Reference No:
MS JC 0274
Dated:
02 Nov. 2002
METHOD STATEMENT
Purpose:
Construction of Foundations for Patfor! " Pi#e su##orts $%R&% 04'.
Equipment:
Concrete cutter( &)cavator " JC*( For+ ,ift( -ransit !i)er and #u!#( Rod t.#e concrete vi/rator(
Pate co!#acter( *oo! truc+( -raier( Misceaneous Surve.ing and 0and -oos.
Typical Procedure for all foundations :
Excavation:
1. %fter getting res#ective #er!its( area s1a /e surve.ed and !ar+ed as #er dra2ing 2it1 c1a+ ine
+ee#ing 2or+ing s#ace a around.
2. %n. interfering underground ines 2i /e !ar+ed on foor.
3. 4arning ta#e and 2arning signs 2i /e instaed to isoate t1e area.
4. Concrete foor 2i /e cut /. concrete cutter in a##ro#riate si5es for eas. re!ova. S!a eft over
corners 2i /e de!ois1ed /. 6ac+1a!!er. 0o2ever for #edestas foundations $P7' #ave!ent
concrete 2i /e de!ois1ed /. Jac+1a!!er on..
7. Concrete foor #anes 2i /e re!oved 2it1 t1e 1e# of e)cavator and oaded on t1e truc+ 2it1
for+ift. *efore re!oving foor #anes a interfering su##orts " structures on t1ese #anes 2i /e
re!oved or reocated.
8. &)cavation 2i /e done using 1and toos and JC*.
7. &)cavated area 2i /e /arricaded /. scaffoding #i#es.
9. &)cavated soi 2i /e oaded on truc+ 2it1 t1e 1e# of /o/cat and dis#osed to t1e designated area.
:. &)cavation 2i /e co!#acted and co!#action test 2i /e done as #er a##roved ;CP.
ean !oncrete:
1. *otto! of ean concrete eve 2i /e c1ec+ed and recorded /efore #ouring ean concrete.
2. ,ean concrete 2i /e #oured in t1e e)cavation.
3. Poured concrete 2i /e eveed !anua. using s1ove( straig1t edge and Stee S#atua.
4. Curing of ean concrete 2i /e done for 7 da.s.
Structural !oncrete:
1. %fter 1ardening $24 1rs( testing of cu/es 2i /e done' of ean concrete ne2 surve. ines 2i /e
!ar+ed on t1e ean concrete as #er dra2ing.
2. Ne2 surve. ines 2i /e c1ec+ed and 2itnessed /. C-J<.
3. %##roved <a#or /arrier $D&SC";C"10:7=021' 2i /e aid on t1e ean concrete.
4. Reinforce!ent /ar 2i /e cut and /ent as #er /ar /ending sc1edue and atest reinforce!ent
dra2ing $in 2or+s1o#'.
7. Reinforce!ent /ars 2i /e trans#orted near t1e foundation 2it1 t1e 1e# of *oo! -ruc+.
8. Reinforce!ent /ars 2i /e tied u# as #er dra2ing on t1e ean concrete using 1.7 !! /inding 2ire.
7. Reinforce!ent for t1e #edesta 2i aso /e tied u#.
9. Side s1uttering 2i /e u/ricated /. a##roved !oud reease oi $D&SC";C"10:7=009' and 2i /e
fi)ed as #er dra2ing to t1e re>uired eve of Raft.
:. Concrete s#acer #ads $of sa!e !i) design' 2i /e #aced under t1e reinforce!ent to !aintain
cover of concrete $77!!' as #er s#ecification 003"00"00"C?"-S"00"017 #age 12.
10. Reinforce!ent 2i /e ins#ected /. C-J< " ;@S /efore #ouring of concrete.
11. %##roved concrete 2i /e #oured in t1e foundation /. concrete #u!# or c1utes.
12. Concrete 2i /e co!#acted /. Concrete vi/rators.
13. Concrete 2i /e #oured and eveed. Midde #ortion for #edesta 2i /e !ade roug1 /. c1i##ing
toos for t1e ne)t #our.
