FARAKKA
FARAKKA
INDEX
Sl.
No.
1
DESCRIPTION
PAGE No.
5-6
7 - 13
LOCOMOTIVES
14 - 21
WAGONS
22 - 26
S&T
27 - 29
MGR OPERATION
30 - 36
37 - 40
FARAKKA
FARAKKA
: 84.50 Km
: 115.50 Km
LOADING POINT
C/ROOM: KM- 81.50
SILO-I & II
20 KM
33 KM
BARHAIT
STATION
KUMARPUR
STATION
TH-I
TH-II
52 KM
PATHRA
STATION
TO EXG. YARD
MGR FEATURES
FARAKKA MGR is longest single line MGR of 85 KMS length with
loop on both ends. This is operated by 3 intermediate full fledge stations
which is a unique feature in any of MGR in NTPC. Out of 85 KM track
length, about 10.5 KM consist of black cotton soil & low bearing capacity
soil, 2.25 KM high bank and 11 KM is very prone to be flood affected.
There is also a ruling gradient of 1:100 rising in empty direction and 1:200
rising in loaded direction. There are 286 no. bridges/culverts (15 no. major
4
FARAKKA
bridges), 49 no. curvatures and 66 no. of unmanned level crossing over
the track length.
Name of Auditor
Designation
Mr.M.V.Krishnan
DGM(MGR)Vindhyacha
l
Mr. C.S.Tiwari
DGM(MGR)Korba
Operation
& S&T
Mr.P.venkatramaiah
Sr.Supdt
(MGR)Ramagundam
Track
Mr. M.M.Manzer
Manager.(ER -I HQ )
Audit Area
Rolling
Stock
Coordination
FARAKKA
Name of internal
No
Members
Shri B.K.Jha
01
Shri S. Roy
Shri Basudeb
Ghosh
Shri A.Chatterjee
Shri S.N.Ganguly
02
Audit Area
Designation
(MGR
System)
AGM (MGR)
Supdt (MGR)
Operation
Dy Supdt (MGR)
AGM(MGR)
DGM(MGR)
Sr.Supdt (MGR)
Dy Supdt (MGR)
Rolling
Stock, S&T
& Allied
System
Asst. Manager
(MGR)
03
Shri R K Sinha
AGM(MGR)
Shri N. Lodh
DGM(MGR)
Track
Maintenanc
FARAKKA
DGM(MGR)
Shri S.Das
Shri Subrato Das
Shri Shabir Ali
Manager (MGR)
Asst.Manager
(MGR)
1.TRACK
General
1.
Track length
2.
3.
Track structure
- 1 in 200
4.
5.
Condition of Sleepers:
necessary through
FARAKKA
CST-9/Wooden sleepers are being replaced with PSC by RITES
and nearly 1,03,200 sleepers(including spl.sleepers) are
replaced. Balance 1800 sleepers are expected to be replaced by
Nov14. This is to be done in approx. 1.1 Km track in total at
Kumarpur yard, Berhait & at Km 40/500 to 40/900.
At various locations excessive PSC sleepers are found which are
to be shifted to required locations..
At several locations of the entire length of the track as
mentioned in last audit, Rail burns, scabs were found on the
track. It is stated that 18 Km Rails shall be replaced by RITES
under the track renewal contract, out of which 16 km is already
replaced and balance qty is likely to be completed by End
Oct.14.
6.
Formation:
The boxing and dressing of ballast in track is required in several
locations.
At approach of track hopper (near level crossing), bushes and
plants including grasses in & around of track are found, which need
to remove and maintain the track proper. To tackle the high
8
FARAKKA
vegetation in the track, regular grass cutting to be done to improve
the visibility at L-Xings to avoid accidents
Drains:
During inspection of track the drain is required to be cleaned at
following locations
a) All cutting areas of track.
b) As there is no drains at Station yards more cross drains
has to be provided to avoid mud pumping
.
7.
Condition of Rails:
Satisfactory, Most of the locations scabbed rails are found through out
the section which need to replace.
8.
9.
Jammed joints:
a. Almost in all the sections the Low joints are found, which needs
proper attention.
b. The Welding of rail joints need to be taken up to reduce the no.
of joints and convert the complete section in SWR section.
10.
Creep:
As the sleepers and rail renovation is in progress the creep
adjustment to be done after completion of work.
