1.0 INTRODUCTION
VAPL awarded the work of geotechnical investigation and topographic survey to DBM
Geotechnics and Constructions Pvt. Ltd. Vide work order No. VAPL/DBM/geoth
tech/VSP/2012/01 dated 29
may 2012. The field work and laboratory testing for the
The existing EQ-7 berth is 255m long for handling fertilizers, dry bulk cargo. The proposed
facilities will include, mechanization such as conveyor system, storage facilities, bagging
plant all the connected civil, mechanical and electrical works. The system shall be designed
for the unloading of fertilizer at the rate of 25,000 TPD. The optimal annual quay capacity of
EQ7 is estimated to be 7.0 million. The system shall consist mainly of (a) Unloading and
Stacking System and (b) Reclaiming, Bagging and Wagon Loading System, etc. The
existing ground surface elevations are between (+)2.70m to (+)4.00m with respect to chart
datum.
g) Topography survey for proposed berth alignment, backup area and stack yard.
Completed borehole co-ordinates, and reduced levels (RL) with respect to Chart
Datum (CD) are summarized in Table A1 below.
BH. No
BH-1
BH-2
BH-3
BH-4
BH-5
BH-8
BH-10
BH-11
BH-12
BH-14
BH-15
BH-18
BH-19
BH-20
BH-21
BH-23
BH-24
BH-26
BH-28
BH-29
BH-31
BH-32
BH-33
BH-N1
BH-N2
BH-N3
BH-N4
BH-N5
BH-N6
BH-N7
BH-N8
TABLE A1
BOREHOLE COORDINATES AND ELEVATIONS
GROUND TERMINATION
CO-ORDINATES
R.L.
DEPTH,BGL
NORTHING
EASTING
(m)
(m)
1960170.557
742490.025
(+)2.723
9.30
1960178.833
742548.89
(+)2.716
10.00
1960191.293
742621.645
(+)2.961
11.20
1960204.398
742692.798
(+)2.851
9.20
1960226.557
742786.083
(+)3.172
9.70
1960153.858
742636.337
(+)2.506
14.50
1960190.307
742781.307
(+)2.756
13.00
1960217.195
742837.117
(+)2.854
14.78
1960092.395
742631.144
(+)2.801
14.50
1960123.496
742735.68
(+)2.455
13.60
1960128.703
742814.601
(+)2.957
19.80
1960042.027
742778.714
(+)2.752
18.15
1960068.066
742850.323
(+)2.922
14.85
1960061.146
742946.34
(+)3.304
13.08
1959993.045
742856.859
(+)2.739
17.50
1960009.016
742957.088
(+)4.010
15.35
1959944.414
742971.158
(+)3.189
16.75
1960147.554
742971.466
(+)3.463
12.10
1960128.52
743078.659
(+)3.360
8.10
1960096.854
742982.144
(+)3.713
9.00
1960062.908
743108.691
(+)3.705
9.60
1960049.003
743038.329
(+)3.511
13.08
1960021.933
743086.241
(+)3.598
9.60
1960307.729
742966.519
(+)3.610
25.50
1960269.345
742988.127
(+)3.474
27.00
1960272.336
742901.831
(+)3.700
26.00
1960203.424
742928.076
(+)3.600
13.50
1960200.620
742988.790
(+)3.683
11.00
1960201.370
743050.820
(+)3.745
9.00
1959964.655
743069.021
(+)3.485
15.0
1959867.214
743184.218
(+)3.550
13.5
3
TERMINATION
LEVEL
(m)
(-)6.577
(-)7.284
(-)8.239
(-)6.349
(-)6.528
(-)11.994
(-)10.244
(-)11.926
(-)11.699
(-)11.145
(-)16.843
(-)15.398
(-)11.928
(-)9.776
(-)14.761
(-)11.340
(-)13.561
(-)8.637
(-)4.740
(-)5.287
(-)5.895
(-)9.569
(-)6.002
(-)21.890
(-)23.526
(-)22.300
(-)9.400
(-)7.317
(-)5.255
(-)11.515
(-)9.950
LAYER I: FILL
Fill soils, consisting mostly of dark grayish or reddish brown silty clay/sand with boulders,
were encountered at the ground surface. Based on Standard Penetration Tests (SPT),
relative densities of the granular soils (sand) within this layer, ranged between Loose to
dense. The thickness of this layer was typically between 1.50m and 4.50m.
Water heights at borehole locations were monitored during and after completion of drilling
activities. Groundwater was encountered at depths between 0.5m and 2.6m below ground
surface in boreholes. Significant tidal fluctuations were measured at each borehole location.
Annual and seasonal fluctuations in water levels can be expected to occur.
Soils encountered within stack yard area are not capable of providing adequate support
2
for the proposed loading of 5 t/m . Hence, ground improvement with band drains and
preloading or stone columns should be implemented at this site. Design of the ground
improvement system is not in current scope of work. However, based on our general
experience, Band drains will be spaced at 1.0m center to center in a triangular pattern and
will be completed to completely weathered rock. Pre-drilling may be required within the top
4.00m granular fill soils in some locations. A minimum 0.30m thick layer of sand blanket
should also be provided at existing ground surface.
Temporary preloading soil Fill corresponding to final design loads should be placed. A
consolidation period of upto 6 months may be required.
Safe Vertical
Downward
Capacity (MT)
115
165
260
Safe Uplift
Capacity
(MT)
30
45
70
Safe Lateral
Capacity (MT)
3.5
4.0
5.0
Maximum total settlement of piles installed as described above will be less than 12mm.
Maximum Depth of fixity can be taken as 13.0D (D is pile diameter ) below pile cap or 1D in
bedrock whichever is less.
Results of chemical analysis on soil and groundwater samples are enclosed in the
Annexure. Results of the soil samples fall under Class 3 for sulphate and class 5 for chloride
concentration. Results of the water samples fall under Class 2 for sulphate and chloride
concentration (As per IS456 and as per CIRIA Sp. Publication No. 31). A very severe
Exposure Condition was assigned to this site.
Type of Cement:
OPC or PPC
M35
400 kg/m
0.40
75mm
a) The sub-surface investigation was completed generally as per IS: 1892-1979. The
field investigation was carried out using rotary drilling machines. Casing was used to
support sides of borehole until sufficiently stiff strata was encountered.
b) Standard Penetration Tests (i.e. SPT) were carried out generally at an interval of
1.5m in the boreholes as per IS: 2131.
diameter split-barrel sampler is driven into the soil by a 63.50 kg. weight falling
75cm. After an initial set of 15cm, the number of blows required to drive the sampler
an additional 30, is known as the penetration resistance or N value. N values
obtained in field are shown on borehole logs enclosed in the Annexure.
c) In soil, drilling was progressed with Tungsten Carbide (T.C.) bit, while in rock it was
continued with diamond bit and double tube core barrel to obtain good quality rock
samples. In rock strata, length of rock core recovered from each run of drilling was
measured and recorded in the borelogs as percentage of Core Recovery (CR) and
Rock Quality Designation (RQD). Ratio of total length of rock pieces to the length
drilled expressed as percentage is known as Core Recovery. Ratio of total length of
rock pieces which are 100mm or longer to the total length drilled, expressed as
percentage is known as RQD. All core pieces obtained were serially numbered and
preserved in core boxes.
10
d) Laboratory tests were carried out on disturbed and UDS samples obtained from
boreholes.
Laboratory tests on disturbed samples included grain size analysis and Atterberg
Limits. Additional laboratory tests consisting of unconfined compression tests and
triaxial tests were conducted on UDS samples. Laboratory tests on rock core
samples included unit weight, water absorption test, porosity, and Uniaxial
Compressive Strength.
Sincerely,
DBM GEOTECHNICS AND CONSTRUCTION PVT. LTD.
__________________________________
Jaydeep Wagh
B.E., M.S., P.E. (Geotechnical)
11
REFERENCES
1) Foundation Analysis and Design, J.E. Bowles, McGraw Hill Publication, 5th Edition, 1996.
th
12
Therefore, Safe pile capacity = 600 t/m x (C/s Area of Pile) = 169 MT
2. SAMPLE CALCULATION OF UPLIFT CAPACITY OF PILES SOCKETED
MINIMUM 1.0D INTO BEDROCK
2
R4
EI
K2
Where,
5
R = 6.5 D
14
DBM
ANNEXURE
DBM
LOCATION PLAN
INVERT
LEVEL=1.729 M.
16
.0
4
19.10
4.1
74.48
71.90
BH 3
61.31
BH 4
71.48
INVERT
LEVEL=2.223 M.
INVERT
LEVEL=2.005 M.
INVERT
LEVEL=2.197 M.
12
.20
16
.51
BH 5
INVERT
LEVEL=2.318 M.
6.4
3
10.0
15.1
4
2
12.1
8
23.7
3.2
.10
75
BH 19
43.3
6
4.2
44.15
BH N3
INVERT
LEVEL=2.031 M.
4.85
20 .8
0
BH N1
8.71
11.0
7
6.8
13
.52
10.2
7
.43
16
4
6.8
21
1.052
1.
4.54
6
4.43 1.322
2
1.35
6
.04
76
4.40
6
BH 29
BH 26
.46
86
BH N5
BH N2
5.2
BH 20
.43
19
BH N4
INVERT
LEVEL=2.315 M.
5.29
6.46
INVERT
LEVEL=2.071 M.
BH 31
2
50.6
88.1
8
BH 33
5
31 .1
BH 28
9.32
BH N6
.45
19
9
17 .6
1
20.3
BH 32A
37 .7
4.87
14.13
INVERT
LEVEL=2.320 M.
BH N7
ELECTRIC LINE
GROUND LEVEL=3.94 0 M.
TOP CABLE LEVEL=12.213 M.
BOTTOM CABLE LEVEL=11.024 M.
1.81
5
47
13.
4.29
8
1.64
2
8
51.6
BH 21
3.36
1.89 8
4
3.35
1672 1
.06
15
2.75
BH 11
INVERT
LEVEL=2.064 M.
BH 15
2.7
5
7
8.4
BH 18
BH 10
INVERT
LEVEL=2.304 M.
BH 8
BH 14
.6
11
INVERT
LEVEL=1.777 M.
BH 12
10.9
9
AY
TO
RK
PA
GREEN HOUSE
4.05
1
2.33
9
4.10
2.36 0
OFFICE ROOM
BH N8
.08
10
3
5
97
60.
4
8.9
4.99
7
45.1
DBM
CLIENT :
PROJECT : Geotechnical Investigation Work for the Proposed Installation of Mechanical Handling Facilities at East Quay-7 (EQ-7)
Berth in the inner harbour of Visakhapatnam Port Trust.
BORE HOLE NO. : BH-01
SHEET NO.
: 1 OF 1
:
CO-ORDINATES :
GROUND R. L.
:
GROUND W. T. :
Stackyard Area
DATE
: 09/06/2012 TO 11/06/2012
N 1960170.557, E 742490.025
METHOD
: ROTARY DRILLING
2.723m
CASING
0.55m Below GL
LL%
PL%
57
--
79
33
46
--
CH
02
21
32
45
73.28
98
37
61
0.11
3.89
CI
12
27
25
36
--
47
22
25
--
LOG
PLI(kg/cm )
CLAY %
34
UCS(kg/cm )
SILT %
09
Cu/ (kg/cm )/
(degrees)
SAND %
00
NMC
GRAVELS %
CONSISTENCY LIMIT
CLASSIFICATION
CH
DESCRIPTION
R.L. (m)
RQD (%)
LABORATORY DATA
TCR (%)
DIA OF BOREHOLE
FIELD DATA
PLASTICITY INDEX
LOCATION
0.00 DS1
0.50
0.50
Fill
(Reddish silty SAND)
1.00
(04)
1.50/
SPT1
2.10
03/02/02/02
1.50
2.00
150
mm
2.50
Soft grey,
marine CLAY
3.00/
UDS1
3.50
3.00
3.50
4.00
(03)
4.50/
SPT2
5.10
01/01/02/02
4.50
5.00
Soft grey,
marine CLAY,
with gravels
5.50
6.00/
6.00
6.23
SPT3
(R)
11/52/--
6.50
7.00
NX
Highly weathered
fine grained, greyish
pink KHONDALITE
7.50
7.50
8.00
8.50
8.50
Moderately weathered,
greyish pink,
KHONDALITE
9.00
9.00
9.30
9.50
10.00
ABBREVIATIONS :
DS
UDS
N
SPT
:
:
:
:
DISTURBED SAMPLE
UNDISTURBED SOIL SAMPLE
SPT VALUE
STD. PENETRATION TEST
R
RQD
CR
TCR
:
:
:
:
PL(%)
Cu
NMC
LL (%)
:
:
:
:
PLASTIC LIMIT
COHESION
NATURAL MOISTURE CONTENT
LIQUID LIMIT
UC :
PLI :
UCS :
Checked By :
Prajit Nagrale
Drawn By:
Rupesh
SCALE : 1: 50
JOB NO. : 3228
CLIENT :
PROJECT : Geotechnical Investigation Work for the Proposed Installation of Mechanical Handling Facilities at East Quay-7 (EQ-7)
Berth in the inner harbour of Visakhapatnam Port Trust.
BORE HOLE NO. : BH-02
: Stackyard Area
: 2.716m
: 1.05m Below GL
: 1 OF 1
DATE
: 09/06/2012 TO 11/06/2012
METHOD
: ROTARY DRILLING
CASING
CH
00
15
34
LOG
Cu/ (kg/cm )/
(degrees)
20
PLASTICITY INDEX
49
PL%
11
LL%
SC
NMC
47
CONSISTENCY LIMIT
--
--
--
--
--
20
38.18
36
22
14
0.08
23.98
51
--
81
30
51
--
CLAY %
SAND %
23
SILT %
GRAVELS %
CLASSIFICATION
SM
DESCRIPTION
R.L. (m)
RQD (%)
LABORATORY DATA
TCR (%)
DIA OF BOREHOLE
FIELD DATA
PLI(kg/cm )
GROUND R. L.
SHEET NO.
UCS(kg/cm )
LOCATION
0.00
0.50
0.50
DS1
Fill
(Brownish silty SAND
with boulders)
1.00
(12)
1.50/
SPT1
2.10
07/07/05/05
1.50
2.00
150
mm
Medium dense,
Blackish brown,
silty SAND with gravels
2.50
3.00/
UDS1
3.50
3.00
30
Greyish clayey,
SAND with gravels
3.50
4.00
(04)
4.50/
SPT2
5.10
01/02/02/02
4.50
5.00
Soft greyish,
marine CLAY
5.50
6.00/
6.00
SPT3
(R)
16/52/--
6.30
6.50
7.00
379
NX
Highly weathered,
greyish pink,
KHONDALITE
7.50
7.50
8.00
98.39
8.50
9.00
9.00
Slightly weathered,
greyish pink
KHONDALITE
9.50
10.00
10.00
ABBREVIATIONS :
DS
UDS
N
SPT
:
:
:
:
DISTURBED SAMPLE
UNDISTURBED SOIL SAMPLE
SPT VALUE
STD. PENETRATION TEST
R
RQD
CR
TCR
:
:
:
:
PL(%)
Cu
NMC
LL (%)
:
:
:
:
PLASTIC LIMIT
COHESION
NATURAL MOISTURE CONTENT
LIQUID LIMIT
UC :
PLI :
UCS :
Checked By :
Prajit Nagrale
Drawn By:
Mithun
SCALE : 1: 50
JOB NO. : 3228
CLIENT :
PROJECT : Geotechnical Investigation Work for the Proposed Installation of Mechanical Handling Facilities at East Quay-7 (EQ-7)
Berth in the inner harbour of Visakhapatnam Port Trust.
BORE HOLE NO. : BH-03
SHEET NO.
: 1 OF 2
:
CO-ORDINATES :
:
GROUND R. L.
GROUND W. T. :
Stackyard Area
DATE
: 09/06/2012 TO 11/06/2012
N 1960191.293, E 742621.645
2.961m
METHOD
: ROTARY DRILLING
CASING
1.15m Below GL
LABORATORY DATA
63
4.50/
UDS1
5.00
CH
00
01
32
67
CH
01
11
28
60
LOG
R.L. (m)
RQD (%)
TCR (%)
76
33
43
--
77.79 122
40
82
0.08
4.36
28
43
--
PLI(kg/cm )
29
UCS(kg/cm )
08
Cu/ (kg/cm )/
(degrees)
CLAY %
00
PL%
SILT %
CH
LL%
SAND %
3.00/
(04)
SPT2
3.60
01/02/02/02
DESCRIPTION
CONSISTENCY LIMIT
NMC
GRAVELS %
CLASSIFICATION
DIA OF BOREHOLE
FIELD DATA
PLASTICITY INDEX
LOCATION
0.00/
DS1
0.50
0.50
1.00
(12)
1.50/
SPT1
2.10
04/06/06/08
1.50
2.00
Fill
(Reddish silty SAND
with boulders)
150
mm
2.50
3.00
--
3.50
4.00
4.50
5.00
Soft grey,
marine CLAY.
5.50
(04)
6.00/ SPT3
6.60
02/02/02/03
6.00
--
71
6.50
7.00
(10)
7.50 SPT4
02/04/06/21
8.10
7.50
8.00
8.20
8.50
NX
9.00
Moderately weathered,
greyish pink,
fine grained,
KHONDALITE
9.20
9.50
703
10.00
ABBREVIATIONS :
DS
UDS
N
SPT
:
:
:
:
DISTURBED SAMPLE
UNDISTURBED SOIL SAMPLE
SPT VALUE
STD. PENETRATION TEST
R
RQD
CR
TCR
:
:
:
:
PL(%)
Cu
NMC
LL (%)
:
:
:
:
PLASTIC LIMIT
COHESION
NATURAL MOISTURE CONTENT
LIQUID LIMIT
UC :
PLI :
UCS :
Checked By :
Prajit Nagrale
Drawn By:
Rupesh
SCALE : 1: 50
JOB NO. : 3228
CLIENT :
PROJECT : Geotechnical Investigation Work for the Proposed Installation of Mechanical Handling Facilities at East Quay-7 (EQ-7)
Berth in the inner harbour of Visakhapatnam Port Trust.
BORE HOLE NO. : BH-03
SHEET NO.
: 2 OF 2
10.50
PLI(kg/cm )
UCS(kg/cm )
(degrees)
Cu/ (kg/cm2)/
PLASTICITY INDEX
PL%
LL%
CONSISTENCY LIMIT
NMC
CLAY %
SILT %
SAND %
GRAVELS %
CLASSIFICATION
LOG
DESCRIPTION
R.L. (m)
RQD (%)
LABORATORY DATA
TCR (%)
DIA OF BOREHOLE
FIELD DATA
Moderately weathered,
greyish pink,
fine grained,
KHONDALITE
NX
11.00
11.50
12.00
12.50
13.00
13.50
14.00
14.50
15.00
15.50
16.00
16.50
17.00
17.50
18.00
18.50
19.00
19.50
20.00
ABBREVIATIONS :
DS
UDS
N
SPT
:
:
:
:
DISTURBED SAMPLE
UNDISTURBED SOIL SAMPLE
SPT VALUE
STD. PENETRATION TEST
R
RQD
CR
TCR
:
:
:
:
PL(%)
Cu
NMC
LL (%)
:
:
:
:
PLASTIC LIMIT
COHESION
NATURAL MOISTURE CONTENT
LIQUID LIMIT
UC :
PLI :
UCS :
Checked By :
Mr. Prajit N.
Drawn By:
Rupesh
SCALE : 1: 50
JOB NO. : 3228
CLIENT :
PROJECT : Geotechnical Investigation Work for the Proposed Installation of Mechanical Handling Facilities at East Quay-7 (EQ-7)
Berth in the inner harbour of Visakhapatnam Port Trust.
BORE HOLE NO. : BH-04
SHEET NO.
: 1 OF 1
:
CO-ORDINATES :
:
GROUND R. L.
GROUND W. T. :
Stackyard Area
DATE
: 09/06/2012 TO 11/06/2012
N 1960204.398, E 742692.798
METHOD
: ROTARY DRILLING
2.851m
CASING
0.85m Below GL
CH
01
02
32
65
CI
15
33
25
27
LOG
--
75
31
44
--
85.70 124
41
83
0.04
4.0
21
23
--
PLI(kg/cm )
58
Cu/ (kg/cm )/
(degrees)
29
PLASTICITY INDEX
CLAY %
13
PL%
SILT %
00
LL%
SAND %
CH
NMC
GRAVELS %
2.00
CONSISTENCY LIMIT
Fill
(Reddish silty SAND)
with gravels)
1.00
1.50
CLASSIFICATION
0.00/
DS1
0.50
0.50
DESCRIPTION
R.L. (m)
RQD (%)
LABORATORY DATA
TCR (%)
DIA OF BOREHOLE
FIELD DATA
UCS(kg/cm )
LOCATION
150
mm
(14)
1.50/
SPT1
2.10
05/07/07/08
Medium dense,
brownish grey,
silty SAND
with gravels
2.50
3.00/
(06)
SPT2
3.60
03/03/03/03
3.00
Medium stiff,
blackish grey,
marine CLAY
3.50
4.00
4.50/
UDS1
5.00
4.50
5.00
5.50
6.00/
(R)
6.18 SPT3 12/52/-6.20
6.00
--
44
6.50
7.00
NX
7.50
7.70
8.00
8.50
703
9.00
9.20
9.50
10.00
ABBREVIATIONS :
DS
UDS
N
SPT
:
:
:
:
DISTURBED SAMPLE
UNDISTURBED SOIL SAMPLE
SPT VALUE
STD. PENETRATION TEST
R
RQD
CR
TCR
:
:
:
:
PL(%)
Cu
NMC
LL (%)
:
:
:
:
PLASTIC LIMIT
COHESION
NATURAL MOISTURE CONTENT
LIQUID LIMIT
:
UC :
PLI :
UCS :
Checked By :
Prajit Nagrale
Drawn By:
Mithun
SCALE : 1: 50
JOB NO. : 3228
CLIENT :
PROJECT : Geotechnical Investigation Work for the Proposed Installation of Mechanical Handling Facilities at East Quay-7 (EQ-7)
Berth in the inner harbour of Visakhapatnam Port Trust.
BORE HOLE NO. : BH-05
SHEET NO.
: 1 OF 1
:
CO-ORDINATES :
GROUND R. L.
:
GROUND W. T. :
Stackyard Area
DATE
: 12/06/2012 TO 14/06/2012
N 1960226.557, E 742786.083
METHOD
: ROTARY DRILLING
3.172m
CASING
0.95m Below GL
CH
00
12
27
--
--
--
--
52
--
82
29
51
--
61
59.36
97
33
64
0.19
4.12
PLI(kg/cm )
34
--
UCS(kg/cm )
12
Cu/ (kg/cm )/
(degrees)
02
PL%
CH
LL%
52
NMC
40
CONSISTENCY LIMIT
CLAY %
SAND %
SP
SM
SILT %
GRAVELS %
LOG
Fill
(Brownish silty SAND
with gravels & boulders)
1.00
(15)
1.50/
SPT1
2.10
04/09/06/06
1.50
2.00
R.L. (m)
RQD (%)
DESCRIPTION
0.00/
DS1
0.50
0.50
CLASSIFICATION
LABORATORY DATA
TCR (%)
DIA OF BOREHOLE
FIELD DATA
PLASTICITY INDEX
LOCATION
150
mm
2.50
Medium dense,
brownish grey,
silty SAND
with gravels
3.00/
(12)
SPT2
3.60
05/07/05/06
3.00
08
3.50
4.00
4.50/
(04)
SPT3
5.10
02/02/02/02
4.50
5.00
Soft grey,
marine 'CLAY' with
with sea-shells.
5.50
6.00/ UDS1
6.50
6.00
6.50
(R)
6.70/
SPT4 52/--/-6.73
7.00
7.50
8.00
Highly weathered,
brownish grey,
fine grained,
KHONDALITE.
7.70
NX
8.50
8.70
9.00
9.50
578
9.70
10.00
ABBREVIATIONS :
DS
UDS
N
SPT
:
:
:
:
DISTURBED SAMPLE
UNDISTURBED SOIL SAMPLE
SPT VALUE
STD. PENETRATION TEST
R
RQD
CR
TCR
:
:
:
:
PL(%)
Cu
NMC
LL (%)
:
:
:
:
PLASTIC LIMIT
COHESION
NATURAL MOISTURE CONTENT
LIQUID LIMIT
UC :
PLI :
UCS :
Checked By :
Prajit Nagrale
Drawn By:
Rupesh
SCALE : 1: 50
JOB NO. : 3228
CLIENT :
PROJECT : Geotechnical Investigation Work for the Proposed Installation of Mechanical Handling Facilities at East Quay-7 (EQ-7)
Berth in the inner harbour of Visakhapatnam Port Trust.
BORE HOLE NO. : BH-08
: Stackyard Area
DATE
: 14/06/2012 TO 15/06/2012
METHOD
: ROTARY DRILLING
CASING
: 0.70m Below GL
LABORATORY DATA
4.50/
UDS1
5.00
CH
00
10
26
CH
02
17
31
LOG
R.L. (m)
48
22
26
--
64
71.26 111
34
77
0.13
2.86
50
68.13 105
35
70
0.12
4.57
PLI(kg/cm )
42
UCS(kg/cm )
39
PL%
CLAY %
19
LL%
SILT %
00
DESCRIPTION
CONSISTENCY LIMIT
NMC
SAND %
CI
RQD (%)
3.00/
(03)
SPT2
3.60
01/02/01/02
TCR (%)
GRAVELS %
CLASSIFICATION
DIA OF BOREHOLE
FIELD DATA
Cu/ (kg/cm )/
(degrees)
GROUND W. T.
: 1 OF 2
PLASTICITY INDEX
LOCATION
SHEET NO.
0.00/
DS1
0.50
0.50
1.00
Fill
1.50
2.00
(R)
1.50/
SPT1
03/07/52/-150 2.10
mm
2.50
3.00
--
3.50
4.00
4.50
5.00
Soft grey,
marine CLAY.
5.50
(04)
6.00/ SPT3
6.60
01/02/02/02
6.00
6.50
7.00
7.50/ UDS2
8.00
7.50
8.00
8.50
(05)
9.00/
SPT4
02/02/03/04
9.60
9.00
9.50
10.00
ABBREVIATIONS :
DS
UDS
N
SPT
:
:
:
:
DISTURBED SAMPLE
UNDISTURBED SOIL SAMPLE
SPT VALUE
STD. PENETRATION TEST
R
RQD
CR
TCR
:
:
:
:
PL(%)
Cu
NMC
LL (%)
:
:
:
:
PLASTIC LIMIT
COHESION
NATURAL MOISTURE CONTENT
LIQUID LIMIT
UC :
PLI :
UCS :
Checked By :
Prajit Nagrale
Drawn By:
Rupesh
SCALE : 1: 50
JOB NO. : 3228
CLIENT :
PROJECT : Geotechnical Investigation Work for the Proposed Installation of Mechanical Handling Facilities at East Quay-7 (EQ-7)
Berth in the inner harbour of Visakhapatnam Port Trust.
BORE HOLE NO. : BH-08
SHEET NO.
: 2 OF 2
PLI(kg/cm )
20
UCS(kg/cm )
36
Cu/ (kg/cm2)/
27
(degrees)
20
PLASTICITY INDEX
CLAY %
39
PL%
SILT %
14
LL%
SAND %
SC
CONSISTENCY LIMIT
NMC
GRAVELS %
LOG
(32)
150 10.50/ SPT5
mm 11.10
09/14/18/22
11.00
R.L. (m)
RQD (%)
DESCRIPTION
TCR (%)
LABORATORY DATA
CLASSIFICATION
10.50
DIA OF BOREHOLE
FIELD DATA
Loose,greyish,cleyey
SAND with gravels
11.10
--
16
--
11.50
12.00
NX 12.10
12.50
Highly weathered,
greyish pink,
KHONDALITE
13.00
13.50
13.50
14.00
23.66
14.50
14.50
15.00
15.50
16.00
16.50
17.00
17.50
18.00
18.50
19.00
19.50
20.00
ABBREVIATIONS :
DS
UDS
N
SPT
:
:
:
:
DISTURBED SAMPLE
UNDISTURBED SOIL SAMPLE
SPT VALUE
STD. PENETRATION TEST
R
RQD
CR
TCR
:
:
:
:
PL(%)
Cu
NMC
LL (%)
:
:
:
:
PLASTIC LIMIT
COHESION
NATURAL MOISTURE CONTENT
LIQUID LIMIT
UC :
PLI :
UCS :
Checked By :
Mr. Prajit N.
Drawn By:
Rupesh
SCALE : 1: 50
JOB NO. : 3228
CLIENT :
PROJECT : Geotechnical Investigation Work for the Proposed Installation of Mechanical Handling Facilities at East Quay-7 (EQ-7)
Berth in the inner harbour of Visakhapatnam Port Trust.
BORE HOLE NO. : BH-10
SHEET NO.
: 1 OF 2
:
CO-ORDINATES :
GROUND R. L.
:
GROUND W. T. :
Stackyard Area
DATE
: 18/06/2012 TO 20/06/2012
N 1960190.307, E 742781.307
2.756m.
METHOD
: ROTARY DRILLING
CASING
: 150mm Upto 1.50m & NX Upto 8.75m BGL.
BOREHOLE DEPTH : 13.00m Below GL.
1.10m Below GL
LABORATORY DATA
CLAY %
LL%
PL%
47
--
62
27
35
--
CH
09
36
21
34
43.91
67
29
38
0.26
4.8
CH
00
08
34
58
--
82
31
51
--
LOG
PLI(kg/cm )
SILT %
33
UCS(kg/cm )
SAND %
20
Cu/ (kg/cm )/
(degrees)
GRAVELS %
00
NMC
CLASSIFICATION
CONSISTENCY LIMIT
Fill
(Reddish silty SAND
with Boulders)
1.00
(07)
1.50/
SPT1
2.10
03/03/04/05
1.50
2.00
2.50
R.L. (m)
RQD (%)
0.00/
DS1
0.50
0.50
CH
DESCRIPTION
TCR (%)
DIA OF BOREHOLE
FIELD DATA
PLASTICITY INDEX
LOCATION
150
mm
3.00/
(04)
SPT2
3.60
01/02/02/02
3.00
3.50
4.00
(03)
4.50/
SPT3
5.10
01/01/02/02
4.50
5.00
Soft grey,
marine CLAY.
5.50
6.00/ UDS1
6.50
6.00
6.50
7.00
(05)
7.50/ SPT4
02/02/03/03
8.10
7.50
8.00
8.50
(05)
9.00/
SPT5
01/02/03/03
9.60
9.00
9.50
10.00
NX
(R)
9.70/ SPT6
9.98
16/52/--/--/--
ABBREVIATIONS :
DS
UDS
N
SPT
:
:
:
:
DISTURBED SAMPLE
UNDISTURBED SOIL SAMPLE
SPT VALUE
STD. PENETRATION TEST
R
RQD
CR
TCR
:
:
:
:
PL(%)
Cu
NMC
LL (%)
:
:
:
:
PLASTIC LIMIT
COHESION
NATURAL MOISTURE CONTENT
LIQUID LIMIT
UC :
PLI :
UCS :
Checked By :
Prajit Nagrale
Drawn By:
Rupesh
SCALE : 1: 50
JOB NO. : 3228
CLIENT :
PROJECT : Geotechnical Investigation Work for the Proposed Installation of Mechanical Handling Facilities at East Quay-7 (EQ-7)
Berth in the inner harbour of Visakhapatnam Port Trust.
BORE HOLE NO. : BH-10
SHEET NO.
: 2 OF 2
PLI(kg/cm )
UCS(kg/cm )
(degrees)
Cu/ (kg/cm2)/
PLASTICITY INDEX
PL%
LL%
CONSISTENCY LIMIT
NMC
CLAY %
SILT %
SAND %
GRAVELS %
CLASSIFICATION
LOG
DESCRIPTION
R.L. (m)
RQD (%)
LABORATORY DATA
TCR (%)
DIA OF BOREHOLE
FIELD DATA
Highly weathered,
greyish pink,
fine grained,
KHONDALITE
10.50
11.00
NX
11.50
Moderately weathered,
greyish pink,
fine grained,
KHONDALITE
12.00
12.50
13.00
13.50
14.00
14.50
15.00
15.50
16.00
16.50
17.00
17.50
18.00
18.50
19.00
19.50
20.00
ABBREVIATIONS :
DS
UDS
N
SPT
:
:
:
:
DISTURBED SAMPLE
UNDISTURBED SOIL SAMPLE
SPT VALUE
STD. PENETRATION TEST
R
RQD
CR
TCR
:
:
:
:
PL(%)
Cu
NMC
LL (%)
:
:
:
:
PLASTIC LIMIT
COHESION
NATURAL MOISTURE CONTENT
LIQUID LIMIT
UC :
PLI :
UCS :
Checked By :
Mr. Prajit N.
Drawn By:
Rupesh
SCALE : 1: 50
JOB NO. : 3228
CLIENT :
PROJECT : Geotechnical Investigation Work for the Proposed Installation of Mechanical Handling Facilities at East Quay-7 (EQ-7)
Berth in the inner harbour of Visakhapatnam Port Trust.
BORE HOLE NO. : BH-11
SHEET NO.
: 1 OF 2
:
CO-ORDINATES :
GROUND R. L.
:
GROUND W. T. :
Stackyard Area
DATE
: 22/06/2012 TO 24/06/2012
N 1960217.195, E 742837.117
2.854m
METHOD
: ROTARY DRILLING
CASING
2.20m Below GL
SAND %
SILT %
CLAY %
NMC
LL%
PL%
PLASTICITY INDEX
Cu/ (kg/cm )/
(degrees)
CH
00
18
32
50
--
69
30
39
--
CH
00
12
30
58
--
72
29
43
--
SM
23
50
--
--
--
--
--
LOG
PLI(kg/cm )
GRAVELS %
2.00
150
mm
CONSISTENCY LIMIT
CLASSIFICATION
1.00
1.50
Fill
(Blackish back filling
materials with Boulders)
0.00/
DS1
0.50
0.50
DESCRIPTION
R.L. (m)
RQD (%)
LABORATORY DATA
TCR (%)
DIA OF BOREHOLE
FIELD DATA
UCS(kg/cm )
LOCATION
(08)
1.50/
SPT1
2.10
03/04/04/05
2.50
3.00/
(04)
SPT2
3.60
01/02/02/02
3.00
3.50
4.00
4.00/
4.50
4.50/ UDS1
5.10
VST1
5.00
5.50
(05)
6.00/
6.60 SPT3 02/02/03/03
6.00
6.50
7.00
(06)
7.50 SPT4
02/03/03/04
8.10
7.50
8.00
8.50
(07)
9.00
SPT5
02/03/04/04
9.60
9.00
27
Loose greyish,
9.50
silty SAND
10.00
ABBREVIATIONS :
DS
UDS
N
SPT
:
:
:
:
DISTURBED SAMPLE
UNDISTURBED SOIL SAMPLE
SPT VALUE
STD. PENETRATION TEST
R
RQD
CR
TCR
:
:
:
:
PL(%)
Cu
NMC
LL (%)
:
:
:
:
PLASTIC LIMIT
COHESION
NATURAL MOISTURE CONTENT
LIQUID LIMIT
:
UC :
PLI :
UCS :
Checked By :
Prajit Nagrale
Drawn By:
Rupesh
SCALE : 1: 50
JOB NO. : 3228
CLIENT :
PROJECT : Geotechnical Investigation Work for the Proposed Installation of Mechanical Handling Facilities at East Quay-7 (EQ-7)
Berth in the inner harbour of Visakhapatnam Port Trust.
BORE HOLE NO. : BH-11
SHEET NO.
: 2 OF 2
PLI(kg/cm )
UCS(kg/cm )
(degrees)
Cu/ (kg/cm2)/
PLASTICITY INDEX
PL%
LL%
CONSISTENCY LIMIT
NMC
CLAY %
SILT %
SAND %
GRAVELS %
CLASSIFICATION
LOG
DESCRIPTION
R.L. (m)
(R)
16/52
RQD (%)
SPT6
LABORATORY DATA
TCR (%)
150
mm
10.50
DIA OF BOREHOLE
FIELD DATA
11.00
11.50
12.00
NX
12.50
Highly weathered,
greyish pink,
KHONDALITE
13.00
13.50
14.00
14.50
15.00
15.50
16.00
16.50
17.00
17.50
18.00
18.50
19.00
19.50
20.00
ABBREVIATIONS :
DS
UDS
N
SPT
:
:
:
:
DISTURBED SAMPLE
UNDISTURBED SOIL SAMPLE
SPT VALUE
STD. PENETRATION TEST
R
RQD
CR
TCR
:
:
:
:
PL(%)
Cu
NMC
LL (%)
:
:
:
:
PLASTIC LIMIT
COHESION
NATURAL MOISTURE CONTENT
LIQUID LIMIT
:
UC :
PLI :
UCS :
Checked By :
Mr. Prajit N.
Drawn By:
Rupesh
SCALE : 1: 50
JOB NO. : 3228
CLIENT :
PROJECT : Geotechnical Investigation Work for the Proposed Installation of Mechanical Handling Facilities at East Quay-7 (EQ-7)
Berth in the inner harbour of Visakhapatnam Port Trust.
BORE HOLE NO. : BH-12
: Stackyard Area
DATE
: 12/06/2012 TO 15/06/2012
METHOD
: ROTARY DRILLING
CASING
: 0.95m Below GL
62
CH
01
05
30
65
CH
00
04
30
66
CH
00
14
25
61
LOG
Cu/ (kg/cm )/
(degrees)
29
PLASTICITY INDEX
CLAY %
09
PL%
SILT %
00
LL%
SAND %
CH
NMC
GRAVELS %
2.00
CONSISTENCY LIMIT
--
93
38
55
--
77.35 116
43
73
0.11
4.11
75
33
42
--
90.03 101
41
60
--
Fill
(Reddish silty SAND)
with gravels & boulders)
1.00
1.50
CLASSIFICATION
0.00/
DS1
0.50
0.50
DESCRIPTION
R.L. (m)
RQD (%)
LABORATORY DATA
TCR (%)
DIA OF BOREHOLE
FIELD DATA
PLI(kg/cm )
GROUND W. T.
: 1 OF 2
UCS(kg/cm )
LOCATION
SHEET NO.
150
mm
(11)
1.50/
SPT1
2.10
03/05/06/06
Medium dense
brownish grey,
silty SAND with gravels
2.50
3.00/
(04)
SPT2
3.60
01/02/02/03
3.00
3.50
4.00
Soft grey,
marine CLAY.
4.50/ UDS1
5.00
4.50
5.00
5.50
(05)
6.00/
6.50 SPT3 02/02/03/03
6.00
6.50
7.00
(06)
7.50/ SPT4
02/03/03/04
8.10
7.50
--
8.00
8.50
9.00/
UDS2
9.50
9.00
9.50
10.00
ABBREVIATIONS :
DS
UDS
N
SPT
:
:
:
:
DISTURBED SAMPLE
UNDISTURBED SOIL SAMPLE
SPT VALUE
STD. PENETRATION TEST
R
RQD
CR
TCR
:
:
:
:
PL(%)
Cu
NMC
LL (%)
:
:
:
:
PLASTIC LIMIT
COHESION
NATURAL MOISTURE CONTENT
LIQUID LIMIT
:
UC :
PLI :
UCS :
Checked By :
Prajit Nagrale
Drawn By:
Rupesh
SCALE : 1: 50
JOB NO. : 3228
CLIENT :
PROJECT : Geotechnical Investigation Work for the Proposed Installation of Mechanical Handling Facilities at East Quay-7 (EQ-7)
Berth in the inner harbour of Visakhapatnam Port Trust.
BORE HOLE NO. : BH-12
SHEET NO.
: 2 OF 2
10.50
PLI(kg/cm )
UCS(kg/cm )
(degrees)
Cu/ (kg/cm2)/
PLASTICITY INDEX
PL%
LL%
CONSISTENCY LIMIT
NMC
CLAY %
SILT %
SAND %
LOG
R.L. (m)
RQD (%)
DESCRIPTION
GRAVELS %
CLASSIFICATION
LABORATORY DATA
TCR (%)
DIA OF BOREHOLE
FIELD DATA
150
mm
10.50/
(03)
SPT5
11.10
01/01/02/02
11.00
11.50
12.00
(R)
12.00/
SPT6
14/52/--/-NX 12.28
12.28
12.50
Moderately weathered,
greyish pink,
KHONDALITE
13.00
66.65
13.50
13.50
Moderately weathered,
brownish pink,
fine grained,
KHONDALITE
14.00
14.50
14.50
15.00
15.50
16.00
16.50
17.00
17.50
18.00
18.50
19.00
19.50
20.00
ABBREVIATIONS :
DS
UDS
N
SPT
:
:
:
:
DISTURBED SAMPLE
UNDISTURBED SOIL SAMPLE
SPT VALUE
STD. PENETRATION TEST
R
RQD
CR
TCR
:
:
:
:
PL(%)
Cu
NMC
LL (%)
:
:
:
:
PLASTIC LIMIT
COHESION
NATURAL MOISTURE CONTENT
LIQUID LIMIT
UC :
PLI :
UCS :
Checked By :
Mr. Prajit N.
Drawn By:
Rupesh
SCALE : 1: 50
JOB NO. : 3228
CLIENT :
PROJECT : Geotechnical Investigation Work for the Proposed Installation of Mechanical Handling Facilities at East Quay-7 (EQ-7)
Berth in the inner harbour of Visakhapatnam Port Trust.
BORE HOLE NO. : BH-14
: Stackyard Area
DATE
: 22/06/2012 TO 24/06/2012
METHOD
: ROTARY DRILLING
CASING
: 0.80m Below GL
LABORATORY DATA
CLAY %
LL%
PL%
36
25
36
--
65
24
41
--
CH
01
30
29
40
--
63
26
37
--
CH
01
22
31
46
--
66
27
39
--
PLI(kg/cm )
SILT %
02
UCS(kg/cm )
SAND %
CH
Cu/ (kg/cm )/
(degrees)
GRAVELS %
CONSISTENCY LIMIT
1.00
(18)
1.50/
SPT1
2.10
07/08/10/08
1.50
2.00
2.50
CLASSIFICATION
0.00/
DS1
0.50
0.50
LOG
R.L. (m)
RQD (%)
DESCRIPTION
TCR (%)
DIA OF BOREHOLE
FIELD DATA
PLASTICITY INDEX
GROUND W. T.
: 1 OF 2
NMC
LOCATION
SHEET NO.
Fill
(Reddish silty SAND)
150
mm
3.00/
(04)
SPT2
3.60
01/02/02/02
3.00
3.50
4.00
4.00/ VST1
4.50
(05)
4.50/
SPT3
5.10
01/02/03/04
5.00
5.50
6.00/ UDS1
6.50
6.00
6.50
7.00
7.00 VST2
7.50
(05)
7.50/ SPT4
02/02/03/03
8.10
8.00
8.50
(08)
9.00/
SPT5
02/04/04/08
9.60
9.00
9.50
10.00
ABBREVIATIONS :
DS
UDS
N
SPT
:
:
:
:
DISTURBED SAMPLE
UNDISTURBED SOIL SAMPLE
SPT VALUE
STD. PENETRATION TEST
R
RQD
CR
TCR
:
:
:
:
PL(%)
Cu
NMC
LL (%)
:
:
:
:
PLASTIC LIMIT
COHESION
NATURAL MOISTURE CONTENT
LIQUID LIMIT
UC :
:
PLI
UCS :
Checked By :
Prajit Nagrale
Drawn By:
Rupesh
SCALE : 1: 50
JOB NO. : 3228
CLIENT :
PROJECT : Geotechnical Investigation Work for the Proposed Installation of Mechanical Handling Facilities at East Quay-7 (EQ-7)
Berth in the inner harbour of Visakhapatnam Port Trust.
BORE HOLE NO. : BH-14
SHEET NO.
: 2 OF 2
10.50
PLI(kg/cm )
UCS(kg/cm )
Cu/ (kg/cm2)/
(degrees)
PLASTICITY INDEX
PL%
LL%
CONSISTENCY LIMIT
NMC
CLAY %
SILT %
SAND %
GRAVELS %
CLASSIFICATION
LOG
DESCRIPTION
R.L. (m)
RQD (%)
LABORATORY DATA
TCR (%)
DIA OF BOREHOLE
FIELD DATA
150
mm
10.50/
(R)
SPT6 52/--/--/-10.60
11.00
Moderately weathered,
grayish pink,
KHONDALITE
11.50
12.00
12.10
12.50
Highly weathered,
brown yellow,
KHONDALITE
13.00
13.50
13.60
14.00
14.50
15.00
15.50
16.00
16.50
17.00
17.50
18.00
18.50
19.00
19.50
20.00
ABBREVIATIONS :
DS
UDS
N
SPT
:
:
:
:
DISTURBED SAMPLE
UNDISTURBED SOIL SAMPLE
SPT VALUE
STD. PENETRATION TEST
R
RQD
CR
TCR
:
:
:
:
PL(%)
Cu
NMC
LL (%)
:
:
:
:
PLASTIC LIMIT
COHESION
NATURAL MOISTURE CONTENT
LIQUID LIMIT
UC :
PLI :
UCS :
Checked By :
Mr. Prajit N.
Drawn By:
Rupesh
SCALE : 1: 50
JOB NO. : 3228
CLIENT :
PROJECT : Geotechnical Investigation Work for the Proposed Installation of Mechanical Handling Facilities at East Quay-7 (EQ-7)
Berth in the inner harbour of Visakhapatnam Port Trust.
BORE HOLE NO. : BH-15
SHEET NO.
: 1 OF 2
:
CO-ORDINATES :
:
GROUND R. L.
GROUND W. T. :
Stackyard Area
DATE
: 19/06/2012 TO 22/06/2012
N 1960128.703, E 742814.601
2.957m
METHOD
: ROTARY DRILLING
CASING
1.05m Below GL
LABORATORY DATA
CLAY %
LL%
PL%
--
68
29
39
--
CH
09
14
29
48
--
70
30
40
--
PLI(kg/cm )
SILT %
49
UCS(kg/cm )
SAND %
30
Cu/ (kg/cm )/
(degrees)
GRAVELS %
22
PLASTICITY INDEX
CLASSIFICATION
CONSISTENCY LIMIT
03
LOG
R.L. (m)
RQD (%)
CH
DESCRIPTION
TCR (%)
DIA OF BOREHOLE
FIELD DATA
NMC
LOCATION
0.00/
DS1
0.50
0.50
1.00
1.50
150
mm 1.50/
(12)
2.10 SPT1 03/05/07/08
Fill
(Brown back filling
silty SAND
with Boulders)
2.00
2.50
3.00/
(04)
SPT2
3.60
01/02/02/02
3.00
3.50
4.00
4.50/
UDS1
5.00
4.50
5.00
5.50
marine CLAY
(05)
6.00/
6.60 SPT3 01/02/03/03
6.00
6.50
7.00
(06)
7.50/ SPT4
02/03/03/03
8.10
7.50
8.00
8.50
(06)
9.00/
SPT5
02/03/03/04
9.60
9.00
9.50
10.00
ABBREVIATIONS :
DS
UDS
N
SPT
:
:
:
:
DISTURBED SAMPLE
UNDISTURBED SOIL SAMPLE
SPT VALUE
STD. PENETRATION TEST
R
RQD
CR
TCR
:
:
:
:
PL(%)
Cu
NMC
LL (%)
:
:
:
:
PLASTIC LIMIT
COHESION
NATURAL MOISTURE CONTENT
LIQUID LIMIT
UC :
PLI :
UCS :
Checked By :
Prajit Nagrale
Drawn By:
Rupesh
SCALE : 1: 50
JOB NO. : 3228
SHEET NO.
: 2 OF 2
PLI(kg/cm )
UCS(kg/cm )
(degrees)
Cu/ (kg/cm2)/
PLASTICITY INDEX
PL%
LL%
CONSISTENCY LIMIT
NMC
CLAY %
SILT %
SAND %
LOG
R.L. (m)
RQD (%)
DESCRIPTION
GRAVELS %
CLASSIFICATION
LABORATORY DATA
TCR (%)
DIA OF BOREHOLE
FIELD DATA
(06)
10.50
SPT6
11.10
02/02/04/06
10.50
11.00
11.50
150
mm
(18)
12.00 SPT7
12.60
04/07/11/13
12.00
12.50
13.00
13.00
SPT8
13.10
13.50
13.60
(R)
52/--/--/--
14.00
14.50
NX
14.60 SPT9
14.70
(R)
52/--/--/--
Completely weathered,
pink KHONDALITE
15.00
15.50
(R)
15.60 SPT10
15.68
51/--/--/--
16.00
16.50
(R)
16.68 SPT11
16.80
51/--/--/--
17.00
17.50
Highly weathered ,
greyish pink,
KHONDALITE
17.80
18.00
18.50
18.80
19.00
Highly weathered ,
greyish pink,
KHONDALITE
19.50
19.80
20.00
ABBREVIATIONS :
DS
UDS
N
SPT
:
:
:
:
DISTURBED SAMPLE
UNDISTURBED SOIL SAMPLE
SPT VALUE
STD. PENETRATION TEST
R
RQD
CR
TCR
:
:
:
:
PL(%)
Cu
NMC
LL (%)
:
:
:
:
PLASTIC LIMIT
COHESION
NATURAL MOISTURE CONTENT
LIQUID LIMIT
UC :
PLI :
UCS :
Checked By :
Mr. Prajit N.
Drawn By:
Rupesh
SCALE : 1: 50
JOB NO. : 3228
CLIENT :
PROJECT : Geotechnical Investigation Work for the Proposed Installation of Mechanical Handling Facilities at East Quay-7 (EQ-7)
Berth in the inner harbour of Visakhapatnam Port Trust.
BORE HOLE NO. : BH-18
SHEET NO.
: 1 OF 2
:
CO-ORDINATES :
:
GROUND R. L.
GROUND W. T. :
Stackyard Area
DATE
: 16/06/2012 TO 19/06/2012
N 1960042.027, E 742778.714
2.752m
METHOD
: ROTARY DRILLING
CASING
: 150mm Upto 2.10m & NX Upto 11.75m BGL.
BOREHOLE DEPTH : 18.15m Below GL.
1.80m Below GL
LABORATORY DATA
00
21
25
CH
00
05
28
LOG
R.L. (m)
64
28
36
--
54
80.37 110
40
70
0.09
3.71
67
71.96 116
43
73
0.10
4.57
PLI(kg/cm )
CH
--
UCS(kg/cm )
4.50/
UDS1
5.00
Cu/ (kg/cm )/
(degrees)
CLAY %
55
PL%
SILT %
21
LL%
SAND %
24
Fill
(Brownish silty SAND
with gravels & boulders)
1.00
(18)
1.50
SPT1
2.10
06/08/10/12
1.50
2.00
2.50
DESCRIPTION
CONSISTENCY LIMIT
NMC
GRAVELS %
00
RQD (%)
CH
TCR (%)
3.00/
(04)
SPT2
3.60
01/02/02/02
0.00/
DS1
0.50
0.50
CLASSIFICATION
DIA OF BOREHOLE
FIELD DATA
PLASTICITY INDEX
LOCATION
Medium dense,
reddish,silty
SAND with gravels
150
mm
3.00
3.50
4.00
4.50
5.00
Soft grey,
marine CLAY.
5.50
(03)
6.00/ SPT3
01/01/02/02
6.60
6.00
6.50
7.00
(04)
7.50/ SPT4
01/02/02/02
8.10
7.50
8.00
8.50
9.00/
UDS2
9.50
9.00
9.50
10.00
ABBREVIATIONS :
DS
UDS
N
SPT
:
:
:
:
DISTURBED SAMPLE
UNDISTURBED SOIL SAMPLE
SPT VALUE
STD. PENETRATION TEST
R
RQD
CR
TCR
:
:
:
:
PL(%)
Cu
NMC
LL (%)
:
:
:
:
PLASTIC LIMIT
COHESION
NATURAL MOISTURE CONTENT
LIQUID LIMIT
UC :
PLI :
UCS :
Checked By :
Prajit Nagrale
Drawn By:
Rupesh
SCALE : 1: 50
JOB NO. : 3228
CLIENT :
PROJECT : Geotechnical Investigation Work for the Proposed Installation of Mechanical Handling Facilities at East Quay-7 (EQ-7)
Berth in the inner harbour of Visakhapatnam Port Trust.
BORE HOLE NO. : BH-18
SHEET NO.
: 2 OF 2
PLI(kg/cm )
UCS(kg/cm )
21
(degrees)
LOG
44
Cu/ (kg/cm2)/
24
PLASTICITY INDEX
20
PL%
CLAY %
55
LL%
SILT %
01
CONSISTENCY LIMIT
NMC
SAND %
SC
DESCRIPTION
R.L. (m)
RQD (%)
TCR (%)
GRAVELS %
11.10
LABORATORY DATA
CLASSIFICATION
10.50/
10.50
DIA OF BOREHOLE
FIELD DATA
(03)
SPT5 01/01/02/02
11.00
11.50
150
mm
Soft grey,
marine CLAY.
12.00/
12.00
12.60
(03)
SPT6 01/01/02/02
12.50
13.00
(09)
13.50/
SPT7 02/04/05/07
14.10
13.50
14.00
--
23
--
Medium dense,
grey clayey,
SAND
14.50
(R)
15.00
SPT8 52/--/--/-15.13
15.00
15.50
16.00
16.50
Highly weathered,
grayish pink,
KHONDALITE
16.65
17.00
17.40
17.50
48.01
18.00
18.15
18.50
19.00
19.50
20.00
ABBREVIATIONS :
DS
UDS
N
SPT
:
:
:
:
DISTURBED SAMPLE
UNDISTURBED SOIL SAMPLE
SPT VALUE
STD. PENETRATION TEST
R
RQD
CR
TCR
:
:
:
:
PL(%)
Cu
NMC
LL (%)
:
:
:
:
PLASTIC LIMIT
COHESION
NATURAL MOISTURE CONTENT
LIQUID LIMIT
UC :
PLI :
UCS :
Checked By :
Mr. Prajit N.
Drawn By:
Rupesh
SCALE : 1: 50
JOB NO. : 3228
CLIENT :
PROJECT : Geotechnical Investigation Work for the Proposed Installation of Mechanical Handling Facilities at East Quay-7 (EQ-7)
Berth in the inner harbour of Visakhapatnam Port Trust.
BORE HOLE NO. : BH-19
SHEET NO.
: 1 OF 2
:
CO-ORDINATES :
:
GROUND R. L.
GROUND W. T. :
Stackyard Area
DATE
: 16/06/2012 TO 18/06/2012
N 1960068.066, E 742850.323
2.922m
METHOD
: ROTARY DRILLING
CASING
0.50m Below GL
LABORATORY DATA
LL%
PL%
57
--
61
27
34
--
4.50/
UDS1
5.00
CH
01
19
29
51
50.92
84
35
49
0.22
4.34
CH
00
12
32
56
--
63
22
41
--
LOG
R.L. (m)
RQD (%)
TCR (%)
PLI(kg/cm )
CLAY %
30
Cu/ (kg/cm )/
(degrees)
SILT %
12
PLASTICITY INDEX
SAND %
01
NMC
GRAVELS %
CH
Fill
(Reddish silty SAND
with gravels & boulders)
1.00
1.50
CONSISTENCY LIMIT
3.00/
(05)
SPT2
3.60
01/02/03/04
DESCRIPTION
0.00
DS1
0.50
0.50
CLASSIFICATION
DIA OF BOREHOLE
FIELD DATA
UCS(kg/cm )
LOCATION
150
(11)
mm 1.50/ SPT1
06/06/05/07
2.10
2.00
2.50
3.00
3.50
4.00
4.50
5.00
5.50
(08)
6.00/ SPT3
03/03/05/06
6.60
6.00
6.50
7.00
(04)
7.50/ SPT4
02/02/02/03
8.10
7.50
8.00
8.50
(06)
9.00/
SPT5 02/03/03/03
9.60
9.00
9.50
10.00
ABBREVIATIONS :
DS
UDS
N
SPT
:
:
:
:
DISTURBED SAMPLE
UNDISTURBED SOIL SAMPLE
SPT VALUE
STD. PENETRATION TEST
R
RQD
CR
TCR
:
:
:
:
PL(%)
Cu
NMC
LL (%)
:
:
:
:
PLASTIC LIMIT
COHESION
NATURAL MOISTURE CONTENT
LIQUID LIMIT
UC :
PLI :
UCS :
Checked By :
Prajit Nagrale
Drawn By:
Rupesh
SCALE : 1: 50
JOB NO. : 3228
CLIENT :
PROJECT : Geotechnical Investigation Work for the Proposed Installation of Mechanical Handling Facilities at East Quay-7 (EQ-7)
Berth in the inner harbour of Visakhapatnam Port Trust.
BORE HOLE NO. : BH-19
SHEET NO.
: 2 OF 2
10.50
150
mm
10.50/
(R)
SPT6
10.85
14/32/52
PLI(kg/cm )
UCS(kg/cm )
(degrees)
Cu/ (kg/cm2)/
PLASTICITY INDEX
PL%
LL%
CONSISTENCY LIMIT
NMC
CLAY %
SILT %
SAND %
GRAVELS %
CLASSIFICATION
LOG
DESCRIPTION
R.L. (m)
RQD (%)
LABORATORY DATA
TCR (%)
DIA OF BOREHOLE
FIELD DATA
Highly weathered,
greyish pink,
KHONDALITE
11.00
11.50
11.85
12.00
12.50
12.85
Highly Weathered,
brownish grey,
fine grained,
13.00
13.50
KHONDALITE
13.85
14.00
14.50
35.54
14.85
15.00
15.50
16.00
16.50
17.00
17.50
18.00
18.50
19.00
19.50
20.00
ABBREVIATIONS :
DS
UDS
N
SPT
:
:
:
:
DISTURBED SAMPLE
UNDISTURBED SOIL SAMPLE
SPT VALUE
STD. PENETRATION TEST
R
RQD
CR
TCR
:
:
:
:
PL(%)
Cu
NMC
LL (%)
:
:
:
:
PLASTIC LIMIT
COHESION
NATURAL MOISTURE CONTENT
LIQUID LIMIT
UC :
PLI :
UCS :
Checked By :
Mr. Prajit N.
Drawn By:
Rupesh
SCALE : 1: 50
JOB NO. : 3228
CLIENT :
PROJECT : Geotechnical Investigation Work for the Proposed Installation of Mechanical Handling Facilities at East Quay-7 (EQ-7)
Berth in the inner harbour of Visakhapatnam Port Trust.
BORE HOLE NO. : BH- 20
SHEET NO.
: 1 OF 2
:
CO-ORDINATES :
:
GROUND R. L.
GROUND W. T. :
Stackyard Area
DATE
: 23/06/2012 TO 25/06/2012
N 1960061.146, E 742946.34
3.304m
METHOD
: ROTARY DRILLING
CASING
: 150mm Upto 1.25m & NX Upto8.00m BGL.
BOREHOLE DEPTH : 13.08m Below GL.
1.80m Below GL
PL%
35
50
--
73
33
40
--
CH
00
04
40
96
--
76
35
41
--
LOG
PLI(kg/cm )
LL%
15
UCS(kg/cm )
CLAY %
00
Cu/ (kg/cm )/
(degrees)
SILT %
CH
PLASTICITY INDEX
SAND %
CONSISTENCY LIMIT
GRAVELS %
1.50
CLASSIFICATION
150
mm
DESCRIPTION
R.L. (m)
RQD (%)
TCR (%)
LABORATORY DATA
0.00/
DS1
0.50
0.50
1.00
DIA OF BOREHOLE
FIELD DATA
NMC
LOCATION
Fill
(Blackish back filling
materials with Boulders)
(17)
1.50/
SPT1
2.10
05/08/09/12
2.00
2.50
3.00/
(05)
SPT2
3.60
02/02/03/03
3.00
3.50
4.00
4.00
4.50
4.50/
UDS1
5.00
VST1
5.00
5.50
(06)
6.00/ SPT3
02/03/03/04
6.50
6.00
6.50
7.00
(07)
7.50/ SPT4
02/03/04/04
8.10
7.50
8.00
8.50
(06)
9.00/
SPT5
02/03/03/04
9.60
9.00
9.50
10.00
ABBREVIATIONS :
DS
UDS
N
SPT
:
:
:
:
DISTURBED SAMPLE
UNDISTURBED SOIL SAMPLE
SPT VALUE
STD. PENETRATION TEST
R
RQD
CR
TCR
:
:
:
:
PL(%)
Cu
NMC
LL (%)
:
:
:
:
PLASTIC LIMIT
COHESION
NATURAL MOISTURE CONTENT
LIQUID LIMIT
UC :
:
PLI
UCS :
Checked By :
Prajit Nagrale
Drawn By:
Rupesh
SCALE : 1: 50
JOB NO. : 3228
CLIENT :
PROJECT : Geotechnical Investigation Work for the Proposed Installation of Mechanical Handling Facilities at East Quay-7 (EQ-7)
Berth in the inner harbour of Visakhapatnam Port Trust.
BORE HOLE NO. : BH-20
SHEET NO.
: 2 OF 2
PLI(kg/cm )
UCS(kg/cm )
(degrees)
Cu/ (kg/cm2)/
PLASTICITY INDEX
PL%
LL%
CONSISTENCY LIMIT
NMC
CLAY %
SILT %
SAND %
LOG
R.L. (m)
RQD (%)
DESCRIPTION
GRAVELS %
CLASSIFICATION
LABORATORY DATA
TCR (%)
DIA OF BOREHOLE
FIELD DATA
(R)
10.00/ SPT6
52/--/-10.08
10.50
Highly weathered,
pinkish grey,
KHONDALITE
11.00
11.58
11.50
12.00
Moderately weathered,
pinkish grey,
KHONDALITE
12.50
13.00
13.08
13.50
14.00
14.50
15.00
15.50
16.00
16.50
17.00
17.50
18.00
18.50
19.00
19.50
20.00
ABBREVIATIONS :
DS
UDS
N
SPT
:
:
:
:
DISTURBED SAMPLE
UNDISTURBED SOIL SAMPLE
SPT VALUE
STD. PENETRATION TEST
R
RQD
CR
TCR
:
:
:
:
PL(%)
Cu
NMC
LL (%)
:
:
:
:
PLASTIC LIMIT
COHESION
NATURAL MOISTURE CONTENT
LIQUID LIMIT
UC :
PLI :
UCS :
Checked By :
Mr. Prajit N.
Drawn By:
Rupesh
SCALE : 1: 50
JOB NO. : 3228
CLIENT :
PROJECT : Geotechnical Investigation Work for the Proposed Installation of Mechanical Handling Facilities at East Quay-7 (EQ-7)
Berth in the inner harbour of Visakhapatnam Port Trust.
BORE HOLE NO. : BH-21
SHEET NO.
: 1 OF 2
:
CO-ORDINATES :
GROUND R. L.
:
GROUND W. T. :
Stackyard Area
DATE
: 13/06/2012 TO 16/06/2012
N 1959993.045, E 742856.859
2.739m
METHOD
: ROTARY DRILLING
CASING
0.70m Below GL
LL%
PL%
--
53
26
27
--
CH
00
03
35
62
61.73
93
36
57
0.17
3.2
CH
00
11
32
57
--
87
32
55
--
PLI(kg/cm )
CLAY %
39
UCS(kg/cm )
SILT %
23
Cu/ (kg/cm )/
(degrees)
SAND %
38
NMC
GRAVELS %
00
LOG
R.L. (m)
RQD (%)
CONSISTENCY LIMIT
CH
DESCRIPTION
TCR (%)
CLASSIFICATION
1.50
LABORATORY DATA
0.00/
DS1
0.50
0.50
1.00
DIA OF BOREHOLE
FIELD DATA
PLASTICITY INDEX
LOCATION
Fill
(Reddish silty SAND)
with gravels & boulders)
150
mm
1.50/
(10)
SPT1
2.10
05/07/03/05
2.00
Medium dense,
brownish red,
silty SAND with gravels
2.50
3.00/
(04)
SPT2
3.60
01/02/02/03
3.00
3.50
4.00
Soft grey,
marine CLAY.
4.50/
UDS1
5.00
4.50
5.00
5.50
6.00/
(09)
6.60 SPT3 02/03/06/08
6.00
6.50
Stiff grey,
marine CLAY.
7.00
(05)
7.50/ SPT4
02/02/03/03
8.10
7.50
8.00
8.50
Soft grey,
marine CLAY.
(04)
9.00/ SPT5
01/02/02/02
9.60
9.00
9.50
10.00
ABBREVIATIONS :
DS
UDS
N
SPT
:
:
:
:
DISTURBED SAMPLE
UNDISTURBED SOIL SAMPLE
SPT VALUE
STD. PENETRATION TEST
R
RQD
CR
TCR
:
:
:
:
PL(%)
Cu
NMC
LL (%)
:
:
:
:
PLASTIC LIMIT
COHESION
NATURAL MOISTURE CONTENT
LIQUID LIMIT
UC :
PLI :
UCS :
Checked By :
Prajit Nagrale
Drawn By:
Rupesh
SCALE : 1: 50
JOB NO. : 3228
CLIENT :
PROJECT : Geotechnical Investigation Work for the Proposed Installation of Mechanical Handling Facilities at East Quay-7 (EQ-7)
Berth in the inner harbour of Visakhapatnam Port Trust.
BORE HOLE NO. : BH-21
SHEET NO.
: 2 OF 2
PLI(kg/cm )
UCS(kg/cm )
(degrees)
Cu/ (kg/cm2)/
PLASTICITY INDEX
PL%
LL%
CONSISTENCY LIMIT
NMC
CLAY %
SILT %
SAND %
LOG
R.L. (m)
RQD (%)
DESCRIPTION
GRAVELS %
CLASSIFICATION
LABORATORY DATA
TCR (%)
DIA OF BOREHOLE
FIELD DATA
10.50/ UDS2
11.00
10.50
11.00
11.50
150
mm
Soft grey,
marine CLAY.
(04)
12.00/ SPT6
01/02/02/03
12.60
12.00
12.50
13.00
(R)
13.50/ SPT7
38/52/--/-13.67
13.50
14.00
Completely weathered,
greyish pink,
KHONDALITE
14.50
15.00
NX 15.00/
(R)
SPT8
52/--/--/-15.05
15.50
16.00
Highly weathered,
greyish pink,
fine grained,
KHONDALITE
16.50
16.50
17.00
17.50
17.50
18.00
18.50
19.00
19.50
20.00
ABBREVIATIONS :
DS
UDS
N
SPT
:
:
:
:
DISTURBED SAMPLE
UNDISTURBED SOIL SAMPLE
SPT VALUE
STD. PENETRATION TEST
R
RQD
CR
TCR
:
:
:
:
PL(%)
Cu
NMC
LL (%)
:
:
:
:
PLASTIC LIMIT
COHESION
NATURAL MOISTURE CONTENT
LIQUID LIMIT
UC :
PLI :
UCS :
Checked By :
Mr. Prajit N.
Drawn By:
Rupesh
SCALE : 1: 50
JOB NO. : 3228
CLIENT :
PROJECT : Geotechnical Investigation Work for the Proposed Installation of Mechanical Handling Facilities at East Quay-7 (EQ-7)
Berth in the inner harbour of Visakhapatnam Port Trust.
BORE HOLE NO. : BH- 23
: Stackyard Area
DATE
: 17/06/2012 TO 20/06/2012
METHOD
: ROTARY DRILLING
CASING
: 2.60m Below GL
--
--
--
--
55.16
67
29
38
0.21
3.66
PLI(kg/cm )
17
--
UCS(kg/cm )
03
PL%
CH
LL%
43
NMC
22
CONSISTENCY LIMIT
CLAY %
SAND %
SM
SILT %
GRAVELS %
Fill
(Blackish silty SAND)
with gravels & boulders)
1.00
1.50
LOG
R.L. (m)
RQD (%)
DESCRIPTION
0.00/
DS1
0.50
0.50
CLASSIFICATION
LABORATORY DATA
TCR (%)
DIA OF BOREHOLE
FIELD DATA
Cu/ (kg/cm )/
(degrees)
GROUND W. T.
: 1 OF 2
PLASTICITY INDEX
LOCATION
SHEET NO.
150
mm 1.50/
(11)
2.10 SPT1 05/07/04/09
2.00
Medium dense,
blackish,silty SAND
with gravels
2.50
3.00/
(02)
SPT2
3.60
02/01/01/02
3.00
3.50
35
Loose grey,
silty SAND
with grevels
4.00
(04)
4.50/
SPT3
5.10
02/02/02/03
4.50
5.00
5.50
6.00/ UDS1
6.50
6.00
31
49
Soft grey ,
marine CLAY.
6.50
7.00
(03)
7.50/ SPT4
01/01/02/02
8.10
7.50
8.00
8.50
(05)
9.00/
SPT5
02/02/03/04
9.60
9.00
9.50
10.00
ABBREVIATIONS :
DS
UDS
N
SPT
:
:
:
:
DISTURBED SAMPLE
UNDISTURBED SOIL SAMPLE
SPT VALUE
STD. PENETRATION TEST
R
RQD
CR
TCR
:
:
:
:
PL(%)
Cu
NMC
LL (%)
:
:
:
:
PLASTIC LIMIT
COHESION
NATURAL MOISTURE CONTENT
LIQUID LIMIT
UC :
PLI :
UCS :
Checked By :
Prajit Nagrale
Drawn By:
Rupesh
SCALE : 1: 50
JOB NO. : 3228
CLIENT :
PROJECT : Geotechnical Investigation Work for the Proposed Installation of Mechanical Handling Facilities at East Quay-7 (EQ-7)
Berth in the inner harbour of Visakhapatnam Port Trust.
BORE HOLE NO. : BH-23
SHEET NO.
