DATA PROFILE OF AIRPORTS AND CIVIL ENCLAVES IN WESTERN REGION

State Airport Code Status Type Apron Capacity


Orientation
Dimension
in Mtrs. Area in Sqm Peak Hour Date of Commissioning Nav- Aids Visual- Aids A/C Move. Pax(in Lacs) Works Planned/ Remarks
1
Goa
Goa (CE)-IN 4D Op'l Int'l CE 08/26 3430x45 9 [2E+ 7C] 61957 (Intg) 2750
Integrated Terminal inaugurated on
03.12.2013 DVOR, DME, ILS R26 PAPI, 28904 40.00 Parallel Taxi track
2 Ahmedabad 4E Op'l Int'l 05/23 3505x45
30Nos.[1F+7E+1D+1
7C+4(A+B)]
39000 (Int'l)
31000 (Dom)
1600 (Int'l)
1400 (Dom)
International Terminal Inauagurated
on 04.07.2010
DVOR, DME, ILS R23,
ASR, MSSR, ARSR,
VCCS PAPI, CAT-I at R23, SAPL at R05 42229 45.64
Cat-IIIB lighting and runway resurfacing
New ATC cum technical block
Extn.of parallel taxiway
3 Bhavnagar 4C Op'l Dom. 07/25 1920x45 2Nos. C 1616 (Dom) 200 DVOR, DME, ILS R25 PAPI, SAPL at R07, SAPL at R25 732 0.67
Extension of Runway
New Dom. Terminal
Subject to availibility of 490.36 acres of land requested from state
Govt and future traffic
4 Bhuj (CE)-IAF 4C Op'l Dom. CE 05/23 2515x45 4 Nos. [2C+2B] 6256 (Dom) 400 DVOR, DME 1452 1.40
5 Deesa Non-Op'l Dom. 06/24 1008x23
6 Jamnagar (CE)- IAF 4C Op'l Dom. CE 06/24 2515x45 2Nos. C 2700 (Dom) 150 720 0.73
Extn of Apron
New Terminal Building
Subject to availibility of 17.38 acres of land requested from state
Govt and future traffic
7 Kandla 3C Op'l Dom. 05/23 1524x30 2Nos. C 1216 (Dom) 100 NDB 10 0.00
New Fire Station,
New ATC Tower
New Terminal Building
Subject to availibility of 282.07 acres of land requested from state
Govt and future traffic
8 Keshod 3C Op'l Dom. 05/23 1372x45 2Nos. C 500 (Dom) 40 NDB
On the request of Coast Guard, AAI is processing to hand over
the Airport to ICG keeping land for Civil Enclave
9 Porbandar 3C Op'l Dom. 09/27 1372x45 2Nos. C 5732 (Dom) 300 NDB, VOR, DME PAPI 1337 0.22
Extn of runway
New Terminal Building
Subject to availibility of 276 acres of land requested from state
Govt and future traffic
10 Rajkot 4C Op'l Dom. 05/23 1846x45 2Nos. C 2490 (Dom) 200 DVOR,DME, ILS R23 PAPI, SAPL at R05, SAPL at R23 2911 3.06 A new Greenfield Airport is proposed
11 Surat 4C Op'l Dom. 04/22 2250x45 4Nos. C 8474 (Dom) 500 DVOR, DME, ILS R22 PAPI, SAPL at R04, SAPL at R22 2034 1.74
Govt. Gujarat has reserved 1067 Hectatres of land for future
Airport Development
12 Vadodara 4C Op'l Dom. 04/22 2469x45 6Nos. C
7674 (Dom-Exist)
17500 (Intg-U/C)
425 (Exist)
700 (U/C) DVOR, DME, ILS R22 PAPI, SAPL at R04, SAPL at R22 6489 6.86
New Integrated Terminal under const.
