You are on page 1of 43

Chvac - Full Commercial HVAC Loads Calculation Program Elite Software Development, Inc.

York International Bodega Guaymaral


Bogota, Columbia, Page 1

General Project Data Input

General Project Information
Project file name: C:\Program Files\Elite\Chvacw\Projects\BODEGAS
GUAYMARAL2.CHV
Project title: Bodega Guaymaral
Project date: Wednesday, April 23, 2014
Weather reference city: Bogota 2, COLOMBIA


Barometric pressure: 21.804 in.Hg.
Altitude: 8500 feet
Latitude: 4 Degrees
Mean daily temperature range: 20 Degrees
Starting & ending time for HVAC load calculations: 7am - 6pm
Number of unique zones in this project: 5



Building Default Values
Calculations performed: Cooling loads only
Lighting requirements: 2.00 Watts per square foot
Equipment requirements: 1.00 Watts per square foot
People sensible load multiplier: 0 Btuh per person
People latent load multiplier: 0 Btuh per person
Zone sensible safety factor: 5 %
Zone latent safety factor: 5 %
Zone heating safety factor: 5 %
People diversity factor: 100 %
Lighting profile number: 1
Equipment profile number: 1
People profile number: 1
Building default ceiling height: 0.00 feet
Building default wall height: 0.00 feet



Internal Operating Load Profiles (C = 100)
hr hr hr hr hr hr hr hr hr hr hr hr hr hr hr hr hr hr hr hr hr hr hr hr
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24
1 0 0 0 0 0 C C C C C C C C C C C C C 0 0 0 0 0 0
2 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
3 C C C C C C C C C C C C C C C C C C C C C C C C
4 C C C C C C C C C C C C C C C C C C C C C C C C
5 C C C C C C C C C C C C C C C C C C C C C C C C
6 C C C C C C C C C C C C C C C C C C C C C C C C
7 C C C C C C C C C C C C C C C C C C C C C C C C
8 C C C C C C C C C C C C C C C C C C C C C C C C
9 C C C C C C C C C C C C C C C C C C C C C C C C
10 C C C C C C C C C C C C C C C C C C C C C C C C
C:\Program Files\Elite\Chvacw\Projects\BODEGAS GUAYMARAL2.CHV Wednesday, April 23, 2014, 2:18 PM
Chvac - Full Commercial HVAC Loads Calculation Program Elite Software Development, Inc.
York International Bodega Guaymaral
Bogota, Columbia, Page 2

General Project Data Input (cont'd)

Building-Level Design Conditions
Design
Month
Outdoor
Dry Bulb
Outdoor
Wet Bulb
Indoor
Rel.Hum
Indoor
Dry Bulb
Grains
Diff
In/Outdoor
Correction

January 64 57 50% 70 10.12 -22
Winter 0 0


Master Roofs
Roof
No.
ASHRAE
Roof#
Roof
U-Fac
Dark
Color
Susp.
Ceil

1 1 0.640 No No




Master Walls
Wall
No.
ASHRAE
Group
Wall
U-Fac
Wall
Color

1 C 0.182 L
2 E 0.110 M




Master Glass
Glass
No.
Summer
U-Factor
Winter
U-Factor
Glass
Shd.Coef.
Interior
Shading
Interior
Shd.Coef

1 1.040 1.100 0.760 2 0.000



C:\Program Files\Elite\Chvacw\Projects\BODEGAS GUAYMARAL2.CHV Wednesday, April 23, 2014, 2:18 PM
Chvac - Full Commercial HVAC Loads Calculation Program Elite Software Development, Inc.
York International Bodega Guaymaral
Bogota, Columbia, Page 3

Air Handler Input

Air Handler Number 1 Input Data

Name: Uma Bodega Doble Altura
Terminal type: Constant Volume
Method for CV Proportion
Supply fan type: Draw-thru fan
Calculations performed: Both heating and cooling loads
Excess supply air: Reserve
Occurrences: 1
People profile number: 1
Lighting profile number: 1
Equipment profile number: 2
Exhaust may not exceed supply air: Yes
Leaving heating coil CFM: 0.0
Leaving cooling coil temp (deg.F): 55.0
Cooling coil CFM 0
Misc. Btuh gain - supply side: 0
Misc. Btuh gain - return side: 0
Combined fan & motor efficiency: 85
Static pressure across fan (in.wg.): 2.00
Summer supply duct temp rise (deg.F): 0.000
Summer return duct temp rise (deg.F): 0.000
Winter supply duct temp drop (deg.F): 0.000
Winter return duct temp drop (deg.F): 0.000
Chilled water temp difference (deg.F): 0.000
Hot water temp difference (deg.F): 0.000
Cooling ventilation: 3000 Direct
Cooling infiltration: 0 Direct
Heating ventilation: 0 CFM/Pr
Heating infiltration: 0 AC/Hr
Pretreated outside air: none
Pretreated air Summer DB (deg.F): 0
Pretreated air Summer WB (deg.F): 0
Pretreated air Winter DB (deg.F): 0

Design
Month
Outdoor
Dry Bulb
Outdoor
Wet Bulb
Indoor
Rel.Hum
Indoor
Dry Bulb
Grains
Diff
In/Outdoor
Correction

January 64 57 50% 70 10.12 -22
Winter 0 0


Air Handler Number 2 Input Data

Name: Uma Bodega Altura Sencilla
Terminal type: Constant Volume
Method for CV Proportion
Supply fan type: Draw-thru fan
Calculations performed: Cooling loads only
Excess supply air: Reserve
Occurrences: 1
People profile number: 2
Lighting profile number: 1
Equipment profile number: 2
Exhaust may not exceed supply air: Yes
Leaving heating coil CFM: 0.0
Leaving cooling coil RH (%): 95
Cooling coil CFM 0
Misc. Btuh gain - supply side: 0
Misc. Btuh gain - return side: 0
Combined fan & motor efficiency: 85
Static pressure across fan (in.wg.): 2.00
Summer supply duct temp rise (deg.F): 0.000
Summer return duct temp rise (deg.F): 0.000
Winter supply duct temp drop (deg.F): 0.000
Winter return duct temp drop (deg.F): 0.000
C:\Program Files\Elite\Chvacw\Projects\BODEGAS GUAYMARAL2.CHV Wednesday, April 23, 2014, 2:18 PM
Chvac - Full Commercial HVAC Loads Calculation Program Elite Software Development, Inc.
York International Bodega Guaymaral
Bogota, Columbia, Page 4

Air Handler Input (cont'd)

Air Handler Number 2 Input Data
Chilled water temp difference (deg.F): 0.000
Hot water temp difference (deg.F): 0.000
Cooling ventilation: 0.15 CFM/sq.ft
Cooling infiltration: 0 AC/Hr
Heating ventilation: 0 CFM/Pr
Heating infiltration: 0 AC/Hr
Pretreated outside air: none
Pretreated air Summer DB (deg.F): 0
Pretreated air Summer WB (deg.F): 0
Pretreated air Winter DB (deg.F): 0

Design
Month
Outdoor
Dry Bulb
Outdoor
Wet Bulb
Indoor
Rel.Hum
Indoor
Dry Bulb
Grains
Diff
In/Outdoor
Correction

January 64 57 50% 70 10.12 -22
Winter 0 0


Air Handler Number 3 Input Data

Name: Uma Hot Room
Terminal type: Constant Volume
Method for CV Proportion
Supply fan type: Draw-thru fan
Calculations performed: Cooling loads only
Excess supply air: Reserve
Occurrences: 1
People profile number: 2
Lighting profile number: 1
Equipment profile number: 1
Exhaust may not exceed supply air: Yes
Leaving heating coil CFM: 0.0
Leaving cooling coil RH (%): 95
Cooling coil CFM 0
Misc. Btuh gain - supply side: 0
Misc. Btuh gain - return side: 0
Combined fan & motor efficiency: 85
Static pressure across fan (in.wg.): 2.00
Summer supply duct temp rise (deg.F): 0.000
Summer return duct temp rise (deg.F): 0.000
Winter supply duct temp drop (deg.F): 0.000
Winter return duct temp drop (deg.F): 0.000
Chilled water temp difference (deg.F): 0.000
Hot water temp difference (deg.F): 0.000
Cooling ventilation: 0.2 CFM/sq.ft
Cooling infiltration: 0 AC/Hr
Heating ventilation: 0 CFM/Pr
Heating infiltration: 0 AC/Hr
Pretreated outside air: none
Pretreated air Summer DB (deg.F): 0
Pretreated air Summer WB (deg.F): 0
Pretreated air Winter DB (deg.F): 0

Design
Month
Outdoor
Dry Bulb
Outdoor
Wet Bulb
Indoor
Rel.Hum
Indoor
Dry Bulb
Grains
Diff
In/Outdoor
Correction

January 64 57 50% 70 10.12 -22
Winter 0 0


Air Handler Number 4 Input Data

Name: Uma Office Room 1
Terminal type: Constant Volume
Method for CV Proportion
Supply fan type: Draw-thru fan
C:\Program Files\Elite\Chvacw\Projects\BODEGAS GUAYMARAL2.CHV Wednesday, April 23, 2014, 2:18 PM
Chvac - Full Commercial HVAC Loads Calculation Program Elite Software Development, Inc.
York International Bodega Guaymaral
Bogota, Columbia, Page 5

Air Handler Input (cont'd)

Air Handler Number 4 Input Data
Calculations performed: Cooling loads only
Excess supply air: Reserve
Occurrences: 1
People profile number: 1
Lighting profile number: 1
Equipment profile number: 1
Exhaust may not exceed supply air: Yes
Leaving heating coil CFM: 0.0
Leaving cooling coil RH (%): 95
Cooling coil CFM 0
Misc. Btuh gain - supply side: 0
Misc. Btuh gain - return side: 0
Combined fan & motor efficiency: 85
Static pressure across fan (in.wg.): 2.00
Summer supply duct temp rise (deg.F): 0.000
Summer return duct temp rise (deg.F): 0.000
Winter supply duct temp drop (deg.F): 0.000
Winter return duct temp drop (deg.F): 0.000
Chilled water temp difference (deg.F): 0.000
Hot water temp difference (deg.F): 0.000
Cooling ventilation: 20 CFM/Pr
Cooling infiltration: 0 AC/Hr
Heating ventilation: 0 AC/Hr
Heating infiltration: 0 AC/Hr
Pretreated outside air: none
Pretreated air Summer DB (deg.F): 0
Pretreated air Summer WB (deg.F): 0
Pretreated air Winter DB (deg.F): 0

Design
Month
Outdoor
Dry Bulb
Outdoor
Wet Bulb
Indoor
Rel.Hum
Indoor
Dry Bulb
Grains
Diff
In/Outdoor
Correction

