Amr Diab event - Mousa Coast 29 / 08 / 2014. Aim of this document is to show all the preparations, actions and KPIs evolution for the event. The event was served by the below sites : 1. RS-AMR-DIAB (mobile shelter) 2. SS-MOUSA-COAST. 3. SZ-HALIJAL-OYN.
Amr Diab event - Mousa Coast 29 / 08 / 2014. Aim of this document is to show all the preparations, actions and KPIs evolution for the event. The event was served by the below sites : 1. RS-AMR-DIAB (mobile shelter) 2. SS-MOUSA-COAST. 3. SZ-HALIJAL-OYN.
Amr Diab event - Mousa Coast 29 / 08 / 2014. Aim of this document is to show all the preparations, actions and KPIs evolution for the event. The event was served by the below sites : 1. RS-AMR-DIAB (mobile shelter) 2. SS-MOUSA-COAST. 3. SZ-HALIJAL-OYN.
The aim of this document is to show all the preparations, actions and KPIs evolution for Amr Diab event which occurred in Mousa Coast on Friday 29-08-2014 .
The preparations for the event (new mobile shelter , sites upgrades , DT measurements , parameters retune ) will be illustrated in details .
The main KPIs evolution will be discussed in the next slides .
The recommendations will be presented in the conclusion to be taken into considerations in next events .
The importance of Amr Diab event could be observed from high number of attendances , therefore special preparations have been done for the sake of this event .
The event was served by the below sites : 1. RS-AMR-DIAB (mobile shelter) . 2. SS-MOUSA-COAST . 3. SZ-HALIJAL-OYN .
The event location is shown in graph
1- Introduction 1| Introduction Agenda 2| 2G Event Preparation 3| 2G KPIs Evolution 4| Conclusion The planned events preparations will be discussed in this section:
Mobile shelter (RS-AMR-DIAB) was planned to rectify the extra TRXs needed on all sectors to guarantee that the capacity will be sufficient.
Mobile shelter configuration was (8HR 8HR 8HR----8HR 8HR 8HR) to avoid any congestion .
Frequency plan and neighbors definition were done on mobile shelter (RS-AMR-DIAB) .
SDCCHs reconfiguration was done to avoid an suspected SDCCH assign cong .
Parameters tuning were done in our preparation for expected traffic increase .
Upgrades were requested as shown below :
2- Event Preparation (1/2) Cell Name Old TRX configuration Needed TRX configuration Status SS-MOUSA-COAST_D_S4_49482_1_S 2 4 Not done SS-MOUSA-COAST_D_S5_49483_1_S 3 4 Not done SS-MOUSA-COAST_D_S6_49484_1_S 2 4 Not done SS-MOUSA-COAST_G_S1_49479_1_S 3 4 Not done SS-MOUSA-COAST_G_S2_49480_1_S 4 4 Not done SS-MOUSA-COAST_G_S3_49481_1_S 3 4 Not done SZ_HALIJAL_OYN_G_S1_14127_1_G 3 12 Not done DT measurements (outdoor) shows good level and quality .
DT measurements (indoor) shows good level and quality .
The traffic was stepped up on 8/29/2014 4:00:00 PM and reached the highest value (106.9 Er) on 8/29/2014 9:00:00 PM , with zero SD and RTCH assign cong.
The traffic was increased during hours of event ( 4 PM to 11 PM) from 381.3 Erl to 692.8 Erl compared with same hours for the day before, with percentage of increase 81.69%.
The CSSR & CDR with normal trend during event period
3- KPIs Evolution
1| Introduction Agenda 2| Event Preparation 3| KPIs Evolution 4| Conclusion The main KPIs were stable during the event period.
Huge increase in traffic as it was increased by 81.69% from 381 Erl to 692 Erl compared with same hours for the day before.
There was zero SDCCH and RTCH assign cong during the highest peak of traffic .
The total number of extra TRXs for this event was 48 TRXs .
There were 11 cells (6 GSM and 5 DCS cells) serving this event .
