You are on page 1of 216

State of New York

Department of Health

and

Environmental Facilities Corporation

DRAFT

Intended Use Plan

Drinking Water State Revolving Fund

October 1, 2012 - September 30, 2013

Issued: July 25, 2012


The State of New York
Andrew M. Cuomo, Governor

Department of Health
Nirav R. Shah, M.D., M.P.H.,
Commissioner

Environmental Facilities Corp.


Matthew J. Driscoll
President and CEO

Public Comments on this draft IUP will be accepted until 5:00PM EST Sept. 10, 2012
(See attachment VII for instructions)

DRAFT

INTENDED USE PLAN

for the

NEW YORK STATE

DRINKING WATER STATE REVOLVING FUND

October 1, 2012 - September 30, 2013

Issued: July 25, 2012

Projects funded through the DWSRF are subject to Federal Davis Bacon Prevailing Wage
Laws in addition to NYS State Prevailing Wage Laws, MWBE/EEO/DBE requirements and
the State Smart Growth Public Infrastructure Policy Act.

INTENDED USE PLAN

TABLE OF CONTENTS

Page
1.0 INTRODUCTION................................................................................................................. 1

2.0 PROGRAM CHANGES AND INITIATIVES.................................................................... 2

3.0 SHORT- AND LONG-TERM GOALS.............................................................................. 4

3.1
3.2

SHORT-TERM GOALS................................................................................................................................... 4

LONG-TERM GOALS ..................................................................................................................................... 4

4.0 FINANCIAL STATUS......................................................................................................... 5

4.1
4.2
4.3
4.4
4.5
4.6
4.7

TOTAL DWSRF MONIES .............................................................................................................................5

FEES ............................................................................................................................................................. 6

TRANSFER OF FUNDS .................................................................................................................................. 6

ELIGIBLE SYSTEMS AND TYPES OF PROJECTS TO BE FUNDED ..................................................................6

FINANCIAL PLANNING PROCESS ..................................................................................................................8

TYPES OF ASSISTANCE AND TERMS ............................................................................................................8

PROGRAM FINANCIAL TERMS ....................................................................................................................10

5.0 AMENDING THE IUP....................................................................................................... 12

6.0 SET-ASIDE ACTIVITIES ................................................................................................. 12

6.1
ADMINISTRATIVE ........................................................................................................................................ 12

6.2
TECHNICAL ASSISTANCE ...........................................................................................................................13

6.2.1 Small Water Systems ..........................................................................................................................13

6.2.2 Comprehensive Performance Evaluation Program.........................................................................14

6.3
STATE PROGRAM MANAGEMENT...............................................................................................................14

6.3.1 Administer the PWSS Program..........................................................................................................14

6.4
SPECIAL ACTIVITIES ................................................................................................................................... 16

7.0 DISADVANTAGED COMMUNITY PROGRAM AND HARDSHIP ........................... 17

7.1
7.2
7.3
7.4
7.5
7.6
7.7

INTRODUCTION ........................................................................................................................................... 17

FINANCIAL AVAILABILITY ............................................................................................................................18

ELIGIBILITY FOR FINANCIAL HARDSHIP ASSISTANCE ................................................................................18

CALCULATING HARDSHIP ...........................................................................................................................19

HARDSHIP APPLICATION PROCESS ...........................................................................................................21

CONFIRMATION OF HARDSHIP AVAILABILITY .............................................................................................21

CO-FUNDING .............................................................................................................................................. 22

8.0 CAPACITY ASSESSMENT ............................................................................................ 22

8.1
8.2
8.3
8.4
8.5
8.6

TECHNICAL CAPACITY ................................................................................................................................ 22

FINANCIAL CAPACITY ................................................................................................................................. 23

MANAGERIAL CAPACITY .............................................................................................................................23

SYSTEMS WITH INADEQUATE CAPACITY ....................................................................................................23

LONG-TERM CAPACITY .............................................................................................................................. 23

ANNUAL REPORTING REQUIREMENTS .......................................................................................................24

9.0 STATE ENVIRONMENTAL REVIEW PROCESS/DETERMINATION OF

EQUIVALENCY PROJECTS .......................................................................................... 24

10.0 PROJECT PRIORITY LISTS .......................................................................................... 25

10.1
10.2

PROJECT SELECTION PROCESS ................................................................................................................25

DESCRIPTION AND USE OF PROJECT LISTS ..............................................................................................25

AND

Attachment I
Attachment II

Attachment III
Attachment IV

Attachment V
Attachment VI
Attachment VII
Attachment VIII

Project Priority Ranking System

Anticipated Intended Use Plan Schedule for the October 1, 2012

September 30, 2013 Funding Period


Financing Fees and Financing Options
Drinking Water State Revolving Fund Listing Form
(Formerly called the pre-application)
Drinking Water State Revolving Fund Application Checklist
Output and Outcome Measures
Public Hearing and Public Comment Information
NYSDOH Central Office DWSRF Contacts

ii

1.0

Introduction

The Drinking Water State Revolving Fund (DWSRF) was created in 1996 as a result of New
York States enactment of Chapter 413 of the Laws of 1996 (Clean Water/Clean Air Bond Act,
Bond Act) and passage of the 1996 Amendments to the Safe Drinking Water Act (Public Law
104-182) by the U.S. Congress. The DWSRF provides a financial incentive for municipally and
privately owned public water systems to undertake needed drinking water infrastructure
improvements (e.g., treatment plants, distribution mains, storage facilities). This program
provides market rate and below market rate financing for the construction of certain eligible
public water system projects. As financings are repaid, money is made available for new
financings - a true revolving fund. For qualifying communities with demonstrated financial
hardship, interest rates can be reduced to zero percent. In this federal fiscal year, the State
expects to receive additional federal grants to capitalize the DWSRF. Monies from the Bond Act
will be used to provide federally mandated state matching funds of at least 20%. The program
is administered jointly by the New York State Department of Health (DOH) and the New York
State Environmental Facilities Corporation (EFC).
This Intended Use Plan (IUP) includes:
1. an anticipated financing schedule which covers the period from October 1, 2012 to
September 30, 2013;
2. a description of the goals of the DWSRF program;
3. specifics on how New York State proposes to use available DWSRF funds during federal
fiscal year (FFY) 2013;
4. criteria for selecting projects to receive financial assistance;
5. criteria for determining which communities qualify as disadvantaged communities;
6. an estimate of anticipated funds available for subsidized financial assistance;
7. a procedure to amend this IUP;
8. a description of capacity assessment;
9. a description of the project selection process;
10. criteria for determining equivalency projects;
11. a Project Annual List (Formerly called Readiness List) which includes eligible projects
expected to be ready for short-term or long-term financing during this IUP period;
12. a Category A List which includes eligible projects of systems serving less than 10,000
people;
13. a Multi-Year List of projects eligible to receive DWSRF financing;
14. a Category C (hardship) List of projects which have received written confirmation that
they qualify for financial hardship;
15. the project scoring and ranking system;
16. a description of the fees associated with DWSRF financing;

17. a copy of the DWSRF Listing Form (Formerly called the pre-application) form and
application checklist;
18. Output and Outcome measures;
19. Public Hearing and Public Comment information; and
20. A map of DOH central office DWSRF contacts by county and area.
This IUP is based on the use of FFY 2013 federal Capitalization Grant monies and unobligated
funds carried forward from the previous IUP. The anticipated financing schedule for this IUP
period is found in Attachment II.
Under the anticipated financing schedule, leveraged financing funded from bond issues will be
determined. Direct long-term and short-term financings will be originated throughout the year.

2.0

Program Changes and Initiatives

Program Changes for- Current FFY 2013 IUP:


1. Beginning in the Draft FFY 2013 IUP the DWSRF program will be making two changes
in nomenclature to provide additional consistency with the NY Clean Water State
Revolving Fund.
a. The term Readiness List will be changed to the Annual List and for the next two
FFYs it will appear in the DWSRF IUPs as Annual List (Formerly called
Readiness List).
b. The Term Pre-application will be changed to the Listing Form and for the next
two FFYs will appear as Listing Form (Formerly called the pre-application).
2. Hardship Program Revision: The hardship program has been updated to implement
the 2010 Median Household Income (MHI) data. The revised target service charge
equation, target service charge chart, and hardship eligibility curve are detailed in
section 7.4.
Recent Program Changes- Previous FFY IUPs:
1. State Smart Growth Public Infrastructure Policy Act- On August 30, 2010 the New
York State Environmental Conservation Law was amended to add the State Smart
Growth Public Infrastructure Policy Act. This law requires that starting September 27th,
2010, any new or expanded public infrastructure project receiving financing from a state
infrastructure agency must be consistent with the relevant smart growth public
infrastructure criteria as they are defined in the law to the extent practicable. DOH will
now require, as a part of the engineers report and/or through other DWSRF application
materials that may be developed, an analysis of each project with respect to its
compliance with the criteria of the smart growth law. Projects that received short term
financing or other phased financing prior to the enactment of the law are exempt.
The Smart Growth Public Infrastructure Policy Act can be viewed at:
http://public.leginfo.state.ny.us/MENUGETF.cgi?COMMONQUERY=LAWS+&TARGET=VIEW
Once there, click on ENV and then click on Article 6

2. Davis-Bacon Compliance- As part of the FFY 2010, 2011, & 2012 budget appropriation
for the DWSRF, Congress mandated that federal labor laws regarding prevailing wages,
hours of work, and rates of pay shall apply to construction carried out in whole or in part
with assistance from the DWSRF. These requirements are collectively known as the
Davis-Bacon laws. These requirements are in addition to the requirements of NYS
prevailing wage laws. EPA guidance requires that any DWSRF financings comply with
the Davis-Bacon laws and incorporate these provisions into any project work that has
been or will be contracted. Work done by a municipal applicants employees, generally
known as force account or work force, is not generally subject to Davis-Bacon
requirements. For more information on Davis-Bacon laws, please visit EFCs website.
3. Phased Points will not be assigned for any Listing Form (Formerly called the preapplication) received if the prior related portion of the project closed on long term
financing more than five years earlier and the improvements already funded are
operational. (DOH reserves the right to assign phased points for projects that require
additional financing, regardless of time frames, to address the more serious original
public health priorities for which the project received its original score.)
4. Minority and Women Business Enterprise/Equal Employment Opportunity
(MWBE/EEO) - Significant revisions to the MWBE/EEO program to reflect statutory
changes and to streamline current procedures were initiated in FFY 2012. EFC will be
strengthening the Disadvantaged Business Enterprise (DBE) requirements in the revised
MWBE/EEO program to offer a seamless solution for our clients to meet both the state
MWBE and Federal DBE requirements. Some of the more significant Program changes
include:
Professionals services, such as engineering, legal, and financial advisory services,
are now subject to MWBE participation requirements;
There are new recordkeeping and reporting requirements;
Information concerning the makeup of the project workforce will be required to be
submitted quarterly; and
All contracts and agreements that are paid for with DWSRF funds will be required to
contain certain contractual provisions.
In addition, EFC is proposing revised goals for MBE and WBE participation for nonconstruction contracts/agreements in projects financed through the DWSRF for FFY
2014. For more information on MWBE/EEO/DBE guidance please visit EFCs website.

Ongoing Initiatives:
1. Asset Management: The DOH and the EFC encourage communities that apply for
financing in this and future IUP periods to prepare and submit an asset management
plan to accompany the engineering report and/or plans and specifications for their
project. An asset management plan would support communities by encouraging the
building of sustainable infrastructure. The DOH reserves the right to require an asset
management plan for any project that has shown deficiencies with respect to
Managerial, Technical, and Financial capacity.
2. Energy Efficiency: New York State encourages the efficient use of energy in all
drinking water projects. Therefore, the DOH and the EFC are requiring, if applicable, that
all engineering reports and/or plans and specifications submitted to the DOH identify
project components that incorporate energy efficiency, water efficiency, and/or other
environmentally innovative activity.

3. Interconnections- Under provisions of the 1996 Amendments to the Federal Safe


Drinking Water Act, DOH is required to ensure that all systems receiving DWSRF
assistance have adequate managerial, technical, and financial capabilities to provide
safe drinking water. The failure to meet this requirement could result in a significant
reduction of the DWSRF federal capitalization grant. Therefore, systems that lack
adequate managerial, technical, and financial capacity may be determined as ineligible
by DOH to receive DWSRF assistance unless the project to be financed corrects the
managerial, technical, and financial deficiencies.
DOH will continue to promote the regionalization and interconnections for public water
systems in an effort to enhance managerial, technical, and financial capacity for those
systems. Therefore, when the possibility to interconnect to another public water system
exists for a project seeking assistance, and if that interconnection will address the scope
of the project with respect to its priority health ranking, the interconnection must be a
carefully considered alternative as a part of the State Environmental Quality Review Act
process and also be discussed in detail in the engineering report. If the system applying
for DWSRF assistance decides not to pursue a possible interconnection alternative
when it exists and would address the scope of the project with respect to its priority
health ranking, then detailed justification satisfactory to DOH must be provided
demonstrating that the interconnection is a technically, financially, or managerially
disadvantageous option. See Section 8 of this IUP for additional information regarding
capacity requirements.
3.0

Short- and Long-Term Goals

The Safe Drinking Water Act (SDWA) Amendments of 1996 authorize a DWSRF to assist public
water systems with financing the costs of infrastructure needed to achieve or maintain
compliance with SDWA requirements and to protect public health. The DWSRF program will
help ensure that New York States drinking water supplies remain safe and affordable, and that
drinking water systems that receive funding will be properly operated and maintained.
3.1

Short-Term Goals

Continue to implement the DWSRF program for the State of New York.
Receive project Listing Forms (Formerly called the pre-applications), score and rank
projects based on human health risk and compliance with the SDWA.
Make available short-term financing to help accelerate project development.
Make available long-term financing for projects in priority order, taking into account
project affordability.
Make available financing and/or financial assistance payments (grants) to help small
public water systems and disadvantaged communities finance needed projects.
Make available emergency financing to allow for emergency repairs when no other
funding source is available to the eligible public water system.
3.2

Long-Term Goals

Help public water supplies achieve and maintain compliance with federal and state
drinking water standards and enforceable requirements of the SDWA and the New York
State Sanitary Code.

Protect and enhance New Yorks public drinking water supplies using the financial
incentives provided by the DWSRF and the programs that the DWSRF supports.
Administer the DWSRF in a fiscally responsible manner that will ensure its revolving
nature in perpetuity.
Assist public water supplies to improve drinking water quality, quantity and dependability
by providing reduced interest rate long-term financing and/or Additional Financing
Subsidies (Grants).
4.0

Financial Status
4.1

Total DWSRF Monies

Capitalization for the New York DWSRF program during this IUP funding period will be provided
from the FFY 2013 federal Capitalization Grant and unobligated funds carried forward from the
previous IUP (October 1, 2011 - September 30, 2012). New York State has not yet received a
FFY 2013 DWSRF Capitalization Grant and the Final IUP may be amended at a future date to
reflect a different amount depending on negotiations and finalization of the federal budget. The
minimum state match requirement is 20% of each federal award. The minimum state match
requirement is made from Bond Act funds that were provided in excess of the 20% minimum
amount required under the federal SDWA and that have been credited (banked) against future
state match. The 100% state match requirement for the state program management set-aside
will be met with in-kind services. The proposed sources and uses of the DWSRF for this IUP
are presented in Table 1. After leveraging the total available DWSRF program resources to
finance drinking water projects are $435,924,679 for this IUP period.
Table 1
Proposed Sources and Uses
And Estimated Amount of DWSRF Funds for FFY 2013
(Numbers subject to change for the final IUP)
Sources
Amount
FFY 2012 Capitalization Grant
Carry-over monies from FFY 2011
Repayments and Interest Earnings
Total Sources
Uses
Amount
Administrative Set-Aside
Technical Assistance Set-Aside
State Program Management Set-Aside
Total Set-Asides
Direct Financing
Grants Expected to Close
Grant Funds Reserved
Grant Funds Available
Reserve Allocation for Leveraged Financing
Total Uses

$52,564,9371
$151,000,000
$38,000,000
$241,564,937
$2,102,597
$1,051,299
$5,256,494
$8,410,3902
$90,000,000
$25,000,000
$9,000,000
$15,769,481
$93,385,0663
$241,564,937

This amount is based on an estimated national DWSRF allocation of $829 million for federal fiscal year 2012;
however, this amount has not yet been appropriated and is subject to change depending on the federal budget.

Refer to Section 6.0 for a detailed description of each set-aside.

Leveraged three times, these funds will provide financing of $280,155,198 worth of eligible projects. Combined
with Direct Financing, Grants Expected to Close, and Grant Funds Available the total subsidized financing capacity
for this IUP period is approximately $410,924,679.

4.2

Fees

Up to 4% of the total amount of federal Capitalization Grants (as provided by Section 1452(g)(2)
of the SDWA) can be set-aside to support the cost of administering the DWSRF program.
Costs of DWSRF program administration not covered by the 4% administrative set-aside must
be paid from fees charged to DWSRF recipients. A program administration fee of 1.1% of the
project costs plus an annual fee of 0.11% of the outstanding principal balance of the financing
will be assessed to support the administration of the DWSRF program. The 1.1% program
administration fee may be included as part of the financing. For non-hardship projects that
receive short-term financing, an administrative fee equal to 0.6% will be charged and may be
included as part of the short-term financing. A description of the fees is presented in
Attachment III. Fees collected by the DWSRF are held in an account outside of the DWSRF.
For the state fiscal year (SFY) 2012 (4/1/11 to 3/31/12), the DWSRF expected to collect
approximately $1,458,967 in program administration fees. It is anticipated that in SFY 2013 a
similar amount of fees will be recognized and collected.
4.3

Transfer of Funds

The SDWA Amendments of 1996 offered states the flexibility to meet the funding needs for
drinking water and wastewater facilities by transferring funds from one SRF program to the
other (Section 302 of Public Law 104-182). An amount equal to up to 33 percent of the DWSRF
Capitalization Grant could be transferred from the DWSRF to the CWSRF program, or an
equivalent amount from the CWSRF to the DWSRF program. While the authority expired on
September 30, 2001, Congress extended this provision within EPAs annual budgets. Transfers
from the CWSRF to the DWSRF were made for FFY 1997 through 2001, totaling $82,443,933.
Pending Congressional approval of an extension within EPAs proposed budget, transfers
between the CWSRF and the DWSRF programs during current and future IUP periods may be
made. Any funds transferred during this IUP period will be returned using program funds within
this IUP period. Therefore, there will be no effect on the funding line of either the DWSRF
program or the CWSRF program.
4.4

Eligible Systems and Types of Projects to be Funded

Drinking water systems that are eligible for project funding are community water systems, both
public and privately owned, and non-profit, non-community water systems (when funding is
provided, a recipient).
Drinking water infrastructure project or water supply project means the planning, design,
construction, improvement, or acquisition of facilities, equipment, sites, or buildings for the
supply, control, treatment, distribution, and transport of drinking water and the testing and
monitoring to ensure the integrity and quality of such water intended to improve drinking water
facilities including achievement of compliance with the federal SDWA or other applicable federal
law and state drinking water quality goals and standards.
Projects eligible for DWSRF financing include investments to upgrade or replace infrastructure,
address noncompliance with federal or state health standards, prevent future violations of such
standards, and provide the public with safe drinking water. Examples of such projects include
but are not limited to:
rehabilitation or development of new drinking water sources to replace contaminated
supplies;

installation or upgrading of facilities if the project will improve the quality of drinking water to
comply with primary or secondary standards or treatment/performance criteria;
installation or upgrading of storage facilities, including finished water reservoirs, to prevent
microbiological contamination or to provide adequate delivery pressures;
installation or replacement of transmission and distribution mains to prevent contamination
caused by leaks or breaks;
funding and/or construction to promote the consolidation of water supply services,
particularly in circumstances where individual homes or water systems generally have an
inadequate quantity of water, the water supply is contaminated, or the system is unable to
maintain adequate compliance for financial or managerial reasons;
the purchase of a portion of another systems capacity, if the purchase is part of a
consolidation plan to bring the system(s) into compliance;
capital investments made to improve the security of drinking water systems; and
any of the above listed project types which are publicly owned and which were previously
financed subsequent to July 1, 1993, may be eligible for refinancing. Planning, design and
other pre-construction costs incurred prior to July 1, 1993, may be allowed if related to an
otherwise eligible project.
Projects submitted by systems that lack technical, managerial or financial capacity or are
classified as priority systems based on EPA's Enforcement Targeting Tool (ETT) are not eligible
for funding unless the proposed project will ensure capacity or compliance. Also, projects whose
primary purpose is fire protection or growth/development, dams and reservoirs, or acquisition of
land not integral to an eligible project are not eligible.
The EPA issued a notice in the Federal Register (63FR 59299, November 3, 1998) which allows
States to provide DWSRF assistance to projects that solve public health problems for residents
currently served by contaminated sources. This policy allows for the creation of a community
water system (publicly or privately owned) to address an existing public health problem caused
by unsafe drinking water provided by individual wells or surface water sources. This policy also
extends to a situation where a new regional public water system is created by consolidating
several existing public water systems that have technical, financial or managerial difficulties.
Under this policy, a proposed project may only receive DWSRF assistance if the following
conditions are met:
upon completion of the project, the entity responsible for the DWSRF financing meets the
definition of a Federal community public water system;
the project is on the Project Annual List (Formerly called Readiness List) and addresses an
actual public health problem with serious risks;
the project is limited in scope to the specific geographic area affected by contamination;
the project is only sized to accommodate a reasonable amount of growth expected over the
life of the facility (growth cannot be a substantial portion of the project);
the applicant demonstrates that sufficient public notice to potentially affected parties was
provided and alternative solutions to addressing the problem were considered; and
the project is a cost-effective solution to solving the public health problem.

4.5

Financial Planning Process

Projects submitted for financing will be screened for eligibility, scored, ranked and listed.
Projects can be submitted to the DOH for listing at any time. All eligible projects for which
Listing Forms (Formerly called pre-applications) are submitted on or before September 5, 2012
will be included in the final IUP. Eligible projects for which Listing Forms (Formerly called the
pre-applications) are submitted after September 5, 2012 will be included in the next IUP
(October 1, 2013 September 30, 2014). Projects for which an engineering report or plans and
specifications are submitted to the DOH or which completed construction by September 5, 2012
will be listed on the Project Annual List (Formerly called Readiness List). Scheduled closings
for leveraged financings during this IUP period will be determined based on program. Direct
long-term and short-term financings will be originated throughout the year.

4.6

Types of Assistance and Terms

The DWSRF program will offer the following types of financial assistance:
1. Short-Term Financing Program (STFP) Short-term financing will be offered interest free
and at market rate for terms of up to three (3) years. Before any short-term financing is
provided, an applicant must, among other conditions, receive approval of an engineering
report for the project, complete the State Environmental Review Process (SERP), obtain
approval from the Office of the State Comptroller for any necessary district formation, and
adopt a bond resolution for the project.
Short-Term Interest Free Financing (STIFF) - The STIFF program provides short-term
financing to recipients that are developing projects eligible for long-term DWSRF
financing. STIFF is available for projects that are eligible to be funded from the current
Project Annual List (Formerly called Readiness List) and have not completed
construction. The amount available is limited to one-third of the estimated total project
costs as set forth on the Project Annual List (Formerly called Readiness List). Recipients
that qualify for hardship assistance are not subject to the one-third project cost limitation.
STIFF is not available to pre-finance any awarded grants.
Short-Term Market Rate Financing (SMRF) For projects with scores too low to be
eligible for long-term DWSRF financing or projects eligible for STIFF but with financing
needs in excess of the one-third project cost limitation referenced above, short-term
financing may be made available at EFC's short-term cost of funds (market rate). SMRF
may be used to pre-finance third party grants. EFC and DOH encourage applicants to
inquire about SMRF availability as we believe this financial assistance is generally less
expensive and more convenient than traditional bond anticipation note financing.
Funds for SMRF are derived internally, from EFC's short-term financing sources or externally,
through the issuance by EFC of long-term bonds or short-term notes (commercial paper). EFC
expects that its commercial paper program will obtain high short-term credit ratings and pass
through low borrowing costs. EFC tracks the availability of its internal short-term financing
sources by projecting its cash flow month to month over the course of the FFY. For FFY 2012,
EFC and DOH project $75 million to be available for DWSRF SMRF from these internal
sources. Upon reaching this threshold amount of SMRF transactions, DOH and EFC will, if
prudent, revise the threshold or EFC will pursue external funding sources as described above.
In the event EFC determines to pursue external funding sources, applicants may experience
delays in SMRF funding until proceeds of external funding are received by EFC. DOH and EFC

intend to make SMRF available to as many applicants as possible. However, DOH and EFC
have determined that additional considerations may need to be given to the process of SMRF
allocation. Therefore, depending on the number of applications received and the total dollar
amounts associated with them, the following priorities which are in order of public health benefit
may be applied, if necessary, to DWSRF SMRF availability:
Projects on the Annual List (Formerly called Readiness List) with scores above the
subsidy funding line requiring short-term financing in excess of the amount available
under the Short Term Interest Free Financing (STIFF) Program. This can include
financings beyond the STIFF for Annual List (Formerly called Readiness List) projects
and pre-financing of third-party grants.
Projects on the Annual List (Formerly called Readiness List) that require interim
financing prior to the next scheduled pooled financing. These financings typically occur
for projects with STIFF that matured prior to the leveraged financing pool or projects that
require additional funds prior to the leveraged financing pool.
Projects on the Annual List (Formerly called Readiness List) below the Subsidy Line and
not reachable for subsidy via bypass between the Subsidy Line down through 45 points.
DOH and EFC, may elect not to process applications for SMRF for projects with priority
health ranking scores of 40 points or lower.

2. Leveraged Financing - Leveraged Financings are DWSRF financings funded from bond
proceeds. Certain bond series issued to fund DWSRF financing will be secured by federal
and state match dollars deposited to and held in program financing indentures. Leveraged
Financings will be at market rate or receive an interest subsidy either from earnings received
from a dedicated reserve allocation equal to one-third of the financing amount or from other
program assets. Certain hardship communities may receive an interest subsidy of more than
one-third of the financing amount. Other program assets or investment earnings from the
reserve allocation will provide a 33 1/3% interest subsidy, based on the market rate of the
related EFC bonds, to certain recipients, thereby resulting in a subsidized interest rate on
the financing. In instances where the project qualifies for a hardship financing, the interest
subsidy may reduce the net interest rate to zero percent. The performance of investments
held in the financing indenture or the general accounts of the program will not impact the net
interest rate on leveraged recipient financings.
3. Regular Reduced Rate Direct Financing - Regular Reduced Rate Direct Financing will be
made available to recipients not eligible for Leveraged Financing. Direct Financing
recipients are determined by EFC and may include non-investment grade borrowers or small
financing requests.
4. Hardship Financing Direct or Hardship Financing will be made available to qualified
recipients at rates below the regular reduced interest rate. Certain hardship eligible
recipients may receive leveraged financing. If qualified, Hardship Financing may also be
issued for 30 years. A description of the DWSRF Disadvantaged Community Program is
provided in Section 7.0.
5. Additional Financial Assistance (Grants) - Grants may be made available to eligible
recipients if a Direct or Hardship interest free financing does not provide sufficient funding to
lower the Projected Service Charge to the Target Service Charge (TSC). A description of
the DWSRF Disadvantaged Community Program is provided in Section 7.0.
6. Emergency Financing - The emergency financing program allows for the immediate
financing of emergency situations as defined in Attachment I of this IUP, at eligible public

water systems. This funding is only available to water supply systems for emergency
repairs when no other funding source is available to the system. The determination of when
an emergency exists would be made by the DOH. Imminent threats to public health would
include situations that result in the unavailability of a source of potable water for an
extended period of time. Projects that are designed to address such emergency situations
will receive the highest priority ranking and will be added to the Project Annual List
(Formerly called Readiness List). These projects would receive the first priority for any
funds that are by-passed in accordance with by-pass procedures authorized in Section 10.2
of this IUP.
7. SRF Bond Market Rate Program - The SRF Bond Market Rate Program provides eligible
financing recipients with project scores below the subsidy funding line on the Project Annual
List (Formerly called Readiness List) access to the public market at preferred market rates.
Projects funded with market rate obligations will be retained, in subsequent years, on the
Project Annual List (Formerly called Readiness List) of the IUP until such time that they may
qualify for subsidy assistance in future years. For projects with scores that later rise above
the subsidy funding line (including through by-pass), subsidy assistance will become
available at the then target rate for the remaining term of the recipient financing. For
projects that qualify for subsidy assistance, a bond guarantee may be available to extend
repayment terms beyond the previous DWSRF limit of 20 years from project completion.
For recipients opting for longer repayment terms, subsidy assistance will be limited to that
which would have been available had the financing been structured with such 20 year
repayment terms. Subsidy assistance will be made available, at the target level, on the
total financed amount of the project. Consistent with project useful life, bonds with
maturities that exceed 20 years from the project completion date will be supported solely by
SRF guarantee and will carry no subsidy.
8. SRF Bond Guarantee Program - The SRF will provide a bond guarantee for bonds issued
by eligible recipients. The Bond Guarantee Program is available to support eligible projects
for which DWSRF subsidized financing is not available. Bonds issued by recipients and
guaranteed by the DWSRF may be issued for terms of up to thirty years.

4.7

Program Financial Terms

1. Short-Term Financing - Communities will borrow through the STFP by issuing municipal
Bond Anticipation Notes (BANs) to the EFC. The EFC will provide funding in the amount
of the BANS on an interest-free or EFC market rate basis. Upon maturity, the BANs may be
retired with long term DWSRF financing, the issuance of long term debt obligations by the
community, or other funding. Applicants other than municipalities will borrow through the
STFP by issuing a promissory note to EFC secured by a letter of credit if not PSC regulated.
Only DWSRF market rate short-term funds will be available to pre-finance any awarded
grants.
2. Leveraged Financing - The financing terms, including the payment of principal and interest,
are based on the terms of the EFCs bonds, proceeds of which fund the Leveraged
Financing. Principal amortization will be required to commence the earlier of a) within one
year of the project completion or b) no later than two years after closing the financing
(consistent with New York State Local Finance Law). Principal amortization cannot exceed
20 years from the project completion date or the Period of Probable Usefulness, whichever
is sooner. The interest subsidy is provided either from other program assets or interest
earnings on the investment of the reserve allocation. Reserve investments will be limited to
U.S. Treasury securities, U.S. Government guaranteed securities, securities of Government
Service Enterprises (GSE) such as the Federal National Mortgage Association and the
Federal Home Loan Mortgage Corporation, GSE guaranteed securities, investment

10

agreements collateralized by U.S. Treasury securities, U.S. Government guaranteed


securities, GSE securities, and GSE guaranteed securities and entered into with banks,
broker dealers or insurance companies rated in one of the two highest rating categories by
each nationally recognized rating service that rates their obligations, and state obligations,
state guaranteed securities or other qualified obligations rated in one of the two highest
rating categories by each nationally recognized rating service that rates the bonds. The
Effective Market Rate for leveraged financing made from New Yorks DWSRF in 2012 B
financing is 3.39 %. The Effective Interest Cost (EIC) for recipient financings based on this
transaction is approximately 2.26% (1/3 subsidy).
3. Regular Reduced Rate Direct Financing Terms governing principal amortization are the
same as those applicable to Leveraged Financing. Interest payable on the financing will be
set at two-thirds of the interest rate, as determined by the most recent issuance of DWSRF
bonds issued to provide financing to eligible recipients.
4. Hardship Financing - For eligible projects the terms governing principal amortization shall be
as long as 30 years from the project completion date or the Period of Probable Usefulness,
whichever is sooner. Any interest payable on Hardship Financing will be set at less than
two-thirds of the interest rate, as determined by the most recent DWSRF financing; rates
may be as low as zero. The actual rate will be determined based on the affordability criteria
(refer to Section 7.0).
5. Additional Financial Assistance (Grants) - Grants will be provided to qualified recipients to
lower the Projected Service Charge to the Target Service Charge. If determined to be
eligible, projects will be ranked according to project priority ranking system score. Projects
with the highest scores will receive confirmation letters for hardship assistance until the
available funding is fully committed (see Section 7.0). To be considered for hardship
assistance, eligible projects must have had a total numerical score greater than (or equal to)
that of the project with the lowest score (excluding bonus points) eligible to be funded from
the Project Annual List (Formerly called Readiness List) for the October 1, 2012 to
September 30, 2013 funding period.
6. Emergency Financing - Emergency financing would be issued as regular reduced rate direct
financing. Interest payable on the financing would be set at two-thirds of the interest rate, as
determined by the most recent issuance of DWSRF bonds for eligible recipient projects.
However, before an emergency financing can be issued the recipient must demonstrate
credit worthiness and fiscal viability in accordance with EFC criteria. Privately owned water
systems regulated by the Public Service Commission would be permitted to apply for
funding only if the Public Service Commission has issued an order allowing the water
system to surcharge its customers to repay the financing.
7. SRF Bond Market Rate Program - Bonds issued by eligible recipients and guaranteed by
the EFC will be purchased by the EFC from proceeds of DWSRF bonds publicly issued by
the EFC to investors. All avenues of recourse currently available to the EFC will apply with
respect to recipient bonds guaranteed by the EFC, including its statutory right to intercept
any state aid annually appropriated by the state to the recipient.
8. SRF Bond Guarantee Program - The SRF will provide a bond guarantee for bonds issued
by eligible recipients. The Bond Guarantee Program is available to support eligible
projectsfor which DWSRF subsidized financing is not available. Bonds issued by recipients
and guaranteed by the DWSRF may be issued for terms of up to thirty years.

11

4.8 Fund Management and Long-Term Effects of Funding Decisions Leveraging


A significant need exists for financial assistance for eligible drinking water projects in New York
State. The EPAs Drinking Water Infrastructure Needs Survey and Assessment Fourth Report
to Congress dated February 2009 estimated that more than $27.1 billion will be needed in New
York State over the next twenty years to ensure continued delivery of safe public drinking water.
Listing Forms (Formerly called the pre-applications) received by the DOH indicate an aggregate
need of approximately $6.5 billion over the next several years. Anticipated project financing
needs for this IUP, ending September 30, 2013, is about $3.8 billion. Given these needs, New
York State plans to leverage the available DWSRF capital by a factor of three to one. Table 1
details the proposed sources and uses for FFY 2013 including the leveraging of funds exclusive
of the direct financings and set asides.
All DWSRF financings are made in a fiscally responsible manner that will ensure the revolving
nature of the program in perpetuity. In addition, the fiscal aspects of the program are regularly
evaluated to ensure optimum use of DWSRF resources. Further, the long-term effect of
leveraging the DWSRF three to one will be to extend the reach of financial assistance benefits
to more New York State water systems than could be served if leveraging were set at a lower
level.

5.0

Amending the IUP

This IUP may be amended to reflect both programmatic and/or project specific changes. Draft
amendment notices will be published in the NYSDEC Environmental Notice Bulletin (ENB). At
the end of the comment period, responses to all significant comments will be made available
and the final amendment notice will be published in the ENB.

6.0

Set-Aside Activities

Section 1452 of the SDWA authorizes states to use a portion of the federal Capitalization Grant
(set-asides) to support various drinking water programs. Section 1452 allows as much as 31%
of a states federal Capitalization Grant to be used for administrative activities, technical
assistance activities, state program management activities, and special activities. New York
State proposes to use 16% FFY 2013 Capitalization Grant for set-aside purposes. Table 2
specifies set-aside allocations and is presented at the end of this section. The State intends to
maximize the use of Capitalization Grant monies for water supply projects. Therefore, only
those funds considered essential for DWSRF and water supply program support have been
allocated to set-aside activities. Also, any unused set-aside monies can be transferred to the
project fund after receiving an approved amendment to the Capitalization Grant. The intended
use of funds and expected accomplishments for each set-aside are described below.
Descriptions of how the FFY 2013 set-aside monies will be budgeted will be included in the
federal Capitalization Grant Application Set-Aside Work Plans. The State plans to bank some
set-aside funds for use in future IUP funding periods.
6.1

Administrative

The SDWA authorizes states to use up to 4% of the total annual federal Capitalization Grant (as
provided in Section 130 of the SDWA Amendments of 1996) to support the cost of administering
the DWSRF program. The State plans to use 4% of the total annual federal Capitalization
Grant for administrative activities.

12

Administrative tasks include, but are not limited to: developing and finalizing the Capitalization
Grant application package to secure federal funds; implementing the Operating Agreement (OA)
between the DOH and the EPA; performing technical project reviews and ranking project
proposals in priority order; preparing an IUP which identifies available funding resources and
expenditures and establishes current year and multi-year project priority lists; implementing a
State Environmental Review Process; reviewing and approving engineering reports,
construction plans and specifications; conducting project inspections; evaluating and
determining specific project affordability (hardship); conducting public participation efforts;
conducting database management activities; establishing DWSRF accounts; directing the
investment of DWSRF funds; preparing project financing agreements (including cost summaries
and project financing schedules); preparing necessary financial documents; issuing Corporation
Bonds and originating financing; establishing annual reserve allocations; establishing
disbursement schedules; processing disbursement requests and conducting associated
document reviews; collecting and managing repayments; establishing and collecting DWSRF
fees; insuring program and fiscal audits are conducted; and preparing technical and financial
reports to meet federal and state mandates.

6.2

Technical Assistance

Section 1452(g)(2)(D) of the SDWA authorizes states to use up to 2% of the total annual federal
Capitalization Grant to provide technical assistance to small water systems (those with
populations of 10,000 or fewer). This technical assistance may include assistance to potential
DWSRF applicants complying with federal and state drinking water regulations. The State plans
to use 2% of the total annual federal Capitalization Grant to continue to fund the enhancement
of the States existing Small Water Systems and Comprehensive Performance Evaluation
Programs and provide for direct technical assistance to small water systems.
6.2.1 Small Water Systems
The DOH has an existing technical assistance program for small water systems. This program
has helped numerous communities improve their drinking water systems while saving money
using self-help techniques. The DOHs Small Systems Program provides guidance to
communities in considering project alternatives, calculating alternative project costs, preparing
budgets for selected projects and reviewing existing operation and maintenance practices.
Additionally, the program assists communities to develop criteria for consultant selection,
determine project priorities, and select the most sensible project, use inexpensive labor and
materials, improve purchasing practices, use volunteers, avoid duplication of services and
conduct technical assessments to determine the overall needs of the community. These
assessments will be useful to the small water systems in helping them improve their overall
capacity. This program provides statewide coverage and the DOH will:
participate in meetings with the public and individual systems to explain the Small Systems
Program and its advantages to local communities;

encourage small water systems to consider collaborative or regional approaches to water


supply services, such as consolidating, forming partnerships, and initiating contract
operation and maintenance agreements;
oversee the contract to provide on-site circuit rider training and other direct technical
assistance to mobile home parks and other small community and non-transient noncommunity public water systems not currently served by such a program;
implement a number of small system projects, focusing primarily on communities applying
for DWSRF financing; and

13

oversee the regional capacity for providing direct assistance to DWSRF communities and to
provide for training and support of local health unit staff.
6.2.2 Comprehensive Performance Evaluation Program
The Comprehensive Performance Evaluation (CPE) Program has resulted in detailed
assessments of 145 water filtration plants since November 1994. Although most of these plants
are able to meet the current Filtration Performance Criteria and Maximum Contaminant Levels
(MCLs), the structural, operational and administrative deficiencies noted in the evaluations will
make it difficult for many of these systems to comply with future regulations without
considerable capital improvements. There are approximately 270 filtration plants in New York
State.
The primary CPE program goal is to review and evaluate the capabilities of existing treatment
facilities to determine if they are meeting current standards and performance goals. A
secondary, but equally important goal is to develop a program, based upon the evaluation, for
the optimization of each facility to assure compliance with current and future standards and
regulations.
The CPE program initiative includes:
conducting 2 3 CPEs per year, complete with a detailed evaluation report with prioritized
recommendations and follow-up meetings with the community to discuss the report, as
needed;
continuing to develop and issue comments and recommendations for initial remedial actions
to the community within 14 days after completion of field work, followed by the submission of
the completed evaluation within an average of 90 days after the completion of field work;
improving training of field staff responsible for follow-up by including them at CPEs, making
equipment available where needed and holding at least one workshop per year on
troubleshooting and plant evaluation techniques; and
conducting 3 5 mini performance evaluations per year, with follow-up letter reports, at
communities who had a full CPE and are implementing recommendations or experiencing
new difficulties, or to support communities who are having a specific critical problem.
6.3

State Program Management

The SDWA authorizes states to take up to 10% of the total annual federal Capitalization Grant
to support state program management activities. The State plans to use 10% of the total annual
federal Capitalization Grant to administer the Public Water System Supervision (PWSS)
program. States are required to match these set-asides on a one-for-one basis above and
beyond the 20% match required of all capitalization funds. This amount will be matched with inkind services associated with the States existing PWSS and Drinking Water Enhancement
Programs.
6.3.1 Administer the PWSS Program
The PWSS program enables the DOH to continue administration and oversight of the drinking
water program, ensuring consistency in the implementation of and compliance with the
requirements of the New York State Sanitary Code on a statewide basis. Additionally, the
PWSS program assures that public water systems are operated in a manner that ensures

14

adequate protection of their source water(s) and delivery of potable, aesthetically pleasing
drinking water.
To achieve these objectives during FFY 2013, the DOH will:
assure compliance with Part 5 of the State Sanitary Code;
coordinate with Wadsworth Center for Laboratories and Research (WCL&R) to assure that
State Laboratory capabilities are maintained;
provide technical assistance to public water systems in achieving compliance;
assure public health protection at public water systems using surface water sources;

assure public health protection by developing, adopting and implementing mandatory


federal drinking water regulations into the State Sanitary Code, including development and
submittal of primacy packages;
ensure that local health department water supply programs properly implement the program;
assure that water supply facilities are built in accordance with proper design criteria by
providing conceptual review and design approval of new construction and major
modifications to water supply systems;
continue to assess whether community groundwater systems may be under the influence of
surface water;
continue to implement the States Capacity Development Program including submitting the
Annual Capacity Development Report to the U.S. EPA by December 31st of each year;
continue to implement the Source Water Assessment and Protection Programs and Well
Head Protection Program;
continue to perform security inspections of public water systems;
assure potable water is provided during water supply emergencies;
assure staff are properly trained;
assure that water systems are operated by competent operators;
continue participation in Child Health Initiative by assisting EPA with collection and analysis
of lead samples from school drinking water outlets in cities around the state;

continue to track NYC avoidance compliance; and


ensure that all EPA reporting requirements under the grant are met and that EPA proposals
for regulations and policies are promptly commented upon as requested.

15

6.4

Special Activities

Section 1452(k) of the SDWA authorizes states to take up to 15% of the annual federal
Capitalization Grant for land acquisition, capacity development projects, wellhead protection,
and source water petitions. No more than 10% of the federal Capitalization Grant can be
allotted to any one of these special activities.
New York State is not proposing to take or use any of the allotted set-aside funds from the FFY
2012 DWSRF Capitalization Grant for the following programs.
1. Land Acquisition
Funds in the DWSRF can be used to purchase land integral to the construction of facilities, but
not for other purposes such as watershed protection. A separate set-aside of 10%, however,
may be used to establish a separate low-interest fund for land acquisition, particularly for
watershed protection. New York State is not proposing to create such a fund at this time.
There are a number of existing programs that can be used to purchase sensitive watershed
lands. These include the States 1986 Environmental Bond Act, the 1996 Clean Water/Clean
Air Bond Act, the New York City Watershed Agreement, the Clean Water State Revolving Fund,
as well as local, regional and private sources. The State will review the need to create
additional capacity for land acquisition as part of its source water assessments and delineation
efforts.

2. Capacity Development Projects


The State has proposed to use a portion of the allotted Program Management set-aside to
implement the statewide capacity development strategy. The DOH with input from the EFC, the
New York State Public Service Commission, the Office of State Comptroller, and other state
agencies will use the capacity development strategy to address non-viable public water supplies
in the State.
3. Wellhead Protection
The DEC developed New Yorks Wellhead Protection Program (WHPP), which was approved
by the U.S. Environmental Protection Agency in 1990. The goal of the WHPP is to protect the
ground water sources and wellhead areas that supply public drinking water systems from
contamination. New Yorks approach to wellhead protection recognizes and includes the
existing federal, state and county programs that protect groundwater, and compliments these
programs through a combination of activities and efforts using existing public and private
agencies and organizations at all levels. In New York, the WHPP has focused on assisting
municipal community water systems with an interest in developing protection plans for their
ground water supplies.
In October 1998, administration of New Yorks WHPP was transferred from the DEC to the
DOH. The basis for the transfer of this program responsibility was due to the creation of the
Source Water Assessment Program (SWAP) under the 1996 SDWA Amendments and the need
to ensure efficiency and compatibility in the administration of these key water supply
management programs. The WHPP and the SWAP share several similar program elements
(e.g., delineation and contaminant inventory) for identifying areas of source water vulnerability to
contamination, and both programs provide a foundation for focusing source water protection
efforts at the local level.
The DOH submitted a Biennial Wellhead Protection Report to the EPA on November 15, 1999
for the October 1997 through September 1999 reporting period. This biennial report was

16

prepared in accordance with the reporting requirements and criteria outlined in the EPA
guidance provided to states and is consistent with previous New York State submittals on
progress reporting for the WHPP. The DOH submitted a Biennial Wellhead Protection Report,
using the 2001 Source Water Assessment and Protection Reporting Matrix, to the EPA on
November 9, 2001 for the October 1999 through September 2001 reporting period. Future
wellhead protection reporting will be prepared in accordance and be consistent with revised
EPA reporting requirements that are under development.
4. Source Water Petitions
As part of the SWAP, the State will assess a variety of options for improving source water
protection throughout the State. The source water petition program outlined in the SDWA is one
such option. It remains premature to develop a financing program to fund source water petition
partnerships at this time.
TABLE 2
DISTRIBUTION OF FFY 2012 SET-ASIDE FUNDS
Drinking Water State Revolving Fund
Set-Aside
SDWA FFY 2012 Maximum Allocation1 NYS

FFY 2012

Administration
EFC (2%)
DOH (2%)

4%

$2,102,597

4%

$2,102,597
($1,051,298)
($1,051,299)

Technical Assistance
DOH

2%

$1,051,299

2%

$1,051,299
($1,051,299)

State Program Management


Administer PWSS Program
DOH

10%

$5,256,494

10%

$5,256,494

Special Activity Set-Asides2

15%
(10%)
(10%)
(10%)
(10%)

$7,884,741
($5,256,494)
($5,256,494)
($5,256,494)
($5,256,494)

0%

31%

$16,295,131

16%

Land Acquisition
Capacity Development
Wellhead Protection
SW Petition Programs
Total Set-Asides3

($5,256,494)

$8,410,390

Based on receiving Federal Capitalization Grant of $52,564,937.


2
No more than 10% for any individual component and a total of 15% under Special Activity Set-Asides.
3
The USEPA Safe Drinking Water Act allows for States to use up to 31% of the federal grant for set- asides, NYS intends on
using a total of 16%.

7.0

Disadvantaged Community Program and Hardship


7.1

Introduction

Chapter 413 of the Laws of 1996 (Clean Water/Clean Air Bond Act) provided $355,000,000 to
finance drinking water infrastructure projects in New York State. Of these monies, $90,000,000
was allocated to provide direct financial hardship assistance payments for projects in
disadvantaged communities. As of December 1998, the $90 million available for State
Assistance Payments (Grants) from the Bond Act was fully committed. Since the inception of
the program the DOH and the EFC exercised the federal SDWA Hardship Provision that
allowed states to utilize up to 30% of their annual DWSRF Federal Capitalization Grant to
provide Additional Financing Subsidies (Grants) beyond the interest free financing rate to
eligible disadvantaged communities. For FFY 2013 it is anticipated that NYS will use 30% of its

17

Federal Capitalization Grant to provide Additional Financing Subsidies (Grants) beyond the
interest free financing rate to eligible disadvantaged communities. Table 3 reflects the
cumulative amount of grant funds that were provided to primarily disadvantaged communities
and the estimated grants to be provided for FFY 2013.
Table 3
Total Financings and Hardship Grant Funds
Total Project 4
Federal Fiscal Years
Federal DWSRF Dollars
Provided to State
Financings
1997 - 2012
2013 (Estimated)
1
2
3
4

(Capitalization Grants)

Through 2012

$946,162,300 1
$52,564,937

$3,639,483,879

Grants Awarded to
Communities
$363,978,225 2
$15,769,481 3

Includes $86.8 million DWSRF American Recovery and Reinvestment Act (ARRA) grant.
Includes $71.5 million in ARRA principal forgiveness/grants and $90 million in State Assistant Payments.
Estimated to be provided for FFY 2013.
Exceeds capitalization grant amount due to leveraging, repayments and interest earnings.

Hardship applications, submitted by December 1, 2012, will be evaluated using the criteria
outlined herein and if determined to be eligible will be ranked according to project priority
ranking system score. Drinking water projects will be reviewed to determine eligibility for
funding and scored based on the established project priority ranking system (see Attachment I).
Communities whose drinking water projects are listed on the Project Annual List (Formerly
called Readiness List) or the Multi-Year List with a total numerical IUP score greater than (or
equal to) that of the project with the lowest score (excluding bonus points) eligible to be funded
will be evaluated for financial hardship. Projects with the highest scores (excluding bonus
points) will receive confirmation letters for hardship assistance until the available hardship
allotment plus any unexpended, previously committed hardship funds are fully committed.
Hardship applications may be submitted after December 1, 2012 for evaluation of a financing
only (no grant) hardship assistance package during the current IUP period (October 1, 2012 September 30, 2013). Applicants that seek additional financial assistance (grants) as part of
their hardship assistance package and submit their hardship application after December 1, 2012
will have to re-apply during the annual call for projects for the next IUP period (October 1, 2013
September 30, 2014) to be re-evaluated.
7.2

Financial Availability

As defined by 1452(d)(3) of the SDWA, a disadvantaged community is one in which the public
water system service area meets established affordability criteria. Under the Disadvantaged
Community Program financial hardship assistance may include:
1. Reduced Interest Rate Financing - The rate on a financing can be reduced to as low as
interest free and/or the financing terms increased to as much as thirty years to bring the
Projected Service Charge (PSC) down to the Target Service Charge (TSC) level (see
Calculating Hardship); and
2. Grants Beyond an Interest Free Financing - If an interest free financing does not provide
sufficient funding to reach the TSC, Grants (up to $2 million or 75% of the eligible project
cost, whichever is less) may be used to make up the difference. An applicant may not be
awarded more than $2 million in grants in a particular funding period. Grants will not be
made available to systems with a Median Household Income (MHI) greater than the
statewide MHI of $55,603.
7.3

Eligibility for Financial Hardship Assistance

18

The following eligibility requirements apply to hardship applicants:


The project must be listed on the Project Annual List (Formerly called Readiness List) or the
Multi-Year List with a total numerical IUP score greater than (or equal to) that of the project
with the lowest score (excluding bonus points) eligible to be funded from the current Project
Annual List (Formerly called Readiness List).

Hardship assistance is available only for drinking water projects for which the notice to
proceed for construction was issued on or after April 1, 1997. Debt issued between July 1,
1993 and March 31, 1997 is eligible only for refinancing through regular subsidized interest
rate financing from the DWSRF program.
Only projects that have a total project cost less than $14,000,000 are eligible for hardship
assistance. Projects may not be segmented in order to qualify for hardship financial
assistance.

An applicant may not be awarded more than $2 million in grants in a particular funding
period.
Grants will not be made available to system service areas with a MHI greater than the
statewide MHI of $55,603. However, projects in such areas with a MHI up to 150% of the
current statewide MHI, or $83,405 will be eligible for reduced interest rate financing (to as
low as 0%) and/or extended up to thirty years to bring the PSC down to the TSC. Systems
with a service area MHI greater than $83,405 will not be eligible for hardship financing.
Only community water systems, systems that provide drinking water to residential
populations, such as municipal water systems and privately owned water supply companies
that are regulated by the Public Service Commission, are eligible for hardship assistance.
7.4

Calculating Hardship

A hardship determination is made based on the information provided in a completed financial


hardship application and a comparison of PSC and TSC for a typical household. The formula
that establishes the TSC is based on the applicants MHI, as indicated in the TSC Chart and
graph that follow. The PSC is the projected annual service charge of the project per Equivalent
Dwelling Unit (EDU) including existing water system debt service, projected project related debt
service, and project operation and maintenance (O&M) costs.
The EDU concept relates all water system usage proportionately to that equivalent to a typical
single family residence. EDUs will be calculated for commercial, industrial and institutional
users based upon the water usage from flow data, number of employees, fixture units, or other
factors that equate usage to that of an equivalent number of residential users. The percentage
of total water use dedicated to institutional/industrial uses is taken into account in calculating the
amount of hardship a particular community will qualify for in grant assistance (see below).
The comparison of PSC to TSC is used to determine which public water systems are eligible for
financial assistance beyond the regular subsidized interest rate financing available through the
DWSRF. The additional benefits will assist economically disadvantaged water systems in the
construction of eligible drinking water projects.
The TSC is based on the service areas MHI. In calculating the MHI for this IUP period, the
2010 U.S. Census data will be used. Under certain circumstances, an income survey for the
service area may also be considered (contact EFC for income survey guidance). The TSC
calculation and examples follow:

19

TSC= [(MHI/10,000)2 x 24] + [(MHI/10,000) x 2] + 70


TSC Examples:
Median Household Income (MHI)

Target Service Charge (TSC)


$170
$225
$292
$371
$680
$807
$1,260
$1,435
$1,620

$20,000
$25,000
$30,000
$35,000
$50,000
$55,000
$70,000
$75,000
$80,000

Hardship Eligibility Curve:

The following factors may be considered including, without limitation, the relative number and
nature of residential, seasonal, commercial, industrial and institutional users when making the
determination regarding hardship assistance.
Once the initial hardship determination is made, a percentage of the calculated grant amount (if
any) equivalent to the percentage of industrial and institutional water use (if that use exceeds
25% of the total water consumption of the applicant service area) will be limited to an interest
free financing. Institutional refers to a facility with dormitory or similar accommodations for
overnight use.
The grant portion of hardship packages will not be provided if the difference of the projected
service charge based on the hardship assistance including a grant, and the projected service
charge for the project with reduced interest rate financing only (no grant) is calculated to be less
than 5%.

20

7.5

Hardship Application Process

To be considered for financial hardship assistance, an applicant must request a Financial


Hardship Application from the DOH or the EFC and provide the following information when
completing the application:
existing population of the project service area;
number of EDUs to be served, including commercial, institutional and industrial users, and
the basis on which they were calculated;
existing annual debt for the system;
existing annual O&M costs;
estimated annual O&M costs based upon completion of the project;
annual financial reports, audited if available, for the last three years;
an analysis of project alternatives for cost effectiveness;
other revenue of the system (including charges to outside users, cell antennas, etc..),
estimated project costs; and
any other funding sources for the project, including detail on whether such funding is a grant
or a loan, and if a loan, its interest rate, term, and annual debt payment.
The hardship application is different than the DWSRF application. It is recommended that
applicants, meeting the aforementioned eligibility criteria obtain and submit a hardship
application directly to the DOH. Hardship applications submitted after December 1, 2012 will be
evaluated for a financial hardship assistance package (no grant) during the current IUP period.
Applicants that seek grants as part of their financial hardship package will have to re-apply, if
eligible, during the next IUP funding period to be re-evaluated.
7.6

Confirmation of Hardship Availability

Upon review of all hardship applications received in a funding round, projects eligible for
hardship assistance will be ranked in priority order based on their project priority ranking scores.
Projects with the highest project priority scores will receive confirmation letters for hardship
assistance until the available hardship monies and any unexpended previously committed
hardship funds are fully committed. Projects which qualify for financial hardship assistance may
be provided with written confirmation from EFC of such qualification and placed on the next IUP
Hardship List unless already funded during the current IUP funding period. Written confirmation
for financial hardship will remain valid for the term identified in the confirmation letter. The
amount and type of hardship assistance offered may change or be withdrawn if:
the applicant fails to demonstrate satisfactory progress towards project implementation;
the information on which the determination was first made changes prior to financial closing;
or
the applicant fails to demonstrate that it can repay the financing portion of the assistance
package.

21

If a project has not closed on funding by the expiration date identified in the confirmation letter, it
will be removed from the Hardship List and will have to reapply for hardship assistance, unless
re-qualified for the Hardship List.
Projects which are deemed eligible for hardship assistance and would otherwise be eligible for a
Grant, but are either not reachable due to the limited grant monies available or consist of
multiple projects submitted by a single applicant for which the sum of the grant component
exceeds $2 million, will have to compete each year for the available hardship monies. However,
these projects may be offered a zero interest rate financing upon determination of hardship
eligibility. Projects that accept this financing will still be eligible to compete for Grant money in
future years up to the time of long-term financing.
Projects that receive a financial hardship confirmation letter, that have not closed on their longterm funding package, and whose project costs increase will be able to apply for a reduced
interest rate financing, as low as zero percent, to cover the cost increases as long as direct
financing dollars are available in the current IUP funding period. As an alternative for projects
not yet closed, the project applicant may submit the entire revised project for reconsideration in
a subsequent annual call for projects.
Projects that receive a financial hardship confirmation letter, that have closed on their long-term
funding package, and whose project costs increased can apply during a subsequent IUP
funding period within five years of closing on the long term financing for a reduced interest rate
financing, as low as zero percent, to cover the cost increases. In this case, the applicant must
file a new Listing Form (Formerly called the pre-application) to list the project in the next IUP.
The project will be awarded additional points for project phasing.
7.7

Co-funding

Confirmation that a project qualifies for hardship assistance will help facilitate funding
coordination with other State and Federal agencies that finance drinking water projects. The
New York State Water and Sewer Infrastructure Co-funding Initiative brings together
representatives from the DOH, EFC, DEC, Department of State, Office of Community Renewal,
United States Department of Agriculture Rural Development, Office of the State Comptroller,
and New York State Energy Research and Development Authority to ensure optimum funding
potential and assistance for New Yorks communities. For more information about co-funding,
visit the co-funding web site at http://www.nycofunding.org.
Co-funding is anticipated and encouraged by the provision of additional points to a projects
score in the priority system. A project must receive co-funding assistance of either $25,000 or
5% of the project costs, whichever is less, to qualify for project co-funding points. Coordination
of joint funding of projects will be done on a project by project basis.

8.0

Capacity Assessment

To provide safe and reliable drinking water, the federal and state governments are investing
substantial financial resources in the drinking water infrastructure of New York State. To assure
the DWSRF is invested wisely, each DWSRF applicant must demonstrate that its water system
has adequate technical, financial and managerial capacity.
8.1

Technical Capacity

To assure adequate technical capacity, the applicant must demonstrate adequacy of source
water, adequacy of infrastructure and technical knowledge. The DOH will review central office
and local office records to assure that the system is being properly operated and maintained.

22

The water system must not have outstanding drinking water compliance problems unless the
project is aimed at correcting those problems. The engineering report and plans and
specifications for the proposed project will be evaluated to insure that the system has a reliable
source for its drinking water and that it is adequately protected; that the project will maintain
system compliance; and that the education, experience, and technical skills and capabilities of
the system operator are appropriate for that system.
8.2

Financial Capacity

To assure adequate financial capacity, the applicant must have sufficient rates, charges and
revenues to cover necessary costs, demonstrate credit worthiness and fiscal condition in
accordance with EFC criteria. The EFC will review the applicants financial capacity during the
full application process to determine financial viability before the awarding of financial
assistance. The EFCs review will include, but not be limited to, the project budget, municipal
bond resolution(s), annual financial reports to the Office of the State Comptroller, and other
financial information to assure adequate financial capacity of the applicant.
8.3

Managerial Capacity

To assure adequate managerial capacity, the water system must have clear ownership identity
and be appropriately staffed by personnel with expertise to administer overall water system
policies and operations. The DOH will review the applicants managerial capacity to assure that
management is involved in the day to day supervision of the water system, is aware and
responsive to all required regulations, is available to respond to emergencies, is capable of
identifying and addressing all necessary capital improvements, is responsive to their customers
and is capable of keeping accurate records and assures financial viability. The water system
must have a qualified water operator in accordance with the State's existing Operator
Certification Program.
8.4

Systems with Inadequate Capacity

For all systems that seek funding under the DWSRF, the DOH will review any history of
violations, outstanding compliance problems, reported source contamination or inadequacies,
treatment failures, needs survey data, operations and maintenance issues, and operator and
owner coverage to determine whether a system lacks adequate capacity. A system that
requires improvements to obtain adequate capacity can apply to the DWSRF provided the
improvements will ensure compliance and render the water system viable. Using the
procedures outlined in Sections 8.1, 8.2, and 8.3 to evaluate the systems technical, financial,
and managerial capacity, the DOH will assess whether DWSRF assistance will help to ensure
compliance. In addition, the DOH will consult with the local health department, which provides
the daily oversight and regulation of the water system, to make this assessment.
8.5

Long-Term Capacity

Water systems must maintain adequate capacity. The DOH and EFC will assess whether each
water system has a long-term plan to undertake feasible and appropriate changes in operations
necessary to develop adequate capacity. The DOH will review Water Resource Management
Strategies, Comprehensive Studies, the Needs Survey and other available engineering reports,
as well as consult with the local health departments, in making these assessments. The DOH
and EFC will encourage restructuring efforts when two or more systems can benefit and other
options, such as contract management or partnerships with other communities in their area, in
an effort to improve the overall capacity. The priority ranking criteria provides additional points
to encourage this objective. In addition, restructuring efforts and other cooperative

23

arrangements among systems will be encouraged as part of the implementation of the statewide
capacity development strategy.

8.6

Annual Reporting Requirements

The State will submit to the EPA and include in the IUP, documentation that summarizes the
results of the capacity assessments conducted on those systems seeking funding under the
DWSRF in the preceding year. The summary will include statistics on the numbers, types, and
sizes of systems assessed to determine technical, managerial, and financial capacity, including
the assessment outcomes; whether DWSRF assistance will ensure compliance for those
systems with inadequate capacity; and whether restructuring efforts will result in both
developing adequate capacity and achieving long-term capacity for systems. Table 4
summarizes the required capacity assessment information. Table 4 shows the summary for
capacity development reviews.
Table 4
Capacity Development Review Summary (10/1/11 9/30/12)
Statewide
Capacity Reviews
Passed
Failed
(Failed) Requiring Restructuring
ERP Priority
Systems1
Requesting
DWSRF
Assistance

Totals

System Type:
System Size (population served)
CWS NTNC <1000 1,000-3,300
>3300

13

13

Funded
Being Processed

Projects submitted by systems that lack technical, managerial or financial capacity or are classified as priority systems based on
EPA's Enforcement Targeting Tool (ETT) are not eligible for funding unless the proposed project will ensure capacity or compliance.
Also, projects whose primary purpose is fire protection or growth/development, dams and reservoirs, or acquisition of land not
integral to an eligible project are not eligible.

9.0

State Environmental Review Process/Determination of Equivalency Projects

The State Environmental Review Process (SERP) applies to all projects receiving financial
assistance from the DWSRF. The SERP incorporates environmental review requirements of
the National Environmental Policy Act (NEPA) and its implementing regulations (40 CFR, Part 6
and 40 CFR, Part 1500), the State Environmental Quality Review (SEQR) Act, Article 8 of the
Environmental Conservation Law (ECL) and its implementing regulations under 6 NYCRR, Part
617, as well as the DOH regulations under 10 NYCRR, Part 97. The DWSRF applicant must
complete the SERP before receiving DWSRF financing.
All projects that are financed from the DWSRF are classified by the DOH under the SERP as
either Tier I or Tier II projects. Tier I projects, also referred to as equivalency projects, refer to
those projects that are financed by the DWSRF whose cumulative total is an amount equal to
the federal Capitalization Grant to the State. Tier II projects, (non-equivalency projects), refer to
all other projects that receive DWSRF financial assistance.
Tier I projects must undergo an environmental review consistent with the NEPA.
DWSRF program, Tier I projects will include:

24

For the

projects for which an environmental review consistent with NEPA has already been
completed; and
projects that meet the definition of a NEPA categorical exclusion.
If necessary, additional Tier I projects will include:
projects for which applicants have voluntarily undertaken to complete a NEPA equivalent
environmental review;
projects that have a particular environmental significance, due to the nature and scope of
the projects; and
projects for which the environmental review can be considered functionally equivalent to a
NEPA environmental review, with some minor additional elements.
Tier II projects are subject to the environmental review requirements of SEQR with additional
requirements imposed by the SERP for the DWSRF program. Applicants will be notified by the
DOH whether their project(s) proposed for financing through the DWSRF program fall under the
category Tier I (equivalency) or Tier II.

10.0

Project Priority Lists


10.1

Project Selection Process

Both federal and state laws require that New York develop a Project Priority Ranking System.
The priority ranking system establishes a list of eligible projects to be funded in a manner
consistent with the SDWA such that the most serious risks to public health are given the highest
priority. The DOH has given the highest priority to acute public health risks, particularly those
related to microbiological organisms. The next priority was given to situations that pose chronic
and longer term risks to consumers, such as organic chemical contamination. The scoring
criteria also consider issues that are related to infrastructure upgrading or replacement. The
project ranking system also considers, as mandated by the SDWA, special allocations and
restrictions on the use of DWSRF monies for disadvantaged and small systems. A detailed
description of the Project Priority Ranking System and Scoring Criteria are included as
Attachment I to this IUP.
10.2

Description and Use of Project Lists

Projects must be included in the IUP to receive DWSRF financing. This IUP includes the
following prioritized lists of eligible projects being considered for financing from the DWSRF:
The Project Annual List (Formerly called Readiness List) for this IUP includes all projects for
which an engineering report or plans and specifications are submitted to the DOH or for
which construction is completed by September 5, 2012. A project is deemed ready when
all technical submittals have been received by the DOH. Projects that have submitted
Listing Forms (Formerly called the pre-applications), but have neither submitted an
engineering report, plans and specifications nor completed construction have been
included on the Multi-Year List.
The Project Annual List (Formerly called Readiness List) includes a subsidized funding
line. Projects listed above this subsidy funding line comprise the Funding List, which
includes all those projects expected to qualify for long-term financing within the current IUP
financing period. Provisions are made in the Project Priority Ranking System to by-pass

25

projects that may not progress as expected (see Attachment I). The DOH will proceed
with an accelerated by-pass of those non-hardship projects that have been on the Project
Annual List (Formerly called Readiness List), above the subsidy funding line for two or
more consecutive IUP periods and fail to submit a complete application by December 1,
2012.
Funds released by project by-passing will first be used for the Emergency Financing
Program to finance imminent threats to public health. Funds released by project bypassing will then be used to finance cost increases incurred by projects on the IUP above
the subsidy funding line. Any remaining funds available will be used to finance projects
below the subsidy funding line in order of priority ranking.
The project cost presented on the Project Annual List (Formerly called Readiness List)
reflects the applicants estimated project cost.
It should be noted that for some larger projects there may not be sufficient funds available
in a single IUP financing period for their complete financing. As necessary, New York
State will segment and/or phase finance (cash flow basis) larger projects over several IUP
financing periods to maintain a statewide program of maximum effectiveness.
The Category A List consists of projects for small systems serving less than 10,000
people from the Project Annual List (Formerly called Readiness List). This list includes
a funding line and a line designating the SDWA minimum funding requirement (15% of
the DWSRF) for small public water systems.
The Category B List consists of projects for water systems serving greater than or equal
to 10,000 people from the Project Annual List (Formerly called Readiness List). This
list has not been included in the IUP.
The Multi-Year List includes all eligible projects for which Listing Form (Formerly called
the pre-application) forms have been submitted and reviewed, including those projects
on the preceding Multi-Year List. The DOH accepts Listing Form (Formerly called the
pre-application)s on a continuous basis. All eligible projects for which Listing Form
(Formerly called the pre-application) forms are submitted on or before September 3,
2010 will be included on the Multi-Year List in the final IUP.
The Category C (Hardship) List includes all eligible projects that have received written
confirmation that they qualify for financial hardship assistance.
Copies of the Project Annual List (Formerly called Readiness List), the Category A List, the
Multi-Year List, and the Category C (Hardship) List follow at the end of this section.

26

PROJECT ANNUAL LIST

(FORMERLY CALLED READINESS LIST)

The Project Annual List (Formerly called Readiness


List) begins with projects that have received a written
confirmation letter that they qualify for financial hardship
and are determined to be ready. These projects are identified
by H in the column labeled score.
Phased or segmented projects are assigned 2000 points
in addition to their total project ranking system score. Phased
points will not typically be assigned for any Listing Form
(Formerly called the pre-application) received if the prior
related portion of the project closed on long term financing
more than five years earlier and the improvements already
funded are operational.
Projects that are eligible for subsidy and have short-term
financing are assigned 1000 points in addition to their total
project ranking system score and are identified by NOTE:
Short-Term Loan Closed in the column labeled project
cost.

Project #

NYS Drinking Water State Revolving Fund DRAFT IUP Annual List
(Formerly Readiness List) October 1, 2012 to September 30, 2013
County

CODES See legend*

17473

Jefferson

System Name/
Borrower
LAFAVE ROAD WATER
DISTRICT / Le Ray (T)

Description
Consolidation of existing public water systems with GUDI wells,
coliform and lead violations., New Distribution System, New System
Consolidation

Pop.
600

Project Cost Score


$0

Cumulative
Total

$0

NOTE: Short - Term Loan Closed, Project Cost Shown


isRemaining Balance Not Funded With Short Term Loan

17321

Jefferson

WESTCOTTS WATER
DISTRICT / Hounsfield (T)

ARRAF

17456

Westcotts WD to serve along NYS Route 3. Consolidation of PWS


systems addressing SWTR & E-Coli violations. , Upgrade Storage,
New Distribution System, New System Consolidation

300

$0

$0

NOTE: Short - Term Loan Closed, Project Cost Shown


isRemaining Balance Not Funded With Short Term Loan
New Surface Water Treatment Rule Compliance Facility, Upgrade
Water Treatment Plant, New Ground Water Source, Upgrade
Distribution System

Hamilton

INDIAN LAKE WD / Indian


Lake (T)

Franklin

SARANAC LAKE V / Saranac New SCADA equipment., New Surface Water Treatment Rule
Compliance Facility, Upgrade Distribution System
Lake (V)

900

$0

$0

NOTE: Short - Term Loan Closed, Project Cost Shown


isRemaining Balance Not Funded With Short Term Loan

17611

5,800

$0

$0

NOTE: Short - Term Loan Closed, Project Cost Shown


isRemaining Balance Not Funded With Short Term Loan

17388

Essex

PORT KENT WD /
Chesterfield (T)

New Surface Water Treatment Rule Compliance Facility, New Ground


Water Source, New Storage

202

$0

$0

NOTE: Short - Term Loan Closed, Project Cost Shown


isRemaining Balance Not Funded With Short Term Loan

15881

Essex

WADHAMS WD / Westport
(T)

New Surface Water Treatment Rule Compliance Facility, New


Inter-Connection, New System Consolidation

140

Chautauqua

FORESTVILLE VILLAGE /
Forestville (V)

New Surface Water Treatment Rule Compliance Facility, New Ground


Water Source, Upgrade Distribution System

804

$0

$0

NOTE: Short - Term Loan Closed, Project Cost Shown


isRemaining Balance Not Funded With Short Term Loan

17561

$0

$0

NOTE: Short - Term Loan Closed, Project Cost Shown


isRemaining Balance Not Funded With Short Term Loan

17461

Orange

PHEASANT HILL / Pheasant


Hill Water Corp

Rehabilitation of water system to address e-coli contamination,


Upgrade Water Treatment Plant, New Ground Water Source, New
Storage

154

$0

$0

NOTE: Short - Term Loan Closed, Project Cost Shown


isRemaining Balance Not Funded With Short Term Loan

15072

Orange

BEAVER DAM LAKE WATER New Surface Water Treatment Rule Compliance Facility, New Ground
Water Source, New Storage, Upgrade Distribution System
CORP. / Beaver Dam Lake
Corp.

Saratoga

STILLWATER VILLAGE /
Stillwater (V)

ARRAF

17647

Alternative Water Source for Surface Water Treatment Rule


compliance., New Transmission, New Inter-Connection

487

$0

$0

NOTE: Short - Term Loan Closed, Project Cost Shown


isRemaining Balance Not Funded With Short Term Loan

1,572

$0

$0

NOTE: Short - Term Loan Closed, Project Cost Shown


isRemaining Balance Not Funded With Short Term Loan

15343

Otsego

UNADILLA VILLAGE /
Unadilla (V)

ARRAF

17928

Wyoming

CASTILE VILLAGE / Castile


(V)

Install new well, pumphouse, controls, chlorination system to replace


GWUDI springs, New Surface Water Treatment Rule Compliance
Facility, New Ground Water Source, Upgrade Pump Station, Upgrade
Distribution System

1,350

Upgrade Water Treatment Plant, Upgrade Ground Water Source,


Upgrade Storage

1,135

$0

$0

NOTE: Short - Term Loan Closed, Project Cost Shown


isRemaining Balance Not Funded With Short Term Loan

$0

$0

NOTE: Short - Term Loan Closed, Project Cost Shown


isRemaining Balance Not Funded With Short Term Loan

18005

Wayne

SAVANNAH WD #1 /
Savannah (T)

New Surface Water Treatment Rule Compliance Facility, New


Storage, Upgrade Distribution System, Extend Distribution System

900

$0

$0

NOTE: Short - Term Loan Closed, Project Cost Shown


isRemaining Balance Not Funded With Short Term Loan

15603

Jefferson

WATER DISTRICT NO. 5 /


Hounsfield (T)

Extend distribution system to area of insufficient yielding or


cantaminated private wells. Consolidate Watertown International
Airport., New Distribution System, New System Consolidation

345

$0

$0

NOTE: Short - Term Loan Closed, Project Cost Shown


isRemaining Balance Not Funded With Short Term Loan

15204

Oswego

HANNIBAL (T) / Hannibal (T)

Extend system to serve area with private contaminated wells,


consolidate public water supply. , Extend Distribution System, New
System Consolidation

1,200

$0

$0

NOTE: Short - Term Loan Closed, Project Cost Shown


isRemaining Balance Not Funded With Short Term Loan

17543

17576

Saratoga

Chautauqua

Consolidate 3 small CWSs, consolidate WD 1, connect Town with


MOREAU WD
New Storage, Extend Distribution System, New
7/CONNECTION TO SCWA / SCWA,
Inter-Connection, Extend System Consolidation, New Water District
Moreau (T)

CHERRY CREEK VILLAGE / New Surface Water Treatment Rule Compliance Facility, Upgrade
Distribution System
Cherry Creek (V)

1,100

$0

$0

NOTE: Short - Term Loan Closed, Project Cost Shown


isRemaining Balance Not Funded With Short Term Loan

650

$0

$0

NOTE: Short - Term Loan Closed, Project Cost Shown


isRemaining Balance Not Funded With Short Term Loan

16692

Herkimer

VAN HORNESVILLE WATER VanHornesville Water System, New Surface Water Treatment Rule
Compliance Facility, New Storage, Upgrade Distribution System
WORKS / Stark (T)

372

$0

$0

NOTE: Short - Term Loan Closed, Project Cost Shown


isRemaining Balance Not Funded With Short Term Loan

16261

17538

Oswego

Oswego

ARRAF

New Surface Water Treatment Rule Compliance Facility, New


TOAD
New Pump Station, New Distribution System, New
HARBOR/CONSTANTIA WD / Storage,
Inter-Connection, New System Consolidation
Constantia (T)

WATER DISTRICT #2 /
Richland (T)

New Surface Water Treatment Rule Compliance Facility, New Ground


Water Source, New Transmission, New Storage, New Distribution
System

2,765

$0

$0

NOTE: Short - Term Loan Closed, Project Cost Shown


isRemaining Balance Not Funded With Short Term Loan

1,662

$0

$0

NOTE: Short - Term Loan Closed, Project Cost Shown


isRemaining Balance Not Funded With Short Term Loan

CODES Legend *

ARRAF=American Recovery Reinvestment Act Financed


GIC=Green Infrastructure Components
FGP=Funded through SRF Bond Market Rate Program
CAT_G=Green Innovative Grants Program Project

Page 1 of 35

Project #

NYS Drinking Water State Revolving Fund DRAFT IUP Annual List
(Formerly Readiness List) October 1, 2012 to September 30, 2013
County

CODES See legend*

17372

Oswego

System Name/
Borrower

Description

MEXICO (T) WD#2 / Mexico Extend distribution system to area with contaminated private wells
and consolidate PWS with GWUDI source, New Distribution System,
(T)
New System Consolidation

Pop.
800

Project Cost Score


$0

Cumulative
Total

$0

NOTE: Short - Term Loan Closed, Project Cost Shown


isRemaining Balance Not Funded With Short Term Loan

17306

Jefferson

WATER DISTRICT #2 /
Henderson (T)

New Surface Water Treatment Rule Compliance Facility, New


Distribution System, New System Consolidation

352

$0

$0

NOTE: Short - Term Loan Closed, Project Cost Shown


isRemaining Balance Not Funded With Short Term Loan

17382

Allegany

HOUGHTON WATER
DISTRICT / Caneadea (T)

Upgrade Water Treatment Plant, New Ground Water Source, New


Transmission, Upgrade Distribution System

Erie

CHAFFEE WATER CO /
Chaffee Water Co.

New Surface Water Treatment Rule Compliance Facility, New Ground


Water Source, New Storage

2,000

ARRAF

17457

$0

NOTE: Short - Term Loan Closed, Project Cost Shown


isRemaining Balance Not Funded With Short Term Loan

200

ARRAF

16882

$0

$0

$0

NOTE: Short - Term Loan Closed, Project Cost Shown


isRemaining Balance Not Funded With Short Term Loan

Onondaga

LIMELEDGE WD / Marcellus
(T) & (V)

ARRAF

New Water District to serve area with insufficient private wells.


Interconnection with GWUDI system., New Surface Water Treatment
Rule Compliance Facility, Extend Distribution System

700

$0

$0

NOTE: Short - Term Loan Closed, Project Cost Shown


isRemaining Balance Not Funded With Short Term Loan

St.Lawrence

LOUISVILLE WATER
DISTRICT #2 / Louisville (T)

New Storage, Upgrade Distribution System, System Consolidation

1,000

17163

Essex

TICONDEROGA WD /
Ticonderoga (T)

New Surface Water Treatment Rule Compliance Facility, New


Storage, Upgrade Distribution System

5,000

$13,954,315

$13,954,315

18061

Franklin

TUPPER LAKE V / Tupper


Lake (V)

New wells to replace SW source and inadequate DE plant., New


Ground Water Source, Upgrade Distribution System

5,500

$2,979,790

$16,934,105

16746

Allegany

CANASERAGA VILLAGE
PUBLIC WATER /
Canaseraga (V)

New Ground Water Source, Upgrade Storage

900

$3,666,749

$20,600,854

17497

Montgomery

AMSTERDAM (C) /
Amsterdam (C)

Upgrade Surface Water Treatment Rule Compliance Facility, Upgrade


Water Treatment Plant, Upgrade Water Treatment Plant, Upgrade
Water Treatment Plant

20,700

$737,000

$21,337,854

15003

Ulster

ELLENVILLE (VILLAGE)
WATER DIS / Ellenville (V)

Water system improvements, Upgrade Surface Water Treatment


Rule Compliance Facility, Upgrade Storage, Upgrade Distribution
System

4,323

$7,136,870

$28,474,724

17425

Chenango

SO. NEW BERLIN WATER


DISTRICT / New Berlin (T)

New Ground Water Source, New Transmission, New Storage,


Upgrade Distribution System, System Consolidation

400

$3,272,000

$31,746,724

17427

Albany

New Surface Water Treatment Rule Compliance Facility, New


NEW SALEM WATER
New Pump Station, New Inter-Connection, New Water
DISTRICT / New Scotland (T) Storage,
District

486

$3,048,000

$34,794,724

17442

Erie

BRANDT (T), NORTH


COLLINS (T)&(V) / North
Collins (V)

1,915

$5,430,000

$40,224,724

17379

Steuben

New Ground Water Source, Extend Distribution System, New System


COOPERS PLAINS/LONG
ACRES WATER SYST / Erwin Consolidation
(T)

1,400

$0

$40,224,724

17552

Herkimer

NEWPORT VILLAGE /
Newport (V)

New Surface Water Treatment Rule Compliance Facility, New Ground


Water Source, Upgrade Transmission, New Storage, Upgrade
Distribution System

740

$2,175,000

$42,399,724

16278

Hamilton

LONG LAKE (T) / Long Lake


(T)

New Ground Water Source, New Storage, Upgrade Distribution


System

750

$3,929,255

$46,328,979

18013

Cattaraugus

RANDOLPH VILLAGE /
Randolph (T)

East Randolph and Randolph (V)'s project includes meters, Upgrade


Other Expenses, New Surface Water Treatment Rule Compliance
Facility, New Ground Water Source, New System Consolidation,
Upgrade Other (OT)

1,250

$3,740,000

$50,068,979

17625

Oswego

EASTERN SHORE WATER


SYSTEM / Sandy Creek (T)

Consolidation of PWS with GWDI source., New Storage, New


Distribution System, New System Consolidation

2,503

$13,988,000

$64,056,979

17637

Chautauqua

NORTH END WD / Pomfret


(T)

Extend distribution system to area with contaminated private wells


and consolidate PWS with Coliform, New Distribution System

$4,432,100

$68,489,079

17140

$0

$0

NOTE: Short - Term Loan Closed, Project Cost Shown


isRemaining Balance Not Funded With Short Term Loan

ARRAF

ARRAF

WTP improvements for lead and copper violations, Fe violations,


Asbestos Main replacement, inadequate pressures, Upgrade Water
Treatment Plant, Upgrade Transmission, Upgrade Distribution
System, New System Consolidation

900

CODES Legend *

ARRAF=American Recovery Reinvestment Act Financed


GIC=Green Infrastructure Components
FGP=Funded through SRF Bond Market Rate Program
CAT_G=Green Innovative Grants Program Project

Page 2 of 35

Project #

NYS Drinking Water State Revolving Fund DRAFT IUP Annual List
(Formerly Readiness List) October 1, 2012 to September 30, 2013
County

CODES See legend*

System Name/
Borrower

Description

Pop.

Project Cost Score

Cumulative
Total

15996

Delaware

FRANKLIN VILLAGE /
Franklin (V)

New Water Treatment Plant, New Ground Water Source, New


Storage, Extend Distribution System, Upgrade Distribution System

481

$2,301,077

$70,790,156

16114

Cayuga

CAYUGA VILLAGE / Cayuga


(V)

New Surface Water Treatment Rule Compliance Facility, Upgrade


Distribution System, New Inter-Connection

600

$6,875,100

$77,665,256

17331

Rensselaer

POESTENKILL (T) WD #1 /
Poestenkill (T)

New Complete System (New System), New System Consolidation

2,300

$0

$77,665,256

17589

Cattaraugus

New Surface Water Treatment Rule Compliance Facility, Upgrade


CRYSTAL WATER CO
(WEST VALLEY) / Ashford (T) Ground Water Source

880

$3,208,500

$80,873,756

18017

Allegany

RICHBURG VILLAGE
PUBLIC WATER / Richburg
(V)

(V) Richburg & (V) Bolivar Consolidation., New Surface Water


Treatment Rule Compliance Facility, New Ground Water Source,
Upgrade Storage, Upgrade Distribution System, New System
Consolidation

600

$7,038,640

$87,912,396

16510

Schenectady

DELANSON VILLAGE
WATER WORKS / Delanson
(V)

Upper resevoir raw water transmission main, new intake, new


controls & meters at filter plant., New Transmission, Extend
Distribution System, Upgrade Distribution System

428

$4,594,000

$92,506,396

17562

Jefferson

HERRINGS VILLAGE /
Herrings (V)

Distribution and storage improvements., Upgrade Storage, Upgrade


Distribution System

120

$3,429,000

$95,935,396

17629

Essex

ESSEX WD / Essex (T)

Address turbidity and organic violations, New Ground Water Source,


Upgrade Distribution System

300

$1,515,954

$97,451,350

17621

Allegany

ANGELICA VILLAGE PUBLIC Surface Water Treatment Rule Compliance Facility


WATER / Angelica (V)

950

$1,061,847

$98,513,197

16618

Dutchess

SHOREHAVEN CIVIC
ASSOC / DCWWA

DCWWA ZONE J SHOREHAVEN WATER SYSTEM, Upgrade Water


Treatment Plant, Upgrade Ground Water Source, Upgrade
Distribution System

300

$3,575,000

$102,088,197

17623

Saratoga

CORINTH VILLAGE / Village


of Corinth

New Surface Water Treatment Rule Compliance Facility, Upgrade


Distribution System

4,700

$6,200,000

$108,288,197

17931

Cayuga

PORT BYRON VILLAGE /


Port Byron (V)

Joint project with (V) Port Byron, (T) Montezuma & (T) Mentz.,
Upgrade Distribution System, Extend Distribution System, New
System Consolidation

1,400

$5,657,000

$113,945,197

17454

St.Lawrence

EAST LOUISVILLE WD#3 /


Louisville (T)

Consolidation of water systems with past coliform detections., New


Storage, New Distribution System, New System Consolidation

1,030

$9,275,000

$123,220,197

18060

Orange

HIGHLANDS WATER
DISTRCIT 2 EXTENTION /
Highlands (T)

Extention of the existing WD #2 to serve private wells with


contamination and consolidation of several PWS's, Extend
Distribution System, Extend System Consolidation

1,379

$1,601,238

$124,821,435

17469

Montgomery

FORT PLAIN (V) WATER


WORKS / Fort Plain (V)

Upgrade Water Treatment Plant, Upgrade Ground Water Source,


Upgrade Storage, Upgrade Distribution System

2,400

$1,565,600

$126,387,035

17513

Essex

WINEBROOK HILLS WD /
Newcomb (T)

New Ground Water Source, Upgrade Distribution System

250

$5,302,728

$131,689,763

17622

Chautauqua

BROCTON VILLAGE /
Brocton (V)

Address turbidity violations, Surface Water Treatment Rule


Compliance Facility, Upgrade Water Treatment Plant

4,000

$3,295,000

$134,984,763

15749

Rensselaer

RENSSELAER CITY PWS /


Rensselaer (C)

New Storage, New Distribution System, System Consolidation

7,500

$7,175,300

$142,160,063

18029

Rensselaer

HOOSICK FALLS (V) PWS /


Hoosick Falls (V)

Phase 2 of Project 15080 , Upgrade Storage, Upgrade Distribution


System

4,000

3225

$142,160,063

ARRAF

$0

NOTE: Short - Term Loan Closed, Project Cost Shown


isRemaining Balance Not Funded With Short Term Loan

17444

Greene

COXSACKIE VILLAGE /
Coxsackie (V)

Phase 2 of 15702, Upgrade Water Treatment Plant, Upgrade Water


Treatment Plant

4,010

$0

3175

$142,160,063

NOTE: Short - Term Loan Closed, Project Cost Shown


isRemaining Balance Not Funded With Short Term Loan

CODES Legend *

ARRAF=American Recovery Reinvestment Act Financed


GIC=Green Infrastructure Components
FGP=Funded through SRF Bond Market Rate Program
CAT_G=Green Innovative Grants Program Project

Page 3 of 35

Project #

NYS Drinking Water State Revolving Fund DRAFT IUP Annual List
(Formerly Readiness List) October 1, 2012 to September 30, 2013
County

CODES See legend*

System Name/
Borrower

Description

Pop.

17866

Delaware

Phase 3 of 15624 (Phase 2 was 17228): Treat or Replace GWUDI


GRAND GORGE WATER
DISTRICT / Town of Roxbury Wells, New Surface Water Treatment Rule Compliance Facility

17773

Chenango

SHERBURNE VILLAGE /
Sherburne (V)

Phase 2 of 15237. Arsenic Removal Treatment for wells funded under


first phase, Upgrade Ground Water Source

17631

Essex

WILMINGTON WD /
Wilmington (T)

Phase 2 (Juniper Hill Road) of DWSRF 15803, New Surface Water


Treatment Rule Compliance Facility, New Storage, Upgrade
Distribution System

980

17515

Orange

NEWBURGH CITY /
Newburgh (C)

Phase 2 of project 16754 Cost overrun, Upgrade Water Treatment


Plant, Upgrade Transmission

17496

Greene

HUNTER VILLAGE / Hunter


(V)

17470

Herkimer

17649

Project Cost Score

370

Cumulative
Total

$992,000

2245

$143,152,063

$1,300,000

2210

$144,452,063

$406,500

2175

$144,858,563

28,000

$2,577,162

2165

$147,435,725

Phase 2 of #16732 - Dolan's Lake Intake and Connection of Wells 1


and 3, Upgrade Water Treatment Plant, New Ground Water Source,
New Transmission

896

$1,518,150

2165

$148,953,875

HERKIMER VILLAGE /
Herkimer (V)

Phase 2 of 16676, New Surface Water Treatment Rule Compliance


Facility

7,606

$300,000

2130

$149,253,875

Ulster

PHOENICIA WATER
DISTRICT / Shandaken (T)

Phase 2, see Project #16491 for Phase 1., New Surface Water
Treatment Rule Compliance Facility, Upgrade Ground Water Source

992

$150,000

2130

$149,403,875

18054

NY City

NEW YORK CITY - CROTON Croton filtration plant(Phase 9 of 16479), New Surface Water
Treatment Rule Compliance Facility
SYSTEM / NYCMWFA

$205,462,340

2115

$354,866,215

18022

Cattaraugus

PERRYSBURG (V) /
Perrysburg (T)

Phase 2 (DWSRF 17192) based on cost increase to address


unresolved deficiencies in the initial project construction, New Water
Treatment Plant, Upgrade Ground Water Source, Upgrade Storage,
New Pump Station

404

$729,657

2095

$355,595,872

17449

Orange

HIGHLANDS (T) WD #2 /
Highlands (T)

Phase 2 of DWSRF 16454 to provide well source capacity for Phase


1 which included, Upgrade Water Treatment Plant, New Ground
Water Source, New Storage, Extend Distribution System

1,379

$4,748,700

2095

$360,344,572

17742

Saratoga

MECHANICVILLE CITY /
Mechanicville (C)

Phase 2 of 15284; Construct additional sludge drying bed capacity,


New Other Expenses, New Water Treatment Plant, New Other (OT)

5,100

$587,100

2090

$360,931,672

17642

Washington

GRANVILLE VILLAGE /
Granville (V)

New Surface Water Treatment Rule Compliance Facility, Upgrade


Ground Water Source, Upgrade Transmission, Upgrade Distribution
System

2,645

$0

1220

$360,931,672

1,531

1,000,000

NOTE: Short - Term Loan Closed, Project Cost Shown


isRemaining Balance Not Funded With Short Term Loan

Westchester

New Surface Water Treatment Rule Compliance Facility


BRIARCLIFF MANOR
VILLAGE / Briarcliff Manor(V)

15862

Putnam

SPRINGHOUSE ESTATES
W.W. CORP. / Southeast (T)

New Ground Water Source, New Storage

17493

Orange

WARWICK VILLAGE /
Warwick (V)

New Surface Water Treatment Rule Compliance Facility, Upgrade


Water Treatment Plant

17337

Erie

HUNTERS CREEK MOBILE Address total coliform detections and organic exceedances, Upgrade
Treatment Plant, New Storage, New Pump Station, Upgrade
HOME PARK / Hunters Creek Water
Distribution System
MHP

15661

Albany

RENSSELAERVILLE WD /
Rensselaerville (T)

17936

Rensselaer

17529

17392

16013

8,831

$0

225

$360,931,672

$1,700,500

200

$362,632,172

$0

190

$362,632,172

150

$175,100

185

$362,807,272

200

$990,242

185

$363,797,514

Distribution Modifications for Flow & Pressure Improvements to


BRUNSWICK WATER
Consecutive System; Emergency Generator, Upgrade Pump
DISTRICT # 6 / Brunswick (T) Support
Station, Upgrade Distribution System

927

$504,000

185

$364,301,514

Jefferson

Serve area with private contaminated wells, New Surface Water


TIBBETS POINT WATER
Rule Compliance Facility, New System Consolidation, New
DISTRICT / Cape Vincent (T) Treatment
Water District

200

$2,645,000

180

$366,946,514

Warren

PIONEER VILLAGE / Pioneer Serve private contaminated wells., New Surface Water Treatment
Rule Compliance Facility, New Inter-Connection, New System
Village Imp. Assoc.
Consolidation

144

$208,575

175

$367,155,089

ARRAF
212

6,083

ARRAF

New Ground Water Source, Upgrade Storage, Upgrade Distribution


System

CODES Legend *

ARRAF=American Recovery Reinvestment Act Financed


GIC=Green Infrastructure Components
FGP=Funded through SRF Bond Market Rate Program
CAT_G=Green Innovative Grants Program Project

Page 4 of 35

Project #

NYS Drinking Water State Revolving Fund DRAFT IUP Annual List
(Formerly Readiness List) October 1, 2012 to September 30, 2013
County

CODES See legend*

System Name/
Borrower

Description

Pop.

Project Cost Score

Cumulative
Total

15557

Herkimer

POLAND VILLAGE / Poland


(V)

Surface Water Treatment Rule Compliance Facility, New Ground


Water Source, New Storage, Upgrade Distribution System

463

$246,000

165

$367,401,089

17537

Delaware

DOWNSVILLE WATER
DISTRICT / Colchester (T)

Package Filtration Plant for GWUDI Spring Source and Addition of


Corrosion Control Treatment., New Surface Water Treatment Rule
Compliance Facility, New Water Treatment Plant

500

$92,400

165

$367,493,489

17438

Oneida

ROME CITY / Rome (C)

New 10 MG storage tank. (Phase 1 of covering city's open finished


water storage, Phase 2 is Proj. # 18023 on multiyear list) , Upgrade
Water Treatment Plant, New Storage, Upgrade Storage

32,000

$10,000,000

160

$377,493,489

16991

Chenango

OXFORD WATER DISTRICT Surface Water Treatment Rule Compliance Facility, New
Transmission
#1 / Oxford (T)

$122,500

160

$377,615,989

16741

Dutchess

PAWLING VILLAGE / Pawling New Surface Water Treatment Rule Compliance Facility, New Ground
Water Source
(V)

$1,270,000

155

$378,885,989

15097

Warren

HAGUE HOA / Hague HOA

Hague Home Owners Association, New Surface Water Treatment


Rule Compliance Facility

18

$119,190

155

$379,005,179

18072

Putnam

GIPSY TRAIL CLUB / Gipsy


Trail Club Inc

Develop additional well source capacity, New Ground Water Source,


New Pump Station

300

$430,540

150

$379,435,719

15600

Hamilton

ANTLERS OF RAQUETTE
LAKE, INC. / Antlers of
Raquette Lake Inc.

New Surface Water Source, Inter-Connection

120

$243,595

150

$379,679,314

16117

Jefferson

ALEXANDRIA TOWN WD #1 Extend Distribution System, Upgrade Distribution System


- OTTER STREET /
Alexandria (T)

60

$3,600,000

150

$383,279,314

17339

Erie

S. EAST ERIE CO.


REGIONAL WATER
PROJECT / Aurora (T)

Aurora WD19, Wales WD's2&3. Extend to serve private


contaminated wells, consolidate public water supplies, eliminate
public water supply with past coliform detections, Storage, Pump
Station, Extend Distribution System, System Consolidation

2,950

$6,400,000

150

$389,679,314

16146

Otsego

MILFORD VILLAGE / Milford


(V)

Address nitrate contamination, New Ground Water Source, Upgrade


Distribution System

510

$3,502,000

145

$393,181,314

17514

Cattaraugus

DELEVAN VILLAGE / Delevan New Surface Water Treatment Rule Compliance Facility, Upgrade
Ground Water Source, Upgrade Storage, Upgrade Distribution
(V)
System

1,090

$1,690,350

145

$394,871,664

17289

Wayne

WOLCOTT VILLAGE /
Wolcott (V)

New Water Treatment Plant, Upgrade Ground Water Source

2,200

$1,250,000

145

$396,121,664

17385

Onondaga

NORTHEAST LAFAYETTE
WD / East Syracuse (V)

Inter-connection to eliminate GWUDI source., New Transmission,


New Inter-Connection

250

$535,600

145

$396,657,264

17944

Nassau

MILL NECK ESTATES / Mill


Neck Estates Association

Transmission main to connect with Locust Valley WD and upgrade


distribution, Upgrade Distribution System, New Inter-Connection

230

$2,021,375

145

$398,678,639

17535

Saratoga

SOUTH GLENS FALLS


VILLAGE / South Glens Falls
(V)

Proposed Cartridge Filtration Plant with SCADA to treat Village


GWUDI spring sources., New Surface Water Treatment Rule
Compliance Facility, New Surface Water Treatment Rule Compliance
Facility

3,700

$1,565,000

145

$400,243,639

17455

Franklin

WATER DISTRICT #3 /
Malone (T)

Consolidate a MHP with nitrate violations, New Distribution System,


System Consolidation, New System Consolidation

300

$1,328,000

145

$401,571,639

17645

Washington

GREENWICH VILLAGE /
Greenwich (V)

New Surface Water Treatment Rule Compliance Facility, New


Storage

$0

140

$401,571,639

50

1,907

2,000

NOTE: Financed through SRF Bond Guarantee Program

FGP

16339

Jefferson

WELLESLEY ISLAND
WATER CORP. / Wellesley
Island Water Corp.

New Water Treatment Plant, New Surface Water Source

548

$2,336,000

140

$403,907,639

15220

Westchester

CROTON FALLS WATER


DISTRICT / North Salem (T)

Installation of new wells to replace existing wells, New Ground Water


Source

175

$400,000

135

$404,307,639

CODES Legend *

ARRAF=American Recovery Reinvestment Act Financed


GIC=Green Infrastructure Components
FGP=Funded through SRF Bond Market Rate Program
CAT_G=Green Innovative Grants Program Project

Page 5 of 35

Project #

NYS Drinking Water State Revolving Fund DRAFT IUP Annual List
(Formerly Readiness List) October 1, 2012 to September 30, 2013
County

CODES See legend*

System Name/
Borrower

Description

Pop.

17560

Sullivan

THE CALLICOON WATER


COMPANY INC / Callicoon
Water Co., Inc.

New Surface Water Treatment Rule Compliance Facility, New


Storage

17619

Livingston

GENESEO VILLAGE /
LCWSA

17612

Onondaga

Project Cost Score

Cumulative
Total

854

$399,485

135

$404,707,124

New Surface Water Treatment Rule Compliance Facility

7,600

$813,000

135

$405,520,124

ELBRIDGE VILLAGE /
Elbridge (V)

New UV treatment for LT2ESWTR compliance., New Surface Water


Treatment Rule Compliance Facility

1,519

$0

135

$405,520,124

NOTE: Financed through SRF Bond Guarantee Program

FGP

16705

Madison

MADISON VILLAGE /
Madison (V)

New Ground Water Source, Upgrade Distribution System

450

$103,500

135

$405,623,624

16106

Greene

TANNERSVILLE VILLAGE /
Tannersville (V)

New Ground Water Source, Upgrade Transmission, Upgrade


Distribution System

448

$1,900,000

135

$407,523,624

15722

Orange

MONROE WD #8 (SKYVIEW Extend system to serve area with private contaminated wells. ,
Upgrade Distribution System
HILLS) / Monroe (T)

544

$1,000,000

135

$408,523,624

17201

Jefferson

ELLISBURG (V) / Ellisburg (V) Extend system to serve area with private contaminated wells,

269

$0

135

$408,523,624

consolidate public water supply, eliminate public water supply with


past total coliform detection. , Extend Distribution System, New
System Consolidation

FGP

17488

Westchester

New Surface Water Treatment Rule Compliance Facility


WESTCHESTER JOINT
WATER WORKS /
Harrison&Mamaroneck(T)s&(V

16279

Steuben

New Chlorination system., Upgrade Ground Water Source


COLONIAL COACH
ESTATES IV (MGRE) / Merlyn
Cavallaro

17618

St.Lawrence

GOUVERNEUR VILLAGE /
Gouverneur (V)

Upgrade Water Treatment Plant

17617

Orange

BLOOMING GROVE WD
#1-WORLEY HE / South
Blooming Grove (V)

17467

Ulster

17597

NOTE: Financed through SRF Bond Guarantee Program

55,210

$65,000,000

130

$473,523,624

$65,900

130

$473,589,524

4,263

$2,160,600

130

$475,750,124

Transmission main with treatment plant to connect Water District 1


and 6 to Orange and Rockland Well., New Water Treatment Plant,
New Transmission

1,500

$3,193,000

130

$478,943,124

SAUGERTIES (VILLAGE)
WATER DIS / Saugerties (V)

Upgrade water mains and appurtenances; distribution extension to


connect 15 existing homes w/ wells to PWS; upgrade raw water
reservoir., Upgrade Other Expenses, Upgrade Distribution System,
Extend Distribution System, Upgrade Other (OT)

4,100

$3,573,894

130

$482,517,018

Oswego

AREA 1 WATER SYSTEM /


Schroeppel (T)

Address organic contaminant violations, New Distribution System,


New System Consolidation

3,200

$11,312,382

130

$493,829,400

17976

Otsego

SOUTHSIDE WATER
DISTRICT / Oneonta (T)

New Complete System (New System), New Water District

1,570

$8,808,000

130

$502,637,400

16912

Chenango

NO. NORWICH (T) WD #1 /


North Norwich (T)

New system to serve area with private contaminated wells,


consolidate public water supply, eliminate public water supply with
past total coliform detection. , New Distribution System

100

$920,300

130

$503,557,700

17516

St.Lawrence

OSWEGATCHIE (T) /
Oswegatchie (T)

Joint water system improvement project between (T) Oswegatchie,


(T) Lisbon and (V) Huevelton, Upgrade Ground Water Source,
Upgrade Storage, Upgrade Distribution System, New
Inter-Connection, New System Consolidation

2,100

$13,973,000

130

$517,530,700

17355

Yates

DRESDEN VILLAGE /
Dresden (V)

New Transmission, Upgrade Storage, New Inter-Connection

700

$515,000

125

$518,045,700

15669

Orange

MONROE WD #12 (MONROE Upgrade Ground Water Source, Upgrade Pump Station, Upgrade
Distribution System
HILLS ESTATES) / Monroe
(T)

120

$1,250,000

125

$519,295,700

17432

Chautauqua

CASSADAGA VILLAGE /
Cassadaga (V)

760

$5,047,000

125

$524,342,700

17615

St.Lawrence

NORFOLK WATER DISTRICT New Surface Water Treatment Rule Compliance Facility, New Ground
Water Source
/ Norfolk (T)

2,300

$1,279,000

125

$525,621,700

** Subsidized Funding Line

New Ground Water Source, New Storage, Upgrade Distribution


System

CODES Legend *

ARRAF=American Recovery Reinvestment Act Financed


GIC=Green Infrastructure Components
FGP=Funded through SRF Bond Market Rate Program
CAT_G=Green Innovative Grants Program Project

79

** Subsidized Funding Line-$410,924,679 are available


leaving at least $2,401,055 for project #17488

Page 6 of 35

Project #

NYS Drinking Water State Revolving Fund DRAFT IUP Annual List
(Formerly Readiness List) October 1, 2012 to September 30, 2013
County

CODES See legend*

17143

Saratoga

System Name/
Borrower

Description

SARATOGA GLEN HOLLOW Extend system to serve area with private contaminated wells,
public water supply, eliminate public water supply with
/ Saratoga Glen Hollow W.C. consolidate
past totalcoliform detection. , Extend Distribution System, New

Pop.

Project Cost Score

Cumulative
Total

750

$1,096,804

125

$526,718,504

280

$5,651,000

125

$532,369,504

System Consolidation

17144

Chemung

CHEMUNG (T) WATER


SYSTEM / Chemung (T)

Consolidate PWS with Coliform contamination, extend to private


contaminated/poor yielding wells, New Complete System (New
System), New System Consolidation

17888

Tompkins

TRUMANSBURG VILLAGE /
Trumansburg (V)

New well to provide source redundancy. New transmission main to


provide adequate CT., New Ground Water Source, New
Transmission

2,300

$1,374,000

120

$533,743,504

18004

Chautauqua

WESTFIELD VILLAGE /
Westfield (V)

Address inadequate source capacity and insuffcient pressure,


Upgrade Storage, Upgrade Distribution System

3,450

$3,977,200

120

$537,720,704

17151

Erie

AURORA WATER DISTRICT Extend system to serve area with private contaminated wells,
consolidate public water supply, eliminate public water supply with
18 / Aurora (T)
past total coliform detection. WD 18., Extend Distribution System

1,288

$15,704,100

120

$553,424,804

17594

Oswego

ROUTE 11 NORTH/FULLER
ROAD WD PHASE D /
Hastings (T)

1,200

$3,106,480

120

$556,531,284

16876

Dutchess

BRETTVIEW ACRES WATER New Surface Water Treatment Rule Compliance Facility
CO / Brettview Water Co. Inc.

$40,800

115

$556,572,084

17728

Onondaga

SKANEATELES VILLAGE /
Skaneateles

Install UV Disinfection for LT2 compliance., Upgrade Water


Treatment Plant

2,610

$793,100

115

$557,365,184

17071

Dutchess

BIRCH HILL MANOR /


DCWWA

DCWWA ZONE K BIRCH HILL WATER SYSTEM, Upgrade Water


Treatment Plant, New Ground Water Source

200

$575,000

115

$557,940,184

17801

Yates

WD #1 / Torrey (T)

New Distribution System

375

$3,079,875

115

$561,020,059

16811

Steuben

RIVERSIDE PARK / Carol


Naar

New chlorination system., Upgrade Ground Water Source

125

$45,735

115

$561,065,794

17986

Orange

PORT JERVIS CITY / Port


Jervis (C)

Addition of clarification, Upgrade Water Treatment Plant

9,000

$3,610,000

115

$564,675,794

16093

Tompkins

TRUMANSBURG VILLAGE /
Trumansburg (V)

New Transmission, New Storage, New Pump Station

2,300

$2,501,000

115

$567,176,794

17068

Rensselaer

SCHAGHTICOKE (V) PWS /


Schaghticoke (V)

Upgrade Water Treatment Plant, Upgrade Storage, Upgrade


Distribution System, Extend Distribution System

675

$6,585,700

115

$573,762,494

17230

Oneida

BENEFITED AREA E / Floyd


(T)

New Distribution System, New System Consolidation

115

$325,000

115

$574,087,494

18053

Schoharie

COBLESKILL / Cobleskill (T)

Howe Caverns/Route 7 Service Area Extension, Extend Distribution


System

500

$4,899,004

115

$578,986,498

16298

Rockland

NYACK VILLAGE WATER


SUPPLY / Nyack (V)

Relocation of intake to correct turbidity violations., New Transmission

14,700

$1,340,000

110

$580,326,498

17591

Ontario

Upgrade Ground Water Source


BLOOMFIELD (V) OAKMOUNT AVE / Bloomfield
(V)

$298,750

110

$580,625,248

17414

Greene

CATSKILL VILLAGE / Catskill Upgrade Water Treatment Plant, New Storage, Upgrade Distribution
System
(V)

$10,270,000

110

$590,895,248

17686

Clinton

SARANAC WD / Saranac (T) New Surface Water Treatment Rule Compliance Facility

$112,000

105

$591,007,248

Extend distribution system to area of insufficient yielding or


cantaminated private wells., Extend Distribution System, New
System Consolidation

920

750

8,000

90

CODES Legend *

ARRAF=American Recovery Reinvestment Act Financed


GIC=Green Infrastructure Components
FGP=Funded through SRF Bond Market Rate Program
CAT_G=Green Innovative Grants Program Project

Page 7 of 35

Project #

NYS Drinking Water State Revolving Fund DRAFT IUP Annual List
(Formerly Readiness List) October 1, 2012 to September 30, 2013
County

CODES See legend*

System Name/
Borrower

Project Cost Score

Cumulative
Total

Description

Pop.
15,310

$17,705,600

105

$608,712,848

17614

Chautauqua

DUNKIRK CITY / Dunkirk (C) Upgrade Water Treatment Plant, Upgrade Distribution System

15301

Dutchess

TIVOLI VILLAGE WATER /


Tivoli (V)

Construct new supply well(s), upgrade treatment, new storage,


upgrade storage, upgrade distribution, Upgrade Water Treatment
Plant, New Ground Water Source, New Storage, Upgrade Pump
Station, Upgrade Distribution System

1,303

$3,729,700

105

$612,442,548

17361

Schoharie

COBLESKILL VILLAGE /
Cobleskill (V)

Upgrade Water Treatment Plant, New Storage, Upgrade Distribution


System

4,533

$4,120,000

105

$616,562,548

16446

Sullivan

WOODRIDGE VILLAGE /
Woodridge (V)

Upgrade Water Treatment Plant

902

$351,430

105

$616,913,978

17358

Rensselaer

Connect WD #3 (Maple Crest) to WD #1 (Clearview), Extend


SCHODACK WATER
DISTRICT # 3 / Schodack (T) Distribution System, New System Consolidation

140

$0

105

$616,913,978

17588

Steuben

CORNING MANOR WATER


DISTRICT / Corning (T)

Extend to ontaminated private wells, consolidate 5 small PWS's,


Upgrade Storage, New System Consolidation

350

$1,315,187

105

$618,229,165

17978

Jefferson

NORTHEAST WATER
DISTRICT / Waertown (T)

New Ground Water Source, New Storage, New Distribution System

550

$6,260,705

105

$624,489,870

17104

Saratoga

East Side Drive WD connection to CPWA, to serve private


CLIFTON PARK WATER
wells, consolidation of public water supplies, Extend
AUTHORITY / Clifton Park (T) contaminated
Distribution System

29,000

$1,329,730

105

$625,819,600

16169

Greene

ASHLAND WD#1 / Ashland


(T)

New Complete System (New System), New Inter-Connection

300

$2,873,620

105

$628,693,220

17338

Dutchess

DUTCHESS ESTATES INC /


Dutchess Estates Water
Company

Upgrade Ground Water Source, Upgrade Storage, Upgrade Pump


Station

500

$455,388

100

$629,148,608

18067

Otsego

GILBERTSVILLE VILLAGE /
Gilbertsville (V)

New Ground Water Source, New Storage, Upgrade Distribution


System

477

$3,865,000

100

$633,013,608

15958

Greene

PRATTSVILLE WATER
DISTRICT / Prattsville (T)

New Ground Water Source

410

$1,361,800

100

$634,375,408

17062

Wyoming

PIKE VILLAGE / Pike (V)

New Ground Water Source, Upgrade Ground Water Source, Upgrade


Transmission, Upgrade Distribution System

369

$494,596

100

$634,870,004

17313

Rockland

LAKE WELCH BEACH W.S. / New Water Treatment Plant, New Transmission
Palisades Interstate Park
Comm

$20,000,000

100

$654,870,004

17021

Dutchess

ROKEBY HOMES,INC. /
DCWWA

DCWWA ZONE F PROJECT ROKEBY WATER SYSTEM , Upgrade


Water Treatment Plant, Upgrade Ground Water Source, Upgrade
Distribution System, New System Consolidation

160

$495,356

100

$655,365,360

17403

Sullivan

WOODRIDGE VILLAGE /
Woodridge (V)

New Ground Water Source

902

$450,000

100

$655,815,360

16323

Monroe

MCWA EASTSIDE WTP /


MCWA

Eastside WTP Phase 1, Raw Water Intake System and a portion of


Phase 5 finished water transmission main work, New Surface Water
Source, New Transmission

222,503

$0

100

$655,815,360

17554

Chautauqua

PORTLAND (T) WATER


DISTRICT NO. 7 / Portland
(T)

Serve 218 parcels currently on insufficient private wells on portions of


Route 5 and Walker Road. Consolidate DJ's Campground., New
System Consolidation, New Water District

333

$1,700,000

100

$657,515,360

15923

Westchester

Upgrade Water Treatment Plant


OSSINING WATER
DEPARTMENT / Ossining (V)

30,000

$1,400,000

95

$658,915,360

16062

Niagara

BARKER VILLAGE / Barker


(V)

$835,085

95

$659,750,445

ARRAF

ARRAF

Upgrade Distribution System

15,000

577

CODES Legend *

ARRAF=American Recovery Reinvestment Act Financed


GIC=Green Infrastructure Components
FGP=Funded through SRF Bond Market Rate Program
CAT_G=Green Innovative Grants Program Project

Page 8 of 35

Project #

NYS Drinking Water State Revolving Fund DRAFT IUP Annual List
(Formerly Readiness List) October 1, 2012 to September 30, 2013
County

CODES See legend*

System Name/
Borrower

Description
New Storage

17492

Clinton

PLATTSBURGH CITY /
Plattsburgh (C)

17855

Onondaga

SYRACUSE CITY / Syracuse Woodland Reservoir UV for LT2SWTR compliance., New Surface
Water Treatment Rule Compliance Facility
(C)

17093

Otsego

HARTWICK WATER
DISTRICT / Hartwick (T) WD

New Ground Water Source, New Storage, Upgrade Distribution


System

16606

Delaware

DELHI VILLAGE / Delhi (V)

16654

Madison

17564

Pop.

Project Cost Score

Cumulative
Total

18,000

$4,550,000

95

$664,300,445

192,000

$10,042,500

95

$674,342,945

416

$1,745,850

95

$676,088,795

Upgrade Distribution System, New System Consolidation

3,833

$1,373,428

95

$677,462,223

MORRISVILLE VILLAGE /
Morrisville (V)

To provide adequate pressure, Upgrade Distribution System

2,456

$1,300,000

95

$678,762,223

Oswego

BERNHARDS BAY WD /
Constantia (T)

Extend Distribution System, New System Consolidation

790

$5,890,000

95

$684,652,223

15933

Seneca

FAYETTE HAMLET WATER


DISTRICT / Fayette (T)

Extend Distribution System

400

$3,198,000

95

$687,850,223

17443

Albany

ALTAMONT VILLAGE /
Altamont (V)

New Brandle Road Wells, Disinfection, and Transmission Main, New


Ground Water Source

2,000

$1,394,550

90

$689,244,773

17458

Onondaga

OCWA / Onondaga County


Water Authorit

Western Reservoir 20 mg storage. Replacing uncovered finished


water storage reservoir with concrete tank, Upgrade Storage

256,000

$0

90

$689,244,773

17638

Onondaga

OCWA / Onondaga County


Water Authorit

Eastern 20 MG Reservoir storage. Replacing uncovered finished


water storage reservoir with concrete tank., Upgrade Storage

256,000

$22,500,000

90

$711,744,773

17460

Onondaga

CLAY WDS / Metropolitan


Water Board

Replace uncovered finished 30 MG Terminal Reservoir with two 15


MG tanks, Upgrade Storage

16,000

$16,050,000

90

$727,794,773

16613

Chautauqua

MAYVILLE VILLAGE /
Mayville (V)

Upgrade Ground Water Source, Upgrade Transmission, Upgrade


Storage, Upgrade Distribution System

1,856

$2,884,000

90

$730,678,773

17992

Cortland

MCGRAW VILLAGE /
McGraw (V)

Upgrade Distribution System

1,306

$4,222,961

90

$734,901,734

17433

Suffolk

SUFFOLK COUNTY WATER New Wells/Upgrade Wells in various locations throughout the system,
Upgrade Ground Water Source, New Ground Water Source
AUTHORITY / SCWA

1,009,264

$9,313,000

90

$744,214,734

17364

Suffolk

SOUTH HUNTINGTON WD / Well 19-2, New Ground Water Source


Huntington (T)

81,760

$1,515,842

90

$745,730,576

17732

Fulton

JOHNSTOWN (C) WATER


WORKS / Johnstown (C)

Replacement of Maylender finished water uncovered reservoir;


automation of water system operations, New Other Expenses, New
Storage, New Other (OT)

8,511

$3,255,000

90

$748,985,576

17870

Saratoga

SCWA STILLWATER
EXTENSION / Saratoga
County Water Authorit

Extend Transmission

2,100

$3,035,000

90

$752,020,576

17925

Schuyler

MONTOUR FALLS / Montour Upgrade Storage, Upgrade Distribution System


Falls (V)

1,800

$5,852,501

90

$757,873,077

15451

Saratoga

STILLWATER WD #1
(STILLWATER VLG) /
Stillwater (T)

New Transmission, New Storage

1,560

$4,912,000

90

$762,785,077

17523

Orange

MONTGOMERY W.D. #1 /
Montgomery (T)

Extend WD #1 to consolidate several water supplies, New System


Consolidation

$13,500,000

90

$776,285,077

ARRAF

605

CODES Legend *

ARRAF=American Recovery Reinvestment Act Financed


GIC=Green Infrastructure Components
FGP=Funded through SRF Bond Market Rate Program
CAT_G=Green Innovative Grants Program Project

Page 9 of 35

Project #

NYS Drinking Water State Revolving Fund DRAFT IUP Annual List
(Formerly Readiness List) October 1, 2012 to September 30, 2013
County

CODES See legend*

System Name/
Borrower

Description
New Storage, Extend Distribution System

16390

Ulster

HIGHLAND WATER
DISTRICT / Lloyd (T)

16889

Oneida

New system to serve area with private contaminated wells,


KIRKLAND (T) ROUTE 5
public water supply. , New Complete System (New
WATER DISTRICT / Kirkland consolidate
System)
(T)

17428

Albany

FLAT ROCK ROAD W.D. /


New Scotland (T)

New Water District

17598

Oswego

AREA 3,4 & 8 WATER


SYSTEM / Schroeppel (T)

16262

Broome

15684

Pop.

Project Cost Score

Cumulative
Total

4,000

$2,369,000

90

$778,654,077

300

$1,578,872

90

$780,232,949

149

$2,152,580

90

$782,385,529

New Distribution System, New System Consolidation

1,500

$7,678,916

90

$790,064,445

CONKLIN (T) W.D. / Conklin


(T)

Extend system to serve area with private contaminated wells,


consolidate public water supply. , Inter-Connection, System
Consolidation

1,000

$863,140

90

$790,927,585

Greene

NEW BALTIMORE (T) / New


Baltimore (T)

Extend system to serve area with private contaminated wells,


consolidate public water supply. , Extend Distribution System, New
System Consolidation

1,300

$5,000,000

90

$795,927,585

17375

St.Lawrence

CANTON (T) E. SIDE WD /


Canton (T)

New Ground Water Source, New Storage, New Distribution System

350

$3,112,660

90

$799,040,245

18083

Hamilton

INDIAN LAKE WD#1 / Indian New Ground Water Source


Lake (T)

150

$1,552,000

85

$800,592,245

17727

Ulster

KINGSTON (CITY) WATER


DISTRICT / Kingston (C)

Upgrade Water Treatment Plant

$0

85

$800,592,245

24,000

NOTE: Financed through SRF Bond Guarantee Program

FGP

17183

Seneca

SENECA FALLS VILLAGE /


Seneca Falls (V)

Upgrade Water Treatment Plant, Upgrade Pump Station

16335

Otsego

MORRIS VILLAGE / Morris


(V)

15490

Warren

17445

7,400

$2,885,000

85

$803,477,245

New Water Treatment Plant, New Ground Water Source, New


Storage

642

$2,475,000

85

$805,952,245

NORTH CREEK WATER


DISTRICT / Johnsburg (T)

Upgrade Water Treatment Plant, New Ground Water Source,


Upgrade Storage

1,000

$1,112,250

85

$807,064,495

Rensselaer

NORTH GREENBUSH (T)


WATER DISTRICT NO. 18 /
North Greenbush (T)

Purchase existing Private Water System, Connect to Municipal Water


System , New System Consolidation, New Water District

$437,750

85

$807,502,245

16111

Dutchess

BARD COLLEGE / Bard


College

Upgrade Water Treatment Plant, New Storage

1,400

$2,100,000

85

$809,602,245

18043

Chautauqua

BARCELONNA WD /
Westfield (T)

New Town WD to aquire private water system. Other funding sources


may be required to make project viable and eligible for DWSRF,
Upgrade Distribution System, New Water District

128

$1,792,125

85

$811,394,370

17422

Herkimer

HERKIMER (T), WD #3, #4,


#5 / Herkimer (T)

Upgrade Pump Station, Upgrade Distribution System, Extend


Distribution System

320

$299,112

85

$811,693,482

16922

Herkimer

GRAHM, NEWPORT &


BROWN RD WD / Schuyler
(T)

New system to serve area with private contaminated wells. , New


Complete System (New System)

260

$1,280,000

85

$812,973,482

17448

Washington

New water district to serve residents in area of groundwater


KINGSBURY WD
(QUEENSBURY) / Kingsbury contamination , New Distribution System, New Water District
(T)

$845,000

85

$813,818,482

17858

Oswego

WD#3 EXPANSION / Granby Extend Distribution System


(T)

238

$8,357,978

85

$822,176,460

15531

Jefferson

Extend system to serve area with private contaminated wells,


TOWN OF PAMELIA RT. 3,
WATER DISTRICT / Pamelia consolidate public water supply. , Extend Distribution System
(T)

96

$474,160

85

$822,650,620

212

1,300

CODES Legend *

ARRAF=American Recovery Reinvestment Act Financed


GIC=Green Infrastructure Components
FGP=Funded through SRF Bond Market Rate Program
CAT_G=Green Innovative Grants Program Project

Page 10 of 35

Project #

NYS Drinking Water State Revolving Fund DRAFT IUP Annual List
(Formerly Readiness List) October 1, 2012 to September 30, 2013
County

CODES See legend*

System Name/
Borrower

Description

15810

Steuben

VICTORY PLACE / Merlyn


Cavallaro

Upgrade Ground Water Source

17298

Putnam

BREWSTER VILLAGE /
Brewster (V)

New Ground Water Source, New Pump Station

16862

Suffolk

SUFFOLK COUNTY WATER Northport Aqueduct Project to reduce nitrate contamination through
source blending, Upgrade Transmission, New Distribution System
AUTHORITY / Suffolk Co.
Water Authority

17900

Nassau

BETHPAGE WD / Bethpage
Water District

17699

Nassau

GARDEN CITY (V) / Village of New Water Treatment Plant, Upgrade Pump Station
Garden City

16139

St.Lawrence

MASSENA VILLAGE /
Massena (V)

16447

Steuben

CORNING CITY / Corning (C) Address total coliform violations, New Storage, New Distribution

17377

Chautauqua

SILVER CREEK VILLAGE /


Silver Creek (V)

Upgrade Distribution System

Aquisition of existing Cambridge Water Works, New Storage,


Upgrade Distribution System

Nitrate removal at Plant #1, Upgrade Water Treatment Plant

Upgrade Water Treatment Plant

System

Pop.
11

Project Cost Score

Cumulative
Total

$112,800

80

$822,763,420

$1,610,920

80

$824,374,340

$22,166,771

80

$846,541,111

33,000

$4,271,616

80

$850,812,727

25,000

$2,221,556

80

$853,034,283

11,209

$3,134,000

80

$856,168,283

10,842

$2,000,000

80

$858,168,283

$0

80

$858,168,283

2,000

1,009,264

3,100

NOTE: Financed through SRF Bond Guarantee Program

FGP

17342

Washington

CAMBRIDGE VILLAGE /
Cambridge (V)

15736

Erie

COLLINS WD #3 / Collins (T) Upgrade Transmission, New Storage, Upgrade Distribution System

18051

Montgomery

FULTONVILLE VILLAGE
PWS / Fultonville (V)

Upgrade Water Treatment Plant, Upgrade Ground Water Source,


Upgrade Distribution System

15704

Greene

COXSACKIE VILLAGE /
Coxsackie (V)

Upgrade Transmission, New Storage, Upgrade Distribution System

15236

Chautauqua

SHERMAN VILLAGE /
Sherman (V)

Address total Coli violations., Upgrade Distribution System

15325

Wayne

WOLCOTT VILLAGE /
Wolcott (V)

Upgrade Water Treatment Plant, Upgrade Surface Water Source

17145

Oneida

TIBBITS/SNOWDEN HILL
WD / New Hartford (T)

18002

Steuben

17934

1,524

$2,500,000

80

$860,668,283

760

$625,000

80

$861,293,283

740

$1,262,150

80

$862,555,433

4,010

$6,210,000

80

$868,765,433

$795,000

80

$869,560,433

2,200

$3,300,000

80

$872,860,433

New system to serve area with private contaminated wells. , New


Complete System (New System)

450

$2,400,000

80

$875,260,433

HAMLET OF WOODHULL
MUNICIPAL WS / Woodhull
(T)

System to serve former Village (now hamlet) with private


contaminated wells., New Ground Water Source, New Storage, New
Distribution System

483

$4,489,928

80

$879,750,361

Onondaga

LAFAYETTE (T) / LaFayette


(T)

Creation of Central LaFayette Water District., New Water District

2,000

$5,700,000

80

$885,450,361

17077

Rensselaer

NORTH GREENBUSH WD
#13 / North Greenbush (T)

New system to serve area with private contaminated wells (Snyder's


Lake Area). , New System Consolidation, New Water District

1,050

$4,635,000

80

$890,085,361

17510

Oswego

NORTH AREA WD / Volney


(T)

New Distribution System, New System Consolidation

1,000

$6,604,000

80

$896,689,361

15599

Seneca

FAYETTE WATER PROJECT Extend Distribution System


/ Varick (T)

520

$1,406,800

80

$898,096,161

917

CODES Legend *

ARRAF=American Recovery Reinvestment Act Financed


GIC=Green Infrastructure Components
FGP=Funded through SRF Bond Market Rate Program
CAT_G=Green Innovative Grants Program Project

Page 11 of 35

Project #

NYS Drinking Water State Revolving Fund DRAFT IUP Annual List
(Formerly Readiness List) October 1, 2012 to September 30, 2013
County

CODES See legend*

System Name/
Borrower

Description

17567

Steuben

URBANA WATER DISTRICT


#2 / Urbana (T)

Proposed WD #3. Extend system to serve private contaminated wells


and consolidate public water supplies., Extend Distribution System,
New System Consolidation, New Water District

17413

Orange

WALLKILL CONSOLIDATED
WD / Wallkill (T)

Rykoski Lane Water Treatment Plant, Upgrade Water Treatment


Plant, New Pump Station, New Pump Station

16444

Columbia

DARROW SCHOOL / The


Darrow School

New Ground Water Source, New Storage

17949

Dutchess

HIGH MEADOWS PARK INC New Ground Water Source, Upgrade Storage
/ High Meadows Co-op Corp

17533

Clinton

CHAMPLAIN VILLAGE /
Champlain (V)

Upgrade Water Treatment Plant, New Storage, Upgrade Distribution


System

16381

Orleans

LYNDONVILLE VILLAGE /
Lyndonville (V)

Upgrade Transmission, Upgrade Distribution System

15843

Delaware

MARGARETVILLE VILLAGE / Upgrade Storage, Upgrade Distribution System


Margaretville (V)

17076

Ulster

ELLENVILLE (VILLAGE)
WATER DIS / Ellenville (V)

16273

Suffolk

15718

Pop.

Project Cost Score

Cumulative
Total

33

$3,565,111

80

$901,661,272

15,000

$7,000,000

75

$908,661,272

150

$169,950

75

$908,831,222

500

$44,577

75

$908,875,799

2,947

$1,883,226

75

$910,759,025

1,418

$1,612,864

75

$912,371,889

700

$737,900

75

$913,109,789

Upgrade Surface Water Source

4,323

$173,600

75

$913,283,389

DERING HARBOR CORP /


Dearing Harbor (V)

Upgrade Water Treatment Plant

250

$20,791

75

$913,304,180

Orange

MONROE WD #10 - PINE


TREE ROAD / Monroe (T)

New system to serve area with private contaminated wells. , New


Transmission

50

$215,000

75

$913,519,180

15950

Albany

GUILDERLAND TOWN WD / Phase III Improvements, New Storage, Extend Distribution System,
Upgrade Distribution System, New Inter-Connection
Guilderland (T)

30,000

$10,146,000

75

$923,665,180

17139

Rensselaer

EAST GREENBUSH
GENERAL W.D. / East
Greenbush (T)

Upgrade Storage, New Storage

10,200

$3,279,680

75

$926,944,860

17633

Steuben

SYLVAN BEACH WANETA


LAKE WATER DISTRICT /
Wayne (T)

New Complete System (New System)

921

$4,175,175

75

$931,120,035

15925

Allegany

TOWN OF WELLSVILLE /
Wellsville (T)

Extend system to serve area with private contaminated wells,


Morningside Area, Extend Distribution System

5,000

$867,106

75

$931,987,141

17229

Rensselaer

NORTH GREENBUSH WD
#14 / North Greenbush (T)

New system to serve inadequate private wells in Northeast corner of


Town , New Inter-Connection, New System Consolidation, New
Water District

3,000

$7,313,000

75

$939,300,141

16899

Oneida

FLOYD BENEFIT (T) AREA


"D" / Floyd (T)

New Complete System (New System)

900

$7,750,000

75

$947,050,141

17979

Jefferson

WATRE DISTRICT NO. 8 /


Watertown (T)

Extend Distribution System, New System Consolidation

119

$1,929,000

75

$948,979,141

17311

Herkimer

MANION HEIGHTS WD /
German Flatts (T)

New Complete System (New System)

105

$152,000

75

$949,131,141

17098

Jefferson

WILNA WD#1 / Wilna (T)

Extend system to serve area with private contaminated wells. , New


Distribution System

85

$569,590

75

$949,700,731

17368

Orange

GOSHEN VILLAGE / Goshen New Water Treatment Plant, New Ground Water Source, New
Transmission
(V)

$5,311,500

70

$955,012,231

5,676

CODES Legend *

ARRAF=American Recovery Reinvestment Act Financed


GIC=Green Infrastructure Components
FGP=Funded through SRF Bond Market Rate Program
CAT_G=Green Innovative Grants Program Project

Page 12 of 35

Project #

NYS Drinking Water State Revolving Fund DRAFT IUP Annual List
(Formerly Readiness List) October 1, 2012 to September 30, 2013
County

CODES See legend*

System Name/
Borrower

16984

Westchester

KITCHAWAN WATER
DISTRICT / Yorktown (T)

17042

Orange

17082

Description
correct organic exceedances., New Transmission

Pop.

Project Cost Score

Cumulative
Total

240

$500,000

70

$955,512,231

MONROE VILLAGE / Monroe Upgrade Distribution System


(V)

8,892

$986,000

70

$956,498,231

Ontario

CLIFTON SPRINGS VILLAGE New Storage, Upgrade Distribution System


/ Clifton Springs (V)

2,190

$618,000

70

$957,116,231

17667

Tioga

NEWARK VALLEY VILLAGE / Upgrade Distribution System


Newark Valley (V)

1,253

$4,813,000

70

$961,929,231

15560

Oneida

VERNON VILLAGE (SWP) /


Vernon (V)

New Transmission, New Storage, New Distribution System, New


Inter-Connection

1,155

$5,610,300

70

$967,539,531

17761

Genesee

BATAVIA CITY / Batavia (C)

Upgrade Water Treatment Plant, Upgrade Distribution System

16,310

$2,067,500

70

$969,607,031

17948

Greene

HENSONVILLE (WINDHAM
W.D.) / Windham (T)

Upgrade Ground Water Source, New Storage, New Pump Station,


Extend Distribution System

402

$2,575,000

70

$972,182,031

15794

Oneida

MOHAWK VALLEY WATER Shacksbury Storage Tank and Mains, Replacement. , Upgrade
AUTHORITY / Upper Mohawk Storage
Valley Reg. WB

120,000

$400,000

70

$972,582,031

17404

Nassau

PLAINVIEW WD / Oyster Bay New air stripper at Plant 7, New Water Treatment Plant
(T)

35,000

$1,287,500

70

$973,869,531

17901

Nassau

BETHPAGE WD / Bethpage
Water District

VOC removal at Plant # 4, Upgrade Water Treatment Plant

33,000

$4,056,717

70

$977,926,248

17902

Nassau

BETHPAGE WD / Bethpage
Water District

VOC removal at Plant #6, Upgrade Water Treatment Plant

33,000

$2,409,376

70

$980,335,624

17911

Nassau

VOC treatment at Well #6, Upgrade Water Treatment Plant


WA OF GREAT NECK
NORTH / Water Auth of Great
Neck North

31,400

$1,400,000

70

$981,735,624

17702

Nassau

GARDEN CITY (V) / Village of VOC Removal at Hilton Park Plant (Wells 15 and 16), New Water
Treatment Plant
Garden City

25,000

$2,580,150

70

$984,315,774

16245

Albany

COHOES CITY / Cohoes (C)

15,550

$1,975,000

70

$986,290,774

17856

Onondaga

SYRACUSE CITY / Syracuse Westcott Reservoir UV for LT2SWTR compliance., New Surface
Water Treatment Rule Compliance Facility
(C)

192,000

$4,805,000

70

$991,095,774

17857

Onondaga

SYRACUSE CITY / Syracuse Lead service replacement., Upgrade Distribution System


(C)

192,000

$16,377,000

70

$1,007,472,774

17626

Ulster

Upgrade Water Treatment Plant, New Storage, Upgrade Distribution


NEW PALTZ (VILLAGE)
WATER DIST / New Paltz (V) System

5,600

$5,675,916

70

$1,013,148,690

18009

Tompkins

DRYDEN VILLAGE / Dryden


(V)

New Ground Water Source, New Storage, Upgrade Distribution


System

2,000

$5,924,000

70

$1,019,072,690

15205

Oneida

BOONVILLE VILLAGE /
Boonville (V)

New Transmission, New Storage, Upgrade Distribution System

2,300

$801,144

70

$1,019,873,834

17635

Schenectady

PRINCETOWN WATER
SUPPLY / Princetown (T)

New Transmission, New Storage, New Pump Station, Extend


Distribution System

600

$360,500

70

$1,020,234,334

Upgrade Water Treatment Plant

CODES Legend *

ARRAF=American Recovery Reinvestment Act Financed


GIC=Green Infrastructure Components
FGP=Funded through SRF Bond Market Rate Program
CAT_G=Green Innovative Grants Program Project

Page 13 of 35

Project #

NYS Drinking Water State Revolving Fund DRAFT IUP Annual List
(Formerly Readiness List) October 1, 2012 to September 30, 2013
County

CODES See legend*

System Name/
Borrower

Description

17972

Cayuga

(T) BRUTUS WATER


DISTRICT #8 / Brutus (T)

New (T) Brutus WD #8 (Cottle Road), Upgrade Distribution System,


New Water District

16012

Chautauqua

WESTFIELD VILLAGE /
Westfield (V)

East Main St., Upgrade Distribution System

18075

Madison

CLOCKVILLE WATER
DISTRICT / Lincoln (T)

New Storage, New Distribution System, New Water District

17571

Ulster

New Complete System (New System)


WEST HURLEY WATER
DISTRICT #1 (PROPOSED) /
Hurley (T)

17359

Madison

LEWIS POINT/PINE RIDGE


ROAD / Lenox (T)

16435

Oneida

DEERFIELD (T), SMITH HILL Extend system to serve area with private contaminated wells,
consolidate public water supply. , Extend Distribution System
EXT. / Deerfield (T)

17526

Allegany

WELLSVILLE WATER
DISTRICT / Wellsville (T)

15435

Washington

FORT EDWARD WD #2 / Fort Extend Distribution System


Edward (T)

17884

Onondaga

MARCELLUS (T) / Marcellus


(T)

17186

Steuben

REXVILLE WATER DISTRICT New system to serve area with private contaminated wells. , New
Complete System (New System)
/ West Union (T)

17655

Nassau

HICKSVILLE WD / Hicksville
Water District

Nitrate Treatment at Plant No. 8, Upgrade Water Treatment Plant

17662

Nassau

MANHASSET LAKEVILLE
WD / Manhasset-Lakeville
WD

17663

Suffolk

16144

Pop.
400

Project Cost Score

Cumulative
Total

$1,920,334

70

$1,022,154,668

$950,000

70

$1,023,104,668

816

$7,258,100

70

$1,030,362,768

450

$4,713,160

70

$1,035,075,928

210

$1,192,230

70

$1,036,268,158

200

$638,000

70

$1,036,906,158

133

$1,192,450

70

$1,038,098,608

126

$650,000

70

$1,038,748,608

93

$782,000

70

$1,039,530,608

60

$100,000

70

$1,039,630,608

47,810

$3,144,322

65

$1,042,774,930

Nitrate Removal Searingtown Station, Upgrade Water Treatment


Plant

43,000

$3,409,300

65

$1,046,184,230

EAST FARMINGDALE WD /
Babylon East Farmingdale
WD

VOC Treatment at Plant No. 4, Upgrade Water Treatment Plant

7,500

$4,398,512

65

$1,050,582,742

Orange

GOSHEN W.D. #1
(HAMBLETONIAN PARK) /
Goshen (T)

New Ground Water Source, New Storage, Upgrade Distribution


System

509

$2,605,900

65

$1,053,188,642

16737

Dutchess

DOVER RIDGE ESTATES /


Beekman (T)

Upgrade Ground Water Source

250

$266,500

65

$1,053,455,142

17504

Schoharie

CENTRAL BRIDGE WATER


DISTRICT / Central Bridge
WD

DBP Control , Upgrade Water Treatment Plant

1,061

$1,773,000

65

$1,055,228,142

17575

Fulton

NORTHAMPTON (T) WATER Upgrade Storage, Upgrade Distribution System


DISTRICT / Northampton (T)

1,000

$6,303,627

65

$1,061,531,769

17218

Chautauqua

FREDONIA VILLAGE /
Fredonia (V)

Upgrade Water Treatment Plant

10,400

$1,287,500

65

$1,062,819,269

17282

Dutchess

RHINEBECK VILLAGE
WATER / Rhinebeck (V)

Upgrade Water Treatment Plant

4,300

$365,200

65

$1,063,184,469

16762

Cayuga

UNION SPRINGS VILLAGE / New Water Treatment Plant


Union Springs (V)

2,000

$165,000

65

$1,063,349,469

New Water District

Extend Distribution System, New Water District

Pheasant Valley Road WD., New Distribution System, New


Inter-Connection

3,450

CODES Legend *

ARRAF=American Recovery Reinvestment Act Financed


GIC=Green Infrastructure Components
FGP=Funded through SRF Bond Market Rate Program
CAT_G=Green Innovative Grants Program Project

Page 14 of 35

Project #

NYS Drinking Water State Revolving Fund DRAFT IUP Annual List
(Formerly Readiness List) October 1, 2012 to September 30, 2013
County

CODES See legend*

System Name/
Borrower

Description

15797

Essex

PORT HENRY V / Port Henry Upgrade Transmission, Upgrade Distribution System


(V)

15042

Genesee

ALEXANDER VILLAGE /
Alexander (V)

17746

Ontario

17389

Pop.

Project Cost Score

Cumulative
Total

1,831

$511,910

65

$1,063,861,379

New Storage

781

$880,425

65

$1,064,741,804

RUSHVILLE VILLAGE /
Rushville (V)

Upgrade Surface Water Treatment Rule Compliance Facility

621

$1,969,200

65

$1,066,711,004

Onondaga

NORTHEAST LAFAYETTE
WD / East Syracuse (V)

Replace lead service lines from the watermain to the property line to
correct lead & copper exceedances., Upgrade Distribution System

250

$444,445

65

$1,067,155,449

17609

Chenango

NORWICH CITY / Norwich (C) New Water Treatment Plant

8,000

$8,652,000

65

$1,075,807,449

17766

Broome

DEPOSIT (V) WATER


DEPARTMENT / Deposit (V)

2,080

$2,006,336

65

$1,077,813,785

17417

Delaware

ARKVILLE WATER DISTRICT Extend distribution, 100,000 gallons of storage, 100 gpm well, system
consolidation., New Ground Water Source, New Storage, Extend
/ Middletown (T)
Distribution System, Extend System Consolidation

400

$1,833,375

65

$1,079,647,160

15750

Westchester

CORTLANDT
CONSOLIDATED WD /
Cortlandt (T)

Upgrade Storage, Upgrade Distribution System

28,369

$4,000,000

65

$1,083,647,160

15040

Montgomery

PALATINE BRIDGE (V)


WATER WORKS / Palantine
Bridge (V)

Upgrade Water Treatment Plant, Upgrade Ground Water Source,


Upgrade Distribution System

890

$985,750

65

$1,084,632,910

17610

Montgomery

AMSTERDAM (T) /
Amsterdam(T)

New Storage, New Pump Station, Extend Distribution System

400

$4,506,250

65

$1,089,139,160

17935

Madison

LENOX (T) / Lenox (T)

Water District No. 12., New Water District

750

$5,000,000

65

$1,094,139,160

18016

Steuben

WD #3 / Campbell (T)

Serve private contaminated/poor yielding wells., Extend Water


District

1,025

$908,687

65

$1,095,047,847

16679

Seneca

JUNIUS WATER DISTRICT


#1 / Junius (T)

Extend system to serve area with private contaminated wells. W.D.


Ext. #2., Extend Distribution System

300

$623,607

65

$1,095,671,454

16798

St.Lawrence

EAST NORFOLK WATER


DISTRICT / Norfolk (T)

New system to serve area with private contaminated wells. , New


Complete System (New System)

270

$750,000

65

$1,096,421,454

15183

Orleans

SHELBY (T) / Shelby (T)

Extend system to serve area with private contaminated wells. Water


Improvement No. 4 - Phase I., Extend Distribution System

240

$249,700

65

$1,096,671,154

17826

Lewis

WATER DISTRICT NO. 10 /


Lowville (T)

New Distribution System

240

$507,000

65

$1,097,178,154

16921

Jefferson

ADAMS (T) WD #2 / Adams


(T)

New system to serve area with private contaminated wells. , New


Complete System (New System)

190

$1,509,000

65

$1,098,687,154

15483

Yates

Extend system to serve area with private contaminated wells. ,


BENTON TOWN WATER
DISTRICT NO. 1 / Benton (T) Extend Distribution System

97

$639,000

65

$1,099,326,154

17352

Suffolk

SOUTH HUNTINGTON WD / Plant No. 10 VOC Removal, Upgrade Water Treatment Plant
Huntington (T)

81,760

$3,913,790

60

$1,103,239,944

17891

Suffolk

SOUTH HUNTINGTON WD / Plant 3 VOC Removal, Upgrade Water Treatment Plant


Huntington (T)

81,760

$3,530,840

60

$1,106,770,784

Upper NW Quadrant water main reconstruction, new river crossing,


new telemetry system., Upgrade Transmission, Upgrade Distribution
System

CODES Legend *

ARRAF=American Recovery Reinvestment Act Financed


GIC=Green Infrastructure Components
FGP=Funded through SRF Bond Market Rate Program
CAT_G=Green Innovative Grants Program Project

Page 15 of 35

Project #

NYS Drinking Water State Revolving Fund DRAFT IUP Annual List
(Formerly Readiness List) October 1, 2012 to September 30, 2013
County

CODES See legend*

System Name/
Borrower

Description

Pop.

Project Cost Score

Cumulative
Total

17892

Suffolk

SOUTH HUNTINGTON WD / Plant 7 VOC Removal, Upgrade Water Treatment Plant


Huntington (T)

81,760

$5,575,390

60

$1,112,346,174

17893

Suffolk

SOUTH HUNTINGTON WD / Plant 4 VOC Removal, Upgrade Water Treatment Plant


Huntington (T)

81,760

$973,350

60

$1,113,319,524

16699

Westchester

SUNSET RIDGE WATER


DISTRICT / North Salem (T)

Replacement of pump control equipment, storage tank cleaning &


coating, water main replacement & installation, pump house reapirs,
pump house fencing and driveway, Upgrade Storage, Upgrade Pump
Station, Upgrade Distribution System

625

$400,000

60

$1,113,719,524

17548

Albany

MENANDS VILLAGE /
Menands (V)

Upgrade Pump Station, Upgrade Distribution System

$6,936,000

60

$1,120,655,524

16474

NY City

3rd City Tunnel, mnhtn borings; Restore shaft 23(C604); Riser Valve
NEW YORK
CITY-CATSKILL/DELAWARE Controls, Delaware system(C347), Upgrade Transmission
SYSTEM / NYCMWFA

6,552,718

$35,000,000

60

$1,155,655,524

16478

NY City

3rd City tunnel and shafts, crit redund, dist press,Field


NEW YORK
CITY-CATSKILL/DELAWARE services(C538B CM), Upgrade Transmission
SYSTEM / NYCMWFA

6,552,718

$470,000,000

60

$1,625,655,524

17011

NY City

City tunnel 3 stage 2, shafts19B-22B (C544B, C, E, H, P), Upgrade


NEW YORK
CITY-CATSKILL/DELAWARE Transmission
SYSTEM / NYCMWFA

6,552,718

$35,000,000

60

$1,660,655,524

17167

NY City

City Tunnel 3, Stage 2, Shaft 15B East-Phase 1, Brooklyn-Queens


NEW YORK
CITY-CATSKILL/DELAWARE (C545G), New Pump Station
SYSTEM / NYCMWFA

6,552,718

$8,000,000

60

$1,668,655,524

17203

NY City

City Tunnel 3, Stage 1, Shafts 8B and 15B, Phase 1 - Completion of


NEW YORK
CITY-CATSKILL/DELAWARE Chlorination Booster Stations, Upgrade Distribution System
SYSTEM / NYCMWFA

6,552,718

$1,000,000

60

$1,669,655,524

17193

Essex

AUSABLE FORKS WD / Jay


(T)

900

$5,201,603

60

$1,674,857,127

16576

Chemung

NORTHSTAR MHP / Leading water softener system and, Upgrade Distribution System
Edge Properties

400

$93,113

60

$1,674,950,240

18038

Saratoga

MECHANICVILLE CITY /
Mechanicville (C)

Interconnection to SCWA, Alternative to Project 17742, New


Transmission

5,100

$9,465,623

60

$1,684,415,863

15846

Essex

MORIAH WD / Moriah (T)

Upgrade Distribution System

3,100

$606,876

60

$1,685,022,739

16069

Suffolk

RIVERHEAD WD / Riverhead Upgrade Ground Water Source


(T)

28,000

$1,211,000

60

$1,686,233,739

15213

Nassau

WESTBURY WD / Westbury
W.D.

New Water Treatment Plant

20,500

$4,120,000

60

$1,690,353,739

16653

Delaware

WALTON VILLAGE / Walton


(V)

Upgrade Controls, Upgrade Ground Water Source, Upgrade


Distribution System

$0

60

$1,690,353,739

Upgrade Water Treatment Plant, New Storage

3,900

3,070

NOTE: Financed through SRF Bond Guarantee Program

FGP

17037

Nassau

EAST WILLISTON (V) / East


Williston (V)

Replacement of lead service lines to about 120 residences, New


Other Expenses, New Other (OT)

2,503

$456,000

60

$1,690,809,739

16236

Dutchess

RED HOOK VILLAGE / Red


Hook (V)

New Ground Water Source, Upgrade Ground Water Source, New


Storage, Upgrade Distribution System

2,214

$9,328,300

60

$1,700,138,039

17883

Ulster

NEW PALTZ (V) / New Paltz


(V)

Construct mains in Northern portion of Village to loop system,


Upgrade Distribution System

6,000

$759,625

60

$1,700,897,664

18026

Tioga

CANDOR VILLAGE WATER


DEPT. / Candor (V)

Upgrade Storage, Upgrade Distribution System

1,020

$3,047,237

60

$1,703,944,901

CODES Legend *

ARRAF=American Recovery Reinvestment Act Financed


GIC=Green Infrastructure Components
FGP=Funded through SRF Bond Market Rate Program
CAT_G=Green Innovative Grants Program Project

Page 16 of 35

Project #

NYS Drinking Water State Revolving Fund DRAFT IUP Annual List
(Formerly Readiness List) October 1, 2012 to September 30, 2013
County

CODES See legend*

System Name/
Borrower

Description

17097

Orleans

MEDINA VILLAGE / Medina


(V)

Upgrade Distribution System

17092

Otsego

LAURENS VILLAGE /
Laurens (V)

15561

Jefferson

17036

Pop.

Project Cost Score

Cumulative
Total

6,500

$4,088,085

60

$1,708,032,986

New Storage, Upgrade Distribution System

381

$1,236,000

60

$1,709,268,986

WATERTOWN (T) /
Watertown (T)

New system to serve area with private contaminated wells. , New


Complete System (New System), New Storage, New Distribution
System

530

$2,547,476

60

$1,711,816,462

Genesee

TOWN OF PEMBROKE
WATER DISTRICT NO. 1 /
Pembroke (T)

Extend system to serve area with private contaminated wells. ,


Extend Distribution System

2,000

$3,860,000

60

$1,715,676,462

16814

Ontario

WEST BLOOMFIELD WD /
West Bloomfield (T)

Extend system to serve area with private contaminated wells. ,


Extend Distribution System

1,500

$231,750

60

$1,715,908,212

16886

Ontario

WEST BLOOMFIELD WD /
West Bloomfield (T)

County Road 35 and Dugway Road. , Extend Distribution System

1,500

$195,513

60

$1,716,103,725

17927

Lewis

CONSOLIDATED WATER
DISTRICT / Watson (T)

New Ground Water Source, New Storage, Extend Distribution System

1,500

$12,389,600

60

$1,728,493,325

16767

Seneca

ROUTE 96 WATER
DISTRICT / Waterloo (T)

Extend system to serve area with private contaminated wells. ,


Extend Distribution System

202

$1,845,512

60

$1,730,338,837

15578

Seneca

BURGESS ROAD WATER


DISTRICT / Junius (T)

Extend system to serve area with private contaminated wells. ,


Extend Distribution System

200

$699,100

60

$1,731,037,937

17616

Oneida

VIENNA (T) / Vienna (T)

New Distribution System

150

$210,000

60

$1,731,247,937

17886

Oneida

HALSTEAD ROAD WD /
Vienna (T)

Extend Distribution System

75

$692,400

60

$1,731,940,337

16516

Suffolk

WEST NECK WATER


SUPPLY / Shelter Island (T)

Upgrade Distribution System

100

$550,000

55

$1,732,490,337

17665

Suffolk

VOC Treatment at Plant No. 11, Upgrade Water Treatment Plant


GREENLAWN WATER
DISTRICT / Greenlawn Water
District

42,000

$1,930,784

55

$1,734,421,121

17664

Suffolk

DIX HILLS WD / Town of


Huntington / Dix Hills

VOC Treatment at Plant No.11, Upgrade Water Treatment Plant

34,522

$2,277,330

55

$1,736,698,451

15811

Onondaga

SKANEATELES VILLAGE /
Skaneateles (V)

Improve disinfection contact time., Upgrade Transmission

2,610

$1,600,000

55

$1,738,298,451

17031

Essex

CROWN POINT WD / Crown Upgrade Distribution System


Point (T)

995

$2,795,678

55

$1,741,094,129

17437

NY City

Catskill& Delaware UV Disinfection, New Water Treatment Plant


NEW YORK
CITY-CATSKILL/DELAWARE
SYSTEM / NYCWMFA

$1,400,000,000

55

$3,141,094,129

16571

Franklin

HARRIETSTOWN (T) /
Harrietstown (T)

Upgrade Distribution System

5,621

$710,800

55

$3,141,804,929

16957

Franklin

CHATEAUGAY V /
Chateaugay (V)

Upgrade Distribution System

1,100

$2,750,000

55

$3,144,554,929

17547

Broome

WHITNEY POINT VILLAGE / New Wells, Main Street Wellfield/Pumphouse Improvements.,


Upgrade Ground Water Source, New Ground Water Source
Whitney Point (V)

1,054

$569,400

55

$3,145,124,329

6,552,718

CODES Legend *

ARRAF=American Recovery Reinvestment Act Financed


GIC=Green Infrastructure Components
FGP=Funded through SRF Bond Market Rate Program
CAT_G=Green Innovative Grants Program Project

Page 17 of 35

Project #

NYS Drinking Water State Revolving Fund DRAFT IUP Annual List
(Formerly Readiness List) October 1, 2012 to September 30, 2013
County

CODES See legend*

System Name/
Borrower

Description
New Ground Water Source

18064

Oneida

FORESTPORT WATER
DISTRICT / Foresport (T)

15786

Oneida

MOHAWK VALLEY WATER Gilbert Road Storage Tank., Upgrade Storage


AUTHORITY / Upper Mohawk

Valley Reg. WB

15865

Oneida

MOHAWK VALLEY WATER


AUTHORITY / UMVRWB

Pleasant Street. Upper Mohawk Valley Regional Water Board,


Upgrade Distribution System

18015

Yates

WS IMPROVEMENTS /
Dundee (V)

18007

Cortland

17940

Pop.

Project Cost Score

Cumulative
Total

900

$390,000

55

$3,145,514,329

120,000

$150,000

55

$3,145,664,329

120,000

$1,600,000

55

$3,147,264,329

Upgrade Storage, Upgrade Distribution System

1,690

$6,913,360

55

$3,154,177,689

MARATHON VILLAGE /
Marathon (V)

New Storage, New Pump Station, Upgrade Distribution System

1,107

$2,947,345

55

$3,157,125,034

Delaware

ROXBURY WATER
DISTRICT / Roxbury (T)

Upgrade Storage, Upgrade Distribution System

755

$1,423,000

55

$3,158,548,034

17599

Sullivan

EDGEWOOD LAKES, INC. /


Edgewood Lakes Inc.

Replace hydropneumatic tank, New Storage

17

$9,000

55

$3,158,557,034

16906

Orange

KIRYAS JOEL VILLAGE /


Kiryas Joel (V)

Pump Station and transmission main from NYC Aqueduct to (V) K.J.,
New Transmission, New Pump Station

21,750

$28,907,400

55

$3,187,464,434

17950

Orange

KIRYAS JOEL VILLAGE /


Kiryas Joel (V)

New wells on Site 1, Site 2, Site 3, Site 4, Site 5, New Ground Water
Source

21,750

$14,246,909

55

$3,201,711,343

17951

Orange

KIRYAS JOEL VILLAGE /


Kiryas Joel (V)

Redevelopment of Wells 6 and 13A and new well at Well 13 Well


Field, New Ground Water Source, Upgrade Ground Water Source

21,750

$3,805,747

55

$3,205,517,090

17952

Orange

KIRYAS JOEL VILLAGE /


Kiryas Joel (V)

Redevelop wells at the Star Expansion Well Field, Upgrade Ground


Water Source

21,750

$1,658,712

55

$3,207,175,802

17027

Oneida

MOHAWK VALLEY WATER The UMVRWB will extend the 12 inch line along Sutliff Road and NYS
233 and connect to Village of Camelot., Extend System
AUTHORITY / Whitestown (T) route
Consolidation

120,000

$629,000

55

$3,207,804,802

17670

Erie

EDEN WD#7 / Eden (T)

Eden WD#7, New Storage, New Distribution System

1,800

$5,460,000

55

$3,213,264,802

17673

Erie

EDEN WD#2 / Eden (T)

Eden WD#2 Shadagee Road Water Project Pump Station and


Waterlines, New Pump Station, New Distribution System

500

$5,280,000

55

$3,218,544,802

17832

Westchester

KENSICO WATER DISTRICT Locust Road Water Main Extension, Extend Distribution System
/ Mount Pleasant

17,857

$8,000,000

55

$3,226,544,802

16501

Erie

BLASDELL VILLAGE /
Blasdell (V)

Consolidation of the Village system with Erie County Water Authority,


Upgrade Distribution System, New System Consolidation

3,200

$2,515,000

55

$3,229,059,802

18071

Cattaraugus

RANDOLPH VILLAGE /
Randolph (T)

East Randolph and Randolph (V)'s Repalcement of Water Mains,


Upgrade Distribution System

1,250

$7,075,000

55

$3,236,134,802

18049

Erie

CONCORD TOWN WATER


SYSTEM / Town of Concord

Extend Distribution System

$335,000

55

$3,236,469,802

18010

Oswego

TOWN/VILLAGE JOINT
WATER PROJECT / Parish
(T)

Serve private contaminated/poor yielding wells., Extend Distribution


System

$10,150,000

55

$3,246,619,802

15109

Seneca

VARICK/ROMULUS WATER
PROJECT / Varick (T)

Extend Distribution System

$3,100,000

55

$3,249,719,802

125

1,200

850

CODES Legend *

ARRAF=American Recovery Reinvestment Act Financed


GIC=Green Infrastructure Components
FGP=Funded through SRF Bond Market Rate Program
CAT_G=Green Innovative Grants Program Project

Page 18 of 35

Project #

NYS Drinking Water State Revolving Fund DRAFT IUP Annual List
(Formerly Readiness List) October 1, 2012 to September 30, 2013
County

CODES See legend*

System Name/
Borrower

Description

Pop.

Project Cost Score

Cumulative
Total

15339

Erie

New Storage, New Pump Station, Extend Distribution System


EAST HILL WATER
DISTRICT NO. 3 / Boston (T)

800

$3,708,000

55

$3,253,427,802

17220

Cayuga

VICTORY (T) WD #2 / Victory Extend Distribution System


(T)

612

$3,389,601

55

$3,256,817,403

15090

Schenectady

PRINCETOWN WATER
SUPPLY / Princetown (T)

Extend Distribution System

600

$929,060

55

$3,257,746,463

15092

Schenectady

PRINCETOWN WATER
SUPPLY / Princetown (T)

Extend Distribution System

600

$632,420

55

$3,258,378,883

16949

Schenectady

PRINCETOWN WATER
SUPPLY / Princetown (T)

Extend Distribution System

600

$495,430

55

$3,258,874,313

17636

Schenectady

PRINCETOWN WATER
SUPPLY / Princetown (T)

Extend Distribution System

600

$286,340

55

$3,259,160,653

15613

Livingston

YORK (T) WD NO. 2 / York


(T)

Extend Distribution System

350

$526,330

55

$3,259,686,983

18047

Genesee

RTE 98 WD / Batavia (T)

New Water District the serve areas East and West of Rte. 98, New
Water District

318

$5,322,464

55

$3,265,009,447

18050

Yates

BENTON WD #1 /

Extend Distribution System

308

$731,000

55

$3,265,740,447

16724

Seneca

TYRE (T) WATER DISTRICT / Extend system to serve area with private contaminated wells. ,
Extend Distribution System
Tyre (T)

260

$992,508

55

$3,266,732,955

16851

Erie

AURORA (T) WATER IMP.


AREA NO. 5 / Aurora (T)

Extend Distribution System

210

$613,500

55

$3,267,346,455

15089

Schenectady

PRINCETOWN (T) - WD#1 /


Princetown (T)

Extend Distribution System

183

$860,050

55

$3,268,206,505

16804

Broome

STILLWATER RD WD#6 /
Conklin (T)

Extend Distribution System

173

$412,782

55

$3,268,619,287

17315

Cayuga

New Pump Station, Extend Distribution System


MORAVIA (T) WATER
DISTRICT NO. 1 / Moravia (T)

162

$663,320

55

$3,269,282,607

15545

Ontario

OAKMOUNT ROAD WATER New Storage, Extend Distribution System


SYSTEM / East Bloomfield (T)

150

$2,224,000

55

$3,271,506,607

18045

Genesee

CREEK RD. WD / Batavia (T) New Water District

136

$1,407,623

55

$3,272,914,230

17189

Jefferson

WATER DISTRICT #5 / Cape New system to serve area with private contaminated wells. , New
Distribution System
Vincent (T)

100

$1,085,200

55

$3,273,999,430

17478

Clinton

ROUTE 11 WD / Champlain
(T)

Extend Distribution System

100

$1,267,380

55

$3,275,266,810

17771

Albany

MARTINS HILL ROAD


WATER DISTRICT /
Coeymans (T)

Extend distribution from Village of Ravena to serve Martins Hill Road


Water District., Extend Distribution System, New Water District

66

$314,150

55

$3,275,580,960

18046

Genesee

PRATT RD. WD / Batavia (T) New Water District

55

$1,067,974

55

$3,276,648,934

CODES Legend *

ARRAF=American Recovery Reinvestment Act Financed


GIC=Green Infrastructure Components
FGP=Funded through SRF Bond Market Rate Program
CAT_G=Green Innovative Grants Program Project

Page 19 of 35

Project #

NYS Drinking Water State Revolving Fund DRAFT IUP Annual List
(Formerly Readiness List) October 1, 2012 to September 30, 2013
County

CODES See legend*

System Name/
Borrower

Description

17479

Clinton

WEST SERVICE ROAD WD / Extend Distribution System


Champlain (T)

18011

Oneida

ROUTE 5 WD / Vernon (T)

Serve private contaminated/poor yielding wells., Extend Distribution


System

15134

Saratoga

CLIFTON PARK WATER


AUTHORITY / Clifton Park
Water Authority

15140

Saratoga

17584

Pop.

Project Cost Score

Cumulative
Total

30

$675,284

55

$3,277,324,218

30

$244,000

55

$3,277,568,218

Inter-Connection

29,000

$252,041

50

$3,277,820,259

CLIFTON PARK WATER


AUTHORITY / Clifton Park
Water Authority

Upgrade Ground Water Source

29,000

$214,327

50

$3,278,034,586

Westchester

ARBOR HILLS WATER


WORKS / Arbor Hills
Waterworks

New wells, storage and booster pump., New Ground Water Source,
New Storage

180

$725,000

50

$3,278,759,586

15430

Putnam

BREWSTER VILLAGE /
Brewster (V)

New Storage

2,000

$1,628,000

50

$3,280,387,586

16211

Niagara

NIAGARA WATER
IMPROVEMENT AREA /
Niagara County

Contract 15G, E., Upgrade Water Treatment Plant, Upgrade


Transmission

8,978

$6,526,857

50

$3,286,914,443

18069

Madison

HAMILTON VILLAGE /
Hamilton (V)

New Ground Water Source, Upgrade Distribution System

3,904

$4,100,000

50

$3,291,014,443

16188

Chautauqua

WESTFIELD VILLAGE /
Westfield (V)

Upgrade Water Treatment Plant

3,450

$2,150,000

50

$3,293,164,443

18062

Oswego

CLEVELAND VILLAGE /
Cleveland (V)

Upgrade Ground Water Source, Upgrade Storage, Upgrade


Distribution System

925

$1,576,930

50

$3,294,741,373

15355

Schenectady

SCHENECTADY CITY
WATER WORKS /
Schenectady (C)

Corrosion Control & Cleaning of Tansmission Mains, Upgrade


Transmission

61,821

$1,248,389

50

$3,295,989,762

16978

Oswego

OSWEGO CITY / Oswego (C) Upgrade Water Treatment Plant

29,400

$4,532,000

50

$3,300,521,762

16760

Nassau

ROCKVILLE CENTRE (V) /


Rockville (V)

Design & construction new iron filtration facility at wellfield # 1,


southside high school, iron removing plant, New Water Treatment
Plant

24,700

$3,012,750

50

$3,303,534,512

16627

Nassau

CARLE PLACE WD / Carle


Place WD

Wells #3 & #4, Terrace Drive, Carle Place, NY, New Water Treatment
Plant

9,005

$1,510,800

50

$3,305,045,312

17191

Yates

PENN YAN VILLAGE / Penn


Yan (V)

Upgrade Water Treatment Plant

5,248

$1,300,000

50

$3,306,345,312

15240

Jefferson

ALEXANDRIA VILLAGE /
Alexandria Bay (V)

Upgrade Surface Water Source, Upgrade Storage, Upgrade


Distribution System

1,900

$3,048,188

50

$3,309,393,500

17982

Steuben

PRATTSBURGH WATER
DISTRICT / Prattsburgh (T)

Upgrade Storage, Upgrade Distribution System

850

$1,485,415

50

$3,310,878,915

17319

Putnam

MOUNTAIN BROOK HOMES New Water Treatment Plant, New Ground Water Source
/ Southeast (T)

176

$427,000

50

$3,311,305,915

16880

Seneca

INTERLAKEN VILLAGE /
Interlaken (V)

Upgrade Ground Water Source

650

$320,807

50

$3,311,626,722

15287

Cortland

VIRGIL (T) / Virgil (T)

Upgrade Ground Water Source, New Storage, Extend Distribution


System, System Consolidation

345

$2,223,234

50

$3,313,849,956

CODES Legend *

ARRAF=American Recovery Reinvestment Act Financed


GIC=Green Infrastructure Components
FGP=Funded through SRF Bond Market Rate Program
CAT_G=Green Innovative Grants Program Project

Page 20 of 35

Project #

NYS Drinking Water State Revolving Fund DRAFT IUP Annual List
(Formerly Readiness List) October 1, 2012 to September 30, 2013
County

CODES See legend*

System Name/
Borrower

Description
Upgrade Other Expenses, Upgrade Other (OT)

17918

Erie

BUFFALO WATER
AUTHORITY / Buffalo (C)

15297

Cortland

HOMER VILLAGE-NEWTON Upgrade Distribution System


WATER WORKS / Homer (V)

17921

Oneida

EUREKA ROAD WD /
Westmoreland (T)

17378

Ontario

16449

Pop.
276,000

Project Cost Score

Cumulative
Total

$7,945,178

50

$3,321,795,134

4,368

$440,000

50

$3,322,235,134

New Pump Station, New Distribution System

35

$180,000

50

$3,322,415,134

GORHAM TOWN WD /
Gorham (T)

Extension No. 9., Extend Distribution System

4,500

$732,000

50

$3,323,147,134

Albany

GREEN ISLAND VILLAGE /


Green Island (V)

Extend Distribution System

2,900

$381,100

50

$3,323,528,234

18018

Wyoming

CASTILE VILLAGE / Castile


(V)

Upgrade Other Expenses, Upgrade Storage, Upgrade Distribution


System, New System Consolidation, Upgrade Other (OT)

1,135

$2,444,813

50

$3,325,973,047

17899

Genesee

WD II / Alabama (T)

Extend Water District

1,056

$5,416,206

50

$3,331,389,253

17596

Tioga

SPENCER (V) / Spencer (V)

New Complete System (New System), New System Consolidation

731

$7,865,000

50

$3,339,254,253

17327

Onondaga

CROSS LAKE/N. ELBRIDGE New Storage, New Pump Station, Extend Distribution System
AREA WD / Elbridge (T)

534

$2,590,450

50

$3,341,844,703

16205

Oswego

SENECA HILLS HEALTH


CAMPUS / Volney (T)

450

$1,115,000

50

$3,342,959,703

16908

Chautauqua

BUSTI (T) WATER DISTRICT Extend Distribution System


#3 / Busti (T)

450

$750,000

50

$3,343,709,703

17223

Cayuga

WEST GENESEE STREET


WATER DISTRICT / Aurelius
(T)

Extend Distribution System

175

$1,198,000

50

$3,344,907,703

17026

Seneca

BOODY'S HILL WD (WATER Extend to serve private contaminated wells. , Extend Distribution
System
DISTRICT #5) / Fayette (T)

151

$788,980

50

$3,345,696,683

17058

Jefferson

Extend Distribution System


HOUNSFIELD (T) WD #2
EXTENSION / Hounsfield (T)

123

$794,439

50

$3,346,491,122

17895

Livingston

LONG POINT ROAD WD /


Geneseo(T)

Extend Water District

100

$1,115,000

50

$3,347,606,122

17326

Onondaga

LAIRD ROAD WATER


DISTRICT / Elbridge (T)

Extend Distribution System

29

$378,000

50

$3,347,984,122

17860

Nassau

JERICHO WD / Oyster Bay


(T)

VOC treatment at Kirby Lane., Upgrade Water Treatment Plant

58,000

$2,215,000

45

$3,350,199,122

17862

Nassau

JERICHO WD / Oyster Bay


(T)

New well at Well #28 site., New Ground Water Source

58,000

$2,150,000

45

$3,352,349,122

16168

Saratoga

SARATOGA SPRINGS CITY / Upgrade Water Treatment Plant, Upgrade Surface Water Source,
New Transmission, New Pump Station
Saratoga Springs (C)

26,525

$15,820,000

45

$3,368,169,122

16136

Westchester

ELMSFORD VILLAGE /
Elmsford (V)

4,600

$1,000,000

45

$3,369,169,122

Upgrade Distribution System

Upgrade Water Treatment Plant

CODES Legend *

ARRAF=American Recovery Reinvestment Act Financed


GIC=Green Infrastructure Components
FGP=Funded through SRF Bond Market Rate Program
CAT_G=Green Innovative Grants Program Project

Page 21 of 35

Project #

NYS Drinking Water State Revolving Fund DRAFT IUP Annual List
(Formerly Readiness List) October 1, 2012 to September 30, 2013
County

CODES See legend*

System Name/
Borrower

Description

15834

Wayne

PALMYRA VILLAGE /
Palmyra (V)

New Pump Station

17941

Herkimer

MIDDLEVILLE (V) WATER


WORKS / Middleville (V)

Upgrade Ground Water Source, Upgrade Pump Station, Upgrade


Distribution System

18082

Madison

ONEIDA CITY / Oneida (C)

Replace RW transmission main crossing of Fish Creek., Upgrade


Transmission

18052

Jefferson

CAPE VINCENT VILLAGE /


Cape Vincent (V)

Upgrade Water Treatment Plant

17929

Steuben

PINEWOOD ACRES WATER Upgrade Storage, Upgrade Pump Station, Upgrade Distribution
System
DISTRICT / Corning

15353

Schenectady

SCHENECTADY CITY
WATER WORKS /
Schenectady (C)

15986

Niagara

15988

Pop.
3,550

Project Cost Score

Cumulative
Total

$102,700

45

$3,369,271,822

725

$3,453,415

45

$3,372,725,237

12,000

$2,309,000

45

$3,375,034,237

1,500

$3,200,000

45

$3,378,234,237

168

$3,426,552

45

$3,381,660,789

Distribution improvements - Elimination of deadends, Upgrade


Distribution System

61,821

$1,170,150

45

$3,382,830,939

NIAGARA FALLS WATER


BOARD / Niagara Falls (C)

Upgrade Distribution System

55,593

$390,000

45

$3,383,220,939

Niagara

NIAGARA FALLS WATER


BOARD / Niagara Falls (C)

McKoon Ave., West Rivershore Dr., Upgrade Distribution System

55,593

$466,920

45

$3,383,687,859

17914

Nassau

Contruction of new Well #14 at Community Drive, New Ground Water


WA OF GREAT NECK
NORTH / Water Auth of Great Source
Neck North

31,400

$2,000,000

45

$3,385,687,859

16749

Orange

KIRYAS JOEL VILLAGE /


Kiryas Joel (V)

Upgrade Pump Station

21,750

$872,247

45

$3,386,560,106

17945

Sullivan

MONTICELLO VILLAGE /
Monticello (V)

Upgrade storage and distribution piping, Upgrade Storage, Upgrade


Distribution System

8,000

$7,395,000

45

$3,393,955,106

17055

Herkimer

FRANKFORT (V) WATER


WORKS / Frankfort (V)

New Ground Water Source

2,995

$481,691

45

$3,394,436,797

17057

Herkimer

FRANKFORT (V) WATER


WORKS / Frankfort (V)

Upgrade Distribution System

2,995

$1,971,007

45

$3,396,407,804

15547

Allegany

FRIENDSHIP TOWN WATER Upgrade Ground Water Source, Upgrade Storage, Upgrade
Distribution System
DISTRICT / Friendship (T)

1,380

$1,030,000

45

$3,397,437,804

17226

Franklin

CHATEAUGAY (T) WD#1 /


Chateaugay (T)

New Water District

100

$114,075

45

$3,397,551,879

17402

Suffolk

WEST NECK WATER


SUPPLY / Shelter Island (T)

New Well, New Ground Water Source

100

$2,000

45

$3,397,553,879

15724

Chautauqua

LAKEWOOD VILLAGE /
Lakewood (V)

New Transmission, New Pump Station, Inter-Connection

3,258

$870,000

45

$3,398,423,879

16512

Wayne

OLD LYONS-NEWARK ROAD New Transmission


WATER DISTRICT / Lyons (T)

300

$207,000

45

$3,398,630,879

17453

Broome

LILIAN DRIVE WD /
Binghamton (T)

New Pump Station, Upgrade Distribution System, New


Inter-Connection, New System Consolidation, New Water District

120

$281,000

45

$3,398,911,879

17953

Montgomery

NELLISTON VILLAGE /
Nelliston (V)

New Storage, Upgrade Distribution System

375

$4,493,000

45

$3,403,404,879

CODES Legend *

ARRAF=American Recovery Reinvestment Act Financed


GIC=Green Infrastructure Components
FGP=Funded through SRF Bond Market Rate Program
CAT_G=Green Innovative Grants Program Project

Page 22 of 35

Project #

NYS Drinking Water State Revolving Fund DRAFT IUP Annual List
(Formerly Readiness List) October 1, 2012 to September 30, 2013
County

CODES See legend*

System Name/
Borrower

Description

15078

Orange

HOLIDAY MOBILE PARK INC. Upgrade Distribution System, System Consolidation


/ Mid-Hudson Park
Management

16065

Suffolk

RIVERHEAD WD / Riverhead Water District Extension No. 47-Herricks Lane., Extend Distribution
System
(T)

16066

Suffolk

16071

Pop.
250

Project Cost Score

Cumulative
Total

$412,000

45

$3,403,816,879

28,000

$1,165,000

45

$3,404,981,879

RIVERHEAD WD / Riverhead New Ground Water Source, New Pump Station


(T)

28,000

$1,413,000

45

$3,406,394,879

Suffolk

RIVERHEAD WD / Riverhead Water District Extension No. 49 Middle Rd. & Harrison Ave., Extend
Distribution System
(T)

28,000

$135,600

45

$3,406,530,479

17831

Westchester

KENSICO WATER DISTRICT Hardscrabble Road Water Main, Extend Distribution System
/ Mount Pleasant

17,857

$4,588,500

45

$3,411,118,979

17833

Westchester

KENSICO WATER DISTRICT Choate Lane Water Main Extension, Extend Distribution System
/ Mount Pleasant

17,857

$532,000

45

$3,411,650,979

17755

Genesee

MCWA GENESEE / Byron (T) New Distribution System

13,250

$148,000

45

$3,411,798,979

17764

Genesee

MCWA GENESEE / Byron (T) New Water District

13,250

$161,000

45

$3,411,959,979

15276

Montgomery

GLEN (T) W.D.#1 / Glen (T)

Extend Distribution System

5,000

$950,000

45

$3,412,909,979

15664

Niagara

HARTLAND WD / Hartland (T) Extend Distribution System

4,165

$726,500

45

$3,413,636,479

16612

Ontario

NORTH FARMINGTON WD / Fox Road & County Road 28., Extend Distribution System
Farmington (T)

2,300

$155,128

45

$3,413,791,607

16698

Ontario

GENEVA (T) / Geneva (T)

New Storage, New Distribution System

1,500

$2,541,000

45

$3,416,332,607

17922

Oneida

NORTHEASTERN WD /
Westmoreland (T)

New Storage, New Pump Station, New Distribution System

880

$6,700,000

45

$3,423,032,607

16442

Suffolk

NORTHEAST WOODS / East Northeast Woods, East Hampton (T), Extend Distribution System
Hampton (T)

675

$2,524,278

45

$3,425,556,885

16313

Onondaga

TOWN OF LYSANDER W.D. / Lamson Road Water District., New Distribution System, New Water
District
Lysander (T)

500

$5,284,000

45

$3,430,840,885

17672

Erie

EDEN WD#6 / Eden (T)

Eden WD#6, New Distribution System

500

$420,000

45

$3,431,260,885

16687

Chenango

NORWICH TOWN WATER


DISTRICT #2 / Norwich (T)

Extend Distribution System

200

$390,885

45

$3,431,651,770

17811

Cayuga

CAYUGA COUNTY WATER & New Centerport / Sine Roads WD in (T) Throop., Extend Distribution
System, New Water District
SEWER / Cayuga County
W&SA

200

$818,850

45

$3,432,470,620

17671

Erie

EDEN WD#5 / Eden (T)

Eden WD#5, New Distribution System

150

$5,880,000

45

$3,438,350,620

17677

Genesee

WATER DISTRICT #5 /
Stafford (T)

Extend Distribution System

123

$927,000

45

$3,439,277,620

CODES Legend *

ARRAF=American Recovery Reinvestment Act Financed


GIC=Green Infrastructure Components
FGP=Funded through SRF Bond Market Rate Program
CAT_G=Green Innovative Grants Program Project

Page 23 of 35

NYS Drinking Water State Revolving Fund DRAFT IUP Annual List
(Formerly Readiness List) October 1, 2012 to September 30, 2013

Project #

County

CODES See legend*

System Name/
Borrower

Description

Pop.

Project Cost Score

Cumulative
Total

16801

Broome

CHENANGO WD #8 /
Chenango (T)

New Water District

100

$121,000

45

$3,439,398,620

16802

Broome

CHENANGO WD #4 /
Chenango (T)

New Water District

100

$112,450

45

$3,439,511,070

16884

Monroe

SOUTH CHILI WATER IMP.


BENEFIT AREA NO. 2 / Chili
(T)

Extend Distribution System

100

$386,250

45

$3,439,897,320

17066

Genesee

BYRON (T) WD NO. 3 / Byron Extend to serve private contaminated wells in the Hamlet of North
Byron., Extend Distribution System
(T)

100

$148,000

45

$3,440,045,320

17768

Genesee

WATER DISTRICT #8 /
Stafford (T)

New Distribution System

90

$859,700

45

$3,440,905,020

17601

Putnam

GARRISON LANDING WS /
Philipstown (T)

New Complete System (New System)

84

$325,146

45

$3,441,230,166

15295

Dutchess

BEEKMAN (T) / Beekman (T) New Complete System (New System), New Distribution System

80

$579,478

45

$3,441,809,644

17676

Genesee

WATER DISTRICT #7 /
Stafford (T)

Extend Distribution System

75

$679,700

45

$3,442,489,344

16575

Genesee

BARBARY COAST MHP /


Affordable Great Locations

Extend Distribution System

50

$82,700

45

$3,442,572,044

15417

Albany

Extend Distribution System


KRUMKILL RD. WATER
DISTRICT / New Scotland (T)

45

$2,500,000

45

$3,445,072,044

15969

Broome

VESTAL CONSOLIDATED
W.D. #1 / Vestal (T)

New Water Treatment Plant

20,950

$1,700,000

40

$3,446,772,044

17318

Nassau

AQUA NY OF SEA CLIFF /


Sea Cliff Water Company

New Storage

15,000

$1,371,000

40

$3,448,143,044

15101

Wayne

ONTARIO TOWN BENEFIT


AREA #1 / Ontario (T)

New Transmission, New Storage

10,462

$4,913,000

40

$3,453,056,044

15616

Ulster

PORT EWEN WATER


DISTRICT / Esopus (T)

New Storage

4,800

$2,100,000

40

$3,455,156,044

15895

Warren

CHESTERTOWN WATER
DISTRICT / Chester (T)

Corrosion Control , Upgrade Ground Water Source

1,300

$2,500

40

$3,455,158,544

15629

Steuben

HAMMONDSPORT VILLAGE Upgrade Distribution System


/ Hammondsport (V)

741

$405,000

40

$3,455,563,544

17804

Cayuga

WELLS COLLEGE / Wells


College

Upgrade Water Treatment Plant, Upgrade Distribution System

400

$1,642,850

40

$3,457,206,394

15884

Warren

POTTERSVILLE WATER
DISTRICT / Chester (T)

Upgrade Ground Water Source

325

$14,400

40

$3,457,220,794

17957

Dutchess

BARD COLLEGE / Bard


College

New microfiltration plant.,

1,400

$991,620

40

$3,458,212,414

OXFORD VILLAGE / Oxford


(V)

New Ground Water Source, Upgrade Distribution System

1,738

$154,039

40

$3,458,366,453

ARRAF GIC

15944

CAT_G

Chenango

CODES Legend *

ARRAF=American Recovery Reinvestment Act Financed


GIC=Green Infrastructure Components
FGP=Funded through SRF Bond Market Rate Program
CAT_G=Green Innovative Grants Program Project

Page 24 of 35

Project #

NYS Drinking Water State Revolving Fund DRAFT IUP Annual List
(Formerly Readiness List) October 1, 2012 to September 30, 2013
County

CODES See legend*

System Name/
Borrower

Description
Upgrade Transmission, Upgrade Distribution System

15229

Orange

SLEEPY HOLLOW MOBILE


PARK / Sleepy Hollow MHP,
LLC

17409

Nassau

PLAINVIEW WD / Oyster Bay Air stripper at Plant 2, New Water Treatment Plant
(T)

17420

Dutchess

POUGHKEEPSIE CITY /
Poughkeepsie (C)

17421

Dutchess

16244

Pop.
400

Project Cost Score

Cumulative
Total

$386,250

40

$3,458,752,703

35,000

$4,403,400

40

$3,463,156,103

Upgrade Distribution System

28,000

$4,223,000

40

$3,467,379,103

POUGHKEEPSIE CITY /
Poughkeepsie (C)

College Hill Reservoir., New Storage

28,000

$6,746,500

40

$3,474,125,603

Albany

COHOES CITY / Cohoes (C)

Upgrade Distribution System

15,550

$1,025,000

40

$3,475,150,603

15677

Oswego

FULTON CITY / Fulton (C)

Upgrade Storage

15,400

$412,000

40

$3,475,562,603

17827

St.Lawrence

OGDENSBURG CITY /
Ogdensburg (C)

Upgrade Transmission

13,500

$351,250

40

$3,475,913,853

18070

Wayne

TRANSMISSION MAIN
REPLACEMENT / Clyde(V)

Upgrade Transmission

2,270

$357,900

40

$3,476,271,753

16330

Monroe

MCWA SHOREMONT WTP / System Consolidation


Monroe Co. Water Authority

310,000

$1,772,057

40

$3,478,043,810

15308

Livingston

EAST LAKE ROAD WATER


DISTRICT / Livonia (T)

1,450

$2,093,140

40

$3,480,136,950

15129

Albany

New Complete System (New System)


NORTHEAST WATER
DISTRICT / New Scotland (T)

370

$843,905

40

$3,480,980,855

15209

Ontario

PHELPS (T) - ROUTE 96


WEST WD / Phelps (T)

300

$1,132,000

40

$3,482,112,855

15554

Ontario

Canandaigua. (T), Extend Distribution System


WEST LAKE RD BENEFIT
BASIS DIS / Canandaigua (T)

220

$1,243,100

40

$3,483,355,955

15148

Monroe

OGDEN (T) / Ogden (T)

Extend Distribution System

171

$429,330

40

$3,483,785,285

16799

Broome

CHENANGO WD #25 /
Chenango (T)

New WD to serve private insufficient yielding wells area of Poplar Hill


Road , New Complete System (New System)

100

$383,500

40

$3,484,168,785

15182

Orange

WOODBURY CONS. W.D. /


Woodbury (T)

New Storage, New Pump Station, Upgrade Distribution System

10,105

$1,564,500

35

$3,485,733,285

17917

Onondaga

CAMILLUS CONSOLIDATED Upgrade Distribution System


WD / Camillus (T)

22,000

$5,035,497

35

$3,490,768,782

18056

Orange

WARWICK VILLAGE /
Warwick (V)

6,083

$323,725

35

$3,491,092,507

17974

Steuben

SOUTH CORNING VILLAGE / Upgrade Storage, Upgrade Distribution System


South Corning (V)

1,147

$7,763,007

35

$3,498,855,514

16073

Rensselaer

PETERSBURGH WATER
DISTRICT / Petersburg (T)

$109,154

35

$3,498,964,668

Extend Distribution System

Extend Distribution System

Upgrade Water Treatment Plant, New Ground Water Source

Upgrade Ground Water Source

240

CODES Legend *

ARRAF=American Recovery Reinvestment Act Financed


GIC=Green Infrastructure Components
FGP=Funded through SRF Bond Market Rate Program
CAT_G=Green Innovative Grants Program Project

Page 25 of 35

NYS Drinking Water State Revolving Fund DRAFT IUP Annual List
(Formerly Readiness List) October 1, 2012 to September 30, 2013

Project #

County

CODES See legend*

System Name/
Borrower

Description

Pop.

Project Cost Score

Cumulative
Total

16209

Niagara

NIAGARA WATER
IMPROVEMENT AREA /
Niagara County

Contract 14A, E, G & H., Upgrade Water Treatment Plant

8,978

$2,859,246

35

$3,501,823,914

16586

Niagara

NIAGARA WATER
IMPROVEMENT AREA /
Niagara (T)

New Transmission

8,978

$400,000

35

$3,502,223,914

18030

Rensselaer

RENSSELAER CITY PWS /


Rensselaer (C)

Washington Ave Corridor Improvements, Upgrade Distribution


System

7,500

$3,169,952

35

$3,505,393,866

17262

Orleans

HOLLEY VILLAGE / Holley


(V)

NYS Route 31., Upgrade Distribution System

2,150

$210,243

35

$3,505,604,109

17540

Genesee

OAKFIELD VILLAGE /
Oakfield (V)

Upgrade Transmission, Upgrade Storage, Upgrade Distribution


System

1,805

$2,864,100

35

$3,508,468,209

17791

Delaware

STAMFORD VILLAGE /
Stamford (V)

New Storage, Upgrade Distribution System

1,280

$2,575,000

35

$3,511,043,209

16897

Essex

CROWN POINT WD / Crown Upgrade Distribution System


Point (T)

995

$1,000,000

35

$3,512,043,209

17595

Essex

FOREVER WILD WATER


CO-SIGNOR / Forever Wild
Water Company

Upgrade Ground Water Source, Upgrade Storage, Upgrade Pump


Station

900

$2,247,987

35

$3,514,291,196

16723

Chemung

WELLSBURG VILLAGE /
Wellsburg (V)

Upgrade Distribution System

631

$644,700

35

$3,514,935,896

15062

Oneida

TAURUSEL, INC (POND


HILL) / Taurusel, Inc.

Upgrade Ground Water Source, Upgrade Distribution System,


System Consolidation

54

$164,000

35

$3,515,099,896

15346

Schenectady

SCHENECTADY CITY
WATER WORKS /
Schenectady (C)

Upgrade Pump Station

61,821

$1,800,476

35

$3,516,900,372

15086

Seneca

BORDER CITY WATER


DISTRICT / Waterloo (T)

Upgrade Distribution System

1,600

$161,340

35

$3,517,061,712

17887

Cayuga

CATO VILLAGE / Cato (V)

New Storage

601

$1,152,505

35

$3,518,214,217

15087

Sullivan

ROUTE 55 WATER
DISTRICT / Liberty (T)

New Storage, New Pump Station, Upgrade Distribution System

500

$400,000

35

$3,518,614,217

17963

Onondaga

SYRACUSE CITY / Syracuse Install hydroturbine at Westcott Reservoir.,


(C)

192,000

$315,000

35

$3,518,929,217

SYRACUSE CITY / Syracuse Install solar power at Westcott Reservoir.,


(C)

192,000

$487,273

35

$3,519,416,490

ARRAF GIC

17964

Onondaga

ARRAF GIC

17967

CAT_G

CAT_G

Rensselaer

ARRAF GIC

TROY CITY PWS / Troy (C)

Installation of leak detection equipment.,

49,170

$450,000

35

$3,519,866,490

CAT_G

15309

Jefferson

WATERTOWN, CITY OF /
Watertown (C)

Upgrade Distribution System

27,861

$152,955

35

$3,520,019,445

16022

Chautauqua

FREDONIA VILLAGE /
Fredonia (V)

New Transmission, Upgrade Distribution System, System


Consolidation

10,400

$716,800

35

$3,520,736,245

17725

Dutchess

DUTCHESS COUNTY
WATER/WASTEWATER
PLANT / DCWWA

New Distribution System, Extend System Consolidation

7,012

$4,417,000

35

$3,525,153,245

CODES Legend *

ARRAF=American Recovery Reinvestment Act Financed


GIC=Green Infrastructure Components
FGP=Funded through SRF Bond Market Rate Program
CAT_G=Green Innovative Grants Program Project

Page 26 of 35

NYS Drinking Water State Revolving Fund DRAFT IUP Annual List
(Formerly Readiness List) October 1, 2012 to September 30, 2013

Project #

County

CODES See legend*

17960

Franklin

ARRAF GIC

17969

Description

SARANAC LAKE V / Saranac Installation of water meters.,


Lake (V)

Pop.

Project Cost Score

Cumulative
Total

5,800

$1,000,000

35

$3,526,153,245

5,641

$437,400

35

$3,526,590,645

CAT_G

Steuben

ARRAF GIC

System Name/
Borrower

BATH VILLAGE / Bath (V)

Installation of solar powered storage tank water circulators.,

CAT_G

16138

Oswego

PHOENIX VILLAGE / Phoenix State Street water main replacement., Upgrade Distribution System
(V)

2,138

$90,125

35

$3,526,680,770

16147

Orange

WESTSIDE GREENWOOD
LAKE W.D. / Warwick (T)

Upgrade Distribution System

1,160

$100,000

35

$3,526,780,770

16246

Dutchess

LITTLE SWITZERLAND /
East Fishkill (T)

Upgrade Distribution System, System Consolidation

450

$428,900

35

$3,527,209,670

15938

Dutchess

TACONIC ESTATES WATER New Ground Water Source, System Consolidation


DISTRICT / East Fishkill (T)

185

$148,000

35

$3,527,357,670

16461

Dutchess

STONY CREEK FARMS


(TOWN HOMES / Stoney
Creek Farms Homeowners

New Water Treatment Plant

21

$18,000

30

$3,527,375,670

15635

Orange

WASHINGTONVILLE
VILLAGE / Washingtonville
(V)

Upgrade Ground Water Source, Upgrade Distribution System

7,000

$435,000

30

$3,527,810,670

17324

Tioga

CONSOLIDATED WATER
DISTRICT / Owego (T)

Upgrade Storage, Upgrade Pump Station

10,306

$3,669,000

30

$3,531,479,670

18037

Ulster

MARLBOROUGH WATER
DISTRICT / (T) Marlborough

New Transmission, New Storage, Upgrade Distribution System

3,248

$16,879,640

30

$3,548,359,310

18079

Tompkins

YELLOW BARN WATER CO / New Water Treatment Plant, New Storage

$540,660

30

$3,548,899,970

17370

NY City

Reconstruction of Delaware Aqueduct, Shafts 9,10 & 17, Upgrade


NEW YORK
CITY-CATSKILL/DELAWARE Transmission
SYSTEM / NYCMWFA

6,552,718

$35,066,289

30

$3,583,966,259

17371

NY City

Inspection and Rehabilitation of New Croton Aqueduct, Upgrade


NEW YORK
CITY-CATSKILL/DELAWARE Transmission
SYSTEM / NYCMWFA

6,552,718

$28,130,420

30

$3,612,096,679

17397

Erie

ECWA DIRECT / Erie County 36 inch transmission main on Sweet Home Road., New Transmission
Water Authority

228,869

$5,323,909

30

$3,617,420,588

15365

Sullivan

New 400,000 gallon potable water stand pipe and distribution system
WURTSBORO VILLAGE
WATER SUPPLY / Wurtsboro improvements, New Storage, Upgrade Distribution System
(V)

1,060

$1,545,000

30

$3,618,965,588

17517

Niagara

LOCKPORT CITY WTP /


Lockport (C)

22,279

$640,000

30

$3,619,605,588

17882

Fulton

BROADALBAN (V) / Broadalin Replace Aged Storage Tank, New Storage


(V)

1,500

$1,990,000

30

$3,621,595,588

17787

Schoharie

SCHOHARIE VILLAGE /
Schoharie (V)

Upgrade Distribution System

1,030

$2,570,000

30

$3,624,165,588

17905

Warren

LAKE GEORGE VILLAGE /


Lake George (V)

Upgrade Distribution System

2,160

$1,650,675

30

$3,625,816,263

17956

Delaware

ROXBURY WATER
DISTRICT / Roxbury (T)

Installation of water meters.,

755

$358,178

30

$3,626,174,441

ARRAF GIC

Replace waterline on Market St. between Union and Spring ,


Upgrade Distribution System

250

CAT_G

CODES Legend *

ARRAF=American Recovery Reinvestment Act Financed


GIC=Green Infrastructure Components
FGP=Funded through SRF Bond Market Rate Program
CAT_G=Green Innovative Grants Program Project

Page 27 of 35

Project #

NYS Drinking Water State Revolving Fund DRAFT IUP Annual List
(Formerly Readiness List) October 1, 2012 to September 30, 2013
County

CODES See legend*

System Name/
Borrower

Description

16720

Wayne

RED CREEK VILLAGE / Red Upgrade Distribution System


Creek (V)

15135

Saratoga

CLIFTON PARK WATER


AUTHORITY / Clifton Park
Water Authority

New Storage

15966

Orange

CORNWALL-ON-HUDSON /
Cornwall-On-Hudson (V)

Upgrade Water Treatment Plant

17909

Westchester

17910

Pop.

Project Cost Score

Cumulative
Total

526

$102,935

30

$3,626,277,376

29,000

$586,438

25

$3,626,863,814

9,300

$2,935,257

25

$3,629,799,071

YONKERS CITY / Yonkers (C) Upgrade electrical service and pumps Nepperhan Ave. and Tuckhoe

196,086

$3,968,048

25

$3,633,767,119

Westchester

YONKERS CITY / Yonkers (C) Upgrade electrical service and pumps at Hillview Pump Station,

196,086

$3,180,691

25

$3,636,947,810

15123

Saratoga

CLIFTON PARK WATER


AUTHORITY / Clifton Park
Water Authority

New Ground Water Source

29,000

$5,020,918

25

$3,641,968,728

17908

Suffolk

SALTARE WATER DISTRICT Infrastructure upgrade, Upgrade Water Treatment Plant, Upgrade
Storage
/ Saltaire (V)

1,400

$668,000

25

$3,642,636,728

17524

Westchester

NORTH CASTLE WD #2 /
North Castle (T)

1,200

$1,458,695

25

$3,644,095,423

16250

Oneida

J.E. BARRETT WD / Prospect Upgrade Ground Water Source, New Storage, Upgrade Distribution
System
(V)

$326,000

25

$3,644,421,423

17582

Westchester

SCARSDALE WATER
DEPARTMENT / Scarsdale
(V)

20,883

$3,700,000

25

$3,648,121,423

16015

Westchester

Upgrade Distribution System


BRIARCLIFF MANOR
VILLAGE / Briarcliff Manor (V)

8,831

$2,845,400

25

$3,650,966,823

15401

Clinton

PERU WD / Peru (T)

Upgrade Surface Water Source, New Transmission

2,600

$620,000

25

$3,651,586,823

17741

Schenectady

ROTTERDAM WD #3 /
Rotterdam (T)

Construction of new storage tank and transmission main, New


Transmission, New Storage

2,000

$2,060,000

25

$3,653,646,823

17795

Clinton

MORRISONVILLE WATER
DISTRICT / Plattsburgh (T)

Upgrade Pump Station

1,300

$225,320

25

$3,653,872,143

15228

Orange

PINE GROVE MOBILE HOME New Water Treatment Plant, Upgrade Transmission, New Storage,
PARK / Pine Grove MHP, LLC Upgrade Distribution System

516

$484,100

25

$3,654,356,243

15634

Cayuga

SENNETT WD #1 / Sennett
(T)

Upgrade Distribution System

200

$470,339

25

$3,654,826,582

17683

Clinton

PLEASANT RIDGE WD /
Plattsburgh (T)

New Storage

168

$3,190,000

25

$3,658,016,582

17341

Albany

SOUTH ALBANY WATER


DISTRICT / Bethlehem (T)

New Transmission

80

$146,775

25

$3,658,163,357

17340

Clinton

GREATER PLATTSBURGH
WATER DISTRICT /
Plattsburgh (T)

New Other Expenses, New Other (OT)

10,000

$541,000

25

$3,658,704,357

15896

Warren

CHESTERTOWN WATER
DISTRICT / Chester (T)

Well #1 - Rehab and Testing, Upgrade Ground Water Source

1,300

$15,500

25

$3,658,719,857

Road, Upgrade Pump Station

Upgrade Pump Station

New well and storage, New Ground Water Source, New Storage

Upgrade Ardsley Road Pumping Station, Upgrade Pump Station

150

CODES Legend *

ARRAF=American Recovery Reinvestment Act Financed


GIC=Green Infrastructure Components
FGP=Funded through SRF Bond Market Rate Program
CAT_G=Green Innovative Grants Program Project

Page 28 of 35

NYS Drinking Water State Revolving Fund DRAFT IUP Annual List
(Formerly Readiness List) October 1, 2012 to September 30, 2013

Project #

County

CODES See legend*

System Name/
Borrower

Description

Pop.

Project Cost Score

Cumulative
Total

15893

Jefferson

ADAMS (T) WD #1 & 2


(ADAMS CENTER) / Adams
Center (T)

Upgrade Storage

1,000

$121,954

25

$3,658,841,811

15805

Warren

WARRENSBURG WATER
DISTRICT / Warrensburg (T)

Upgrade Ground Water Source

3,600

$375,000

25

$3,659,216,811

17965

Oswego

RICHLAND TOWN PWS /


Richland (T)

Wind power generation at Schoeller well site.,

2,350

$585,000

25

$3,659,801,811

ARRAF GIC

CAT_G

16481

Jefferson

VILLAGE OF CLAYTON /
Clayton (V)

New Transmission, New Distribution System

2,160

$214,000

25

$3,660,015,811

17939

Herkimer

OLD FORGE (V) WATER


DISTRICT / Webb (T)

Upgrade Distribution System, Extend Distribution System

1,766

$561,350

25

$3,660,577,161

15268

Madison

EARLVILLE VILLAGE /
Earlville (V)

East Main Street., Upgrade Distribution System

790

$96,509

25

$3,660,673,670

17961

Jefferson

LAFARGEVILLE (T.
ORLEANS) / Orleans (T)

Installation of water meters.,

750

$208,078

25

$3,660,881,748

Upgrade Water Treatment Plant

$1,459,374

20

$3,662,341,122

851

$572,474

20

$3,662,913,596

400

$443,500

20

$3,663,357,096

ARRAF GIC

CAT_G

16167

Erie

GRAND ISLAND (T) / Grand


Island (T)

15951

Orange

New Water Treatment Plant, New Ground Water Source, New


VALLEY VIEW CTR FOR
NURSING CARE & REHAB / Storage, Upgrade Distribution System
Orange County

15538

Tompkins

LANSING WD #2 / Lansing
(T)

New Storage, New Pump Station, Upgrade Distribution System

17785

Nassau

LONG ISLAND AMERICAN


WATER CORP / Long Island
American Water

Plant No. 8 Iron Removal, New Water Treatment Plant

230,300

$7,100,000

20

$3,670,457,096

17840

Westchester

WESTCHESTER JOINT
WATER WORKS / WJWW

York Road Transmission Main, Upgrade Transmission

65,000

$630,000

20

$3,671,087,096

17839

Westchester

WESTCHESTER JOINT
WATER WORKS / WJWW

Flagler Drive Transmission Main, Upgrade Transmission

55,210

$840,000

20

$3,671,927,096

17816

Orange

NEW WINDSOR
CONSOLIDATED WD / New
Winsor (T)

Reactivation of St. Anne's Well, Upgrade Ground Water Source

30,000

$748,000

20

$3,672,675,096

17977

Orange

NEW WINDSOR
CONSOLIDATED WD / New
Windsor (T)

Rehabilitate St. Anne Well Field, Upgrade Water Treatment Plant,


Upgrade Ground Water Source

30,000

$748,000

20

$3,673,423,096

17264

Niagara

LEWISTON WATER
IMPROVEMENTAREA /
Lewiston (T)

Upgrade Transmission, Upgrade Distribution System

16,257

$5,000,000

20

$3,678,423,096

15281

Nassau

ALBERTSON WD / North
Hempstead (T)

Well #4 Replacement of Screen and Well Pump, Upgrade Ground


Water Source

13,500

$188,044

20

$3,678,611,140

15175

Orange

WOODBURY CONS. W.D. /


Woodbury (T)

New Ground Water Source, New Pump Station

10,105

$291,500

20

$3,678,902,640

16053

Niagara

CAMBRIA WATER DISTRICT New Storage, New Pump Station, Upgrade Distribution System
/ Cambria (T)

5,393

$1,000,000

20

$3,679,902,640

16041

Ontario

GORHAM TOWN WD /
Gorham (T)

4,500

$141,280

20

$3,680,043,920

New Pump Station, Upgrade Distribution System

18,000

CODES Legend *

ARRAF=American Recovery Reinvestment Act Financed


GIC=Green Infrastructure Components
FGP=Funded through SRF Bond Market Rate Program
CAT_G=Green Innovative Grants Program Project

Page 29 of 35

Project #

NYS Drinking Water State Revolving Fund DRAFT IUP Annual List
(Formerly Readiness List) October 1, 2012 to September 30, 2013
County

CODES See legend*

System Name/
Borrower

Description

Pop.

Project Cost Score

Cumulative
Total

17772

Saratoga

BURNT HILLS-BALLSTON LK New Pump Station, Extend Distribution System


WD (GLENVILLE) / Ballston
(T)

4,500

$606,052

20

$3,680,649,972

17400

Orange

HIGHLAND FALLS VILLAGE / Water Treatment Plant Filter Upgrades, Upgrade Water Treatment
Plant
Highland Falls (V)

4,400

$800,000

20

$3,681,449,972

18041

Putnam

COLD SPRING VILLAGE /


Cold Spring (V)

2,666

$958,000

20

$3,682,407,972

17920

Oneida

WESTMORELAND WD NO 1 New Ground Water Source, Upgrade Storage


(GU) / Westmoreland (T)

600

$2,850,000

20

$3,685,257,972

18073

Tompkins

WEST DANBY WD /
Danbury(T)

New Storage

265

$384,600

20

$3,685,642,572

17565

Orange

BRITTANY TERRACE /
Brittany Terrace, Inc.

New water storage tank, New Storage

169

$215,000

20

$3,685,857,572

18000

Dutchess

BEACON CITY / Beacon (C)

Upgrade Distribution System

19,000

$972,907

20

$3,686,830,479

18001

Dutchess

BEACON CITY / Beacon (C)

Upgrade Distribution System

19,000

$509,737

20

$3,687,340,216

17583

Nassau

OYSTER BAY WD / Oyster


Bay (T)

VOC removal at Plant #2., New Water Treatment Plant

8,700

$1,597,530

20

$3,688,937,746

15755

Albany

RAVENA VILLAGE / Ravena


(V)

New Storage

4,500

$497,500

20

$3,689,435,246

15832

Wayne

PALMYRA VILLAGE /
Palmyra (V)

Upgrade Surface Water Source

3,550

$291,050

20

$3,689,726,296

15914

Wayne

PALMYRA VILLAGE /
Palmyra (V)

Upgrade Transmission

3,550

$1,581,250

20

$3,691,307,546

15918

Wayne

PALMYRA VILLAGE /
Palmyra (V)

Upgrade Storage

3,550

$189,750

20

$3,691,497,296

15045

Oneida

CLINTON VILLAGE / Clinton


(V)

Upgrade Distribution System

3,000

$822,000

20

$3,692,319,296

15691

Greene

SLEEPY HOLLOW LAKE


WATER CO. / Sleepy Hollow
Lake Assoc.

Upgrade Surface Water Source, Upgrade Storage

2,000

$1,144,330

20

$3,693,463,626

17383

Genesee

OAKFIELD VILLAGE /
Oakfield (T)

Upgrade Transmission

1,805

$1,661,600

20

$3,695,125,226

16885

Ontario

WEST BLOOMFIELD WD /
West Bloomfield (T)

Cathodic protection system., Upgrade Storage

1,500

$13,390

20

$3,695,138,616

17802

Jefferson

MADISON BARRACKS
WATER SYSTEM / Sackets
Harbor (V)

Upgrade Distribution System

1,000

$1,700,000

20

$3,696,838,616

16758

Erie

W. SENECA WD#3 / West


Seneca (T)

Orchard Park Road Watermain, Upgrade Distribution System

520

$460,000

20

$3,697,298,616

17419

Dutchess

WAPPINGERS FALLS
VILLAGE / Wappinger Falls
(V)

Upgrade Storage, New Storage, Upgrade Distribution System

6,000

$6,238,532

20

$3,703,537,148

Upgrade Transmission

CODES Legend *

ARRAF=American Recovery Reinvestment Act Financed


GIC=Green Infrastructure Components
FGP=Funded through SRF Bond Market Rate Program
CAT_G=Green Innovative Grants Program Project

Page 30 of 35

NYS Drinking Water State Revolving Fund DRAFT IUP Annual List
(Formerly Readiness List) October 1, 2012 to September 30, 2013

Project #

County

CODES See legend*

System Name/
Borrower

Description

Pop.

Project Cost Score

Cumulative
Total

17325

Onondaga

MINOA VILLAGE / Minoa (V)

Upgrade Distribution System

3,745

$307,336

20

$3,703,844,484

15897

Warren

CHESTERTOWN WATER
DISTRICT / Chester (T)

Upgrade Distribution System

1,300

$42,200

20

$3,703,886,684

17970

Sullivan

Installation of water meters.,


WURTSBORO VILLAGE
WATER SUPPLY / Wurtsboro
(V)

1,060

$201,438

20

$3,704,088,122

ARRAF GIC

17966

Rensselaer

ARRAF GIC

17968

CAT_G

675

$75,000

20

$3,704,163,122

SHARON SPRINGS VILLAGE Installation of water meters.,


/ Sharon Springs (V)

547

$203,148

20

$3,704,366,270

CAT_G

Schoharie

ARRAF GIC

Installation of water meters.,

SCHAGHTICOKE (V) PWS /


Schaghticoke (V)

CAT_G

15312

Westchester

CROTON FALLS WATER


DISTRICT / North Salem (T)

Upgrade Distribution System

175

$121,339

20

$3,704,487,609

16494

Clinton

CHAMPLAIN (T) / Champlain System Acquisition-"Benefit Area #1", New Ground Water Source,
New Distribution System
(T)

50

$497,200

20

$3,704,984,809

15136

Saratoga

CLIFTON PARK WATER


AUTHORITY / Clifton Park
Water Authority

New Water Treatment Plant

29,000

$1,005,713

15

$3,705,990,522

15469

Erie

WILLIAMSVILLE (V) /
Williamsville (V)

Los Robles Street water reconstruction project., Upgrade Distribution


System

6,017

$408,447

15

$3,706,398,969

15556

Tompkins

LANSING WD #2 / Lansing
(T)

Extend Distribution System

400

$117,300

15

$3,706,516,269

17786

Nassau

LONG ISLAND AMERICAN


WATER CORP / Long Island
American Water

Water main replacements, Upgrade Distribution System

230,300

$10,900,000

15

$3,717,416,269

18048

Westchester

YONKERS CITY / Yonkers (C) Upgrade Distribution System

196,086

$7,279,450

15

$3,724,695,719

17774

Westchester

Shaft 22 Chlorination Facility Security Improvements, Upgrade Water


WESTCHESTER COUNTY
WD #1 / Westchester County Treatment Plant
#1

187,004

$1,000,000

15

$3,725,695,719

17351

Suffolk

SOUTH HUNTINGTON WD / Rehabilitation of Plant No. 4, Upgrade Water Treatment Plant


Huntington (T)

81,760

$1,551,077

15

$3,727,246,796

17365

Suffolk

SOUTH HUNTINGTON WD / Contruction of Plant 20, New Water Treatment Plant


Huntington (T)

81,760

$3,270,250

15

$3,730,517,046

17890

Suffolk

SOUTH HUNTINGTON WD / Plant 14 Standpipe Rehabilitation, Upgrade Storage


Huntington (T)

81,760

$1,905,500

15

$3,732,422,546

17837

Westchester

WESTCHESTER JOINT
WATER WORKS / WJWW

Anderson Hill Road Booster Pump Station, New Pump Station

65,000

$400,000

15

$3,732,822,546

17838

Westchester

WESTCHESTER JOINT
WATER WORKS / WJWW

Rye Lake generator, Upgrade Water Treatment Plant

55,210

$475,000

15

$3,733,297,546

16421

Nassau

MASSAPEQUA WD / Oyster
Bay (T)

Well No 3 Replacement of Screen and Well Pump, Upgrade Ground


Water Source

43,000

$237,278

15

$3,733,534,824

17661

Nassau

MANHASSET LAKEVILLE
WD / Manhasset-Lakeville
WD

Thomaston Tank Rehabilitation, Upgrade Storage

43,000

$3,630,750

15

$3,737,165,574

CODES Legend *

ARRAF=American Recovery Reinvestment Act Financed


GIC=Green Infrastructure Components
FGP=Funded through SRF Bond Market Rate Program
CAT_G=Green Innovative Grants Program Project

Page 31 of 35

Project #

NYS Drinking Water State Revolving Fund DRAFT IUP Annual List
(Formerly Readiness List) October 1, 2012 to September 30, 2013
County

CODES See legend*

System Name/
Borrower

15452

Nassau

PORT WASHINGTON WD /
Port Washington Water
District

15371

Nassau

15377

Description
Upgrade Storage

Pop.

Project Cost Score

Cumulative
Total

34,000

$2,781,000

15

$3,739,946,574

Construction of a replacement well for well no. 10, Upgrade Ground


WA OF GREAT NECK
NORTH / Water Auth. of Great Water Source
Neck No.

31,400

$301,200

15

$3,740,247,774

Nassau

Water Mill Lane, New Storage, New Pump Station


WA OF GREAT NECK
NORTH / Water Auth. of Great
Neck No.

31,400

$2,567,000

15

$3,742,814,774

15381

Nassau

Transmission main from the Weybridge Road tank to Oxford


WA OF GREAT NECK
NORTH / Water Auth. of Great Boulevard, New Transmission
Neck No.

31,400

$431,000

15

$3,743,245,774

17913

Nassau

Replacement of Waybridge Road storage tank,


WA OF GREAT NECK
NORTH / Water Auth of Great
Neck North

31,400

$1,545,000

15

$3,744,790,774

15632

Westchester

Upgrade Storage
OSSINING WATER
DEPARTMENT / Ossining (V)

30,000

$300,000

15

$3,745,090,774

17718

Suffolk

RIVERHEAD WD / River
Head WD / Riverhead (T)

28,000

$2,060,000

15

$3,747,150,774

17698

Nassau

GARDEN CITY (V) / Village of Rehabilitation of Maria Street Tank, Upgrade Storage
Garden City

25,000

$2,575,000

15

$3,749,725,774

15313

Nassau

ROCKVILLE CENTRE (V) /


Rockville Centre (V)

Tank #4 rehabilitation, Upgrade Storage

24,700

$2,500,000

15

$3,752,225,774

15351

Nassau

ROCKVILLE CENTRE (V) /


Rockville Centre (V)

Rehab Wells 4a & 4b, Upgrade Ground Water Source

24,700

$600,000

15

$3,752,825,774

15356

Nassau

ROCKVILLE CENTRE (V) /


Rockville Centre (V)

Rehab tank #2, Upgrade Storage

24,700

$1,900,000

15

$3,754,725,774

15671

Nassau

ROSLYN WD / North
Hempstead (T)

Upgrade Ground Water Source

17,000

$83,224

15

$3,754,808,998

15676

Nassau

ROSLYN WD / North
Hempstead (T)

Roslyn Estate Pressure Zone, New Pump Station

17,000

$852,135

15

$3,755,661,133

15285

Nassau

ALBERTSON WD / North
Hempstead (T)

Wells no. 2 & 3 Replacement of screen and well pump, Upgrade


Ground Water Source

13,500

$386,686

15

$3,756,047,819

15274

Montgomery

GLEN (T) W.D.#2 / Glen (T)

Upgrade Distribution System

7,626

$95,000

15

$3,756,142,819

17344

Nassau

WILLISTON PARK (V) /


Williston Park (V)

Secondary Containment for Caustic Soda, Upgrade Other Expenses,


Upgrade Other (OT)

7,516

$161,350

15

$3,756,304,169

17829

Westchester

PLEASANTVILLE /
Pleasantville (V)

Replacement of water mains., Upgrade Distribution System

7,166

$1,955,000

15

$3,758,259,169

16038

Ontario

GORHAM TOWN WD /
Gorham (T)

Upgrade Storage

4,500

$77,500

15

$3,758,336,669

17835

Orange

MONTGOMERY (V) /
Montgomery (V)

New Storage Tank, New Storage

3,696

$825,030

15

$3,759,161,699

17916

Orange

GREENWOOD LAKE (V) /


Greenwood Lake (V)

Cleaning and painting storage tank, Upgrade Storage

3,400

$245,660

15

$3,759,407,359

Rehabiitation of Route 58 Storage Tank, Upgrade Storage

CODES Legend *

ARRAF=American Recovery Reinvestment Act Financed


GIC=Green Infrastructure Components
FGP=Funded through SRF Bond Market Rate Program
CAT_G=Green Innovative Grants Program Project

Page 32 of 35

NYS Drinking Water State Revolving Fund DRAFT IUP Annual List
(Formerly Readiness List) October 1, 2012 to September 30, 2013

Project #

County

CODES See legend*

System Name/
Borrower

Description

Pop.