Curves :
a. Kinks were observed at various Curves.
9
FARAKKA
b. Realignment of most of curves is immediately required. Curves from
Workshop to Pathra and up to Loading Point, to be done on priority
basis.
11.
12.
The points and crossings are being inspected on 6 monthly basis as per
the records produced.
16. Bridges:
(a) For regular system of checking of bridges checking is being
done as per CC format.
10
FARAKKA
17. Indication/Caution board: There are no curve boards. They are to be provided as per IR
specification.:- All under mentioned points Contract has been
awarded and work is in progress.
Creep posts: Available. Numbering is required like.
Curve detail boards: Curve numbers, Versine, SE, Station No.
are not visible, needs to be rewritten on the rails of all the curves.
Bridge details (Br No., Span, Type of Bridge, HFL etc) are not
marked on most of the bridges. In some bridges, the details written
are not visible. They need to be repainted.
It is suggested that the long trees available on both sides of the
track can be used to clamp the boards at a higher elevation or they
can be painted on the tree itself.
All the missing engg. Boards to be fixed in all sections
including plant area and repainted Site informed that a work
award is under process for this work this is pending since
last audit.
All caution boards e.g. Level crossing and unauthorized level
crossing to be painted and missing boards to be re-fixed as
per IR norms.
Record Keeping:
(a) All the track maintenance records are being maintained on the
register .
(b) Gang charts are printed and implemented.
(c) Daily progress Register: Available.
d. However, only works like through packing, Slack packing is being
recorded.
e. Record of Track
maintained..
overhauling
11
(Shallow
screening)
is
being
FARAKKA
f. Curve Register: Available.
g. Points & Crossing Register: Available.
h. Creep Register: Available.
i. Level-Xing Register: Available.
j. Gang chart: Available.
Type/
No
Model
001
WDM2
H.P
2600/
Date of
Commissioning
Dynamic
Speed
Creep
Brake
Recorder
Control
9.12.1987
O.K.
O.K.
2400
002
WDM2
- do-
9.12.1987
O.K.
O.K.
003
WDM2
- do-
24.4.1987
O.K.
O.K.
004
WDM2
- do-
24.4.1986
O.K.
O.K.
005
WDM2
- do-
16.2.1985
O.K.
O.K.
006
WDM2
- do-
20.6.1990
O.K.
O.K.
12
Remarks
FARAKKA
007
WDM2
- do-
4.12.1990
O.K.
O.K.
008
WDM2
- do-
14.3.1991
009
WDM2
- do-
15.7.1991
O.K.
O.K.
010
WDM2
- do-
15.7.1991
O.K.
O.K.
011
WDM2
- do-
17.7.1995
O.K.
O.K.
012
WDM2
- do-
Oct-1989
O.K.
O.K.
014
WDM2
- do-
20.1.2000
O.K.
O.K.
015
WDG3
3100
11.11.2010
O.K.
O.K.
O.K.
016
WDG3
3100
11.11.2010
O.K.
O.K.
O.K.
017
WDG3
3100
11.11.2010
O.K
O.K
O.K
Loco
No
Previous
month Aug
14
During the
year (13-14)
During the
year (12-13 )
13
During
previous year
(11-12 )
Remarks
FARAKKA
001
96.0
93.7
97.0
85.4
002
97.0
96.5
96.5
57.1
003
97.5
97.55
97.55
97.789
004
97.3
95.0
95.0
75.523
005
97.5
97.0
97.0
96.789
006
96.8
98.0
98.0
98.5
007
97.0
97.0
97.0
96.995
008
009
97.0
95.6
85.5
010
96.00
96.5
98.998
011
96.00
96.0
98.596
012
96.7
97.0
98.925
014
JMP
94.0
97.982
015
98.5
97.59
98.95
016
98.0
98.5
98.94
017
99.0
98.0
98.955
Previous month
Aug14
During the
year (1213)
During previous
year (11-12)
001
Rly Rake
3.915
Rly Rake
002
5.868
5.1
4.616
003
5.4
4.25
4.634
14
Remarks
FARAKKA
004
5.832
5.723
Rly Rake
005
Rly Rake
Rly Rake
4.846
006
Rly Rake
5.012
4.978
007
5.76
5.22
4.854
008
009
5.364
4.012
4.652
010
Rly Rake
3.897
4.978
011
5.508
5.687
4.939
012
5.4
4.023
4.981
014
Rly Rake
Rly Rake
Rly Rake
015
Rly Rake
Rly Rake
Rly Rake
016
Rly Rake
Rly Rake
- do -
017
Rly Rake
Rly Rake
- do -
Previous month
Aug14
001
Nil
0.569
Nil
002
Nil
1.00
0.681
003
0.513
0.65
0.860
004
0.414
1.99
1.03
005
Nil
1.987
1.191
006
1.058
0.885
0.614
007
0.542
0.751
0.637
008
During the
year (12-13)
During previous
year (11-12)
Remarks
009
0.754
0.678
0.984
010
Nil
0.621
0.703
15
FARAKKA
011
1.225
1.759
0.925
012
0.356
0.582
0.917
014
0.556
1.82
0.985
015
1.818
Nil
Nil
016
0.843
Nil
Nil
017
2.394
Nil
Nil
E.Details of Locomotives overdue for higher schedule Yearly: M-24 & above
Copy of Program of higher schedule for Year 2014-15 (Six Year Rolling Plan) is as under :
Loc Type Comm.
LAST
Last
09-10
o
Date
P.O.H
Schedule
No
001 WDM2 9.12.198 20/01/06 M-48
M18
.
7
JMP
Apr-12
Feb-08
002 - do - 9.12.198 10/ 2007 M-48
.
7
JMP
Dec-10
003 - do - 24.4.198 06/ 2009 POH
.
7
JMP
17.06.200
9
004 - do - 24.4.198 12/ 2003 M-54
.
6
JMP
18.11.200
9
10-11
M-48
Dec-10
POH
Jun 09
13-14
14-15
15-16
16-17
M-48
Apr-12
M-72
Dec-14
POH
Aug-16
Sp Rep
Jun-12
M-72
Jan-15
POH
Jul-16
M-24
Dec-12
M-48
Feb-15
M-72
Mar-17
M-48
Feb-11
12-13
008.
11-12
POH
Aug-13
M-24
Aug 15
M24
Sep-13
M-48
Sep 15
M-72
Nov-13
POH
Nov-15
M-48
Apr-11
M-72
Apr-14
POH
Aug-15
Diverted to TALCHER on
11.03.2005
M-72
Jan-12
M-36
Mar 09
POH
Mar-14
M-72
Sep-12
16
M-24
Jan 14
M-24
May-16
POH
Jan-15
M-24
Jan 17
M-48
Dec-14
M-72
Feb-17
FARAKKA
10
M-54
Aug 08
POH
Apr13
M-18
Mar-10
M-24
Aug-14
M-48
Dec 13
016 - do - 11.11.20
10
017 - do - 11.11.20
10
M-48
Oct-16
M-72
Dec 15
M-24
Jun 14
M-24
Jun 16
M-24
Aug 14
M-24
Oct 14
M-24
Aug 16
M-24
Oct 16
F. System of Maintenance:
i) Departmental/Expert Agency: Expert Agency- M/S RITES.
ii) Concept of attending of different Schedule of maintenance: - i.e. based on running hrs. / Time based. :
Time based (Fortnightly, Monthly, Quarterly & Half Yearly)
iii) Specify the concept values for taking up different schedules: As per Railway norms.
G. Check Hauling power and other Loco operating parameters
Inspection of NTPC load rake No 300 Dt 27-28.08.2013 with Loco. No - 03 & 07 was done from
Lalmatia to Track hopper #2 Farakka and following observations was recorded :Rake Size: 50 wagons plus brake van
i) General health of both the loco Crews is in good condition.
(ii) Communication equipment i.e. wireless set was found in working order.
(iii) Load Meter Working order on both control stands
(iv) Speedometer Analog & Electrical speedometer available at both control stand.
(v) Fire extinguishers checked in loco-07 & 03 and found available.
(vi) Creep control device in loco was not available.
(vii) Loco hauling power was good.
