fi9ed on the door. 12. #e sure that the load between phases are balanced before our approval on submittal. 1!. :asher for all screw to be provided on the internal cover of enclosure. 1$. (evel of the pro;ection for brea&er and contactor should be e6ual with %C#5E(C#. 1*. Particular E(C# section with brea&er to be in one row. 1.. <eutral bar should be separate for each section. 1 N.N. Group 4 (Updated as of 9 June 2011) 1/. %inimum 2 nos. earth bars to be provided for each "# and connected to the body. 11. =ating of all brea&ers should as per approved load schedule' ta&ing in consideration approved actual mechanical load for >.C.3.5:.?.5coo&er5 and any other appliances. 12. #efore the approval of service "#s' ta&e in consideration the mode of operation of the light in service areas 7it will wor& though timer' Contractor ) etc.8 to provide the necessary' re6uirements inside the "#s. 2,. >or all services "#' wiring diagram should be inside "# clearing all in and out wires' timer' contactor' over ride switch ) etc. 21. %a&e sure that the curves connected between incomer 7isolator8 of "# and other section are si+ed according to the rating of the incomer and connected to the sectors as the following: a. 0hould be through the E(C# if the section has more than one %C#. b. 0hould be through the %C# if the section has only one %C# and E(C#. 22. All space bus bar for future brea&ers should be protected by attention danger ferrules. @ <umber of holes for circuit conduit should be e6uals the number of circuits 7used circuits' spare and space8 approved load schedule. %ain Contractor %EP Contractor <ame: <ame: 0ignature: 0ignature: 2 N.N. Group 4 (Updated as of 9 June 2011)