: 2 OF 2
--
PLI(kg/cm )
UCS(kg/cm )
--
(degrees)
--
Cu/ (kg/cm2)/
PL%
--
PLASTICITY INDEX
LL%
27
CONSISTENCY LIMIT
NMC
68
CLAY %
05
SILT %
SAND %
SM
150
mm
GRAVELS %
CLASSIFICATION
LOG
R.L. (m)
RQD (%)
DESCRIPTION
TCR (%)
LABORATORY DATA
(16)
10.50/ SPT 6
04/06/10/15
11.10
10.50
11.00
DIA OF BOREHOLE
FIELD DATA
--
Medium dense,
grey silty,
SAND with gravels
11.50
(R)
12.00/ SPT 7 14/30/51/-12.35
12.35
12.00
12.50
Highly weathered,
brownish grey,
fine grained,
KHONDALITE
13.00
NX
13.35
13.50
14.00
Highly weathered,
brownish pink,
KHONDALITE
14.35
14.50
16.26
15.00
15.35
15.50
16.00
16.50
17.00
17.50
18.00
18.50
19.00
19.50
20.00
ABBREVIATIONS :
DS
UDS
N
SPT
:
:
:
:
DISTURBED SAMPLE
UNDISTURBED SOIL SAMPLE
SPT VALUE
STD. PENETRATION TEST
R
RQD
CR
TCR
:
:
:
:
PL(%)
Cu
NMC
LL (%)
:
:
:
:
PLASTIC LIMIT
COHESION
NATURAL MOISTURE CONTENT
LIQUID LIMIT
UC :
PLI :
UCS :
Checked By :
Mr. Prajit N.
Drawn By:
Rupesh
SCALE : 1: 50
JOB NO. : 3228
CLIENT :
PROJECT : Geotechnical Investigation Work for the Proposed Installation of Mechanical Handling Facilities at East Quay-7 (EQ-7)
Berth in the inner harbour of Visakhapatnam Port Trust.
BORE HOLE NO. : BH- 24
SHEET NO.
: 1 OF 2
:
CO-ORDINATES :
:
GROUND R. L.
GROUND W. T. :
Stackyard Area
DATE
: 17/06/2012 TO 20/06/2012
N 1959944.414, E 742971.158
3.189 m
METHOD
: ROTARY DRILLING
CASING
1.70m Below GL
LABORATORY DATA
00
09
31
60
CH
00
22
27
51
25
33
--
63.76 112
38
74
0.18
2.75
23
38
--
PLI(kg/cm )
CH
58
UCS(kg/cm )
CLAY %
38
Cu/ (kg/cm )/
(degrees)
SILT %
25
PL%
SAND %
35
LL%
GRAVELS %
02
NMC
CLASSIFICATION
2.00
150
mm
CONSISTENCY LIMIT
Fill
(Reddish silty SAND
with gravels & boulders)
1.00
1.50
LOG
R.L. (m)
0.00/
DS1
0.50
0.50
CH
DESCRIPTION
RQD (%)
TCR (%)
DIA OF BOREHOLE
FIELD DATA
PLASTICITY INDEX
LOCATION
(05)
1.50/
SPT1
2.10
02/02/03/03
2.50
3.00/
(07)
SPT2
3.60
02/03/04/06
3.00
3.50
--
Medium stiff,
brownish grey,
marine CLAY
4.00
(06)
4.50/
SPT3
5.10
02/03/03/04
4.50
5.00
Medium stiff,
grey marine,
CLAY with sea-shells
5.50
6.00/ UDS1
6.50
6.00
6.50
7.00
(05)
7.50/ SPT4
01/02/03/04
8.10
7.50
8.00
8.50
(06)
9.00/
SPT5
02/03/03/04
9.60
9.00
--
61
9.50
10.00
ABBREVIATIONS :
DS
UDS
N
SPT
:
:
:
:
DISTURBED SAMPLE
UNDISTURBED SOIL SAMPLE
SPT VALUE
STD. PENETRATION TEST
R
RQD
CR
TCR
:
:
:
:
PL(%)
Cu
NMC
LL (%)
:
:
:
:
PLASTIC LIMIT
COHESION
NATURAL MOISTURE CONTENT
LIQUID LIMIT
UC :
PLI :
UCS :
Checked By :
Prajit Nagrale
Drawn By:
Rupesh
SCALE : 1: 50
JOB NO. : 3228
CLIENT :
PROJECT : Geotechnical Investigation Work for the Proposed Installation of Mechanical Handling Facilities at East Quay-7 (EQ-7)
Berth in the inner harbour of Visakhapatnam Port Trust.
BORE HOLE NO. : BH-24
SHEET NO.
: 2 OF 2
PLI(kg/cm )
UCS(kg/cm )
(degrees)
Cu/ (kg/cm2)/
PLASTICITY INDEX
PL%
LL%
CONSISTENCY LIMIT
NMC
CLAY %
SILT %
SAND %
GRAVELS %
CLASSIFICATION
LOG
(05)
10.50/ SPT6
03/03/02/05
11.10
10.50
11.00
11.50
DESCRIPTION
R.L. (m)
RQD (%)
LABORATORY DATA
TCR (%)
DIA OF BOREHOLE
FIELD DATA
150
mm
12.00
(09)
12.00/ SPT7
02/04/05/05
12.60
12.50
Stiff grey,
marine CLAY.
13.00
13.50/ SPT8
13.50
13.75
(R)
16/52
14.00
14.50
14.75
15.00
Highly weathered,
fine grained,
KHONDALITE.
NX
15.50
15.75
16.00
21.44
16.50
16.75
17.00
17.50
18.00
18.50
19.00
19.50
20.00
ABBREVIATIONS :
DS
UDS
N
SPT
:
:
:
:
DISTURBED SAMPLE
UNDISTURBED SOIL SAMPLE
SPT VALUE
STD. PENETRATION TEST
R
RQD
CR
TCR
:
:
:
:
PL(%)
Cu
NMC
LL (%)
:
:
:
:
PLASTIC LIMIT
COHESION
NATURAL MOISTURE CONTENT
LIQUID LIMIT
UC :
PLI :
UCS :
Checked By :
Mr. Prajit N.
Drawn By:
Rupesh
SCALE : 1: 50
JOB NO. : 3228
CLIENT :
PROJECT : Geotechnical Investigation Work for the Proposed Installation of Mechanical Handling Facilities at East Quay-7 (EQ-7)
Berth in the inner harbour of Visakhapatnam Port Trust.
BORE HOLE NO. : BH-26
SHEET NO.
: 1 OF 2
:
CO-ORDINATES :
GROUND R. L.
:
GROUND W. T. :
Stackyard Area
DATE
: 01/07/2012 TO 04/07/2012
N 1960147.554, E 742471.466
3.463m
METHOD
: ROTARY DRILLING
CASING
: 150mm Upto 1.5m & NX Upto 4.30m BGL.
BOREHOLE DEPTH : 12.10m Below GL.
1.20m Below GL
LABORATORY DATA
CLAY %
LL%
PL%
--
75
31
44
--
CH
07
05
37
51
--
86
34
52
--
CH
01
33
26
40
--
73
32
41
--
PLI(kg/cm )
SILT %
34
UCS(kg/cm )
SAND %
26
Cu/ (kg/cm )/
(degrees)
GRAVELS %
34
PLASTICITY INDEX
CLASSIFICATION
CONSISTENCY LIMIT
01
LOG
R.L. (m)
RQD (%)
CH
DESCRIPTION
TCR (%)
DIA OF BOREHOLE
FIELD DATA
NMC
LOCATION
0.00/
DS1
0.50
0.50
1.00
1.50
(16)
150 1.50/ SPT1
mm 2.10
04/07/09/11
Fill
(Black back filling
materials SAND
with Boulders.)
2.00
2.50
3.00/
(14)
SPT2
3.60
04/06/08/12
3.00
3.50
4.00
(04)
4.50/
SPT3
5.10
01/02/02/03
4.50
5.00
5.50
5.50 VST1
6.00
6.00/ UDS1
6.50
6.50
Soft grey,
marine CLAY
7.00
(07)
7.50/ SPT4
02/03/04/04
8.10
7.50
8.00
(R)
8.50/
SPT5
51/--/--/-8.60
8.50
9.00
Highly Weathered,
brownish pink,
KHONDALITE
NX
9.50
10.00
ABBREVIATIONS :
DS
UDS
N
SPT
:
:
:
:
DISTURBED SAMPLE
UNDISTURBED SOIL SAMPLE
SPT VALUE
STD. PENETRATION TEST
R
RQD
CR
TCR
:
:
:
:
PL(%)
Cu
NMC
LL (%)
:
:
:
:
PLASTIC LIMIT
COHESION
NATURAL MOISTURE CONTENT
LIQUID LIMIT
UC :
PLI :
UCS :
Checked By :
Prajit Nagrale
Drawn By:
Rupesh
SCALE : 1: 50
JOB NO. : 3228
CLIENT :
PROJECT : Geotechnical Investigation Work for the Proposed Installation of Mechanical Handling Facilities at East Quay-7 (EQ-7)
Berth in the inner harbour of Visakhapatnam Port Trust.
BORE HOLE NO. : BH-26
SHEET NO.
: 2 OF 2
PLI(kg/cm )
UCS(kg/cm )
(degrees)
Cu/ (kg/cm2)/
PLASTICITY INDEX
PL%
LL%
CONSISTENCY LIMIT
NMC
CLAY %
SILT %
SAND %
GRAVELS %
CLASSIFICATION
LOG
DESCRIPTION
R.L. (m)
RQD (%)
LABORATORY DATA
TCR (%)
DIA OF BOREHOLE
FIELD DATA
10.10
10.50
NX
11.00
Highly moderately,
pinkish grey
KHONDALITE
11.10
11.50
12.00
12.10
12.50
13.00
13.50
14.00
14.50
15.00
15.50
16.00
16.50
17.00
17.50
18.00
18.50
19.00
19.50
20.00
ABBREVIATIONS :
DS
UDS
N
SPT
:
:
:
:
DISTURBED SAMPLE
UNDISTURBED SOIL SAMPLE
SPT VALUE
STD. PENETRATION TEST
R
RQD
CR
TCR
:
:
:
:
PL(%)
Cu
NMC
LL (%)
:
:
:
:
PLASTIC LIMIT
COHESION
NATURAL MOISTURE CONTENT
LIQUID LIMIT
:
UC :
PLI :
UCS :
Checked By :
Mr. Prajit N.
Drawn By:
Rupesh
SCALE : 1: 50
JOB NO. : 3228
CLIENT :
PROJECT : Geotechnical Investigation Work for the Proposed Installation of Mechanical Handling Facilities at East Quay-7 (EQ-7)
Berth in the inner harbour of Visakhapatnam Port Trust.
BORE HOLE NO. : BH- 28
: Stackyard Area
: 1 OF 1
DATE
: 06/07/2012 TO 07/07/2012
METHOD
: ROTARY DRILLING
CASING
: 1.10m Below GL
PLI(kg/cm )
UCS(kg/cm )
Cu/ (kg/cm )/
(degrees)
PLASTICITY INDEX
CONSISTENCY LIMIT
PL%
CLAY %
SILT %
SAND %
GRAVELS %
LOG
Fill
(Brownish silty SAND
with gravels & boulders)
1.00
1.50
R.L. (m)
RQD (%)
DESCRIPTION
0.00/
DS1
0.50
0.50
CLASSIFICATION
LABORATORY DATA
TCR (%)
DIA OF BOREHOLE
FIELD DATA
LL%
GROUND W. T.
SHEET NO.
NMC
LOCATION
(05)
150 1.50/ SPT1
mm 2.10
01/02/03/05
2.00
Loose grey,
silty to fine grained,
clayey SAND
2.50
3.00/
(05)
SPT2
3.60
02/02/03/03
3.00
3.50
Loose grey,
silty to fine grained,
sandy CLAY
4.00
4.50/
(R)
SPT3
4.60
51/--/--/--
4.50
5.00
5.50
6.00
6.10
Highly weathered,
fine grained,
KHONDALITE.
6.50
7.00
7.10
7.50
8.00
8.10
8.50
9.00
9.50
10.00
ABBREVIATIONS :
DS
UDS
N
SPT
:
:
:
:
DISTURBED SAMPLE
UNDISTURBED SOIL SAMPLE
SPT VALUE
STD. PENETRATION TEST
R
RQD
CR
TCR
:
:
:
:
PL(%)
Cu
NMC
LL (%)
:
:
:
:
PLASTIC LIMIT
COHESION
NATURAL MOISTURE CONTENT
LIQUID LIMIT
UC :
PLI :
UCS :
Checked By :
Prajit Nagrale
Drawn By:
Rupesh
SCALE : 1: 50
JOB NO. : 3228
CLIENT :
PROJECT : Geotechnical Investigation Work for the Proposed Installation of Mechanical Handling Facilities at East Quay-7 (EQ-7)
Berth in the inner harbour of Visakhapatnam Port Trust.
BORE HOLE NO. : BH- 29
SHEET NO.
: 1 OF 1
:
CO-ORDINATES :
GROUND R. L.
:
GROUND W. T. :
Stackyard Area
DATE
: 26/06/2012 TO 29/06/2012
N 1960096.854, E 742982.144
3.713m
METHOD
: ROTARY DRILLING
CASING
1.35m Below GL
SAND %
SILT %
CLAY %
NMC
LL%
PL%
PLASTICITY INDEX
Cu/ (kg/cm )/
(degrees)
CH
00
09
43
48
--
64
31
44
--
CH
01
34
26
34
--
75
31
44
--
LOG
PLI(kg/cm )
GRAVELS %
CONSISTENCY LIMIT
CLASSIFICATION
0.00/
DS1
0.50
0.50
Fill
(Brownish back filling
materials with coarse
grained with sand)
1.00
1.50
DESCRIPTION
R.L. (m)
RQD (%)
LABORATORY DATA
TCR (%)
DIA OF BOREHOLE
FIELD DATA
UCS(kg/cm )
LOCATION
150 1.50/
(08)
mm 2.10 SPT1
03/04/04/06
2.00
2.50
3.00/
(04)
SPT2
3.60
02/02/02/03
3.00
3.50
4.00
4.00
4.50
4.50/
UDS1
5.00
Soft greyish,
marine CLAY
VST1
5.00
5.50
6.00/ SPT3
6.10
6.00
(R)
52/--/--/--
Highly weathered,
greyish pink,
KHONDALITE
6.50
7.00
7.10
Highly weathered,
brownish yellow,
KHONDALITE
7.50
8.00
8.10
Moderately weathered,
brownish yellow,
KHONDALITE
8.50
9.00
9.10
9.50
10.00
ABBREVIATIONS :
DS
UDS
N
SPT
:
:
:
:
DISTURBED SAMPLE
UNDISTURBED SOIL SAMPLE
SPT VALUE
STD. PENETRATION TEST
R
RQD
CR
TCR
:
:
:
:
PL(%)
Cu
NMC
LL (%)
:
:
:
:
PLASTIC LIMIT
COHESION
NATURAL MOISTURE CONTENT
LIQUID LIMIT
:
UC :
PLI :
UCS :
Checked By :
Prajit Nagrale
Drawn By:
Rupesh
SCALE : 1: 50
JOB NO. : 3228
CLIENT :
PROJECT : Geotechnical Investigation Work for the Proposed Installation of Mechanical Handling Facilities at East Quay-7 (EQ-7)
Berth in the inner harbour of Visakhapatnam Port Trust.
BORE HOLE NO. : BH-31
: Stackyard Area
: 05/07/2012 TO 07/07/2012
METHOD
: ROTARY DRILLING
CASING
SAND %
SILT %
CLAY %
LL%
PL%
32
42
--
74
32
42
--
CH
03
06
40
51
--
78
33
45
--
PLI(kg/cm )
GRAVELS %
26
UCS(kg/cm )
CLASSIFICATION
CONSISTENCY LIMIT
00
LOG
R.L. (m)
RQD (%)
CH
DESCRIPTION
TCR (%)
DIA OF BOREHOLE
FIELD DATA
Cu/ (kg/cm )/
(degrees)
GROUND W. T.
: 3.705m
: 1.55m Below GL
DATE
PLASTICITY INDEX
GROUND R. L.
: 1 OF 1
NMC
LOCATION
SHEET NO.
0.00
0.00/
DS1
0.50
0.50
Fill
(Brownish gravels &
boulders)
1.00
1.50
150
mm
(24)
1.50/
SPT1
2.10
05/09/15/21
2.00
2.50
(04)
3.00/
SPT2
3.60
03/03/01/02
3.00
3.50
4.00
4.50/
UDS1
5.00
4.50
5.00
5.00
Soft to medium,
stiff grey,
marine CLAY
VST1
5.50
6.00
(05)
6.00/
SPT3
6.60
02/02/03/05
6.50
6.60
7.00
7.50
NX
7.60
Moderately weathered
grayish pink
KHONDALITE
8.00
8.50
8.60
9.00
9.50
9.60
10.00
ABBREVIATIONS :
DS
UDS
N
SPT
:
:
:
:
DISTURBED SAMPLE
UNDISTURBED SOIL SAMPLE
SPT VALUE
STD. PENETRATION TEST
R
RQD
CR
TCR
:
:
:
:
PL(%)
Cu
NMC
LL (%)
:
:
:
:
PLASTIC LIMIT
COHESION
NATURAL MOISTURE CONTENT
LIQUID LIMIT
UC :
PLI :
UCS :
Checked By :
Prajit Nagrale
Drawn By:
Rupesh
SCALE : 1: 50
JOB NO. : 3228
CLIENT :
PROJECT : Geotechnical Investigation Work for the Proposed Installation of Mechanical Handling Facilities at East Quay-7 (EQ-7)
Berth in the inner harbour of Visakhapatnam Port Trust.
BORE HOLE NO. : BH- 32A
SHEET NO.
: 1 OF 2
:
CO-ORDINATES :
GROUND R. L.
:
GROUND W. T. :
Stackyard Area
DATE
: 27/06/2012 TO 29/06/2012
N 1960049.003, E 743038.329
3.511m
METHOD
: ROTARY DRILLING
CASING
: 150mm Upto 2.20m & NX Upto7.85m BGL.
BOREHOLE DEPTH : 11.74m Below GL.
1.35m Below GL
LABORATORY DATA
23
PLI(kg/cm )
47
UCS(kg/cm )
24
Cu/ (kg/cm )/
(degrees)
CLAY %
25
PLASTICITY INDEX
SILT %
38
PL%
SAND %
13
LL%
GRAVELS %
SC
CONSISTENCY LIMIT
Fill
(Reddish back filling
materials with boulders)
1.00
1.50
CLASSIFICATION
0.00/
DS1
0.50
0.50
LOG
R.L. (m)
RQD (%)
TCR (%)
DESCRIPTION
(SPT'N')
DIA OF BOREHOLE
FIELD DATA
NMC
LOCATION
150 1.50/
(12)
mm 2.10 SPT1
03/05/07/09
2.00
Fill
(Brownish grey,clayey
SAND with boulders)
2.50
3.00/
(10)
SPT2
3.60
03/04/06/07
3.00
--
24
--
3.50
4.00
4.00
4.50
4.50/
UDS1
5.00
VST1
5.00
5.50
(06)
6.00/ SPT3
01/02/04/04
6.60
6.00
6.50
7.00
7.00
7.50
(R)
7.50/ SPT4
16/52/--/--/-7.74
VST2
8.00
8.50
Highly weathered,
Brownish yellow
KHONDALITE
9.00
9.24
9.50
10.00
ABBREVIATIONS :
DS
UDS
N
SPT
:
:
:
:
DISTURBED SAMPLE
UNDISTURBED SOIL SAMPLE
SPT VALUE
STD. PENETRATION TEST
R
RQD
CR
TCR
:
:
:
:
PL(%)
Cu
NMC
LL (%)
:
:
:
:
PLASTIC LIMIT
COHESION
NATURAL MOISTURE CONTENT
LIQUID LIMIT
UC :
PLI :
UCS :
Checked By :
Prajit Nagrale
Drawn By:
Rupesh
SCALE : 1: 50
JOB NO. : 3228
CLIENT :
PROJECT : Geotechnical Investigation Work for the Proposed Installation of Mechanical Handling Facilities at East Quay-7 (EQ-7)
Berth in the inner harbour of Visakhapatnam Port Trust.
BORE HOLE NO. : BH-32A
SHEET NO.
: 2 OF 2
10.50
PLI(kg/cm )
UCS(kg/cm )
Cu/ (kg/cm2)/
(degrees)
PLASTICITY INDEX
PL%
LL%
CONSISTENCY LIMIT
NMC
CLAY %
SILT %
SAND %
GRAVELS %
CLASSIFICATION
LOG
DESCRIPTION
R.L. (m)
RQD (%)
LABORATORY DATA
TCR (%)
DIA OF BOREHOLE
FIELD DATA
Highly weathered,
brownish yellow,
KHONDALITE
10.74
11.00
11.50
11.74
12.00
12.50
13.00
13.50
14.00
14.50
15.00
15.50
16.00
16.50
17.00
17.50
18.00
18.50
19.00
19.50
20.00
ABBREVIATIONS :
DS
UDS
N
SPT
:
:
:
:
DISTURBED SAMPLE
UNDISTURBED SOIL SAMPLE
SPT VALUE
STD. PENETRATION TEST
R
RQD
CR
TCR
:
:
:
:
PL(%)
Cu
NMC
LL (%)
:
:
:
:
PLASTIC LIMIT
COHESION
NATURAL MOISTURE CONTENT
LIQUID LIMIT
UC :
PLI :
UCS :
Checked By :
Mr. Prajit N.
Drawn By:
Rupesh
SCALE : 1: 50
JOB NO. : 3228
CLIENT :
PROJECT : Geotechnical Investigation Work for the Proposed Installation of Mechanical Handling Facilities at East Quay-7 (EQ-7)
Berth in the inner harbour of Visakhapatnam Port Trust.
BORE HOLE NO. : BH-33
: Stackyard Area
: 01/07/2012 TO 03/07/2012
METHOD
: ROTARY DRILLING
CASING
PLI(kg/cm )
UCS(kg/cm )
Cu/ (kg/cm )/
(degrees)
CONSISTENCY LIMIT
PLASTICITY INDEX
CLAY %
SILT %
SAND %
GRAVELS %
CLASSIFICATION
LOG
DESCRIPTION
R.L. (m)
RQD (%)
LABORATORY DATA
TCR (%)
DIA OF BOREHOLE
FIELD DATA
PL%
GROUND W. T.
: 3.598m
: 1.55m Below GL
DATE
LL%
GROUND R. L.
: 1 OF 1
NMC
LOCATION
SHEET NO.
0.00
0.50 DS1
0.50
1.00
1.50
Fill
(Reddish brown,
back filling materials
Silty SAND
with Boulders)
150
(14)
mm 1.50/ SPT1
03/05/09/13
2.10
2.00
2.50
(04)
3.00/
SPT2
3.60
01/02/02/06
3.00
3.50
4.00
4.50
4.50/
UDS1
5.00
5.00
5.00 VST1
Soft brown,
marine CLAY
5.50
6.00
(16)
6.00/
SPT3
6.60
04/07/09/24
6.50
6.60
7.00
7.50
NX
7.60
Moderately weathered,
greyish pink,
8.00
KHONDALITE
8.50
8.60
9.00
9.50
9.60
10.00
ABBREVIATIONS :
DS
UDS
N
SPT
:
:
:
:
DISTURBED SAMPLE
UNDISTURBED SOIL SAMPLE
SPT VALUE
STD. PENETRATION TEST
R
RQD
CR
TCR
:
:
:
:
PL(%)
Cu
NMC
LL (%)
:
:
:
:
PLASTIC LIMIT
COHESION
NATURAL MOISTURE CONTENT
LIQUID LIMIT
UC :
PLI :
UCS :
Checked By :
Prajit Nagrale
Drawn By:
Rupesh
SCALE : 1: 50
JOB NO. : 3228
CLIENT :
PROJECT : Geotechnical Investigation Work for the Proposed Installation of Mechanical Handling Facilities at East Quay-7 (EQ-7)
Berth in the inner harbour of Visakhapatnam Port Trust.
BORE HOLE NO. : BH- N1
SHEET NO.
: 1 OF 3
:
CO-ORDINATES :
:
GROUND R. L.
GROUND W. T. :
Stackyard Area
DATE
: 12/08/2012 TO 17/08/2012
N 1960307.729, E 742966.519
3.61 m
METHOD
: ROTARY DRILLING
CASING
0.55m Below GL
LL%
PL%
29
--
48
25
23
--
CI
03
44
33
20
--
42
22
20
--
SP
00
97
--
--
--
--
--
LOG
PLI(kg/cm )
CLAY %
37
UCS(kg/cm )
SILT %
33
Cu/ (kg/cm )/
(degrees)
SAND %
01
PLASTICITY INDEX
GRAVELS %
CONSISTENCY LIMIT
CLASSIFICATION
CI
DESCRIPTION
R.L. (m)
RQD (%)
LABORATORY DATA
TCR (%)
DIA OF BOREHOLE
FIELD DATA
NMC
LOCATION
0.00/
DS1
0.50
0.50
1.00
1.50
Fill
(Reddish,silty SAND
with gravels & boulders)
150
mm
(R)
1.50/
SPT1
1.60
53/--/--/--
2.00
2.50
3.00/
(07)
SPT2
3.60
03/03/04/05
3.00
3.50
4.00
(14)
4.50/
SPT3
5.10
04/06/08/10
4.50
5.00
5.50
(12)
6.00/
SPT4 03/04/08/10
6.60
6.00
6.50
Medium dense,
brownish,SAND with
sea-shells
7.00
(R)
7.50/
SPT5 17/25/51/-7.85
7.50
8.00
03
NX
8.50
Hard,yellowish grey,
sandy CLAY as
completely weathered,
ROCK
(R)
9.00/
SPT6 23/51/--/-9.28
9.00
9.50
10.00
ABBREVIATIONS :
DS
UDS
N
SPT
:
:
:
:
DISTURBED SAMPLE
UNDISTURBED SOIL SAMPLE
SPT VALUE
STD. PENETRATION TEST
R
RQD
CR
TCR
:
:
:
:
PL(%)
Cu
NMC
LL (%)
:
:
:
:
PLASTIC LIMIT
COHESION
NATURAL MOISTURE CONTENT
LIQUID LIMIT
UC :
PLI :
UCS :
Checked By :
Prajit Nagrale
Drawn By:
Rupesh
SCALE : 1: 50
JOB NO. : 3228
CLIENT :
PROJECT : Geotechnical Investigation Work for the Proposed Installation of Mechanical Handling Facilities at East Quay-7 (EQ-7)
Berth in the inner harbour of Visakhapatnam Port Trust.
BORE HOLE NO. : BH- N1
SHEET NO.
: 2 OF 3
--
PLI(kg/cm )
UCS(kg/cm )
--
(degrees)
--
Cu/ (kg/cm2)/
--
PLASTICITY INDEX
PL%
34
LL%
CLAY %
40
SILT %
26
CONSISTENCY LIMIT
NMC
SM
SAND %
10.50/
(55)
SPT7
10.98
10/20/35/53
10.50
GRAVELS %
CLASSIFICATION
LOG
DESCRIPTION
R.L. (m)
RQD (%)
LABORATORY DATA
TCR (%)
DIA OF BOREHOLE
FIELD DATA
--
11.00
11.50
NX
12.00/
(R)
SPT8
12.28
19/51/--/--
12.00
Hard,brownish
yellow,sandy CLAY
as completely
weathered,ROCK
12.50
13.00
13.50/
(R)
SPT9
13.60
55/--/--/--
13.50
14.00
Completely weathered,
yellowish, grey ROCK
14.50
15.00/
(R)
SPT10
15.10
53/--/--/--
15.00
15.50
16.00
16.50/
(R)
SPT10
16.58
55/--/--/--
16.50
Completely weathered,
Brownish grey,ROCK
17.00
17.50
18.00/
(R)
SPT11
18.10
51/--/--/--
18.00
18.50
Highly weathered,
greyish brown,ROCK
19.00
19.50/
(R)
SPT12
19.57
55/--/--/--
19.50
20.00
ABBREVIATIONS :
DS
UDS
N
SPT
:
:
:
:
DISTURBED SAMPLE
UNDISTURBED SOIL SAMPLE
SPT VALUE
STD. PENETRATION TEST
R
RQD
CR
TCR
:
:
:
:
PL(%)
Cu
NMC
LL (%)
:
:
:
:
PLASTIC LIMIT
COHESION
NATURAL MOISTURE CONTENT
LIQUID LIMIT
UC :
PLI :
UCS :
Checked By :
Mr. Prajit N.
Drawn By:
Rupesh
SCALE : 1: 50
JOB NO. : 3228
CLIENT :
PROJECT : Geotechnical Investigation Work for the Proposed Installation of Mechanical Handling Facilities at East Quay-7 (EQ-7)
Berth in the inner harbour of Visakhapatnam Port Trust.
BORE HOLE NO. : BH- N1
SHEET NO.
: 3 OF 3
PLI(kg/cm )
UCS(kg/cm )
(degrees)
Cu/ (kg/cm2)/
PLASTICITY INDEX
PL%
LL%
CONSISTENCY LIMIT
NMC
CLAY %
SILT %
SAND %
GRAVELS %
CLASSIFICATION
LOG
DESCRIPTION
R.L. (m)
RQD (%)
LABORATORY DATA
TCR (%)
DIA OF BOREHOLE
FIELD DATA
20.50
21.00
NX 21.00/SPT14 (R)
21.05
52/--/--/--
21.50
22.00
Highly weathered,
greyish brown,ROCK
22.50/
(R)
SPT15
22.57
52/--/--/--
22.50
23.00
23.50
24.00
24.00
24.50
Moderately weathered,
brownish grey,ROCK
25.00
2.26
25.50
25.50
26.00
26.50
27.00
27.50
28.00
28.50
29.00
29.50
30.00
30.20
ABBREVIATIONS :
DS
UDS
N
SPT
:
:
:
:
DISTURBED SAMPLE
UNDISTURBED SOIL SAMPLE
SPT VALUE
STD. PENETRATION TEST
R
RQD
CR
TCR
:
:
:
:
PL(%)
Cu
NMC
LL (%)
:
:
:
:
PLASTIC LIMIT
COHESION
NATURAL MOISTURE CONTENT
LIQUID LIMIT
UC :
PLI :
UCS :
Checked By :
Mr. Prajit N.
Drawn By:
Rupesh
SCALE : 1: 50
JOB NO. : 3228
CLIENT :
PROJECT : Geotechnical Investigation Work for the Proposed Installation of Mechanical Handling Facilities at East Quay-7 (EQ-7)
Berth in the inner harbour of Visakhapatnam Port Trust.
BORE HOLE NO. : BH- N2
SHEET NO.
: 1 OF 3
:
CO-ORDINATES :
GROUND R. L.
:
GROUND W. T. :
Stackyard Area
DATE
: 13/08/2012 TO 19/08/2012
N 1960269.345, E 742988.127
3.474 m
METHOD
: ROTARY DRILLING
CASING
1.05m Below GL
PL%
--
--
--
--
--
SM
09
52
39
--
--
--
--
--
SM
65
24
11
--
--
--
--
--
SILT %
LOG
PLI(kg/cm )
LL%
24
Cu/ (kg/cm )/
(degrees)
NMC
44
CLAY %
SAND %
32
UCS(kg/cm )
CONSISTENCY LIMIT
GRAVELS %
CLASSIFICATION
SM
DESCRIPTION
R.L. (m)
RQD (%)
LABORATORY DATA
TCR (%)
DIA OF BOREHOLE
FIELD DATA
PLASTICITY INDEX
LOCATION
0.00/
DS1
0.50
0.50
1.00
1.50
150 1.50/
(37)
mm 2.10 SPT1 11/17/20/23
Fill
(Dense,brownish,silty
2.00
2.50
3.00/
(20)
SPT2
3.60
05/08/12/06
3.00
3.50
Medium dense,
greyish brown,
silty SAND with gravels
4.00
(R)
4.50/
SPT3
4.78
15/52/--/--
4.50
5.00
Completely weathered,
ROCK
5.50
NX
(R)
6.00/
SPT4 53/--/--/-6.10
6.00
Highly weathered,
greyish yellow,ROCK
6.50
6.50
Completely weathered,
ROCK
7.00
(R)
7.50/
SPT4 52/--/--/-7.60
7.50
8.00
8.50
Completely weathered,
yellowish,ROCK
(R)
9.00/
SPT5 52/--/--/-9.12
9.00
9.50
10.00
ABBREVIATIONS :
DS
UDS
N
SPT
:
:
:
:
DISTURBED SAMPLE
UNDISTURBED SOIL SAMPLE
SPT VALUE
STD. PENETRATION TEST
R
RQD
CR
TCR
:
:
:
:
PL(%)
Cu
NMC
LL (%)
:
:
:
:
PLASTIC LIMIT
COHESION
NATURAL MOISTURE CONTENT
LIQUID LIMIT
UC :
PLI :
UCS :
Checked By :
Prajit Nagrale
Drawn By:
Rupesh
SCALE : 1: 50
JOB NO. : 3228
CLIENT :
PROJECT : Geotechnical Investigation Work for the Proposed Installation of Mechanical Handling Facilities at East Quay-7 (EQ-7)
Berth in the inner harbour of Visakhapatnam Port Trust.
BORE HOLE NO. : BH- N2
SHEET NO.
: 2 OF 3
PLI(kg/cm )
UCS(kg/cm )
(degrees)
--
Cu/ (kg/cm2)/
PL%
--
PLASTICITY INDEX
LL%
CONSISTENCY LIMIT
NMC
33
CLAY %
53
SILT %
SAND %
LOG
R.L. (m)
RQD (%)
DESCRIPTION
GRAVELS %
CLASSIFICATION
LABORATORY DATA
TCR (%)
DIA OF BOREHOLE
FIELD DATA
10.50/
(R)
SPT7
10.60
55/--/--/--
10.50
11.00
11.50
NX
Completely weathered,
yellowish,ROCK
12.00/
(R)
SPT8
12.12
54/--/--/--
12.00
12.50
13.00
13.50/
(R)
SPT9
13.58
55/--/--/--
13.50
14.00
14.50
15.00/
(R)
SPT10
15.10
52/--/--/--
15.00
15.50
Completely weathered,
Brownish grey,ROCK
16.00
16.50/
(R)
SPT11
16.60
53/--/--/--
16.50
17.00
17.50
18.00/
(R)
SPT12
18.10
55/--/--/--
18.00
GM
14
--
--
--
18.50
Completely weathered,
yellowish grey,ROCK
19.00
19.50/
(R)
SPT13
19.55
51/--/--/--
19.50
20.00
ABBREVIATIONS :
DS
UDS
N
SPT
:
:
:
:
DISTURBED SAMPLE
UNDISTURBED SOIL SAMPLE
SPT VALUE
STD. PENETRATION TEST
R
RQD
CR
TCR
:
:
:
:
PL(%)
Cu
NMC
LL (%)
:
:
:
:
PLASTIC LIMIT
COHESION
NATURAL MOISTURE CONTENT
LIQUID LIMIT
UC :
PLI :
UCS :
Checked By :
Mr. Prajit N.
Drawn By:
Rupesh
SCALE : 1: 50
JOB NO. : 3228
CLIENT :
PROJECT : Geotechnical Investigation Work for the Proposed Installation of Mechanical Handling Facilities at East Quay-7 (EQ-7)
Berth in the inner harbour of Visakhapatnam Port Trust.
BORE HOLE NO. : BH- N2
SHEET NO.
