Amr Diab event - Mousa Coast



29/08/2014
1| Introduction
Agenda
2| Event Preparation
3| KPIs Evolution
4| Conclusion

The aim of this document is to show all the preparations, actions and KPIs evolution for Amr Diab event which
occurred in Mousa Coast on Friday 29-08-2014 .

The preparations for the event (new mobile shelter , sites upgrades , DT measurements , parameters retune ) will be
illustrated in details .

The main KPIs evolution will be discussed in the next slides .

The recommendations will be presented in the conclusion to be taken into considerations in next events .

The importance of Amr Diab event could be observed from high number of attendances , therefore special
preparations have been done for the sake of this event .

The event was served by the below sites :
1. RS-AMR-DIAB (mobile shelter) .
2. SS-MOUSA-COAST .
3. SZ-HALIJAL-OYN .

The event location is shown in graph
















1- Introduction
1| Introduction
Agenda
2| 2G Event Preparation
3| 2G KPIs Evolution
4| Conclusion
The planned events preparations will be discussed in this section:

Mobile shelter (RS-AMR-DIAB) was planned to rectify the extra TRXs needed on all sectors to
guarantee that the capacity will be sufficient.

Mobile shelter configuration was (8HR 8HR 8HR----8HR 8HR 8HR) to avoid any congestion .

Frequency plan and neighbors definition were done on mobile shelter (RS-AMR-DIAB) .

SDCCHs reconfiguration was done to avoid an suspected SDCCH assign cong .

Parameters tuning were done in our preparation for expected traffic increase .

Upgrades were requested as shown below :
















2- Event Preparation (1/2)
Cell Name Old TRX configuration Needed TRX configuration Status
SS-MOUSA-COAST_D_S4_49482_1_S 2 4 Not done
SS-MOUSA-COAST_D_S5_49483_1_S 3 4 Not done
SS-MOUSA-COAST_D_S6_49484_1_S 2 4 Not done
SS-MOUSA-COAST_G_S1_49479_1_S 3 4 Not done
SS-MOUSA-COAST_G_S2_49480_1_S 4 4 Not done
SS-MOUSA-COAST_G_S3_49481_1_S 3 4 Not done
SZ_HALIJAL_OYN_G_S1_14127_1_G 3 12 Not done
DT measurements (outdoor) shows good level and quality .










DT measurements (indoor) shows good level and quality .

























2- Event Preparation (2/2)
1| Introduction
Agenda
2| 2G Event Preparation
3| 2G KPIs Evolution
4| Conclusion

The traffic was stepped up on
8/29/2014 4:00:00 PM and
reached the highest value (106.9
Er) on 8/29/2014 9:00:00 PM ,
with zero SD and RTCH assign
cong.

The traffic was increased during
hours of event ( 4 PM to 11 PM)
from 381.3 Erl to 692.8 Erl
compared with same hours for the
day before, with percentage of
increase 81.69%.

The CSSR & CDR with normal trend
during event period


3- KPIs Evolution

1| Introduction
Agenda
2| Event Preparation
3| KPIs Evolution
4| Conclusion
The main KPIs were stable during the event period.

Huge increase in traffic as it was increased by 81.69% from 381 Erl to 692 Erl compared with
same hours for the day before.

There was zero SDCCH and RTCH assign cong during the highest peak of traffic .

The total number of extra TRXs for this event was 48 TRXs .

There were 11 cells (6 GSM and 5 DCS cells) serving this event .

Upgrades were not done on sites SS-MOUSA-COAST and SZ-HALIJAL-OYN but did not affect the
congestion during the peak of the highest traffic .

Mobile shelter is highly recommended in such events .
4- Conclusion
1| Introduction
Agenda
2| 3G Event Preparation
3| 3G KPIs Evolution
4| Conclusion
The planned events preparations will be discussed in this section:
Mobile shelter (RS-AMR-DIAB) & the configuration was planned to guarantee that the capacity will
be sufficient.
CE & PS Needed:


Features Needed






Upgrades which requested on G_SZ-HALIJAL-OYUN_0029SI site.
CE & PS Needed:



Features Needed:
2- Event Preparation (1/2)
Target R99 CE Target HSDPA PS Target HSUPA PS
600 4 6
2
nd
Carrier
HSDPA
Enable
HSUPA Enable HSDPA 64QAM 15 Codes HSPA 72 proposed no of E1s
Needed
Needed for
each carrier
Needed for each
carrier
Needed for each
carrier
15 codes needs to be
activated on each carrier
enable HSPA 72
Users per cell for
each carrier
8E1s
RNC ID
WBTS
ID
WBTS Name Site code
Target R99
CE
Target HSDPA
PS
Target HSUPA
PS
26 64 G_SZ-HALIJAL-OYUN_0029SI 0029SI 400 2 6
RNC ID WBTS ID WBTS Name 2
nd
Carrier HSDPA Enable HSUPA Enable HSDPA 64QAM 15 Codes
26 64
G_SZ-HALIJAL-
OYUN_0029SI
Needed
Needed for each
carrier
Needed for each
carrier
Needed for each carrier
15 codes needs to be activated on
each carrier
DT measurements (outdoor) shows RSCP level and EcNo .










DT measurements (indoor) shows good RSCP and EcNo .

























2- Event Preparation (2/2)
1| Introduction
Agenda
2| 3G Event Preparation
3| 3G KPIs Evolution
4| Conclusion

Voice traffic was stepped up on
8/29/2014 2:00 PM and reached the
highest value (54 Er) on 8/29/2014 8:00
PM .

Data traffic was stepped up on
8/29/2014 12:00 PM and HSDPA
reached the highest value (3.5 Gbyte) on
8/30/2014 12:00 AM
& HSUPA reached the highest value
(4.2 Gbyte) on 8/29/2014 11:00 PM .

CSSR Voice & HSDPA degraded for due
VCC congestions @ 10PM and solved
next hour due to below actions.

We Increased CPICH power for S_SS-
MOUSA-COAST_0485SI @11PM to
offload traffic from site MS-AMR-DIAB &
we Decreased MaxTotalUplinkSymbolRate
for site MS-AMR-DIAB @11:03 PM.
3- KPIs Evolution

3- KPIs Evolution


Voice traffic was stepped up on
8/29/2014 2:00 PM and reached the
highest value (54 Er) on 8/29/2014 8:00
PM .

Data traffic was stepped up on
8/29/2014 12:00 PM and HSDPA
reached the highest value (3.5 Gbyte) on
8/30/2014 12:00 AM
& HSUPA reached the highest value
(4.2 Gbyte) on 8/29/2014 11:00 PM .

CSSR Voice & HSDPA degraded for
2hours due to VCC utilization.

We Increased CPICH power for S_SS-
MOUSA-COAST_0485SI to offload
traffic from site MS-AMR-DIAB & we
Decreased MaxTotalUplinkSymbolRate for
site MS-AMR-DIAB .
1| Introduction
Agenda
2| 3G Event Preparation
3| 3G KPIs Evolution
4| Conclusion
Upgrades were done on sites SS-MOUSA-COAST and SZ-HALIJAL-OYN .

The main KPIs were stable during the event period except 2 hours.

Voice traffic increased by 61% from 21 Erl to 54 Erl compared with same hours for the day
before.

HSDPA Traffic increased by 48.5% from 1.8Gbyte to 3.5Gbyte compared with same hours for the
day before.

HSUPA Traffic increased by 88.8% from 0.47Gbyte to 4.2Gbyte compared with same hours for the
day before.

Mobile shelter is highly recommended in such events .
4- Conclusion