January 64 57 50% 70 10.12 -22
Winter 0 0


Air Handler Number 5 Input Data

Name: Uma Electric Room
Terminal type: Constant Volume
Method for CV Proportion
Supply fan type: Draw-thru fan
Calculations performed: Cooling loads only
Excess supply air: Reserve
Occurrences: 1
People profile number: 1
Lighting profile number: 1
Equipment profile number: 1
Exhaust may not exceed supply air: Yes
Leaving heating coil CFM: 0.0
Leaving cooling coil RH (%): 95
Cooling coil CFM 0
Misc. Btuh gain - supply side: 0
Misc. Btuh gain - return side: 0
Combined fan & motor efficiency: 85
Static pressure across fan (in.wg.): 2.00
Summer supply duct temp rise (deg.F): 0.000
Summer return duct temp rise (deg.F): 0.000
Winter supply duct temp drop (deg.F): 0.000
Winter return duct temp drop (deg.F): 0.000
Chilled water temp difference (deg.F): 0.000
Hot water temp difference (deg.F): 0.000
Cooling ventilation: 0.5 CFM/sq.ft
Cooling infiltration: 0 AC/Hr
C:\Program Files\Elite\Chvacw\Projects\BODEGAS GUAYMARAL2.CHV Wednesday, April 23, 2014, 2:18 PM
Chvac - Full Commercial HVAC Loads Calculation Program Elite Software Development, Inc.
York International Bodega Guaymaral
Bogota, Columbia, Page 6

Air Handler Input (cont'd)

Air Handler Number 5 Input Data
Heating ventilation: 0 AC/Hr
Heating infiltration: 0 AC/Hr
Pretreated outside air: none
Pretreated air Summer DB (deg.F): 0
Pretreated air Summer WB (deg.F): 0
Pretreated air Winter DB (deg.F): 0

Design
Month
Outdoor
Dry Bulb
Outdoor
Wet Bulb
Indoor
Rel.Hum
Indoor
Dry Bulb
Grains
Diff
In/Outdoor
Correction

January 64 57 50% 70 10.12 -22
Winter 0 0

C:\Program Files\Elite\Chvacw\Projects\BODEGAS GUAYMARAL2.CHV Wednesday, April 23, 2014, 2:18 PM
Chvac - Full Commercial HVAC Loads Calculation Program Elite Software Development, Inc.
York International Bodega Guaymaral
Bogota, Columbia, Page 7

Zone Input

Zone 1: Bodega Doble Altura (2578.08 sq.ft) (Group 0)

Air Handler number: 1 Zone occurrences: 1
Zone length: (feet) 65.60 Zone width (feet): 39.30
Lighting Watts: 1,000 Equipment Watts: 126
Number of people in zone: 2 People profile number: 1
Lighting profile number: 1 Equipment profile number: 2
Ceiling height (feet): 28.20 Heating safety factor (%): 5
Sensible safety factor (%): 5 Latent safety factor (%): 5
Sensible heat per person (Btuh): 245 Latent heat per person (Btuh): 155
Cooling ventilation method: Direct Cooling ventilation value: 3,000.000
Cooling infiltration method: Direct Cooling infiltration value: 0.000
Heating ventilation method: CFM/Pr Heating ventilation value: 0.000
Heating infiltration method: AC/Hr Heating infiltration value: 0.000
Winter exhaust air CFM: 0 Summer exhaust air CFM: 0
Minimum supply CFM: 2,600 Latent Btuh equipment load: 0
Ceil. exposed to plenum (sq.ft): 2,578 Exposed floor slab perimeter (ft): 0
Both heating and cooling loads are calculated for this zone.

Roof Type ASHRAE# U-Factor Dark Length Width Area Susp.Ceil

1 1 1 0.640 No 39.30 65.00 2,554.5 No

Wall Type ASHRAE# U-Factor Color Height Width Area Direction

1 1 C 0.182 L 28.20 65.60 1,849.9 N
2 1 C 0.182 L 28.20 65.60 1,849.9 S
3 1 C 0.182 L 28.20 39.30 1,108.3 E
4 1 C 0.182 L 28.20 39.30 1,108.3 W


Zone 2: Bodega Altura Sencilla (1216 sq.ft) (Group 0)

Air Handler number: 2 Zone occurrences: 1
Zone length: (feet) 1,216.00 Zone width (feet): 1.00
Lighting Watts: 2,432 Equipment Watts: 1,216
Number of people in zone: 0 People profile number: 2
Lighting profile number: 1 Equipment profile number: 2
Ceiling height (feet): 16.00 Heating safety factor (%): 5
Sensible safety factor (%): 5 Latent safety factor (%): 5
Sensible heat per person (Btuh): 0 Latent heat per person (Btuh): 0
Cooling ventilation method: CFM/sq.ft Cooling ventilation value: 0.150
Cooling infiltration method: AC/Hr Cooling infiltration value: 0.000
Heating ventilation method: CFM/Pr Heating ventilation value: 0.000
Heating infiltration method: AC/Hr Heating infiltration value: 0.000
Winter exhaust air CFM: 0 Summer exhaust air CFM: 0
Minimum supply CFM: 0 Latent Btuh equipment load: 0
Ceil. exposed to plenum (sq.ft): 1,216 Exposed floor slab perimeter (ft): 0
Cooling loads only are calculated for this zone.

Wall Type ASHRAE# U-Factor Color Height Width Area Direction

1 1 C 0.182 L 1.00 1,216.00 1,216.0 N
2 1 C 0.182 L 1.00 1,216.00 1,216.0 S
3 1 C 0.182 L 1.00 1,216.00 1,216.0 E
4 1 C 0.182 L 1.00 1,216.00 1,216.0 W


Zone 3: Hot Room (184.08 sq.ft) (Group 0)

Air Handler number: 3 Zone occurrences: 1
Zone length: (feet) 11.80 Zone width (feet): 15.60
Lighting Watts: 368 Equipment Watts: 184
Number of people in zone: 1 People profile number: 2
Lighting profile number: 1 Equipment profile number: 1
Ceiling height (feet): 16.40 Heating safety factor (%): 5
Sensible safety factor (%): 5 Latent safety factor (%): 5
Sensible heat per person (Btuh): 0 Latent heat per person (Btuh): 0
C:\Program Files\Elite\Chvacw\Projects\BODEGAS GUAYMARAL2.CHV Wednesday, April 23, 2014, 2:18 PM
Chvac - Full Commercial HVAC Loads Calculation Program Elite Software Development, Inc.
York International Bodega Guaymaral
Bogota, Columbia, Page 8

Zone Input (cont'd)

Zone 3: Hot Room (184.08 sq.ft) (Group 0)
Cooling ventilation method: CFM/sq.ft Cooling ventilation value: 0.200
Cooling infiltration method: AC/Hr Cooling infiltration value: 0.000
Heating ventilation method: CFM/Pr Heating ventilation value: 0.000
Heating infiltration method: AC/Hr Heating infiltration value: 0.000
Winter exhaust air CFM: 0 Summer exhaust air CFM: 0
Minimum supply CFM: 0 Latent Btuh equipment load: 0
Ceil. exposed to plenum (sq.ft): 184 Exposed floor slab perimeter (ft): 0
Cooling loads only are calculated for this zone.

Wall Type ASHRAE# U-Factor Color Height Width Area Direction

1 1 C 0.182 L 16.40 11.80 193.5 W
2 1 C 0.182 L 16.40 11.80 193.5 E
3 1 C 0.182 L 16.40 15.60 255.8 N
4 1 C 0.182 L 16.40 15.60 255.8 S


Zone 4: Office Room 1 (530.54 sq.ft) (Group 0)

Air Handler number: 4 Zone occurrences: 1
Zone length: (feet) 16.40 Zone width (feet): 32.35
Lighting Watts: 1,061 Equipment Watts: 1,915
Number of people in zone: 10 People profile number: 1
Lighting profile number: 1 Equipment profile number: 1
Ceiling height (feet): 15.00 Heating safety factor (%): 5
Sensible safety factor (%): 5 Latent safety factor (%): 5
Sensible heat per person (Btuh): 250 Latent heat per person (Btuh): 200
Cooling ventilation method: CFM/Pr Cooling ventilation value: 20.000
Cooling infiltration method: AC/Hr Cooling infiltration value: 0.000
Heating ventilation method: AC/Hr Heating ventilation value: 0.000
Heating infiltration method: AC/Hr Heating infiltration value: 0.000
Winter exhaust air CFM: 0 Summer exhaust air CFM: 0
Minimum supply CFM: 0 Latent Btuh equipment load: 0
Ceil. exposed to plenum (sq.ft): 531 Exposed floor slab perimeter (ft): 0
Cooling loads only are calculated for this zone.

Roof Type ASHRAE# U-Factor Dark Length Width Area Susp.Ceil

1 1 1 0.640 No 16.40 32.35 530.5 No

Wall Type ASHRAE# U-Factor Color Height Width Area Direction

1 1 C 0.182 L 15.00 32.35 485.3 N
2 1 C 0.182 L 15.00 32.35 485.3 S
3 1 C 0.182 L 15.00 16.40 246.0 E
4 1 C 0.182 L 15.00 16.40 246.0 W

Glass Type S.U-F. Shd C. Height Width Occur. Area Shade Tilt Ref

1 1 1.040 0.760 4.62 10.33 2 95.4 0 90 1


Zone 5: Uma Electric Room (69.08 sq.ft) (Group 0)

Air Handler number: 5 Zone occurrences: 1
Zone length: (feet) 4.40 Zone width (feet): 15.70
Lighting Watts: 138 Equipment Watts: 100
Number of people in zone: 0 People profile number: 2
Lighting profile number: 2 Equipment profile number: 1
Ceiling height (feet): 10.00 Heating safety factor (%): 5
Sensible safety factor (%): 5 Latent safety factor (%): 5
Sensible heat per person (Btuh): 0 Latent heat per person (Btuh): 0
Cooling ventilation method: CFM/sq.ft Cooling ventilation value: 0.500
Cooling infiltration method: AC/Hr Cooling infiltration value: 0.000
Heating ventilation method: AC/Hr Heating ventilation value: 0.000
Heating infiltration method: AC/Hr Heating infiltration value: 0.000
Winter exhaust air CFM: 0 Summer exhaust air CFM: 0
C:\Program Files\Elite\Chvacw\Projects\BODEGAS GUAYMARAL2.CHV Wednesday, April 23, 2014, 2:18 PM
Chvac - Full Commercial HVAC Loads Calculation Program Elite Software Development, Inc.
York International Bodega Guaymaral
Bogota, Columbia, Page 9

Zone Input (cont'd)

Zone 5: Uma Electric Room (69.08 sq.ft) (Group 0)
Minimum supply CFM: 0 Latent Btuh equipment load: 0
Ceil. exposed to plenum (sq.ft): 69 Exposed floor slab perimeter (ft): 0
Cooling loads only are calculated for this zone.

Roof Type ASHRAE# U-Factor Dark Length Width Area Susp.Ceil

1 1 1 0.640 No 4.40 15.70 69.1 No

Wall Type ASHRAE# U-Factor Color Height Width Area Direction

1 1 C 0.182 L 10.00 4.40 44.0 W
2 1 C 0.182 L 10.00 4.40 44.0 E
3 1 C 0.182 L 10.00 15.70 157.0 S
4 1 C 0.182 L 10.00 15.70 157.0 N

C:\Program Files\Elite\Chvacw\Projects\BODEGAS GUAYMARAL2.CHV Wednesday, April 23, 2014, 2:18 PM
Chvac - Full Commercial HVAC Loads Calculation Program Elite Software Development, Inc.
York International Bodega Guaymaral
Bogota, Columbia, Page 10

Air Handler #1 - Uma Bodega Doble Altura - Summary Loads

Zn
No

Description
Zone Peak Time
Area
People
Volume
Htg.Loss
Htg.CFM
CFM/Sqft
Sen.Gain
Clg.CFM
CFM/Sqft
Lat.Gain
S.Exh
W.Exh
Htg.O.A.
Req.CFM
Act.CFM
Clg.O.A.
Req.CFM
Act.CFM


1 Bodega Doble Altura
2pm January
2,578
2
72,702
0
0
0.00
17,622
2,999
1.16
326
0
0
None
0
0
Direct
3,000
3,000


Zone Peak Totals:
Total Zones: 1
Unique Zones: 1
2,578
2
72,702
0
0
0.00
17,622
2,999
1.16
326
0
0
0
0
3,000
3,000
C:\Program Files\Elite\Chvacw\Projects\BODEGAS GUAYMARAL2.CHV Wednesday, April 23, 2014, 2:18 PM
Chvac - Full Commercial HVAC Loads Calculation Program Elite Software Development, Inc.
York International Bodega Guaymaral
Bogota, Columbia, Page 11

Air Handler #1 - Uma Bodega Doble Altura - Total Load Summary
Air Handler Description: Uma Bodega Doble Altura Constant Volume - Proportion
Supply Air Fan: Draw-Thru with program estimated horsepower of 1.11 HP
Fan Input: 85% motor and fan efficiency with 2 in. water across the fan
Sensible Heat Ratio: 0.99 --- This system occurs 1 time(s) in the building. ---


Air System Peak Time: 3pm in January.
Outdoor Conditions: 64DB, 57WB, 84.72 grains


Because of the diversity in zone, plenum and ventilation loads, the zone sensible peak time in January at 2pm is
different from the total system peak time, hence the air system CFM was computed using a zone sensible load of
17,622.


Summer: Ventilation controls outside air, ----- Winter: Exhaust controls outside air.


Zone Space sensible loss: 0 Btuh
Infiltration sensible loss: 0 Btuh 0 CFM
Outside Air sensible loss: 0 Btuh 0 CFM
Supply Duct sensible loss: 0 Btuh
Return Duct sensible loss: 0 Btuh
Return Plenum sensible loss: 0 Btuh
Total System sensible loss: 0 Btuh


Heating Supply Air: 0 / (.729 X 1.08 X 0) = 0 CFM
Winter Vent Outside Air (0.0% of supply) = 0 CFM


Zone space sensible gain: 17,238 Btuh
Infiltration sensible gain: 0 Btuh
Draw-thru fan sensible gain: 2,053 Btuh
Supply duct sensible gain: 0 Btuh
Reserve sensible gain: 16,385 Btuh
Total sensible gain on supply side of coil: 35,676 Btuh


Cooling Supply Air: 36,061 / (.729 X 1.1 X 15) = 2,999 CFM
Summer Vent Outside Air (100.0% of supply) = 3,000 CFM


Return duct sensible gain: 0 Btuh
Return plenum sensible gain: 0 Btuh
Outside air sensible gain: -14,429 Btuh 3,000 CFM
Blow-thru fan sensible gain: 0 Btuh
Total sensible gain on return side of coil: -14,429 Btuh
Total sensible gain on air handling system: 21,248 Btuh


Zone space latent gain: 326 Btuh
Infiltration latent gain: 0 Btuh
Outside air latent gain: 13,725 Btuh
Total latent gain on air handling system: 14,050 Btuh
Total system sensible and latent gain: 35,298 Btuh


Check Figures
Total Air Handler Supply Air (based on a 15TD): 2,999 CFM
Total Air Handler Vent. Air (100.03% of Supply): 3,000 CFM


Total Conditioned Air Space: 2,578 Sq.ft
Supply Air Per Unit Area: 1.1633 CFM/Sq.ft
Area Per Cooling Capacity: 876.4455 Sq.ft/Ton
Cooling Capacity Per Area: 0.0011 Tons/Sq.ft
Heating Capacity Per Area: 0.00 Btuh/Sq.ft


Total Heating Required With Outside Air: 0 Btuh
Total Cooling Required With Outside Air: 2.94 Tons


C:\Program Files\Elite\Chvacw\Projects\BODEGAS GUAYMARAL2.CHV Wednesday, April 23, 2014, 2:18 PM
Chvac - Full Commercial HVAC Loads Calculation Program Elite Software Development, Inc.
York International Bodega Guaymaral
Bogota, Columbia, Page 12

Air Handler #2 - Uma Bodega Altura Sencilla - Summary Loads

Zn
No

Description
Zone Peak Time
Area
People
Volume
Htg.Loss
Htg.CFM
CFM/Sqft
Sen.Gain
Clg.CFM
CFM/Sqft
Lat.Gain
S.Exh
W.Exh
Htg.O.A.
Req.CFM
Act.CFM
Clg.O.A.
Req.CFM
Act.CFM


2
Bodega Altura
Sencilla
6pm January
1,216
0
19,456
0
0
0.00
2,166
182
0.15
0
0
0
None
0
0
0.15/ft
182
182


Zone Peak Totals:
Total Zones: 1
Unique Zones: 1
1,216
0
19,456
0
0
0.00
2,166
182
0.15
0
0
0
0
0
182
182
C:\Program Files\Elite\Chvacw\Projects\BODEGAS GUAYMARAL2.CHV Wednesday, April 23, 2014, 2:18 PM
Chvac - Full Commercial HVAC Loads Calculation Program Elite Software Development, Inc.
York International Bodega Guaymaral
Bogota, Columbia, Page 13

Air Handler #2 - Uma Bodega Altura Sencilla - Total Load Summary
Air Handler Description: Uma Bodega Altura Sencilla Constant Volume - Proportion
Supply Air Fan: Draw-Thru with program estimated horsepower of 0.07 HP
Fan Input: 85% motor and fan efficiency with 2 in. water across the fan
Sensible Heat Ratio: 1.00 --- This system occurs 1 time(s) in the building. ---


Air System Peak Time: 6pm in January.
Outdoor Conditions: 60DB, 56WB, 86.40 grains


Summer: Ventilation controls outside air, ----- Winter: Exhaust controls outside air.


Zone Space sensible loss: 0 Btuh
Infiltration sensible loss: 0 Btuh 0 CFM
Outside Air sensible loss: 0 Btuh 0 CFM
Supply Duct sensible loss: 0 Btuh
Return Duct sensible loss: 0 Btuh
Return Plenum sensible loss: 0 Btuh
Total System sensible loss: 0 Btuh


Heating Supply Air: 0 / (.729 X 1.08 X 0) = 0 CFM
Winter Vent Outside Air (0.0% of supply) = 0 CFM


Zone space sensible gain: 2,166 Btuh
Infiltration sensible gain: 0 Btuh
Draw-thru fan sensible gain: 124 Btuh
Supply duct sensible gain: 0 Btuh
Reserve sensible gain: 344 Btuh
Total sensible gain on supply side of coil: 2,635 Btuh


Cooling Supply Air: 2,635 / (.729 X 1.1 X 18) = 182 CFM
Summer Vent Outside Air (100.4% of supply) = 182 CFM


Return duct sensible gain: 0 Btuh
Return plenum sensible gain: 0 Btuh
Outside air sensible gain: -1,462 Btuh 182 CFM
Blow-thru fan sensible gain: 0 Btuh
Total sensible gain on return side of coil: -1,462 Btuh
Total sensible gain on air handling system: 1,173 Btuh


Zone space latent gain: 0 Btuh
Infiltration latent gain: 0 Btuh
Outside air latent gain: 959 Btuh
Total latent gain on air handling system: 959 Btuh
Total system sensible and latent gain: 2,132 Btuh


Check Figures
Total Air Handler Supply Air (based on a 18TD): 182 CFM
Total Air Handler Vent. Air (100.38% of Supply): 182 CFM


Total Conditioned Air Space: 1,216 Sq.ft
Supply Air Per Unit Area: 0.1494 CFM/Sq.ft
Area Per Cooling Capacity: 6,845.8520 Sq.ft/Ton
Cooling Capacity Per Area: 0.0001 Tons/Sq.ft
Heating Capacity Per Area: 0.00 Btuh/Sq.ft


Total Heating Required With Outside Air: 0 Btuh
Total Cooling Required With Outside Air: 0.18 Tons


C:\Program Files\Elite\Chvacw\Projects\BODEGAS GUAYMARAL2.CHV Wednesday, April 23, 2014, 2:18 PM
Chvac - Full Commercial HVAC Loads Calculation Program Elite Software Development, Inc.
York International Bodega Guaymaral
Bogota, Columbia, Page 14

Air Handler #3 - Uma Hot Room - Summary Loads

Zn
No

Description
Zone Peak Time
Area
People
Volume
Htg.Loss
Htg.CFM
CFM/Sqft
Sen.Gain
Clg.CFM
CFM/Sqft
Lat.Gain
S.Exh
W.Exh
Htg.O.A.
Req.CFM
Act.CFM
Clg.O.A.
Req.CFM
Act.CFM


3 Hot Room
6pm January
184
1
3,019
0
0
0.00
740
54
0.29
0
0
0
None
0
0
0.2/ft
37
37


Zone Peak Totals:
Total Zones: 1
Unique Zones: 1
184
1
3,019
0
0
0.00
740
54
0.29
0
0
0
0
0
37
37
C:\Program Files\Elite\Chvacw\Projects\BODEGAS GUAYMARAL2.CHV Wednesday, April 23, 2014, 2:18 PM
Chvac - Full Commercial HVAC Loads Calculation Program Elite Software Development, Inc.
York International Bodega Guaymaral
Bogota, Columbia, Page 15

Air Handler #3 - Uma Hot Room - Total Load Summary
Air Handler Description: Uma Hot Room Constant Volume - Proportion
Supply Air Fan: Draw-Thru with program estimated horsepower of 0.02 HP
Fan Input: 85% motor and fan efficiency with 2 in. water across the fan
Sensible Heat Ratio: 1.00 --- This system occurs 1 time(s) in the building. ---


Air System Peak Time: 6pm in January.
Outdoor Conditions: 60DB, 56WB, 86.40 grains


Summer: Ventilation controls outside air, ----- Winter: Exhaust controls outside air.