Page 2 of 2
14. Curing 2i /e done using !i) >uait. 2ater. 0essian cot1 and #o.et1.ene 2i /e 2ra##ed
around t1e foundation to +ee# it 2et.
17. %fter 24 1rs of curing( surve. ines for #edesta 2i /e !ar+ed and c1ec+ed.
18. For!2or+ for #edesta 2it1 c1a!fers 2i /e co!#eted as #er dra2ing using scaffoding #i#es.
17. -e!#orar. te!#ate for /ots 2it1 /ots in it or insert #ates 2i /e instaed( in true orientation
and eevation. -e!#ate 2i /e fi)ed rigid. to t1e for! 2or+ /. additiona reinforcing #an+s
19. ?ns#ection of reinforce!ent( -e!#ate( *ots orientation( *ots #ro6ection and eves 2i /e done
and recorded as #er ;CP.
1:. Fina ins#ection /efore #ouring 2i /e done.
20. Concrete 2i /e #oured in t1e for!2or+ /. concrete #u!# " c1utes and co!#acted /. diese or
#neu!atic vi/rators.
21. Care 2i /e ta+en to avoid distur/ing of te!#ate and /ots during concrete #ouring. ?nter!ediate
surve.s 2i /e done during #ouring to +ee# e)act ine and eevation of /ots.
22. Concrete 2i /e #oured to t1e /otto! of te!#ate and finis1ed #ro#er..
23. Curing 2i /e done 2it1 !i) >uait. 2ater for 14 da.s as #er s#ecification
003"00"00"C?"-S"00"017 Para :. 0essian cot1 and #o.t1ene 2i /e 2ra##ed around t1e
foundation and 2i /e !ade 2et t1roug1 out for curing.
24. %fter 12 1rs for!2or+ 2i /e re!oved.
27. ?f 1one.co!/ing found on concrete surfaces( NCR 2oud /e !ade and re#aired 2i /e done /.
a##roved #rocedure and !ateria.
28. *efore /ac+fiing surface Protection 2i /e done as #er s#ecification 010"00"00"C?"DR"-D"102.
%##roved !ateria s1a /e a##ied as on t1e concrete surfaces using 1and /rus1.
27. *ac+fiing around t1e foundation 2i /e done in a.ers of 300 !! and co!#acted to t1e re>uired
densit. /. diese o#erated #ate co!#actor and !anua ra!!ing. No /ac+ fiing is re>uired for
#edesta foundations.
29. Co!#action tests 2i /e conducted and recorded as #er a##roved ;CP.
2:. So#e of t1e /ac+ fi s1a /e !aintained as #er #aving dra2ing.
30. Reinforce!ent for t1e #aving 2i /e done. *itu!inous /oard 2i /e fi)ed at 6oints 2it1 t1e
e)isting #aving and foundations. Concrete s1a /e #oured after ins#ection. Curing 2i continue
for 14 da.s.
31. Joint in #ave!ent 2i /e fied 2it1 a##roved 6oint seaant.
Permit "equirements
Activity Permit
Pave!ent cutting( &)cavation( Re/ar(
For!2or+( insert #ates fi)ing( %nc1or
/ot fi)ing and #ouring of concrete.
1. 0ot 4or+ Per!it( Concrete cutting
and &)cavation certificate.
2. CS& #er!it
3. <e1ice &ntr. Certificate.
"eference Documents
1. ;CP 8708P=1700=;CP=1( 8708P=1400=;CP=1
2. Dra2ings: 028"02"00"MP"DR"@%"101( 028"00"00"PP"DR"AP"008
028"02"44"C?"DR"%@"104( 028"01"44"C?"DR"-D"033
Pre Prepared # Su$mitted %y "evie&ed %y Approved %y
Descon En'ineerin' !T() *atar +as
Na!e B Signature: Na!e B Signature: Na!e B Signature:
Date: Date: Date: