A Concept Plan for a Bicycle and Pedestrian Corridor from the National Mall to Fairfax City
WASHINGTON
AREA
BICYCLIST
ASSOCIATION
FALL 2014
Executive Summary
Arlington Boulevard runs just over twelve miles from the National
Mall in Washington, DC to Fairfax City, VA, crossing several jurisdictional lines and the Potomac River along the way. The thoroughfare
connects over 110,000 people living in the adjacent neighborhoods to
offices, retail, parks, schools, and government services. But it lacks a
consistent, high-quality bicycling route.
Such a route would encourage bicycling and walking along its length,
increase the value of existing bicycle and pedestrian facilities by
making them part of a more connected network, and improve the
character of the corridor for all users. The Virginia Department of
Transportation (VDOT) and the Metropolitan Washington Council
of Governments (MWCOG) have identified this route as an important, yet underdeveloped, bicycle route in several planning documents--but to date, improvements have been piecemeal. This document shows how those piecemeal improvements could combine to
form a functional trail for transportation and recreation.
Much of the Arlington Boulevard bicycle route already exists in
the form of off-road paths and wide service roads with little traffic.
Building just 1.3 miles of bridges and 8.1 miles of protected bicycle
lanes (or off-road shared-use paths) would create a continuous trail,
22 miles in length, on both the north and south sides of Arlington Boulevard. A basic, interim version of this focused on at-grade
improvements and low hanging fruit could be built for just $2-4M,
while a high quality path with grade separated crossing of major
obstacles would cost $20-40M as redevelopment allows for increased
investment.
Arlington Boulevard already has many miles of excellent infrastructure for bicyclists and pedestrians. Investing in linking this piecemeal
infrastructure into a continuous trail corridorand linking that
corridor, in turn, to the regional trail network, would unlock the full
potential of the corridor as a place for people, not just automobiles.
Glossary
Table of Contents
Shared-Use Path
A path for bicyclists and pedestrians, physically separated
from motorized vehicular traffic by a curb plus open
space or barrier when there is insufficient separation
from roads.
Bicycle Lane
A one-way portion of the roadway designated for
preferential use by bicyclists, at least 5 feet wide.
Additional buffering of 2-3 feet may be added if adjacent
to heavy or higher speed traffic.
Shared Lane Marking
Also known as a sharrow, this is a bicycle symbol
with arrows painted on the road to alert bicyclists the
preferred location to ride to avoid hazards and to inform
motorists to expect bicycles on this road.
Executive Summary
Glossary
The History of Arlington Boulevard
How Arlington Boulevard came to be, and why its time to consider a
bicycle and pedestrian path
Why Arlington Boulevard Needs a Trail
The benefits of an Arlington Boulevard Trail to DC, Arlington
County, Fairfax County, and the City of Fairfax
Arlington Boulevard Today
A detailed look at Arlington Boulevard from a bicyclists perspective
Arlington Boulevard Tomorrow
Arlington Boulevard was one of the first major roads in the region to
be designed for the automobile. Also known as US Route 50, it began
at Memorial Bridge and continued west to Fairfax City. It had four
lanes, service roads, no overpasses, and often a grassy median. By the
1940s and 1950s, car use and the local population were booming. To
keep pace with increases in automobile usage and local population
growth in the 1940s and 1950s, interchanges were added, and the
road was widened to six lanes in Arlington. By the end of the 1960s,
Arlington Boulevard looked almost as it does today, complete with
residences and shopping centers along its length--but divided by the
Capital Beltway and connected across the Potomac on the Theodore
Roosevelt Bridge.
The 1970s, 1980s, and 1990s saw a shift in focus away from Arlington
Boulevard. I-66 and Metros Orange Line were completed, creating
freeway and mass transit links that paralleled Arlington Boulevard.
The Custis Trail was built concurrently with I-66 and the bulk of the
Washington and Old Dominion Trail was completed during this time.
Growth in the region continued, but these new transit links largely
met the demand for east-west travel in the area, sparing Arlington
Boulevard from further expansion.
In 2003, a Virginia Department of Transportation regional bikeway study identified Arlington Boulevard
as an important corridor for bicycles and ranked it
as trail with potential for heavy use. A year later The
Washington Post published Mary Battiatas A Walk
on the Wild Side. Her story of how much of Northern Virginia had turned from walkable to inhospitable in the last 40 years helped people see roads like
Arlington Boulevard in a new light. In 2012 VDOT
published a study of long-term transportation needs
along the I-66 corridor. This study rejected turning
Arlington Boulevard into a freeway and recommended building a shared-use trail along the road from
Rosslyn to Fairfax City. The agency provided further
detail and continued support for the trail in a 2014
supplemental report. Even as VDOT conducted
these studies, the area became friendlier to pedestrians and bicyclists. Capital Bikeshare has come to
Arlington. Merrifield has been rebuilt as a walkable
mixed-use destination. A pedestrian bridge has been
built across Arlington Boulevard in Seven Corners.