Zone Space sensible loss: 0 Btuh
Infiltration sensible loss: 0 Btuh 0 CFM
Outside Air sensible loss: 0 Btuh 0 CFM
Supply Duct sensible loss: 0 Btuh
Return Duct sensible loss: 0 Btuh
Return Plenum sensible loss: 0 Btuh
Total System sensible loss: 0 Btuh


Heating Supply Air: 0 / (.729 X 1.08 X 0) = 0 CFM
Winter Vent Outside Air (0.0% of supply) = 0 CFM


Zone space sensible gain: 740 Btuh
Infiltration sensible gain: 0 Btuh
Draw-thru fan sensible gain: 37 Btuh
Supply duct sensible gain: 0 Btuh
Reserve sensible gain: 0 Btuh
Total sensible gain on supply side of coil: 776 Btuh


Cooling Supply Air: 776 / (.729 X 1.1 X 18) = 54 CFM
Summer Vent Outside Air (68.8% of supply) = 37 CFM


Return duct sensible gain: 0 Btuh
Return plenum sensible gain: 0 Btuh
Outside air sensible gain: -295 Btuh 37 CFM
Blow-thru fan sensible gain: 0 Btuh
Total sensible gain on return side of coil: -295 Btuh
Total sensible gain on air handling system: 481 Btuh


Zone space latent gain: 0 Btuh
Infiltration latent gain: 0 Btuh
Outside air latent gain: 194 Btuh
Total latent gain on air handling system: 194 Btuh
Total system sensible and latent gain: 675 Btuh


Check Figures
Total Air Handler Supply Air (based on a 18TD): 54 CFM
Total Air Handler Vent. Air (68.78% of Supply): 37 CFM


Total Conditioned Air Space: 184 Sq.ft
Supply Air Per Unit Area: 0.2908 CFM/Sq.ft
Area Per Cooling Capacity: 3,273.1740 Sq.ft/Ton
Cooling Capacity Per Area: 0.0003 Tons/Sq.ft
Heating Capacity Per Area: 0.00 Btuh/Sq.ft


Total Heating Required With Outside Air: 0 Btuh
Total Cooling Required With Outside Air: 0.06 Tons


C:\Program Files\Elite\Chvacw\Projects\BODEGAS GUAYMARAL2.CHV Wednesday, April 23, 2014, 2:18 PM
Chvac - Full Commercial HVAC Loads Calculation Program Elite Software Development, Inc.
York International Bodega Guaymaral
Bogota, Columbia, Page 16

Air Handler #4 - Uma Office Room 1 - Summary Loads

Zn
No

Description
Zone Peak Time
Area
People
Volume
Htg.Loss
Htg.CFM
CFM/Sqft
Sen.Gain
Clg.CFM
CFM/Sqft
Lat.Gain
S.Exh
W.Exh
Htg.O.A.
Req.CFM
Act.CFM
Clg.O.A.
Req.CFM
Act.CFM


4 Office Room 1
3pm January
531
10
7,958
0
0
0.00
16,863
1,132
2.13
2,100
0
0
None
0
0
20/P
200
200


Zone Peak Totals:
Total Zones: 1
Unique Zones: 1
531
10
7,958
0
0
0.00
16,863
1,132
2.13
2,100
0
0
0
0
200
200
C:\Program Files\Elite\Chvacw\Projects\BODEGAS GUAYMARAL2.CHV Wednesday, April 23, 2014, 2:18 PM
Chvac - Full Commercial HVAC Loads Calculation Program Elite Software Development, Inc.
York International Bodega Guaymaral
Bogota, Columbia, Page 17

Air Handler #4 - Uma Office Room 1 - Total Load Summary
Air Handler Description: Uma Office Room 1 Constant Volume - Proportion
Supply Air Fan: Draw-Thru with program estimated horsepower of 0.42 HP
Fan Input: 85% motor and fan efficiency with 2 in. water across the fan
Sensible Heat Ratio: 0.89 --- This system occurs 1 time(s) in the building. ---


Air System Peak Time: 3pm in January.
Outdoor Conditions: 64DB, 57WB, 84.72 grains


Summer: Ventilation controls outside air, ----- Winter: Exhaust controls outside air.


Zone Space sensible loss: 0 Btuh
Infiltration sensible loss: 0 Btuh 0 CFM
Outside Air sensible loss: 0 Btuh 0 CFM
Supply Duct sensible loss: 0 Btuh
Return Duct sensible loss: 0 Btuh
Return Plenum sensible loss: 0 Btuh
Total System sensible loss: 0 Btuh


Heating Supply Air: 0 / (.729 X 1.08 X 0) = 0 CFM
Winter Vent Outside Air (0.0% of supply) = 0 CFM


Zone space sensible gain: 16,863 Btuh
Infiltration sensible gain: 0 Btuh
Draw-thru fan sensible gain: 775 Btuh
Supply duct sensible gain: 0 Btuh
Reserve sensible gain: 0 Btuh
Total sensible gain on supply side of coil: 17,638 Btuh


Cooling Supply Air: 17,638 / (.729 X 1.1 X 19) = 1,132 CFM
Summer Vent Outside Air (17.7% of supply) = 200 CFM


Return duct sensible gain: 0 Btuh
Return plenum sensible gain: 0 Btuh
Outside air sensible gain: -962 Btuh 200 CFM
Blow-thru fan sensible gain: 0 Btuh
Total sensible gain on return side of coil: -962 Btuh
Total sensible gain on air handling system: 16,676 Btuh


Zone space latent gain: 2,100 Btuh
Infiltration latent gain: 0 Btuh
Outside air latent gain: 915 Btuh
Total latent gain on air handling system: 3,015 Btuh
Total system sensible and latent gain: 19,691 Btuh


Check Figures
Total Air Handler Supply Air (based on a 19TD): 1,132 CFM
Total Air Handler Vent. Air (17.68% of Supply): 200 CFM


Total Conditioned Air Space: 531 Sq.ft
Supply Air Per Unit Area: 2.1328 CFM/Sq.ft
Area Per Cooling Capacity: 323.3220 Sq.ft/Ton
Cooling Capacity Per Area: 0.0031 Tons/Sq.ft
Heating Capacity Per Area: 0.00 Btuh/Sq.ft


Total Heating Required With Outside Air: 0 Btuh
Total Cooling Required With Outside Air: 1.64 Tons


C:\Program Files\Elite\Chvacw\Projects\BODEGAS GUAYMARAL2.CHV Wednesday, April 23, 2014, 2:18 PM
Chvac - Full Commercial HVAC Loads Calculation Program Elite Software Development, Inc.
York International Bodega Guaymaral
Bogota, Columbia, Page 18

Air Handler #5 - Uma Electric Room - Summary Loads

Zn
No

Description
Zone Peak Time
Area
People
Volume
Htg.Loss
Htg.CFM
CFM/Sqft
Sen.Gain
Clg.CFM
CFM/Sqft
Lat.Gain
S.Exh
W.Exh
Htg.O.A.
Req.CFM
Act.CFM
Clg.O.A.
Req.CFM
Act.CFM


5 Uma Electric Room
3pm January
69
0
691
0
0
0.00
179
34
0.49
0
0
0
None
0
0
0.5/ft
35
35


Zone Peak Totals:
Total Zones: 1
Unique Zones: 1
69
0
691
0
0
0.00
179
34
0.49
0
0
0
0
0
35
35
C:\Program Files\Elite\Chvacw\Projects\BODEGAS GUAYMARAL2.CHV Wednesday, April 23, 2014, 2:18 PM
Chvac - Full Commercial HVAC Loads Calculation Program Elite Software Development, Inc.
York International Bodega Guaymaral
Bogota, Columbia, Page 19

Air Handler #5 - Uma Electric Room - Total Load Summary
Air Handler Description: Uma Electric Room Constant Volume - Proportion
Supply Air Fan: Draw-Thru with program estimated horsepower of 0.01 HP
Fan Input: 85% motor and fan efficiency with 2 in. water across the fan
Sensible Heat Ratio: 1.00 --- This system occurs 1 time(s) in the building. ---


Air System Peak Time: 3pm in January.
Outdoor Conditions: 64DB, 57WB, 84.72 grains


Summer: Ventilation controls outside air, ----- Winter: Exhaust controls outside air.


Zone Space sensible loss: 0 Btuh
Infiltration sensible loss: 0 Btuh 0 CFM
Outside Air sensible loss: 0 Btuh 0 CFM
Supply Duct sensible loss: 0 Btuh
Return Duct sensible loss: 0 Btuh
Return Plenum sensible loss: 0 Btuh
Total System sensible loss: 0 Btuh


Heating Supply Air: 0 / (.729 X 1.08 X 0) = 0 CFM
Winter Vent Outside Air (0.0% of supply) = 0 CFM


Zone space sensible gain: 179 Btuh
Infiltration sensible gain: 0 Btuh
Draw-thru fan sensible gain: 23 Btuh
Supply duct sensible gain: 0 Btuh
Reserve sensible gain: 290 Btuh
Total sensible gain on supply side of coil: 493 Btuh


Cooling Supply Air: 493 / (.729 X 1.1 X 18) = 34 CFM
Summer Vent Outside Air (101.7% of supply) = 35 CFM


Return duct sensible gain: 0 Btuh
Return plenum sensible gain: 0 Btuh
Outside air sensible gain: -166 Btuh 35 CFM
Blow-thru fan sensible gain: 0 Btuh
Total sensible gain on return side of coil: -166 Btuh
Total sensible gain on air handling system: 326 Btuh


Zone space latent gain: 0 Btuh
Infiltration latent gain: 0 Btuh
Outside air latent gain: 158 Btuh
Total latent gain on air handling system: 158 Btuh
Total system sensible and latent gain: 484 Btuh


Check Figures
Total Air Handler Supply Air (based on a 18TD): 34 CFM
Total Air Handler Vent. Air (101.72% of Supply): 35 CFM


Total Conditioned Air Space: 69 Sq.ft
Supply Air Per Unit Area: 0.4915 CFM/Sq.ft
Area Per Cooling Capacity: 1,711.2340 Sq.ft/Ton
Cooling Capacity Per Area: 0.0006 Tons/Sq.ft
Heating Capacity Per Area: 0.00 Btuh/Sq.ft


Total Heating Required With Outside Air: 0 Btuh
Total Cooling Required With Outside Air: 0.04 Tons


C:\Program Files\Elite\Chvacw\Projects\BODEGAS GUAYMARAL2.CHV Wednesday, April 23, 2014, 2:18 PM
Chvac - Full Commercial HVAC Loads Calculation Program Elite Software Development, Inc.
York International Bodega Guaymaral
Bogota, Columbia, Page 20

Zone Detailed Loads (At Group Peak Times)

Load
Description
Unit
Quan
-SC-
CFAC
CLTD
SHGF
U.Fac
-CLF-
Sen.
Gain
Lat.
Gain
Htg.
Mult.
Htg.
Loss

Zone 1-Bodega Doble Altura - Air Handler 1 (Uma Bodega Doble Altura), Group 0 peaks (sensible) in
January at 2pm.

Roof-1-1-No.Clg-L 2,555 0.50 15.9 0.640 25,913 0.000 0
Wall-1-N-C-L 1,850 0.65 -18.5 0.182 -6,229 0.000 0
Wall-2-S-C-L 1,850 0.65 -7.8 0.182 -2,618 0.000 0
Wall-3-E-C-L 1,108 0.65 -5.8 0.182 -1,175 0.000 0
Wall-4-W-C-L 1,108 0.65 -14.9 0.182 -3,010 0.000 0
Lights-Prof=1 1,000 1.000 3,412
People-Prof=1 2.0 1.000 490 310


Sub-total 16,783 310 0
Safety factors: +5%
---------
+5%
---------
+5%
---------
Total w/ safety factors: 17,622 326 0



Zone 2-Bodega Altura Sencilla - Air Handler 2 (Uma Bodega Altura Sencilla), Group 0 peaks (sensible)
in January at 6pm.

Wall-1-N-C-L 1,216 0.65 -15.3 0.182 -3,375 0.000 0
Wall-2-S-C-L 1,216 0.65 -1.3 0.182 -282 0.000 0
Wall-3-E-C-L 1,216 0.65 -3.9 0.182 -858 0.000 0
Wall-4-W-C-L 1,216 0.65 -7.8 0.182 -1,721 0.000 0
Lights-Prof=1 2,432 1.000 8,298


Sub-total 2,063 0 0
Safety factors: +5%
---------
+5%
---------
+5%
---------
Total w/ safety factors: 2,166 0 0



Zone 3-Hot Room - Air Handler 3 (Uma Hot Room), Group 0 peaks (sensible) in January at 6pm.