: 3 OF 3
PLI(kg/cm )
UCS(kg/cm )
(degrees)
Cu/ (kg/cm2)/
PLASTICITY INDEX
PL%
LL%
CONSISTENCY LIMIT
NMC
CLAY %
SILT %
SAND %
LOG
R.L. (m)
RQD (%)
DESCRIPTION
GRAVELS %
CLASSIFICATION
LABORATORY DATA
TCR (%)
DIA OF BOREHOLE
FIELD DATA
20.50
21.00
Highly weathered,
yellowish grey,ROCK
(R)
NX 21.00 SPT14
21.06
52/--/--/--
21.50
22.00/
(R)
SPT15
22.05
53/--/--/--
22.00
22.50
23.00/
(R)
SPT16
23.05
55/--/--/--
23.00
Completely weathered,
yellowish grey,ROCK
23.50
24.00/
(R)
SPT17
24.08
56/--/--/--
24.00
24.50
25.00
25.00
Highly weathered,
pinkish grey,
KHONDALITE
25.50
26.00
26.00
26.50
27.00
27.00
27.50
28.00
28.50
29.00
29.50
30.00
30.20
ABBREVIATIONS :
DS
UDS
N
SPT
:
:
:
:
DISTURBED SAMPLE
UNDISTURBED SOIL SAMPLE
SPT VALUE
STD. PENETRATION TEST
R
RQD
CR
TCR
:
:
:
:
PL(%)
Cu
NMC
LL (%)
:
:
:
:
PLASTIC LIMIT
COHESION
NATURAL MOISTURE CONTENT
LIQUID LIMIT
UC :
PLI :
UCS :
Checked By :
Mr. Prajit N.
Drawn By:
Rupesh
SCALE : 1: 50
JOB NO. : 3228
CLIENT :
PROJECT : Geotechnical Investigation Work for the Proposed Installation of Mechanical Handling Facilities at East Quay-7 (EQ-7)
Berth in the inner harbour of Visakhapatnam Port Trust.
BORE HOLE NO. : BH- N3
SHEET NO.
: 1 OF 3
:
CO-ORDINATES :
:
GROUND R. L.
GROUND W. T. :
Stackyard Area
DATE
: 12/08/2012 TO 16/08/2012
N 1960272.336, E 742901.831
3.700m
METHOD
: ROTARY DRILLING
CASING
1.70m Below GL
--
--
--
--
56.61 46
22
24
0.15
3.89
PLI(kg/cm )
--
UCS(kg/cm )
LOG
Cu/ (kg/cm )/
(degrees)
31
PL%
02
LL%
CI
NMC
70
CONSISTENCY LIMIT
CLAY %
SAND %
19
SILT %
GRAVELS %
CLASSIFICATION
SM
DESCRIPTION
R.L. (m)
RQD (%)
LABORATORY DATA
TCR (%)
DIA OF BOREHOLE
FIELD DATA
PLASTICITY INDEX
LOCATION
0.00/
DS1
0.50
0.50
1.00
1.50
150
mm
(14)
1.50/ SPT1
2.10
09/08/06/05
Fill
(Medium dense,
reddish brown,silty
SAND with gravels)
2.00
2.50
3.00/
(10)
SPT2
3.60
08/05/05/04
3.00
15
3.50
4.00
Loose to brownish
grey,silty SAND
with gravels
(07)
4.50/
SPT3
5.10
04/04/03/04
4.50
5.00
5.50
6.00/
UDS1
6.60
6.00
35
32
6.50
Grey,
sandy CLAY
7.00
(27)
7.50/
SPT4 10/12/15/19
8.10
7.50
8.00
Very stiff,
greyish brown,sandy
CLAY with gravels
8.50
(R)
9.00/
SPT5 53/--/--/-9.10
9.00
9.50
Completely weathered,
NX
yellowish ROCK
(R)
10.00/SPT6
51/--/--/-10.05
10.00
ABBREVIATIONS :
DS
UDS
N
SPT
:
:
:
:
DISTURBED SAMPLE
UNDISTURBED SOIL SAMPLE
SPT VALUE
STD. PENETRATION TEST
R
RQD
CR
TCR
:
:
:
:
PL(%)
Cu
NMC
LL (%)
:
:
:
:
PLASTIC LIMIT
COHESION
NATURAL MOISTURE CONTENT
LIQUID LIMIT
UC :
PLI :
UCS :
Checked By :
Prajit Nagrale
Drawn By:
Rupesh
SCALE : 1: 50
JOB NO. : 3228
CLIENT :
PROJECT : Geotechnical Investigation Work for the Proposed Installation of Mechanical Handling Facilities at East Quay-7 (EQ-7)
Berth in the inner harbour of Visakhapatnam Port Trust.
BORE HOLE NO. : BH- N3
SHEET NO.
: 2 OF 3
PLI(kg/cm )
UCS(kg/cm )
(degrees)
Cu/ (kg/cm2)/
PLASTICITY INDEX
PL%
LL%
CONSISTENCY LIMIT
NMC
CLAY %
SILT %
SAND %
GRAVELS %
CLASSIFICATION
LOG
DESCRIPTION
R.L. (m)
RQD (%)
LABORATORY DATA
TCR (%)
DIA OF BOREHOLE
FIELD DATA
10.05
10.50
11.00/
(R)
SPT7
11.05
53/--/--/--
11.00
11.50
NX
12.00/
(R)
SPT8
12.07
55/--/--/--
12.00
Completely weathered,
12.50
yellowish ROCK
13.00/
(R)
SPT9
13.05
53/--/--/--
13.00
13.50
14.00/
(R)
SPT10
14.10
52/--/--/--
14.00
14.50
15.00/
(R)
SPT11
15.07
51/--/--/--
15.00
15.50
16.00
16.00
Highly weathered,
yellowish ROCK
16.50
17.00/
(R)
SPT12
17.05
52/--/--/--
17.00
17.50
18.00/
(R)
SPT13
18.05
52/--/--/--
18.00
18.50
Completely weathered,
yellowish ROCK
19.00
(R)
SPT14
19.07
55/--/--/--
19.00
19.50
20.00
ABBREVIATIONS :
DS
UDS
N
SPT
:
:
:
:
DISTURBED SAMPLE
UNDISTURBED SOIL SAMPLE
SPT VALUE
STD. PENETRATION TEST
R
RQD
CR
TCR
:
:
:
:
PL(%)
Cu
NMC
LL (%)
:
:
:
:
PLASTIC LIMIT
COHESION
NATURAL MOISTURE CONTENT
LIQUID LIMIT
UC :
PLI :
UCS :
Checked By :
Mr. Prajit N.
Drawn By:
Rupesh
SCALE : 1: 50
JOB NO. : 3228
CLIENT :
PROJECT : Geotechnical Investigation Work for the Proposed Installation of Mechanical Handling Facilities at East Quay-7 (EQ-7)
Berth in the inner harbour of Visakhapatnam Port Trust.
BORE HOLE NO. : BH- N3
SHEET NO.
: 3 OF 3
PLI(kg/cm )
UCS(kg/cm )
--
(degrees)
--
Cu/ (kg/cm2)/
PL%
--
PLASTICITY INDEX
LL%
CONSISTENCY LIMIT
NMC
36
CLAY %
53
SILT %
SAND %
GRAVELS %
CLASSIFICATION
LOG
R.L. (m)
RQD (%)
DESCRIPTION
TCR (%)
LABORATORY DATA
20.50/
(R)
SPT15
20.57
53/--/--/--
20.50
21.00
DIA OF BOREHOLE
FIELD DATA
NX
21.50
Completely weathered,
greyish yellow,
22.00/
(R)
SPT16
22.09
55/--/--/--
22.00
SM
ROCK
14
--
--
22.50
23.00
23.50/
(R)
SPT17
23.58
55/--/--/--
23.50
24.00
24.50
0.89
Completely weathered,
greyish brown,ROCK
25.00
25.00
25.50
26.00
26.00
26.50
27.00
27.50
28.00
28.50
29.00
29.50
30.00
30.20
ABBREVIATIONS :
DS
UDS
N
SPT
:
:
:
:
DISTURBED SAMPLE
UNDISTURBED SOIL SAMPLE
SPT VALUE
STD. PENETRATION TEST
R
RQD
CR
TCR
:
:
:
:
PL(%)
Cu
NMC
LL (%)
:
:
:
:
PLASTIC LIMIT
COHESION
NATURAL MOISTURE CONTENT
LIQUID LIMIT
UC :
PLI :
UCS :
Checked By :
Mr. Prajit N.
Drawn By:
Rupesh
SCALE : 1: 50
JOB NO. : 3228
CLIENT :
PROJECT : Geotechnical Investigation Work for the Proposed Installation of Mechanical Handling Facilities at East Quay-7 (EQ-7)
Berth in the inner harbour of Visakhapatnam Port Trust.
BORE HOLE NO. : BH- N4
SHEET NO.
: 1 OF 2
:
CO-ORDINATES :
GROUND R. L.
:
GROUND W. T. :
Stackyard Area
DATE
: 18/08/2012 TO 20/08/2012
N 1960203.424, E 742928.076
3.600m
METHOD
: ROTARY DRILLING
CASING
1.4m Below GL
76
LOG
R.L. (m)
--
--
--
--
63.77 87
29
58
0.14
4.12
--
--
--
PLI(kg/cm )
01
--
UCS(kg/cm )
SM
Cu/ (kg/cm )/
(degrees)
01
PL%
00
LL%
CI
NMC
69
CONSISTENCY LIMIT
CLAY %
07
SILT %
SAND %
SM
DESCRIPTION
RQD (%)
GRAVELS %
CLASSIFICATION
LABORATORY DATA
TCR (%)
DIA OF BOREHOLE
FIELD DATA
PLASTICITY INDEX
LOCATION
0.00/
DS1
0.50
0.50
1.00
1.50
2.00
Fill
(Medium dense,
brownish,silty
SAND with gravels)
(21)
1.50/
150 2.10 SPT1 07/09/12/15
mm
24
2.50
3.00/
(16)
SPT2
3.60
05/07/09/12
3.00
3.50
Medium dense,greyish
brown,silty SAND
with gravels
4.00
4.50/
UDS1
5.00
4.50
32
67
5.00
5.50
Medium stiff,
grey,
with gravels
(06)
6.00/ SPT3
6.60
01/02/04/05
6.00
6.50
7.00
(05)
7.50/ SPT4
01/02/03/04
8.10
7.50
8.00
8.50
Loose grey,
silty SAND
(06)
9.00/ SPT5
02/03/03/04
9.60
9.00
23
--
--
9.50
10.00
ABBREVIATIONS :
DS
UDS
N
SPT
:
:
:
:
DISTURBED SAMPLE
UNDISTURBED SOIL SAMPLE
SPT VALUE
STD. PENETRATION TEST
R
RQD
CR
TCR
:
:
:
:
PL(%)
Cu
NMC
LL (%)
:
:
:
:
PLASTIC LIMIT
COHESION
NATURAL MOISTURE CONTENT
LIQUID LIMIT
UC :
PLI :
UCS :
Checked By :
Prajit Nagrale
Drawn By:
Rupesh
SCALE : 1: 50
JOB NO. : 3228
CLIENT :
PROJECT : Geotechnical Investigation Work for the Proposed Installation of Mechanical Handling Facilities at East Quay-7 (EQ-7)
Berth in the inner harbour of Visakhapatnam Port Trust.
BORE HOLE NO. : BH- N4
SHEET NO.
: 2 OF 2
10.50
PLI(kg/cm )
UCS(kg/cm )
(degrees)
Cu/ (kg/cm2)/
PLASTICITY INDEX
PL%
LL%
CONSISTENCY LIMIT
NMC
CLAY %
SILT %
SAND %
GRAVELS %
CLASSIFICATION
LOG
DESCRIPTION
R.L. (m)
RQD (%)
LABORATORY DATA
TCR (%)
DIA OF BOREHOLE
FIELD DATA
150
mm
10.50/
(R)
SPT6
54/--/--/-10.58
11.00
11.50
NX
Highly weathered,
pinkish grey,
11.50
KHONDALITE
12.00
12.50
12.50
Slightly weathered,
pinkish grey,
13.00
720
KHONDALITE
13.50
13.50
14.00
14.50
15.00
15.50
16.00
16.50
17.00
17.50
18.00
18.50
19.00
19.50
20.00
ABBREVIATIONS :
DS
UDS
N
SPT
:
:
:
:
DISTURBED SAMPLE
UNDISTURBED SOIL SAMPLE
SPT VALUE
STD. PENETRATION TEST
R
RQD
CR
TCR
:
:
:
:
PL(%)
Cu
NMC
LL (%)
:
:
:
:
PLASTIC LIMIT
COHESION
NATURAL MOISTURE CONTENT
LIQUID LIMIT
UC :
PLI :
UCS :
Checked By :
Mr. Prajit N.
Drawn By:
Rupesh
SCALE : 1: 50
JOB NO. : 3228
CLIENT :
PROJECT : Geotechnical Investigation Work for the Proposed Installation of Mechanical Handling Facilities at East Quay-7 (EQ-7)
Berth in the inner harbour of Visakhapatnam Port Trust.
BORE HOLE NO. : BH- N5
SHEET NO.
: 1 OF 2
:
CO-ORDINATES :
:
GROUND R. L.
GROUND W. T. :
Stackyard Area
DATE
: 19/08/2012 TO 21/08/2012
N 1960200.62, E 742988.79
3.683m
METHOD
: ROTARY DRILLING
CASING
1.65m Below GL
LABORATORY DATA
52
LOG
82.86 94
33
61
0.07
3.71
--
--
--
PLI(kg/cm )
Medium dense,
SM 23
yellowish brown,
silty SAND with gravels
Cu/ (kg/cm )/
(degrees)
CLAY %
60
PLASTICITY INDEX
SILT %
31
PL%
SAND %
08
LL%
GRAVELS %
01
NMC
CLASSIFICATION
150
mm
CONSISTENCY LIMIT
Fill
(Loose,reddish brown
silty SAND with
gravels)
1.00
1.50
R.L. (m)
RQD (%)
0.00/
DS1
0.50
0.50
CH
DESCRIPTION
TCR (%)
DIA OF BOREHOLE
FIELD DATA
UCS(kg/cm )
LOCATION
(04)
1.50/
SPT1
2.10
03/02/02/02
2.00
Fill
(Blackish grey,
clayey SAND with
gravels)
2.50
3.00/
(05)
SPT2
3.60
02/02/03/03
3.00
3.50
4.00
4.50/
UDS1
5.00
4.50
5.00
5.50
(18)
6.00/ SPT3
6.60
03/08/10/14
6.00
6.50
Medium dense,
brownish grey,
silty SAND with gravels
7.00
(24)
7.50/ SPT4
08/10/14/53
8.00
7.50
8.00
8.00
8.50
25
--
--
NX
Moderately weathered,
pinkish grey,
KHONDALITE
9.00
9.00
9.50
10.00
10.00
ABBREVIATIONS :
DS
UDS
N
SPT
:
:
:
:
DISTURBED SAMPLE
UNDISTURBED SOIL SAMPLE
SPT VALUE
STD. PENETRATION TEST
R
RQD
CR
TCR
:
:
:
:
PL(%)
Cu
NMC
LL (%)
:
:
:
:
PLASTIC LIMIT
COHESION
NATURAL MOISTURE CONTENT
LIQUID LIMIT
UC :
PLI :
UCS :
Checked By :
Prajit Nagrale
Drawn By:
Rupesh
SCALE : 1: 50
JOB NO. : 3228
CLIENT :
PROJECT : Geotechnical Investigation Work for the Proposed Installation of Mechanical Handling Facilities at East Quay-7 (EQ-7)
Berth in the inner harbour of Visakhapatnam Port Trust.
BORE HOLE NO. : BH- N5
SHEET NO.
: 2 OF 2
PLI(kg/cm )
UCS(kg/cm )
(degrees)
Cu/ (kg/cm2)/
PLASTICITY INDEX
PL%
LL%
CONSISTENCY LIMIT
NMC
CLAY %
SILT %
SAND %
LOG
R.L. (m)
RQD (%)
DESCRIPTION
GRAVELS %
CLASSIFICATION
LABORATORY DATA
TCR (%)
DIA OF BOREHOLE
FIELD DATA
10.00
10.50
Moderately weathered,
greyish pink,
NX
KHONDALITE
11.00
11.00
521
11.50
12.00
12.50
13.00
13.50
14.00
14.50
15.00
15.50
16.00
16.50
17.00
17.50
18.00
18.50
19.00
19.50
20.00
ABBREVIATIONS :
DS
UDS
N
SPT
:
:
:
:
DISTURBED SAMPLE
UNDISTURBED SOIL SAMPLE
SPT VALUE
STD. PENETRATION TEST
R
RQD
CR
TCR
:
:
:
:
PL(%)
Cu
NMC
LL (%)
:
:
:
:
PLASTIC LIMIT
COHESION
NATURAL MOISTURE CONTENT
LIQUID LIMIT
UC :
PLI :
UCS :
Checked By :
Mr. Prajit N.
Drawn By:
Rupesh
SCALE : 1: 50
JOB NO. : 3228
CLIENT :
PROJECT : Geotechnical Investigation Work for the Proposed Installation of Mechanical Handling Facilities at East Quay-7 (EQ-7)
Berth in the inner harbour of Visakhapatnam Port Trust.
BORE HOLE NO. : BH- N6
SHEET NO.
: 1 OF 1
:
CO-ORDINATES :
GROUND R. L.
:
GROUND W. T. :
Stackyard Area
DATE
: 21/08/2012 TO 22/08/2012
N 1960201.37, E 743050.82
3.745 m
METHOD
: ROTARY DRILLING
CASING
1.85m Below GL
LL%
PL%
32
43
--
64
28
36
--
CH
01
04
36
59
58.50
92
36
56
0.15
3.2
GP
GM
61
30
--
--
--
--
--
LOG
PLI(kg/cm )
CLAY %
22
UCS(kg/cm )
SILT %
04
Cu/ (kg/cm )/
(degrees)
SAND %
CH
NMC
GRAVELS %
2.00
CONSISTENCY LIMIT
Fill
(Reddish brown silty
SAND with gravels)
1.00
(09)
1.50/
SPT1
2.10
03/04/05/06
1.50
CLASSIFICATION
0.00/
DS1
0.50
0.50
DESCRIPTION
R.L. (m)
RQD (%)
LABORATORY DATA
TCR (%)
DIA OF BOREHOLE
FIELD DATA
PLASTICITY INDEX
LOCATION
150
mm
2.50
3.00/
UDS1
3.50
3.00
Stiff grey,
sandy CLAY
3.50
4.00
(R)
4.50/
SPT2
4.75
24/52/--/--
4.50
09
5.00
Completely weathered,
yellowish grey,ROCK
5.50
NX
(R)
6.00/
6.08 SPT3 55/--/--/--
6.00
6.50
7.00
7.00
Highly weathered,
pinkish grey,
KHONDALITE
7.50
8.00
8.00
8.50
908
9.00
9.00
9.50
10.00
ABBREVIATIONS :
DS
UDS
N
SPT
:
:
:
:
DISTURBED SAMPLE
UNDISTURBED SOIL SAMPLE
SPT VALUE
STD. PENETRATION TEST
R
RQD
CR
TCR
:
:
:
:
PL(%)
Cu
NMC
LL (%)
:
:
:
:
PLASTIC LIMIT
COHESION
NATURAL MOISTURE CONTENT
LIQUID LIMIT
UC :
PLI :
UCS :
Checked By :
Prajit Nagrale
Drawn By:
Rupesh
SCALE : 1: 50
JOB NO. : 3228
DBM
LABORATORY TEST
RESULTS
Geotechnical Investigation Work for the Proposed Installation of Mechanical Handling Facilities at East Quay-7 (EQ-7) Berth in the inner harbour of Visakhapatnam Port Trust.
Location :
------------
DATE:
Sample Type
Wet Density
Dry Density
Gravel %
Sand %
Silt %
Clay %
Liquid %
Plastic %
Plasticity Index, Ip %
Shrinkage Limit%
Type
Cohesion Cu kg/cm
Degree
BH - 01
1.50 - 2.10
SPT 1
-----
-----
-----
CH
34
57
79
33
46
14
-----
-----
-----
-----
-----
-----
-----
-----
2.63
BH - 01
3.00 - 3.50
UDS 1
1.53
0.88
73.28
CH
21
32
45
98
37
61
15
TUU
0.11
3.89
-----
40
-----
-----
-----
2.62
BH - 01
4.50 - 5.10
SPT 2
-----
-----
-----
CI
12
27
25
36
47
22
25
12
-----
-----
-----
-----
-----
-----
-----
-----
2.65
CHEM
: Chemical Analysis
Vertical
Consolidation
Tuu
Tcu
Cu :
Undrained Cohesion
'
: Direct Shear
Tcd
: Permeability Test
NP
: Non Plastic
VL
Cu'
FSI
SL
UC
-----> :
UDS :
DS
Remarks
Shear Test
Specific Gravity
Consistency Limits
Mechanical Analysis
Test Kg/cm
Density
gm/ cm
Depth in m.
05.07.2012
FLB 04
:
:
Effective Cohesion
Job. No. :
3228
80.0
GRAVEL
SAND
M
C
4.75
20.0
CLAY
75x10 -3
0.425
2.00
SILT
2x10-3
70
60
50
40
30
20
10
0
10
0.1
0.01
0.001
0.0001
Plasticity Index, Ip
Remarks
CH
34
57
-----
-----
-----
-----
-----
79
33
46
SPT 1
BH - 01
3.00 - 3.50
CH
21
32
45
-----
-----
-----
-----
-----
98
37
61
UDS 1
BH - 01
4.50 - 5.10
CI
12
27
25
36
-----
-----
-----
-----
-----
47
22
25
SPT 2
3228
CC
FF
Gravel
Sand
Silt
Clay
60%
1.50 - 2.10
Depth in m.
Classifi-cation
( IS )
30%
Plastic Limit, Wp
BH - 01
Bore Hole
No.
10%
Job No.
Symbol
Liquid Limit, Wl
PARTICLE SIZE ( mm )
mm
mm
mm
Coeff. Of
Coeff. of
Curvature
Uniformity,
Cc
Cu = D60 /
D302/(D60*D
D10
10)
80
Geotechnical Investigation Work for the Proposed Installation of Mechanical Handling Facilities at East Quay7 (EQ-7) Berth in the inner harbour of Visakhapatnam Port Trust.
90
Project :
100
Location : ------------
Particle
Size(mm)
Geotechnical Investigation Work for the Proposed Installation of Mechanical Handling Facilities
at East Quay-7 (EQ-7) Berth in the inner harbour of Visakhapatnam Port Trust.
--------
Location:
Rate of Strain :
Diameter of Specimen:
Height of Specimen:
Dry Density,d :
Moisture Content:
1.25
38.00
76.00
0.88
73.28
Date: 07.07.2012
Bore Hole No.:
01
Depth (m) 3.00 - 3.50
Condition of Test :
TUU
State of Sample: UDS 01
mm/min
mm
mm
g/cm3
%
Cell
Pressure 3
Deviatoric
Force at
Failure
Deviatoric
Stress at
Failure,d
Normal Stress
at Failure,1
Change in
Length at
Failure,L
Strain at
Failure,
kg/cm2
kg
kg/cm2
cm
cm2
0.50
3.82
0.306
0.806
6.84
9.00
1.00
4.77
0.379
1.379
7.60
10.00
1.50
5.80
0.455
1.955
8.36
11.00
Serial No.
2.5
2.0
1.5
1.0
0.5
0.0
0.0
Cohesion:
0.11
0.5
kg/cm2
1.0
1.5
Normal Stress, kg/sq.cm
2.0
2.5
3.89
JOB No.
Checked By:
3228
Ravi A
Geotechnical Investigation Work for the Proposed Installation of Mechanical Handling Facilities at East Quay-7 (EQ-7) Berth in the inner harbour of Visakhapatnam Port Trust.
Location :
------------
Gravel %
Sand %
SM
23
47
BH - 02
3.00 - 3.50
UDS 1
2.05
1.48
38.18
SC
11
49
20
BH - 02
4.50 - 5.10
SPT 2
-----
-----
-----
CH
15
34
CHEM
: Chemical Analysis
Liquid %
Plastic %
Plasticity Index, Ip %
Shrinkage Limit%
Type
Cohesion Cu kg/cm
Degree
-----
-----
-----
-----
-----
-----
-----
-----
-----
-----
-----
-----
2.66
20
36
22
14
-----
DSUU
(RM)
0.08
23.98
-----
-----
-----
-----
-----
2.65
51
81
30
51
-----
-----
-----
-----
-----
70
-----
-----
-----
2.63
Clay %
Silt %
Vertical
Consolidation
30
Tuu
Tcu
Cu :
Undrained Cohesion
'
: Direct Shear
Tcd
: Permeability Test
NP
: Non Plastic
VL
Cu'
FSI
SL
UC
-----> :
UDS :
DS
Remarks
-----
05.07.2012
Specific Gravity
-----
Shear Test
Dry Density
-----
Consistency Limits
Wet Density
SPT 1
Mechanical Analysis
Test Kg/cm
Sample Type
1.50 - 2.10
Depth in m.
BH - 02
Density
gm/ cm
DATE:
FLB 04
:
:
Effective Cohesion
Job. No. :
3228
80.0
GRAVEL
SAND
M
C
4.75
20.0
CLAY
75x10 -3
0.425
2.00
SILT
2x10-3
70
60
50
40
30
20
10
0
10
0.1
0.01
0.001
0.0001
Sand
Silt
Clay
mm
mm
mm
Plastic Limit, Wp
Plasticity Index, Ip
Remarks
Liquid Limit, Wl
Gravel
60%
Depth in m.
Classifi-cation
( IS )
30%
Job No.
Symbol
Bore Hole
No.
10%
PARTICLE SIZE ( mm )
-----
-----
-----
-----
-----
-----
-----
-----
SPT 1
30
Coeff. Of
Coeff. of
Curvature
Uniformity,
Cc
Cu = D60 /
D302/(D60*D
D10
10)
BH - 02
1.50 - 2.10
SM
23
47
BH - 02
3.00 - 3.50
SC
11
49
20
20
-----
-----
-----
-----
-----
36
22
14
UDS 1
BH - 02
4.50 - 5.10
CH
15
34
51
-----
-----
-----
-----
-----
81
30
51
SPT 2
3228
CC
FF
80
Geotechnical Investigation Work for the Proposed Installation of Mechanical Handling Facilities at East Quay7 (EQ-7) Berth in the inner harbour of Visakhapatnam Port Trust.
90
Project :
100
Location : ------------
Particle
Size(mm)
Location
Condition of Test
Rate of Strain
Size of the
Height of Specimen
Dry Density, d
Moisture Content,
:
:
:
:
:
:
Normal
Serial No. Pressure,
v
Date :
Bore Hole No. :
Depth of Sample (m)
Type of Sample:
mm/min
mm(Square )
mm
gm / cm3
%
Shear
Force at
Failure
Shear
Change
Stress at
Strain at
in Length
Failure,
Failure
,
L
s
Kg / cm2
Kg.
Kg / cm2
mm
0.50
9.68
0.299
3.00
5.00
1.00
16.13
0.533
4.80
8.00
1.50
22.58
0.765
5.40
9.00
2.00
07.07.2012
BH -02
3.00 - 3.50
UDS 01
28.31
1.50
Shear Stress
(Kg/cm2)
1.00
0.50
0.00
0.00
0.50
1.00
1.50
2.00
COHESION, C u ( Kg / cm2 ) :-
0.08
23.98
Job No. :-
3228
Location :
------------
Sample Type
Wet Density
Dry Density
Gravel %
Sand %
Silt %
Clay %
Liquid %
Plastic %
Plasticity Index, Ip %
Shrinkage Limit%
Type
Cohesion Cu kg/cm
Degree
BH - 03
3.00 - 3.60
SPT 2
-----
-----
-----
CH
29
63
76
33
43
-----
-----
-----
-----
-----
-----
-----
-----
-----
-----
BH - 03
4.50 - 5.00
UDS 1
1.52
0.85
77.79
CH
32
67
122
40
82
-----
TUU
0.08
4.36
-----
-----
-----
0.64
2.04
2.60
BH - 03
6.00 - 6.60
SPT 3
-----
-----
-----
CH
11
28
60
71
28
43
-----
-----
-----
-----
-----
60
-----
-----
-----
-----
CHEM
: Chemical Analysis
Vertical
Consolidation
Tuu
Tcu
Cu :
Undrained Cohesion
'
: Direct Shear
Tcd
: Permeability Test
NP
: Non Plastic
VL
Cu'
FSI
SL
UC
-----> :
UDS :
DS
Specific Gravity
Shear Test
Consistency Limits
Test Kg/cm
Mechanical Analysis
gm/ cm
Depth in m.
05.07.2012
Density
(Remoulded)
DATE:
Cu from Unconfined Compression
FLB 04
Remarks
Project :
:
:
Effective Cohesion
Job. No. :
3228
80.0
GRAVEL
SAND
M
C
4.75
20.0
CLAY
75x10 -3
0.425
2.00
SILT
2x10-3
70
60
50
40
30
20
10
0
10
0.1
0.01
0.001
0.0001
Plasticity Index, Ip
Remarks
CH
29
63
-----
-----
-----
-----
-----
76
33
43
SPT 2
BH - 03
4.50 - 5.00
CH
32
67
-----
-----
-----
-----
-----
122
40
82
UDS 1
BH - 03
6.00 - 6.60
CH
11
28
60
-----
-----
-----
-----
-----
71
28
43
SPT 3
3228
CC
FF
Gravel
Sand
Silt
Clay
60%
3.00 - 3.60
Depth in m.
Classifi-cation
( IS )
30%
Plastic Limit, Wp
BH - 03
Bore Hole
No.
10%
Job No.
Symbol
Liquid Limit, Wl
PARTICLE SIZE ( mm )
mm
mm
mm
Coeff. Of
Coeff. of
Curvature
Uniformity,
Cc
Cu = D60 /
D302/(D60*D
D10
10)
80
90
Project :
100
Location : ------------
Particle
Size(mm)
CONSOLIDATION TEST
IS - 2720 , P-15
Project:
Location:
-----------
Date:
BH - 03
Depth in M.:
4.50 - 5.00
UDS-01
Type of Samples:
Properties of Soil
Start
End
Dry density d
0.85
1.05
Moisture Content, w
77.79
56.60
2.04
1.47
Specific Gravity,G
2.60
2.60
Degree of Saturation, Sr
98.95
100.00
0.64
0.51
gm/cm
%
kg/cm2
60 mm
Height of specimen:
20 mm
Coefficient Coefficient of
of
volume
Permeability (K)
consolidatio compressibilty
n Cv
mv
0.10 - 0.25
m2/year
3.38
cm2/kg
1.17E-01
cm/sec
1.25E-04
0.25 - 0.50
2.53
9.85E-02
7.89E-05
0.50 - 1.00
1.71
9.74E-02
5.28E-05
1.00 - 2.00
0.94
7.03E-02
2.10E-05
2.00 - 4.00
0.66
3.75E-02
7.90E-06
kg/cm2
0.1 2.0439484
Voids Ratio, e Vs Pressure Increment (Kg/cm2)
0.25 1.9906793
0.5
1.917
1
1.775
2
1.58
Pc
4 1.3864555
2 1.3910214
1 1.4123291
0.5 1.4321148
0.25 1.4549444
0.1 1.4716861
0
0
0
0
0
0
0
0
0
0
0
0
2.10
2.05
2.00
1.95
1.90
1.85
1.80
Voids Ratio, e
Pressure
Increment
04.09.2012
Dia.of Specimen:
1.75
1.70
1.65
1.60
1.55
1.50
1.45
1.40
1.35
1.30
0.10
1.00
10.00
Job No.:
Checked By:
3228
Geotechnical Investigation Work for the Proposed Installation of Mechanical Handling Facilities
at East Quay-7 (EQ-7) Berth in the inner harbour of Visakhapatnam Port Trust.
--------
Location:
Rate of Strain :
Diameter of Specimen:
Height of Specimen:
Dry Density,d :
Moisture Content:
1.25
38.00
76.00
0.85
77.79
Date: 07.07.2012
Bore Hole No.:
03
Depth (m) 4.50 - 5.00
Condition of Test :
TUU
State of Sample: UDS 01
mm/min
mm
mm
g/cm3
%
Cell
Pressure 3
Deviatoric
Force at
Failure
Deviatoric
Stress at
Failure,d
Normal Stress
at Failure,1
Change in
Length at
Failure,L
Strain at
Failure,
kg/cm2
kg
kg/cm2
cm
cm2
0.50
3.34
0.268
0.768
6.84
9.00
1.00
4.37
0.347
1.347
7.60
10.00
1.50
5.41
0.419
1.919
9.12
12.00
Serial No.
2.5
2.0
1.5
1.0
0.5
0.0
0.0
Cohesion:
0.08
0.5
kg/cm2
1.0
1.5
Normal Stress, kg/sq.cm
2.0
2.5
4.36
JOB No.
Checked By:
3228
Ravi A
Location :
------------
Sample Type
Wet Density
Dry Density
Gravel %
Sand %
Silt %
Clay %
Liquid %
Plastic %
Plasticity Index, Ip %
Shrinkage Limit%
Type
Cohesion Cu kg/cm
Degree
BH - 04
3.00 - 3.60
SPT 2
-----
-----
-----
CH
13
29
58
75
31
44
-----
-----
-----
-----
-----
70
-----
-----
-----
-----
BH - 04
4.50 - 5.00
UDS 1
1.48
0.80
85.70
CH
32
65
124
41
83
-----
TUU
0.04
4.0
-----
-----
-----
0.93
2.27
2.61
BH - 04
6.00 - 6.60
SPT 3
-----
-----
-----
CI
15
33
25
27
44
21
23
-----
-----
-----
-----
-----
-----
-----
-----
-----
-----
CHEM
: Chemical Analysis
Vertical
Consolidation
Tuu
Tcu
Cu :
Undrained Cohesion
'
: Direct Shear
Tcd
: Permeability Test
NP
: Non Plastic
VL
Cu'
FSI
SL
UC
-----> :
UDS :
DS
Specific Gravity
Shear Test
Consistency Limits
Test Kg/cm
Mechanical Analysis
gm/ cm
Depth in m.
05.07.2012
Density
(Remoulded)
DATE:
Cu from Unconfined Compression
FLB 04
Remarks
Project :
:
:
Effective Cohesion
Job. No. :
3228
80.0
GRAVEL
SAND
M
C
4.75
20.0
CLAY
75x10 -3
0.425
2.00
SILT
2x10-3
70
60
50
40
30
20
10
0
10
0.1
0.01
0.001
0.0001
Plasticity Index, Ip
Remarks
CH
13
29
58
-----
-----
-----
-----
-----
75
31
44
SPT 2
BH - 04
4.50 - 5.00
CH
32
65
-----
-----
-----
-----
-----
124
41
83
UDS 1
BH - 04
6.00 - 6.60
CI
15
33
25
27
-----
-----
-----
-----
-----
44
21
23
SPT 3
3228
CC
FF
Gravel
Sand
Silt
Clay
60%
3.00 - 3.60
Depth in m.
Classifi-cation
( IS )
30%
Plastic Limit, Wp
BH - 04
Bore Hole
No.
10%
Job No.
