You are on page 1of 36

NAME OF CLIENT

NAME OF PROJECT
DEPARTMENT
INSPECTION DATE
REPORT DATE
SR. NO

DATE

23-May-12

:
:
:
:
:

JINDAL INDIA THERMAL POWER LIMITED


2X6OOMW THERMAL PROJECT,ORISSA
CIVIL
23-05-2012
24-05-2012
NAME OF THE
INSPECTOR

AREA VISITED

Cooling Tower #
1 /Eliminator
S P Karmakar
beams at cell no01

23-May-12

S P Karmakar

Laboratory

23-May-12

Cooling Tower #
S P Karmakar 1 /Fan cylinder
6B & 10A

23-May-12

Bottom Ash
Storage Silo #
S P Karmakar 1/column no - F2
(2 nos) at grid C2
& C3

23-May-12

S P Karmakar

Laboratory

23-May-12

S P Karmakar

Laboratory

DAILY INSPECTION REPORT

MAL POWER LIMITED


AL PROJECT,ORISSA

ACTIVITY

OBSERVATION/DEVIATION

Concrete casting was in progress at


the mentioned structure about 10:30
am. Checked the following items:
1) Concrete constituents were found
under limit of tolerance as per IS
4925 in digital panel board of mini
Concrete casting reversible mixture.
was in progress. 2) Concrete slump checked and found
80 mm.
3) Concrete qty. - 05 m3
approximately. Cube casted at site 09 nos.
4) Needle vibrator was available at
pouring point.

Concrete cube
(15x15x15) cm.
testing of M25
grade.

Concrete cube (15x15x15) cm. testing


in lab. and found ok.
The above test is conforming to IS
456:2000.

Moist curing was Moist curing was in progress at the


mentioned structure about 10:45 am.
in progress.

Cement mortar finishing work was


Mortar finishing in
doing at the mentioned columns
column at
where small honeycombs were
honeycomb
appeared. Moist curing was not in
portion.
progress there.

Concrete cube
(15x15x15) cm.
testing of M25
grade

Witnessed the testing in lab. and


found 01 sample was INVALID &
other sample was failure (M25 grade
concrete) of 28 days testing.
Another 01 sample of 7 days testing
was failure.
The above test is conforming to IS
456:2000.

Concrete casting was in progress at


the mentioned foundation about
Electric room no - 11:30 am. Concrete needle vibrator
2/foundation raft was available at pouring point.
F2 at grid A1
Concrete slump cone & cubes were
not available at site.

ON REPORT

REMEDIAL ACTION
SUGGESTED

NAME OF THE
CONTRACTOR

M/s. Paharpur
Cooling Towers
Limited

M/s. Paharpur
Cooling Towers
Limited

M/s. Paharpur
Cooling Towers
Limited

Suggested at site to
the concern person of
Contractor about this
M/s. Macawber
as per JITPL
Beekay Pvt. Ltd.
specification.

M/s. Tecpro
Systems Limited

Already suggested to
M/s. Tecpro
Mr. Kashyap - QA/QC
Systems Limited
of TECPRO

STATUS

RECTIFICATION
REFERENCE WITH
DATE AND SR.
NO.

Today 02 samples of 7
days and 02 samples of
28 days testing observed.

Dimensions of concrete
cube were ok.

Open

Cubes dimensions were


ok.
Structure name:
Stacker - Reclaimer wall
module no -04/south
side wall -2nd lift casting,
BCN 6A/6B, TR-29/01 no
raft, TR-13 & 13A column casting. (based
on 28 days result)
Concrete qty.- 15.02m3

Action not taken in spite


of our strictly instruction.

NAME OF CLIENT
NAME OF PROJECT
DEPARTMENT
INSPECTION DATE
REPORT DATE

:
:
:
:
:

JINDAL INDIA THERMAL POWER LIMITED


2X6OOMW THERMAL PROJECT,ORISSA
CIVIL
22-05-2012
23-05-2012
NAME OF THE
INSPECTOR

SR. NO

DATE

22-May-12

S P Karmakar Cooling Tower # 1 & 2

22-May-12

S P Karmakar

Laboratory

S P Karmakar

Cooling Tower # 1
/Fan cylinder 6B &
10A

22-May-12

AREA VISITED

22-May-12

Bottom Ash
S P Karmakar Silo/column no - F2 (2
nos) at grid C2 & C3

22-May-12

S P Karmakar

Laboratory

22-May-12

S P Karmakar

Laboratory

22-May-12

S P Karmakar

Township / 01 no raft
of B5 type quarter.

22-May-12

S P Karmakar

Township/C1 type
quarter

DAILY INSPECTION REPORT

POWER LIMITED
OJECT,ORISSA

ACTIVITY

OBSERVATION/DEVIATION

Concrete casting was not in


Concrete casting was not
progress at the mentioned area
in progress.
due to labour problems.

No test has done

They have not arrange any test of


materials & concrete cube testing
.

Moist curing was in


progress.

Moist curing was in progress at


the mentioned structure about
10:25 am.

Concrete casting was


going on.