Wall-1-W-C-L 194 0.65 -7.8 0.182 -274 0.000 0
Wall-2-E-C-L 194 0.65 -3.9 0.182 -136 0.000 0
Wall-3-N-C-L 256 0.65 -15.3 0.182 -710 0.000 0
Wall-4-S-C-L 256 0.65 -1.3 0.182 -59 0.000 0
Lights-Prof=1 368 1.000 1,256
Equipment-Prof=1 184 1.000 628 0


Sub-total 705 0 0
Safety factors: +5%
---------
+5%
---------
+5%
---------
Total w/ safety factors: 740 0 0



Zone 4-Office Room 1 - Air Handler 4 (Uma Office Room 1), Group 0 peaks (sensible) in January at
3pm.

Roof-1-1-No.Clg-L 531 0.50 14.9 0.640 5,042 0.000 0
Wall-1-N-C-L 390 0.65 -17.9 0.182 -1,266 0.000 0
Wall-2-S-C-L 485 0.65 -5.8 0.182 -514 0.000 0
Wall-3-E-C-L 246 0.65 -4.5 0.182 -203 0.000 0
Wall-4-W-C-L 246 0.65 -14.3 0.182 -639 0.000 0
Gls-N-1-90-Tran 95.4 1.000 -8 1.040 -834 0.000 0
0%S-0-NS-Solar 95.4 0.760 33 0.760 1,819
Lights-Prof=1 1,061 1.000 3,621
Equipment-Prof=1 1,915 1.000 6,534 0
People-Prof=1 10.0 1.000 2,500 2,000


Sub-total 16,060 2,000 0
C:\Program Files\Elite\Chvacw\Projects\BODEGAS GUAYMARAL2.CHV Wednesday, April 23, 2014, 2:18 PM
Chvac - Full Commercial HVAC Loads Calculation Program Elite Software Development, Inc.
York International Bodega Guaymaral
Bogota, Columbia, Page 21

Zone Detailed Loads (At Group Peak Times) (cont'd)

Load
Description
Unit
Quan
-SC-
CFAC
CLTD
SHGF
U.Fac
-CLF-
Sen.
Gain
Lat.
Gain
Htg.
Mult.
Htg.
Loss
Safety factors: +5%
---------
+5%
---------
+5%
---------
Total w/ safety factors: 16,863 2,100 0



Zone 5-Uma Electric Room - Air Handler 5 (Uma Electric Room), Group 0 peaks (sensible) in January
at 3pm.

Roof-1-1-No.Clg-L 69 0.50 14.9 0.640 657 0.000 0
Wall-1-W-C-L 44 0.65 -14.3 0.182 -114 0.000 0
Wall-2-E-C-L 44 0.65 -4.5 0.182 -36 0.000 0
Wall-3-S-C-L 157 0.65 -5.8 0.182 -166 0.000 0
Wall-4-N-C-L 157 0.65 -17.9 0.182 -510 0.000 0
Equipment-Prof=1 100 1.000 341 0


Sub-total 171 0 0
Safety factors: +5%
---------
+5%
---------
+5%
---------
Total w/ safety factors: 179 0 0
C:\Program Files\Elite\Chvacw\Projects\BODEGAS GUAYMARAL2.CHV Wednesday, April 23, 2014, 2:18 PM
Chvac - Full Commercial HVAC Loads Calculation Program Elite Software Development, Inc.
York International Bodega Guaymaral
Bogota, Columbia, Page 22

Zone Detailed Loads (At Zone Peak Times)

Load
Description
Unit
Quan
-SC-
CFAC
CLTD
SHGF
U.Fac
-CLF-
Sen.
Gain
Lat.
Gain
Htg.
Mult.
Htg.
Loss

Zone 1-Bodega Doble Altura peaks (sensible) in January at 2pm, Air Handler 1 (Uma Bodega Doble
Altura), Group 0, 65.6 x 39.3, Construction Type: 22 (Medium)

Roof-1-1-No.Clg-L 2,555 0.50 15.9 0.640 25,913 0.000 0
Wall-1-N-C-L 1,850 0.65 -18.5 0.182 -6,229 0.000 0
Wall-2-S-C-L 1,850 0.65 -7.8 0.182 -2,618 0.000 0
Wall-3-E-C-L 1,108 0.65 -5.8 0.182 -1,175 0.000 0
Wall-4-W-C-L 1,108 0.65 -14.9 0.182 -3,010 0.000 0
Lights-Prof=1 1,000 1.000 3,412
People-Prof=1 2.0 1.000 490 310


Sub-total 16,783 310 0
Safety factors: +5%
---------
+5%
---------
+5%
---------
Total w/ safety factors: 17,622 326 0



Zone 2-Bodega Altura Sencilla peaks (sensible) in January at 6pm, Air Handler 2 (Uma Bodega Altura
Sencilla), Group 0, 1,216.0 x 1.0, Construction Type: 22 (Medium)

Wall-1-N-C-L 1,216 0.65 -15.3 0.182 -3,375 0.000 0
Wall-2-S-C-L 1,216 0.65 -1.3 0.182 -282 0.000 0
Wall-3-E-C-L 1,216 0.65 -3.9 0.182 -858 0.000 0
Wall-4-W-C-L 1,216 0.65 -7.8 0.182 -1,721 0.000 0
Lights-Prof=1 2,432 1.000 8,298


Sub-total 2,063 0 0
Safety factors: +5%
---------
+5%
---------
+5%
---------
Total w/ safety factors: 2,166 0 0



Zone 3-Hot Room peaks (sensible) in January at 6pm, Air Handler 3 (Uma Hot Room), Group 0, 11.8 x
15.6, Construction Type: 22 (Medium)

Wall-1-W-C-L 194 0.65 -7.8 0.182 -274 0.000 0
Wall-2-E-C-L 194 0.65 -3.9 0.182 -136 0.000 0
Wall-3-N-C-L 256 0.65 -15.3 0.182 -710 0.000 0
Wall-4-S-C-L 256 0.65 -1.3 0.182 -59 0.000 0
Lights-Prof=1 368 1.000 1,256
Equipment-Prof=1 184 1.000 628 0


Sub-total 705 0 0
Safety factors: +5%
---------
+5%
---------
+5%
---------
Total w/ safety factors: 740 0 0



Zone 4-Office Room 1 peaks (sensible) in January at 3pm, Air Handler 4 (Uma Office Room 1), Group
0, 16.4 x 32.4, Construction Type: 10 (Medium)

Roof-1-1-No.Clg-L 531 0.50 14.9 0.640 5,042 0.000 0
Wall-1-N-C-L 390 0.65 -17.9 0.182 -1,266 0.000 0
Wall-2-S-C-L 485 0.65 -5.8 0.182 -514 0.000 0
Wall-3-E-C-L 246 0.65 -4.5 0.182 -203 0.000 0
Wall-4-W-C-L 246 0.65 -14.3 0.182 -639 0.000 0
Gls-N-1-90-Tran 95.4 1.000 -8 1.040 -834 0.000 0
0%S-0-NS-Solar 95.4 0.760 33 0.760 1,819
Lights-Prof=1 1,061 1.000 3,621
Equipment-Prof=1 1,915 1.000 6,534 0
People-Prof=1 10.0 1.000 2,500 2,000


Sub-total 16,060 2,000 0
C:\Program Files\Elite\Chvacw\Projects\BODEGAS GUAYMARAL2.CHV Wednesday, April 23, 2014, 2:18 PM
Chvac - Full Commercial HVAC Loads Calculation Program Elite Software Development, Inc.
York International Bodega Guaymaral
Bogota, Columbia, Page 23

Zone Detailed Loads (At Zone Peak Times) (cont'd)

Load
Description
Unit
Quan
-SC-
CFAC
CLTD
SHGF
U.Fac
-CLF-
Sen.
Gain
Lat.
Gain
Htg.
Mult.
Htg.
Loss
Safety factors: +5%
---------
+5%
---------
+5%
---------
Total w/ safety factors: 16,863 2,100 0



Zone 5-Uma Electric Room peaks (sensible) in January at 3pm, Air Handler 5 (Uma Electric Room),
Group 0, 4.4 x 15.7, Construction Type: 22 (Medium)

Roof-1-1-No.Clg-L 69 0.50 14.9 0.640 657 0.000 0
Wall-1-W-C-L 44 0.65 -14.3 0.182 -114 0.000 0
Wall-2-E-C-L 44 0.65 -4.5 0.182 -36 0.000 0
Wall-3-S-C-L 157 0.65 -5.8 0.182 -166 0.000 0
Wall-4-N-C-L 157 0.65 -17.9 0.182 -510 0.000 0
Equipment-Prof=1 100 1.000 341 0


Sub-total 171 0 0
Safety factors: +5%
---------
+5%
---------
+5%
---------
Total w/ safety factors: 179 0 0
C:\Program Files\Elite\Chvacw\Projects\BODEGAS GUAYMARAL2.CHV Wednesday, April 23, 2014, 2:18 PM
Chvac - Full Commercial HVAC Loads Calculation Program Elite Software Development, Inc.
York International Bodega Guaymaral
Bogota, Columbia, Page 24

Air System #1 (Uma Bodega Doble Altura) Psychrometric Analysis

System Load Analysis Latent Grains Sensible Temp CFM
Leaving Coil Condition 74.886 55.000
Draw-Thru Fan 2,053 0.854 171
Misc Load on Supply Side 0 0.000 0
Supply Air Duct 0 0.000 0
Zone Loads 326 0.219 17,622 7.330 1,466
Sensible Reserve 16,385 6.816 1,363


Zone Condition 326 75.105 36,061 69.800 2,999
Return Air Duct 0 0.000
Return Air Plenum 0 0.000
Misc Load on Return Side 0 0.000
Vent Air 3,000 CFM 13,725 9.233 -14,429 -6.000
Blow-Thru Fan 0 0.000


Entering Coil Condition 14,050 84.338 21,632 64.000 2,999




General Psychrometric Equations Used In Analysis:
PR = (Barometric pressure of site / Standard ASHRAE pressure of 29.921)
TSH = PR x 1.10 x CFM x (DB entering - DB leaving)
TLH = PR x 0.68 x CFM x (Grains entering - Grains leaving)
GTH = PR x 4.50 x CFM x (Enthalpy entering - Enthalpy leaving)

TSH = 0.729 x 1.10 x 2,999 x ( 64.000 - 55.000 ) = 21,63
6
Btuh
TLH = 0.729 x 0.68 x 2,999 x ( 84.338 - 74.886 ) = 14,04
6
Btuh
--------
--
SUM = 35,68
3
Btuh
GTH = 0.729 x 4.50 x 2,999 x ( 28.488 - 24.814 ) = 36,13
2
Btuh
Total System Load = 35,29
8
Btuh


Chilled and Hot Water Flow Rates and Steam Requirement
Cooling GPM = 36,132 / ( 0.00 x 500 ) = 0.0 GPM
Heating GPM = 0 / ( 0.00 x 500 ) = 0.0 GPM
Steam Req. = 0 / 970 = 0.0 lb./hr