NOTC
H1
NOTC
H2
NOTC
H3
NOTC
H4
17
NOTC
H5
NOTC
H6
Date : 10.09.2014
NOTC
NOTC
H7
H8
FARAKKA
RAKE POSITION
10
12
15
18
20
23
26
29
LCP POSITION
Max
Max
Max
Max
Max
Max
05-30
05-30
4.2
4.2
4.2
4.2
4.2
4.2
4.2
4.2
3.0
4.0
4.5
4.5
5.5
5.7
6.0
6.0
BOOSTER AIR
PRESSURE
MOTOR CURRENT
(Amp)
MAX SPEED (kmph)
----
----
----
----
0.2
0.5
0.8
1.2
250
350
400
430
450
500
550
630
----
----
----
----
----
40
40
55
LOAD
BRAKE PRESSURE AT
ENGINE
BRAKE PRESSURE AT
BV
Rake no 399B
5.1
5.1
5.1
5.1
5.1
5.1
5.1
5.1
4.9
4.9
4.9
4.9
4.9
4.9
4.9
4.9
Loco
No
(till date)
F-006
05.06.2013
ER-116
F-006&7
09.12.2013
LR-559
Loco F007 failed at Km47, Loco not moving in forward direction but
could not rectified, asked for relief engine.
F014&00
4
29.05.2014
LR-165
Loco failed due to fuel oil pressure zero. On checking found fuel
pump motor was not working. Checked and found FPB 15Amps
circuit breaker failure.
18
FARAKKA
F007+00
1
20.08.2014
LR-343
Loading point Loco 007 failed due to heavy air leakage from inter
cooler. Relief engine sent.
F006&00
9
22.08.2014
LR-345
Loco 009 failed at 24KM Kumarpur due to huge water leakage from L8
water jumper. Sent relief engine.
Available
Synchronous jacks
4 Nos available
Available
Not available
Available
Available
Available
not available
not available
not available
not available
Mini DM Plant
not available
available
19
FARAKKA
i.
available
available
available
: 20.06.2014
4. Whether procedure for handling of HSD (HSD filling arrangement for Locomotives) and
safety aspects are being followed properly or not: All procedures are being followed.
5. Whether Re-railing equipments and jacks are maintained properly and are stored in a
separate van or not. = (MFD) 17.04.2014 & (LUCAS) 28.12.2013. Regular checking for
proper functioning is done on every Wednesday.
6. Whether drainage system of Workshop is adequate and regular cleaning is being ensured.
Adequate and regular cleaning being done.
7. Whether the necessary license for HSD installation is renewed: 3x70 KL=210
KL HSD installation of NTPC-MGR is renewed up to 31/12/2014
WAGONS:
A
276
246
231
15
Procurement plan
1) 21 Wagons( Texmaco) received at site on 17.08.2013 vide PO No 4000073900,
commissioning & PG test completed on 26.09.2013
2) 11 Wagons(BSCL) received at site on 17.08.2013 vide PO No 4000073900,
commissioning & PG test completed on 06.03.2014.
3) P O No. 4000130589 dtd. 24.05.2014 raised for 10 nos. Wagons & Due on Dec 2014
4) P O No.4000130590 dtd. 24.05.2014 raised for 08 nos. Wagons & Due on May 2015
20
FARAKKA
Intensive rake checking is done once in a month. Time taken 6 hours.
a) ROH: ROH Schedule is being done every 02 years as per Railway Standard.
b) POH: POH Schedule is being done every 06 years as per Railway Standard
D) Average Availability of Wagon (%): Not to be less than 96%.
Month
2013-14
Apr
May
Jun
Jul
Aug
Sep
Oct
Nov
Dec
Jan
Feb
Mar
Average
availability
2012-13
97.8
97.58
97.9
97.4
93.9
97.8
97.19
97.74
97
97
97
97
97.1
2011-12
98.21
98.1
96.96
97.67
97.75
97.0
97.6
97.7
97.0
98.18
97.7
97.2
2010-11
96.12
97.87
97.46
98.54
96.25
97.35
98.12
97.85
98.05
97.74
95.58
95.72
95.43
93.28
94.63
95.26
94.27
96.34
96.65
98.02
96.97
96.92
97.62
96.0
97.59
97.22
95.95
Locations
Status
Signaling
Type
Axle Counter
/Track Circuiting
21
Availability
Remarks
FARAKKA
01
Unloading
Station &
Exchange
Yard
03
MGR W/S
03
Lalmatia
Loading
Point
AV
AV
MACLS
AV
Comprehensive
AMC and trg is
required for digital
axle counter
AV
-do-
- do -
AV
NOT
WORKING
NOT
WORKING
--
NOT
WORKING
Only point No
25A/B AV
04
Kumarpur
- do -
- do -
- do -
- do -
05
Berhait
- do -
- do -
- do -
- do -
06
Pathra
- do -
- do -
- do -
NOT
WORKING
Not available
due to rail and
sleeper renewal
07
Entrance
Cabin
- do -
- do -
- do -
AV
a.