Concrete casting was going on at


the mentioned column about 1.75
m3 concrete. During concreting
checked the following items:
1) Concrete ingredients were out
of tolerance as per IS 4925 in
digital panel board at mini
reversible mixture.
2) Concrete slump cone & cubes
(15x15x15) cm. were available at
site. But, not taken at site.
3) Concrete vibrator was available
at pouring point.

Witnessed the testing in lab. and


found 02 samples (M30 grade
concrete) of 28 days testing were
Concrete cube
failure at Pipe rack pedestal /grid (15x15x15) cm. testing
A/43 & B/45 upto plinth beam
of M25 & M30 grade
and 01 sample (M25 grade
concrete) of 7 days testing was
found ok.

Witnessed the testing in lab. and


found 02 samples of 28 days
testing were INVALID out of 03
samples and one individual test
result was under the limit as per
''Acceptance Criteria'' of IS
Concrete cube
(15x15x15) cm. testing 456:2000. So, these result were
not
compliance
with
the
of M25 grade
'Acceptance Criteria'' of IS
456:2000.
Another 01 sample of 7 days
testing was found ok.

Concrete casting was


going on.

Concrete vibrator was available at


pouring point. Concrete slump
cone and cubes were not available
at site.

Field compaction test

Witnessed the field compaction


test as per approved FQP and
found ok.

SPECTION REPORT

SERVATION/DEVIATION

e casting was not in


s at the mentioned area
abour problems.

REMEDIAL ACTION
SUGGESTED

NAME OF THE
CONTRACTOR

M/s. Paharpur
Cooling Towers
Limited

ve not arrange any test of Suggested for testing


ls & concrete cube testing
to Mr. Ansari Manager of PCTL

M/s. Paharpur
Cooling Towers
Limited

uring was in progress at


entioned structure about
m.

M/s. Paharpur
Cooling Towers
Limited

e casting was going on at


ntioned column about 1.75
ncrete. During concreting
d the following items:
rete ingredients were out
rance as per IS 4925 in
Suggested to Mr.
panel board at mini
Santosh for
M/s. Macawber
le mixture.
rectification of item no Beekay Pvt. Ltd.
rete slump cone & cubes
-1&2
15) cm. were available at
t, not taken at site.
rete vibrator was available
ng point.

ed the testing in lab. and


02 samples (M30 grade
e) of 28 days testing were
at Pipe rack pedestal /grid B/45 upto plinth beam
1 sample (M25 grade
e) of 7 days testing was
k.

M/s. Macawber
Beekay Pvt. Ltd.

ed the testing in lab. and


02 samples of 28 days
were INVALID out of 03
s and one individual test
was under the limit as per
ance Criteria'' of IS
00. So, these result were
compliance
with
the
ance Criteria'' of IS
00.

M/s. Tecpro
Systems Limited

r 01 sample of 7 days
was found ok.

e vibrator was available at


Already suggested to
point. Concrete slump
Mr. Santosh as per
d cubes were not available
approved FQP.

M/s. Gammon
India Limited

ed the field compaction


per approved FQP and
k.

M/s. Gammon
India Limited

STATUS

RECTIFICATION
REFERENCE WITH
DATE AND SR.
NO.

Quality Engineer
was absent at
site.

Quality Engineer
was absent at
site.

Cubes
dimensions were
ok.
Concrete qty.3.20 m3

Cubes
dimensions were
ok.
Structure name:
JNT - 6 F12 raft
beam casting ,
BCN 6A/6B, TR - 9
& 9A tie beam, ER
- 2/6 nos raft
foundation.

Concrete qty. 26.95 m3.

Action not taken

NAME OF CLIENT
NAME OF PROJECT
DEPARTMENT
INSPECTION DATE
REPORT DATE

:
:
:
:
:

JINDAL INDIA THERMAL POWER LIMITED


2X6OOMW THERMAL PROJECT,ORISSA
CIVIL
13.06.2012
13.06.2012

SR. NO

DATE

NAME OF THE
INSPECTOR

AREA VISITED

13.06.2012

D.Banerjee

Tecpro laboratory

13.06.2012

D.Banerjee

Paharpur cooling
tower (1)&(2)

13.06.2012

D.Banerjee

Tecpro laboratory

DAILY INSPECTION REPORT

AL POWER LIMITED
PROJECT,ORISSA

ACTIVITY

Bulk density test of


corse and fine
aggrigate

Curing of structure

OBSERVATION/DEVIATION

results found ok.

1.curing done by pipes

Cube test conducted 28 days cube test conducted.results found ok.

AILY INSPECTION REPORT

OBSERVATION/DEVIATION

results found ok.

done by pipes

REMEDIAL ACTION
SUGGESTED

ok

Issued hassion cloth


for curing

cube test conducted.results found ok.

ok

NAME OF THE
CONTRACTOR

STATUS

RECTIFICATION
REFERENCE WITH
DATE AND SR.
NO.

M/s. Tecpro
systems Limited

closed

M/s Paharpur
cooling tower
Limited

OPEN

M/s Tecpro
system limited

closed

You might also like