Entering Cooling Coil Conditions Entering Heating Coil Conditions
Dry bulb temperature: 64.00 Dry bulb temperature: .00
Wet bulb temperature: 57.00
Relative humidity: 68.93
Enthalpy: 28.49 Btu/lbm


Leaving Cooling Coil Conditions Leaving Heating Coil Conditions
Dry bulb temperature: 55.00 Dry bulb temperature: .00
Wet bulb temperature: 52.07
Relative humidity: 84.60
Enthalpy: 24.81 Btu/lbm
C:\Program Files\Elite\Chvacw\Projects\BODEGAS GUAYMARAL2.CHV Wednesday, April 23, 2014, 2:18 PM
Chvac - Full Commercial HVAC Loads Calculation Program Elite Software Development, Inc.
York International Bodega Guaymaral
Bogota, Columbia, Page 25

Air System #1 (Uma Bodega Doble Altura) Psychrometric Analysis (G)

System Load Analysis Latent Grains Sensible Temp CFM
Leaving Coil Condition 74.886 55.000
Draw-Thru Fan 2,053 0.854 171
Misc Load on Supply Side 0 0.000 0
Supply Air Duct 0 0.000 0
Zone Loads 326 0.219 17,622 7.330 1,466
Sensible Reserve 16,385 6.816 1,363


Zone Condition 326 75.105 36,061 69.800 2,999
Return Air Duct 0 0.000
Return Air Plenum 0 0.000
Misc Load on Return Side 0 0.000
Vent Air 3,000 CFM 13,725 9.233 -14,429 -6.000
Blow-Thru Fan 0 0.000


Entering Coil Condition 14,050 84.338 21,632 64.000 2,999




General Psychrometric Equations Used In Analysis:
PR = (Barometric pressure of site / Standard ASHRAE pressure of 29.921)
TSH = PR x 1.10 x CFM x (DB entering - DB leaving)
TLH = PR x 0.68 x CFM x (Grains entering - Grains leaving)
GTH = PR x 4.50 x CFM x (Enthalpy entering - Enthalpy leaving)

TSH = 0.729 x 1.10 x 2,999 x ( 64.000 - 55.000 ) = 21,63
6
Btuh
TLH = 0.729 x 0.68 x 2,999 x ( 84.338 - 74.886 ) = 14,04
6
Btuh
--------
--
SUM = 35,68
3
Btuh
GTH = 0.729 x 4.50 x 2,999 x ( 28.488 - 24.814 ) = 36,13
2
Btuh
Total System Load = 35,29
8
Btuh


Chilled and Hot Water Flow Rates and Steam Requirement
Cooling GPM = 36,132 / ( 0.00 x 500 ) = 0.0 GPM
Heating GPM = 0 / ( 0.00 x 500 ) = 0.0 GPM
Steam Req. = 0 / 970 = 0.0 lb./hr



Entering Cooling Coil Conditions Entering Heating Coil Conditions
Dry bulb temperature: 64.00 Dry bulb temperature: .00
Wet bulb temperature: 57.00
Relative humidity: 68.93
Enthalpy: 28.49 Btu/lbm


Leaving Cooling Coil Conditions Leaving Heating Coil Conditions
Dry bulb temperature: 55.00 Dry bulb temperature: .00
Wet bulb temperature: 52.07
Relative humidity: 84.60
Enthalpy: 24.81 Btu/lbm
C:\Program Files\Elite\Chvacw\Projects\BODEGAS GUAYMARAL2.CHV Wednesday, April 23, 2014, 2:18 PM
Chvac - Full Commercial HVAC Loads Calculation Program Elite Software Development, Inc.
York International Bodega Guaymaral
Bogota, Columbia, Page 26

Air System #2 (Uma Bodega Altura Sencilla) Psychrometric Analysis

System Load Analysis Latent Grains Sensible Temp CFM
Leaving Coil Condition 75.109 51.914
Draw-Thru Fan 124 0.854 9
Misc Load on Supply Side 0 0.000 0
Supply Air Duct 0 0.000 0
Zone Loads 0 0.000 2,166 14.871 149
Sensible Reserve 344 2.363 24


Zone Condition 0 75.109 2,635 69.800 182
Return Air Duct 0 0.000
Return Air Plenum 0 0.000
Misc Load on Return Side 0 0.000
Vent Air 182 CFM 959 10.606 -1,462 -10.000
Blow-Thru Fan 0 0.000


Entering Coil Condition 959 85.715 1,173 60.000 182




General Psychrometric Equations Used In Analysis:
PR = (Barometric pressure of site / Standard ASHRAE pressure of 29.921)
TSH = PR x 1.10 x CFM x (DB entering - DB leaving)
TLH = PR x 0.68 x CFM x (Grains entering - Grains leaving)
GTH = PR x 4.50 x CFM x (Enthalpy entering - Enthalpy leaving)

TSH = 0.729 x 1.10 x 182 x ( 60.000 - 51.914 ) = 1,178 Btuh
TLH = 0.729 x 0.68 x 182 x ( 85.715 - 75.109 ) = 955 Btuh
--------
--
SUM = 2,133 Btuh
GTH = 0.729 x 4.50 x 182 x ( 27.721 - 24.093 ) = 2,161 Btuh
Total System Load = 2,132 Btuh


Chilled and Hot Water Flow Rates and Steam Requirement
Cooling GPM = 2,161 / ( 0.00 x 500 ) = 0.0 GPM
Heating GPM = 0 / ( 0.00 x 500 ) = 0.0 GPM
Steam Req. = 0 / 970 = 0.0 lb./hr



Entering Cooling Coil Conditions Entering Heating Coil Conditions
Dry bulb temperature: 60.00 Dry bulb temperature: .00
Wet bulb temperature: 56.00
Relative humidity: 80.68
Enthalpy: 27.72 Btu/lbm


Leaving Cooling Coil Conditions Leaving Heating Coil Conditions
Dry bulb temperature: 51.91 Dry bulb temperature: .00
Wet bulb temperature: 51.02
Relative humidity: 95.00
Enthalpy: 24.09 Btu/lbm
C:\Program Files\Elite\Chvacw\Projects\BODEGAS GUAYMARAL2.CHV Wednesday, April 23, 2014, 2:18 PM
Chvac - Full Commercial HVAC Loads Calculation Program Elite Software Development, Inc.
York International Bodega Guaymaral
Bogota, Columbia, Page 27

Air System #2 (Uma Bodega Altura Sencilla) Psychrometric Analysis (G)

System Load Analysis Latent Grains Sensible Temp CFM
Leaving Coil Condition 75.109 51.914
Draw-Thru Fan 124 0.854 9
Misc Load on Supply Side 0 0.000 0
Supply Air Duct 0 0.000 0
Zone Loads 0 0.000 2,166 14.871 149
Sensible Reserve 344 2.363 24


Zone Condition 0 75.109 2,635 69.800 182
Return Air Duct 0 0.000
Return Air Plenum 0 0.000
Misc Load on Return Side 0 0.000
Vent Air 182 CFM 959 10.606 -1,462 -10.000
Blow-Thru Fan 0 0.000


Entering Coil Condition 959 85.715 1,173 60.000 182




General Psychrometric Equations Used In Analysis:
PR = (Barometric pressure of site / Standard ASHRAE pressure of 29.921)
TSH = PR x 1.10 x CFM x (DB entering - DB leaving)
TLH = PR x 0.68 x CFM x (Grains entering - Grains leaving)
GTH = PR x 4.50 x CFM x (Enthalpy entering - Enthalpy leaving)

TSH = 0.729 x 1.10 x 182 x ( 60.000 - 51.914 ) = 1,178 Btuh
TLH = 0.729 x 0.68 x 182 x ( 85.715 - 75.109 ) = 955 Btuh
--------
--
SUM = 2,133 Btuh
GTH = 0.729 x 4.50 x 182 x ( 27.721 - 24.093 ) = 2,161 Btuh
Total System Load = 2,132 Btuh


Chilled and Hot Water Flow Rates and Steam Requirement
Cooling GPM = 2,161 / ( 0.00 x 500 ) = 0.0 GPM
Heating GPM = 0 / ( 0.00 x 500 ) = 0.0 GPM
Steam Req. = 0 / 970 = 0.0 lb./hr



Entering Cooling Coil Conditions Entering Heating Coil Conditions
Dry bulb temperature: 60.00 Dry bulb temperature: .00
Wet bulb temperature: 56.00
Relative humidity: 80.68
Enthalpy: 27.72 Btu/lbm


Leaving Cooling Coil Conditions Leaving Heating Coil Conditions
Dry bulb temperature: 51.91 Dry bulb temperature: .00
Wet bulb temperature: 51.02
Relative humidity: 95.00
Enthalpy: 24.09 Btu/lbm
C:\Program Files\Elite\Chvacw\Projects\BODEGAS GUAYMARAL2.CHV Wednesday, April 23, 2014, 2:18 PM
Chvac - Full Commercial HVAC Loads Calculation Program Elite Software Development, Inc.
York International Bodega Guaymaral
Bogota, Columbia, Page 28

Air System #3 (Uma Hot Room) Psychrometric Analysis

System Load Analysis Latent Grains Sensible Temp CFM
Leaving Coil Condition 75.109 51.914
Draw-Thru Fan 37 0.854 3
Misc Load on Supply Side 0 0.000 0
Supply Air Duct 0 0.000 0
Zone Loads 0 0.000 740 17.241 51
Sensible Reserve 0 0.000 0


Zone Condition 0 75.109 776 69.800 54
Return Air Duct 0 0.000
Return Air Plenum 0 0.000
Misc Load on Return Side 0 0.000
Vent Air 37 CFM 194 7.295 -295 -6.878
Blow-Thru Fan 0 0.000


Entering Coil Condition 194 82.404 481 63.122 54




General Psychrometric Equations Used In Analysis:
PR = (Barometric pressure of site / Standard ASHRAE pressure of 29.921)
TSH = PR x 1.10 x CFM x (DB entering - DB leaving)
TLH = PR x 0.68 x CFM x (Grains entering - Grains leaving)
GTH = PR x 4.50 x CFM x (Enthalpy entering - Enthalpy leaving)

TSH = 0.729 x 1.10 x 54 x ( 63.122 - 51.914 ) = 481 Btuh
TLH = 0.729 x 0.68 x 54 x ( 82.404 - 75.109 ) = 193 Btuh
--------
--
SUM = 674 Btuh
GTH = 0.729 x 4.50 x 54 x ( 27.972 - 24.093 ) = 681 Btuh
Total System Load = 675 Btuh


Chilled and Hot Water Flow Rates and Steam Requirement
Cooling GPM = 681 / ( 0.00 x 500 ) = 0.0 GPM
Heating GPM = 0 / ( 0.00 x 500 ) = 0.0 GPM
Steam Req. = 0 / 970 = 0.0 lb./hr



Entering Cooling Coil Conditions Entering Heating Coil Conditions
Dry bulb temperature: 63.12 Dry bulb temperature: .00
Wet bulb temperature: 56.35
Relative humidity: 69.51
Enthalpy: 27.97 Btu/lbm