VHF base & hand held communication system: - Adequate and well
maintained.
FARAKKA
Signal failure register available in MGR Workshop station. Five failures
observed in a month of Aug14. Most of the failures are due to
miscreants cutting the jumpers of the track and are attending by the
available S&T staff within stipulated time. However other station signals
are not available due to Rail renewal (52kg to 60kg) & sleeper
replacement by M/s Rites. Presently 60kg block insulation fish plates
are not available (under machining). Other signaling equipment such as
battery banks, chargers, RRI, DGs are in order. Restoring of all track
circuits is required for signal availability, operation of point machines in
way side stations and safe & smooth coal transportation. Possibility of
uninterrupted electrical power supply may be explored for all the way
side MGR Stations.
Equipment
Frequency
01
Testing of Motor
Points for smooth
Operation and proper
setting (with 5 mm
No-
Monthly
Status
Done
O.K.
Action taken
Obstruction test carried
out at a) Exchange Yard
Point no 34 & 35 b)
MGR Workshop 21A/B
tested & found ok.
FARAKKA
02
Testing of focus of
Signal, Cleanliness of
Lenses and visibility
To Loco crew.
Monthly
OK
03
Testing of Track
Circuit:
Monthly
Within
04
Weekly
Done/O.K
Done regularly
05
Testing of Generator
Set on full load
Monthly
working
06
Limit
Done
Done regularly.
O.K.
MGR Operation:
A. Rake Size (Nos. of Wagons).
As per DPR
57
B.
Actual
53
Suggested if
any
Remarks
Maximum line capacity at all stations is
for 55 wagons only. Total available
wagons are 223 only.
NIL
Particular
s
As per
DPR
Actual
Reasons
24
Expected
date to
FARAKKA
Achieve
Max
Permissible
65 KMPH
30 KMPH
Strengthening of track is in
progress.
Dec14
Average
Speed
55 KMPH
20 KMPH
Strengthening of track is in
progress and speed
restrictions in some
curvature/ gradient
Dec14
Cycle Time
06 Hours
25
minutes
Average
1. Less coal feeding at
cycle time
loading point.
for last 12
2. Miscreant activity in
months=
route.
15:14Hrs.
Speed
Location
Type
Authorizing
Authority
From
To
Reasons
01
25-26 km
Permanent
RITES
1995
Till
date
Critical
curves
02
43-45 km
- Do -
- Do -
- Do -
- Do -
- Do -
03
68-69 km
- Do -
- Do -
- Do -
- Do -
- Do -
25
FARAKKA
D. Check List for Operational Safety:
1. Whether prescribed medical examination of the Loco Drivers and
Staff is regularly carried out in time= Yes, done in every Six month in
NTPC hospital (Records verified).
2. Whether long duty hours are defined /fixed at 12 Hrs in line with the
Railway working: Followed but due to Higher cycle time, shortage of
loco drivers the working hours of retired staff in higher side (12 to 16 hrs.)
3. Adequacy of Loco Drivers: Nos. Required/Sanctioned:- Presently 34
loco drivers are in the roll against the sanctioned strength of 48.
Immediate actions to be taken for appointment of required loco drivers. In
spite of best efforts by NTPC Farakka, retired railway staff are not joining
due to poor pay package.
Presently 29 controllers, 10 guard, 01 PWI/PWI is available against the
sanctioned strength of 36 controllers, 14 guards and 01 PWI/PWM.
4. Whether Railway drivers appointed have sufficient experience of
operating WDM2/WDG3A Locomotives Being verified during Interview
& checking Service certificate, issued by Railways.
5. Whether placement of (LV) board during day Hrs and Red Lamp (Tail
Lamp) During night/thick and foggy weather is compulsorily
followed.= Indian railway retired guard is accompanying in all moving
rakes with red & green flag, Flasher Tail lamp and tri color light. Guard is
also provided with talkie talkie for better communication with loco driver.
