Professional Documents
Culture Documents
PresentedTo:
PDVSA
For
3xRollsRoyceTrent60
TurbineEquipment
PreparedBy
ProposalNo.7103131
January14,2010
Thisdocumentisprivilegedandcontainsconfidentialinformationintendedforuseonlyby
PDVSA
Introduction
DERWICKASSOCIATES(DA)ispleasedtoprovidethisproposaltoPetroleosde
Venezuela(PDV)forThree(3)BrandNewRollsRoyceTrent60GasTurbines.
Page 2 of 23
PDVSA: 710-3131
Trent60WLEPowerGenerationPackage
SCOPEOFSUPPLY
DERWICKASSOCIATESoffersthedeliveryofThree(3)BrandNewRollsRoyce
Trent60WetLowEmissions(WLE)GasTurbinePowerGenerationPackages,
designedinaccordancewiththespecificationsoutlinedinthisproposal,
comprisingof:
GasTurbine
Trent60WLE
RollsRoyceIndustrialTrent60GasTurbineWLE,DualFuel
Onenginemountedlubricationpumpandhydraulicstarter
GasTurbineignitionsystemconsistingofsixteenonengineigniterswithseals,
eight onengine high energy igniter leads dual circuits and offengine
mountedexciterunit
Onenginemountedgasfuelinjectionmanifolds.
Onenginemountedwaterinjectionandliquidfuelmanifold.
ACGenerator
Twopole,OpenAirCooled(OAC)ACgenerator,13.8kV,3phase,60Hz,0.85
powerfactorinaccordancewithIEC343orANSIC.5014,fittedwithclassF
insulation and designed for class B temperature rises with a brushless
exciter.
AC generator cooling system comprising air filter media, ducting and silencer
andageneratorshaft
Page 3 of 23
PDVSA: 710-3131
GasTurbineModule
EnclosureandBase
Fabricated weatherproof painted carbon steel baseplate mounted acoustic
enclosure (85dB(A) avg. @ 1m) and base for housing the gas turbine, inlet
plenum, fuel and oil systems, exhaust volute and enclosure ventilation air
systems.
Allinternallighting(mainandemergency),maintenancepowerpoints,tubing,
pipingandcabling.
Maintenance access and features, facilitating engine / module removal
(sidewaysremovalfrompackage)andinsitumaintenance.Anchorpointsand
any special tooling are provided. Mechanical Handling Skid, standard
walkwaysandladdersgivingaccesstotheinletfilterhouseareincluded.
Fire protection and gas detection system, complete with thermal detectors
andgassensorsforGTenclosure.
TwoshotCO2extinguishingsystem,includingstoragecylinders,manifold,fire
dampers, pipe work to nozzles within the gas turbine compartment, warning
lamps,lockoffs,interlocksandhightemperaturecabling.
Drydiaphragmflexiblecouplingshaftincludingbolts.Aseparateshaftguardis
notrequiredasthecouplingshaftisprotectedbytheconearrangementinthe
exhaustdiffuser.
CombustionAirSystem
Selfcleaning(pulsed)combustionairintakefilterswithfirststagecoalesce.
Pulsedcleaningcontrolsystemfittedonthefilterunit.Theairrequiredforthe
pulsecleaningofthefilterwillbesuppliedbyothers.
Combustionairinletsilencerandducting,withflexiblejointstoaccommodate
thermalmovement.
SteelsupportstructuremountedontheGTbase,includingaccessladderupto
thefilterunits.
Page 4 of 23
PDVSA: 710-3131
Page 5 of 23
PDVSA: 710-3131
watercooledplateoilcooler,stainlesssteelpipeworkandfittings,associated
valvesandinstrumentation.
GasTurbineHydraulicStartSystem
Gas turbine hydraulic start system comprising of one 100% duty AC motor
driven variable displacement pump and fixed displacement charge pump in
tandem, stainless steel pipe work and fittings, associated filters, valves and
instrumentation.
GasTurbineGasFuelSystem.
Gasfuelforwardingsystem,locatedtothesideofthegasturbine,comprising
of metering valves, high speed shutoff valves, last chance strainer, enclosure
mounted fuel manifolds, stainless steel pipe work and fittings, associated
valvesandinstrumentation.
ACGeneratorModule
EnclosureandBase
FabricatedcarbonsteelskidandacousticenclosurehousingtheACgenerator,
cooling air system, exciter and line and neutral cubicles. Access doors and
hatchesformaintenance.