Leaving Cooling Coil Conditions Leaving Heating Coil Conditions
Dry bulb temperature: 51.91 Dry bulb temperature: .00
Wet bulb temperature: 51.02
Relative humidity: 95.00
Enthalpy: 24.09 Btu/lbm
C:\Program Files\Elite\Chvacw\Projects\BODEGAS GUAYMARAL2.CHV Wednesday, April 23, 2014, 2:18 PM
Chvac - Full Commercial HVAC Loads Calculation Program Elite Software Development, Inc.
York International Bodega Guaymaral
Bogota, Columbia, Page 29

Air System #3 (Uma Hot Room) Psychrometric Analysis (G)

System Load Analysis Latent Grains Sensible Temp CFM
Leaving Coil Condition 75.109 51.914
Draw-Thru Fan 37 0.854 3
Misc Load on Supply Side 0 0.000 0
Supply Air Duct 0 0.000 0
Zone Loads 0 0.000 740 17.241 51
Sensible Reserve 0 0.000 0


Zone Condition 0 75.109 776 69.800 54
Return Air Duct 0 0.000
Return Air Plenum 0 0.000
Misc Load on Return Side 0 0.000
Vent Air 37 CFM 194 7.295 -295 -6.878
Blow-Thru Fan 0 0.000


Entering Coil Condition 194 82.404 481 63.122 54




General Psychrometric Equations Used In Analysis:
PR = (Barometric pressure of site / Standard ASHRAE pressure of 29.921)
TSH = PR x 1.10 x CFM x (DB entering - DB leaving)
TLH = PR x 0.68 x CFM x (Grains entering - Grains leaving)
GTH = PR x 4.50 x CFM x (Enthalpy entering - Enthalpy leaving)

TSH = 0.729 x 1.10 x 54 x ( 63.122 - 51.914 ) = 481 Btuh
TLH = 0.729 x 0.68 x 54 x ( 82.404 - 75.109 ) = 193 Btuh
--------
--
SUM = 674 Btuh
GTH = 0.729 x 4.50 x 54 x ( 27.972 - 24.093 ) = 681 Btuh
Total System Load = 675 Btuh


Chilled and Hot Water Flow Rates and Steam Requirement
Cooling GPM = 681 / ( 0.00 x 500 ) = 0.0 GPM
Heating GPM = 0 / ( 0.00 x 500 ) = 0.0 GPM
Steam Req. = 0 / 970 = 0.0 lb./hr



Entering Cooling Coil Conditions Entering Heating Coil Conditions
Dry bulb temperature: 63.12 Dry bulb temperature: .00
Wet bulb temperature: 56.35
Relative humidity: 69.51
Enthalpy: 27.97 Btu/lbm


Leaving Cooling Coil Conditions Leaving Heating Coil Conditions
Dry bulb temperature: 51.91 Dry bulb temperature: .00
Wet bulb temperature: 51.02
Relative humidity: 95.00
Enthalpy: 24.09 Btu/lbm
C:\Program Files\Elite\Chvacw\Projects\BODEGAS GUAYMARAL2.CHV Wednesday, April 23, 2014, 2:18 PM
Chvac - Full Commercial HVAC Loads Calculation Program Elite Software Development, Inc.
York International Bodega Guaymaral
Bogota, Columbia, Page 30

Air System #4 (Uma Office Room 1) Psychrometric Analysis

System Load Analysis Latent Grains Sensible Temp CFM
Leaving Coil Condition 71.362 50.554
Draw-Thru Fan 775 0.854 50
Misc Load on Supply Side 0 0.000 0
Supply Air Duct 0 0.000 0
Zone Loads 2,100 3.745 16,863 18.592 1,082
Sensible Reserve 0 0.000 0


Zone Condition 2,100 75.108 17,638 69.800 1,132
Return Air Duct 0 0.000
Return Air Plenum 0 0.000
Misc Load on Return Side 0 0.000
Vent Air 200 CFM 915 1.631 -962 -1.061
Blow-Thru Fan 0 0.000


Entering Coil Condition 3,015 76.739 16,676 68.939 1,132




General Psychrometric Equations Used In Analysis:
PR = (Barometric pressure of site / Standard ASHRAE pressure of 29.921)
TSH = PR x 1.10 x CFM x (DB entering - DB leaving)
TLH = PR x 0.68 x CFM x (Grains entering - Grains leaving)
GTH = PR x 4.50 x CFM x (Enthalpy entering - Enthalpy leaving)

TSH = 0.729 x 1.10 x 1,132 x ( 68.939 - 50.554 ) = 16,67
5
Btuh
TLH = 0.729 x 0.68 x 1,132 x ( 76.739 - 71.362 ) = 3,015 Btuh
--------
--
SUM = 19,69
0
Btuh
GTH = 0.729 x 4.50 x 1,132 x ( 28.515 - 23.180 ) = 19,79
3
Btuh
Total System Load = 19,69
1
Btuh


Chilled and Hot Water Flow Rates and Steam Requirement
Cooling GPM = 19,793 / ( 0.00 x 500 ) = 0.0 GPM
Heating GPM = 0 / ( 0.00 x 500 ) = 0.0 GPM
Steam Req. = 0 / 970 = 0.0 lb./hr



Entering Cooling Coil Conditions Entering Heating Coil Conditions
Dry bulb temperature: 68.94 Dry bulb temperature: .00
Wet bulb temperature: 57.07
Relative humidity: 52.97
Enthalpy: 28.51 Btu/lbm


Leaving Cooling Coil Conditions Leaving Heating Coil Conditions
Dry bulb temperature: 50.55 Dry bulb temperature: .00
Wet bulb temperature: 49.69
Relative humidity: 95.00
Enthalpy: 23.18 Btu/lbm
C:\Program Files\Elite\Chvacw\Projects\BODEGAS GUAYMARAL2.CHV Wednesday, April 23, 2014, 2:18 PM
Chvac - Full Commercial HVAC Loads Calculation Program Elite Software Development, Inc.
York International Bodega Guaymaral
Bogota, Columbia, Page 31

Air System #4 (Uma Office Room 1) Psychrometric Analysis (G)

System Load Analysis Latent Grains Sensible Temp CFM
Leaving Coil Condition 71.362 50.554
Draw-Thru Fan 775 0.854 50
Misc Load on Supply Side 0 0.000 0
Supply Air Duct 0 0.000 0
Zone Loads 2,100 3.745 16,863 18.592 1,082
Sensible Reserve 0 0.000 0


Zone Condition 2,100 75.108 17,638 69.800 1,132
Return Air Duct 0 0.000
Return Air Plenum 0 0.000
Misc Load on Return Side 0 0.000
Vent Air 200 CFM 915 1.631 -962 -1.061
Blow-Thru Fan 0 0.000


Entering Coil Condition 3,015 76.739 16,676 68.939 1,132




General Psychrometric Equations Used In Analysis:
PR = (Barometric pressure of site / Standard ASHRAE pressure of 29.921)
TSH = PR x 1.10 x CFM x (DB entering - DB leaving)
TLH = PR x 0.68 x CFM x (Grains entering - Grains leaving)
GTH = PR x 4.50 x CFM x (Enthalpy entering - Enthalpy leaving)

TSH = 0.729 x 1.10 x 1,132 x ( 68.939 - 50.554 ) = 16,67
5
Btuh
TLH = 0.729 x 0.68 x 1,132 x ( 76.739 - 71.362 ) = 3,015 Btuh
--------
--
SUM = 19,69
0
Btuh
GTH = 0.729 x 4.50 x 1,132 x ( 28.515 - 23.180 ) = 19,79
3
Btuh
Total System Load = 19,69
1
Btuh


Chilled and Hot Water Flow Rates and Steam Requirement
Cooling GPM = 19,793 / ( 0.00 x 500 ) = 0.0 GPM
Heating GPM = 0 / ( 0.00 x 500 ) = 0.0 GPM
Steam Req. = 0 / 970 = 0.0 lb./hr



Entering Cooling Coil Conditions Entering Heating Coil Conditions
Dry bulb temperature: 68.94 Dry bulb temperature: .00
Wet bulb temperature: 57.07
Relative humidity: 52.97
Enthalpy: 28.51 Btu/lbm


Leaving Cooling Coil Conditions Leaving Heating Coil Conditions
Dry bulb temperature: 50.55 Dry bulb temperature: .00
Wet bulb temperature: 49.69
Relative humidity: 95.00
Enthalpy: 23.18 Btu/lbm
C:\Program Files\Elite\Chvacw\Projects\BODEGAS GUAYMARAL2.CHV Wednesday, April 23, 2014, 2:18 PM
Chvac - Full Commercial HVAC Loads Calculation Program Elite Software Development, Inc.
York International Bodega Guaymaral
Bogota, Columbia, Page 32

Air System #5 (Uma Electric Room) Psychrometric Analysis

System Load Analysis Latent Grains Sensible Temp CFM
Leaving Coil Condition 75.109 51.914
Draw-Thru Fan 23 0.854 2
Misc Load on Supply Side 0 0.000 0
Supply Air Duct 0 0.000 0
Zone Loads 0 0.000 179 6.586 12
Sensible Reserve 290 10.656 20


Zone Condition 0 75.109 493 69.800 34
Return Air Duct 0 0.000
Return Air Plenum 0 0.000
Misc Load on Return Side 0 0.000
Vent Air 35 CFM 158 9.229 -166 -6.000
Blow-Thru Fan 0 0.000


Entering Coil Condition 158 84.338 326 64.000 34




General Psychrometric Equations Used In Analysis:
PR = (Barometric pressure of site / Standard ASHRAE pressure of 29.921)
TSH = PR x 1.10 x CFM x (DB entering - DB leaving)
TLH = PR x 0.68 x CFM x (Grains entering - Grains leaving)
GTH = PR x 4.50 x CFM x (Enthalpy entering - Enthalpy leaving)

TSH = 0.729 x 1.10 x 34 x ( 64.000 - 51.914 ) = 329 Btuh
TLH = 0.729 x 0.68 x 34 x ( 84.338 - 75.109 ) = 155 Btuh
--------
--
SUM = 484 Btuh
GTH = 0.729 x 4.50 x 34 x ( 28.488 - 24.093 ) = 489 Btuh
Total System Load = 484 Btuh


Chilled and Hot Water Flow Rates and Steam Requirement
Cooling GPM = 489 / ( 0.00 x 500 ) = 0.0 GPM
Heating GPM = 0 / ( 0.00 x 500 ) = 0.0 GPM
Steam Req. = 0 / 970 = 0.0 lb./hr



Entering Cooling Coil Conditions Entering Heating Coil Conditions
Dry bulb temperature: 64.00 Dry bulb temperature: .00
Wet bulb temperature: 57.00
Relative humidity: 68.93
Enthalpy: 28.49 Btu/lbm


Leaving Cooling Coil Conditions Leaving Heating Coil Conditions
Dry bulb temperature: 51.91 Dry bulb temperature: .00
Wet bulb temperature: 51.02
Relative humidity: 95.00
Enthalpy: 24.09 Btu/lbm
C:\Program Files\Elite\Chvacw\Projects\BODEGAS GUAYMARAL2.CHV Wednesday, April 23, 2014, 2:18 PM
Chvac - Full Commercial HVAC Loads Calculation Program Elite Software Development, Inc.
York International Bodega Guaymaral
Bogota, Columbia, Page 33