New ATC Tower
New Parallel Taxitrack and resurfacing of runway
24.28 acres of land requested from State Govt. For basic Strip
13 Bhopal 4D Op'l Dom. 12/30 2744x45 13Nos. C 26936 (Intg) 700
Integrated Terminal inaugurated on
28.06.2011 DVOR, DME, ILS R30 PAPI, CAT-I at R30, SAPL at R12 7446 4.30
Extn. Of Runway
New ATC Tower
14 Indore 4D Op'l Dom. 07/25 2750x45 11 Nos. C 18056 (Intg) 700
Integrated Terminal inaugurated
on14.04.2012 DVOR, DME, ILS R25 PAPI, SAPL at R07, SAPL at R25 13785 11.14
15 Jabalpur 4C Op'l Dom. 06/24 1988x45 2Nos. C 2626 (Dom) 150 DVOR, DME PAPI, SAPL at R06, SAPL at R24 2090 1.07
New Fire Station and ATC Tower
New Terminal Building
Extn. Of Runway
Subject to availibility of 470 acres of land requested from state
Govt and future traffic
16 Khandwa 2B Non-Op'l Dom. 10/28 890x45
On the request of State Govt., AAI is processing to hand over the
Airport to State Govt. On 30 years lease.
17 Panna 2B Non-Op'l Dom. 17/35 1539x18
On the request of State Govt., AAI is processing to hand over the
Airport to State Govt. Subject to clearance of MoCA
18 Satna 2B Non-Op'l Dom. 11/29 1400x25
On the request of State Govt., AAI is processing to hand over the
Airport to State Govt. On 30 years lease.
19 Akola 3C Op'l Dom. 10/28 1400x45 2Nos. C 650 (Dom) 50
20 Auranagabad 4C Op'l Dom. 09/27 2836x45 6Nos. C 20000 (Intg) 800
Integrated Terminal inaugurated on
21.11.2008 DVOR, DME. ILS R27 PAPI, SAPL at R09, SAPL at R27 4096 4.48
Extn. Of Runway and Parallel Taxi track
Subject to availibility of 182 acres of land requested from state
Govt and future traffic
21 Gondia 4C Op'l Dom. 04/22 2290x45 25 Nos. (24 B+ 1 C) 925 (Dom) 75 DVOR, DME. ILS R22 PAPI, Extn. Of Runway and Parallel taxi track
22 Jalgaon 3C Op'l Dom. 09/27 1700x45 2Nos. C 1000 (Dom) 75 Airport inaugurated on 23.03.2012 DVOR PAPI, SAPL at R09
23 Juhu 2B Op'l Dom. 08/26 1143x30 1400 (Dom-U/C) 100 22657 1.65
New Terminal building and ATC Control Tower
New Apron and FATO for helicopters
Raising the level of runway
Flood mitigation measures
24 Kolhapur 3C Op'l Dom. 07/25 1370x45 2Nos. C 600 (Dom) 50 NDB 8 0.00
New Terminal building, ATC control Tower, Fire Station
New Apron and Extn. Of Runway
Subject to availibility of total 239 hectares of land requested from
state Govt and future traffic
25 Mumbai 4E Op'l Int'l
09/27
14/32
3448x60
2871x45
91 Nos.
(62C+2D+29E) 450000 (intg)
9800 (intg)
5300 (Dom)
Integrated Terminal inaugurated on
10.01.2014
DVOR, DME, ILS, ASR,
MSSR
PAPI, CAT-I at R09, CAT-II at
R27, CAT-I at R14, SAPL at R32 260666 322.21
26 Nagpur 4C Op'l Int'l 14/32 3200x45 17Nos. C 15000 (intg) 800
DVOR, DME, ILS R32,
MSSR PAPI, SAPL at R14, CAT-I at R32 12990 12.64 New ATC Control Tower
27 Pune (CE) - IAF 4C Op'l Int'l CE 10/28 2535x45 8Nos. [1D+ 7C] 19500 (Intg) 800 DVOR, DME 30534 35.97 Terminal Building Modifications
28 Sholapur 3C Op'l Dom. 15/33 2100x45 1(ATR) 500 (Dom) 40 NDB Greenfield Airport is proposed at Boramani, Sholapur
Runway Traffic handled in 2013-14 Terminal Building
Maharashtra
Madhya Pradesh
Gujarat
WESTERN REGION