Symbol
Liquid Limit, Wl
PARTICLE SIZE ( mm )
mm
mm
mm
Coeff. Of
Coeff. of
Curvature
Uniformity,
Cc
Cu = D60 /
D302/(D60*D
D10
10)
80
90
Project :
100
Location : ------------
Particle
Size(mm)
CONSOLIDATION TEST
IS - 2720 , P-15
Project:
Location:
-----------
Date:
BH - 4
Depth in M.:
4.50 - 5.00
UDS-01
Type of Samples:
Properties of Soil
Start
End
Dry density d
0.80
1.04
Moisture Content, w
85.70
58.17
2.27
1.52
Specific Gravity,G
2.61
2.61
Degree of Saturation, Sr
98.33
100.00
0.93
0.60
gm/cm
%
kg/cm2
60 mm
Height of specimen:
20 mm
Coefficient Coefficient of
of
volume
Permeability (K)
consolidatio compressibilty
n Cv
mv
0.10 - 0.25
m2/year
3.52
cm2/kg
1.56E-01
cm/sec
1.75E-04
0.25 - 0.50
2.06
1.43E-01
9.32E-05
0.50 - 1.00
1.32
9.99E-02
4.19E-05
1.00 - 2.00
0.71
9.35E-02
2.11E-05
2.00 - 4.00
0.49
5.27E-02
8.17E-06
kg/cm2
0.1 2.2748446
Voids Ratio, e Vs Pressure Increment (Kg/cm2)
0.25
2.198
0.5
2.084
1
1.93
2
1.656
Pc
4 1.3758998
2 1.3840869
1 1.4184727
0.5 1.4610457
0.25 1.4937942
0.1 1.5183555
0
0
0
0
0
0
0
0
0
0
0
0
2.30
2.25
2.20
2.15
2.10
2.05
2.00
1.95
Voids Ratio, e
Pressure
Increment
04.09.2012
Dia.of Specimen:
1.90
1.85
1.80
1.75
1.70
1.65
1.60
1.55
1.50
1.45
1.40
1.35
0.10
1.00
10.00
Job No.:
Checked By:
3228
RAVI A.
Geotechnical Investigation Work for the Proposed Installation of Mechanical Handling Facilities
at East Quay-7 (EQ-7) Berth in the inner harbour of Visakhapatnam Port Trust.
--------
Location:
Rate of Strain :
Diameter of Specimen:
Height of Specimen:
Dry Density,d :
Moisture Content:
1.25
38.00
76.00
0.81
85.70
Date: 07.07.2012
Bore Hole No.:
04
Depth (m) 4.50 - 5.00
Condition of Test :
TUU
State of Sample: UDS 01
mm/min
mm
mm
g/cm3
%
Cell
Pressure 3
Deviatoric
Force at
Failure
Deviatoric
Stress at
Failure,d
Normal Stress
at Failure,1
Change in
Length at
Failure,L
Strain at
Failure,
kg/cm2
kg
kg/cm2
cm
cm2
0.50
1.99
0.156
0.656
8.36
11.00
1.00
3.10
0.241
1.241
9.12
12.00
1.50
3.90
0.299
1.799
9.88
13.00
Serial No.
2.0
1.5
1.0
0.5
0.0
0.0
Cohesion:
0.04
0.5
kg/cm2
1.0
Normal Stress, kg/sq.cm
1.5
2.0
4.00
JOB No.
Checked By:
3228
Ravi A
Location :
Gravel %
Sand %
-----
-----
SP-SM
40
52
BH - 05
4.50 - 5.10
SPT 3
-----
-----
-----
CH
12
34
BH - 05
6.00 - 6.50
UDS 1
1.63
1.02
59.36
CH
12
27
CHEM
: Chemical Analysis
Liquid %
Plastic %
Plasticity Index, Ip %
Shrinkage Limit%
Type
Cohesion Cu kg/cm
Degree
Vertical
Consolidation
-----
-----
-----
-----
-----
-----
-----
-----
-----
-----
-----
-----
-----
52
80
29
51
-----
-----
-----
-----
-----
70
-----
-----
-----
-----
61
97
33
64
-----
TUU
0.19
4.12
-----
-----
-----
0.42
1.57
2.63
Clay %
Silt %
05.07.2012
Tuu
Tcu
Cu :
Undrained Cohesion
'
: Direct Shear
Tcd
: Permeability Test
NP
: Non Plastic
VL
Cu'
FSI
SL
UC
-----> :
UDS :
DS
Specific Gravity
Dry Density
-----
Shear Test
Wet Density
SPT 2
Consistency Limits
Sample Type
3.00 - 3.60
Mechanical Analysis
Test Kg/cm
Depth in m.
BH - 05
gm/ cm
Density
(Remoulded)
DATE:
Cu from Unconfined Compression
FLB 04
Remarks
Project :
:
:
Effective Cohesion
Job. No. :
3228
80.0
GRAVEL
SAND
M
C
4.75
20.0
CLAY
75x10 -3
0.425
2.00
SILT
2x10-3
70
60
50
40
30
20
10
0
10
0.1
0.01
0.001
0.0001
Sand
Silt
Clay
mm
mm
mm
Plastic Limit, Wp
Plasticity Index, Ip
Remarks
Liquid Limit, Wl
Gravel
60%
Depth in m.
Classifi-cation
( IS )
30%
Job No.
Symbol
Bore Hole
No.
10%
PARTICLE SIZE ( mm )
0.12
1.50
4.70
39.17
3.99
-----
-----
-----
SPT 2
Coeff. Of
Coeff. of
Curvature
Uniformity,
Cc
Cu = D60 /
D302/(D60*D
D10
10)
BH - 05
3.00 - 3.60
SP-SM
40
52
BH - 05
4.50 - 5.10
CH
12
34
52
-----
-----
-----
-----
-----
80
29
51
SPT 3
BH - 05
6.00 - 6.50
CH
12
27
61
-----
-----
-----
-----
-----
97
33
64
UDS 1
3228
CC
FF
80
90
Project :
100
Location : ------------
Particle
Size(mm)
CONSOLIDATION TEST
IS - 2720 , P-15
Project:
Location:
-----------
Date:
BH - 05
Depth in M.:
6.00 - 6.50
UDS-01
Type of Samples:
Properties of Soil
Start
End
Dry density d
1.02
1.19
Moisture Content, w
59.36
45.71
1.57
1.20
Specific Gravity,G
2.63
2.63
Degree of Saturation, Sr
99.28
100.00
0.42
0.51
gm/cm
%
kg/cm2
60 mm
Height of specimen:
20 mm
Coefficient Coefficient of
of
volume
Permeability (K)
consolidatio compressibilty
n Cv
mv
0.10 - 0.25
m2/year
3.58
cm2/kg
1.10E-01
cm/sec
1.25E-04
0.25 - 0.50
2.28
9.76E-02
7.05E-05
0.50 - 1.00
1.65
7.19E-02
3.76E-05
1.00 - 2.00
1.08
5.35E-02
1.82E-05
2.00 - 4.00
0.76
2.83E-02
6.85E-06
kg/cm2
0.1 1.5725313
Voids Ratio, e Vs Pressure Increment (Kg/cm2)
0.25 1.5300845
0.5 1.4683438
1 1.3795915
2 1.2522512
Pc4 1.1249109
2 1.1429186
1 1.1634988
0.5 1.1763615
0.25 1.1917967
0.1 1.2020868
0
0
0
0
0
0
0
0
0
0
0
0
1.60
1.55
1.50
1.45
Voids Ratio, e
Pressure
Increment
04.09.2012
Dia.of Specimen:
1.40
1.35
1.30
1.25
1.20
1.15
1.10
0.10
1.00
10.00
Job No.:
Checked By:
3228
Geotechnical Investigation Work for the Proposed Installation of Mechanical Handling Facilities
at East Quay-7 (EQ-7) Berth in the inner harbour of Visakhapatnam Port Trust.
--------
Location:
Rate of Strain :
Diameter of Specimen:
Height of Specimen:
Dry Density,d :
Moisture Content:
1.25
38.00
76.00
1.02
59.36
Date: 07.07.2012
Bore Hole No.:
05
Depth (m) 6.00 - 6.50
Condition of Test :
TUU
State of Sample: UDS 01
mm/min
mm
mm
g/cm3
%
Cell
Pressure 3
Deviatoric
Force at
Failure
Deviatoric
Stress at
Failure,d
Normal Stress
at Failure,1
Change in
Length at
Failure,L
Strain at
Failure,
kg/cm2
kg
kg/cm2
cm
cm2
0.50
5.80
0.455
0.955
8.36
11.00
1.00
6.76
0.524
1.524
9.12
12.00
1.50
7.79
0.598
2.098
9.88
13.00
Serial No.
2.5
2.0
1.5
1.0
0.5
0.0
0.0
Cohesion:
0.19
0.5
kg/cm2
1.0
1.5
Normal Stress, kg/sq.cm
2.0
2.5
4.12
JOB No.
Checked By:
3228
Ravi A
Geotechnical Investigation Work for the Proposed Installation of Mechanical Handling Facilities at East Quay-7 (EQ-7) Berth in the inner harbour of Visakhapatnam Port Trust.
Location :
------------
DATE:
Sample Type
Wet Density
Dry Density
Gravel %
Sand %
Silt %
Clay %
Liquid %
Plastic %
Plasticity Index, Ip %
Shrinkage Limit%
Type
Cohesion Cu kg/cm
Degree
BH - 08
3.00 - 3.60
SPT 2
-----
-----
-----
CI
19
39
42
48
22
26
-----
-----
-----
-----
-----
30
-----
-----
-----
2.64
BH - 08
4.50 - 5.00
UDS 1
1.56
0.91
71.26
CH
10
26
64
111
34
77
-----
TUU
0.13
2.86
-----
-----
-----
-----
-----
-----
BH - 08
7.50 - 8.00
UDS 2
1.57
0.93
68.13
CH
17
31
50
105
35
70
-----
TUU
0.12
4.57
-----
-----
-----
-----
-----
-----
BH - 08
10.50 - 11.10
SPT 5
-----
-----
-----
SC
14
39
20
27
36
20
16
-----
-----
-----
-----
-----
-----
-----
-----
-----
-----
CHEM
: Chemical Analysis
Vertical
Consolidation
Tuu
Tcu
Cu :
Undrained Cohesion
'
: Direct Shear
Tcd
: Permeability Test
NP
: Non Plastic
VL
Cu'
FSI
SL
UC
-----> :
UDS :
DS
Remarks
Shear Test
Specific Gravity
Consistency Limits
Mechanical Analysis
Test Kg/cm
Density
gm/ cm
Depth in m.
05.07.2012
FLB 04
:
:
Effective Cohesion
Job. No. :
3228
80.0
SAND
M
C
4.75
20.0
CLAY
75x10 -3
0.425
2.00
SILT
2x10-3
70
60
50
40
30
20
10
0
10
0.1
0.01
0.001
0.0001
Remarks
CI
19
39
42
-----
-----
-----
-----
-----
48
22
26
SPT 2
BH - 08
4.50 - 5.00
CH
10
26
64
-----
-----
-----
-----
-----
111
34
77
UDS 1
BH - 08
7.50 - 8.00
CH
17
31
50
-----
-----
-----
-----
-----
105
35
70
UDS 2
SC
14
39
20
27
-----
-----
-----
-----
-----
36
20
16
SPT 5
BH - 08 10.50 - 11.10
CC
FF
Gravel
Sand
Silt
Clay
60%
3.00 - 3.60
Depth in m.
Classifi-cation
( IS )
30%
Plasticity Index, Ip
3228
Plastic Limit, Wp
BH - 08
Bore Hole
No.
10%
Job No.
Symbol
Liquid Limit, Wl
PARTICLE SIZE ( mm )
mm
mm
mm
Coeff. Of
Coeff. of
Curvature
Uniformity,
Cc
Cu = D60 /
D302/(D60*D
D10
10)
80
Geotechnical Investigation Work for the Proposed Installation of Mechanical Handling Facilities at East Quay7 (EQ-7) Berth in the inner harbour of Visakhapatnam Port Trust.
90
Project :
100
GRAVEL
Location : ------------
Particle
Size(mm)
CONSOLIDATION TEST
IS - 2720 , P-15
Project:
Location:
-----------
Date:
BH - 08
Depth in M.:
4.50 - 5.00
UDS - 1
Type of Samples:
Properties of Soil
Start
End
Dry density d
0.91
1.29
Moisture Content, w
71.26
39.69
1.89
1.04
Specific Gravity,G
2.63
2.63
Degree of Saturation, Sr
99.11
100.00
0.81
0.39
gm/cm
%
kg/cm2
60 mm
Height of specimen:
20 mm
Coefficient Coefficient of
of
volume
Permeability (K)
consolidatio compressibilty
n Cv
mv
0.10 - 0.25
m2/year
3.37
cm2/kg
2.19E-01
cm/sec
2.34E-04
0.25 - 0.50
2.18
2.00E-01
1.39E-04
0.50 - 1.00
1.35
1.75E-01
7.50E-05
1.00 - 2.00
0.93
9.65E-02
2.85E-05
2.00 - 4.00
0.53
5.55E-02
9.39E-06
kg/cm2
0.1 1.8909743
Voids Ratio, e Vs Pressure Increment (Kg/cm2)
0.25
1.796
0.5
1.656
1
1.424
2
1.19
4
0.9470712
Pc
2 0.9629716
1 0.9889903
0.5 1.0092272
0.25 1.026573
0.1 1.0439188
0
0
0
0
0
0
0
0
0
0
0
0
2.00
1.95
1.90
1.85
1.80
1.75
1.70
1.65
1.60
Voids Ratio, e
Pressure
Increment
07.09.2012
Dia.of Specimen:
1.55
1.50
1.45
1.40
1.35
1.30
1.25
1.20
1.15
1.10
1.05
1.00
0.95
0.90
0.10
1.00
10.00
Job No.:
3228
Checked By: PRAJEET N.
CONSOLIDATION TEST
IS - 2720 , P-15
Project:
Location:
-----------
Date:
BH - 08
Depth in M.:
7.50 - 8.10
UDS - 2
Type of Samples:
Properties of Soil
Start
End
Dry density d
0.93
1.12
Moisture Content, w
68.13
51.54
1.83
1.36
Specific Gravity,G
2.64
2.64
Degree of Saturation, Sr
98.44
100.00
0.63
0.66
gm/cm
%
kg/cm2
60 mm
Height of specimen:
20 mm
Coefficient Coefficient of
of
volume
Permeability (K)
consolidatio compressibilty
n Cv
mv
0.10 - 0.25
m2/year
4.29
cm2/kg
1.00E-01
cm/sec
1.36E-04
0.25 - 0.50
2.91
9.30E-02
8.57E-05
0.50 - 1.00
1.62
8.82E-02
4.52E-05
1.00 - 2.00
0.96
6.00E-02
1.83E-05
2.00 - 4.00
0.70
3.87E-02
8.58E-06
kg/cm2
0.1 1.8271541
Voids Ratio, e Vs Pressure Increment (Kg/cm2)
0.25 1.7847468
0.5
1.72
1
1.6
2
1.444
4
1.255
Pc
2 1.2687912
1 1.2914084
0.5 1.3253343
0.25 1.3451244
0.1 1.3606737
0
0
0
0
0
0
0
0
0
0
0
0
1.90
1.85
1.80
1.75
1.70
1.65
Voids Ratio, e
Pressure
Increment
07.09.2012
Dia.of Specimen:
1.60
1.55
1.50
1.45
1.40
1.35
1.30
1.25
1.20
0.10
1.00
10.00
Job No.:
3228
Checked By: PRAJEET N.
Geotechnical Investigation Work for the Proposed Installation of Mechanical Handling Facilities
at East Quay-7 (EQ-7) Berth in the inner harbour of Visakhapatnam Port Trust.
--------
Location:
Rate of Strain :
Diameter of Specimen:
Height of Specimen:
Dry Density,d :
Moisture Content:
1.25
38.00
76.00
0.91
71.26
Date: 09.07.2012
Bore Hole No.:
8
Depth (m) 4.50 - 5.00
Condition of Test :
TUU
State of Sample: UDS 01
mm/min
mm
mm
g/cm3
%
Cell
Pressure 3
Deviatoric
Force at
Failure
Deviatoric
Stress at
Failure,d
Normal Stress
at Failure,1
Change in
Length at
Failure,L
Strain at
Failure,
kg/cm2
kg
kg/cm2
cm
cm2
0.50
4.29
0.337
0.837
8.36
11.00
1.00
5.01
0.389
1.389
9.12
12.00
1.50
5.80
0.445
1.945
9.88
13.00
Serial No.
2.0
1.5
1.0
0.5
0.0
0.0
Cohesion:
0.13
0.5
kg/cm2
1.0
Normal Stress, kg/sq.cm
1.5
2.0
2.86
JOB No.
Checked By:
3228
Ravi A
Location:
Rate of Strain :
Diameter of Specimen:
Height of Specimen:
Dry Density,d :
Moisture Content:
1.25
38.00
76.00
0.93
68.13
Date: 09.07.2012
Bore Hole No.:
8
Depth (m) 7.50 - 8.00
Condition of Test :
TUU
State of Sample: UDS 01
mm/min
mm
mm
g/cm3
%
Cell
Pressure 3
Deviatoric
Force at
Failure
Deviatoric
Stress at
Failure,d
Normal Stress
at Failure,1
Change in
Length at
Failure,L
Strain at
Failure,
kg/cm2
kg
kg/cm2
cm
cm2
0.50
4.69
0.376
0.876
6.84
9.00
1.00
5.57
0.442
1.442
7.60
10.00
1.50
6.68
0.524
2.024
8.36
11.00
Serial No.
2.5
2.0
1.5
1.0
0.5
0.0
0.0
Cohesion:
0.12
0.5
kg/cm2
1.0
1.5
Normal Stress, kg/sq.cm
2.0
2.5
4.57
JOB No.
Checked By:
3228
Ravi A
Location :
------------
DATE:
Sample Type
Wet Density
Dry Density
Gravel %
Sand %
Silt %
Clay %
Liquid %
Plastic %
Plasticity Index, Ip %
Shrinkage Limit%
Type
Cohesion Cu kg/cm
Degree
BH - 10
3.00 - 3.60
SPT 2
-----
-----
-----
CH
20
33
47
62
27
35
-----
-----
-----
-----
-----
35
-----
-----
-----
-----
BH - 10
6.00 - 6.50
UDS 1
1.74
1.21
43.91
CH
36
21
34
67
29
38
-----
TUU
0.26
4.8
-----
-----
-----
0.44
1.19
2.65
BH - 10
9.00 - 9.60
SPT 3
-----
-----
-----
CH
34
58
82
31
51
-----
-----
-----
-----
-----
-----
-----
-----
-----
-----
CHEM
: Chemical Analysis
Shear Test
Vertical
Consolidation
Tuu
Tcu
Cu :
Undrained Cohesion
'
: Direct Shear
Tcd
: Permeability Test
NP
: Non Plastic
VL
Cu'
FSI
SL
UC
-----> :
UDS :
DS
Specific Gravity
Consistency Limits
Mechanical Analysis
Test Kg/cm
Density
gm/ cm
Depth in m.
05.07.2012
FLB 04
Remarks
Project :
:
:
Effective Cohesion
Job. No. :
3228
80.0
GRAVEL
SAND
M
C
4.75
20.0
CLAY
75x10 -3
0.425
2.00
SILT
2x10-3
70
60
50
40
30
20
10
0
10
0.1
0.01
0.001
0.0001
Plasticity Index, Ip
Remarks
CH
20
33
47
-----
-----
-----
-----
-----
62
27
35
SPT 2
BH - 10
6.00 - 6.50
CH
36
21
34
-----
-----
-----
-----
-----
67
29
38
UDS 1
BH - 10
9.00 - 9.60
CH
34
58
-----
-----
-----
-----
-----
82
31
51
SPT 3
3228
CC
FF
Gravel
Sand
Silt
Clay
60%
3.00 - 3.60
Depth in m.
Classifi-cation
( IS )
30%
Plastic Limit, Wp
BH - 10
Bore Hole
No.
10%
Job No.
Symbol
Liquid Limit, Wl
PARTICLE SIZE ( mm )
mm
mm
mm
Coeff. Of
Coeff. of
Curvature
Uniformity,
Cc
Cu = D60 /
D302/(D60*D
D10
10)
80
90
Project :
100
Location : ------------
Particle
Size(mm)
CONSOLIDATION TEST
IS - 2720 , P-15
Project:
Location:
-----------
Date:
BH-10
Depth in M.:
6.00 - 6.50
UDS-01
Type of Samples:
Properties of Soil
Start
End
Dry density d
1.21
1.51
Moisture Content, w
43.91
28.44
1.19
0.75
Specific Gravity,G
2.65
2.65
Degree of Saturation, Sr
97.85
100.00
0.44
0.48
gm/cm
%
kg/cm2
60 mm
Height of specimen:
20 mm
Coefficient Coefficient of
of
volume
Permeability (K)
consolidatio compressibilty
n Cv
mv
0.10 - 0.25
m2/year
4.51
cm2/kg
2.00E-01
cm/sec
2.86E-04
0.25 - 0.50
2.67
1.26E-01
1.07E-04
0.50 - 1.00
1.69
9.90E-02
5.30E-05
1.00 - 2.00
0.98
6.60E-02
2.05E-05
2.00 - 4.00
0.70
3.60E-02
8.00E-06
kg/cm2
0.1 1.1892164
Voids Ratio, e Vs Pressure Increment (Kg/cm2)
0.25 1.1235399
0.5 1.0567688
1
0.955
2
0.826
4
0.6944535
Pc
2 0.7032104
1 0.7163457
0.5 0.7305756
0.25 0.7437109
0.1 0.7535624
0
0
0
0
0
0
0
0
0
0
0
0
1.23
1.18
1.13
1.08
1.03
Voids Ratio, e
Pressure
Increment
31.08.2012
Dia.of Specimen:
0.98
0.93
0.88
0.83
0.78
0.73
0.68
0.10
1.00
10.00
Job No.:
Checked By:
3228
Geotechnical Investigation Work for the Proposed Installation of Mechanical Handling Facilities
at East Quay-7 (EQ-7) Berth in the inner harbour of Visakhapatnam Port Trust.
--------
Location:
Rate of Strain :
Diameter of Specimen:
Height of Specimen:
Dry Density,d :
Moisture Content:
1.25
38.00
76.00
1.21
43.91
Date: 09.07.2012
Bore Hole No.:
10
Depth (m) 6.00 - 6.50
Condition of Test :
TUU
State of Sample: UDS 01
mm/min
mm
mm
g/cm3
%
Cell
Pressure 3
Deviatoric
Force at
Failure
Deviatoric
Stress at
Failure,d
Normal Stress
at Failure,1
Change in
Length at
Failure,L
Strain at
Failure,
kg/cm2
kg
kg/cm2
cm
cm2
0.50
8.13
0.646
1.146
7.60
10.00
1.00
9.37
0.727
1.727
9.12
12.00
1.50
10.60
0.813
2.313
9.88
13.00
Serial No.
2.5
2.0
1.5
1.0
0.5
0.0
0.0
Cohesion:
0.26
0.5
kg/cm2
1.0
1.5
Normal Stress, kg/sq.cm
2.0
2.5
4.8
JOB No.
Checked By:
3228
Ravi A
Geotechnical Investigation Work for the Proposed Installation of Mechanical Handling Facilities at East Quay-7 (EQ-7) Berth in the inner harbour of Visakhapatnam Port Trust.
Location :
------------
DATE:
Sample Type
Wet Density
Dry Density
Gravel %
Sand %
Silt %
Clay %
Liquid %
Plastic %
Plasticity Index, Ip %
Shrinkage Limit%
Type
Cohesion Cu kg/cm
Degree
BH - 11
3.00 - 3.60
SPT 2
-----
-----
-----
CH
18
32
50
69
30
39
-----
-----
-----
-----
-----
-----
-----
-----
-----
-----
BH - 11
4.50 - 5.00
UDS 1
1.66
1.08
54.17
CH
12
30
58
72
29
43
-----
TUU
0.14
3.43
-----
44
-----
-----
-----
2.63
BH - 11
9.00 - 9.60
SPT 5
-----
-----
-----
SM
23
50
-----
-----
-----
-----
-----
-----
-----
-----
-----
-----
-----
-----
-----
CHEM
: Chemical Analysis
27
Vertical
Consolidation
Tuu
Tcu
Cu :
Undrained Cohesion
'
: Direct Shear
Tcd
: Permeability Test
NP
: Non Plastic
VL
Cu'
FSI
SL
UC
-----> :
UDS :
DS
Remarks
Shear Test
Specific Gravity
Consistency Limits
Mechanical Analysis
Test Kg/cm
Density
gm/ cm
Depth in m.
18.08.2012
FLB 04
:
:
Effective Cohesion
Job. No. :
3228
80.0
GRAVEL
SAND
M
C
4.75
20.0
CLAY
75x10 -3
0.425
2.00
SILT
2x10-3
70
60
50
40
30
20
10
0
10
0.1
0.01
0.001
0.0001
Plasticity Index, Ip
Remarks
CH
18
32
50
-----
-----
-----
-----
-----
69
30
39
SPT 2
BH - 11
4.50 - 5.00
CH
12
30
58
-----
-----
-----
-----
-----
72
29
43
UDS 1
BH - 11
9.00 - 9.60
SM
23
50
-----
-----
-----
-----
-----
-----
-----
-----
SPT 5
3228
CC
FF
Gravel
Sand
Silt
Clay
60%
3.00 - 3.60
Depth in m.
Classifi-cation
( IS )
30%
Plastic Limit, Wp
BH - 11
Bore Hole
No.
10%
Job No.
Symbol
Liquid Limit, Wl
PARTICLE SIZE ( mm )
mm
mm
mm
27
Coeff. Of
Coeff. of
Curvature
Uniformity,
Cc
Cu = D60 /
D302/(D60*D
D10
10)
80
Geotechnical Investigation Work for the Proposed Installation of Mechanical Handling Facilities at East Quay7 (EQ-7) Berth in the inner harbour of Visakhapatnam Port Trust.
90
Project :
100
Location : ------------
Particle
Size(mm)
Geotechnical Investigation Work for the Proposed Installation of Mechanical Handling Facilities
at East Quay-7 (EQ-7) Berth in the inner harbour of Visakhapatnam Port Trust.
--------
Location:
Rate of Strain :
Diameter of Specimen:
Height of Specimen:
Dry Density,d :
Moisture Content:
1.25
38.00
76.00
1.08
54.17
Date: 18.08.2012
Bore Hole No.: BH - 11
Depth (m) 4.50 - 5.00
Condition of Test :
TUU
State of Sample: UDS 01
mm/min
mm
mm
g/cm3
%
Cell
Pressure 3
Deviatoric
Force at
Failure
Deviatoric
Stress at
Failure,d
Normal Stress
at Failure,1
Change in
Length at
Failure,L
Strain at
Failure,
kg/cm2
kg
kg/cm2
cm
cm2
0.50
4.53
0.363
0.863
6.84
9.00
1.00
5.41
0.429
1.429
7.60
10.00
1.50
6.28
0.493
1.993
8.36
11.00
Serial No.
2.5
2.0
1.5
1.0
0.5
0.0
0.0
Cohesion:
0.14
0.5
kg/cm2
1.0
1.5
Normal Stress, kg/sq.cm
2.0
2.5
3.43
JOB No.
Checked By:
3228
Ravi A
Location :
------------
Sample Type
Wet Density
Dry Density
Gravel %
Sand %
Silt %
Clay %
Liquid %
Plastic %
Plasticity Index, Ip %
Shrinkage Limit%
Type
Cohesion Cu kg/cm
Degree
BH - 12
3.00 - 3.60
SPT 2
-----
-----
-----
CH
29
62
93
38
55
-----
-----
-----
-----
-----
70
-----
-----
-----
-----
BH - 12
4.50 - 5.00
UDS 1
1.52
0.86
77.35
CH
30
65
116
43
73
-----
TUU
0.11
4.11
-----
-----
-----
-----
-----
-----
BH - 12
7.50 - 8.10
SPT 4
-----
-----
-----
CH
30
66
75
33
42
-----
-----
-----
-----
-----
-----
-----
-----
-----
2.60
BH - 12
9.00 - 9.50
UDS 2
1.47
0.77
90.026
CH
14
25
61
101
41
60
-----
-----
-----
-----
-----
-----
-----
1.02
2.40
2.63
CHEM
: Chemical Analysis
Vertical
Consolidation
Tuu
Tcu
Cu :
Undrained Cohesion
'
: Direct Shear
Tcd
: Permeability Test
NP
: Non Plastic
VL
Cu'
FSI
SL
UC
-----> :
UDS :
DS
Specific Gravity
Shear Test
Consistency Limits
Test Kg/cm
Mechanical Analysis
gm/ cm
Depth in m.
05.07.2012
Density
(Remoulded)
DATE:
Cu from Unconfined Compression
FLB 04
Remarks
Project :
:
:
Effective Cohesion
Job. No. :
3228
80.0
GRAVEL
SAND
M
C
4.75
20.0
CLAY
75x10 -3
0.425
2.00
SILT
2x10-3
70
60
50
40
30
20
10
0
10
0.1
0.01
0.001
0.0001
Remarks
CH
29
62
-----
-----
-----
-----
-----
93
38
55
SPT 2
BH - 12
4.50 - 5.00
CH
30
65
-----
-----
-----
-----
-----
116
43
73
UDS 1
BH - 12
7.50 - 8.10
CH
30
66
-----
-----
-----
-----
-----
75
33
42
SPT 4
BH - 12
9.00 - 9.50
CH
14
25
61
-----
-----
-----
-----
-----
101
41
60
UDS 2
CC
FF
Gravel
Sand
Silt
Clay
60%
3.00 - 3.60
Depth in m.
Classifi-cation
( IS )
30%
Plasticity Index, Ip
3228
Plastic Limit, Wp
BH - 12
Bore Hole
No.
10%
Job No.
Symbol
Liquid Limit, Wl
PARTICLE SIZE ( mm )
mm
mm
mm
Coeff. Of
Coeff. of
Curvature
Uniformity,
Cc
Cu = D60 /
D302/(D60*D
D10
10)
80
90
Project :
100
Location : ------------
Particle
Size(mm)
CONSOLIDATION TEST
IS - 2720 , P-15
Project:
Location:
-----------
Date:
BH- -12
Depth in M.:
4.50 - 5.00
UDS-01
Type of Samples:
Properties of Soil
Start
End
Dry density d
0.86
1.13
Moisture Content, w
77.35
50.40
2.06
1.32
Specific Gravity,G
2.61
2.61
Degree of Saturation, Sr
98.14
100.00
0.71
0.41
gm/cm
%
kg/cm2
60 mm
Height of specimen:
20 mm
Coefficient Coefficient of
of
volume
Permeability (K)
consolidatio compressibilty
n Cv
mv
0.10 - 0.25
m2/year
3.18
cm2/kg
1.82E-01
cm/sec
1.84E-04
0.25 - 0.50
2.10
1.73E-01
1.15E-04
0.50 - 1.00
1.32
1.37E-01
5.72E-05
1.00 - 2.00
0.91
7.92E-02
2.28E-05
2.00 - 4.00
0.55
4.39E-02
7.62E-06
kg/cm2
0.1
2.057
Voids Ratio, e Vs Pressure Increment (Kg/cm2)
0.25 1.9735687
0.5
1.845
1
1.65
2
1.44
Pc
4 1.2256065
2 1.2347466
1 1.2575967
0.5 1.2789236
0.25 1.2987271
0.1 1.3154838
0
0
0
0
0
0
0
0
0
0
0
0
2.10
2.05
2.00
1.95
1.90
1.85
1.80
1.75
Voids Ratio, e
Pressure
Increment
07.09.2012
Dia.of Specimen:
1.70
1.65
1.60
1.55
1.50
1.45
1.40
1.35
1.30
1.25
1.20
0.10
1.00
10.00
Job No.:
3228
Checked By: PRAJEET N.
CONSOLIDATION TEST
IS - 2720 , P-15
Project:
Location:
-----------
Date:
BH - 12
Depth in M.:
9.00 - 9.50
UDS - 02
Type of Samples:
Properties of Soil
Start
End
Dry density d
0.77
1.04
Moisture Content, w
90.03
57.90
2.40
1.52
Specific Gravity,G
2.63
2.63
Degree of Saturation, Sr
98.66
100.00
1.02
0.65
Voids Ratio, e
Pressure
Increment
gm/cm
%
kg/cm2
04.09.2012
Dia.of Specimen:
60 mm
Height of specimen:
20 mm
Coefficient Coefficient of
of
volume
Permeability (K)
consolidatio compressibilty
n Cv
mv
0.10 - 0.25
m2/year
3.12
cm2/kg
1.82E-01
cm/sec
1.80E-04
0.25 - 0.50
2.11
1.73E-01
1.16E-04
0.50 - 1.00
1.20
9.99E-02
3.79E-05
1.00 - 2.00
0.63
9.12E-02
1.83E-05
2.00 - 4.00
0.48
5.64E-02
8.62E-06
kg/cm2
0.1 2.3998565
Voids Ratio, e Vs Pressure Increment (Kg/cm2)
0.25
2.307
0.5
2.164
1
2.006
2
1.732
4 Pc
1.4240977
2 1.439397
1 1.4648959
0.5 1.4835951
0.25 1.5090941
0.1 1.5226935
0
0
0
0
0
0
0
0
0
0
0
0
2.50
2.45
2.40
2.35
2.30
2.25
2.20
2.15
2.10
2.05
2.00
1.95
1.90
1.85
1.80
1.75
1.70
1.65
1.60
1.55
1.50
1.45
1.40
1.35
1.30
1.25
1.20
0.10
1.00
10.00
Job No.:
Checked By:
3228
Geotechnical Investigation Work for the Proposed Installation of Mechanical Handling Facilities
at East Quay-7 (EQ-7) Berth in the inner harbour of Visakhapatnam Port Trust.
--------
Location:
Rate of Strain :
Diameter of Specimen:
Height of Specimen:
Dry Density,d :
Moisture Content:
1.25
38.00
76.00
0.86
77.35
Date: 09.07.2012
Bore Hole No.:
12
Depth (m) 4.50 - 5.00
Condition of Test :
TUU
State of Sample: UDS 01
mm/min
mm
mm
g/cm3
%
Cell
Pressure 3
Deviatoric
Force at
Failure
Deviatoric
Stress at
Failure,d
Normal Stress
at Failure,1
Change in
Length at
Failure,L
Strain at
Failure,
kg/cm2
kg
kg/cm2
cm
cm2
0.50
4.13
0.339
0.839
5.32
7.00
1.00
5.17
0.419
1.419
6.08
8.00
1.50
6.12
0.491
1.991
6.84
9.00
Serial No.
2.5
2.0
1.5
1.0
0.5
0.0
0.0
Cohesion:
0.11
0.5
kg/cm2
1.0
1.5
Normal Stress, kg/sq.cm
2.0
2.5
4.11
JOB No.
Checked By:
3228
Ravi A
Geotechnical Investigation Work for the Proposed Installation of Mechanical Handling Facilities at East Quay-7 (EQ-7) Berth in the inner harbour of Visakhapatnam Port Trust.
Location :
------------
DATE:
Sample Type
Wet Density
Dry Density
Gravel %
Sand %
Silt %
Clay %
Liquid %
Plastic %
Plasticity Index, Ip %
Shrinkage Limit%
Type
Cohesion Cu kg/cm
Degree
BH - 14
3.00 - 3.60
SPT 2
-----
-----
-----
CH
36
25
36
65
24
41
-----
-----
-----
-----
-----
-----
-----
-----
-----
-----
BH - 14
6.00 - 6.50
UDS 1
1.58
1.00
57.45
CH
30
29
40
63
26
37
-----
TUU
0.13
3.89
-----
46
-----
-----
-----
2.63
BH - 14
9.00 - 9.60
SPT 5
-----
-----
-----
CH
22
31
46
66
27
39
-----
-----
-----
-----
-----
-----
-----
-----
-----
-----
CHEM
: Chemical Analysis
Vertical
Consolidation
Tuu
Tcu
Cu :
Undrained Cohesion
'
: Direct Shear
Tcd
: Permeability Test
NP
: Non Plastic
VL
Cu'
FSI
SL
UC
-----> :
UDS :
DS
Remarks
Shear Test
Specific Gravity
Consistency Limits
Mechanical Analysis
Test Kg/cm
Density
gm/ cm
Depth in m.