Upgrades were not done on sites SS-MOUSA-COAST and SZ-HALIJAL-OYN but did not affect the congestion during the peak of the highest traffic .
Mobile shelter is highly recommended in such events . 4- Conclusion 1| Introduction Agenda 2| 3G Event Preparation 3| 3G KPIs Evolution 4| Conclusion The planned events preparations will be discussed in this section: Mobile shelter (RS-AMR-DIAB) & the configuration was planned to guarantee that the capacity will be sufficient. CE & PS Needed:
Features Needed
Upgrades which requested on G_SZ-HALIJAL-OYUN_0029SI site. CE & PS Needed:
Features Needed: 2- Event Preparation (1/2) Target R99 CE Target HSDPA PS Target HSUPA PS 600 4 6 2 nd Carrier HSDPA Enable HSUPA Enable HSDPA 64QAM 15 Codes HSPA 72 proposed no of E1s Needed Needed for each carrier Needed for each carrier Needed for each carrier 15 codes needs to be activated on each carrier enable HSPA 72 Users per cell for each carrier 8E1s RNC ID WBTS ID WBTS Name Site code Target R99 CE Target HSDPA PS Target HSUPA PS 26 64 G_SZ-HALIJAL-OYUN_0029SI 0029SI 400 2 6 RNC ID WBTS ID WBTS Name 2 nd Carrier HSDPA Enable HSUPA Enable HSDPA 64QAM 15 Codes 26 64 G_SZ-HALIJAL- OYUN_0029SI Needed Needed for each carrier Needed for each carrier Needed for each carrier 15 codes needs to be activated on each carrier DT measurements (outdoor) shows RSCP level and EcNo .
DT measurements (indoor) shows good RSCP and EcNo .
Voice traffic was stepped up on 8/29/2014 2:00 PM and reached the highest value (54 Er) on 8/29/2014 8:00 PM .
Data traffic was stepped up on 8/29/2014 12:00 PM and HSDPA reached the highest value (3.5 Gbyte) on 8/30/2014 12:00 AM & HSUPA reached the highest value (4.2 Gbyte) on 8/29/2014 11:00 PM .
CSSR Voice & HSDPA degraded for due VCC congestions @ 10PM and solved next hour due to below actions.
We Increased CPICH power for S_SS- MOUSA-COAST_0485SI @11PM to offload traffic from site MS-AMR-DIAB & we Decreased MaxTotalUplinkSymbolRate for site MS-AMR-DIAB @11:03 PM. 3- KPIs Evolution
3- KPIs Evolution
Voice traffic was stepped up on 8/29/2014 2:00 PM and reached the highest value (54 Er) on 8/29/2014 8:00 PM .
Data traffic was stepped up on 8/29/2014 12:00 PM and HSDPA reached the highest value (3.5 Gbyte) on 8/30/2014 12:00 AM & HSUPA reached the highest value (4.2 Gbyte) on 8/29/2014 11:00 PM .
CSSR Voice & HSDPA degraded for 2hours due to VCC utilization.
We Increased CPICH power for S_SS- MOUSA-COAST_0485SI to offload traffic from site MS-AMR-DIAB & we Decreased MaxTotalUplinkSymbolRate for site MS-AMR-DIAB . 1| Introduction Agenda 2| 3G Event Preparation 3| 3G KPIs Evolution 4| Conclusion Upgrades were done on sites SS-MOUSA-COAST and SZ-HALIJAL-OYN .
The main KPIs were stable during the event period except 2 hours.
Voice traffic increased by 61% from 21 Erl to 54 Erl compared with same hours for the day before.
HSDPA Traffic increased by 48.5% from 1.8Gbyte to 3.5Gbyte compared with same hours for the day before.
HSUPA Traffic increased by 88.8% from 0.47Gbyte to 4.2Gbyte compared with same hours for the day before.
Mobile shelter is highly recommended in such events . 4- Conclusion COPYRIGHT 2011 ALCATEL-LUCENT. ALL RIGHTS RESERVED.