6. Working instructions are prepared and are acknowledged in writing
by all the Staff concerned with MGR trains operation.- Rake operating
instructions are available but required to review & modify as per present
condition.
7. Whether station-working rules are available at MGR control room
and at all Stations=Individual station working rules are available in each
station.
8. Whether the Train operational requirement of not permitting any
rake to enter the block section until and unless previous rake is
26
FARAKKA
clear the block section & clear the safe distance beyond the 1st stop
signal of the next station is being followed= Yes.
9. Whether the person granting permission through physical
verification or other means of the last Vehicle is ensuring complete
arrival/departure of the train =Brake van is attached in all rakes as last
vehicle and railway retired guard is accompanying every rake.
10.
Whether electronic breath analyzer to ascertain that the loco
crew members are not under the influence of alcohol at the time of
reporting of duty and on leaving after duty (signing ON & signing
OFF) is installed in the central control Room or the place where
they report for duty= Electronic breath analyzer is available in working
condition in MGR control room and it has been observed that random
checking is being carried out. It is to be in practice on regular basis and
proper record to be maintained.
27
FARAKKA
All intermediate stations are also equipped with Crank Handle, Signal
Torch / Hand flags & Track layout diagram evidence checked at
Kumarpur & Pathra station during visit.
Foot plating by Operation and track staff has been carried out on
regular basis. The frequency of foot plate and way side station
inspection should be maintained as per norms and caution to be
issued to the crew as per comments of foot plate inspection for safe
movement of coal rakes.
Fire extinguishers available in MGR control room, Wayside Stations
are in filled condition.
All the rakes are equipped with Tool Box (Spanner, C clamp, Skids,
Break hose pipe, knuckle & Fish Plate sets etc) along with Signal
Torch / Hand flags and fire Extinguishers.
Regular safety counseling with loco drivers being carried out by MGR
staff and RITES.
FARAKKA
First aid box with all the medicines are be available at MGR control
room and other wayside stations.
For ensuring of the safe movement of the rake during passing of the
rake from the intermediate stations, loaded/empty rakes are checked
by the Station controller for hot axle, hanging parts from loco &
wagons, any abnormal sound coming from loco/wagon.
NTPC Weigh Bridge is working properly & weighment of All the IR
rakes (Load & Empty) is recorded. CC camera is also provided and in
working condition
MGR I/C
Safety Officer
O&M Head
GM
FARAKKA
PROFORMA FOR RECORDS OF DERAILMENTS/ ACCIDENTS
Sl Date & Time
No
Of
Occurrences
Date &
Time
Of
Restorati
on
01 02.08.2014
02.08.14
01:50 Hrs
02 02.08.2014
Reason Of
Derailment/
Accident
At
Track boulder
Hopper
#2
04:20Hrs
MGR wagon
No 2001 FKK
03, one trolley
derailed
22:30hrs
20:10 Hrs
03 03.08.2014
15:30hrs
Brief
Description of
Accident/
Derailment
03.08.14
17:30hrs
Losses/
Damage
s
With
approx
Cost
At
Track
Hopper #2 IR hit
with DC ch
wagon
No boulder
increas
73141355971/
ed
BOBRn/SECR
one
trolley
derailed
At
Track hit
with DC ch
Hopper #2 IR boulder
increas
wagon
No
ed
72110602320/
BOBRn/SECR
one
trolley
derailed
30
Enquiry
Committee
Recommenda
tions
FARAKKA
04 04.08.2014
22:00hrs
05.08.14
13:30hrs
05 05.08.2014
06:00hrs
05.08.14
15:30hrs
Wagon
No Fouling was
2001 FKK 03 not cleared
capsized near
inspection line
06 11.08.2014
00:15hrs
11.08.14
13:50hrs
IR
wagon Point
SCR BOBRn route
73091340881
derailed
at
point No 33 in
exchange
Yard
07 18.08.2014
00:15hrs
18.08.14
02:45hrs
IR
wagon Motor point DC ch
BOXn
SE- not
set increas
12477 SECR properly
ed
derailed
at
point No 34 in
exchange
Yard
31
two DC ch
increas
ed
FARAKKA
Observations & Recommendations
Track:
1) By replacing of CST-9/wooden sleepers with PSC sleepers, track condition got
improved, however wheel burns are observed at many places of through out the
section. Necessary action to reduce further wheel burns of rails and replacement of
rails may be taken up: It is observed that M/s RITES has already replaced 16 Km
length of 52 Kg rails by 60 kg rails.