18.08.2012
FLB 04
:
:
Effective Cohesion
Job. No. :
3228
80.0
GRAVEL
SAND
M
C
4.75
20.0
CLAY
75x10 -3
0.425
2.00
SILT
2x10-3
70
60
50
40
30
20
10
0
10
0.1
0.01
0.001
0.0001
Plasticity Index, Ip
Remarks
CH
36
25
36
-----
-----
-----
-----
-----
65
24
41
SPT 2
BH - 14
6.00 - 6.50
CH
30
29
40
-----
-----
-----
-----
-----
63
26
37
UDS 1
BH - 14
9.00 - 9.60
CH
22
31
46
-----
-----
-----
-----
-----
66
27
39
SPT 5
3228
CC
FF
Gravel
Sand
Silt
Clay
60%
3.00 - 3.60
Depth in m.
Classifi-cation
( IS )
30%
Plastic Limit, Wp
BH - 14
Bore Hole
No.
10%
Job No.
Symbol
Liquid Limit, Wl
PARTICLE SIZE ( mm )
mm
mm
mm
Coeff. Of
Coeff. of
Curvature
Uniformity,
Cc
Cu = D60 /
D302/(D60*D
D10
10)
80
Geotechnical Investigation Work for the Proposed Installation of Mechanical Handling Facilities at East Quay7 (EQ-7) Berth in the inner harbour of Visakhapatnam Port Trust.
90
Project :
100
Location : ------------
Particle
Size(mm)
CONSOLIDATION TEST
IS - 2720 , P-15
Project:
Location:
-----------
Date:
BH - 14
Depth in M.:
6.00 - 6.50
UDS-01
Type of Samples:
Properties of Soil
Start
End
Dry density d
1.00
1.14
Moisture Content, w
57.45
49.92
1.62
1.31
Specific Gravity,G
2.63
2.63
Degree of Saturation, Sr
93.22
100.00
0.51
0.85
gm/cm
%
kg/cm2
60 mm
Height of specimen:
20 mm
Coefficient Coefficient of
of
volume
Permeability (K)
consolidatio compressibilty
n Cv
mv
0.10 - 0.25
m2/year
3.59
cm2/kg
8.61E-02
cm/sec
9.81E-05
0.25 - 0.50
2.31
6.72E-02
4.93E-05
0.50 - 1.00
1.63
6.17E-02
3.19E-05
1.00 - 2.00
1.19
4.06E-02
1.53E-05
2.00 - 4.00
0.77
3.23E-02
7.91E-06
kg/cm2
0.1 1.6208449
Voids Ratio, e Vs Pressure Increment (Kg/cm2)
0.25
1.587
0.5
1.54353
1
1.465
2
1.365
4 1.2119931
2 1.2250974
Pc
1 1.2434433
0.5 1.2617892
0.25 1.2866872
0.1 1.3128957
0
0
0
0
0
0
0
0
0
0
0
0
1.70
1.65
1.60
1.55
Voids Ratio, e
Pressure
Increment
07.09.2012
Dia.of Specimen:
1.50
1.45
1.40
1.35
1.30
1.25
1.20
0.10
1.00
10.00
Job No.:
3228
Checked By: PRAJEET N.
Geotechnical Investigation Work for the Proposed Installation of Mechanical Handling Facilities
at East Quay-7 (EQ-7) Berth in the inner harbour of Visakhapatnam Port Trust.
--------
Location:
Rate of Strain :
Diameter of Specimen:
Height of Specimen:
Dry Density,d :
Moisture Content:
1.25
38.00
76.00
1.00
57.45
Date: 18.08.2012
Bore Hole No.:
14
Depth (m) 6.00 - 6.50
Condition of Test :
TUU
State of Sample: UDS 01
mm/min
mm
mm
g/cm3
%
Cell
Pressure 3
Deviatoric
Force at
Failure
Deviatoric
Stress at
Failure,d
Normal Stress
at Failure,1
Change in
Length at
Failure,L
kg/cm2
kg
kg/cm2
cm
cm2
0.50
4.77
0.366
0.866
9.88
13.00
1.00
5.64
0.428
1.428
10.64
14.00
1.50
6.44
0.483
1.983
11.40
15.00
Serial No.
Strain at
Failure,
2.5
2.0
1.5
1.0
0.5
0.0
Cohesion:
0.13
kg/cm2
3.89
JOB No.
Checked By:
3228
Ravi A
Geotechnical Investigation Work for the Proposed Installation of Mechanical Handling Facilities at East Quay-7 (EQ-7) Berth in the inner harbour of Visakhapatnam Port Trust.
Location :
------------
DATE:
Sample Type
Wet Density
Dry Density
Gravel %
Sand %
Silt %
Clay %
Liquid %
Plastic %
Plasticity Index, Ip %
Shrinkage Limit%
Type
Cohesion Cu kg/cm
Degree
BH - 15
3.00 - 3.60
SPT 2
-----
-----
-----
CH
22
30
45
68
29
39
-----
-----
-----
-----
-----
-----
-----
-----
-----
-----
BH - 15
4.50 - 5.00
UDS 1
1.55
0.93
66.78
CH
39
54
74
32
42
-----
TUU
0.11
3.66
-----
42
-----
-----
-----
2.63
BH - 15
10.50 - 11.10
SPT 6
-----
-----
-----
CH
14
29
48
70
30
40
-----
-----
-----
-----
-----
-----
-----
-----
-----
-----
CHEM
: Chemical Analysis
Vertical
Consolidation
Tuu
Tcu
Cu :
Undrained Cohesion
'
: Direct Shear
Tcd
: Permeability Test
NP
: Non Plastic
VL
Cu'
FSI
SL
UC
-----> :
UDS :
DS
Remarks
Shear Test
Specific Gravity
Consistency Limits
Mechanical Analysis
Test Kg/cm
Density
gm/ cm
Depth in m.
18.08.2012
FLB 04
:
:
Effective Cohesion
Job. No. :
3228
80.0
GRAVEL
SAND
M
C
4.75
20.0
CLAY
75x10 -3
0.425
2.00
SILT
2x10-3
70
60
50
40
30
20
10
0
10
0.1
0.01
0.001
0.0001
Plasticity Index, Ip
Remarks
CH
22
30
45
-----
-----
-----
-----
-----
68
29
39
SPT 2
BH - 15
4.50 - 5.00
CH
39
54
-----
-----
-----
-----
-----
74
32
42
UDS 1
CH
14
29
48
-----
-----
-----
-----
-----
70
30
40
SPT 6
BH - 15 10.50 - 11.10
3228
CC
FF
Gravel
Sand
Silt
Clay
60%
3.00 - 3.60
Depth in m.
Classifi-cation
( IS )
30%
Plastic Limit, Wp
BH - 15
Bore Hole
No.
10%
Job No.
Symbol
Liquid Limit, Wl
PARTICLE SIZE ( mm )
mm
mm
mm
Coeff. Of
Coeff. of
Curvature
Uniformity,
Cc
Cu = D60 /
D302/(D60*D
D10
10)
80
Geotechnical Investigation Work for the Proposed Installation of Mechanical Handling Facilities at East Quay7 (EQ-7) Berth in the inner harbour of Visakhapatnam Port Trust.
90
Project :
100
Location : ------------
Particle
Size(mm)
CONSOLIDATION TEST
IS - 2720 , P-15
Project:
Location:
-----------
Date:
BH - 18
Depth in M.:
9.00 - 9.50
UDS - 02
Type of Samples:
Properties of Soil
Start
End
Dry density d
0.90
1.12
Moisture Content, w
71.96
50.81
1.91
1.33
Specific Gravity,G
2.62
2.62
Degree of Saturation, Sr
98.88
100.00
0.64
0.51
gm/cm
%
kg/cm2
60 mm
Height of specimen:
20 mm
Coefficient Coefficient of
of
volume
Permeability (K)
consolidatio compressibilty
n Cv
mv
0.10 - 0.25
m2/year
3.99
cm2/kg
1.70E-01
cm/sec
2.15E-04
0.25 - 0.50
2.23
1.17E-01
8.26E-05
0.50 - 1.00
1.51
9.82E-02
4.70E-05
1.00 - 2.00
0.95
7.42E-02
2.23E-05
2.00 - 4.00
0.74
3.99E-02
9.35E-06
kg/cm2
0.1 1.9066787
Voids Ratio, e Vs Pressure Increment (Kg/cm2)
0.25 1.8325584
0.5
1.75
1
1.615
2
1.421
4 1.2279692
2 1.243956
Pc
1 1.2701161
0.5 1.2919162
0.25 1.3122629
0.1 1.3311563
0
0
0
0
0
0
0
0
0
0
0
0
2.00
1.95
1.90
1.85
1.80
1.75
1.70
Voids Ratio, e
Pressure
Increment
06.09.2012
Dia.of Specimen:
1.65
1.60
1.55
1.50
1.45
1.40
1.35
1.30
1.25
1.20
0.10
1.00
10.00
Job No.:
3228
Checked By: PRAJEET N.
Geotechnical Investigation Work for the Proposed Installation of Mechanical Handling Facilities
at East Quay-7 (EQ-7) Berth in the inner harbour of Visakhapatnam Port Trust.
--------
Location:
Rate of Strain :
Diameter of Specimen:
Height of Specimen:
Dry Density,d :
Moisture Content:
1.25
38.00
76.00
0.93
66.78
Date: 18.08.2012
Bore Hole No.:
15
Depth (m) 4.50 - 5.00
Condition of Test :
TUU
State of Sample: UDS 01
mm/min
mm
mm
g/cm3
%
Cell
Pressure 3
Deviatoric
Force at
Failure
Deviatoric
Stress at
Failure,d
Normal Stress
at Failure,1
Change in
Length at
Failure,L
kg/cm2
kg
kg/cm2
cm
cm2
0.50
3.66
0.290
0.790
7.60
10.00
1.00
4.53
0.355
1.355
8.36
11.00
1.50
5.41
0.420
1.920
9.12
12.00
Serial No.
Strain at
Failure,
2.5
2.0
1.5
1.0
0.5
0.0
Cohesion:
0.11
kg/cm2
3.66
JOB No.
Checked By:
3228
Ravi A
Geotechnical Investigation Work for the Proposed Installation of Mechanical Handling Facilities at East Quay-7 (EQ-7) Berth in the inner harbour of Visakhapatnam Port Trust.
Location :
------------
DATE:
Sample Type
Wet Density
Dry Density
Gravel %
Sand %
Silt %
Clay %
Liquid %
Plastic %
Plasticity Index, Ip %
Shrinkage Limit%
Type
Cohesion Cu kg/cm
Degree
BH - 18
3.00 - 3.60
SPT 2
-----
-----
-----
CH
24
21
55
64
28
36
-----
-----
-----
-----
-----
-----
-----
-----
-----
-----
BH - 18
4.50 - 5.00
UDS 1
1.51
0.84
80.376
CH
21
25
54
110
40
70
-----
TUU
0.09
3.71
-----
40
-----
-----
-----
2.63
BH - 18
9.00 - 9.50
UDS 2
1.5504
0.90
71.96
CH
28
67
116
43
73
-----
TUU
0.10
4.57
-----
-----
-----
-----
-----
-----
BH - 18
13.50 - 14.10
SPT 7
-----
-----
-----
SC
55
20
24
44
21
23
-----
-----
-----
-----
-----
-----
-----
-----
-----
-----
CHEM
: Chemical Analysis
Vertical
Consolidation
Tuu
Tcu
Cu :
Undrained Cohesion
'
: Direct Shear
Tcd
: Permeability Test
NP
: Non Plastic
VL
Cu'
FSI
SL
UC
-----> :
UDS :
DS
Remarks
Shear Test
Specific Gravity
Consistency Limits
Mechanical Analysis
Test Kg/cm
Density
gm/ cm
Depth in m.
05.07.2012
FLB 04
:
:
Effective Cohesion
Job. No. :
3228
80.0
GRAVEL
SAND
M
C
4.75
20.0
CLAY
75x10 -3
0.425
2.00
SILT
2x10-3
70
60
50
40
30
20
10
0
10
0.1
0.01
0.001
0.0001
Remarks
CH
24
21
55
-----
-----
-----
-----
-----
64
28
36
SPT 2
BH - 18
4.50 - 5.00
CH
21
25
54
-----
-----
-----
-----
-----
110
40
70
UDS 1
BH - 18
9.00 - 9.50
CH
28
67
-----
-----
-----
-----
-----
116
43
73
UDS 2
SC
55
20
24
-----
-----
-----
-----
-----
44
21
23
SPT 7
BH - 18 13.50 - 14.10
CC
FF
Gravel
Sand
Silt
Clay
60%
3.00 - 3.60
Depth in m.
Classifi-cation
( IS )
30%
Plasticity Index, Ip
3228
Plastic Limit, Wp
BH - 18
Bore Hole
No.
10%
Job No.
Symbol
Liquid Limit, Wl
PARTICLE SIZE ( mm )
mm
mm
mm
Coeff. Of
Coeff. of
Curvature
Uniformity,
Cc
Cu = D60 /
D302/(D60*D
D10
10)
80
Geotechnical Investigation Work for the Proposed Installation of Mechanical Handling Facilities at East Quay7 (EQ-7) Berth in the inner harbour of Visakhapatnam Port Trust.
90
Project :
100
Location : ------------
Particle
Size(mm)
Geotechnical Investigation Work for the Proposed Installation of Mechanical Handling Facilities
at East Quay-7 (EQ-7) Berth in the inner harbour of Visakhapatnam Port Trust.
--------
Location:
Rate of Strain :
Diameter of Specimen:
Height of Specimen:
Dry Density,d :
Moisture Content:
1.25
38.00
76.00
0.90
71.96
Date: 09.07.2012
Bore Hole No.:
18
Depth (m) 9.00 - 9.50
Condition of Test :
TUU
State of Sample: UDS 01
mm/min
mm
mm
g/cm3
%
Cell
Pressure 3
Deviatoric
Force at
Failure
Deviatoric
Stress at
Failure,d
Normal Stress
at Failure,1
Change in
Length at
Failure,L
kg/cm2
kg
kg/cm2
cm
cm2
0.50
3.98
0.315
0.815
7.60
10.00
1.00
4.93
0.387
1.387
8.36
11.00
1.50
6.28
0.487
1.987
9.12
12.00
Serial No.
Strain at
Failure,
2.5
2.0
1.5
1.0
0.5
0.0
Cohesion:
0.1
kg/cm2
4.57
JOB No.
Checked By:
3228
Ravi A
Location :
------------
DATE:
Sample Type
Wet Density
Dry Density
Gravel %
Sand %
Silt %
Clay %
Liquid %
Plastic %
Plasticity Index, Ip %
Shrinkage Limit%
Type
Cohesion Cu kg/cm
Degree
BH - 19
3.00 - 3.60
SPT 2
-----
-----
-----
CH
12
30
57
61
27
34
-----
-----
-----
-----
-----
-----
-----
-----
-----
-----
BH - 19
4.50 - 5.00
UDS 1
1.68
1.11
50.92
CH
19
29
51
84
35
49
-----
TUU
0.22
4.34
-----
55
-----
-----
-----
-----
BH - 19
9.00 - 9.60
SPT 5
-----
-----
-----
CH
12
32
56
63
22
41
-----
-----
-----
-----
-----
-----
-----
-----
-----
2.63
CHEM
: Chemical Analysis
Shear Test
Vertical
Consolidation
Tuu
Tcu
Cu :
Undrained Cohesion
'
: Direct Shear
Tcd
: Permeability Test
NP
: Non Plastic
VL
Cu'
FSI
SL
UC
-----> :
UDS :
DS
Specific Gravity
Consistency Limits
Mechanical Analysis
Test Kg/cm
Density
gm/ cm
Depth in m.
05.07.2012
FLB 04
Remarks
Project :
:
:
Effective Cohesion
Job. No. :
3228
80.0
GRAVEL
SAND
M
C
4.75
20.0
CLAY
75x10 -3
0.425
2.00
SILT
2x10-3
70
60
50
40
30
20
10
0
10
0.1
0.01
0.001
0.0001
Plasticity Index, Ip
Remarks
CH
12
30
57
-----
-----
-----
-----
-----
61
27
34
SPT 2
BH - 19
4.50 - 5.00
CH
19
29
51
-----
-----
-----
-----
-----
84
35
49
UDS 1
BH - 19
9.00 - 9.60
CH
12
32
56
-----
-----
-----
-----
-----
63
22
41
SPT 5
3228
CC
FF
Gravel
Sand
Silt
Clay
60%
3.00 - 3.60
Depth in m.
Classifi-cation
( IS )
30%
Plastic Limit, Wp
BH - 19
Bore Hole
No.
10%
Job No.
Symbol
Liquid Limit, Wl
PARTICLE SIZE ( mm )
mm
mm
mm
Coeff. Of
Coeff. of
Curvature
Uniformity,
Cc
Cu = D60 /
D302/(D60*D
D10
10)
80
90
Project :
100
Location : ------------
Particle
Size(mm)
CONSOLIDATION TEST
IS - 2720 , P-15
Project:
Location:
-----------
Date:
BH - 19
Depth in M.:
4.50 - 5.00
UDS-01
Type of Samples:
Properties of Soil
Start
End
Dry density d
1.11
1.53
Moisture Content, w
50.92
27.31
1.38
0.72
Specific Gravity,G
2.64
2.64
Degree of Saturation, Sr
97.52
100.00
0.65
0.41
gm/cm
%
kg/cm2
60 mm
Height of specimen:
20 mm
Coefficient Coefficient of
of
volume
Permeability (K)
consolidatio compressibilty
n Cv
mv
0.10 - 0.25
m2/year
3.51
cm2/kg
2.48E-01
cm/sec
2.76E-04
0.25 - 0.50
2.43
2.11E-01
1.63E-04
0.50 - 1.00
1.42
1.60E-01
7.20E-05
1.00 - 2.00
0.85
9.82E-02
2.65E-05
2.00 - 4.00
0.56
5.47E-02
9.69E-06
kg/cm2
0.1 1.3785374
Voids Ratio, e Vs Pressure Increment (Kg/cm2)
0.25
1.29
0.5
1.169
1
0.996
2
0.8
4
0.6031342
Pc
2 0.6281089
1 0.6625976
0.5 0.6840045
0.25 0.704222
0.1 0.7208718
0
0
0
0
0
0
0
0
0
0
0
0
1.45
1.40
1.35
1.30
1.25
1.20
1.15
1.10
Voids Ratio, e
Pressure
Increment
07.09.2012
Dia.of Specimen:
1.05
1.00
0.95
0.90
0.85
0.80
0.75
0.70
0.65
0.60
0.55
0.50
0.10
1.00
10.00
Job No.:
3228
Checked By: PRAJEET N.
Geotechnical Investigation Work for the Proposed Installation of Mechanical Handling Facilities
at East Quay-7 (EQ-7) Berth in the inner harbour of Visakhapatnam Port Trust.
--------
Location:
Rate of Strain :
Diameter of Specimen:
Height of Specimen:
Dry Density,d :
Moisture Content:
1.25
38.00
76.00
1.11
50.92
Date: 09.07.2012
Bore Hole No.:
19
Depth (m) 4.50 - 5.00
Condition of Test :
TUU
State of Sample: UDS 01
mm/min
mm
mm
g/cm3
%
Cell
Pressure 3
Deviatoric
Force at
Failure
Deviatoric
Stress at
Failure,d
Normal Stress
at Failure,1
Change in
Length at
Failure,L
kg/cm2
kg
kg/cm2
cm
cm2
0.50
7.71
0.598
1.098
9.12
12.00
1.00
8.59
0.659
1.659
9.88
13.00
1.50
9.62
0.729
2.229
10.64
14.00
Serial No.
Strain at
Failure,
2.5
2.0
1.5
1.0
0.5
0.0
Cohesion:
0.22
kg/cm2
4.34
JOB No.
Checked By:
3228
Ravi A
Geotechnical Investigation Work for the Proposed Installation of Mechanical Handling Facilities at East Quay-7 (EQ-7) Berth in the inner harbour of Visakhapatnam Port Trust.
Location :
------------
DATE:
Sample Type
Wet Density
Dry Density
Gravel %
Sand %
Silt %
Clay %
Liquid %
Plastic %
Plasticity Index, Ip %
Shrinkage Limit%
Type
Cohesion Cu kg/cm
Degree
BH - 20
3.00 - 3.60
SPT 2
-----
-----
-----
CH
15
35
50
73
33
40
-----
-----
-----
-----
-----
-----
-----
-----
-----
-----
BH - 20
4.50 - 5.00
UDS 1
1.63
1.02
60.24
CH
40
56
76
35
41
-----
TUU
0.14
5.93
-----
48
-----
-----
-----
2.65
BH - 20
9.00 - 9.60
SPT 5
-----
-----
-----
CH
12
35
53
74
32
42
-----
-----
-----
-----
-----
-----
-----
-----
-----
-----
CHEM
: Chemical Analysis
Vertical
Consolidation
Tuu
Tcu
Cu :
Undrained Cohesion
'
: Direct Shear
Tcd
: Permeability Test
NP
: Non Plastic
VL
Cu'
FSI
SL
UC
-----> :
UDS :
DS
Remarks
Shear Test
Specific Gravity
Consistency Limits
Mechanical Analysis
Test Kg/cm
Density
gm/ cm
Depth in m.
18.08.2012
FLB 04
:
:
Effective Cohesion
Job. No. :
3228
80.0
GRAVEL
SAND
M
C
4.75
20.0
CLAY
75x10 -3
0.425
2.00
SILT
2x10-3
70
60
50
40
30
20
10
0
10
0.1
0.01
0.001
0.0001
Plasticity Index, Ip
Remarks
CH
15
35
50
-----
-----
-----
-----
-----
73
33
40
SPT 2
BH - 20
4.50 - 5.00
CH
40
56
-----
-----
-----
-----
-----
76
35
41
UDS 1
BH - 20
9.00 - 9.60
CH
12
35
53
-----
-----
-----
-----
-----
74
32
42
SPT 5
3228
CC
FF
Gravel
Sand
Silt
Clay
60%
3.00 - 3.60
Depth in m.
Classifi-cation
( IS )
30%
Plastic Limit, Wp
BH - 20
Bore Hole
No.
10%
Job No.
Symbol
Liquid Limit, Wl
PARTICLE SIZE ( mm )
mm
mm
mm
Coeff. Of
Coeff. of
Curvature
Uniformity,
Cc
Cu = D60 /
D302/(D60*D
D10
10)
80
Geotechnical Investigation Work for the Proposed Installation of Mechanical Handling Facilities at East Quay7 (EQ-7) Berth in the inner harbour of Visakhapatnam Port Trust.
90
Project :
100
Location : ------------
Particle
Size(mm)
Geotechnical Investigation Work for the Proposed Installation of Mechanical Handling Facilities
at East Quay-7 (EQ-7) Berth in the inner harbour of Visakhapatnam Port Trust.
--------
Location:
Rate of Strain :
Diameter of Specimen:
Height of Specimen:
Dry Density,d :
Moisture Content:
1.25
38.00
76.00
1.02
60.24
Date: 18.08.2012
Bore Hole No.: BH - 20
Depth (m) 4.50 - 5.00
Condition of Test :
TUU
State of Sample: UDS 01
mm/min
mm
mm
g/cm3
%
Cell
Pressure 3
Deviatoric
Force at
Failure
Deviatoric
Stress at
Failure,d
Normal Stress
at Failure,1
Change in
Length at
Failure,L
kg/cm2
kg
kg/cm2
cm
cm2
0.50
4.85
0.381
0.881
8.36
11.00
1.00
5.72
0.444
1.444
9.12
12.00
1.50
6.60
0.506
2.006
9.88
13.00
Serial No.
Strain at
Failure,
2.5
2.0
1.5
1.0
0.5
0.0
Cohesion:
0.14
kg/cm2
5.93
JOB No.
Checked By:
3228
Ravi A
Geotechnical Investigation Work for the Proposed Installation of Mechanical Handling Facilities at East Quay-7 (EQ-7) Berth in the inner harbour of Visakhapatnam Port Trust.
Location :
------------
DATE:
Sample Type
Wet Density
Dry Density
Gravel %
Sand %
Silt %
Clay %
Liquid %
Plastic %
Plasticity Index, Ip %
Shrinkage Limit%
Type
Cohesion Cu kg/cm
Degree
BH - 21
3.00 - 3.60
SPT 2
-----
-----
-----
CH
38
23
39
53
26
27
-----
-----
-----
-----
-----
40
-----
-----
-----
-----
BH - 21
4.50 - 5.00
UDS 1
1.60
0.99
61.73
CH
35
62
93
36
57
-----
TUU
0.17
3.2
-----
-----
-----
-----
-----
-----
BH - 21
7.50 - 8.10
SPT 4
-----
-----
-----
CH
11
32
57
87
32
55
-----
-----
-----
-----
-----
-----
-----
-----
-----
2.61
CHEM
: Chemical Analysis
Vertical
Consolidation
Tuu
Tcu
Cu :
Undrained Cohesion
'
: Direct Shear
Tcd
: Permeability Test
NP
: Non Plastic
VL
Cu'
FSI
SL
UC
-----> :
UDS :
DS
Remarks
Shear Test
Specific Gravity
Consistency Limits
Mechanical Analysis
Test Kg/cm
Density
gm/ cm
Depth in m.
05.07.2012
FLB 04
:
:
Effective Cohesion
Job. No. :
3228
80.0
GRAVEL
SAND
M
C
4.75
20.0
CLAY
75x10 -3
0.425
2.00
SILT
2x10-3
70
60
50
40
30
20
10
0
10
0.1
0.01
0.001
0.0001
Plasticity Index, Ip
Remarks
CH
38
23
39
-----
-----
-----
-----
-----
53
26
27
SPT 2
BH - 21
4.50 - 5.00
CH
35
62
-----
-----
-----
-----
-----
93
36
57
UDS 1
BH - 21
7.50 - 8.10
CH
11
32
57
-----
-----
-----
-----
-----
87
32
55
SPT 4
3228
CC
FF
Gravel
Sand
Silt
Clay
60%
3.00 - 3.60
Depth in m.
Classifi-cation
( IS )
30%
Plastic Limit, Wp
BH - 21
Bore Hole
No.
10%
Job No.
Symbol
Liquid Limit, Wl
PARTICLE SIZE ( mm )
mm
mm
mm
Coeff. Of
Coeff. of
Curvature
Uniformity,
Cc
Cu = D60 /
D302/(D60*D
D10
10)
80
Geotechnical Investigation Work for the Proposed Installation of Mechanical Handling Facilities at East Quay7 (EQ-7) Berth in the inner harbour of Visakhapatnam Port Trust.
90
Project :
100
Location : ------------
Particle
Size(mm)
Geotechnical Investigation Work for the Proposed Installation of Mechanical Handling Facilities
at East Quay-7 (EQ-7) Berth in the inner harbour of Visakhapatnam Port Trust.
--------
Location:
Rate of Strain :
Diameter of Specimen:
Height of Specimen:
Dry Density,d :
Moisture Content:
1.25
38.00
76.00
0.99
61.73
Date: 09.07.2012
Bore Hole No.:
21
Depth (m) 4.50 - 5.00
Condition of Test :
TUU
State of Sample: UDS 01
mm/min
mm
mm
g/cm3
%
Cell
Pressure 3
Deviatoric
Force at
Failure
Deviatoric
Stress at
Failure,d
Normal Stress
at Failure,1
Change in
Length at
Failure,L
kg/cm2
kg
kg/cm2
cm
cm2
0.50
5.33
0.423
0.923
7.60
10.00
1.00
6.28
0.493
1.493
8.36
11.00
1.50
7.16
0.555
2.055
9.12
12.00
Serial No.
Strain at
Failure,
2.5
2.0
1.5
1.0
0.5
0.0
Cohesion:
0.17
kg/cm2
3.2
JOB No.
Checked By:
3228
Ravi A
Location :
Gravel %
Sand %
-----
-----
SM
22
43
BH - 23
6.00 - 6.50
UDS 1
1.65
1.06
55.16
CH
17
BH - 23
10.50 - 11.10
SPT 6
-----
-----
-----
SM
68
CHEM
: Chemical Analysis
Shrinkage Limit%
Type
Cohesion Cu kg/cm
Degree
27
Plasticity Index, Ip %
49
Plastic %
31
Vertical
Consolidation
Liquid %
Clay %
Silt %
35
05.07.2012
-----
-----
-----
-----
-----
-----
-----
-----
-----
-----
-----
-----
-----
67
29
38
-----
TUU
0.21
3.66
-----
40
-----
0.31
1.47
2.63
-----
-----
-----
-----
-----
-----
-----
-----
-----
-----
-----
-----
-----
Tuu
Tcu
Cu :
Undrained Cohesion
'
: Direct Shear
Tcd
: Permeability Test
NP
: Non Plastic
VL
Cu'
FSI
SL
UC
-----> :
UDS :
DS
Specific Gravity
Dry Density
-----
Shear Test
Wet Density
SPT 2
Consistency Limits
Sample Type
3.00 - 3.60
Mechanical Analysis
Test Kg/cm
Depth in m.
BH - 23
gm/ cm
Density
(Remoulded)
DATE:
Cu from Unconfined Compression
FLB 04
Remarks
Project :
:
:
Effective Cohesion
Job. No. :
3228
80.0
GRAVEL
SAND
M
C
4.75
20.0
CLAY
75x10 -3
0.425
2.00
SILT
2x10-3
70
60
50
40
30
20
10
0
10
0.1
0.01
0.001
0.0001
Sand
Silt
Clay
mm
mm
mm
Plastic Limit, Wp
Plasticity Index, Ip
Remarks
Liquid Limit, Wl
Gravel
60%
Depth in m.
Classifi-cation
( IS )
30%
Job No.
Symbol
Bore Hole
No.
10%
PARTICLE SIZE ( mm )
-----
-----
-----
-----
-----
-----
-----
-----
SPT 2
-----
-----
-----
-----
-----
67
29
38
UDS 1
-----
-----
-----
-----
-----
-----
-----
-----
SPT 6
BH - 23
3.00 - 3.60
SM
22
43
BH - 23
6.00 - 6.50
CH
17
SM
68
BH - 23 10.50 - 11.10
3228
CC
FF
35
31
49
27
Coeff. Of
Coeff. of
Curvature
Uniformity,
Cc
Cu = D60 /
D302/(D60*D
D10
10)
80
90
Project :
100
Location : ------------
Particle
Size(mm)
CONSOLIDATION TEST
IS - 2720 , P-15
Project:
Location:
-----------
Date:
BH - 23
Depth in M.:
6.00 - 6.50
UDS-01
Type of Samples:
Properties of Soil
Start
End
Dry density d
1.06
1.16
Moisture Content, w
55.16
48.35
1.47
1.27
Specific Gravity,G
2.63
2.63
Degree of Saturation, Sr
98.38
100.00
0.31
0.71
gm/cm
%
kg/cm2
60 mm
Height of specimen:
20 mm
Coefficient Coefficient of
of
volume
Permeability (K)
consolidatio compressibilty
n Cv
mv
0.10 - 0.25
m2/year
3.83
cm2/kg
4.67E-02
cm/sec
5.67E-05
0.25 - 0.50
2.46
4.45E-02
3.47E-05
0.50 - 1.00
1.61
4.36E-02
2.23E-05
1.00 - 2.00
1.17
3.32E-02
1.23E-05
2.00 - 4.00
0.82
2.05E-02
5.31E-06
kg/cm2
0.1 1.4746562
Voids Ratio, e Vs Pressure Increment (Kg/cm2)
0.25 1.4573336
0.5
1.43
1
1.377
2
1.298
4 1.2036813
Pc
2 1.2148173
1 1.2321399
0.5 1.2469878
0.25 1.2630731
0.1 1.2717344
0
0
0
0
0
0
0
0
0
0
0
0
1.50
1.45
1.40
Voids Ratio, e
Pressure
Increment
03.09.2012
Dia.of Specimen:
1.35
1.30
1.25
1.20
0.10
1.00
10.00
Job No.:
Checked By:
3228
Geotechnical Investigation Work for the Proposed Installation of Mechanical Handling Facilities
at East Quay-7 (EQ-7) Berth in the inner harbour of Visakhapatnam Port Trust.
--------
Location:
Rate of Strain :
Diameter of Specimen:
Height of Specimen:
Dry Density,d :
Moisture Content:
1.25
38.00
76.00
1.06
55.16
Date: 09.07.2012
Bore Hole No.:
23
Depth (m) 6.00 - 6.50
Condition of Test :
TUU
State of Sample: UDS 01
mm/min
mm
mm
g/cm3
%
Cell
Pressure 3
Deviatoric
Force at
Failure
Deviatoric
Stress at
Failure,d
Normal Stress
at Failure,1
Change in
Length at
Failure,L
kg/cm2
kg
kg/cm2
cm
cm2
0.50
6.68
0.524
1.024
8.36
11.00
1.00
7.63
0.592
1.592
9.12
12.00
1.50
8.67
0.665
2.165
9.88
13.00
Serial No.
Strain at
Failure,
2.5
2.0
1.5
1.0
0.5
0.0
Cohesion:
0.21
kg/cm2
3.66
JOB No.
Checked By:
3228
Ravi A
Location :
------------
Sample Type
Wet Density
Dry Density
Gravel %
Sand %
Silt %
Clay %
Liquid %
Plastic %
Plasticity Index, Ip %
Shrinkage Limit%
Type
Cohesion Cu kg/cm
Degree
BH - 24
3.00 - 3.60
SPT 2
-----
-----
-----
CH
35
25
38
58
25
33
-----
-----
-----
-----
-----
60
-----
-----
-----
-----
BH - 24
6.00 - 6.50
UDS 1
1.59
0.97
63.76
CH
31
60
112
38
74
-----
TUU
0.18
2.75
-----
-----
-----
0.76
1.71
2.63
BH - 24
9.00 - 9.60
SPT 5
-----
-----
-----
CH
22
27
51
61
23
38
-----
-----
-----
-----
-----
-----
-----
-----
-----
2.63
CHEM
: Chemical Analysis
Vertical
Consolidation
Tuu
Tcu
Cu :
Undrained Cohesion
'
: Direct Shear
Tcd
: Permeability Test
NP
: Non Plastic
VL
Cu'
FSI
SL
UC
-----> :
UDS :
DS
Specific Gravity
Shear Test
Consistency Limits
Test Kg/cm
Mechanical Analysis
gm/ cm
Depth in m.
05.07.2012
Density
(Remoulded)
DATE:
Cu from Unconfined Compression
FLB 04
Remarks
Project :
:
:
Effective Cohesion
Job. No. :
3228
80.0
GRAVEL
SAND
M
C
4.75
20.0
CLAY
75x10 -3
0.425
2.00
SILT
2x10-3
70
60
50
40
30
20
10
0
10
0.1
0.01
0.001
0.0001
Plasticity Index, Ip
Remarks
CH
35
25
38
-----
-----
-----
-----
-----
58
25
33
SPT 2
BH - 24
6.00 - 6.50
CH
31
60
-----
-----
-----
-----
-----
112
38
74
UDS 1
BH - 24
9.00 - 9.60
CH
22
27
51
-----
-----
-----
-----
-----
61
23
38
SPT 5
3228
CC
FF
Gravel
Sand
Silt
Clay
60%
3.00 - 3.60
Depth in m.