TwoshotCO2extinguishingsystem,includingstoragecylinders,manifold,fire
dampers, pipe work to nozzles within the gas turbine compartment, warning
lamps,lockoffs,interlocksandhightemperaturecabling.
GeneratorLubeOilSystem
One lube oil system located adjacent/near to the AC Generator base
comprising one shaft driven oil pump (mounted on the generator, one AC
motordrivenauxiliaryoilpump,oneACmotordrivenjackingoilpump,oneDC
motordrivenemergencylubeoilpumpforrundown,duplexoilfilter,carbon
steel oil reservoir with mist eliminator, vent and thermostatically controlled
electric heater, associated pipe work (stainless steel downstream of
filters/carbonsteelupstream),fittings,valvesandinstrumentation.
Page 6 of 23
PDVSA: 710-3131
WaterWashSystem
One mobile gas turbine compressor cleaning system, suitable for unfired
washing.Attachmentpointsforthewaterwashsystemareexternallylocated
ontheoutsideoftheGasTurbineBaseplate.
LiquidFuelSystem
HighpressureliquidfuelsystemcomprisingonemainandoneauxiliaryAC
electricmotordrivenfixeddisplacement,bentaxis,axialpistonpump,
meteringvalves,highspeedshutoffvalves,stainlesssteelpipeworkand
fittings,associatedvalvesandinstrumentation.Thesystemismountedona
freestandingskidtobelocatedadjacenttothegasturbinemodule.
WaterInjectionSystem(forEmissionsControl)
Waterinjectionsystemcomprisingthree(3)x33%ACelectricmotordriven
fixeddisplacement,bentaxis,axialpistonpumps,stainlesssteelpipeworkand
fittings,associatedsimplexfilters,valvesandinstrumentation.Thesystemis
mountedonafreestandingskidtobelocatedadjacenttothegasturbine
module.
ControlSystem
Human Machine Interfaces (HMI) To be mounted in the remote control
room,shippedlooseforinstallationintheoperatorscontrolroom.Allcontrol
systemsareaccessibleremotelyviatheHMIsystem.
Gasturbinecontrolsystemwillbeinstalledinthefrontofthepackageonthe
gasturbinebaseplate.ThefollowingisincludedintheonskidControlsScope
ofSupply:
PackageControlSystem(PCS)
EngineControlSystem(ECS)
FireandGasProtectionSystem
Vibrationmonitoringforallrotatingequipment
Temperaturemonitoringofallrotatingequipment
Page 7 of 23
PDVSA: 710-3131
Projectdrawingsanddocumentlist.
Options(Budgetary)
AvailabilityguaranteeisofferedaspartoftheLongTermServiceAgreement
GeneratorRotorWithdrawaltool
FreightFAS,PortofExport
MCC/UPS
InletChillerCoil
Page 9 of 23
PDVSA: 710-3131
TRENT60POWERGENERATIONPACKAGE
TERMINATIONPOINTS
InterfaceDescription
TerminalPoints
CombustionAir
Inlettointakefilterhouse.
Compressedair
Compressedairconnectionatskidedge.
ExhaustGas
Transitionenclosurewallductjoint.Inletandoutlet
flangesofsilencersection
Ventilation
Enclosureventsoutlets.
Mountings
Locationsonskidbaseplatesandallotherstructural
members.
FuelGas
Inletflangeonsideofbaseplateandventflangeon
theroofoftheenclosure.
InstrumentAir
Inletconnectiononenginebaseplate.
Lubricants
Fillingpointsatlubricatingoiltanks.
Drainsconnectionsatoiltanks.
Drains
Drainssystemconnectionsonallskidsasnecessary.
Grounding
Groundingterminalsonskids.
ControlandInstrumentation
SeriallinkconnectionbetweenHMIandPackage
mountedcontrolsystem.
GCPPTerminalblocksincontrolpanelsandonskid
connections.
HVElectricPower
LinesideterminalsofACgenerator.
NeutralterminalofACgenerator
CompressorCleaning
Fillingpointofwashtanks.
LowVoltagePower
AtterminalsinsidetheMCC.
Page 10 of 23
PDVSA: 710-3131
TRENT60POWERGENERATIONPACKAGE
EXCLUSIONS
PDVSAdoesnotacceptresponsibilityforitemsoraspectsofequipmentwhich
areoutsidetheScopeofSupplydefinedabove.Thefollowingitemsare
excludedfromthisproposal,unlessofferedasanoption.
Sitegrounding
Lightningprotection
Compressedairsupply
Allauxiliarypowersupplies
Allfirstfills
Allfuelsupplies,fuelsupplyandtreatment
Watersupplyandtreatment
Installation&commissioninglabor
Demolition and/or removal of any existing equipment, structures and
concrete.
Installationtooling
InstrumentationforsitePerformanceTesting
Sitefacilities
Fire sprinklers or other fire protection devices which may be required by
insuranceregulations.
MotorControlCenter(BudgetaryOption)
BatteryBackUpSystem(BudgetaryOption)
Switchgear
Transformers(Auxiliary&Main)
Control system housing, external to gas turbine package enclosure mounted
equipment
ControlSystemintegrationwithexistingDCS
BlackStartDieselGenSet
Page 11 of 23
PDVSA: 710-3131
ACGeneratorRotorWithdrawal
Fiscalmetering
Sitefacilities
Operatingandstrategicspares
Civilengineeringdesign,embedmentandworks
Grout
Erectionofequipment
Civilengineeringdesignofanykind
Page 12 of 23
PDVSA: 710-3131
Page 13 of 23
PDVSA: 710-3131
ATTACHMENTSCHEDULEDDATE(S)
FCAMANUFACTURERSSITEDELIVERYSCHEDULE
THEFOLLOWINGDATESAREFORDELIVERYDATESASAPPLICABLETOTHIS
CONTRACT.UNDERNOCIRCUMSTANCESHALLANYDELIVERYDATEBEPRIORTO
THERECEIPTOFAMUTUALLYAGREEDLETTEROFCREDIT,ASDEFINEDINSECTION
3.8OFTHEMAINCONTRACT.DELIVERYDATESFORTHEPACKAGEREQUIRING
ADDITIONALFIELDMODIFICATIONFOR50HZTO60HZCONVERSIONOFGENSET
PACKAGE:
Item
Equipment
Description
Delivery
LeadTime
DeliveryUnit
2
Delivery
Unit3
MainGas
TurbineSkid,
Generator
withoutLine
Sideand
Neutral
Cubicle
March30,
2010
March30,
2010
March30,
2010
GasTurbine
SeeNote1
SeeNote1
SeeNote1
LineSideand
Neutral
cubicle
June30,
2010
June30,
2010
June30,
2010
Equipment
requiredto
beinstalled
for50hzto
60Hz
Conversion
August30,
2010(See
Note2)
August30,
2010(See
Note2)
August30,
2010(See
Note2)
Page 14 of 23
PDVSA: 710-3131
Note1Thegasturbinewillbedeliveredinaccordancewiththe
customersinstallationandcommissioningscheduleneeddate,not
toexceed60daysfromMainGasTurbineSkidDelivery.
Note2Customerwillberequiredtotakeintoconsideration
appropriatefieldsupportlaborandscheduletoinstallequipment
shippedtositedirectlyforconvertingGenSetpackagefrom50Hzto
60Hzapplicationready.
60HERTZCONVERSIONOFPACKAGE(INSTALLATIONATFACORYORPOSTFCA
DELIVERYDEPENDINGONDELIVERYDATEOPTIONSELECTED)
60 hertz compliant materials to be installed by Customer supplied. Scope of
conversiontoinclude,butnotlimitedto,
ExchangeofAirFilterVentFans
ExchangeofPackageEnclosureLighting
ExchangeofUCPLighting
ExchangeofMineralOilHeaters&PumpMotors
ExchangeofGTLubeOilHeaters&PumpMotors
ExchangeofLiquidFuelForwardingPumpMotors
ExchangeofPackageHeaters
ExchangeofF&GCO2SkidHeaters
ExchangeofGTHydraulicStartMotor
CraftLaborforinstallationofconversionmaterialtobeprovidedbyDERWICK
Page 15 of 23
PDVSA: 710-3131
FUELREQUIREMENTS
1GENERAL
RRgasturbineshavetheabilitytoburnawiderangeofgaseousfuelsasshownin
Table1.Thesegasespresent abroadspectrumofpropertiesdueto bothactive
and inert components. This specification is designed to define guidelines that
mustbefollowedinordertoburnthesefuelsinanefficient,troublefreemanner,
whileprotectingthegasturbineandsupportinghardware.
Table2identifiestheacceptabletestmethodstobeusedindetermininggasfuel
properties.
Notes:
1. Whenconsideringtheuseofalternatefuels,providedetailsofthefuel
constituents,fueltemperature,andexpectedengineusageconditionsand
operatingcharacteristicstoRRforevaluationandrecommendations.