Project Cost Score

Cumulative
Total

17525

Westchester

NORTH CASTLE WD #1 /
North Castle (T)

Rehabilitation of water storage tanks, Upgrade Storage

2,500

$813,500

15

$3,760,220,859

18040

Ontario

BLOOMFIELD VILLAGE /
Bloomfield (V)

Upgrade Distribution System

1,675

$1,340,697

15

$3,761,561,556

15792

Putnam

CONTINENTAL VILLAGE WD Upgrade Distribution System


/ Philipstown (T)

1,509

$1,350,000

15

$3,762,911,556

15559

Ontario

HOPEWELL WD #2 /
Hopewell (T)

New Pump Station

1,148

$435,600

15

$3,763,347,156

17843

Orange

TUXEDO PARK (V) / Tuxedo


(V)

West Lake Road Transmission Line, Upgrade Transmission

1,100

$487,000

15

$3,763,834,156

17061

Westchester

LAKE KATONAH CLUB INC / Upgrade Storage


Lake Katonah Club Inc

356

$131,910

15

$3,763,966,066

17999

Dutchess

BEACON CITY / Beacon (C)

Upgrade Pump Station

19,000

$71,379

15

$3,764,037,445

17889

Westchester

Cleaning and lining 36,800 feet of distribution main., Upgrade


MT VERNON BOARD OF
WATER SUPPLY / Mt Vernon Distribution System
B'rd Water Supply

15,000

$3,700,000

15

$3,767,737,445

17946

Westchester

MOUNT VERNON (C) / Mt


Vernon Board Water Supply

Upgrade distribution system, Upgrade Distribution System

15,000

$3,700,000

15

$3,771,437,445

16815

Erie

LANCASTER (V) / Lancaster


(V)

Upgrade Distribution System

11,940

$1,670,454

15

$3,773,107,899

15717

Rensselaer

EAST GREENBUSH
GENERAL W.D. / East
Greenbush (T)

Distribution extension, loop water main on Gilligan Road to Hays


Road, Upgrade Distribution System

10,200

$409,000

15

$3,773,516,899

17539

Rensselaer

CASTLETON VILLAGE PWS Replacement in-kind of aged water mains., Upgrade Distribution
System
/ Castleton-on-Hudson (V)

2,013

$1,661,400

15

$3,775,178,299

17527

Genesee

OAKFIELD VILLAGE /
Oakfield (V)

Upgrade Transmission, Upgrade Distribution System

1,805

$1,147,575

15

$3,776,325,874

17959

Dutchess

SHOREHAVEN CIVIC
ASSOC / DCWWA

Installation of water meters.,

300

$61,692

15

$3,776,387,566

13

$325,000

15

$3,776,712,566

$5,982,162

15

$3,782,694,728

ARRAF GIC

CAT_G

18003

Erie

New Distribution System, New Water District


CATTARAUGUS STREET
WATER DISTRICT / Concord
(T)

17198

NY City

Test Borings for City Tunnel 3 and Upstate Tunnel Sites, Phase 1
NEW YORK
CITY-CATSKILL/DELAWARE (C554), NYC & Westchester, Upgrade Transmission
SYSTEM / NYCMWFA

6,552,718

17844

Steuben

CAMPBELL WATER
DISTRICT / Campbell (T)

Extend Distribution System

280

$216,744

15

$3,782,911,472

18020

Lewis

WATER DISTRICT #1 /
Denmark (T)

Serve private contaminated/poor yielding wells., Extend Distribution


System

275

$2,603,000

15

$3,785,514,472

18077

Yates

EXT #1 TO WD #1 / Benton
(T)

Extend Distribution System

42

$800,000

15

$3,786,314,472

15328

Nassau

SOUTH FARMINGDALE WD / Caustic Soda Conversion at Plants 1, 5 & 6, Upgrade Water


Treatment Plant
South Farmingdale W.D.

44,700

$638,000

10

$3,786,952,472

CODES Legend *

ARRAF=American Recovery Reinvestment Act Financed


GIC=Green Infrastructure Components
FGP=Funded through SRF Bond Market Rate Program
CAT_G=Green Innovative Grants Program Project

Page 33 of 35

NYS Drinking Water State Revolving Fund DRAFT IUP Annual List
(Formerly Readiness List) October 1, 2012 to September 30, 2013

Project #

County

CODES See legend*

System Name/
Borrower

Description
Upgrade Ground Water Source

15642

Nassau

WILLISTON PARK (V) /


Williston Park (V)

17696

Suffolk

SUFFOLK COUNTY WATER Automated Meter Reading / Leak Detection, Upgrade Distribution
System
AUTHORITY / SCWA

16050

Westchester

17708

Pop.
7,516

Project Cost Score

Cumulative
Total

$800,000

10

$3,787,752,472

1,009,264

$7,273,000

10

$3,795,025,472

WHITE PLAINS CITY / White Previously completed water mains, Upgrade Distribution System
Plains (C)

53,077

$2,221,356

10

$3,797,246,828

Nassau

SOUTH FARMINGDALE WD / Construction of Well 1-5, New Ground Water Source


South Farmingdale Water Dist

44,700

$644,350

10

$3,797,891,178

15264

Nassau

PLAINVIEW WD / Oyster Bay New Pump Station


(T)

35,000

$4,663,248

10

$3,802,554,426

17912

Nassau

Water main replacement, Upgrade Distribution System


WA OF GREAT NECK
NORTH / Water Auth of Great
Neck North

31,400

$500,000

10

$3,803,054,426

15633

Westchester

Cement lining of water lines at various locations, Upgrade


OSSINING WATER
DEPARTMENT / Ossining (V) Distribution System

30,000

$900,000

10

$3,803,954,426

16740

Erie

ORCHARD PARK (T) /


Orchard Park (T)

2000 water system improvements., Upgrade Distribution System

28,000

$7,081,000

10

$3,811,035,426

17717

Suffolk

RIVERHEAD WD / River
Head WD / Riverhead (T)

Contruction of New Wells at Plant no. 15, New Ground Water Source

28,000

$1,973,480

10

$3,813,008,906

15357

Nassau

ROCKVILLE CENTRE (V) /


Rockville Centre (V)

SCADA - Phase I, Upgrade Water Treatment Plant

24,700

$550,000

10

$3,813,558,906

17958

Dutchess

BEACON CITY / Beacon (C)

Installation of leak detection equipment., Upgrade Other Expenses,


Upgrade Other (OT)

19,000

$233,100

10

$3,813,792,006

ARRAF GIC

CAT_G

17830

Westchester

KENSICO WATER DISTRICT Phase VI Water Main Replacement, Upgrade Distribution System
/ Mount Pleasant

17,857

$4,503,500

10

$3,818,295,506

17834

Westchester

KENSICO WATER DISTRICT Cement lining of water mains, Upgrade Distribution System
/ Mount Pleasant

17,857

$4,560,500

10

$3,822,856,006

17783

Westchester

TARRYTOWN WATER
SUPPLY / Tarrytown (V)

Water main improvements, Upgrade Distribution System

11,000

$2,549,250

10

$3,825,405,256

17784

Westchester

TARRYTOWN WATER
SUPPLY / Tarrytown (V)

Cement line existing water main, Upgrade Distribution System

11,000

$1,892,110

10

$3,827,297,366

15180

Orange

WOODBURY CONS. W.D. /


Woodbury (T)

Upgrade Distribution System

10,105

$528,000

10

$3,827,825,366

15507

Westchester

PLEASANTVILLE WATER
DISTRICT / Pleasantville (V)

Refinance '93 bonds for relining water mains, Upgrade Distribution


System

9,500

$4,155,408

10

$3,831,980,774

15514

Westchester

PLEASANTVILLE WATER
DISTRICT / Pleasantville (V)

Water Mains for Sarles Lane, Upgrade Distribution System

9,500

$343,291

10

$3,832,324,065

17817

Orange

WASHINGTONVILLE
VILLAGE / Washingtonville
(V)

Watermain replacement Patricia and Beverly Lane, Upgrade


Distribution System

7,000

$961,000

10

$3,833,285,065

17818

Orange

WASHINGTONVILLE
VILLAGE / Washingtonville
(V)

Replace watermains in Dutch Arms area., Upgrade Distribution


System

7,000

$1,654,700

10

$3,834,939,765

CODES Legend *

ARRAF=American Recovery Reinvestment Act Financed


GIC=Green Infrastructure Components
FGP=Funded through SRF Bond Market Rate Program
CAT_G=Green Innovative Grants Program Project

Page 34 of 35

NYS Drinking Water State Revolving Fund DRAFT IUP Annual List
(Formerly Readiness List) October 1, 2012 to September 30, 2013

Project #

County

CODES See legend*

System Name/
Borrower

Description

17775

Westchester

Lateral Main Rehabilitation, Upgrade Distribution System


WESTCHESTER COUNTY
WD #3 / Westchester County
#3

15131

Livingston

LIVONIA VILLAGE / Livonia


(V)

17907

Nassau

17985

Pop.

Project Cost Score

Cumulative
Total

6,000

$670,000

10

$3,835,609,765

Upgrade Distribution System

1,360

$1,105,325

10

$3,836,715,090

VILLAGE OF PLANDOME /
Plandome (V)

Replace aged mains in distribution system, Upgrade Distribution


System

1,350

$5,113,950

10

$3,841,829,040

Westchester

BEAR RIDGE LAKE WATER


DISTRICT / Mount Pleasant
(T)

Water main replacement-Highland Place, Mountain Trail and


Woodland Road, Upgrade Distribution System

170

$1,436,085

10

$3,843,265,125

16540

Dutchess

Upgrade Distribution System


CHARLOTTE GROVE
MOBILE HOME CT / Charlette
Grove MH Court

112

$302,820

10

$3,843,567,945

17993

Suffolk

WEST NECK WATER


SUPPLY / Shelter Island (T)

100

$669,093

10

$3,844,237,038

16178

Erie

Ransom Road waterline improvements., Upgrade Distribution


GRAND ISLAND TOWN
WATER DEPT. / Grand Island System
(T)

19,500

$111,453

$3,844,348,491

16182

Erie

Bush Road waterline improvements., Upgrade Distribution System


GRAND ISLAND TOWN
WATER DEPT. / Grand Island
(T)

19,500

$228,113

$3,844,576,604

15963

Orange

CORNWALL-ON-HUDSON /
Cornwall-On-Hudson (V)

Upgrade Distribution System

9,300

$520,000

$3,845,096,604

17854

Putnam

SOUTHEAST (T)
PEACEABLE WATER
DISTRICT / Southeast (T)

Development new water source instead of continuing to purchase


from Brewster (V), New Ground Water Source

440

$1,700,000

$3,846,796,604

17853

Onondaga

OCWA / Onondaga County


Water Authorit

Roof and siding improvements for Water System Maintenance and


Operations Facility., Upgrade Other Expenses, Upgrade Other (OT)

256,000

$1,620,000

$3,848,416,604

17781

Rensselaer

WATER DISTRICT 15 / North Extend Distribution System


Greenbush (T)

4,000

$9,785,000

$3,858,201,604

18068

Orleans

WATER IMPROVEMENT
BENEFIT AREA #10 /
Clarendon (T)

Extend Distribution System

250

$1,634,949

$3,859,836,553

18078

Genesee

WD #2 / Alexander (T)

Extend Distribution System

165

$1,747,910

$3,861,584,463

Water main replacement, Upgrade Distribution System

Total # Projects
694

Total Cost
$3,861,584,463

CODES Legend *

ARRAF=American Recovery Reinvestment Act Financed


GIC=Green Infrastructure Components
FGP=Funded through SRF Bond Market Rate Program
CAT_G=Green Innovative Grants Program Project

Page 35 of 35

CATEGORY A LIST SMALL SYSTEMS

LESS THAN 10,000 PEOPLE

NYS Drinking Water State Revolving Fund DRAFT IUP Category A List ( Small Systems Serving < 10,000 People )
October 1, 2012 to September 30, 2013
Project County
17473

17321

17456

17611

17388

15881

17561

17461

15072

17647

15343

17928

18005

15603

15204

17543

17576

16692

16261

Jefferson

Jefferson

Hamilton

Franklin

Essex

Essex

Chautauqua

Orange

Orange

Saratoga

Otsego

Wyoming

Wayne

Jefferson

Oswego

Saratoga

Chautauqua

Herkimer

Oswego

System Name/
Borrower

Description

Pop.

LAFAVE ROAD WATER


DISTRICT / Le Ray (T)

Consolidation of existing public water systems with GUDI wells,


coliform and lead violations., New Distribution System, New System
Consolidation

600

WESTCOTTS WATER
DISTRICT / Hounsfield (T)

Westcotts WD to serve along NYS Route 3. Consolidation of PWS


systems addressing SWTR & E-Coli violations. , Upgrade Storage,
New Distribution System, New System Consolidation

300

INDIAN LAKE WD / Indian


Lake (T)

New Surface Water Treatment Rule Compliance Facility, Upgrade


Water Treatment Plant, New Ground Water Source, Upgrade
Distribution System

900

SARANAC LAKE V / Saranac


Lake (V)

New SCADA equipment., New Surface Water Treatment Rule


Compliance Facility, Upgrade Distribution System

PORT KENT WD /
Chesterfield (T)

New Surface Water Treatment Rule Compliance Facility, New Ground


Water Source, New Storage

WADHAMS WD / Westport
(T)

New Surface Water Treatment Rule Compliance Facility, New


Inter-Connection, New System Consolidation

FORESTVILLE VILLAGE /
Forestville (V)

New Surface Water Treatment Rule Compliance Facility, New Ground


Water Source, Upgrade Distribution System

PHEASANT HILL / Pheasant


Hill Water Corp

Rehabilitation of water system to address e-coli contamination,


Upgrade Water Treatment Plant, New Ground Water Source, New
Storage

154

BEAVER DAM LAKE WATER


CORP. / Beaver Dam Lake
Corp.

New Surface Water Treatment Rule Compliance Facility, New Ground


Water Source, New Storage, Upgrade Distribution System

487

STILLWATER VILLAGE /
Stillwater (V)

Alternative Water Source for Surface Water Treatment Rule


compliance., New Transmission, New Inter-Connection

UNADILLA VILLAGE /
Unadilla (V)

Install new well, pumphouse, controls, chlorination system to replace


GWUDI springs, New Surface Water Treatment Rule Compliance
Facility, New Ground Water Source, Upgrade Pump Station, Upgrade
Distribution System

1,350

CASTILE VILLAGE / Castile


(V)

Upgrade Water Treatment Plant, Upgrade Ground Water Source,


Upgrade Storage

1,135

SAVANNAH WD #1 /
Savannah (T)

New Surface Water Treatment Rule Compliance Facility, New


Storage, Upgrade Distribution System, Extend Distribution System

WATER DISTRICT NO. 5 /


Hounsfield (T)

Extend distribution system to area of insufficient yielding or


cantaminated private wells. Consolidate Watertown International
Airport., New Distribution System, New System Consolidation

HANNIBAL (T) / Hannibal (T)

Extend system to serve area with private contaminated wells,


consolidate public water supply. , Extend Distribution System, New
System Consolidation

1,200

MOREAU WD
7/CONNECTION TO SCWA /
Moreau (T)

Consolidate 3 small CWSs, consolidate WD 1, connect Town with


SCWA, New Storage, Extend Distribution System, New
Inter-Connection, Extend System Consolidation, New Water District

1,100

CHERRY CREEK VILLAGE /


Cherry Creek (V)

New Surface Water Treatment Rule Compliance Facility, Upgrade


Distribution System

VAN HORNESVILLE WATER


WORKS / Stark (T)

VanHornesville Water System, New Surface Water Treatment Rule


Compliance Facility, New Storage, Upgrade Distribution System

$0

Cumulative

Total

$0

NOTE: Short - Term Loan Closed, Project Cost Shown is


Remaining Balance Not Funded With Short Term Loan

$0

$0

NOTE: Short - Term Loan Closed, Project Cost Shown is


Remaining Balance Not Funded With Short Term Loan

$0

$0

NOTE: Short - Term Loan Closed, Project Cost Shown is


Remaining Balance Not Funded With Short Term Loan

5,800

$0

$0

NOTE: Short - Term Loan Closed, Project Cost Shown is


Remaining Balance Not Funded With Short Term Loan

202

$0

$0

NOTE: Short - Term Loan Closed, Project Cost Shown is


Remaining Balance Not Funded With Short Term Loan

140

$0

$0

NOTE: Short - Term Loan Closed, Project Cost Shown is


Remaining Balance Not Funded With Short Term Loan

804

$0

$0

NOTE: Short - Term Loan Closed, Project Cost Shown is


Remaining Balance Not Funded With Short Term Loan

$0

$0

NOTE: Short - Term Loan Closed, Project Cost Shown is


Remaining Balance Not Funded With Short Term Loan

$0

$0

NOTE: Short - Term Loan Closed, Project Cost Shown is


Remaining Balance Not Funded With Short Term Loan

1,572

$0

$0

NOTE: Short - Term Loan Closed, Project Cost Shown is


Remaining Balance Not Funded With Short Term Loan

$0

$0

NOTE: Short - Term Loan Closed, Project Cost Shown is


Remaining Balance Not Funded With Short Term Loan

$0

$0

NOTE: Short - Term Loan Closed, Project Cost Shown is


Remaining Balance Not Funded With Short Term Loan

900

$0

$0

NOTE: Short - Term Loan Closed, Project Cost Shown is


Remaining Balance Not Funded With Short Term Loan

345

$0

$0

NOTE: Short - Term Loan Closed, Project Cost Shown is


Remaining Balance Not Funded With Short Term Loan

$0

$0

NOTE: Short - Term Loan Closed, Project Cost Shown is


Remaining Balance Not Funded With Short Term Loan

$0

$0

NOTE: Short - Term Loan Closed, Project Cost Shown is


Remaining Balance Not Funded With Short Term Loan

650

$0

$0

NOTE: Short - Term Loan Closed, Project Cost Shown is


Remaining Balance Not Funded With Short Term Loan

New Surface Water Treatment Rule Compliance Facility, New


TOAD
HARBOR/CONSTANTIA WD / Storage, New Pump Station, New Distribution System, New
Inter-Connection, New System Consolidation
Constantia (T)

Page 1 of 28

Project Cost Score

372

$0

$0

NOTE: Short - Term Loan Closed, Project Cost Shown is


Remaining Balance Not Funded With Short Term Loan

2,765

$0

NOTE: Short - Term Loan Closed, Project Cost Shown is


Remaining Balance Not Funded With Short Term Loan

$0

NYS Drinking Water State Revolving Fund DRAFT IUP Category A List ( Small Systems Serving < 10,000 People )
October 1, 2012 to September 30, 2013
Project County
17538

17372

17306

17382

17457

16882

17140

Oswego

Oswego

Jefferson

Allegany

Erie

Onondaga

St.Lawrence

System Name/
Borrower

Description

Pop.

WATER DISTRICT #2 /
Richland (T)

New Surface Water Treatment Rule Compliance Facility, New Ground


Water Source, New Transmission, New Storage, New Distribution
System

1,662

MEXICO (T) WD#2 / Mexico


(T)

Extend distribution system to area with contaminated private wells


and consolidate PWS with GWUDI source, New Distribution System,
New System Consolidation

800

WATER DISTRICT #2 /
Henderson (T)

New Surface Water Treatment Rule Compliance Facility, New


Distribution System, New System Consolidation

352

HOUGHTON WATER
DISTRICT / Caneadea (T)

Upgrade Water Treatment Plant, New Ground Water Source, New


Transmission, Upgrade Distribution System

CHAFFEE WATER CO /
Chaffee Water Co.

New Surface Water Treatment Rule Compliance Facility, New Ground


Water Source, New Storage

LIMELEDGE WD / Marcellus
(T) & (V)

New Water District to serve area with insufficient private wells.


Interconnection with GWUDI system., New Surface Water Treatment
Rule Compliance Facility, Extend Distribution System

LOUISVILLE WATER
DISTRICT #2 / Louisville (T)

New Storage, Upgrade Distribution System, System Consolidation

Project Cost Score


$0

Cumulative

Total

$0

NOTE: Short - Term Loan Closed, Project Cost Shown is


Remaining Balance Not Funded With Short Term Loan

$0

$0

NOTE: Short - Term Loan Closed, Project Cost Shown is


Remaining Balance Not Funded With Short Term Loan

$0

$0

NOTE: Short - Term Loan Closed, Project Cost Shown is


Remaining Balance Not Funded With Short Term Loan

2,000

$0

$0

NOTE: Short - Term Loan Closed, Project Cost Shown is


Remaining Balance Not Funded With Short Term Loan

200

$0

$0

NOTE: Short - Term Loan Closed, Project Cost Shown is


Remaining Balance Not Funded With Short Term Loan

700

$0

$0

NOTE: Short - Term Loan Closed, Project Cost Shown is


Remaining Balance Not Funded With Short Term Loan

1,000

$0

$0

NOTE: Short - Term Loan Closed, Project Cost Shown is


Remaining Balance Not Funded With Short Term Loan

17163

Essex

TICONDEROGA WD /
Ticonderoga (T)

New Surface Water Treatment Rule Compliance Facility, New


Storage, Upgrade Distribution System

5,000

$13,954,315

$13,954,315

18061

Franklin

TUPPER LAKE V / Tupper


Lake (V)

New wells to replace SW source and inadequate DE plant., New


Ground Water Source, Upgrade Distribution System

5,500

$2,979,790

$16,934,105

16746

Allegany

CANASERAGA VILLAGE
PUBLIC WATER /
Canaseraga (V)

New Ground Water Source, Upgrade Storage

900

$3,666,749

$20,600,854

15003

Ulster

ELLENVILLE (VILLAGE)
WATER DIS / Ellenville (V)

Water system improvements, Upgrade Surface Water Treatment


Rule Compliance Facility, Upgrade Storage, Upgrade Distribution
System

4,323

$7,136,870

$27,737,724

17425

Chenango

SO. NEW BERLIN WATER


DISTRICT / New Berlin (T)

New Ground Water Source, New Transmission, New Storage,


Upgrade Distribution System, System Consolidation

400

$3,272,000

$31,009,724

17427

Albany

NEW SALEM WATER


DISTRICT / New Scotland (T)

New Surface Water Treatment Rule Compliance Facility, New


Storage, New Pump Station, New Inter-Connection, New Water
District

486

$3,048,000

$34,057,724

17442

Erie

BRANDT (T), NORTH


COLLINS (T)&(V) / North
Collins (V)

WTP improvements for lead and copper violations, Fe violations,


Asbestos Main replacement, inadequate pressures, Upgrade Water
Treatment Plant, Upgrade Transmission, Upgrade Distribution
System, New System Consolidation

1,915

$5,430,000

$39,487,724

17379

Steuben

New Ground Water Source, Extend Distribution System, New System


COOPERS PLAINS/LONG
ACRES WATER SYST / Erwin Consolidation
(T)

1,400

$0

$39,487,724

17552

Herkimer

NEWPORT VILLAGE /
Newport (V)

New Surface Water Treatment Rule Compliance Facility, New Ground


Water Source, Upgrade Transmission, New Storage, Upgrade
Distribution System

740

$2,175,000

$41,662,724

16278

Hamilton

LONG LAKE (T) / Long Lake


(T)

New Ground Water Source, New Storage, Upgrade Distribution


System

750

$3,929,255

$45,591,979

18013

Cattaraugus

RANDOLPH VILLAGE /
Randolph (T)

East Randolph and Randolph (V)'s project includes meters, Upgrade


Other Expenses, New Surface Water Treatment Rule Compliance
Facility, New Ground Water Source, New System Consolidation,
Upgrade Other (OT)

1,250

$3,740,000

$49,331,979

Consolidation of PWS with GWDI source., New Storage, New


Distribution System, New System Consolidation

2,503

$13,988,000

$63,319,979

15% Minimum Requirement

17625

Oswego

EASTERN SHORE WATER


SYSTEM / Sandy Creek (T)

Page 2 of 28

NYS Drinking Water State Revolving Fund DRAFT IUP Category A List ( Small Systems Serving < 10,000 People )
October 1, 2012 to September 30, 2013
Project County

System Name/
Borrower

Description

Pop.

Project Cost Score

Cumulative

Total

17637

Chautauqua

NORTH END WD / Pomfret


(T)

Extend distribution system to area with contaminated private wells


and consolidate PWS with Coliform, New Distribution System

900

$4,432,100

$67,752,079

15996

Delaware

FRANKLIN VILLAGE /
Franklin (V)

New Water Treatment Plant, New Ground Water Source, New


Storage, Extend Distribution System, Upgrade Distribution System

481

$2,301,077

$70,053,156

16114

Cayuga

CAYUGA VILLAGE / Cayuga


(V)

New Surface Water Treatment Rule Compliance Facility, Upgrade


Distribution System, New Inter-Connection

600

$6,875,100

$76,928,256

17331

Rensselaer

POESTENKILL (T) WD #1 /
Poestenkill (T)

New Complete System (New System), New System Consolidation

2,300

$0

$76,928,256

17589

Cattaraugus

New Surface Water Treatment Rule Compliance Facility, Upgrade


CRYSTAL WATER CO
(WEST VALLEY) / Ashford (T) Ground Water Source

880

$3,208,500

$80,136,756

18017

Allegany

RICHBURG VILLAGE
PUBLIC WATER / Richburg
(V)

(V) Richburg & (V) Bolivar Consolidation., New Surface Water


Treatment Rule Compliance Facility, New Ground Water Source,
Upgrade Storage, Upgrade Distribution System, New System
Consolidation

600

$7,038,640

$87,175,396

16510

Schenectady

DELANSON VILLAGE
WATER WORKS / Delanson
(V)

Upper resevoir raw water transmission main, new intake, new


controls & meters at filter plant., New Transmission, Extend
Distribution System, Upgrade Distribution System

428

$4,594,000

$91,769,396

17562

Jefferson

HERRINGS VILLAGE /
Herrings (V)

Distribution and storage improvements., Upgrade Storage, Upgrade


Distribution System

120

$3,429,000

$95,198,396

17629

Essex

ESSEX WD / Essex (T)

Address turbidity and organic violations, New Ground Water Source,


Upgrade Distribution System

300

$1,515,954

$96,714,350

17621

Allegany

ANGELICA VILLAGE PUBLIC


WATER / Angelica (V)

Surface Water Treatment Rule Compliance Facility

950

$1,061,847

$97,776,197

16618

Dutchess

SHOREHAVEN CIVIC
ASSOC / DCWWA

DCWWA ZONE J SHOREHAVEN WATER SYSTEM, Upgrade Water


Treatment Plant, Upgrade Ground Water Source, Upgrade
Distribution System

300

$3,575,000

$101,351,197

17623

Saratoga

CORINTH VILLAGE / Village


of Corinth

New Surface Water Treatment Rule Compliance Facility, Upgrade


Distribution System

4,700

$6,200,000

$107,551,197

17931

Cayuga

PORT BYRON VILLAGE /


Port Byron (V)

Joint project with (V) Port Byron, (T) Montezuma & (T) Mentz.,
Upgrade Distribution System, Extend Distribution System, New
System Consolidation

1,400

$5,657,000

$113,208,197

17454

St.Lawrence

EAST LOUISVILLE WD#3 /


Louisville (T)

Consolidation of water systems with past coliform detections., New


Storage, New Distribution System, New System Consolidation

1,030

$9,275,000

$122,483,197

18060

Orange

HIGHLANDS WATER
DISTRCIT 2 EXTENTION /
Highlands (T)

Extention of the existing WD #2 to serve private wells with


contamination and consolidation of several PWS's, Extend
Distribution System, Extend System Consolidation

1,379

$1,601,238

$124,084,435

17469

Montgomery

FORT PLAIN (V) WATER


WORKS / Fort Plain (V)

Upgrade Water Treatment Plant, Upgrade Ground Water Source,


Upgrade Storage, Upgrade Distribution System

2,400

$1,565,600

$125,650,035

17513

Essex

WINEBROOK HILLS WD /
Newcomb (T)

New Ground Water Source, Upgrade Distribution System

250

$5,302,728

$130,952,763

17622

Chautauqua

BROCTON VILLAGE /
Brocton (V)

Address turbidity violations, Surface Water Treatment Rule


Compliance Facility, Upgrade Water Treatment Plant

4,000

$3,295,000

$134,247,763

15749

Rensselaer

RENSSELAER CITY PWS /


Rensselaer (C)

New Storage, New Distribution System, System Consolidation

7,500

$7,175,300

$141,423,063

Page 3 of 28

NYS Drinking Water State Revolving Fund DRAFT IUP Category A List ( Small Systems Serving < 10,000 People )
October 1, 2012 to September 30, 2013
Project County
18029

17444

Rensselaer

Greene

System Name/
Borrower

Description

Pop.

HOOSICK FALLS (V) PWS /


Hoosick Falls (V)

Phase 2 of Project 15080 , Upgrade Storage, Upgrade Distribution


System

4,000

COXSACKIE VILLAGE /
Coxsackie (V)

Phase 2 of 15702, Upgrade Water Treatment Plant, Upgrade Water


Treatment Plant

Project Cost Score


$0

3225

Cumulative
Total
$141,423,063

NOTE: Short - Term Loan Closed, Project Cost Shown is


Remaining Balance Not Funded With Short Term Loan

4,010

$0

3175

$141,423,063

NOTE: Short - Term Loan Closed, Project Cost Shown is


Remaining Balance Not Funded With Short Term Loan

17866

Delaware

GRAND GORGE WATER


DISTRICT / Town of Roxbury

Phase 3 of 15624 (Phase 2 was 17228): Treat or Replace GWUDI


Wells, New Surface Water Treatment Rule Compliance Facility

17773

Chenango

SHERBURNE VILLAGE /
Sherburne (V)

Phase 2 of 15237. Arsenic Removal Treatment for wells funded under


first phase, Upgrade Ground Water Source

17631

Essex

WILMINGTON WD /
Wilmington (T)

Phase 2 (Juniper Hill Road) of DWSRF 15803, New Surface Water


Treatment Rule Compliance Facility, New Storage, Upgrade
Distribution System

17496

Greene

HUNTER VILLAGE / Hunter


(V)

17470

Herkimer

17649

370

$992,000

2245

$142,415,063

$1,300,000

2210

$143,715,063

980

$406,500

2175

$144,121,563

Phase 2 of #16732 - Dolan's Lake Intake and Connection of Wells 1


and 3, Upgrade Water Treatment Plant, New Ground Water Source,
New Transmission

896

$1,518,150

2165

$145,639,713

HERKIMER VILLAGE /
Herkimer (V)

Phase 2 of 16676, New Surface Water Treatment Rule Compliance


Facility

7,606

$300,000

2130

$145,939,713

Ulster

PHOENICIA WATER
DISTRICT / Shandaken (T)

Phase 2, see Project #16491 for Phase 1., New Surface Water
Treatment Rule Compliance Facility, Upgrade Ground Water Source

992

$150,000

2130

$146,089,713

18022

Cattaraugus

PERRYSBURG (V) /
Perrysburg (T)

Phase 2 (DWSRF 17192) based on cost increase to address


unresolved deficiencies in the initial project construction, New Water
Treatment Plant, Upgrade Ground Water Source, Upgrade Storage,
New Pump Station

404

$729,657

2095

$146,819,370

17449

Orange

HIGHLANDS (T) WD #2 /
Highlands (T)

Phase 2 of DWSRF 16454 to provide well source capacity for Phase


1 which included, Upgrade Water Treatment Plant, New Ground
Water Source, New Storage, Extend Distribution System

1,379

$4,748,700

2095

$151,568,070

17742

Saratoga

MECHANICVILLE CITY /
Mechanicville (C)

Phase 2 of 15284; Construct additional sludge drying bed capacity,


New Other Expenses, New Water Treatment Plant, New Other (OT)

5,100

$587,100

2090

$152,155,170

17642

Washington

GRANVILLE VILLAGE /
Granville (V)

New Surface Water Treatment Rule Compliance Facility, Upgrade


Ground Water Source, Upgrade Transmission, Upgrade Distribution
System

2,645

$0

1220

$152,155,170

8,831

16013

Westchester

BRIARCLIFF MANOR
VILLAGE / Briarcliff Manor(V)

New Surface Water Treatment Rule Compliance Facility

15862

Putnam

SPRINGHOUSE ESTATES
W.W. CORP. / Southeast (T)

New Ground Water Source, New Storage

17493

Orange

WARWICK VILLAGE /
Warwick (V)

New Surface Water Treatment Rule Compliance Facility, Upgrade


Water Treatment Plant

17337

Erie

HUNTERS CREEK MOBILE


HOME PARK / Hunters Creek
MHP

Address total coliform detections and organic exceedances, Upgrade


Water Treatment Plant, New Storage, New Pump Station, Upgrade
Distribution System

15661

Albany

RENSSELAERVILLE WD /
Rensselaerville (T)

17936

Rensselaer

17529

Jefferson

1,531

NOTE: Short - Term Loan Closed, Project Cost Shown is


Remaining Balance Not Funded With Short Term Loan

$0

225

$152,155,170

$1,700,500

200

$153,855,670

$0

190

$153,855,670

150

$175,100

185

$154,030,770

New Ground Water Source, Upgrade Storage, Upgrade Distribution


System

200

$990,242

185

$155,021,012

BRUNSWICK WATER
DISTRICT # 6 / Brunswick (T)

Distribution Modifications for Flow & Pressure Improvements to


Support Consecutive System; Emergency Generator, Upgrade Pump
Station, Upgrade Distribution System

927

$504,000

185

$155,525,012

TIBBETS POINT WATER


DISTRICT / Cape Vincent (T)

Serve area with private contaminated wells, New Surface Water


Treatment Rule Compliance Facility, New System Consolidation, New
Water District

200

$2,645,000

180

$158,170,012

Page 4 of 28

212

6,083

NYS Drinking Water State Revolving Fund DRAFT IUP Category A List ( Small Systems Serving < 10,000 People )
October 1, 2012 to September 30, 2013
Project County

System Name/
Borrower

Description

Pop.

Project Cost Score

Cumulative

Total

17392

Warren

PIONEER VILLAGE / Pioneer


Village Imp. Assoc.

Serve private contaminated wells., New Surface Water Treatment


Rule Compliance Facility, New Inter-Connection, New System
Consolidation

144

$208,575

175

$158,378,587

15557

Herkimer

POLAND VILLAGE / Poland


(V)

Surface Water Treatment Rule Compliance Facility, New Ground


Water Source, New Storage, Upgrade Distribution System

463

$246,000

165

$158,624,587

17537

Delaware

DOWNSVILLE WATER
DISTRICT / Colchester (T)

Package Filtration Plant for GWUDI Spring Source and Addition of


Corrosion Control Treatment., New Surface Water Treatment Rule
Compliance Facility, New Water Treatment Plant

500

$92,400

165

$158,716,987

16991

Chenango

OXFORD WATER DISTRICT


#1 / Oxford (T)

Surface Water Treatment Rule Compliance Facility, New


Transmission

50

$122,500

160

$158,839,487

16741

Dutchess

PAWLING VILLAGE / Pawling


(V)

New Surface Water Treatment Rule Compliance Facility, New Ground


Water Source

$1,270,000

155

$160,109,487

15097

Warren

HAGUE HOA / Hague HOA

Hague Home Owners Association, New Surface Water Treatment


Rule Compliance Facility

18

$119,190

155

$160,228,677

18072

Putnam

GIPSY TRAIL CLUB / Gipsy


Trail Club Inc

Develop additional well source capacity, New Ground Water Source,


New Pump Station

300

$430,540

150

$160,659,217

15600

Hamilton

ANTLERS OF RAQUETTE
LAKE, INC. / Antlers of

Raquette Lake Inc.

New Surface Water Source, Inter-Connection

120

$243,595

150

$160,902,812

16117

Jefferson

ALEXANDRIA TOWN WD #1
- OTTER STREET /

Alexandria (T)

Extend Distribution System, Upgrade Distribution System

60

$3,600,000

150

$164,502,812

17339

Erie

S. EAST ERIE CO.


REGIONAL WATER
PROJECT / Aurora (T)

Aurora WD19, Wales WD's2&3. Extend to serve private


contaminated wells, consolidate public water supplies, eliminate
public water supply with past coliform detections, Storage, Pump
Station, Extend Distribution System, System Consolidation

2,950

$6,400,000

150

$170,902,812

16146

Otsego

MILFORD VILLAGE / Milford


(V)

Address nitrate contamination, New Ground Water Source, Upgrade


Distribution System

510

$3,502,000

145

$174,404,812

17514

Cattaraugus

DELEVAN VILLAGE / Delevan New Surface Water Treatment Rule Compliance Facility, Upgrade
Ground Water Source, Upgrade Storage, Upgrade Distribution
(V)

1,090

$1,690,350

145

$176,095,162

2,200

$1,250,000

145

$177,345,162

1,907

System

17289

Wayne

WOLCOTT VILLAGE /
Wolcott (V)

New Water Treatment Plant, Upgrade Ground Water Source

17385

Onondaga

NORTHEAST LAFAYETTE
WD / East Syracuse (V)

Inter-connection to eliminate GWUDI source., New Transmission,


New Inter-Connection

250

$535,600

145

$177,880,762

17944

Nassau

MILL NECK ESTATES / Mill


Neck Estates Association

Transmission main to connect with Locust Valley WD and upgrade


distribution, Upgrade Distribution System, New Inter-Connection

230

$2,021,375

145

$179,902,137

17535

Saratoga

SOUTH GLENS FALLS


VILLAGE / South Glens Falls
(V)

Proposed Cartridge Filtration Plant with SCADA to treat Village


GWUDI spring sources., New Surface Water Treatment Rule
Compliance Facility, New Surface Water Treatment Rule Compliance
Facility

3,700

$1,565,000

145

$181,467,137

17455

Franklin

WATER DISTRICT #3 /
Malone (T)

Consolidate a MHP with nitrate violations, New Distribution System,


System Consolidation, New System Consolidation

300

$1,328,000

145

$182,795,137

17645

Washington

GREENWICH VILLAGE /
Greenwich (V)

New Surface Water Treatment Rule Compliance Facility, New


Storage

$0

140

$182,795,137

16339

Jefferson

WELLESLEY ISLAND
WATER CORP. / Wellesley

Island Water Corp.

New Water Treatment Plant, New Surface Water Source

$2,336,000

140

$185,131,137

Page 5 of 28

2,000

548

NYS Drinking Water State Revolving Fund DRAFT IUP Category A List ( Small Systems Serving < 10,000 People )

October 1, 2012 to September 30, 2013

Project County

System Name/
Borrower

Description

Pop.

Project Cost Score

Cumulative

Total

15220

Westchester

CROTON FALLS WATER


DISTRICT / North Salem (T)

Installation of new wells to replace existing wells, New Ground Water


Source

175

$400,000

135

$185,531,137

17560

Sullivan

THE CALLICOON WATER


COMPANY INC / Callicoon

Water Co., Inc.

New Surface Water Treatment Rule Compliance Facility, New


Storage

854

$399,485

135

$185,930,622

17619

Livingston

GENESEO VILLAGE /
LCWSA

New Surface Water Treatment Rule Compliance Facility

7,600

$813,000

135

$186,743,622

17612

Onondaga

ELBRIDGE VILLAGE /
Elbridge (V)

New UV treatment for LT2ESWTR compliance., New Surface Water


Treatment Rule Compliance Facility

1,519

$0

135

$186,743,622

16705

Madison

MADISON VILLAGE /
Madison (V)

New Ground Water Source, Upgrade Distribution System

450

$103,500

135

$186,847,122

16106

Greene

TANNERSVILLE VILLAGE /
Tannersville (V)

New Ground Water Source, Upgrade Transmission, Upgrade


Distribution System

448

$1,900,000

135

$188,747,122

15722

Orange

MONROE WD #8 (SKYVIEW
HILLS) / Monroe (T)

Extend system to serve area with private contaminated wells. ,


Upgrade Distribution System

544

$1,000,000

135

$189,747,122

17201

Jefferson

ELLISBURG (V) / Ellisburg (V) Extend system to serve area with private contaminated wells,

269

$0

135

$189,747,122

16279

Steuben

New Chlorination system., Upgrade Ground Water Source


COLONIAL COACH
ESTATES IV (MGRE) / Merlyn

Cavallaro

79

$65,900

130

$189,813,022

17618

St.Lawrence

GOUVERNEUR VILLAGE /
Gouverneur (V)

Upgrade Water Treatment Plant

4,263

$2,160,600

130

$191,973,622

17617

Orange

BLOOMING GROVE WD
#1-WORLEY HE / South
Blooming Grove (V)

Transmission main with treatment plant to connect Water District 1


and 6 to Orange and Rockland Well., New Water Treatment Plant,
New Transmission

1,500

$3,193,000

130

$195,166,622

17467

Ulster

SAUGERTIES (VILLAGE)
WATER DIS / Saugerties (V)

Upgrade water mains and appurtenances; distribution extension to


connect 15 existing homes w/ wells to PWS; upgrade raw water
reservoir., Upgrade Other Expenses, Upgrade Distribution System,
Extend Distribution System, Upgrade Other (OT)

4,100

$3,573,894

130

$198,740,516

17597

Oswego

AREA 1 WATER SYSTEM /


Schroeppel (T)

Address organic contaminant violations, New Distribution System,


New System Consolidation

3,200

$11,312,382

130

$210,052,898

17976

Otsego

SOUTHSIDE WATER
DISTRICT / Oneonta (T)

New Complete System (New System), New Water District

1,570

$8,808,000

130

$218,860,898

16912

Chenango

NO. NORWICH (T) WD #1 /


North Norwich (T)

New system to serve area with private contaminated wells,


consolidate public water supply, eliminate public water supply with
past total coliform detection. , New Distribution System

100

$920,300

130

$219,781,198

17516

St.Lawrence

OSWEGATCHIE (T) /
Oswegatchie (T)

Joint water system improvement project between (T) Oswegatchie,


(T) Lisbon and (V) Huevelton, Upgrade Ground Water Source,
Upgrade Storage, Upgrade Distribution System, New
Inter-Connection, New System Consolidation

2,100

$13,973,000

130

$233,754,198

17355

Yates

DRESDEN VILLAGE /
Dresden (V)

New Transmission, Upgrade Storage, New Inter-Connection

700

$515,000

125

$234,269,198

15669

Orange

MONROE WD #12 (MONROE Upgrade Ground Water Source, Upgrade Pump Station, Upgrade
Distribution System
HILLS ESTATES) / Monroe
(T)

120

$1,250,000

125

$235,519,198

17432

Chautauqua

CASSADAGA VILLAGE /
Cassadaga (V)

760

$5,047,000

125

$240,566,198

consolidate public water supply, eliminate public water supply with


past total coliform detection. , Extend Distribution System, New
System Consolidation

Subsidized Funding Line

Page 6 of 28

New Ground Water Source, New Storage, Upgrade Distribution


System

NYS Drinking Water State Revolving Fund DRAFT IUP Category A List ( Small Systems Serving < 10,000 People )

October 1, 2012 to September 30, 2013

Project County

System Name/
Borrower

Description

17615

St.Lawrence

NORFOLK WATER DISTRICT New Surface Water Treatment Rule Compliance Facility, New Ground
Water Source
/ Norfolk (T)

17143

Saratoga

SARATOGA GLEN HOLLOW


/ Saratoga Glen Hollow W.C.

17144

Chemung

17888

Pop.

Project Cost Score

Cumulative

Total

2,300

$1,279,000

125

$241,845,198

Extend system to serve area with private contaminated wells,


consolidate public water supply, eliminate public water supply with
past totalcoliform detection. , Extend Distribution System, New
System Consolidation

750

$1,096,804

125

$242,942,002

CHEMUNG (T) WATER


SYSTEM / Chemung (T)

Consolidate PWS with Coliform contamination, extend to private


contaminated/poor yielding wells, New Complete System (New
System), New System Consolidation

280

$5,651,000

125

$248,593,002

Tompkins

TRUMANSBURG VILLAGE /
Trumansburg (V)

New well to provide source redundancy. New transmission main to


provide adequate CT., New Ground Water Source, New
Transmission

2,300

$1,374,000

120

$249,967,002

18004

Chautauqua

WESTFIELD VILLAGE /
Westfield (V)

Address inadequate source capacity and insuffcient pressure,


Upgrade Storage, Upgrade Distribution System

3,450

$3,977,200

120

$253,944,202

17151

Erie

AURORA WATER DISTRICT


18 / Aurora (T)

Extend system to serve area with private contaminated wells,


consolidate public water supply, eliminate public water supply with
past total coliform detection. WD 18., Extend Distribution System

1,288

$15,704,100

120

$269,648,302

17594

Oswego

ROUTE 11 NORTH/FULLER
ROAD WD PHASE D /
Hastings (T)

Extend distribution system to area of insufficient yielding or


cantaminated private wells., Extend Distribution System, New
System Consolidation

1,200

$3,106,480

120

$272,754,782

16876

Dutchess

BRETTVIEW ACRES WATER New Surface Water Treatment Rule Compliance Facility
CO / Brettview Water Co. Inc.

$40,800

115

$272,795,582

17728

Onondaga

SKANEATELES VILLAGE /
Skaneateles

Install UV Disinfection for LT2 compliance., Upgrade Water


Treatment Plant

2,610

$793,100

115

$273,588,682

17071

Dutchess

BIRCH HILL MANOR /


DCWWA

DCWWA ZONE K BIRCH HILL WATER SYSTEM, Upgrade Water


Treatment Plant, New Ground Water Source

200

$575,000

115

$274,163,682

17801

Yates

WD #1 / Torrey (T)

New Distribution System

375

$3,079,875

115

$277,243,557

16811

Steuben

RIVERSIDE PARK / Carol


Naar

New chlorination system., Upgrade Ground Water Source

125

$45,735

115

$277,289,292

17986

Orange

PORT JERVIS CITY / Port


Jervis (C)

Addition of clarification, Upgrade Water Treatment Plant

9,000

$3,610,000

115

$280,899,292

16093

Tompkins

TRUMANSBURG VILLAGE /
Trumansburg (V)

New Transmission, New Storage, New Pump Station

2,300

$2,501,000

115

$283,400,292

17068

Rensselaer

SCHAGHTICOKE (V) PWS /


Schaghticoke (V)

Upgrade Water Treatment Plant, Upgrade Storage, Upgrade


Distribution System, Extend Distribution System

675

$6,585,700

115

$289,985,992

17230

Oneida

BENEFITED AREA E / Floyd


(T)

New Distribution System, New System Consolidation

115

$325,000

115

$290,310,992

18053

Schoharie

COBLESKILL / Cobleskill (T)

Howe Caverns/Route 7 Service Area Extension, Extend Distribution


System

500

$4,899,004

115

$295,209,996

17591

Ontario

Upgrade Ground Water Source


BLOOMFIELD (V) OAKMOUNT AVE / Bloomfield
(V)

750

$298,750

110

$295,508,746

17414

Greene

CATSKILL VILLAGE / Catskill


(V)

$10,270,000

110

$305,778,746

Page 7 of 28

Upgrade Water Treatment Plant, New Storage, Upgrade Distribution


System

920

8,000

NYS Drinking Water State Revolving Fund DRAFT IUP Category A List ( Small Systems Serving < 10,000 People )

October 1, 2012 to September 30, 2013

Project County

System Name/
Borrower

Description

17686

Clinton

SARANAC WD / Saranac (T)

New Surface Water Treatment Rule Compliance Facility

15301

Dutchess

TIVOLI VILLAGE WATER /


Tivoli (V)

Construct new supply well(s), upgrade treatment, new storage,


upgrade storage, upgrade distribution, Upgrade Water Treatment
Plant, New Ground Water Source, New Storage, Upgrade Pump
Station, Upgrade Distribution System

17361

Schoharie

COBLESKILL VILLAGE /
Cobleskill (V)

Upgrade Water Treatment Plant, New Storage, Upgrade Distribution


System

16446

Sullivan

WOODRIDGE VILLAGE /
Woodridge (V)

Upgrade Water Treatment Plant

17358

Rensselaer

SCHODACK WATER
DISTRICT # 3 / Schodack (T)

17588

Steuben

17978

Pop.
90

Project Cost Score

Cumulative

Total

$112,000

105

$305,890,746

1,303

$3,729,700

105

$309,620,446

4,533

$4,120,000

105

$313,740,446

902

$351,430

105

$314,091,876

Connect WD #3 (Maple Crest) to WD #1 (Clearview), Extend


Distribution System, New System Consolidation

140

$0

105

$314,091,876

CORNING MANOR WATER


DISTRICT / Corning (T)

Extend to ontaminated private wells, consolidate 5 small PWS's,


Upgrade Storage, New System Consolidation

350

$1,315,187

105

$315,407,063

Jefferson

NORTHEAST WATER
DISTRICT / Waertown (T)

New Ground Water Source, New Storage, New Distribution System

550

$6,260,705

105

$321,667,768

16169

Greene

ASHLAND WD#1 / Ashland


(T)

New Complete System (New System), New Inter-Connection

300

$2,873,620

105

$324,541,388

17338

Dutchess

DUTCHESS ESTATES INC /


Dutchess Estates Water
Company

Upgrade Ground Water Source, Upgrade Storage, Upgrade Pump


Station

500

$455,388

100

$324,996,776

18067

Otsego

GILBERTSVILLE VILLAGE /
Gilbertsville (V)

New Ground Water Source, New Storage, Upgrade Distribution


System

477

$3,865,000

100

$328,861,776

15958

Greene

PRATTSVILLE WATER
DISTRICT / Prattsville (T)

New Ground Water Source

410

$1,361,800

100

$330,223,576

17062

Wyoming

PIKE VILLAGE / Pike (V)

New Ground Water Source, Upgrade Ground Water Source, Upgrade


Transmission, Upgrade Distribution System

369

$494,596

100

$330,718,172

17021

Dutchess

ROKEBY HOMES,INC. /
DCWWA

DCWWA ZONE F PROJECT ROKEBY WATER SYSTEM , Upgrade


Water Treatment Plant, Upgrade Ground Water Source, Upgrade
Distribution System, New System Consolidation

160

$495,356

100

$331,213,528

17403

Sullivan

WOODRIDGE VILLAGE /
Woodridge (V)

New Ground Water Source

902

$450,000

100

$331,663,528

17554

Chautauqua

PORTLAND (T) WATER


DISTRICT NO. 7 / Portland
(T)

Serve 218 parcels currently on insufficient private wells on portions of


Route 5 and Walker Road. Consolidate DJ's Campground., New
System Consolidation, New Water District

333

$1,700,000

100

$333,363,528

16062

Niagara

BARKER VILLAGE / Barker


(V)

Upgrade Distribution System

577

$835,085

95

$334,198,613

17093

Otsego

HARTWICK WATER
DISTRICT / Hartwick (T) WD

New Ground Water Source, New Storage, Upgrade Distribution


System

416

$1,745,850

95

$335,944,463

16606

Delaware

DELHI VILLAGE / Delhi (V)

Upgrade Distribution System, New System Consolidation

3,833

$1,373,428

95

$337,317,891

16654

Madison

MORRISVILLE VILLAGE /
Morrisville (V)

To provide adequate pressure, Upgrade Distribution System

2,456

$1,300,000

95

$338,617,891

Page 8 of 28

NYS Drinking Water State Revolving Fund DRAFT IUP Category A List ( Small Systems Serving < 10,000 People )

October 1, 2012 to September 30, 2013

Project County

System Name/
Borrower

Description

Pop.

Project Cost Score

Cumulative

Total

17564

Oswego

BERNHARDS BAY WD /
Constantia (T)

Extend Distribution System, New System Consolidation

790

$5,890,000

95

$344,507,891

15933

Seneca

FAYETTE HAMLET WATER


DISTRICT / Fayette (T)

Extend Distribution System

400

$3,198,000

95

$347,705,891

17443

Albany

ALTAMONT VILLAGE /
Altamont (V)

New Brandle Road Wells, Disinfection, and Transmission Main, New


Ground Water Source

2,000

$1,394,550

90

$349,100,441

16613

Chautauqua

MAYVILLE VILLAGE /
Mayville (V)

Upgrade Ground Water Source, Upgrade Transmission, Upgrade


Storage, Upgrade Distribution System

1,856

$2,884,000

90

$351,984,441

17992

Cortland

MCGRAW VILLAGE /
McGraw (V)

Upgrade Distribution System

1,306

$4,222,961

90

$356,207,402

17732

Fulton

JOHNSTOWN (C) WATER


WORKS / Johnstown (C)

Replacement of Maylender finished water uncovered reservoir;


automation of water system operations, New Other Expenses, New
Storage, New Other (OT)

8,511

$3,255,000

90

$359,462,402

17870

Saratoga

SCWA STILLWATER
EXTENSION / Saratoga
County Water Authorit

Extend Transmission

2,100

$3,035,000

90

$362,497,402

17925

Schuyler

MONTOUR FALLS / Montour


Falls (V)

Upgrade Storage, Upgrade Distribution System

1,800

$5,852,501

90

$368,349,903

15451

Saratoga

STILLWATER WD #1
(STILLWATER VLG) /
Stillwater (T)

New Transmission, New Storage

1,560

$4,912,000

90

$373,261,903

17523

Orange

MONTGOMERY W.D. #1 /
Montgomery (T)

Extend WD #1 to consolidate several water supplies, New System


Consolidation

$13,500,000

90

$386,761,903

16390

Ulster

HIGHLAND WATER
DISTRICT / Lloyd (T)

New Storage, Extend Distribution System

4,000

$2,369,000

90

$389,130,903

16889

Oneida

KIRKLAND (T) ROUTE 5


WATER DISTRICT / Kirkland
(T)

New system to serve area with private contaminated wells,


consolidate public water supply. , New Complete System (New
System)

300

$1,578,872

90

$390,709,775

17428

Albany

FLAT ROCK ROAD W.D. /


New Scotland (T)

New Water District

149

$2,152,580

90

$392,862,355

17598

Oswego

AREA 3,4 & 8 WATER


SYSTEM / Schroeppel (T)

New Distribution System, New System Consolidation

1,500

$7,678,916

90

$400,541,271

16262

Broome

CONKLIN (T) W.D. / Conklin


(T)

Extend system to serve area with private contaminated wells,


consolidate public water supply. , Inter-Connection, System
Consolidation

1,000

$863,140

90

$401,404,411

15684

Greene

NEW BALTIMORE (T) / New


Baltimore (T)

Extend system to serve area with private contaminated wells,


consolidate public water supply. , Extend Distribution System, New
System Consolidation

1,300

$5,000,000

90

$406,404,411

17375

St.Lawrence

CANTON (T) E. SIDE WD /


Canton (T)

New Ground Water Source, New Storage, New Distribution System

350

$3,112,660

90

$409,517,071

18083

Hamilton

INDIAN LAKE WD#1 / Indian


Lake (T)

New Ground Water Source

150

$1,552,000

85

$411,069,071

17183

Seneca

SENECA FALLS VILLAGE /


Seneca Falls (V)

Upgrade Water Treatment Plant, Upgrade Pump Station

7,400

$2,885,000

85

$413,954,071

Page 9 of 28

605

NYS Drinking Water State Revolving Fund DRAFT IUP Category A List ( Small Systems Serving < 10,000 People )

October 1, 2012 to September 30, 2013

Project County

System Name/
Borrower

Description

Pop.

Project Cost Score

Cumulative

Total

16335

Otsego

MORRIS VILLAGE / Morris


(V)

New Water Treatment Plant, New Ground Water Source, New


Storage

642

$2,475,000

85

$416,429,071

15490

Warren

NORTH CREEK WATER


DISTRICT / Johnsburg (T)

Upgrade Water Treatment Plant, New Ground Water Source,


Upgrade Storage

1,000

$1,112,250

85

$417,541,321

17445

Rensselaer

NORTH GREENBUSH (T)


WATER DISTRICT NO. 18 /
North Greenbush (T)

Purchase existing Private Water System, Connect to Municipal Water


System , New System Consolidation, New Water District

$437,750

85

$417,979,071

16111

Dutchess

BARD COLLEGE / Bard


College

Upgrade Water Treatment Plant, New Storage

1,400

$2,100,000

85

$420,079,071

18043

Chautauqua

BARCELONNA WD /
Westfield (T)

New Town WD to aquire private water system. Other funding sources


may be required to make project viable and eligible for DWSRF,
Upgrade Distribution System, New Water District

128

$1,792,125

85

$421,871,196

17422

Herkimer

HERKIMER (T), WD #3, #4,


#5 / Herkimer (T)

Upgrade Pump Station, Upgrade Distribution System, Extend


Distribution System

320

$299,112

85

$422,170,308

16922

Herkimer

GRAHM, NEWPORT &


BROWN RD WD / Schuyler
(T)

New system to serve area with private contaminated wells. , New


Complete System (New System)

260

$1,280,000

85

$423,450,308

17448

Washington

KINGSBURY WD
(QUEENSBURY) / Kingsbury
(T)

New water district to serve residents in area of groundwater


contamination , New Distribution System, New Water District

$845,000

85

$424,295,308

17858

Oswego

WD#3 EXPANSION / Granby


(T)

Extend Distribution System

238

$8,357,978

85

$432,653,286

15531

Jefferson

TOWN OF PAMELIA RT. 3,


WATER DISTRICT / Pamelia
(T)

Extend system to serve area with private contaminated wells,


consolidate public water supply. , Extend Distribution System

96

$474,160

85

$433,127,446

15810

Steuben

VICTORY PLACE / Merlyn


Cavallaro

Upgrade Ground Water Source

11

$112,800

80

$433,240,246

17298

Putnam

BREWSTER VILLAGE /
Brewster (V)

New Ground Water Source, New Pump Station

2,000

$1,610,920

80

$434,851,166

17377

Chautauqua

SILVER CREEK VILLAGE /


Silver Creek (V)

Upgrade Distribution System

3,100

$0

80

$434,851,166

17342

Washington

CAMBRIDGE VILLAGE /
Cambridge (V)

Aquisition of existing Cambridge Water Works, New Storage,


Upgrade Distribution System

1,524

$2,500,000

80

$437,351,166

15736

Erie

COLLINS WD #3 / Collins (T)

Upgrade Transmission, New Storage, Upgrade Distribution System

760

$625,000

80

$437,976,166

18051

Montgomery

FULTONVILLE VILLAGE
PWS / Fultonville (V)

Upgrade Water Treatment Plant, Upgrade Ground Water Source,


Upgrade Distribution System

740

$1,262,150

80

$439,238,316

15704

Greene

COXSACKIE VILLAGE /
Coxsackie (V)

Upgrade Transmission, New Storage, Upgrade Distribution System

4,010

$6,210,000

80

$445,448,316

15236

Chautauqua

SHERMAN VILLAGE /
Sherman (V)

Address total Coli violations., Upgrade Distribution System

$795,000

80

$446,243,316

15325

Wayne

WOLCOTT VILLAGE /
Wolcott (V)

Upgrade Water Treatment Plant, Upgrade Surface Water Source

$3,300,000

80

$449,543,316

Page 10 of 28

212

1,300

917

2,200

NYS Drinking Water State Revolving Fund DRAFT IUP Category A List ( Small Systems Serving < 10,000 People )

October 1, 2012 to September 30, 2013

Project County

System Name/
Borrower

Description

Pop.

Project Cost Score

Cumulative

Total

17145

Oneida

TIBBITS/SNOWDEN HILL
WD / New Hartford (T)

New system to serve area with private contaminated wells. , New


Complete System (New System)

450

$2,400,000

80

$451,943,316

18002

Steuben

HAMLET OF WOODHULL
MUNICIPAL WS / Woodhull
(T)

System to serve former Village (now hamlet) with private


contaminated wells., New Ground Water Source, New Storage, New
Distribution System

483

$4,489,928

80

$456,433,244

17934

Onondaga

LAFAYETTE (T) / LaFayette


(T)

Creation of Central LaFayette Water District., New Water District

2,000

$5,700,000

80

$462,133,244

17077

Rensselaer

NORTH GREENBUSH WD
#13 / North Greenbush (T)

New system to serve area with private contaminated wells (Snyder's


Lake Area). , New System Consolidation, New Water District

1,050

$4,635,000

80

$466,768,244

17510

Oswego

NORTH AREA WD / Volney


(T)

New Distribution System, New System Consolidation

1,000

$6,604,000

80

$473,372,244

15599

Seneca

FAYETTE WATER PROJECT


/ Varick (T)

Extend Distribution System

520

$1,406,800

80

$474,779,044

17567

Steuben

URBANA WATER DISTRICT


#2 / Urbana (T)

Proposed WD #3. Extend system to serve private contaminated wells


and consolidate public water supplies., Extend Distribution System,
New System Consolidation, New Water District

33

$3,565,111

80

$478,344,155

16444

Columbia

DARROW SCHOOL / The


Darrow School

New Ground Water Source, New Storage

150

$169,950

75

$478,514,105

17949

Dutchess

HIGH MEADOWS PARK INC


/ High Meadows Co-op Corp

New Ground Water Source, Upgrade Storage

500

$44,577

75

$478,558,682

17533

Clinton

CHAMPLAIN VILLAGE /
Champlain (V)

Upgrade Water Treatment Plant, New Storage, Upgrade Distribution


System

2,947

$1,883,226

75

$480,441,908

16381

Orleans

LYNDONVILLE VILLAGE /
Lyndonville (V)

Upgrade Transmission, Upgrade Distribution System

1,418

$1,612,864

75

$482,054,772

15843

Delaware

MARGARETVILLE VILLAGE / Upgrade Storage, Upgrade Distribution System


Margaretville (V)

700

$737,900

75

$482,792,672

17076

Ulster

ELLENVILLE (VILLAGE)
WATER DIS / Ellenville (V)

Upgrade Surface Water Source

4,323

$173,600

75

$482,966,272

16273

Suffolk

DERING HARBOR CORP /


Dearing Harbor (V)

Upgrade Water Treatment Plant

250

$20,791

75

$482,987,063

15718

Orange

MONROE WD #10 - PINE


TREE ROAD / Monroe (T)

New system to serve area with private contaminated wells. , New


Transmission

50

$215,000

75

$483,202,063

17633

Steuben

SYLVAN BEACH WANETA


LAKE WATER DISTRICT /
Wayne (T)

New Complete System (New System)

921

$4,175,175

75

$487,377,238

15925

Allegany

TOWN OF WELLSVILLE /
Wellsville (T)

Extend system to serve area with private contaminated wells,


Morningside Area, Extend Distribution System

5,000

$867,106

75

$488,244,344

17229

Rensselaer

NORTH GREENBUSH WD
#14 / North Greenbush (T)

New system to serve inadequate private wells in Northeast corner of


Town , New Inter-Connection, New System Consolidation, New
Water District

3,000

$7,313,000

75

$495,557,344

16899

Oneida

FLOYD BENEFIT (T) AREA


"D" / Floyd (T)

New Complete System (New System)

900

$7,750,000

75

$503,307,344

Page 11 of 28

NYS Drinking Water State Revolving Fund DRAFT IUP Category A List ( Small Systems Serving < 10,000 People )

October 1, 2012 to September 30, 2013

Project County

System Name/
Borrower

Description

Pop.

Project Cost Score

Cumulative

Total

17979

Jefferson

WATRE DISTRICT NO. 8 /


Watertown (T)

Extend Distribution System, New System Consolidation

119

$1,929,000

75

$505,236,344

17311

Herkimer

MANION HEIGHTS WD /
German Flatts (T)

New Complete System (New System)

105

$152,000

75

$505,388,344

17098

Jefferson

WILNA WD#1 / Wilna (T)

Extend system to serve area with private contaminated wells. , New


Distribution System

85

$569,590

75

$505,957,934

17368

Orange

GOSHEN VILLAGE / Goshen


(V)

New Water Treatment Plant, New Ground Water Source, New


Transmission

$5,311,500

70

$511,269,434

16984

Westchester

KITCHAWAN WATER
DISTRICT / Yorktown (T)

correct organic exceedances., New Transmission

240

$500,000

70

$511,769,434

17042

Orange

MONROE VILLAGE / Monroe


(V)

Upgrade Distribution System

8,892

$986,000

70

$512,755,434

17082

Ontario

CLIFTON SPRINGS VILLAGE New Storage, Upgrade Distribution System


/ Clifton Springs (V)

2,190

$618,000

70

$513,373,434

17667

Tioga

NEWARK VALLEY VILLAGE / Upgrade Distribution System


Newark Valley (V)

1,253

$4,813,000

70

$518,186,434

15560

Oneida

VERNON VILLAGE (SWP) /


Vernon (V)

New Transmission, New Storage, New Distribution System, New


Inter-Connection

1,155

$5,610,300

70

$523,796,734

17948

Greene

HENSONVILLE (WINDHAM
W.D.) / Windham (T)

Upgrade Ground Water Source, New Storage, New Pump Station,


Extend Distribution System

402

$2,575,000

70

$526,371,734

17626

Ulster

NEW PALTZ (VILLAGE)


WATER DIST / New Paltz (V)

Upgrade Water Treatment Plant, New Storage, Upgrade Distribution


System

5,600

$5,675,916

70

$532,047,650

18009

Tompkins

DRYDEN VILLAGE / Dryden


(V)

New Ground Water Source, New Storage, Upgrade Distribution


System

2,000

$5,924,000

70

$537,971,650

15205

Oneida

BOONVILLE VILLAGE /
Boonville (V)

New Transmission, New Storage, Upgrade Distribution System

2,300

$801,144

70

$538,772,794

17635

Schenectady

PRINCETOWN WATER
SUPPLY / Princetown (T)

New Transmission, New Storage, New Pump Station, Extend


Distribution System

600

$360,500

70

$539,133,294

17972

Cayuga

(T) BRUTUS WATER


DISTRICT #8 / Brutus (T)

New (T) Brutus WD #8 (Cottle Road), Upgrade Distribution System,


New Water District

400

$1,920,334

70

$541,053,628

16012

Chautauqua

WESTFIELD VILLAGE /
Westfield (V)

East Main St., Upgrade Distribution System

$950,000

70

$542,003,628

18075

Madison

CLOCKVILLE WATER
DISTRICT / Lincoln (T)

New Storage, New Distribution System, New Water District

816

$7,258,100

70

$549,261,728

17571

Ulster

WEST HURLEY WATER


DISTRICT #1 (PROPOSED) /
Hurley (T)

New Complete System (New System)

450

$4,713,160

70

$553,974,888

17359

Madison

LEWIS POINT/PINE RIDGE


ROAD / Lenox (T)

New Water District

210

$1,192,230

70

$555,167,118

Page 12 of 28

5,676

3,450

NYS Drinking Water State Revolving Fund DRAFT IUP Category A List ( Small Systems Serving < 10,000 People )
October 1, 2012 to September 30, 2013
Project County

System Name/
Borrower

Description

Pop.

Project Cost Score

Cumulative

Total

16435

Oneida

DEERFIELD (T), SMITH HILL


EXT. / Deerfield (T)

Extend system to serve area with private contaminated wells,


consolidate public water supply. , Extend Distribution System

200

$638,000

70

$555,805,118

17526

Allegany

WELLSVILLE WATER
DISTRICT / Wellsville (T)

Extend Distribution System, New Water District

133

$1,192,450

70

$556,997,568

15435

Washington

FORT EDWARD WD #2 / Fort Extend Distribution System


Edward (T)

126

$650,000

70

$557,647,568

17884

Onondaga

MARCELLUS (T) / Marcellus


(T)

93

$782,000

70

$558,429,568

17186

Steuben

REXVILLE WATER DISTRICT New system to serve area with private contaminated wells. , New
Complete System (New System)
/ West Union (T)

60

$100,000

70

$558,529,568

17663

Suffolk

EAST FARMINGDALE WD /
Babylon East Farmingdale
WD

VOC Treatment at Plant No. 4, Upgrade Water Treatment Plant

7,500

$4,398,512

65

$562,928,080

16144

Orange

GOSHEN W.D. #1
(HAMBLETONIAN PARK) /
Goshen (T)

New Ground Water Source, New Storage, Upgrade Distribution


System

509

$2,605,900

65

$565,533,980

16737

Dutchess

DOVER RIDGE ESTATES /


Beekman (T)

Upgrade Ground Water Source

250

$266,500

65

$565,800,480

17504

Schoharie

CENTRAL BRIDGE WATER


DISTRICT / Central Bridge
WD

DBP Control , Upgrade Water Treatment Plant

1,061

$1,773,000

65

$567,573,480

17575

Fulton

NORTHAMPTON (T) WATER


DISTRICT / Northampton (T)

Upgrade Storage, Upgrade Distribution System

1,000

$6,303,627

65

$573,877,107

17282

Dutchess

RHINEBECK VILLAGE
WATER / Rhinebeck (V)

Upgrade Water Treatment Plant

4,300

$365,200

65

$574,242,307

16762

Cayuga

UNION SPRINGS VILLAGE /


Union Springs (V)

New Water Treatment Plant

2,000

$165,000

65

$574,407,307

15797

Essex

PORT HENRY V / Port Henry


(V)

Upgrade Transmission, Upgrade Distribution System

1,831

$511,910

65

$574,919,217

15042

Genesee

ALEXANDER VILLAGE /
Alexander (V)

New Storage

781

$880,425

65

$575,799,642

17746

Ontario

RUSHVILLE VILLAGE /
Rushville (V)

Upgrade Surface Water Treatment Rule Compliance Facility

621

$1,969,200

65

$577,768,842

17389

Onondaga

NORTHEAST LAFAYETTE
WD / East Syracuse (V)

Replace lead service lines from the watermain to the property line to
correct lead & copper exceedances., Upgrade Distribution System

250

$444,445

65

$578,213,287

17609

Chenango

NORWICH CITY / Norwich (C) New Water Treatment Plant

8,000

$8,652,000

65

$586,865,287

17766

Broome

DEPOSIT (V) WATER


DEPARTMENT / Deposit (V)

2,080

$2,006,336

65

$588,871,623

17417

Delaware

ARKVILLE WATER DISTRICT Extend distribution, 100,000 gallons of storage, 100 gpm well, system
consolidation., New Ground Water Source, New Storage, Extend
/ Middletown (T)

400

$1,833,375

65

$590,704,998

Pheasant Valley Road WD., New Distribution System, New


Inter-Connection

Upper NW Quadrant water main reconstruction, new river crossing,


new telemetry system., Upgrade Transmission, Upgrade Distribution
System

Distribution System, Extend System Consolidation

Page 13 of 28

NYS Drinking Water State Revolving Fund DRAFT IUP Category A List ( Small Systems Serving < 10,000 People )
October 1, 2012 to September 30, 2013
Project County

System Name/
Borrower

Description

Pop.

Project Cost Score

Cumulative
Total

15040

Montgomery

PALATINE BRIDGE (V)


WATER WORKS / Palantine
Bridge (V)

Upgrade Water Treatment Plant, Upgrade Ground Water Source,


Upgrade Distribution System

890

$985,750

65

$591,690,748

17610

Montgomery

AMSTERDAM (T) /
Amsterdam(T)

New Storage, New Pump Station, Extend Distribution System

400

$4,506,250

65

$596,196,998

17935

Madison

LENOX (T) / Lenox (T)

Water District No. 12., New Water District

750

$5,000,000

65

$601,196,998

18016

Steuben

WD #3 / Campbell (T)

Serve private contaminated/poor yielding wells., Extend Water


District

1,025

$908,687

65

$602,105,685

16679

Seneca

JUNIUS WATER DISTRICT


#1 / Junius (T)

Extend system to serve area with private contaminated wells. W.D.


Ext. #2., Extend Distribution System

300

$623,607

65

$602,729,292

16798

St.Lawrence

EAST NORFOLK WATER


DISTRICT / Norfolk (T)

New system to serve area with private contaminated wells. , New


Complete System (New System)

270

$750,000

65

$603,479,292

15183

Orleans

SHELBY (T) / Shelby (T)

Extend system to serve area with private contaminated wells. Water


Improvement No. 4 - Phase I., Extend Distribution System

240

$249,700

65

$603,728,992

17826

Lewis

WATER DISTRICT NO. 10 /


Lowville (T)

New Distribution System

240

$507,000

65

$604,235,992

16921

Jefferson

ADAMS (T) WD #2 / Adams


(T)

New system to serve area with private contaminated wells. , New


Complete System (New System)

190

$1,509,000

65

$605,744,992

15483

Yates

BENTON TOWN WATER


DISTRICT NO. 1 / Benton (T)

Extend system to serve area with private contaminated wells. ,


Extend Distribution System

97

$639,000

65

$606,383,992

16699

Westchester

SUNSET RIDGE WATER


DISTRICT / North Salem (T)

Replacement of pump control equipment, storage tank cleaning &


coating, water main replacement & installation, pump house reapirs,
pump house fencing and driveway, Upgrade Storage, Upgrade Pump
Station, Upgrade Distribution System

625

$400,000

60

$606,783,992

17548

Albany

MENANDS VILLAGE /
Menands (V)

Upgrade Pump Station, Upgrade Distribution System

3,900

$6,936,000

60

$613,719,992

17193

Essex

AUSABLE FORKS WD / Jay


(T)

Upgrade Water Treatment Plant, New Storage

900

$5,201,603

60

$618,921,595

16576

Chemung

NORTHSTAR MHP / Leading


Edge Properties

water softener system and, Upgrade Distribution System

400

$93,113

60

$619,014,708

18038

Saratoga

MECHANICVILLE CITY /
Mechanicville (C)

Interconnection to SCWA, Alternative to Project 17742, New


Transmission

5,100

$9,465,623

60

$628,480,331

15846

Essex

MORIAH WD / Moriah (T)

Upgrade Distribution System

3,100

$606,876

60

$629,087,207

16653

Delaware

WALTON VILLAGE / Walton


(V)

Upgrade Controls, Upgrade Ground Water Source, Upgrade


Distribution System

3,070

$0

60

$629,087,207

17037

Nassau

EAST WILLISTON (V) / East


Williston (V)

Replacement of lead service lines to about 120 residences, New


Other Expenses, New Other (OT)

2,503

$456,000

60

$629,543,207

16236

Dutchess

RED HOOK VILLAGE / Red


Hook (V)

New Ground Water Source, Upgrade Ground Water Source, New


Storage, Upgrade Distribution System

2,214

$9,328,300

60

$638,871,507

Page 14 of 28

NYS Drinking Water State Revolving Fund DRAFT IUP Category A List ( Small Systems Serving < 10,000 People )

October 1, 2012 to September 30, 2013

Project County

System Name/
Borrower

Description

Pop.

Project Cost Score

Cumulative

Total

17883

Ulster

NEW PALTZ (V) / New Paltz


(V)

Construct mains in Northern portion of Village to loop system,


Upgrade Distribution System

6,000

$759,625

60

$639,631,132

18026

Tioga

CANDOR VILLAGE WATER


DEPT. / Candor (V)

Upgrade Storage, Upgrade Distribution System

1,020

$3,047,237

60

$642,678,369

17097

Orleans

MEDINA VILLAGE / Medina


(V)

Upgrade Distribution System

6,500

$4,088,085

60

$646,766,454

17092

Otsego

LAURENS VILLAGE /
Laurens (V)

New Storage, Upgrade Distribution System

381

$1,236,000

60

$648,002,454

15561

Jefferson

WATERTOWN (T) /
Watertown (T)

New system to serve area with private contaminated wells. , New


Complete System (New System), New Storage, New Distribution
System

530

$2,547,476

60

$650,549,930

17036

Genesee

TOWN OF PEMBROKE
WATER DISTRICT NO. 1 /
Pembroke (T)

Extend system to serve area with private contaminated wells. ,


Extend Distribution System

2,000

$3,860,000

60

$654,409,930

16814

Ontario

WEST BLOOMFIELD WD /
West Bloomfield (T)

Extend system to serve area with private contaminated wells. ,


Extend Distribution System

1,500

$231,750

60

$654,641,680

16886

Ontario

WEST BLOOMFIELD WD /
West Bloomfield (T)

County Road 35 and Dugway Road. , Extend Distribution System

1,500

$195,513

60

$654,837,193

17927

Lewis

CONSOLIDATED WATER
DISTRICT / Watson (T)

New Ground Water Source, New Storage, Extend Distribution System

1,500

$12,389,600

60

$667,226,793

16767

Seneca

ROUTE 96 WATER
DISTRICT / Waterloo (T)

Extend system to serve area with private contaminated wells. ,


Extend Distribution System

202

$1,845,512

60

$669,072,305

15578

Seneca

BURGESS ROAD WATER


DISTRICT / Junius (T)

Extend system to serve area with private contaminated wells. ,


Extend Distribution System

200

$699,100

60

$669,771,405

17616

Oneida

VIENNA (T) / Vienna (T)

New Distribution System

150

$210,000

60

$669,981,405

17886

Oneida

HALSTEAD ROAD WD /
Vienna (T)

Extend Distribution System

75

$692,400

60

$670,673,805

16516

Suffolk

WEST NECK WATER


SUPPLY / Shelter Island (T)

Upgrade Distribution System

100

$550,000

55

$671,223,805

15811

Onondaga

SKANEATELES VILLAGE /
Skaneateles (V)

Improve disinfection contact time., Upgrade Transmission

2,610

$1,600,000

55

$672,823,805

17031

Essex

CROWN POINT WD / Crown


Point (T)

Upgrade Distribution System

995

$2,795,678

55

$675,619,483

16571

Franklin

HARRIETSTOWN (T) /
Harrietstown (T)

Upgrade Distribution System

5,621

$710,800

55

$676,330,283

16957

Franklin

CHATEAUGAY V /
Chateaugay (V)

Upgrade Distribution System

1,100

$2,750,000

55

$679,080,283

17547

Broome

WHITNEY POINT VILLAGE /


Whitney Point (V)

New Wells, Main Street Wellfield/Pumphouse Improvements.,


Upgrade Ground Water Source, New Ground Water Source

1,054

$569,400

55

$679,649,683

Page 15 of 28

NYS Drinking Water State Revolving Fund DRAFT IUP Category A List ( Small Systems Serving < 10,000 People )

October 1, 2012 to September 30, 2013

Project County

System Name/
Borrower

Description

18064

Oneida

FORESTPORT WATER
DISTRICT / Foresport (T)

New Ground Water Source

18015

Yates

WS IMPROVEMENTS /
Dundee (V)

Upgrade Storage, Upgrade Distribution System

18007

Cortland

MARATHON VILLAGE /
Marathon (V)

New Storage, New Pump Station, Upgrade Distribution System

17940

Delaware

ROXBURY WATER
DISTRICT / Roxbury (T)

Upgrade Storage, Upgrade Distribution System

17599

Sullivan

EDGEWOOD LAKES, INC. /


Edgewood Lakes Inc.

Replace hydropneumatic tank, New Storage

17670

Erie

EDEN WD#7 / Eden (T)

Eden WD#7, New Storage, New Distribution System

17673

Erie

EDEN WD#2 / Eden (T)

Eden WD#2 Shadagee Road Water Project Pump Station and


Waterlines, New Pump Station, New Distribution System

16501

Erie

BLASDELL VILLAGE /
Blasdell (V)

18071

Cattaraugus

18049

Pop.
900

Project Cost Score

Cumulative

Total

$390,000

55

$680,039,683

1,690

$6,913,360

55

$686,953,043

1,107

$2,947,345

55

$689,900,388

755

$1,423,000

55

$691,323,388

17

$9,000

55

$691,332,388

1,800

$5,460,000

55

$696,792,388

500

$5,280,000

55

$702,072,388

Consolidation of the Village system with Erie County Water Authority,


Upgrade Distribution System, New System Consolidation

3,200

$2,515,000

55

$704,587,388

RANDOLPH VILLAGE /
Randolph (T)

East Randolph and Randolph (V)'s Repalcement of Water Mains,


Upgrade Distribution System

1,250

$7,075,000

55

$711,662,388

Erie

CONCORD TOWN WATER


SYSTEM / Town of Concord

Extend Distribution System

$335,000

55

$711,997,388

18010

Oswego

TOWN/VILLAGE JOINT
WATER PROJECT / Parish
(T)

Serve private contaminated/poor yielding wells., Extend Distribution


System

$10,150,000

55

$722,147,388

15109

Seneca

VARICK/ROMULUS WATER
PROJECT / Varick (T)

Extend Distribution System

850

$3,100,000

55

$725,247,388

15339

Erie

EAST HILL WATER


DISTRICT NO. 3 / Boston (T)

New Storage, New Pump Station, Extend Distribution System

800

$3,708,000

55

$728,955,388

17220

Cayuga

VICTORY (T) WD #2 / Victory


(T)

Extend Distribution System

612

$3,389,601

55

$732,344,989

15090

Schenectady

PRINCETOWN WATER
SUPPLY / Princetown (T)

Extend Distribution System

600

$929,060

55

$733,274,049

15092

Schenectady

PRINCETOWN WATER
SUPPLY / Princetown (T)

Extend Distribution System

600

$632,420

55

$733,906,469

16949

Schenectady

PRINCETOWN WATER
SUPPLY / Princetown (T)

Extend Distribution System

600

$495,430

55

$734,401,899

17636

Schenectady

PRINCETOWN WATER
SUPPLY / Princetown (T)

Extend Distribution System

600

$286,340

55

$734,688,239

15613

Livingston

YORK (T) WD NO. 2 / York


(T)

Extend Distribution System

350

$526,330

55

$735,214,569

Page 16 of 28

125

1,200

NYS Drinking Water State Revolving Fund DRAFT IUP Category A List ( Small Systems Serving < 10,000 People )

October 1, 2012 to September 30, 2013

Project County

System Name/
Borrower

Description

Pop.

Project Cost Score

Cumulative

Total

18047

Genesee

RTE 98 WD / Batavia (T)

New Water District the serve areas East and West of Rte. 98, New
Water District

318

$5,322,464

55

$740,537,033

18050

Yates

BENTON WD #1 /

Extend Distribution System

308

$731,000

55

$741,268,033

16724

Seneca

TYRE (T) WATER DISTRICT / Extend system to serve area with private contaminated wells. ,
Extend Distribution System
Tyre (T)

260

$992,508

55

$742,260,541

16851

Erie

AURORA (T) WATER IMP.


AREA NO. 5 / Aurora (T)

Extend Distribution System

210

$613,500

55

$742,874,041

15089

Schenectady

PRINCETOWN (T) - WD#1 /


Princetown (T)

Extend Distribution System

183

$860,050

55

$743,734,091

16804

Broome

STILLWATER RD WD#6 /
Conklin (T)

Extend Distribution System

173

$412,782

55

$744,146,873

17315

Cayuga

New Pump Station, Extend Distribution System


MORAVIA (T) WATER
DISTRICT NO. 1 / Moravia (T)

162

$663,320

55

$744,810,193

15545

Ontario

New Storage, Extend Distribution System


OAKMOUNT ROAD WATER
SYSTEM / East Bloomfield (T)

150

$2,224,000

55

$747,034,193

18045

Genesee

CREEK RD. WD / Batavia (T)

New Water District

136

$1,407,623

55

$748,441,816

17189

Jefferson

WATER DISTRICT #5 / Cape


Vincent (T)

New system to serve area with private contaminated wells. , New


Distribution System

100

$1,085,200

55

$749,527,016

17478

Clinton

ROUTE 11 WD / Champlain
(T)

Extend Distribution System

100

$1,267,380

55

$750,794,396

17771

Albany

MARTINS HILL ROAD


WATER DISTRICT /
Coeymans (T)

Extend distribution from Village of Ravena to serve Martins Hill Road


Water District., Extend Distribution System, New Water District

66

$314,150

55

$751,108,546

18046

Genesee

PRATT RD. WD / Batavia (T)

New Water District

55

$1,067,974

55

$752,176,520

17479

Clinton

WEST SERVICE ROAD WD /


Champlain (T)

Extend Distribution System

30

$675,284

55

$752,851,804

18011

Oneida

ROUTE 5 WD / Vernon (T)

Serve private contaminated/poor yielding wells., Extend Distribution


System

30

$244,000

55

$753,095,804

17584

Westchester

ARBOR HILLS WATER


WORKS / Arbor Hills

Waterworks

New wells, storage and booster pump., New Ground Water Source,
New Storage

180

$725,000

50

$753,820,804

15430

Putnam

BREWSTER VILLAGE /
Brewster (V)

New Storage

2,000

$1,628,000

50

$755,448,804

16211

Niagara

NIAGARA WATER
IMPROVEMENT AREA /

Niagara County

Contract 15G, E., Upgrade Water Treatment Plant, Upgrade


Transmission

8,978

$6,526,857

50

$761,975,661

18069

Madison

HAMILTON VILLAGE /
Hamilton (V)

New Ground Water Source, Upgrade Distribution System

3,904

$4,100,000

50

$766,075,661

Page 17 of 28

NYS Drinking Water State Revolving Fund DRAFT IUP Category A List ( Small Systems Serving < 10,000 People )

October 1, 2012 to September 30, 2013

Project County

System Name/
Borrower

Project Cost Score

Cumulative

Total

Description

Pop.
3,450

$2,150,000

50

$768,225,661

925

$1,576,930

50

$769,802,591

16188

Chautauqua

WESTFIELD VILLAGE /
Westfield (V)

Upgrade Water Treatment Plant

18062

Oswego

CLEVELAND VILLAGE /
Cleveland (V)

Upgrade Ground Water Source, Upgrade Storage, Upgrade


Distribution System

16627

Nassau

CARLE PLACE WD / Carle


Place WD

Wells #3 & #4, Terrace Drive, Carle Place, NY, New Water Treatment
Plant

9,005

$1,510,800

50

$771,313,391

17191

Yates

PENN YAN VILLAGE / Penn


Yan (V)

Upgrade Water Treatment Plant

5,248

$1,300,000

50

$772,613,391

15240

Jefferson

ALEXANDRIA VILLAGE /
Alexandria Bay (V)

Upgrade Surface Water Source, Upgrade Storage, Upgrade


Distribution System

1,900

$3,048,188

50

$775,661,579

17982

Steuben

PRATTSBURGH WATER
DISTRICT / Prattsburgh (T)

Upgrade Storage, Upgrade Distribution System

850

$1,485,415

50

$777,146,994

17319

Putnam

MOUNTAIN BROOK HOMES


/ Southeast (T)

New Water Treatment Plant, New Ground Water Source

176

$427,000

50

$777,573,994

16880

Seneca

INTERLAKEN VILLAGE /
Interlaken (V)

Upgrade Ground Water Source

650

$320,807

50

$777,894,801

15287

Cortland

VIRGIL (T) / Virgil (T)

Upgrade Ground Water Source, New Storage, Extend Distribution


System, System Consolidation

345

$2,223,234

50

$780,118,035

15297

Cortland

HOMER VILLAGE-NEWTON
WATER WORKS / Homer (V)

Upgrade Distribution System

4,368

$440,000

50

$780,558,035

17921

Oneida

EUREKA ROAD WD /
Westmoreland (T)

New Pump Station, New Distribution System

35

$180,000

50

$780,738,035

17378

Ontario

GORHAM TOWN WD /
Gorham (T)

Extension No. 9., Extend Distribution System

4,500

$732,000

50

$781,470,035

16449

Albany

GREEN ISLAND VILLAGE /


Green Island (V)

Extend Distribution System

2,900

$381,100

50

$781,851,135

18018

Wyoming

CASTILE VILLAGE / Castile


(V)

Upgrade Other Expenses, Upgrade Storage, Upgrade Distribution


System, New System Consolidation, Upgrade Other (OT)

1,135

$2,444,813

50

$784,295,948

17899

Genesee

WD II / Alabama (T)

Extend Water District

1,056

$5,416,206

50

$789,712,154

17596

Tioga

SPENCER (V) / Spencer (V)

New Complete System (New System), New System Consolidation

731

$7,865,000

50

$797,577,154

17327

Onondaga

CROSS LAKE/N. ELBRIDGE


AREA WD / Elbridge (T)

New Storage, New Pump Station, Extend Distribution System

534

$2,590,450

50

$800,167,604

16205

Oswego

SENECA HILLS HEALTH


CAMPUS / Volney (T)

Upgrade Distribution System

450

$1,115,000

50

$801,282,604

16908

Chautauqua

BUSTI (T) WATER DISTRICT


#3 / Busti (T)

Extend Distribution System

450

$750,000

50

$802,032,604

Page 18 of 28

NYS Drinking Water State Revolving Fund DRAFT IUP Category A List ( Small Systems Serving < 10,000 People )
October 1, 2012 to September 30, 2013
Project County

System Name/
Borrower

Description

Pop.

