Package 1A "Design Construction, Supply, Installation, Laying & Jointing, Testing and Commissioning Success
PROJECT :
Raw Water Pumping Station and Raw Water Twin Main."
Mix Proportions:
For 1 M
(a.)
(b.)
(c.)
(d.)
Water
Cement
Sand...
Coarse aggregate
Ltr./M
Kg./M
Kg./M
Kg./M
%
%
Kg. x
Kg. x
Liters.
Kg.+
Moisture% in sand
+Qty. of col.3
+Qty. of col.4
Kg.
Kg.
-Absorption
-Absorption
Kg./M
Kg./M
Kg./M
Kg./M
Liters/M
Kg./M
10mm
20mm
DJB
Rep No. :
Dt.
inting, Testing and Commissioning Successfully,01 yr. DLP And 05 yr. O&M of 55MGD Intake Works,
Moisture% in sand
+Qty. of col.3
+Qty. of col.4
-Absorption
-Absorption
-Qty. of col.4
(=) (=) -
Liters.
Liters.
Liters.
Kg.
=(+)
=(-)
(=)
(=)
(=)
(=)
Kg.
Kg.
L&T
L&T/DJB/DWSS/FM/
174
290
4
785
4%
498
608
1106
0.5
5.53
2.9
60.00
100.00
4.00
270.69
10.83
171.72
209.66
381.38
1.91
51.08
100.00
4.00
281.52
10.83
170.87
208.61
379.47
1.91
51.079
100.000
4.000
281.517
10.828
170.866
208.607
379.472
162
324
3
763
3%
629
629
1258
0.5
6.29
3.888
50.00
100.00
3.00
235.49
7.06
194.14
194.14
388.27
1.94
44.88
100.00
3.00
242.56
7.06
193.17
193.17
386.33
1.94
44.877
100.000
3.000
242.559
7.065
193.165
193.165
386.330
1.2
180
360
2
775
2%
451
677
1128
0.8
9.024
1.44
50.00
100.00
2.00
215.28
4.31
125.28
188.06
313.33
2.51
48.20
100.00
2.00
219.58
4.31
124.28
186.55
310.83
2.51
48.201
100.000
2.000
219.583
4.306
124.276
186.551
310.827
0.4
162
360
4
722
4%
634
634
1268
0.5
6.34
4.32
45.00
100.00
4.00
200.56
8.02
176.11
176.11
352.22
1.76
38.74
100.00
4.00
208.58
8.02
175.23
175.23
350.46
1.76
38.739
100.000
4.000
208.578
8.022
175.231
175.231
350.461
1.2