The fitness app, Strava, provides data (albeit limited, see note on next
page) on where people do and do not ride. This data reveals a bicyclist and runner dead zone along Arlington Boulevard. This map
also demonstrates that, in contrast, regional bicycle and pedestrian
routes that are continuous, well-connected, and safe see heavy usage
from runners and bicyclists. Intermittent facilities along roads like
Arlington Boulevard see almost no activity.
Sensibly, neighborhoods near good bike infrastructure have many
people biking, while neighborhoods lacking such facilities have few.
Strava map of bicycle density with Arlington Boulevard Trail circled. The
brightest red lines are the W&OD, Custis, and Capital Cresent Trails.
Route Summary
D.C.
LE
ES
BU
RG
Fairfax County
PI
KE
I-66
I-6
Arlington
Falls Church
LEE HWY
I-495
National Mall to
Meade Street
Meade Street
Meade Street
to Pickett Road
to Pickett Road
(North Side)
(South Side)
Total Arlington
Boulevard Trail*
Shared-Use Path,
>8 wide sidewalk,
or low-traffic road
Green
Busy road,
<8 wide sidewalk,
one-way road
4.6 miles
(37%)
Yellow
pedestrians and
section
Longest Red section
Total distance
covered
3.6 miles
1.2 miles
1.2 miles
1.2 miles
0.2 miles
0.3 miles
1.3 miles
0.3 miles
1.3 miles
12.3 miles
12.0 miles
*Assumes the south side connections are not built between Pershing Drive and
Washington Boulevard (Arlington has deemed this impractical due to limited space) and
only one pedestrian bridge is built over the Beltway on the north side due to the cost of
this bridge
(30%)
bicyclists Red
Longest Green
The followings sections address the current conditions along Arlington Boulevard in detail, along with suggesting what improvements
would be necessary in each section. From east to west, the Arlington
Boulevard Trail is grouped into six segments, each with the potential
for trail on both the north and south sides of the main roadway.
National Mall to Meade Street in Rosslyn
Impassable or
dangerous for
The twelve mile trip from the National Mall to Fairfax City on Arlington Boulevard takes one through a variety of settings. The route
includes parks, urban centers, residential neighborhoods, and shopping centers. Counting facilities on both sides of the route separately,
more than 11 miles of shared-use infrastructure already exist, though
these are in need of wayfinding signage, lane markings, and amenities. Only 3 miles of new construction and 8 miles of upgrades would
be needed to create a total of over 22 continuous miles of shareduse trail, bicycle-friendly sidewalks, and bicycle lanes between the
National Mall and Fairfax City. Over time, as the road is redeveloped,
a full multi-use trail can be constructed, upgrading the temporary
improvements.
23.8 miles
R O U T E O V E R V I E W : N AT I O N A L M A L L TO C I T Y O F FA I R FA X
Segment 1 of 6:
National Mall to Meade Street
I-66
MT
D.C.
NO
L
RAI
NT
ON
GT
VER
E ST
MEAD
Looking east from the Marine Corps War Memorial a bridge would
bring bicyclists and pedestrians across traffic, following the white line
D
BLV
VELT
E
ROOS
LIN
AR
Arlington
GW
CONSTITUTION AVE
BRIDG
PA
R
KW
AY
ME
GE
RID
LB
IA
OR
N
one mile
R O U T E O V E R V I E W : N AT I O N A L M A L L TO C I T Y O F FA I R FA X
North Side
From the Marine Corps War Memorial, the trail continues
west on both the north and south side of Arlington Boulevard. To get to the north side, the trail uses Meade Street to
Arlington Boulevard, although this requires users to navigate
a 5-lane road or ride on sidewalks with several crosswalks.
The trail then follows Fairfax Drive to its intersection with
Rolfe Street. Fairfax Drive is lightly traveled, although the
traffic getting on and off Arlington Boulevard at Queen Street
makes for a dangerous intersection there. Once at Rolfe
Street, the road connects to a new shared-use path constructed in 2014. The 10 foot wide path parallels Arlington Boulevard to its intersection with Pershing Drive. This section
passes through the urban villages of Rosslyn, Courthouse,
and Clarendon. The many homes and businesses make this a
prime route for commuting or running errands.