Air System #5 (Uma Electric Room) Psychrometric Analysis (G)

System Load Analysis Latent Grains Sensible Temp CFM
Leaving Coil Condition 75.109 51.914
Draw-Thru Fan 23 0.854 2
Misc Load on Supply Side 0 0.000 0
Supply Air Duct 0 0.000 0
Zone Loads 0 0.000 179 6.586 12
Sensible Reserve 290 10.656 20


Zone Condition 0 75.109 493 69.800 34
Return Air Duct 0 0.000
Return Air Plenum 0 0.000
Misc Load on Return Side 0 0.000
Vent Air 35 CFM 158 9.229 -166 -6.000
Blow-Thru Fan 0 0.000


Entering Coil Condition 158 84.338 326 64.000 34




General Psychrometric Equations Used In Analysis:
PR = (Barometric pressure of site / Standard ASHRAE pressure of 29.921)
TSH = PR x 1.10 x CFM x (DB entering - DB leaving)
TLH = PR x 0.68 x CFM x (Grains entering - Grains leaving)
GTH = PR x 4.50 x CFM x (Enthalpy entering - Enthalpy leaving)

TSH = 0.729 x 1.10 x 34 x ( 64.000 - 51.914 ) = 329 Btuh
TLH = 0.729 x 0.68 x 34 x ( 84.338 - 75.109 ) = 155 Btuh
--------
--
SUM = 484 Btuh
GTH = 0.729 x 4.50 x 34 x ( 28.488 - 24.093 ) = 489 Btuh
Total System Load = 484 Btuh


Chilled and Hot Water Flow Rates and Steam Requirement
Cooling GPM = 489 / ( 0.00 x 500 ) = 0.0 GPM
Heating GPM = 0 / ( 0.00 x 500 ) = 0.0 GPM
Steam Req. = 0 / 970 = 0.0 lb./hr



Entering Cooling Coil Conditions Entering Heating Coil Conditions
Dry bulb temperature: 64.00 Dry bulb temperature: .00
Wet bulb temperature: 57.00
Relative humidity: 68.93
Enthalpy: 28.49 Btu/lbm


Leaving Cooling Coil Conditions Leaving Heating Coil Conditions
Dry bulb temperature: 51.91 Dry bulb temperature: .00
Wet bulb temperature: 51.02
Relative humidity: 95.00
Enthalpy: 24.09 Btu/lbm
C:\Program Files\Elite\Chvacw\Projects\BODEGAS GUAYMARAL2.CHV Wednesday, April 23, 2014, 2:18 PM
Chvac - Full Commercial HVAC Loads Calculation Program Elite Software Development, Inc.
York International Bodega Guaymaral
Bogota, Columbia, Page 34

Air System #1 (Uma Bodega Doble Altura) Psychrometric Chart
ZC Zone Condition OC Outdoor Condition
LC Leaving Coil Condition EC Entering Coil Condition
SD Supply Duct Temperature Rise RD Return Duct Temperature Rise
DTF Draw Through Fan Sensible Gain BTF Blow Through Fan Sensible Gain
RE Reserve or Reheat Sensible Gain PL Return Air Plenum Sensible Gain
SM Supply Side Miscellaneous Sensible Gain RM Return Side Miscellaneous Gain
PRE Pretreated Air Condition
C:\Program Files\Elite\Chvacw\Projects\BODEGAS GUAYMARAL2.CHV Wednesday, April 23, 2014, 2:18 PM
Chvac - Full Commercial HVAC Loads Calculation Program Elite Software Development, Inc.
York International Bodega Guaymaral
Bogota, Columbia, Page 35

Air System #1 (Uma Bodega Doble Altura) Psychrometric Chart (G)
ZC Zone Condition OC Outdoor Condition
LC Leaving Coil Condition EC Entering Coil Condition
SD Supply Duct Temperature Rise RD Return Duct Temperature Rise
DTF Draw Through Fan Sensible Gain BTF Blow Through Fan Sensible Gain
RE Reserve or Reheat Sensible Gain PL Return Air Plenum Sensible Gain
SM Supply Side Miscellaneous Sensible Gain RM Return Side Miscellaneous Gain
PRE Pretreated Air Condition
C:\Program Files\Elite\Chvacw\Projects\BODEGAS GUAYMARAL2.CHV Wednesday, April 23, 2014, 2:18 PM
Chvac - Full Commercial HVAC Loads Calculation Program Elite Software Development, Inc.
York International Bodega Guaymaral
Bogota, Columbia, Page 36

Air System #2 (Uma Bodega Altura Sencilla) Psychrometric Chart
ZC Zone Condition OC Outdoor Condition
LC Leaving Coil Condition EC Entering Coil Condition
SD Supply Duct Temperature Rise RD Return Duct Temperature Rise
DTF Draw Through Fan Sensible Gain BTF Blow Through Fan Sensible Gain
RE Reserve or Reheat Sensible Gain PL Return Air Plenum Sensible Gain
SM Supply Side Miscellaneous Sensible Gain RM Return Side Miscellaneous Gain
PRE Pretreated Air Condition
C:\Program Files\Elite\Chvacw\Projects\BODEGAS GUAYMARAL2.CHV Wednesday, April 23, 2014, 2:18 PM
Chvac - Full Commercial HVAC Loads Calculation Program Elite Software Development, Inc.
York International Bodega Guaymaral
Bogota, Columbia, Page 37

Air System #2 (Uma Bodega Altura Sencilla) Psychrometric Chart (G)
ZC Zone Condition OC Outdoor Condition
LC Leaving Coil Condition EC Entering Coil Condition
SD Supply Duct Temperature Rise RD Return Duct Temperature Rise
DTF Draw Through Fan Sensible Gain BTF Blow Through Fan Sensible Gain
RE Reserve or Reheat Sensible Gain PL Return Air Plenum Sensible Gain
SM Supply Side Miscellaneous Sensible Gain RM Return Side Miscellaneous Gain
PRE Pretreated Air Condition
C:\Program Files\Elite\Chvacw\Projects\BODEGAS GUAYMARAL2.CHV Wednesday, April 23, 2014, 2:18 PM
Chvac - Full Commercial HVAC Loads Calculation Program Elite Software Development, Inc.
York International Bodega Guaymaral
Bogota, Columbia, Page 38

Air System #3 (Uma Hot Room) Psychrometric Chart
ZC Zone Condition OC Outdoor Condition
LC Leaving Coil Condition EC Entering Coil Condition
SD Supply Duct Temperature Rise RD Return Duct Temperature Rise
DTF Draw Through Fan Sensible Gain BTF Blow Through Fan Sensible Gain
RE Reserve or Reheat Sensible Gain PL Return Air Plenum Sensible Gain
SM Supply Side Miscellaneous Sensible Gain RM Return Side Miscellaneous Gain
PRE Pretreated Air Condition
C:\Program Files\Elite\Chvacw\Projects\BODEGAS GUAYMARAL2.CHV Wednesday, April 23, 2014, 2:18 PM
Chvac - Full Commercial HVAC Loads Calculation Program Elite Software Development, Inc.
York International Bodega Guaymaral
Bogota, Columbia, Page 39

Air System #3 (Uma Hot Room) Psychrometric Chart (G)
ZC Zone Condition OC Outdoor Condition
LC Leaving Coil Condition EC Entering Coil Condition
SD Supply Duct Temperature Rise RD Return Duct Temperature Rise
DTF Draw Through Fan Sensible Gain BTF Blow Through Fan Sensible Gain
RE Reserve or Reheat Sensible Gain PL Return Air Plenum Sensible Gain
SM Supply Side Miscellaneous Sensible Gain RM Return Side Miscellaneous Gain
PRE Pretreated Air Condition
C:\Program Files\Elite\Chvacw\Projects\BODEGAS GUAYMARAL2.CHV Wednesday, April 23, 2014, 2:18 PM
Chvac - Full Commercial HVAC Loads Calculation Program Elite Software Development, Inc.
York International Bodega Guaymaral
Bogota, Columbia, Page 40

Air System #4 (Uma Office Room 1) Psychrometric Chart
ZC Zone Condition OC Outdoor Condition
LC Leaving Coil Condition EC Entering Coil Condition
SD Supply Duct Temperature Rise RD Return Duct Temperature Rise
DTF Draw Through Fan Sensible Gain BTF Blow Through Fan Sensible Gain
RE Reserve or Reheat Sensible Gain PL Return Air Plenum Sensible Gain
SM Supply Side Miscellaneous Sensible Gain RM Return Side Miscellaneous Gain
PRE Pretreated Air Condition
C:\Program Files\Elite\Chvacw\Projects\BODEGAS GUAYMARAL2.CHV Wednesday, April 23, 2014, 2:18 PM
Chvac - Full Commercial HVAC Loads Calculation Program Elite Software Development, Inc.
York International Bodega Guaymaral
Bogota, Columbia, Page 41

Air System #4 (Uma Office Room 1) Psychrometric Chart (G)
ZC Zone Condition OC Outdoor Condition
LC Leaving Coil Condition EC Entering Coil Condition
SD Supply Duct Temperature Rise RD Return Duct Temperature Rise
DTF Draw Through Fan Sensible Gain BTF Blow Through Fan Sensible Gain
RE Reserve or Reheat Sensible Gain PL Return Air Plenum Sensible Gain
SM Supply Side Miscellaneous Sensible Gain RM Return Side Miscellaneous Gain
PRE Pretreated Air Condition
C:\Program Files\Elite\Chvacw\Projects\BODEGAS GUAYMARAL2.CHV Wednesday, April 23, 2014, 2:18 PM
Chvac - Full Commercial HVAC Loads Calculation Program Elite Software Development, Inc.
York International Bodega Guaymaral
Bogota, Columbia, Page 42

Air System #5 (Uma Electric Room) Psychrometric Chart
ZC Zone Condition OC Outdoor Condition
LC Leaving Coil Condition EC Entering Coil Condition
SD Supply Duct Temperature Rise RD Return Duct Temperature Rise
DTF Draw Through Fan Sensible Gain BTF Blow Through Fan Sensible Gain
RE Reserve or Reheat Sensible Gain PL Return Air Plenum Sensible Gain
SM Supply Side Miscellaneous Sensible Gain RM Return Side Miscellaneous Gain
PRE Pretreated Air Condition
C:\Program Files\Elite\Chvacw\Projects\BODEGAS GUAYMARAL2.CHV Wednesday, April 23, 2014, 2:18 PM
Chvac - Full Commercial HVAC Loads Calculation Program Elite Software Development, Inc.
York International Bodega Guaymaral
Bogota, Columbia, Page 43

Air System #5 (Uma Electric Room) Psychrometric Chart (G)
ZC Zone Condition OC Outdoor Condition
LC Leaving Coil Condition EC Entering Coil Condition
SD Supply Duct Temperature Rise RD Return Duct Temperature Rise
DTF Draw Through Fan Sensible Gain BTF Blow Through Fan Sensible Gain
RE Reserve or Reheat Sensible Gain PL Return Air Plenum Sensible Gain
SM Supply Side Miscellaneous Sensible Gain RM Return Side Miscellaneous Gain
PRE Pretreated Air Condition
C:\Program Files\Elite\Chvacw\Projects\BODEGAS GUAYMARAL2.CHV Wednesday, April 23, 2014, 2:18 PM

You might also like