2. Valuesandlimitsapplyattheinletofthegasfuelcontrolmodule.
Page 16 of 23
PDVSA: 710-3131
DesignCriteria
Thefollowingtableoutlinesthecriteriaconditionsattheproposedjobsitefor
thedesignoftheequipment:
Location
TBD
Elevation
TBD
DesignPointAmbientTemperature/
TBD
RelativeHumidity
Page 17 of 23
PDVSA: 710-3131
PrimaryFuelSource
TBD
SecondaryFuelSource
TBD
SeismicDesignCriteria(BOPEquipment)
TBD
MaximumWindSpeed(WindLoad),
TBD
MPH
NearFieldNoiseat3fthorizontaland5
TBD
ftvertical,dBANOTE1
FarFieldNoise,dBANOTE1
TBDat400ft/TBDat700ft
NOTE1:Farfieldnoiseisbasedonsingleunitonlyoperation.Multipleunits
operatingatthesametimewillhaveanimpactonbothnearandfarfieldnoise
levels.
Page 18 of 23
PDVSA: 710-3131
COMMERCIALTERMS
BasisofPricing
Validity
ThisproposalisvaliduntilFebruary15,2010.
Taxes
No sales or use taxes have been included in this quotation. These prices
quoted exclude any federal, state or local taxes or fees which may be
associatedwiththeexport,importorpurchaseofequipmentand/orservices.
Price
Three(3)RRTrent60GasTurbineGeneratorSetincludingasdescribedinthe
scopeofsupply.Allpricingisbasedonexworksfactorydeliveryunless
otherwisestated.
AllEquipmentSubjecttoPreviousSale
GTGUNIT
Generatorssetprice(Unit)...US$32,500,000
Generatorssetprice(ThreeUnits).US$97,500,000
Page 19 of 23
PDVSA: 710-3131
WireInformation
BENEFICIARY:
BANKNAME:
BANKADDRESS:
CITY,STATE,ZIP:
COUNTRY:
SWIFTCODE:
RoutingNumber/ABACode:
(ForUSAVendors)
ACCOUNTNUMBER:(withoutIBAN
details)
DERWICKASSOCIATESCORP.
JPMorganChaseBankN.A.
345ParkAvenue
NewYork,NY10154
UnitedStatesofAmerica
CHASUS33
021000021
811156397
PaymentSchedule
Thisproposalisbaseduponreceiptofthefollowingprogresspaymentsanda
ContractAgreementbybothPartiesbytheValiditydateSellermayrequestat
anytime,Purchaserwilldemonstrateitsfinancialcapabilitytocontinueto
carryoutitsobligationsunderthisContract.Thisdemonstrationmayrequire
thatPurchaserfurnishadequatepaymentsecurity.
Page 20 of 23
PDVSA: 710-3131
Milestone
1
Milestone
Description
EquipmentContract
Signature
GasTurbinePackage
SkidavailableEXW
ACGeneratorSkid
availableEXW
GasTurbineavailable
EXW
Evidenceof
Completion
Receiptof
signed
Equipment
Contract
Notificationof
readinessto
shipEXW
Manufacturing
Facility
Notificationof
readinessto
shipEXW
Manufacturing
Facility
Notificationof
readinessto
shipEXW
Manufacturing
Facility
Unit1,2
&3
25%
Contract
Price
Termsof
Payment
Payment3
daysfrom
signature
35%
Contract
Value
DrawonLOC
35%
Contract
Value
DrawonLOC
5%
Contract
Value
DrawonLOC
Page 21 of 23
PDVSA: 710-3131
Warranty
DERWICKwillprovideaone(1)yearwarrantyontheentiregasturbinegenerator
packageandanyotherbalanceofplantequipmentprovided.
Terms&Conditions
This proposal shall be valid for fifteen (15) days; provided, however, the
obligationtotreatthisproposalasconfidential,andthatitcannotbesharedwith
anythirdpartywithoutthepriorwrittenconsentofDERWICKshallsurvive.
PDVSA and DERWICK will negotiate in good faith to establish general termsand
conditionsthatareusualandcustomaryofthesaleofthesenewequipments.
SiteServices
DERWICKwouldbepleasedtoalsoprovideaproposalfortheinstallation,startup
and commissioning of the facility. This would include providing construction
supervisionaswellasstartupengineersforallequipmentprovided.
FollowUp
PleasecontactthefollowingpersonatDERWICKASSOCIATESforinformation
regardingthisproposal:
PedroTrebbau
Director
ptrebbau@derwickassociates.com
584123007470
Page 22 of 23
PDVSA: 710-3131
Attachment A
Page 23 of 23
PDVSA: 710-3131