NPV Scheduler is the most complete tool for strategic open pit mine planning. Functionality spans everything from preliminary modeling through to building detailed life-of-mine plans. Pits are optimized for maximum cash flow (base and precious metals) or maximum reserve life (industrial minerals)
NPV Scheduler is the most complete tool for strategic open pit mine planning. Functionality spans everything from preliminary modeling through to building detailed life-of-mine plans. Pits are optimized for maximum cash flow (base and precious metals) or maximum reserve life (industrial minerals)
NPV Scheduler is the most complete tool for strategic open pit mine planning. Functionality spans everything from preliminary modeling through to building detailed life-of-mine plans. Pits are optimized for maximum cash flow (base and precious metals) or maximum reserve life (industrial minerals)
planning on the market. Functionality spans everything from preliminary modeling through to building detailed life-of-mine plans with practical push-backs and scheduling. NPV Scheduler The complete strategic mine planning system cae.com/mining Geological Model Import a geological block model with grade, lithology, topography, surfaces and mining boundaries. Digitize plan data. Model may also contain recovery, cost and slope information. Economic Model Input commodity prices, mining costs, processing costs and recoveries to create a three-dimensional economic model with intrinsic block values. Nested Pits Generate a set of nested Lerchs-Grossmann (LG) pit shells that represent varying economic parameters and generate an Ultimate Pit Optimal Extraction Sequence (OES). Practical Pushbacks Use the LG shells, Optimal Extraction Sequence and pushback targets to generate practical pushback shapes that respect good mine design practice. Optimized Schedule Schedule pushbacks according to production targets and mining constraints for maximum optimization. Rene the schedule with blending and cut-off grade optimization. Include haulage truck hours as an optimization target. Methodology Optimized strategic mine plan with design and schedule contained in one system Ultimate pits are optimized for maximum cash ow (base and precious metals) or maximum reserve life (industrial minerals). Pits are optimally sequenced to maximize NPV or achieve material blend Fast, practical, mineable pushback generation Sophisticated scheduling, blending, stockpiling, grade optimization, process optimization, production targeting and haulage optimization Easy-to-use methodology with multiple layers of sophistication, from quick studies to detailed mine plans From Geological Model to Mine Plan Benets Inside NPV Scheduler First Pushback ? Last Pushback ? Determining Pushback Shapes Pushbacks are based on LG shells, but practical mining requires careful formation of the nal pushback shapes. NPV Scheduler creates the pushbacks using LG shells and the Ultimate Pit OES, but it also optimizes the push back shapes for practical mining, while retaining the maximum possible NPV. Visualization, Animation and Reporting NPV Scheduler has a wide variety of reporting and visualization options, from full reports with customizable content to 3D rendered life of mine animations. Material Allocation Optimizer MAO examines the processing of each block (leach pad, mill, stockpile, waste etc.) and reallocates it to a new method based on overall economic value. MAO optimizes stockpiling and multiple blended products (e.g. iron ore & industrial minerals) where production targets and varying product specications can be blended from different inputs. Mine Flow Optimizer MFO increases NPV by optimizing cut-off grades. It adjusts the schedule to create more value by mining a higher grade of ore earlier when that outweighs the cost of wasting or stockpiling lower grade ore. Geo-Risk Assessment GRA provides a mechanism for understanding the risk associated with the uncertainty of grade distribution in the resource model. It does this by considering conditionally-simulated models in the strategic planning process. GRA generates a set of risk-rated pits which can be used to limit the impact of grade uncertainty on planning outcomes. Capital Costs NPV Scheduler can model multiple types of capital costs such as pushback start-up costs, costs that occur at xed times or are associated with the removal of material within specied boundaries. Haulage Optimization In order to produce a schedule with practical haulage eet requirements NPV Scheduler allows the inclusion of haulage truck hours as an integral optimization target. The scheduler will allocate blocks taking into account their transport requirements as well as their material types and values. This is in contrast to other systems that typically provide tools to analyze the haulage requirements after a schedule has been developed. AUSTRALIA Perth Level 3, 41-43 Ord Street West Perth WA 6005 Tel +61 8 6462 0900 Brisbane Level 15, 120 Edward Street Brisbane, Queensland, 4000 Tel +61 7 3248 0000 BRAZIL Belo Horizonte Alameda da Serra, 360 7 o andar Vila de Serra Nova Lima MG 34000-000 Tel +55 31 3264 9377 CANADA Montreal 3200 Guenette Saint-Laurent, Quebec H4S 2G5 Canada Tel +1 514 341 2000 ext. 2404 Sudbury 866 Newgate Avenue, Unit 2 Sudbury, Ontario P3A 5J9 Toll-free: 1 800 240 6941 Tel +1 705 688 0101 Vancouver 2000-1066 W Hastings St Vancouver, BC V6E 3X2 Canada Tel + 1 604 601 8233
CHILE Santiago Santa Magdalena, 75 Ocina 903, Providencia Santiago 751-0038 Tel +56 2 2334 5952 CHINA 505A, 19A West Chegongzhuang Road Beijing, China 100048 Tel: +86-137-0122-9235 COLOMBIA Calle 29 N 41 - 105 Of. 1206 Edicio Soho Medelln, Antioquia Tel +57 - 4 - 403 17 75 INDIA New Delhi 601, Elegance Tower Jasola District Centre New Delhi - 110 025 India Tel +91 11 41290000 KAZAKHSTAN Karaganda 201, 2 Lenin Street 100012, Karaganda Republic of Kazakhstan Tel +7 7212 425138 MEXICO Callejn del Capuln #101, esquina con Avenida Torren, centro Histrico Zacatecas, Zac. C.P. 98000 Tel +52 492 22 122 PERU Lima Av. Manuel Olgun, 335 Ocina 503 Torre Link Tower Surco, Lima - Peru Tel +51 1 434 2727 SOUTH AFRICA Johannesburg 9 Fricker Road Illovo Boulevard, Illovo Johannesburg, 2196 Republic of South Africa Tel +27 11 772 7960 UNITED KINGDOM Wells Unit A, Underwood Business Park Wookey Hole Road, Wells, Somerset BA5 1AF United Kingdom Tel +44 1749 683 350 UNITED STATES OF AMERICA Denver 10901 W. Toller Drive #205 Littleton, CO 80127 United States Tel +1 303 985 7713 caemining@cae.com Global ofces 2014 CAE Mining