Classifi-cation
( IS )
30%
Plastic Limit, Wp
BH - 24
Bore Hole
No.
10%
Job No.
Symbol
Liquid Limit, Wl
PARTICLE SIZE ( mm )
mm
mm
mm
Coeff. Of
Coeff. of
Curvature
Uniformity,
Cc
Cu = D60 /
D302/(D60*D
D10
10)
80
90
Project :
100
Location : ------------
Particle
Size(mm)
CONSOLIDATION TEST
IS - 2720 , P-15
Project:
Location:
-----------
Date:
BH - 24
Depth in M.:
6.00 - 6.50
UDS-01
Type of Samples:
Properties of Soil
Start
End
Dry density d
0.97
1.34
Moisture Content, w
63.76
36.63
1.71
0.96
Specific Gravity,G
2.63
2.63
Degree of Saturation, Sr
97.85
100.00
0.76
0.42
gm/cm
%
kg/cm2
60 mm
Height of specimen:
20 mm
Coefficient Coefficient of
of
volume
Permeability (K)
consolidatio compressibilty
n Cv
mv
0.10 - 0.25
m2/year
3.95
cm2/kg
2.40E-01
cm/sec
3.01E-04
0.25 - 0.50
2.11
2.25E-01
1.50E-04
0.50 - 1.00
1.22
1.51E-01
5.85E-05
1.00 - 2.00
0.80
9.86E-02
2.49E-05
2.00 - 4.00
0.49
5.54E-02
8.69E-06
kg/cm2
0.1 1.7136841
Voids Ratio, e Vs Pressure Increment (Kg/cm2)
0.25 1.6159915
0.5
1.469
1
1.282
2 1.0569725
4 0.8290231
Pc
2 0.8575168
1 0.8968652
0.5 0.9212883
0.25 0.9443546
0.1 0.9633504
0
0
0
0
0
0
0
0
0
0
0
0
1.80
1.75
1.70
1.65
1.60
1.55
1.50
1.45
Voids Ratio, e
Pressure
Increment
06.09.2012
Dia.of Specimen:
1.40
1.35
1.30
1.25
1.20
1.15
1.10
1.05
1.00
0.95
0.90
0.85
0.80
0.10
1.00
10.00
Job No.:
Checked By:
3228
Geotechnical Investigation Work for the Proposed Installation of Mechanical Handling Facilities
at East Quay-7 (EQ-7) Berth in the inner harbour of Visakhapatnam Port Trust.
--------
Location:
Rate of Strain :
Diameter of Specimen:
Height of Specimen:
Dry Density,d :
Moisture Content:
1.25
38.00
76.00
0.97
63.76
Date: 09.07.2012
Bore Hole No.:
24
Depth (m) 6.00 - 6.50
Condition of Test :
TUU
State of Sample: UDS 01
mm/min
mm
mm
g/cm3
%
Cell
Pressure 3
Deviatoric
Force at
Failure
Deviatoric
Stress at
Failure,d
Normal Stress
at Failure,1
Change in
Length at
Failure,L
kg/cm2
kg
kg/cm2
cm
cm2
0.50
5.17
0.405
0.905
8.36
11.00
1.00
6.04
0.469
1.469
9.12
12.00
1.50
7.00
0.537
2.037
9.88
13.00
Serial No.
Strain at
Failure,
2.5
2.0
1.5
1.0
0.5
0.0
Cohesion:
0.18
kg/cm2
2.75
JOB No.
Checked By:
3228
Ravi A
Geotechnical Investigation Work for the Proposed Installation of Mechanical Handling Facilities at East Quay-7 (EQ-7) Berth in the inner harbour of Visakhapatnam Port Trust.
Location :
------------
DATE:
Sample Type
Wet Density
Dry Density
Gravel %
Sand %
Silt %
Clay %
Liquid %
Plastic %
Plasticity Index, Ip %
Shrinkage Limit%
Type
Cohesion Cu kg/cm
Degree
BH - 26
4.50 - 5.10
SPT 3
-----
-----
-----
CH
34
26
39
75
31
44
-----
-----
-----
-----
-----
-----
-----
-----
-----
-----
BH - 26
6.00 - 6.50
UDS 1
1.49
0.81
84.76
CH
37
51
86
34
52
-----
TUU
0.07
3.43
-----
45
-----
-----
-----
2.61
BH - 26
7.50 - 8.10
SPT 4
-----
-----
-----
CH
33
26
40
73
32
41
-----
-----
-----
-----
-----
-----
-----
-----
-----
-----
CHEM
: Chemical Analysis
Vertical
Consolidation
Tuu
Tcu
Cu :
Undrained Cohesion
'
: Direct Shear
Tcd
: Permeability Test
NP
: Non Plastic
VL
Cu'
FSI
SL
UC
-----> :
UDS :
DS
Remarks
Shear Test
Specific Gravity
Consistency Limits
Mechanical Analysis
Test Kg/cm
Density
gm/ cm
Depth in m.
18.08.2012
FLB 04
:
:
Effective Cohesion
Job. No. :
3228
80.0
GRAVEL
SAND
M
C
4.75
20.0
CLAY
75x10 -3
0.425
2.00
SILT
2x10-3
70
60
50
40
30
20
10
0
10
0.1
0.01
0.001
0.0001
Plasticity Index, Ip
Remarks
CH
34
26
39
-----
-----
-----
-----
-----
75
31
44
SPT 3
BH - 26
6.00 - 6.50
CH
37
51
-----
-----
-----
-----
-----
86
34
52
UDS 1
BH - 26
7.50 - 8.10
CH
33
26
40
-----
-----
-----
-----
-----
73
32
41
SPT 4
3228
CC
FF
Gravel
Sand
Silt
Clay
60%
4.50 - 5.10
Depth in m.
Classifi-cation
( IS )
30%
Plastic Limit, Wp
BH - 26
Bore Hole
No.
10%
Job No.
Symbol
Liquid Limit, Wl
PARTICLE SIZE ( mm )
mm
mm
mm
Coeff. Of
Coeff. of
Curvature
Uniformity,
Cc
Cu = D60 /
D302/(D60*D
D10
10)
80
Geotechnical Investigation Work for the Proposed Installation of Mechanical Handling Facilities at East Quay7 (EQ-7) Berth in the inner harbour of Visakhapatnam Port Trust.
90
Project :
100
Location : ------------
Particle
Size(mm)
Geotechnical Investigation Work for the Proposed Installation of Mechanical Handling Facilities at
East Quay-7 (EQ-7) Berth in the inner harbour of Visakhapatnam Port Trust.
-------1.25
38.00
76.00
0.81
84.76
Location:
Rate of Strain :
Diameter of Specimen:
Height of Specimen:
Dry Density,d :
Moisture Content:
g/cm3
%
Cell
Deviatoric
Pressure 3 Force at Failure
Serial No.
Date: 18.08.2012
Bore Hole No.: BH - 26
Depth (m) 6.00 - 6.50
Condition of Test :
TUU
State of Sample: UDS 01
mm/min
mm
mm
Deviatoric
Stress at
Failure,d
Normal Stress
at Failure,1
Change in
Length at
Failure,L
Strain at
Failure,
kg/cm2
kg
kg/cm2
cm
cm2
0.50
2.78
0.223
0.723
6.84
9.00
1.00
3.74
0.297
1.297
7.60
10.00
1.50
4.61
0.358
1.858
9.12
12.00
2.0
1.5
1.0
0.5
0.0
0.0
Cohesion:
0.07
0.5
kg/cm2
1.0
Normal Stress, kg/sq.cm
1.5
2.0
3.43
JOB No.
Checked By:
3228
Ravi A
Lateral Pressure,s3
Deviatoric Stress, sd
Principal Stress
Radius,r
X Coordinate of Centre,k
I set of
Reading
II set of
Reading
III set of
Reading
0.50
0.223
0.723
0.112
0.612
1.00
0.297
1.297
0.148
1.148
1.50
0.358
1.858
0.179
1.679
AREA
11.34
cm
Y
theeta
Normal
Stress
Kg/cm2
Shear
Stress
Kg/cm2
Normal
Stress
Kg/cm2
Shear
Stress
Kg/cm2
Normal
Stress
Kg/cm2
Shear
Stress
Kg/cm2
0.5000
0.5004
0.5017
0.5038
0.5067
0.5104
0.5149
0.5202
0.5261
0.5327
0.5398
0.5476
0.5558
0.5644
0.5734
0.5827
0.5922
0.6018
0.6115
0.6212
0.6309
0.6404
0.6497
0.6587
0.6673
0.6755
0.6832
0.0000
0.0097
0.0194
0.0289
0.0381
0.0471
0.0558
0.0640
0.0717
0.0789
0.0854
0.0914
0.0966
0.1011
0.1048
0.1077
0.1098
0.1111
0.1115
0.1111
0.1098
0.1077
0.1048
0.1011
0.0966
0.0914
0.0854
1.0000
1.0006
1.0023
1.0051
1.0089
1.0139
1.0199
1.0268
1.0347
1.0435
1.0530
1.0633
1.0742
1.0857
1.0976
1.1100
1.1226
1.1355
1.1484
1.1613
1.1742
1.1868
1.1991
1.2111
1.2226
1.2335
1.2438
0.0000
0.0129
0.0258
0.0384
0.0508
0.0627
0.0742
0.0851
0.0954
0.1049
0.1137
0.1216
0.1285
0.1345
0.1394
0.1433
0.1461
0.1478
0.1484
0.1478
0.1461
0.1433
0.1395
0.1345
0.1285
0.1216
0.1137
1.5000
1.5007
1.5027
1.5061
1.5108
1.5168
1.5240
1.5323
1.5418
1.5524
1.5639
1.5763
1.5894
1.6033
1.6177
1.6326
1.6478
1.6633
1.6788
1.6944
1.7099
1.7251
1.7400
1.7544
1.7683
1.7814
1.7938
0.0000
0.0156
0.0311
0.0463
0.0612
0.0756
0.0894
0.1026
0.1150
0.1265
0.1370
0.1465
0.1549
0.1621
0.1681
0.1728
0.1761
0.1782
0.1789
0.1782
0.1761
0.1728
0.1681
0.1621
0.1549
0.1465
0.1370
0
5.0000
10.0000
15.0000
20.0000
25.0000
30.0000
35.0000
40.0000
45.0000
50.0000
55.0000
60.0000
65.0000
70.0000
75.0000
80.0000
85.0000
90.0000
95.0000
100.0000
105.0000
110.0000
115.0000
120.0000
125.0000
130.0000
0.0871532
0.6904
0.6970
0.7029
0.7081
0.7126
0.7163
0.7193
0.7214
0.7226
0.7231
0.0789
0.0717
0.0640
0.0558
0.0472
0.0382
0.0289
0.0194
0.0097
0.0000
1.2533
1.2621
1.2700
1.2769
1.2829
1.2878
1.2917
1.2945
1.2962
1.2968
0.1049
0.0954
0.0851
0.0742
0.0627
0.0508
0.0384
0.0258
0.0129
0.0000
1.8053
1.8159
1.8254
1.8337
1.8409
1.8469
1.8516
1.8550
1.8570
1.8577
0.1265
0.1150
0.1026
0.0894
0.0756
0.0612
0.0463
0.0311
0.0156
0.0000
135.0000
140.0000
145.0000
150.0000
155.0000
160.0000
165.0000
170.0000
175.0000
180.0000
Geotechnical Investigation Work for the Proposed Installation of Mechanical Handling Facilities at East Quay-7 (EQ-7) Berth in the inner harbour of Visakhapatnam Port Trust.
Location :
------------
CHEM
: Chemical Analysis
Type
Cohesion Cu kg/cm
Degree
-----
-----
-----
Shrinkage Limit%
-----
-----
42
-----
-----
-----
Tuu
Tcu
Cu :
Undrained Cohesion
'
: Direct Shear
Tcd
: Permeability Test
NP
: Non Plastic
VL
Cu'
FSI
SL
UC
-----> :
UDS :
2.63
DS
Remarks
35
Specific Gravity
28
Vertical
Consolidation
63
18.08.2012
42
38
20
Plasticity Index, Ip %
Shear Test
Plastic %
CH
Consistency Limits
Test Kg/cm
Liquid %
-----
Mechanical Analysis
DATE:
Cu from Unconfined Compression
Clay %
-----
Silt %
-----
Sand %
Sample Type
SPT 1
Dry Density
Depth in m.
1.50 - 2.10
Wet Density
BH - 28
Gravel %
Density
gm/ cm
FLB 04
:
:
Effective Cohesion
Job. No. :
3228
80.0
SAND
M
C
4.75
20.0
CLAY
75x10 -3
0.425
2.00
SILT
2x10-3
70
60
50
40
30
20
10
0
10
0.1
0.01
0.001
0.0001
3228
CC
FF
mm
mm
mm
20
38
42
-----
-----
-----
Coeff. Of
Coeff. of
Curvature
Uniformity,
Cc
Cu = D60 /
D302/(D60*D
D10
10)
-----
-----
Remarks
Clay
Plasticity Index, Ip
Silt
Plastic Limit, Wp
CH
Sand
Liquid Limit, Wl
1.50 - 2.10
Gravel
60%
BH - 28
Depth in m.
Classifi-cation
( IS )
30%
Job No.
Symbol
Bore Hole
No.
10%
PARTICLE SIZE ( mm )
63
28
35
SPT 1
80
Geotechnical Investigation Work for the Proposed Installation of Mechanical Handling Facilities at East Quay7 (EQ-7) Berth in the inner harbour of Visakhapatnam Port Trust.
90
Project :
100
GRAVEL
Location : ------------
Particle
Size(mm)
Geotechnical Investigation Work for the Proposed Installation of Mechanical Handling Facilities at East Quay-7 (EQ-7) Berth in the inner harbour of Visakhapatnam Port Trust.
Location :
------------
DATE:
Sample Type
Wet Density
Dry Density
Gravel %
Sand %
Silt %
Clay %
Liquid %
Plastic %
Plasticity Index, Ip %
Shrinkage Limit%
Type
Cohesion Cu kg/cm
Degree
BH - 29
3.00 - 3.60
SPT 2
-----
-----
-----
CH
43
48
64
31
33
-----
-----
-----
-----
-----
-----
-----
-----
-----
-----
BH - 29
4.50 - 5.00
UDS 1
1.68
1.12
50.29
CH
10
40
50
68
33
35
-----
TUU
0.28
5.48
-----
43
-----
-----
-----
2.64
CHEM
: Chemical Analysis
Vertical
Consolidation
Tuu
Tcu
Cu :
Undrained Cohesion
'
: Direct Shear
Tcd
: Permeability Test
NP
: Non Plastic
VL
Cu'
FSI
SL
UC
-----> :
UDS :
DS
Remarks
Shear Test
Specific Gravity
Consistency Limits
Mechanical Analysis
Test Kg/cm
Density
gm/ cm
Depth in m.
18.08.2012
FLB 04
:
:
Effective Cohesion
Job. No. :
3228
80.0
GRAVEL
SAND
M
C
4.75
20.0
CLAY
75x10 -3
0.425
2.00
SILT
2x10-3
70
60
50
40
30
20
10
0
10
0.1
0.01
0.001
0.0001
Plasticity Index, Ip
Remarks
CH
43
48
-----
-----
-----
-----
-----
64
31
33
SPT 2
BH - 29
4.50 - 5.00
CH
10
40
50
-----
-----
-----
-----
-----
68
33
35
UDS 1
3228
CC
FF
Gravel
Sand
Silt
Clay
60%
3.00 - 3.60
Depth in m.
Classifi-cation
( IS )
30%
Plastic Limit, Wp
BH - 29
Bore Hole
No.
10%
Job No.
Symbol
Liquid Limit, Wl
PARTICLE SIZE ( mm )
mm
mm
mm
Coeff. Of
Coeff. of
Curvature
Uniformity,
Cc
Cu = D60 /
D302/(D60*D
D10
10)
80
Geotechnical Investigation Work for the Proposed Installation of Mechanical Handling Facilities at East Quay7 (EQ-7) Berth in the inner harbour of Visakhapatnam Port Trust.
90
Project :
100
Location : ------------
Particle
Size(mm)
CONSOLIDATION TEST
IS - 2720 , P-15
Project:
Location:
-----------
Date:
BH - 29
Depth in M.:
4.50 - 5.00
UDS-01
Type of Samples:
Properties of Soil
Start
End
Dry density d
1.12
1.32
Moisture Content, w
50.29
38.03
1.36
1.00
Specific Gravity,G
2.64
2.64
Degree of Saturation, Sr
97.50
100.00
0.59
0.94
gm/cm
%
kg/cm2
60 mm
Height of specimen:
20 mm
Coefficient Coefficient of
of
volume
Permeability (K)
consolidatio compressibilty
n Cv
mv
0.10 - 0.25
m2/year
3.83
cm2/kg
6.13E-02
cm/sec
7.44E-05
0.25 - 0.50
2.57
5.98E-02
4.88E-05
0.50 - 1.00
1.54
5.47E-02
2.67E-05
1.00 - 2.00
1.15
5.44E-02
1.98E-05
2.00 - 4.00
0.84
4.19E-02
1.11E-05
kg/cm2
0.1
1.3617
Voids Ratio, e Vs Pressure Increment (Kg/cm2)
0.25
1.34
0.5
1.305
1
1.242
2
1.12
Pc
4 0.9424983
2 0.9578493
1 0.9708387
0.5 0.9802855
0.25 0.9944557
0.1 1.0039025
0
0
0
0
0
0
0
0
0
0
0
0
1.40
1.35
1.30
1.25
Voids Ratio, e
Pressure
Increment
07.09.2012
Dia.of Specimen:
1.20
1.15
1.10
1.05
1.00
0.95
0.90
0.10
1.00
10.00
Job No.:
3228
Checked By: PRAJEET N.
Geotechnical Investigation Work for the Proposed Installation of Mechanical Handling Facilities at
East Quay-7 (EQ-7) Berth in the inner harbour of Visakhapatnam Port Trust.
-------1.25
38.00
76.00
1.12
50.29
Location:
Rate of Strain :
Diameter of Specimen:
Height of Specimen:
Dry Density,d :
Moisture Content:
g/cm3
%
Cell
Deviatoric
Pressure 3 Force at Failure
Serial No.
Date: 18.08.2012
Bore Hole No.: BH - 29
Depth (m) 4.50 - 5.00
Condition of Test :
TUU
State of Sample: UDS 01
mm/min
mm
mm
Deviatoric
Stress at
Failure,d
Normal Stress
at Failure,1
Change in
Length at
Failure,L
Strain at
Failure,
kg/cm2
kg
kg/cm2
cm
cm2
0.50
8.29
0.672
1.172
6.08
8.00
1.00
9.95
0.798
1.798
6.84
9.00
1.50
11.94
0.947
2.447
7.60
10.00
3.0
2.5
2.0
1.5
1.0
0.5
0.0
0.0
Cohesion:
0.28
0.5
kg/cm2
1.0
1.5
2.0
Normal Stress, kg/sq.cm
2.5
3.0
5.48
JOB No.
Checked By:
3228
Ravi A
Geotechnical Investigation Work for the Proposed Installation of Mechanical Handling Facilities at East Quay-7 (EQ-7) Berth in the inner harbour of Visakhapatnam Port Trust.
Location :
------------
DATE:
Sample Type
Wet Density
Dry Density
Gravel %
Sand %
Silt %
Clay %
Liquid %
Plastic %
Plasticity Index, Ip %
Shrinkage Limit%
Type
Cohesion Cu kg/cm
Degree
BH - 31
3.00 - 3.60
SPT 2
-----
-----
-----
CH
26
32
42
74
32
42
-----
-----
-----
-----
-----
-----
-----
-----
-----
-----
BH - 31
4.50 - 5.00
UDS 1
1.66
1.08
54.13
CH
40
51
78
33
45
-----
TUU
0.17
4.11
-----
45
-----
-----
-----
2.63
BH - 31
6.00 - 6.60
SPT 3
-----
-----
-----
CH
11
35
47
72
30
42
-----
-----
-----
-----
-----
-----
-----
-----
-----
-----
CHEM
: Chemical Analysis
Vertical
Consolidation
Tuu
Tcu
Cu :
Undrained Cohesion
'
: Direct Shear
Tcd
: Permeability Test
NP
: Non Plastic
VL
Cu'
FSI
SL
UC
-----> :
UDS :
DS
Remarks
Shear Test
Specific Gravity
Consistency Limits
Mechanical Analysis
Test Kg/cm
Density
gm/ cm
Depth in m.
18.08.2012
FLB 04
:
:
Effective Cohesion
Job. No. :
3228
80.0
GRAVEL
SAND
M
C
4.75
20.0
CLAY
75x10 -3
0.425
2.00
SILT
2x10-3
70
60
50
40
30
20
10
0
10
0.1
0.01
0.001
0.0001
Plasticity Index, Ip
Remarks
CH
26
32
42
-----
-----
-----
-----
-----
74
32
42
SPT 2
BH - 31
4.50 - 5.00
CH
40
51
-----
-----
-----
-----
-----
78
33
45
UDS 1
BH - 31
6.00 - 6.60
CH
11
35
47
-----
-----
-----
-----
-----
72
30
42
SPT 3
3228
CC
FF
Gravel
Sand
Silt
Clay
60%
3.00 - 3.60
Depth in m.
Classifi-cation
( IS )
30%
Plastic Limit, Wp
BH - 31
Bore Hole
No.
10%
Job No.
Symbol
Liquid Limit, Wl
PARTICLE SIZE ( mm )
mm
mm
mm
Coeff. Of
Coeff. of
Curvature
Uniformity,
Cc
Cu = D60 /
D302/(D60*D
D10
10)
80
Geotechnical Investigation Work for the Proposed Installation of Mechanical Handling Facilities at East Quay7 (EQ-7) Berth in the inner harbour of Visakhapatnam Port Trust.
90
Project :
100
Location : ------------
Particle
Size(mm)
Geotechnical Investigation Work for the Proposed Installation of Mechanical Handling Facilities at
East Quay-7 (EQ-7) Berth in the inner harbour of Visakhapatnam Port Trust.
-------1.25
38.00
76.00
1.08
54.13
Location:
Rate of Strain :
Diameter of Specimen:
Height of Specimen:
Dry Density,d :
Moisture Content:
g/cm3
%
Cell
Deviatoric
Pressure 3 Force at Failure
Serial No.
Date: 18.08.2012
Bore Hole No.: BH - 31
Depth (m) 4.50 - 5.00
Condition of Test :
TUU
State of Sample: UDS 01
mm/min
mm
mm
Deviatoric
Stress at
Failure,d
Normal Stress
at Failure,1
Change in
Length at
Failure,L
Strain at
Failure,
kg/cm2
kg
kg/cm2
cm
cm2
0.50
5.41
0.425
0.925
8.36
11.00
1.00
6.28
0.487
1.487
9.12
12.00
1.50
7.23
0.555
2.055
9.88
13.00
2.5
2.0
1.5
1.0
0.5
0.0
0.0
Cohesion:
0.17
0.5
kg/cm2
1.0
1.5
Normal Stress, kg/sq.cm
2.0
2.5
4.11
JOB No.
Checked By:
3228
Ravi A
Geotechnical Investigation Work for the Proposed Installation of Mechanical Handling Facilities at East Quay-7 (EQ-7) Berth in the inner harbour of Visakhapatnam Port Trust.
Location :
------------
DATE:
Sample Type
Wet Density
Dry Density
Gravel %
Sand %
Silt %
Clay %
Liquid %
Plastic %
Plasticity Index, Ip %
Shrinkage Limit%
Type
Cohesion Cu kg/cm
Degree
BH - 32A
3.00 - 3.60
SPT 2
-----
-----
-----
SC
13
38
25
24
47
23
24
-----
-----
-----
-----
-----
-----
-----
-----
-----
-----
BH - 32A
4.50 - 5.00
UDS 1
1.52
0.87
75.01
CH
40
50
79
30
49
-----
TUU
0.09
2.86
-----
48
-----
-----
-----
2.62
CHEM
: Chemical Analysis
Vertical
Consolidation
Tuu
Tcu
Cu :
Undrained Cohesion
'
: Direct Shear
Tcd
: Permeability Test
NP
: Non Plastic
VL
Cu'
FSI
SL
UC
-----> :
UDS :
DS
Remarks
Shear Test
Specific Gravity
Consistency Limits
Mechanical Analysis
Test Kg/cm
Density
gm/ cm
Depth in m.
18.08.2012
FLB 04
:
:
Effective Cohesion
Job. No. :
3228
80.0
SAND
M
C
4.75
20.0
CLAY
75x10 -3
0.425
2.00
SILT
2x10-3
70
60
50
40
30
20
10
0
10
0.1
0.01
0.001
0.0001
Plasticity Index, Ip
Remarks
SC
13
38
25
24
-----
-----
-----
-----
-----
47
23
24
SPT 2
BH - 32A
4.50 - 5.00
CH
40
50
-----
-----
-----
-----
-----
79
30
49
UDS 1
3228
CC
FF
Gravel
Sand
Silt
Clay
60%
3.00 - 3.60
Depth in m.
Classifi-cation
( IS )
30%
Plastic Limit, Wp
BH - 32A
Bore Hole
No.
10%
Job No.
Symbol
Liquid Limit, Wl
PARTICLE SIZE ( mm )
mm
mm
mm
Coeff. Of
Coeff. of
Curvature
Uniformity,
Cc
Cu = D60 /
D302/(D60*D
D10
10)
80
Geotechnical Investigation Work for the Proposed Installation of Mechanical Handling Facilities at East Quay7 (EQ-7) Berth in the inner harbour of Visakhapatnam Port Trust.
90
Project :
100
GRAVEL
Location : ------------
Particle
Size(mm)
Geotechnical Investigation Work for the Proposed Installation of Mechanical Handling Facilities at
East Quay-7 (EQ-7) Berth in the inner harbour of Visakhapatnam Port Trust.
-------1.25
38.00
76.00
0.87
75.01
Location:
Rate of Strain :
Diameter of Specimen:
Height of Specimen:
Dry Density,d :
Moisture Content:
g/cm3
%
Cell
Deviatoric
Pressure 3 Force at Failure
Serial No.
Date: 18.08.2012
Bore Hole No.: BH - 32 A
Depth (m) 4.50 - 5.00
Condition of Test :
TUU
State of Sample: UDS 01
mm/min
mm
mm
Deviatoric
Stress at
Failure,d
Normal Stress
at Failure,1
Change in
Length at
Failure,L
Strain at
Failure,
kg/cm2
kg
kg/cm2
cm
cm2
0.50
3.02
0.242
0.742
6.84
9.00
1.00
3.74
0.297
1.297
7.60
10.00
1.50
4.61
0.362
1.862
8.36
11.00
2.0
1.5
1.0
0.5
0.0
0.0
Cohesion:
0.09
0.5
kg/cm2
1.0
Normal Stress, kg/sq.cm
1.5
2.0
2.86
JOB No.
Checked By:
3228
Ravi A
Geotechnical Investigation Work for the Proposed Installation of Mechanical Handling Facilities at East Quay-7 (EQ-7) Berth in the inner harbour of Visakhapatnam Port Trust.
Location :
------------
DATE:
Sample Type
Wet Density
Dry Density
Gravel %
Sand %
Silt %
Clay %
Liquid %
Plastic %
Plasticity Index, Ip %
Shrinkage Limit%
Type
Cohesion Cu kg/cm
Degree
BH - 33
3.00 - 3.60
SPT 2
-----
-----
-----
CH
39
53
78
30
48
-----
-----
-----
-----
-----
-----
-----
-----
-----
-----
BH - 33
4.50 - 5.00
UDS 1
1.59
0.96
64.87
CH
42
48
75
28
47
-----
TUU
0.10
3.15
-----
42
-----
-----
-----
2.62
BH - 33
6.00 - 6.60
SPT 3
-----
-----
-----
CH
17
20
27
36
57
27
30
-----
-----
-----
-----
-----
-----
-----
-----
-----
-----
CHEM
: Chemical Analysis
Vertical
Consolidation
Tuu
Tcu
Cu :
Undrained Cohesion
'
: Direct Shear
Tcd
: Permeability Test
NP
: Non Plastic
VL
Cu'
FSI
SL
UC
-----> :
UDS :
DS
Remarks
Shear Test
Specific Gravity
Consistency Limits
Mechanical Analysis
Test Kg/cm
Density
gm/ cm
Depth in m.
18.08.2012
FLB 04
:
:
Effective Cohesion
Job. No. :
3228
80.0
GRAVEL
SAND
M
C
4.75
20.0
CLAY
75x10 -3
0.425
2.00
SILT
2x10-3
70
60
50
40
30
20
10
0
10
0.1
0.01
0.001
0.0001
Plasticity Index, Ip
Remarks
CH
39
53
-----
-----
-----
-----
-----
78
30
48
SPT 2
BH - 33
4.50 - 5.00
CH
42
48
-----
-----
-----
-----
-----
75
28
47
UDS 1
BH - 33
6.00 - 6.60
CH
17
20
27
36
-----
-----
-----
-----
-----
57
27
30
SPT 3
3228
CC
FF
Gravel
Sand
Silt
Clay
60%
3.00 - 3.60
Depth in m.
Classifi-cation
( IS )
30%
Plastic Limit, Wp
BH - 33
Bore Hole
No.
10%
Job No.
Symbol
Liquid Limit, Wl
PARTICLE SIZE ( mm )
mm
mm
mm
Coeff. Of
Coeff. of
Curvature
Uniformity,
Cc
Cu = D60 /
D302/(D60*D
D10
10)
80
Geotechnical Investigation Work for the Proposed Installation of Mechanical Handling Facilities at East Quay7 (EQ-7) Berth in the inner harbour of Visakhapatnam Port Trust.
90
Project :
100
Location : ------------
Particle
Size(mm)
CONSOLIDATION TEST
IS - 2720 , P-15
Project:
Location:
-----------
Date:
BH - 33
Depth in M.:
4.50 - 5.00
UDS-01
Type of Samples:
Properties of Soil
Start
End
Dry density d
0.96
1.07
Moisture Content, w
64.87
55.41
1.72
1.45
Specific Gravity,G
2.62
2.62
Degree of Saturation, Sr
99.00
100.00
0.36
0.53
gm/cm
%
kg/cm2
60 mm
Height of specimen:
20 mm
Coefficient Coefficient of
of
volume
Permeability (K)
consolidatio compressibilty
n Cv
mv
0.10 - 0.25
m2/year
3.41
cm2/kg
6.80E-02
cm/sec
7.37E-05
0.25 - 0.50
1.73
6.55E-02
3.59E-05
0.50 - 1.00
1.37
5.82E-02
2.53E-05
1.00 - 2.00
1.07
4.05E-02
1.37E-05
2.00 - 4.00
0.78
2.18E-02
5.40E-06
kg/cm2
0.1 1.7167258
Voids Ratio, e Vs Pressure Increment (Kg/cm2)
0.25
1.689
0.5
1.645
1
1.568
2 1.4640703
4 1.3567596
Pc 2 1.3771351
1 1.3934354
0.5 1.4097358
0.25 1.4301112
0.1 1.451845
0
0
0
0
0
0
0
0
0
0
0
0
1.80
1.75
1.70
1.65
Voids Ratio, e
Pressure
Increment
07.09.2012
Dia.of Specimen:
1.60
1.55
1.50
1.45
1.40
1.35
1.30
0.10
1.00
10.00
Job No.:
3228
Checked By: PRAJEET N.
Geotechnical Investigation Work for the Proposed Installation of Mechanical Handling Facilities at
East Quay-7 (EQ-7) Berth in the inner harbour of Visakhapatnam Port Trust.
-------1.25
38.00
76.00
0.96
64.87
Location:
Rate of Strain :
Diameter of Specimen:
Height of Specimen:
Dry Density,d :
Moisture Content:
g/cm3
%
Cell
Deviatoric
Pressure 3 Force at Failure
Serial No.
Date: 18.08.2012
Bore Hole No.: BH - 33
Depth (m) 4.50 - 5.00
Condition of Test :
TUU
State of Sample: UDS 01
mm/min
mm
mm
Deviatoric
Stress at
Failure,d
Normal Stress
at Failure,1
Change in
Length at
Failure,L
Strain at
Failure,
kg/cm2
kg
kg/cm2
cm
cm2
0.50
3.34
0.265
0.765
7.60
10.00
1.00
4.05
0.318
1.318
8.36
11.00
1.50
5.01
0.389
1.889
9.12
12.00
2.0
1.5
1.0
0.5
0.0
0.0
Cohesion:
0.1
0.5
kg/cm2
1.0
Normal Stress, kg/sq.cm
1.5
2.0
3.15
JOB No.
Checked By:
3228
Ravi A
Location :
------------
Sample Type
Wet Density
Dry Density
Gravel %
Sand %
Silt %
Clay %
Liquid %
Plastic %
Plasticity Index, Ip %
Shrinkage Limit%
Type
Cohesion Cu kg/cm
Degree
BH - N - 01
3.00 - 3.60
SPT 2
-----
-----
-----
CI
33
37
29
48
25
23
-----
-----
-----
-----
-----
-----
-----
-----
-----
2.64
BH - N - 01
4.50 - 5.10
SPT 3
-----
-----
-----
CI
44
33
20
42
22
20
-----
-----
-----
-----
-----
-----
-----
-----
-----
-----
BH - N - 01
6.00 - 6.60
SPT 4
-----
-----
-----
SP
97
-----
-----
-----
-----
-----
-----
-----
-----
-----
-----
-----
-----
-----
BH - N - 01
10.50 - 10.98
SPT 7
-----
-----
-----
SM
26
40
34
-----
-----
-----
-----
-----
-----
-----
-----
-----
-----
-----
-----
-----
CHEM
: Chemical Analysis
Vertical
Consolidation
Tuu
Tcu
Cu :
Undrained Cohesion
'
: Direct Shear
Tcd
: Permeability Test
NP
: Non Plastic
VL
Cu'
FSI
SL
UC
-----> :
UDS :
DS
Specific Gravity
Shear Test
Consistency Limits
Test Kg/cm
Mechanical Analysis
gm/ cm
Depth in m.
10.09.2012
Density
(Remoulded)
DATE:
Cu from Unconfined Compression
FLB 04
Remarks
Project :
:
:
Effective Cohesion
Job. No. :
3228
80.0
SAND
M
C
4.75
20.0
CLAY
75x10 -3
0.425
2.00
SILT
2x10-3
70
60
50
40
30
20
10
0
10
0.1
0.01
0.001
0.0001
Remarks
CI
33
37
29
-----
-----
-----
-----
-----
48
25
23
SPT 2
BH - N - 01
4.50 - 5.10
CI
44
33
20
-----
-----
-----
-----
-----
42
22
20
SPT 3
BH - N - 01
6.00 - 6.60
SP
97
0.16
0.32
0.58
3.63
1.10
-----
-----
-----
SPT 4
SM
26
40
34
-----
-----
-----
-----
-----
-----
-----
-----
SPT 7
BH - N - 01 10.50 - 10.98
CC
FF
Gravel
Sand
Silt
Clay
60%
3.00 - 3.60
Depth in m.