MEADE ST
FA
I
RF
AX
South Side
DR
10TH ST
ING RD
Fort Myer
N
TO
IN
H
AS
W
QUEEN ST
ROLFE ST
VD
BL
BLVD
GTON
ARLIN
one mile
R O U T E O V E R V I E W : N AT I O N A L M A L L TO C I T Y O F FA I R FA X
Fairfax
County
BE
TH
N ST
DERS
O
AN
A
GR
ST
AL
DR
E
TH
CA
HEN
DA
S
NG
AS
BLV
RD
RI
CA
ING
ARL
LE
IKE
P
RG
RL
IN
BU
ES
SP
LE
GE
OR
GE
FED.
HILL
DR
TON
SR
Arlington
WILSON BLVD
R
ND
SO
MA
one mile
R O U T E O V E R V I E W : N AT I O N A L M A L L TO C I T Y O F FA I R FA X
South Side
Back at Washington Boulevard, users can also follow an underpass
to arrive on the south side of Arlington Boulevard without having to
cross its six lanes of traffic. From here to near Glebe Road, the current
route is a mix of service roads and shared-use path. This service
road is narrow with parking on both sides. The path crosses several
roads and driveways that connect directly to Arlington Boulevard.
Finally, to get from the service road to Glebe Road, there is only an
overgrown footpath up a fairly steep hill.
From Glebe Road to George Mason Drive, there are only 5 foot wide
sidewalks to ride on, often not in good condition and with little
buffer from traffic. Yet after crossing George Mason Drive and before
Carlin Springs Road, the route is quite pleasant. It is all on service
roads, but they are adjacent to neighborhoods and get little traffic.
Smooth travel is interrupted when the wide sidewalk leading up to
Carlin Springs Road ends and the route detours via a gravel path to a
neighborhood road. A block later, a narrow 5 foot sidewalk with poor
visibility brings connects to the crosswalk at Carlin Springs Road.
Once across Carlin Springs Road, the route follows a wide sidewalk
for a block before connecting to a lightly-traveled service road. The
border with Fairfax County comes just east of Olin Drive.
Fairfax
County
G
WILSON BLVD
LE
BE
Arlington
TH
RD
DR
DERS
O
R
ND
SO
MA
IN
ST
AL
DR
E
TH
CA
HEN
GR
AN
A
RI
DA
S
NG
SR
N ST
AS
GE
OR
GE
FED.
HILL
DR
OL
IKE
P
RG
RL
BU
IN
ES
SP
LE
CA
one mile
R O U T E O V E R V I E W : N AT I O N A L M A L L TO C I T Y O F FA I R FA X
North Side
South Side
HIL
LW
O
AV
E
ANNANDALE RD
OD
LI
DR
K R
IC
TR Y D
PA ENR
H
O
LL
OW
HO
PY
EE
SL
IK
P
RG
one mile
BU
ES
LE
RD
WILSON BLVD
R O U T E O V E R V I E W : N AT I O N A L M A L L TO C I T Y O F FA I R FA X
ANNANDALE RD
AH
GR
SE R
OU
EH
GAT
AM
RD
FA
PA IRV
RK IE
DR W
GALLOWS RD
Mosaic
District
I-495
LEE HW
one mile
R O U T E O V E R V I E W : N AT I O N A L M A L L TO C I T Y O F FA I R FA X
RD
AM
AH
WILL
R
PA
IAMS
IE
GR
RV
DR
SE R
OU
EH
GAT
I
FA
GALLOWS RD
ANNANDALE RD
JAG
UAR
TR
How Segment 5
Could Be Better:
HOLLY HILL DR
MARC DR
CAMP
ALGER
AVE
GA
LL
OW
SR
N DR
HOLMES RU
one mile
R O U T E O V E R V I E W : N AT I O N A L M A L L TO C I T Y O F FA I R FA X
How Segment 6
Could Be Better:
North Side
Connections
South Side
PICKETT RD
BA
RK
LEY
DR
N ST
WILL
IAMS
COVINGTO
DR
PRO
PSE
RIT
YD
R
GALLOWS RD
CEDAR RD
one mile
Shared-use Trails
The Arlington Boulevard Trail will connect many
of the outstanding shared-use trails that already
exist in the area. These trails include:
Rock Creek Park Trail (National Mall to
Rockville, MD)
Mount Vernon Trail (Mount Vernon to Rosslyn)
Custis Trail (Rosslyn to Falls Church)
Washington Boulevard Trail (Arlington Boulevard to Columbia Pike)
Four Mile Run Trail (Crystal City to Falls
Church)
Schools
Elementary Schools: Francis Scott Key, Long
Branch, Patrick Henry, Barcroft, Barrett,
Carlin Springs, McKinley, Westlawn, Graham
Road, Pine Spring, Fairhill, Mosby Woods,
Daniels Run
Middle Schools: Thomas Jefferson, Kenmore,
Luther Jackson
High Schools: Falls Church, Fairfax
Private Schools: Merritt Academy, Saint Leo
the Great Catholic School
Libraries
Fairview Park
Exxon-Mobile campus
Getting it Built
Design Issues
To the extent possible, any new construction along the trail corridor
should be done in accordance with the American Association of State
and Highway Transportation Officials (AASHTO) Guide for the Development of Bicycle Facilities and the National Association of City
Transportation Officials (NACTO) Urban Bikeway Design Guide.