2)
It is observed that all built up X-ing turn outs with wooden sleepers have
been replaced by 60 Kg CMS X-ing turn outs with PSC sleepers. Only 3 nos are
remaining for changing which is in progress.
3) on bridges deep screening of ballast to be done for easy drainage and
shortage of ballast to be recouped.
4)
In cutting areas the damaged drains to be repaired and J type
drains are to be provided wherever the pucca drains are not existing.
5).
6).
FARAKKA
7).
10)
11)
ROLLING STOCKS
All the records of Loco maintenance are very well maintained. All schedules are followed as per
Railway norms.
For replacement of Traction Motor pinion, Bearings etc suitable Induction Heater is not available. PO
placed vide PO NO: 4000132919 dated 07.09.14 complied..
PM schedule forms for WDM2 & WDG3A are to be made separately as per guideline. It is
under Progress
After intensive checking of Rake, it is proposed to reverse the direction of movement to reduce wear of
wagon wheels and uniform wear pattern of all wheels. Done for around 7 to 8 times
Around 35 wheel sets are going to be condemned in the next one year and 91 in next two years.
Immediate procurement action for minimum 125 wheel sets to be indented by site.
33
FARAKKA
As per RDSO guidelines, to reduce the repeated failure of Traction Motor, PM schedule to be
modified suitably. 9 nos of traction motors which under breakdown going for repair to Jamalpur.
Follow up action is to be done.
Following spares to be procured for Locos immediately for smooth running of locos
4)
5)
6)
7)
Maintenance Contract is required for microprocessor (Make M/S Medha Servo drives PVT Ltd)
FARAKKA
Circuit breaker test bench & traction motor no load test bench to be procured immediately for
checking of healthiness of circuit breaker & Traction motor
Luboil, water & flaw test of axles are not being done through chemistry. Same to be ensured on
regular basis.
Expertise of traction motor, Governor & trouble shooting personnel are to be deployed
immediately by M/S Rites for smooth running of locos.
S&T:
1.
2.
3.
4.
5.
6.
7.
8.
35
FARAKKA
MGR Operation
o It was observed that, Token less block instruments are not working.
TBI is to be replaced urgently to avoid unsafe movement. Total
operation movement is being done by exchanging private number and
on communication, which is not safe. Hence Signals must be
available in all the stations.
o Average unloading time is increasing due to huge quantity of stone
intake through Rly rakes. Though stones are breaking & removing by
Stone Breaker & JCB in Track Hoppers, Huge amount of Boulders are
still lying at track hopper which increases unloading time. Practice is
to be made that before placing loaded rake, track hopper walk way
and Grizzly is to be cleared to avoid derailment and timely unloading
of rakes.
o It was observed that, most of the derailments are due to obstruction
of boulders in track hopper area. To minimize the derailments regular
cleaning of boulders at track hopper and wagon tippler area to be
done.
o Availability of retired railway staff is less against the sanctioned
strength. Early action to be taken to recruits the shortfall.
o In WDM2 locomotives no vigilance control devices are provided, it is
suggested to provide in all WDM2 locomotives.
o Periodic Training / Awareness / Feedback session may be planned
preferably in shift general with all MGR staff including loco drivers at
least once in a month with each shift group for safe and smooth
operation of coal rake.
o
FARAKKA
o CSR activities being organized by MGR is appreciable.
o Coal Co-ordination documentation is up to date for domestic as well
as imported coal.
The MGR team of FSTPP is very co-operative with positive approach. The
entire MGR team was fully involved in the audit and discussions and
shown eagerness to implement various suggestions of audit team.
(M.V.Krishnan)
DGM(MGR)VSTPP
(C.S.Tiwari)
(P.Venkatramaiah)
DGM(MGR) KSTPP
(A.Chatterjee)
AGM(MGR)FSTPP
(B.K.Jha)
AGM(MGR)FSTPP
37
(M.M.Manzer)
Manager(ER-I HQ)
(R.K.Sinha)
AGM(MGR)FSTPP
FARAKKA