Classifi-cation
( IS )
30%
Plasticity Index, Ip
3228
Plastic Limit, Wp
BH - N - 01
Bore Hole
No.
10%
Job No.
Symbol
Liquid Limit, Wl
PARTICLE SIZE ( mm )
mm
mm
mm
Coeff. Of
Coeff. of
Curvature
Uniformity,
Cc
Cu = D60 /
D302/(D60*D
D10
10)
80
90
Project :
100
GRAVEL
Location : ------------
Particle
Size(mm)
Location :
------------
Sample Type
Wet Density
Dry Density
Gravel %
Sand %
Liquid %
Plastic %
Plasticity Index, Ip %
Shrinkage Limit%
Type
Cohesion Cu kg/cm
Degree
BH-N-2
1.50 - 2.10
SPT 1
-----
-----
-----
SM
32
44
24
-----
-----
-----
-----
-----
-----
-----
-----
-----
-----
-----
-----
2.65
BH-N-2
3.00 - 3.60
SPT 2
-----
-----
-----
SM
52
39
-----
-----
-----
-----
-----
-----
-----
-----
-----
-----
-----
-----
-----
BH-N-2
9.00 - 9.12
SPT 10
-----
-----
-----
GM
65
24
11
-----
-----
-----
-----
-----
-----
-----
-----
-----
-----
-----
-----
-----
BH-N-2
18.00 - 18.10
SPT 12
-----
-----
-----
GM
53
33
14
-----
-----
-----
-----
-----
-----
-----
-----
-----
-----
-----
-----
-----
CHEM
: Chemical Analysis
Vertical
Consolidation
Tuu
Tcu
Cu :
Undrained Cohesion
'
: Direct Shear
Tcd
: Permeability Test
NP
: Non Plastic
VL
Cu'
FSI
SL
UC
-----> :
UDS :
DS
Specific Gravity
Test Kg/cm
Shear Test
Consistency Limits
Clay %
Mechanical Analysis
Silt %
gm/ cm
Depth in m.
08.09.2012
Density
(Remoulded)
DATE:
Cu from Unconfined Compression
FLB 04
Remarks
Project :
:
:
Effective Cohesion
Job. No. :
3228
80.0
GRAVEL
SAND
M
C
4.75
20.0
CLAY
75x10 -3
0.425
2.00
SILT
2x10-3
70
60
50
40
30
20
10
0
10
0.1
0.01
0.001
0.0001
Remarks
SM
32
44
24
-----
-----
-----
-----
-----
-----
-----
-----
SPT 1
BH-N-2
3.00 - 3.60
SM
52
39
-----
-----
-----
-----
-----
-----
-----
-----
SPT 2
BH-N-2
9.00 - 9.12
GM
65
24
11
-----
-----
-----
-----
-----
-----
-----
-----
SPT 10
GM
53
33
14
-----
-----
-----
-----
-----
-----
-----
-----
SPT 12
CC
FF
Gravel
Sand
Silt
Clay
60%
1.50 - 2.10
Depth in m.
Classifi-cation
( IS )
30%
Plasticity Index, Ip
3228
Plastic Limit, Wp
BH-N-2
Bore Hole
No.
10%
Job No.
Symbol
Liquid Limit, Wl
PARTICLE SIZE ( mm )
mm
mm
mm
Coeff. Of
Coeff. of
Curvature
Uniformity,
Cc
Cu = D60 /
D302/(D60*D
D10
10)
80
90
Project :
100
Location : ------------
Particle
Size(mm)
Location :
Gravel %
Sand %
-----
-----
SM
15
70
BH - N - 3
6.00 - 6.60
UDS 1
1.53
0.98
56.61
CI
31
35
BH - N - 3
7.50 - 8.10
SPT 4
-----
-----
-----
SC
49
32
BH - N - 3
22.00 - 22.09
SPT 16
-----
-----
-----
SM
53
36
CHEM
: Chemical Analysis
Liquid %
Plastic %
Plasticity Index, Ip %
Shrinkage Limit%
Type
Cohesion Cu kg/cm
Degree
Vertical
Consolidation
-----
-----
-----
-----
-----
-----
-----
-----
-----
-----
-----
-----
-----
32
46
22
24
-----
TUU
0.15
3.89
-----
-----
-----
-----
-----
2.65
17
42
20
22
-----
-----
-----
-----
-----
-----
-----
-----
-----
-----
-----
-----
-----
-----
-----
-----
-----
-----
-----
-----
-----
-----
-----
Clay %
Silt %
10.09.2012
15
11
Tuu
Tcu
Cu :
Undrained Cohesion
'
: Direct Shear
Tcd
: Permeability Test
NP
: Non Plastic
VL
Cu'
FSI
SL
UC
-----> :
UDS :
DS
Specific Gravity
Dry Density
-----
Shear Test
Wet Density
SPT 2
Consistency Limits
Sample Type
3.00 - 3.60
Mechanical Analysis
Test Kg/cm
Depth in m.
BH - N - 3
gm/ cm
Density
(Remoulded)
DATE:
Cu from Unconfined Compression
FLB 04
Remarks
Project :
:
:
Effective Cohesion
Job. No. :
3228
80.0
SAND
M
C
4.75
20.0
CLAY
75x10 -3
0.425
2.00
SILT
2x10-3
70
60
50
40
30
20
10
0
10
0.1
0.01
0.001
0.0001
Sand
Silt
Clay
mm
mm
mm
Plastic Limit, Wp
Plasticity Index, Ip
Remarks
Liquid Limit, Wl
Gravel
60%
Depth in m.
Classifi-cation
( IS )
30%
Job No.
Symbol
Bore Hole
No.
10%
PARTICLE SIZE ( mm )
-----
-----
-----
-----
-----
-----
-----
-----
SPT 2
15
Coeff. Of
Coeff. of
Curvature
Uniformity,
Cc
Cu = D60 /
D302/(D60*D
D10
10)
3228
BH - N - 3
3.00 - 3.60
SM
15
70
BH - N - 3
6.00 - 6.60
CI
31
35
32
-----
-----
-----
-----
-----
46
22
24
UDS 1
BH - N - 3
7.50 - 8.10
SC
49
32
17
-----
-----
-----
-----
-----
42
20
22
SPT 4
SM
53
36
-----
-----
-----
-----
-----
-----
-----
-----
SPT 16
BH - N - 3 22.00 - 22.09
CC
FF
11
80
90
Project :
100
GRAVEL
Location : ------------
Particle
Size(mm)
Location:
Rate of Strain :
Diameter of Specimen:
Height of Specimen:
Dry Density,d :
Moisture Content:
g/cm3
%
Cell
Deviatoric
Pressure 3 Force at Failure
Serial No.
Date: 10.03.2012
Bore Hole No.: BH-N-3
Depth (m) 6.00 - 6.50
Condition of Test :
UU
State of Sample: UDS 01
mm/min
mm
mm
Deviatoric
Stress at
Failure,d
Normal Stress
at Failure,1
Change in
Length at
Failure,L
Strain at
Failure,
kg/cm2
kg
kg/cm2
cm
cm2
0.50
4.91
0.385
0.885
8.36
11.00
1.00
5.88
0.456
1.456
9.12
12.00
1.50
6.92
0.531
2.031
9.88
13.00
2.5
2.0
1.5
1.0
0.5
0.0
0.0
Cohesion:
0.15
0.5
kg/cm2
1.0
1.5
Normal Stress, kg/sq.cm
2.0
2.5
3.89
JOB No.
Checked By:
3228
Ravi A
Location :
Gravel %
Sand %
-----
-----
SM
69
BH -N- 04
4.50 - 5.00
UDS 1
1.58
0.96
63.77
CH
BH -N- 04
9.00 - 9.60
SPT 5
-----
-----
-----
SM
76
CHEM
: Chemical Analysis
Shrinkage Limit%
Type
Cohesion Cu kg/cm
Degree
23
Plasticity Index, Ip %
67
Plastic %
32
Vertical
Consolidation
Liquid %
Clay %
Silt %
24
10.09.2012
-----
-----
-----
-----
-----
-----
-----
-----
-----
-----
-----
-----
-----
87
29
58
-----
TUU
0.14
4.12
-----
-----
-----
-----
-----
2.64
-----
-----
-----
-----
-----
-----
-----
-----
-----
-----
-----
-----
-----
Tuu
Tcu
Cu :
Undrained Cohesion
'
: Direct Shear
Tcd
: Permeability Test
NP
: Non Plastic
VL
Cu'
FSI
SL
UC
-----> :
UDS :
DS
Specific Gravity
Dry Density
-----
Shear Test
Wet Density
SPT 1
Consistency Limits
Sample Type
1.50 - 2.10
Mechanical Analysis
Test Kg/cm
Depth in m.
BH -N- 04
gm/ cm
Density
(Remoulded)
DATE:
Cu from Unconfined Compression
FLB 04
Remarks
Project :
:
:
Effective Cohesion
Job. No. :
3228
80.0
SAND
M
C
4.75
20.0
CLAY
75x10 -3
0.425
2.00
SILT
2x10-3
70
60
50
40
30
20
10
0
10
0.1
0.01
0.001
0.0001
Sand
Silt
Clay
mm
mm
mm
Plastic Limit, Wp
Plasticity Index, Ip
Remarks
Liquid Limit, Wl
Gravel
60%
Depth in m.
Classifi-cation
( IS )
30%
Job No.
Symbol
Bore Hole
No.
10%
PARTICLE SIZE ( mm )
-----
-----
-----
-----
-----
-----
-----
-----
SPT 1
-----
-----
-----
-----
-----
87
29
58
UDS 1
-----
-----
-----
-----
-----
-----
-----
-----
SPT 5
BH -N- 04
1.50 - 2.10
SM
69
BH -N- 04
4.50 - 5.00
CH
BH -N- 04
9.00 - 9.60
SM
76
3228
CC
FF
24
32
67
23
Coeff. Of
Coeff. of
Curvature
Uniformity,
Cc
Cu = D60 /
D302/(D60*D
D10
10)
80
90
Project :
100
GRAVEL
Location : ------------
Particle
Size(mm)
Location:
Rate of Strain :
Diameter of Specimen:
Height of Specimen:
Dry Density,d :
Moisture Content:
g/cm3
%
Cell
Deviatoric
Pressure 3 Force at Failure
Serial No.
Date: 10.03.2012
Bore Hole No.: BH-N-4
Depth (m) 4.50 - 5.00
Condition of Test :
UU
State of Sample: UDS 01
mm/min
mm
mm
Deviatoric
Stress at
Failure,d
Normal Stress
at Failure,1
Change in
Length at
Failure,L
Strain at
Failure,
kg/cm2
kg
kg/cm2
cm
cm2
0.50
4.69
0.372
0.872
7.60
10.00
1.00
5.57
0.437
1.437
8.36
11.00
1.50
6.52
0.526
2.026
6.52
8.58
2.5
2.0
1.5
1.0
0.5
0.0
0.0
Cohesion:
0.14
0.5
kg/cm2
1.0
1.5
Normal Stress, kg/sq.cm
2.0
2.5
4.12
JOB No.
Checked By:
3228
Ravi A
Location :
------------
Sample Type
Wet Density
Dry Density
Gravel %
Sand %
Silt %
Clay %
Liquid %
Plastic %
Plasticity Index, Ip %
Shrinkage Limit%
Type
Cohesion Cu kg/cm
Degree
BH -N- 5
1.50-2.00
SPT 2
-----
-----
-----
SC
20
32
20
28
38
22
16
-----
-----
-----
-----
-----
-----
-----
-----
-----
-----
BH -N- 5
4.50 - 5.00
UDS 1
1.50
0.82
82.86
CH
31
60
94
33
61
-----
TUU
0.07
3.71
-----
-----
-----
-----
-----
2.62
BH -N- 5
7.50 - 8.00
SPT 4
-----
-----
-----
SM
23
52
-----
-----
-----
-----
-----
-----
-----
-----
-----
-----
-----
-----
-----
CHEM
: Chemical Analysis
25
Vertical
Consolidation
Tuu
Tcu
Cu :
Undrained Cohesion
'
: Direct Shear
Tcd
: Permeability Test
NP
: Non Plastic
VL
Cu'
FSI
SL
UC
-----> :
UDS :
DS
Specific Gravity
Shear Test
Consistency Limits
Test Kg/cm
Mechanical Analysis
gm/ cm
Depth in m.
10.09.2012
Density
(Remoulded)
DATE:
Cu from Unconfined Compression
FLB 04
Remarks
Project :
:
:
Effective Cohesion
Job. No. :
3228
80.0
SAND
M
C
4.75
20.0
CLAY
75x10 -3
0.425
2.00
SILT
2x10-3
70
60
50
40
30
20
10
0
10
0.1
0.01
0.001
0.0001
Plasticity Index, Ip
Remarks
SC
20
32
20
28
-----
-----
-----
-----
-----
38
22
16
SPT 2
BH -N- 5
4.50 - 5.00
CH
31
60
-----
-----
-----
-----
-----
94
33
61
UDS 1
BH -N- 5
7.50 - 8.00
SM
23
52
-----
-----
-----
-----
-----
-----
-----
-----
SPT 4
3228
CC
FF
Gravel
Sand
Silt
Clay
60%
1.50-2.00
Depth in m.
Classifi-cation
( IS )
30%
Plastic Limit, Wp
BH -N- 5
Bore Hole
No.
10%
Job No.
Symbol
Liquid Limit, Wl
PARTICLE SIZE ( mm )
mm
mm
mm
25
Coeff. Of
Coeff. of
Curvature
Uniformity,
Cc
Cu = D60 /
D302/(D60*D
D10
10)
80
90
Project :
100
GRAVEL
Location : ------------
Particle
Size(mm)
Location:
Rate of Strain :
Diameter of Specimen:
Height of Specimen:
Dry Density,d :
Moisture Content:
g/cm3
%
Cell
Deviatoric
Pressure 3 Force at Failure
Serial No.
Date: 10.03.2012
Bore Hole No.: BH-N-5
Depth (m) 4.50 - 5.00
Condition of Test :
UU
State of Sample: UDS 01
mm/min
mm
mm
Deviatoric
Stress at
Failure,d
Normal Stress
at Failure,1
Change in
Length at
Failure,L
Strain at
Failure,
kg/cm2
kg
kg/cm2
cm
cm2
0.50
2.86
0.229
0.729
6.84
9.00
1.00
3.74
0.297
1.297
7.60
10.00
1.50
4.69
0.368
1.868
8.36
11.00
2.0
1.5
1.0
0.5
0.0
0.0
Cohesion:
0.07
0.5
kg/cm2
1.0
Normal Stress, kg/sq.cm
1.5
2.0
3.71
JOB No.
Checked By:
3228
Ravi A
Location :
------------
Sample Type
Wet Density
Dry Density
Gravel %
Sand %
Silt %
Clay %
Liquid %
Plastic %
Plasticity Index, Ip %
Shrinkage Limit%
Type
Cohesion Cu kg/cm
Degree
BH - N - 6
1.50 - 2.10
SPT 1
-----
-----
-----
CH
22
32
43
64
28
36
-----
-----
-----
-----
-----
-----
-----
-----
-----
-----
BH - N - 6
3.00 - 3.50
UDS 1
1.62
1.02
58.50
CH
36
59
92
36
56
-----
TUU
0.15
3.2
-----
-----
-----
-----
-----
2.63
BH - N - 6
4.50 - 4.75
SPT 2
-----
-----
-----
GP-GM
61
30
-----
-----
-----
-----
-----
-----
-----
-----
-----
-----
-----
-----
-----
CHEM
: Chemical Analysis
Vertical
Consolidation
Tuu
Tcu
Cu :
Undrained Cohesion
'
: Direct Shear
Tcd
: Permeability Test
NP
: Non Plastic
VL
Cu'
FSI
SL
UC
-----> :
UDS :
DS
Specific Gravity
Shear Test
Consistency Limits
Test Kg/cm
Mechanical Analysis
gm/ cm
Depth in m.
10.09.2012
Density
(Remoulded)
DATE:
Cu from Unconfined Compression
FLB 04
Remarks
Project :
:
:
Effective Cohesion
Job. No. :
3228
80.0
SAND
M
C
4.75
20.0
CLAY
75x10 -3
0.425
2.00
SILT
2x10-3
70
60
50
40
30
20
10
0
10
0.1
0.01
0.001
0.0001
Plasticity Index, Ip
Remarks
CH
22
32
43
-----
-----
-----
-----
-----
64
28
36
SPT 1
BH - N - 6
3.00 - 3.50
CH
36
59
-----
-----
-----
-----
-----
92
36
56
UDS 1
BH - N - 6
4.50 - 4.75
GP-GM
61
30
0.08
0.17
11
137.50
0.03
-----
-----
-----
SPT 2
3228
CC
FF
Gravel
Sand
Silt
Clay
60%
1.50 - 2.10
Depth in m.
Classifi-cation
( IS )
30%
Plastic Limit, Wp
BH - N - 6
Bore Hole
No.
10%
Job No.
Symbol
Liquid Limit, Wl
PARTICLE SIZE ( mm )
mm
mm
mm
Coeff. Of
Coeff. of
Curvature
Uniformity,
Cc
Cu = D60 /
D302/(D60*D
D10
10)
80
90
Project :
100
GRAVEL
Location : ------------
Particle
Size(mm)
Location:
Rate of Strain :
Diameter of Specimen:
Height of Specimen:
Dry Density,d :
Moisture Content:
g/cm3
%
Cell
Deviatoric
Pressure 3 Force at Failure
Serial No.
Date: 10.03.2012
Bore Hole No.: BH-N-6
Depth (m) 3.00 - 3.50
Condition of Test :
UU
State of Sample: UDS 01
mm/min
mm
mm
Deviatoric
Stress at
Failure,d
Normal Stress
at Failure,1
Change in
Length at
Failure,L
Strain at
Failure,
kg/cm2
kg
kg/cm2
cm
cm2
0.50
4.77
0.374
0.874
8.36
11.00
1.00
5.64
0.438
1.438
9.12
12.00
1.50
6.52
0.500
2.000
9.88
13.00
2.5
2.0
1.5
1.0
0.5
0.0
0.0
Cohesion:
0.15
0.5
kg/cm2
1.0
1.5
Normal Stress, kg/sq.cm
2.0
2.5
3.2
JOB No.
Checked By:
3228
Ravi A
LOCATION: ----------------------
10.07.2012
Sr. No.
Depth in m.
Type of Sample
pH
Electrometrically
Sulphate as SO 3
(%)
Chloride as Cl (%)
BH -01
1.50 - 2.10
SPT -1
7.40
0.340
1.225
BH - 02
4.50 - 5.10
SPT - 2
7.48
0.535
2.349
BH - 03
6.00 - 6.60
SPT - 3
7.49
0.577
2.369
BH - 04
6.00 - 6.60
SPT - 3
7.75
0.303
1.060
BH - 05
4.50 - 5.10
SPT - 3
7.46
0.421
1.560
BH - 08
3.00 - 3.60
SPT - 2
6.80
0.289
1.040
BH - 10
3.00 - 3.60
SPT - 2
7.30
0.458
1.42
BH - 12
7.50 - 8.10
SPT - 4
7.48
0.513
2.79
BH - 18
3.00 - 3.60
SPT - 2
7.20
0.392
1.83
10
BH - 19
3.00 - 3.60
SPT - 2
7.28
0.415
1.65
11
BH - 21
7.50 - 8.10
SPT - 4
7.33
0.131
0.46
12
BH - 23
3.00 - 3.60
SPT - 2
7.39
0.194
0.64
13
BH - 24
3.00 - 3.60
SPT - 2
7.35
0.312
1.06
Remarks
3228
DBM
3.00
2.00
1.00
0.00
-1.00
-2.00
-3.00
-4.00
-5.00
-6.00
-7.00
BH-01
DS1
N=04
UDS-1
N=03
36
NIL
NIL
RQD%
N=03
37
CR%
G.W.T. @
0.55m. BGL.
GL: 2.723m.
(I)
(II)
(III)
NIL
NIL
{(-)6.577m.}
60
73
(I)
(II)
(III)
G.W.T. @
1.05m. BGL.
BH-02
(I)
(II)
(III)
GL: 2.716m.
DS1
N=12
UDS-1
N=R
RQD%
N=04
CR%
15
45
13
27
50
88
G.W.T. @
1.15m. BGL.
BH-03
GL: 2.961m.
DS1
N=12
N=04
UDS-1
N=04
33
RQD%
N=10
76
60
31
CR%
50
63
(I)
(II)
(III)
BH-04
GL: 2.851m.
DS1
CR%
73
N=R
RQD%
G.W.T. @
0.85m. BGL.
N=14
N=06
95
91
UDS-1
96
{(-)6.349m.}
(I)
(II)
(III)
G.W.T. @
0.95m. BGL.
BH-05
(I)
(II)
GL: 3.172m.
DS1
N=15
N=12
N=04
UDS-1
NIL
RQD%N=R
37
NIL
CR%
39
30
{(-)6.528m.}
80
(III)
10
CR%
10
NIL
BH-N-3
BH-N1
GL: 3.610m.
NIL
N=R
N=R
N=R
N=R
N=R
N=R
N=R
N=R
N=R
N=R
N=R
N=07
RQD%N=26
DS1
CR%
GL: 3.700m.
(I)
13
N=14
N=12
NIL
NIL
NIL
NIL
NIL
NIL
NIL
NIL
NIL
NIL
NIL
NIL
NIL
NIL
NIL
14
NIL
NIL
13
18
NIL
NIL
32
53
{(-)21.890m.}
(I)
(II)
(III)
RL.4.00m.
3.00
2.00
1.00
0.00
-1.00
-2.00
-3.00
-4.00
-5.00
-6.00
-7.00
-8.00
-9.00
-10.00
-11.00
-12.00
-13.00
-14.00
-15.00
-16.00
-17.00
-18.00
-19.00
-20.00
-21.00
-22.00
-23.00
401, Grande Palladium, 175 CST Road, Kalina , Santacruz (E), Mumbai- 98
: Jitin More
: Prajit Nagrale
Drawn By
Appr. by.
Checked By : B. S. Telang
DBM
Sub -Surface Profile Through Bore Holes for Proposed Installation of Mechanical Handling
Facilities at East Quay-7 (EQ-7)Berth in the inner harbour of Visakhapatnam Port Trust.
CLIENT :
(III)
(II)
DS1
N=14
N=10
N=07
UDS1
N=27
NIL
N=R
N=R
N=R
N=R
N=R
N=R
N=R
N=R
N=R
N=R
N=R
N=R
RQD% N=R
NIL
NIL
NIL
{(-)7.284m.}
NIL
-8.00
09
{(-)8.239m.}
NIL
NIL
NIL
NIL
NIL
NIL
NIL
NIL
NIL
NIL
NIL
{(-)16.843m.}
NIL
NIL
32
33
NIL
NIL
NIL
18
25
NIL
-9.00
-11.00
-12.00
-13.00
-14.00
-15.00
-16.00
-17.00
-18.00
-19.00
-20.00
-21.00
-22.00
-23.00
SECTION = 1:1
-10.00
LEGEND :
LAYERS
( I ) FILL
( II ) MARINE DEPOSITS
( IV ) KHONDALITE/GRANITE BEDROCK
Depth in 'm'
RL.4.00m.
Depth in 'm'
BH-N-2
BH-11
BH-10
BH-8
RL.4.00m.
RL.4.00m.
GL: 3.474m.
3.00
2.00
1.00
DS1
(I)
GL: 2.854m.
GL: 2.756m.
GL: 2.506m.
DS1
(I)
DS1
(I)
2.00
N=37
(I)
N=08
N=07
N=R
3.00
DS1
1.00
N=20
0.00
0.00
N=03
N=04
N=04
N=03
VST1
UDS1
-1.00
UDS-1
-3.00
UDS-1
N=04
-4.00
(II)
N=04
N=05
N=06
CR%
N=05
N=R
RQD%
27
15
N=07
50
13
N=05
-8.00
-10.00
(IV)
CR%
RQD%
21
NIL
21
NIL
25
NIL
(IV)
20
NIL
-3.00
NIL
NIL
NIL
NIL
NIL
NIL
-5.00
-6.00
-7.00
(IV)
88
-11.00
-12.00
-2.00
UDS-1
-6.00
-9.00
NIL
-4.00
UDS-2
-7.00
45
{(-)10.244m.}
CR%
N=R
RQD%
27
NIL
23
07
34
16
NIL
NIL
NIL
NIL
-8.00
-9.00
-10.00
(II)
NIL
NIL
NIL
NIL
(II)
-11.00
-12.00
{(-)11.994m.}
(31.10m.)
-13.00
-13.00
-14.00
NIL
NIL
NIL
NIL
-14.00
-15.00
-15.00
-16.00
-16.00
-17.00
-18.00
-19.00
-20.00
-21.00
-1.00
NIL
(II)
-5.00
Depth in 'm'
(II)
RQD% N=R
Depth in 'm'
-2.00
CR%
19
NIL
15
NIL
NIL
NIL
NIL
NIL
24
NIL
30
NIL
44
NIL
-17.00
-18.00
-19.00
-20.00
SECTION = 2 : 2
(IV)
-22.00
-23.00
-24.00
-21.00
(IV)
-22.00
-23.00
-24.00
{(-)23.253m.}
-25.00
-25.00
CLIENT :
LEGEND :
LAYERS
Sub -Surface Profile Through Bore Holes for Proposed Installation of Mechanical Handling
Facilities at East Quay-7 (EQ-7)Berth in the inner harbour of Visakhapatnam Port Trust.
( I ) FILL
R
( II ) MARINE DEPOSITS
DBM
Drawn By
( IV ) KHONDALITE/GRANITE BEDROCK
Checked By : B. S. Telang
Appr. by.
: Jitin More
: Prajit Nagrale
3.00
2.00
1.00
0.00
-1.00
-2.00
-3.00
-4.00
-5.00
-6.00
-7.00
-8.00
-9.00
-10.00
-11.00
-12.00
-13.00
-14.00
-15.00
-16.00
-17.00
(I)
GL: 2.801m.
BH-12
DS1
N=11
N=04
UDS-1
N=05
N=06
UDS2
N=03
NIL
RQD% N=R
58
NIL
CR%
G.W.T. @
0.95m. BGL.
(II)
(IV)
55
{(-)11.699m.}
(I)
(II)
(IV)
G.W.T. @
0.80m. BGL.
BH-14
GL: 2.455m.
DS1
N=18
N=04
VST1
N=05
UDS-1
VST2
N=05
N=R
RQD%
N=08
CR%
51
08
57
47
{(-)11.145m.}
(I)
(II)
(IV)
BH-15
GL: 2.957m.
DS1
N=12
N=04
UDS-1
N=05
N=06
N=06
N=06
N=18
N=R
RQD% N=R
NIL
NIL
CR%
30
N=R
28
NIL
N=R
33
13
{(-)16.843m.}
50
SECTION = 3 : 3
(I)
(II)
(IV)
G.W.T. @
1.20m. BGL.
BH-26
GL: 3.463m.
DS1
N=16
N=14
N=04
VST1
UDS-1
N=05
38
07
RQD% N=R
52
NIL
35
CR%
40
{(-)8.637m.}
(I)
(II)
(IV)
LEGEND :
LAYERS
BH-N5
GL: 3.683m.
DS1
N=04
N=05
UDS1
N=18
31
N=24
RQD%
44
59
66
56
CR%
84
{(-)7.317m.}
(I)
(II)
(III)
(IV)
CLIENT :
CR%
BH-N6
(II)
(I)
GL: 3.745m.
DS1
N=09
UDS1
(IV)
N=R
(III)
RQD%
N=R
NIL
NIL
29
NIL
NIL
30
13
{(-)5.255m.}
48
RL.4.00m.
3.00
2.00
1.00
0.00
-1.00
-2.00
-3.00
-4.00
-5.00
-6.00
-7.00
-8.00
-9.00
-10.00
-11.00
-12.00
-13.00
-14.00
-15.00
-16.00
-17.00
Sub -Surface Profile Through Bore Holes for Proposed Installation of Mechanical Handling
Facilities at East Quay-7 (EQ-7)Berth in the inner harbour of Visakhapatnam Port Trust.
DBM
Appr. by.
: Jitin More
: Prajit Nagrale
401, Grande Palladium, 175 CST Road, Kalina , Santacruz (E), Mumbai- 98
( II ) MARINE DEPOSITS
Drawn By
( IV ) KHONDALITE/GRANITE BEDROCK
Checked By : B. S. Telang
( I ) FILL
Depth in 'm'
RL.4.00m.
Depth in 'm'
3.00
GL: 2.752m.
BH-18
DS1
N=R
RQD%
2.00
CR%
NIL
(I)
N=18
N=04
UDS-1
N=03
N=04
N=05
N=03
N=03
32
NIL
N=09
40
G.W.T. @
1.80m. BGL.
(II)
(IV)
NIL
{(-)15.398m.}
49
1.00
0.00
-1.00
-2.00
-3.00
-4.00
-5.00
-6.00
-7.00
-8.00
-9.00
-10.00
-11.00
-12.00
-13.00
-14.00
-15.00
-16.00
-17.00
(I)
(II)
(IV)
BH-19
GL: 2.922m.
DS1
N=R
RQD%
G.W.T. @
0.50m. BGL.
N=11
N=05
UDS-1
N=08
N=04
CR%
NIL
N=06
30
35
45
39
NIL
NIL
NIL
( I ) FILL
(I)
(II)
(IV)
BH-20
GL: 3.304m
DS1
N=07
N=04
UDS-1
VST1
N=06
N=07
N=06
16
N=R
RQD%
41
37
CR%
65
(31.10m.)
SECTION = 4 : 4
(I)
(II)
(IV)
LEGEND :
LAYERS
( I ) FILL
G.W.T. @
1.35m. BGL.
CR%
50
30
50
BH-29
GL: 3.713m.
DS1
N=08
N=04
VST1
UDS1
RQD% N=R
NIL
NIL
13
{(-)5.287m.}
(I)
(II)
(IV)
CLIENT :
G.W.T. @
1.10m. BGL.
CR%
BH-28
(II)
(I)
GL: 3.360m.
DS1
N=05
N=05
(IV)
RQD% N=R
NIL
40
47
NIL
60
45
{(-)4.74m.}
RL.4.00m.
3.00
2.00
1.00
0.00
-1.00
-2.00
-3.00
-4.00
-5.00
-6.00
-7.00
-8.00
-9.00
-10.00
-11.00
-12.00
-13.00
-14.00
-15.00
-16.00
-17.00
Sub -Surface Profile Through Bore Holes for Proposed Installation of Mechanical Handling
Facilities at East Quay-7 (EQ-7)Berth in the inner harbour of Visakhapatnam Port Trust.
DBM
Appr. by.
: Jitin More
: Prajit Nagrale
401, Grande Palladium, 175 CST Road, Kalina , Santacruz (E), Mumbai- 98
( II ) MARINE DEPOSITS
Drawn By
Checked By : B. S. Telang
( IV ) KHONDALITE/GRANITE BEDROCK
Depth in 'm'
RL.4.00m.
Depth in 'm'
3.00
2.00
1.00
0.00
-1.00
-2.00
-3.00
-4.00
-5.00
-6.00
-7.00
-8.00
-9.00
-10.00
-11.00
-12.00
-13.00
-14.00
-15.00
(IV)
GL: 2.739m
(I)
(II)
CR%
04
11
25
BH-21
DS1
N=10
N=04
UDS-1
N=09
N=05
N=04
UDS-2
N=04
(IV)
(II)
(I)
N=R
RQD% N=R
NIL
NIL
NIL
{(-)14.761m.}
CR%
BH-23
GL: 4.010m
DS1
N=11
N=02
N=04
UDS-1
N=03
N=05
N=16
RQD% N=R
(I)
(II)
(IV)
G.W.T. @
1.35m. BGL.
CR%
BH-32A
GL: 3.511m.
DS1
N=12
N=10
VST1
UDS1
N=06
VST2
RQD%
N=R
07
26
46
NIL
41
40
(I)
(II)
(IV)
BH-31
GL: 3.705m.
DS1
N=05
N=05
RQD%
G.W.T. @
1.55m. BGL.
N=05
CR%
21
UDS1
VST1
60
38
20
86
70
{(-)5.895m.}
(I)
(II)
(IV)
BH-33
(IV)
(II)
(I)
GL: 3.598m.
DS1
N=14
N=16
RQD%
G.W.T. @
1.55m. BGL.
N=04
CR%
NIL
UDS1
VST1
55
12
19
51
66
{(-)6.002m.}
RL.4.00m.
3.00
2.00
1.00
0.00
-1.00
-2.00
-3.00
-4.00
-5.00
-6.00
-7.00
-8.00
NIL
-10.00
401, Grande Palladium, 175 CST Road, Kalina , Santacruz (E), Mumbai- 98
: Jitin More
: Prajit Nagrale
Drawn By
Appr. by.
Checked By : B. S. Telang
DBM
Sub -Surface Profile Through Bore Holes for Proposed Installation of Mechanical Handling
Facilities at East Quay-7 (EQ-7)Berth in the inner harbour of Visakhapatnam Port Trust.
-15.00
-14.00
-13.00
-12.00
-9.00
35
NIL
{(-)8.229m.}
38
-11.00
NIL
CLIENT :
40
{(-)11.340m.}
SECTION = 5 : 5
LEGEND :
LAYERS
( I ) FILL
( II ) MARINE DEPOSITS
( III ) COMPLETELY WEATHERED BEDROCK
( IV ) KHONDALITE/GRANITE BEDROCK
Depth in 'm'
RL.4.00m.
Depth in 'm'
BH-N-8
BH-N-7
BH-24
RL.4.00m.
RL.4.00m.
2.00
GL: 3.550m.
DS1
DS1
GL: 3.189 m.
DS1
(I)
(I)
(I)
N=11
N=05
N=12
3.00
(I)
1.00
1.00
N=08
N=08
N=07
0.00
0.00
-1.00
N=06
UDS-1
UDS1
N=07
N=07
-1.00
-2.00
-2.00
UDS-1
-3.00
(II)
(II)
(II)
N=05
N=15
N=40
N=R
N=R
-4.00
Depth in 'm'
-5.00
-5.00
N=06
-6.00
-7.00
CR%
RQD%
(III)
(III)
CR%
N=05
08
-8.00
-10.00
CR%
-11.00
-14.00
(IV)
RQD%
N=R
29
NIL
31
NIL
45
24
NIL
(IV)
31
10
34
NIL
42
NIL
RQD% N=R
32
NIL
33
NIL
-6.00
-7.00
-8.00
(III)
N=09
-9.00
-13.00
-3.00
(II)
-4.00
-12.00
2.00
Depth in 'm'
3.00
GL: 3.485m.
(IV)
53
(IV)
-9.00
23
-10.00
{(-)9.950m.}
-11.00
-12.00
{(-)11.515m.}
-13.00
-14.00
{(-)13.561m.}
-15.00
-15.00
SECTION = 6 : 6
CLIENT :
LEGEND :
LAYERS
Sub -Surface Profile Through Bore Holes for Proposed Installation of Mechanical Handling
Facilities at East Quay-7 (EQ-7)Berth in the inner harbour of Visakhapatnam Port Trust.
( I ) FILL
R
( II ) MARINE DEPOSITS
DBM
Drawn By
( IV ) KHONDALITE/GRANITE BEDROCK
Checked By : B. S. Telang
Appr. by.
: Jitin More
: Prajit Nagrale