Existing facilities that do not meet current standards but which meet
the needs of trail users need only be upgraded when construction is
done for other reasons. The following AASHTO guidelines apply to
the Arlington Boulevard Trail:
Appendix A: Stakeholders
District of Columbia
Only one mile of the trail will be in DC, but it is
an important mile to link Rosslyn and the Marine
Corps Memorial with DC and the National Mall.
This mile will provide the most direct bicycle and
pedestrian link between the Mall and the Virginia
section of the Arlington Boulevard Trail. The DC
Department of Transportation is currently assessing a rehabilitation of the Theodore Roosevelt
Bridge which should include bicycle and pedestrian upgrades.
Arlington County
The Arlington County section of the trail is about
5 miles long, much of which needs little change to
be incorporated into the final trail. Arlington has
already committed to improving this corridor by
rebuilding the trail between Rolfe Street and 10th
Street. There are also studies planned for the section in Rosslyn and of the intersection with Glebe
Road. The county plans to upgrade several intersections, improve the trail between Pershing Drive
and Washington Boulevard, and build new trail on
the south side near Fillmore Street.
Fairfax County
Just over 7 miles of the trail are in Fairfax County.
Unlike in Arlington County, there is no existing
trail route so many of the largest challenges are
found here. In the 2014 public draft of the Fairfax
County Bicycle Master Plan, Arlington Boulevard
is designated a Policy Road, meaning that further
study is necessary before specific recommendations can be made. Despite this, there are plans
to improve sidewalks along Arlington Boulevard
inside the beltway and to study adding crosswalks
at Route 7 in Seven Corners. Most significantly,
Fairfax County plans to eventually widen Arlington Boulevard to six lanes to match the width in
Total Cost *
Notes
$7,886,500
$7,227,000
Bottom-up estimate
$17,678,340
$22,187,408
$849,294
$1,586,356
Integrated estimate
$18,353,900
$15,000
$200,000
$500,000
Bike/pedestrian bridge
$7,900,000
$9,504,000
Source: Regional Transportation Priorities Plan, I-66 Multimodal Study 2012 Appendix
* Costs on this page are hard costs associated with actually building infrastructure. In the text of this document, we have
factored in estimated soft costs for for planning, design and other contingencies.
Integrated Estimate
Segment
Cost*
Source/Notes
From I-66 Study (2012): $600/sqft
$5,873,400
$704,000
District of Columbia
Arlington County
Trail extension study Meade Street to Rolfe Street
$1,000,000
Fairfax County
Sidewalk improvements Patrick Henry Dr to Olin Dr (south side), areas between Seven Corners and
Jaguar Trl (both sides), I-495 to Pickett Road
Pedestrian improvements study Seven Corners intersection
Glebe Rd to I-495
$3,062,000
Crossing I-495
$3,300,000
I-495 to Pickett Rd
$865,000
$14,804,400
$18,353,900
* Costs on this page are hard costs associated with actually building infrastructure. In the text of this document, we have
factored in estimated soft costs for for planning, design and other contingencies.
Widen road to 6 lanes Arlington Boulevard from Fairfax City to Arlington County line, Route 7 from
Seven Corners to Baileys Crossroads
References
Maps are courtesy of Google and Open Street Map, 2014
Street cross-sections courtesy of Streetmix.net (see http://streetmix.net/-/146830)
A Walk on the Wild Side Mary Battiata / Washington Post January 2004
Arlington Master Transportation Plan Bicycle Element July 2008
Bicycle and Pedestrian Plan for the National Capital Region National Capital Region Transportation Planning Board October 2010
Captial Bikeshare Member Survey Report May 2013
The External Damage Cost of Noise Emitted from Motor Vehicles Mark Delucchi and Sing-Ling Hsu / University of California Davis 1998
Fairfax County Bicycle Master Plan Public Draft Version June 2014
Guide for the Development of Bicycle Facilities AASHTO Fourth Edition, 2012
I-66 Multimodal Study Final Report VDOT 2012
I-66 Multimodal Study Supplemental Report VDOT 2014
NOVA Regional Bikeway Study VDOT 2003
Regional Transportation Priorities Plan National Capital Region Transportation Planning Board January
2014
Nicholls, Sarah and Crompton, John. The Impact of Greenwa ys on Property Values: Evidence from Austin,
Texas. Journal of Leisure Research. 2005. 37: 321341