Project Cost Score

Cumulative
Total

17223

Cayuga

WEST GENESEE STREET


WATER DISTRICT / Aurelius
(T)

Extend Distribution System

175

$1,198,000

50

$803,230,604

17026

Seneca

BOODY'S HILL WD (WATER


DISTRICT #5) / Fayette (T)

Extend to serve private contaminated wells. , Extend Distribution


System

151

$788,980

50

$804,019,584

17058

Jefferson

HOUNSFIELD (T) WD #2
EXTENSION / Hounsfield (T)

Extend Distribution System

123

$794,439

50

$804,814,023

17895

Livingston

LONG POINT ROAD WD /


Geneseo(T)

Extend Water District

100

$1,115,000

50

$805,929,023

17326

Onondaga

LAIRD ROAD WATER


DISTRICT / Elbridge (T)

Extend Distribution System

29

$378,000

50

$806,307,023

16136

Westchester

ELMSFORD VILLAGE /
Elmsford (V)

Upgrade Water Treatment Plant

4,600

$1,000,000

45

$807,307,023

15834

Wayne

PALMYRA VILLAGE /
Palmyra (V)

New Pump Station

3,550

$102,700

45

$807,409,723

17941

Herkimer

MIDDLEVILLE (V) WATER


WORKS / Middleville (V)

Upgrade Ground Water Source, Upgrade Pump Station, Upgrade


Distribution System

725

$3,453,415

45

$810,863,138

18052

Jefferson

CAPE VINCENT VILLAGE /


Cape Vincent (V)

Upgrade Water Treatment Plant

1,500

$3,200,000

45

$814,063,138

17929

Steuben

PINEWOOD ACRES WATER


DISTRICT / Corning

Upgrade Storage, Upgrade Pump Station, Upgrade Distribution


System

168

$3,426,552

45

$817,489,690

17945

Sullivan

MONTICELLO VILLAGE /
Monticello (V)

Upgrade storage and distribution piping, Upgrade Storage, Upgrade


Distribution System

8,000

$7,395,000

45

$824,884,690

17055

Herkimer

FRANKFORT (V) WATER


WORKS / Frankfort (V)

New Ground Water Source

2,995

$481,691

45

$825,366,381

17057

Herkimer

FRANKFORT (V) WATER


WORKS / Frankfort (V)

Upgrade Distribution System

2,995

$1,971,007

45

$827,337,388

15547

Allegany

FRIENDSHIP TOWN WATER


DISTRICT / Friendship (T)

Upgrade Ground Water Source, Upgrade Storage, Upgrade


Distribution System

1,380

$1,030,000

45

$828,367,388

17226

Franklin

CHATEAUGAY (T) WD#1 /


Chateaugay (T)

New Water District

100

$114,075

45

$828,481,463

17402

Suffolk

WEST NECK WATER


SUPPLY / Shelter Island (T)

New Well, New Ground Water Source

100

$2,000

45

$828,483,463

15724

Chautauqua

LAKEWOOD VILLAGE /
Lakewood (V)

New Transmission, New Pump Station, Inter-Connection

3,258

$870,000

45

$829,353,463

16512

Wayne

OLD LYONS-NEWARK ROAD New Transmission


WATER DISTRICT / Lyons (T)

300

$207,000

45

$829,560,463

17453

Broome

LILIAN DRIVE WD /
Binghamton (T)

120

$281,000

45

$829,841,463

Page 19 of 28

New Pump Station, Upgrade Distribution System, New


Inter-Connection, New System Consolidation, New Water District

NYS Drinking Water State Revolving Fund DRAFT IUP Category A List ( Small Systems Serving < 10,000 People )

October 1, 2012 to September 30, 2013

Project County

System Name/
Borrower

Description
New Storage, Upgrade Distribution System

17953

Montgomery

NELLISTON VILLAGE /
Nelliston (V)

15078

Orange

HOLIDAY MOBILE PARK INC. Upgrade Distribution System, System Consolidation


/ Mid-Hudson Park
Management

15276

Montgomery

GLEN (T) W.D.#1 / Glen (T)

15664

Pop.

Project Cost Score

Cumulative

Total

375

$4,493,000

45

$834,334,463

250

$412,000

45

$834,746,463

Extend Distribution System

5,000

$950,000

45

$835,696,463

Niagara

HARTLAND WD / Hartland (T) Extend Distribution System

4,165

$726,500

45

$836,422,963

16612

Ontario

NORTH FARMINGTON WD /
Farmington (T)

Fox Road & County Road 28., Extend Distribution System

2,300

$155,128

45

$836,578,091

16698

Ontario

GENEVA (T) / Geneva (T)

New Storage, New Distribution System

1,500

$2,541,000

45

$839,119,091

17922

Oneida

NORTHEASTERN WD /
Westmoreland (T)

New Storage, New Pump Station, New Distribution System

880

$6,700,000

45

$845,819,091

16442

Suffolk

NORTHEAST WOODS / East


Hampton (T)

Northeast Woods, East Hampton (T), Extend Distribution System

675

$2,524,278

45

$848,343,369

16313

Onondaga

TOWN OF LYSANDER W.D. / Lamson Road Water District., New Distribution System, New Water
District
Lysander (T)

500

$5,284,000

45

$853,627,369

17672

Erie

EDEN WD#6 / Eden (T)

Eden WD#6, New Distribution System

500

$420,000

45

$854,047,369

16687

Chenango

NORWICH TOWN WATER


DISTRICT #2 / Norwich (T)

Extend Distribution System

200

$390,885

45

$854,438,254

17811

Cayuga

CAYUGA COUNTY WATER &


SEWER / Cayuga County
W&SA

New Centerport / Sine Roads WD in (T) Throop., Extend Distribution


System, New Water District

200

$818,850

45

$855,257,104

17671

Erie

EDEN WD#5 / Eden (T)

Eden WD#5, New Distribution System

150

$5,880,000

45

$861,137,104

17677

Genesee

WATER DISTRICT #5 /
Stafford (T)

Extend Distribution System

123

$927,000

45

$862,064,104

16801

Broome

CHENANGO WD #8 /
Chenango (T)

New Water District

100

$121,000

45

$862,185,104

16802

Broome

CHENANGO WD #4 /
Chenango (T)

New Water District

100

$112,450

45

$862,297,554

16884

Monroe

SOUTH CHILI WATER IMP.


BENEFIT AREA NO. 2 / Chili
(T)

Extend Distribution System

100

$386,250

45

$862,683,804

17066

Genesee

BYRON (T) WD NO. 3 / Byron Extend to serve private contaminated wells in the Hamlet of North
Byron., Extend Distribution System
(T)

100

$148,000

45

$862,831,804

17768

Genesee

WATER DISTRICT #8 /
Stafford (T)

90

$859,700

45

$863,691,504

Page 20 of 28

New Distribution System

NYS Drinking Water State Revolving Fund DRAFT IUP Category A List ( Small Systems Serving < 10,000 People )

October 1, 2012 to September 30, 2013

Project County

System Name/
Borrower

Description

Pop.

Project Cost Score

Cumulative

Total

17601

Putnam

GARRISON LANDING WS /
Philipstown (T)

New Complete System (New System)

84

$325,146

45

$864,016,650

15295

Dutchess

BEEKMAN (T) / Beekman (T)

New Complete System (New System), New Distribution System

80

$579,478

45

$864,596,128

17676

Genesee

WATER DISTRICT #7 /
Stafford (T)

Extend Distribution System

75

$679,700

45

$865,275,828

16575

Genesee

BARBARY COAST MHP /


Affordable Great Locations

Extend Distribution System

50

$82,700

45

$865,358,528

15417

Albany

KRUMKILL RD. WATER


DISTRICT / New Scotland (T)

Extend Distribution System

45

$2,500,000

45

$867,858,528

15616

Ulster

PORT EWEN WATER


DISTRICT / Esopus (T)

New Storage

4,800

$2,100,000

40

$869,958,528

15895

Warren

CHESTERTOWN WATER
DISTRICT / Chester (T)

Corrosion Control , Upgrade Ground Water Source

1,300

$2,500

40

$869,961,028

15629

Steuben

HAMMONDSPORT VILLAGE
/ Hammondsport (V)

Upgrade Distribution System

741

$405,000

40

$870,366,028

17804

Cayuga

WELLS COLLEGE / Wells


College

Upgrade Water Treatment Plant, Upgrade Distribution System

400

$1,642,850

40

$872,008,878

15884

Warren

POTTERSVILLE WATER
DISTRICT / Chester (T)

Upgrade Ground Water Source

325

$14,400

40

$872,023,278

17957

Dutchess

BARD COLLEGE / Bard


College

New microfiltration plant.,

1,400

$991,620

40

$873,014,898

15944

Chenango

OXFORD VILLAGE / Oxford


(V)

New Ground Water Source, Upgrade Distribution System

1,738

$154,039

40

$873,168,937

15229

Orange

SLEEPY HOLLOW MOBILE


PARK / Sleepy Hollow MHP,
LLC

Upgrade Transmission, Upgrade Distribution System

400

$386,250

40

$873,555,187

18070

Wayne

TRANSMISSION MAIN
REPLACEMENT / Clyde(V)

Upgrade Transmission

2,270

$357,900

40

$873,913,087

15308

Livingston

EAST LAKE ROAD WATER


DISTRICT / Livonia (T)

Extend Distribution System

1,450

$2,093,140

40

$876,006,227

15129

Albany

NORTHEAST WATER
DISTRICT / New Scotland (T)

New Complete System (New System)

370

$843,905

40

$876,850,132

15209

Ontario

PHELPS (T) - ROUTE 96


WEST WD / Phelps (T)

Extend Distribution System

300

$1,132,000

40

$877,982,132

15554

Ontario

WEST LAKE RD BENEFIT


BASIS DIS / Canandaigua (T)

Canandaigua. (T), Extend Distribution System

220

$1,243,100

40

$879,225,232

15148

Monroe

OGDEN (T) / Ogden (T)

Extend Distribution System

171

$429,330

40

$879,654,562

Page 21 of 28

NYS Drinking Water State Revolving Fund DRAFT IUP Category A List ( Small Systems Serving < 10,000 People )
October 1, 2012 to September 30, 2013
Project County

System Name/
Borrower

Description

16799

Broome

CHENANGO WD #25 /
Chenango (T)

New WD to serve private insufficient yielding wells area of Poplar Hill


Road , New Complete System (New System)

18056

Orange

WARWICK VILLAGE /
Warwick (V)

Upgrade Water Treatment Plant, New Ground Water Source

17974

Steuben

SOUTH CORNING VILLAGE / Upgrade Storage, Upgrade Distribution System


South Corning (V)

16073

Rensselaer

PETERSBURGH WATER
DISTRICT / Petersburg (T)

Upgrade Ground Water Source

16209

Niagara

NIAGARA WATER
IMPROVEMENT AREA /
Niagara County

Contract 14A, E, G & H., Upgrade Water Treatment Plant

16586

Niagara

NIAGARA WATER
IMPROVEMENT AREA /
Niagara (T)

18030

Rensselaer

17262

Pop.

Project Cost Score

Cumulative

Total

100

$383,500

40

$880,038,062

6,083

$323,725

35

$880,361,787

1,147

$7,763,007

35

$888,124,794

$109,154

35

$888,233,948

8,978

$2,859,246

35

$891,093,194

New Transmission

8,978

$400,000

35

$891,493,194

RENSSELAER CITY PWS /


Rensselaer (C)

Washington Ave Corridor Improvements, Upgrade Distribution


System

7,500

$3,169,952

35

$894,663,146

Orleans

HOLLEY VILLAGE / Holley


(V)

NYS Route 31., Upgrade Distribution System

2,150

$210,243

35

$894,873,389

17540

Genesee

OAKFIELD VILLAGE /
Oakfield (V)

Upgrade Transmission, Upgrade Storage, Upgrade Distribution


System

1,805

$2,864,100

35

$897,737,489

17791

Delaware

STAMFORD VILLAGE /
Stamford (V)

New Storage, Upgrade Distribution System

1,280

$2,575,000

35

$900,312,489

16897

Essex

CROWN POINT WD / Crown


Point (T)

Upgrade Distribution System

995

$1,000,000

35

$901,312,489

17595

Essex

FOREVER WILD WATER


CO-SIGNOR / Forever Wild
Water Company

Upgrade Ground Water Source, Upgrade Storage, Upgrade Pump


Station

900

$2,247,987

35

$903,560,476

16723

Chemung

WELLSBURG VILLAGE /
Wellsburg (V)

Upgrade Distribution System

631

$644,700

35

$904,205,176

15062

Oneida

TAURUSEL, INC (POND


HILL) / Taurusel, Inc.

Upgrade Ground Water Source, Upgrade Distribution System,


System Consolidation

54

$164,000

35

$904,369,176

15086

Seneca

BORDER CITY WATER


DISTRICT / Waterloo (T)

Upgrade Distribution System

1,600

$161,340

35

$904,530,516

17887

Cayuga

CATO VILLAGE / Cato (V)

New Storage

601

$1,152,505

35

$905,683,021

15087

Sullivan

ROUTE 55 WATER
DISTRICT / Liberty (T)

New Storage, New Pump Station, Upgrade Distribution System

500

$400,000

35

$906,083,021

17725

Dutchess

DUTCHESS COUNTY
WATER/WASTEWATER
PLANT / DCWWA

New Distribution System, Extend System Consolidation

7,012

$4,417,000

35

$910,500,021

17960

Franklin

SARANAC LAKE V / Saranac


Lake (V)

Installation of water meters.,

5,800

$1,000,000

35

$911,500,021

Page 22 of 28

240

NYS Drinking Water State Revolving Fund DRAFT IUP Category A List ( Small Systems Serving < 10,000 People )

October 1, 2012 to September 30, 2013

Project County

System Name/
Borrower

Project Cost Score

Cumulative

Total

Description

Pop.

Installation of solar powered storage tank water circulators.,

5,641

$437,400

35

$911,937,421

17969

Steuben

BATH VILLAGE / Bath (V)

16138

Oswego

PHOENIX VILLAGE / Phoenix State Street water main replacement., Upgrade Distribution System
(V)

2,138

$90,125

35

$912,027,546

16147

Orange

WESTSIDE GREENWOOD
LAKE W.D. / Warwick (T)

Upgrade Distribution System

1,160

$100,000

35

$912,127,546

16246

Dutchess

LITTLE SWITZERLAND /
East Fishkill (T)

Upgrade Distribution System, System Consolidation

450

$428,900

35

$912,556,446

15938

Dutchess

TACONIC ESTATES WATER


DISTRICT / East Fishkill (T)

New Ground Water Source, System Consolidation

185

$148,000

35

$912,704,446

16461

Dutchess

STONY CREEK FARMS


(TOWN HOMES / Stoney
Creek Farms Homeowners

New Water Treatment Plant

21

$18,000

30

$912,722,446

15635

Orange

WASHINGTONVILLE
VILLAGE / Washingtonville
(V)

Upgrade Ground Water Source, Upgrade Distribution System

7,000

$435,000

30

$913,157,446

18037

Ulster

MARLBOROUGH WATER
DISTRICT / (T) Marlborough

New Transmission, New Storage, Upgrade Distribution System

3,248

$16,879,640

30

$930,037,086

18079

Tompkins

YELLOW BARN WATER CO / New Water Treatment Plant, New Storage

$540,660

30

$930,577,746

15365

Sullivan

WURTSBORO VILLAGE
WATER SUPPLY / Wurtsboro
(V)

1,060

$1,545,000

30

$932,122,746

17882

Fulton

BROADALBAN (V) / Broadalin Replace Aged Storage Tank, New Storage


(V)

1,500

$1,990,000

30

$934,112,746

17787

Schoharie

SCHOHARIE VILLAGE /
Schoharie (V)

Upgrade Distribution System

1,030

$2,570,000

30

$936,682,746

17905

Warren

LAKE GEORGE VILLAGE /


Lake George (V)

Upgrade Distribution System

2,160

$1,650,675

30

$938,333,421

17956

Delaware

ROXBURY WATER
DISTRICT / Roxbury (T)

Installation of water meters.,

755

$358,178

30

$938,691,599

16720

Wayne

RED CREEK VILLAGE / Red


Creek (V)

Upgrade Distribution System

526

$102,935

30

$938,794,534

15966

Orange

CORNWALL-ON-HUDSON /
Cornwall-On-Hudson (V)

Upgrade Water Treatment Plant

9,300

$2,935,257

25

$941,729,791

17908

Suffolk

SALTARE WATER DISTRICT


/ Saltaire (V)

Infrastructure upgrade, Upgrade Water Treatment Plant, Upgrade


Storage

1,400

$668,000

25

$942,397,791

17524

Westchester

NORTH CASTLE WD #2 /
North Castle (T)

New well and storage, New Ground Water Source, New Storage

1,200

$1,458,695

25

$943,856,486

16250

Oneida

J.E. BARRETT WD / Prospect Upgrade Ground Water Source, New Storage, Upgrade Distribution
System
(V)

$326,000

25

$944,182,486

Page 23 of 28

New 400,000 gallon potable water stand pipe and distribution system
improvements, New Storage, Upgrade Distribution System

250

150

NYS Drinking Water State Revolving Fund DRAFT IUP Category A List ( Small Systems Serving < 10,000 People )

October 1, 2012 to September 30, 2013

Project County

System Name/
Borrower

Description

Pop.

Project Cost Score

Cumulative

Total

16015

Westchester

BRIARCLIFF MANOR
VILLAGE / Briarcliff Manor (V)

Upgrade Distribution System

8,831

$2,845,400

25

$947,027,886

15401

Clinton

PERU WD / Peru (T)

Upgrade Surface Water Source, New Transmission

2,600

$620,000

25

$947,647,886

17741

Schenectady

ROTTERDAM WD #3 /
Rotterdam (T)

Construction of new storage tank and transmission main, New


Transmission, New Storage

2,000

$2,060,000

25

$949,707,886

17795

Clinton

MORRISONVILLE WATER
DISTRICT / Plattsburgh (T)

Upgrade Pump Station

1,300

$225,320

25

$949,933,206

15228

Orange

PINE GROVE MOBILE HOME New Water Treatment Plant, Upgrade Transmission, New Storage,
PARK / Pine Grove MHP, LLC Upgrade Distribution System

516

$484,100

25

$950,417,306

15634

Cayuga

SENNETT WD #1 / Sennett
(T)

Upgrade Distribution System

200

$470,339

25

$950,887,645

17683

Clinton

PLEASANT RIDGE WD /
Plattsburgh (T)

New Storage

168

$3,190,000

25

$954,077,645

17341

Albany

SOUTH ALBANY WATER


DISTRICT / Bethlehem (T)

New Transmission

80

$146,775

25

$954,224,420

15896

Warren

CHESTERTOWN WATER
DISTRICT / Chester (T)

Well #1 - Rehab and Testing, Upgrade Ground Water Source

1,300

$15,500

25

$954,239,920

15893

Jefferson

ADAMS (T) WD #1 & 2


(ADAMS CENTER) / Adams
Center (T)

Upgrade Storage

1,000

$121,954

25

$954,361,874

15805

Warren

WARRENSBURG WATER
DISTRICT / Warrensburg (T)

Upgrade Ground Water Source

3,600

$375,000

25

$954,736,874

17965

Oswego

RICHLAND TOWN PWS /


Richland (T)

Wind power generation at Schoeller well site.,

2,350

$585,000

25

$955,321,874

16481

Jefferson

VILLAGE OF CLAYTON /
Clayton (V)

New Transmission, New Distribution System

2,160

$214,000

25

$955,535,874

17939

Herkimer

OLD FORGE (V) WATER


DISTRICT / Webb (T)

Upgrade Distribution System, Extend Distribution System

1,766

$561,350

25

$956,097,224

15268

Madison

EARLVILLE VILLAGE /
Earlville (V)

East Main Street., Upgrade Distribution System

790

$96,509

25

$956,193,733

17961

Jefferson

LAFARGEVILLE (T.
ORLEANS) / Orleans (T)

Installation of water meters.,

750

$208,078

25

$956,401,811

15951

Orange

VALLEY VIEW CTR FOR


NURSING CARE & REHAB /
Orange County

New Water Treatment Plant, New Ground Water Source, New


Storage, Upgrade Distribution System

851

$572,474

20

$956,974,285

15538

Tompkins

LANSING WD #2 / Lansing
(T)

New Storage, New Pump Station, Upgrade Distribution System

400

$443,500

20

$957,417,785

16053

Niagara

CAMBRIA WATER DISTRICT


/ Cambria (T)

New Storage, New Pump Station, Upgrade Distribution System

5,393

$1,000,000

20

$958,417,785

Page 24 of 28

NYS Drinking Water State Revolving Fund DRAFT IUP Category A List ( Small Systems Serving < 10,000 People )

October 1, 2012 to September 30, 2013

Project County

System Name/
Borrower

Project Cost Score

Cumulative

Total

Description

Pop.

New Pump Station, Upgrade Distribution System

4,500

$141,280

20

$958,559,065

16041

Ontario

GORHAM TOWN WD /
Gorham (T)

17772

Saratoga

BURNT HILLS-BALLSTON LK New Pump Station, Extend Distribution System


WD (GLENVILLE) / Ballston
(T)

4,500

$606,052

20

$959,165,117

17400

Orange

HIGHLAND FALLS VILLAGE / Water Treatment Plant Filter Upgrades, Upgrade Water Treatment
Plant
Highland Falls (V)

4,400

$800,000

20

$959,965,117

18041

Putnam

COLD SPRING VILLAGE /


Cold Spring (V)

Upgrade Transmission

2,666

$958,000

20

$960,923,117

17920

Oneida

WESTMORELAND WD NO 1
(GU) / Westmoreland (T)

New Ground Water Source, Upgrade Storage

600

$2,850,000

20

$963,773,117

18073

Tompkins

WEST DANBY WD /
Danbury(T)

New Storage

265

$384,600

20

$964,157,717

17565

Orange

BRITTANY TERRACE /
Brittany Terrace, Inc.

New water storage tank, New Storage

169

$215,000

20

$964,372,717

17583

Nassau

OYSTER BAY WD / Oyster


Bay (T)

VOC removal at Plant #2., New Water Treatment Plant

8,700

$1,597,530

20

$965,970,247

15755

Albany

RAVENA VILLAGE / Ravena


(V)

New Storage

4,500

$497,500

20

$966,467,747

15832

Wayne

PALMYRA VILLAGE /
Palmyra (V)

Upgrade Surface Water Source

3,550

$291,050

20

$966,758,797

15914

Wayne

PALMYRA VILLAGE /
Palmyra (V)

Upgrade Transmission

3,550

$1,581,250

20

$968,340,047

15918

Wayne

PALMYRA VILLAGE /
Palmyra (V)

Upgrade Storage

3,550

$189,750

20

$968,529,797

15045

Oneida

CLINTON VILLAGE / Clinton


(V)

Upgrade Distribution System

3,000

$822,000

20

$969,351,797

15691

Greene

SLEEPY HOLLOW LAKE


WATER CO. / Sleepy Hollow
Lake Assoc.

Upgrade Surface Water Source, Upgrade Storage

2,000

$1,144,330

20

$970,496,127

17383

Genesee

OAKFIELD VILLAGE /
Oakfield (T)

Upgrade Transmission

1,805

$1,661,600

20

$972,157,727

16885

Ontario

WEST BLOOMFIELD WD /
West Bloomfield (T)

Cathodic protection system., Upgrade Storage

1,500

$13,390

20

$972,171,117

17802

Jefferson

MADISON BARRACKS
WATER SYSTEM / Sackets
Harbor (V)

Upgrade Distribution System

1,000

$1,700,000

20

$973,871,117

16758

Erie

W. SENECA WD#3 / West


Seneca (T)

Orchard Park Road Watermain, Upgrade Distribution System

520

$460,000

20

$974,331,117

17419

Dutchess

WAPPINGERS FALLS
VILLAGE / Wappinger Falls
(V)

Upgrade Storage, New Storage, Upgrade Distribution System

6,000

$6,238,532

20

$980,569,649

Page 25 of 28

NYS Drinking Water State Revolving Fund DRAFT IUP Category A List ( Small Systems Serving < 10,000 People )

October 1, 2012 to September 30, 2013

Project County

System Name/
Borrower

Description

Pop.

Project Cost Score

Cumulative

Total

17325

Onondaga

MINOA VILLAGE / Minoa (V)

Upgrade Distribution System

3,745

$307,336

20

$980,876,985

15897

Warren

CHESTERTOWN WATER
DISTRICT / Chester (T)

Upgrade Distribution System

1,300

$42,200

20

$980,919,185

17970

Sullivan

WURTSBORO VILLAGE
WATER SUPPLY / Wurtsboro
(V)

Installation of water meters.,

1,060

$201,438

20

$981,120,623

17966

Rensselaer

SCHAGHTICOKE (V) PWS /


Schaghticoke (V)

Installation of water meters.,

675

$75,000

20

$981,195,623

17968

Schoharie

SHARON SPRINGS VILLAGE Installation of water meters.,


/ Sharon Springs (V)

547

$203,148

20

$981,398,771

15312

Westchester

CROTON FALLS WATER


DISTRICT / North Salem (T)

Upgrade Distribution System

175

$121,339

20

$981,520,110

16494

Clinton

CHAMPLAIN (T) / Champlain


(T)

System Acquisition-"Benefit Area #1", New Ground Water Source,


New Distribution System

50

$497,200

20

$982,017,310

15469

Erie

WILLIAMSVILLE (V) /
Williamsville (V)

Los Robles Street water reconstruction project., Upgrade Distribution


System

6,017

$408,447

15

$982,425,757

15556

Tompkins

LANSING WD #2 / Lansing
(T)

Extend Distribution System

400

$117,300

15

$982,543,057

15274

Montgomery

GLEN (T) W.D.#2 / Glen (T)

Upgrade Distribution System

7,626

$95,000

15

$982,638,057

17344

Nassau

WILLISTON PARK (V) /


Williston Park (V)

Secondary Containment for Caustic Soda, Upgrade Other Expenses,


Upgrade Other (OT)

7,516

$161,350

15

$982,799,407

17829

Westchester

PLEASANTVILLE /
Pleasantville (V)

Replacement of water mains., Upgrade Distribution System

7,166

$1,955,000

15

$984,754,407

16038

Ontario

GORHAM TOWN WD /
Gorham (T)

Upgrade Storage

4,500

$77,500

15

$984,831,907

17835

Orange

MONTGOMERY (V) /
Montgomery (V)

New Storage Tank, New Storage

3,696

$825,030

15

$985,656,937

17916

Orange

GREENWOOD LAKE (V) /


Greenwood Lake (V)

Cleaning and painting storage tank, Upgrade Storage

3,400

$245,660

15

$985,902,597

17525

Westchester

NORTH CASTLE WD #1 /
North Castle (T)

Rehabilitation of water storage tanks, Upgrade Storage

2,500

$813,500

15

$986,716,097

18040

Ontario

BLOOMFIELD VILLAGE /
Bloomfield (V)

Upgrade Distribution System

1,675

$1,340,697

15

$988,056,794

15792

Putnam

CONTINENTAL VILLAGE WD Upgrade Distribution System


/ Philipstown (T)

1,509

$1,350,000

15

$989,406,794

15559

Ontario

HOPEWELL WD #2 /
Hopewell (T)

1,148

$435,600

15

$989,842,394

Page 26 of 28

New Pump Station

NYS Drinking Water State Revolving Fund DRAFT IUP Category A List ( Small Systems Serving < 10,000 People )

October 1, 2012 to September 30, 2013

Project County

System Name/
Borrower

Project Cost Score

Cumulative

Total

Description

Pop.
1,100

$487,000

15

$990,329,394

356

$131,910

15

$990,461,304

17843

Orange

TUXEDO PARK (V) / Tuxedo


(V)

West Lake Road Transmission Line, Upgrade Transmission

17061

Westchester

LAKE KATONAH CLUB INC /


Lake Katonah Club Inc

Upgrade Storage

17539

Rensselaer

CASTLETON VILLAGE PWS


/ Castleton-on-Hudson (V)

Replacement in-kind of aged water mains., Upgrade Distribution


System

2,013

$1,661,400

15

$992,122,704

17527

Genesee

OAKFIELD VILLAGE /
Oakfield (V)

Upgrade Transmission, Upgrade Distribution System

1,805

$1,147,575

15

$993,270,279

17959

Dutchess

SHOREHAVEN CIVIC
ASSOC / DCWWA

Installation of water meters.,

300

$61,692

15

$993,331,971

18003

Erie

CATTARAUGUS STREET
WATER DISTRICT / Concord
(T)

New Distribution System, New Water District

13

$325,000

15

$993,656,971

17844

Steuben

CAMPBELL WATER
DISTRICT / Campbell (T)

Extend Distribution System

280

$216,744

15

$993,873,715

18020

Lewis

WATER DISTRICT #1 /
Denmark (T)

Serve private contaminated/poor yielding wells., Extend Distribution


System

275

$2,603,000

15

$996,476,715

18077

Yates

EXT #1 TO WD #1 / Benton
(T)

Extend Distribution System

42

$800,000

15

$997,276,715

15642

Nassau

WILLISTON PARK (V) /


Williston Park (V)

Upgrade Ground Water Source

7,516

$800,000

10

$998,076,715

15507

Westchester

PLEASANTVILLE WATER
DISTRICT / Pleasantville (V)

Refinance '93 bonds for relining water mains, Upgrade Distribution


System

9,500

$4,155,408

10

$1,002,232,123

15514

Westchester

PLEASANTVILLE WATER
DISTRICT / Pleasantville (V)

Water Mains for Sarles Lane, Upgrade Distribution System

9,500

$343,291

10

$1,002,575,414

17817

Orange

WASHINGTONVILLE
VILLAGE / Washingtonville
(V)

Watermain replacement Patricia and Beverly Lane, Upgrade


Distribution System

7,000

$961,000

10

$1,003,536,414

17818

Orange

WASHINGTONVILLE
VILLAGE / Washingtonville
(V)

Replace watermains in Dutch Arms area., Upgrade Distribution


System

7,000

$1,654,700

10

$1,005,191,114

17775

Westchester

WESTCHESTER COUNTY
WD #3 / Westchester County
#3

Lateral Main Rehabilitation, Upgrade Distribution System

6,000

$670,000

10

$1,005,861,114

15131

Livingston

LIVONIA VILLAGE / Livonia


(V)

Upgrade Distribution System

1,360

$1,105,325

10

$1,006,966,439

17907

Nassau

VILLAGE OF PLANDOME /
Plandome (V)

Replace aged mains in distribution system, Upgrade Distribution


System

1,350

$5,113,950

10

$1,012,080,389

17985

Westchester

BEAR RIDGE LAKE WATER


DISTRICT / Mount Pleasant
(T)

Water main replacement-Highland Place, Mountain Trail and


Woodland Road, Upgrade Distribution System

170

$1,436,085

10

$1,013,516,474

16540

Dutchess

Upgrade Distribution System


CHARLOTTE GROVE
MOBILE HOME CT / Charlette
Grove MH Court

112

$302,820

10

$1,013,819,294

Page 27 of 28

NYS Drinking Water State Revolving Fund DRAFT IUP Category A List ( Small Systems Serving < 10,000 People )

October 1, 2012 to September 30, 2013

Project County

System Name/
Borrower

Description

17993

Suffolk

WEST NECK WATER


SUPPLY / Shelter Island (T)

Water main replacement, Upgrade Distribution System

15963

Orange

CORNWALL-ON-HUDSON /
Cornwall-On-Hudson (V)

Upgrade Distribution System

17854

Putnam

SOUTHEAST (T)
PEACEABLE WATER
DISTRICT / Southeast (T)

Development new water source instead of continuing to purchase


from Brewster (V), New Ground Water Source

17781

Rensselaer

WATER DISTRICT 15 / North


Greenbush (T)

18068

Orleans

18078

Genesee

Pop.

Project Cost Score

Cumulative

Total

100

$669,093

10

$1,014,488,387

9,300

$520,000

$1,015,008,387

440

$1,700,000

$1,016,708,387

Extend Distribution System

4,000

$9,785,000

$1,026,493,387

WATER IMPROVEMENT
BENEFIT AREA #10 /
Clarendon (T)

Extend Distribution System

250

$1,634,949

$1,028,128,336

WD #2 / Alexander (T)

Extend Distribution System

165

$1,747,910

$1,029,876,246

Total # Projects

Total Cost
$1,029,876,246

519

Page 28 of 28

MULTI-YEAR LIST OF PROJECTS

NYS Drinking Water State Revolving Fund DRAFT IUP Multiyear List
October 1, 2012 to September 30, 2013
Project County

System Name/
Borrower

Description

Pop.

Project Cost

Score

Cumulative
Total

Albany County
17427

Albany

NEW SALEM WATER


DISTRICT / New Scotland
(T)

New Surface Water Treatment Rule Compliance Facility, New Storage,


New Pump Station, New Inter-Connection, New Water District

486

$3,048,000

210

$3,048,000

15661

Albany

RENSSELAERVILLE WD /
Rensselaerville (T)

New Ground Water Source, Upgrade Storage, Upgrade Distribution


System

200

$990,242

185

$4,038,242

17443

Albany

ALTAMONT VILLAGE /
Altamont (V)

New Brandle Road Wells, Disinfection, and Transmission Main, New


Ground Water Source

2,000

$1,394,550

90

$5,432,792

17428

Albany

FLAT ROCK ROAD W.D. /


New Scotland (T)

New Water District

149

$2,152,580

90

$7,585,372

15950

Albany

GUILDERLAND TOWN WD
/ Guilderland (T)

Phase III Improvements, New Storage, Extend Distribution System,


Upgrade Distribution System, New Inter-Connection

30,000

$10,146,000

75

$17,731,372

16245

Albany

COHOES CITY / Cohoes


(C)

Upgrade Water Treatment Plant

15,550

$1,975,000

70

$19,706,372

16670

Albany

ALTAMONT RD. WATER


DISTRICT / New Scotland
(T)

Extension of Village of Voorheesville system into the Town of New


Scotland, New Distribution System

93

$314,000

70

$20,020,372

17548

Albany

MENANDS VILLAGE /
Menands (V)

Upgrade Pump Station, Upgrade Distribution System

3,900

$6,936,000

60

$26,956,372

17771

Albany

MARTINS HILL ROAD


WATER DISTRICT /
Coeymans (T)

Extend distribution from Village of Ravena to serve Martins Hill Road


Water District., Extend Distribution System, New Water District

66

$314,150

55

$27,270,522

17299

Albany

RAVENA VILLAGE / Ravena Upgrade Water Treatment Plant, Upgrade Transmission, Upgrade
Storage
(V)

4,500

$3,090,000

50

$30,360,522

15705

Albany

ALBANY CITY / Albany (C)

Pearl Street Reconstruction, Phase 1, Upgrade Distribution System

101,082

$2,000,000

50

$32,360,522

16449

Albany

GREEN ISLAND VILLAGE /


Green Island (V)

Extend Distribution System

2,900

$381,100

50

$32,741,622

15417

Albany

KRUMKILL RD. WATER


DISTRICT / New Scotland
(T)

Extend Distribution System

45

$2,500,000

45

$35,241,622

15747

Albany

ALBANY CITY / Albany (C)

New Transmission

101,082

$10,000,000

45

$45,241,622

15698

Albany

ALBANY CITY / Albany (C)

1997 Capital Improvement Program, Upgrade Distribution System

101,082

$1,350,000

45

$46,591,622

15446

Albany

NORMANSKILL RD,
WORMER RD WATER
SYS. / New Scotland (T)

Extend Distribution System

30

$376,000

40

$46,967,622

15395

Albany

WATERVLIET CITY /
Watervliet (C)

New Storage

9,889

$1,548,000

40

$48,515,622

15129

Albany

NORTHEAST WATER
DISTRICT / New Scotland
(T)

New Complete System (New System)

370

$843,905

40

$49,359,527

15300

Albany

NORTHEAST WATER
DISTRICT / New Scotland
(T)

Extend Distribution System

45

$267,000

40

$49,626,527

15720

Albany

ALBANY CITY / Albany (C)

Upgrade Water Treatment Plant

101,082

$960,000

40

$50,586,527

Page 1 of 86

NYS Drinking Water State Revolving Fund DRAFT IUP Multiyear List

October 1, 2012 to September 30, 2013

Project County

System Name/
Borrower

Description

Pop.

Project Cost

Score

Cumulative
Total

Albany County
16244

Albany

COHOES CITY / Cohoes


(C)

Upgrade Distribution System

15397

Albany

WATERVLIET CITY /
Watervliet (C)

Upgrade Transmission

15743

Albany

ALBANY CITY / Albany (C)

Upgrade Distribution System

17740

Albany

COHOES CITY / Cohoes


(C)

Replace water main on Vliet St. from Main St. to Garner St, Upgrade
Distribution System

15392

Albany

WATERVLIET CITY /
Watervliet (C)

Replace undersized lines - 1998, Upgrade Distribution System

17738

Albany

COHOES CITY / Cohoes


(C)

Reline water mains, Upgrade Transmission

15393

Albany

WATERVLIET CITY /
Watervliet (C)

Replace undersized water mains provided insufficient flow &


pressure-1997, Upgrade Distribution System

17341

Albany

SOUTH ALBANY WATER


DISTRICT / Bethlehem (T)

New Transmission

15755

Albany

15247

Albany

15,550

$1,025,000

40

$51,611,527

9,889

$208,500

35

$51,820,027

101,082

$6,000,000

35

$57,820,027

15,550

$747,532

30

$58,567,559

9,889

$795,000

30

$59,362,559

15,550

$1,595,000

30

$60,957,559

9,889

$317,700

30

$61,275,259

80

$146,775

25

$61,422,034

RAVENA VILLAGE / Ravena New Storage


(V)

4,500

$497,500

20

$61,919,534

LATHAM WATER DISTRICT New Storage


/ Colonie (T)

78,500

$1,290,000

15

$63,209,534

1175

$63,209,534

Allegany County
17382

Allegany

HOUGHTON WATER
DISTRICT / Caneadea (T)

Upgrade Water Treatment Plant, New Ground Water Source, New


Transmission, Upgrade Distribution System

2,000

$0

NOTE: Short - Term Loan Closed, Project Cost Shown is


Remaining Balance Not Funded With Short Term Loan

16746

Allegany

CANASERAGA VILLAGE
PUBLIC WATER /
Canaseraga (V)

New Ground Water Source, Upgrade Storage

900

$3,666,749

220

$66,876,283

18017

Allegany

RICHBURG VILLAGE
PUBLIC WATER / Richburg
(V)

(V) Richburg & (V) Bolivar Consolidation., New Surface Water


Treatment Rule Compliance Facility, New Ground Water Source,
Upgrade Storage, Upgrade Distribution System, New System
Consolidation

600

$7,038,640

180

$73,914,923

17621

Allegany

ANGELICA VILLAGE
PUBLIC WATER / Angelica
(V)

Surface Water Treatment Rule Compliance Facility

950

$1,061,847

165

$74,976,770

15925

Allegany

TOWN OF WELLSVILLE /
Wellsville (T)

Extend system to serve area with private contaminated wells,


Morningside Area, Extend Distribution System

5,000

$867,106

75

$75,843,876

17526

Allegany

WELLSVILLE WATER
DISTRICT / Wellsville (T)

Extend Distribution System, New Water District

133

$1,192,450

70

$77,036,326

15502

Allegany

WELLSVILLE VILLAGE
PUBLIC WATER / Wellsville
(V)

New Storage

5,700

$1,177,000

50

$78,213,326

15547

Allegany

FRIENDSHIP TOWN
WATER DISTRICT /
Friendship (T)

Upgrade Ground Water Source, Upgrade Storage, Upgrade Distribution


System

1,380

$1,030,000

45

$79,243,326

16636

Allegany

BOLIVAR VILLAGE PUBLIC


WATER / Bolivar (V)

New Storage, Upgrade Distribution System

1,040

$788,500

45

$80,031,826

16655

Allegany

GENESEE HEIGHTS
MOBILE HOME PK / Mr. &
Mrs. Anzivine

New Ground Water Source, Upgrade Distribution System

65

$69,000

40

$80,100,826

Page 2 of 86

NYS Drinking Water State Revolving Fund DRAFT IUP Multiyear List
October 1, 2012 to September 30, 2013
Project County

System Name/
Borrower

Description

Pop.

Project Cost

Score

Cumulative
Total

Allegany County
15943

Allegany

ANDOVER VILLAGE
PUBLIC WATER / Andover
(V)

Upgrade Surface Water Source

16747

Allegany

CANASERAGA VILLAGE
PUBLIC WATER /
Canaseraga (V)

Upgrade Distribution System

16154

Allegany

BELMONT VILLAGE
PUBLIC WATER / Belmont
(V)

16156

Allegany

15983

17762

1,130

$3,299,000

40

$83,399,826

900

$2,039,915

35

$85,439,741

Trianna St. & Milton St., Upgrade Distribution System

1,325

$494,452

30

$85,934,193

BELMONT VILLAGE
PUBLIC WATER / Belmont
(V)

Greenwich St. to Allegany County Office Complex., Upgrade


Distribution System

1,325

$405,827

30

$86,340,020

Allegany

ALMOND VILLAGE PUBLIC


WATER / Almond (V)

Upgrade Distribution System

600

$257,500

25

$86,597,520

Allegany

DISTRIBUTION MAIN
REPLACEMENT / Allegany
(T)

Upgrade Distribution System

500

$121,000

20

$86,718,520

1,000

$863,140

90

$87,581,660

101

$343,200

65

$87,924,860

2,080

$2,006,336

65

$89,931,196

Broome County
16262

Broome

CONKLIN (T) W.D. / Conklin


(T)

Extend system to serve area with private contaminated wells,


consolidate public water supply. , Inter-Connection, System
Consolidation

16175

Broome

CONKLIN WD #1 / Conklin
(T)

Upgrade Ground Water Source

17766

Broome

DEPOSIT (V) WATER


DEPARTMENT / Deposit (V)

Upper NW Quadrant water main reconstruction, new river crossing,


new telemetry system., Upgrade Transmission, Upgrade Distribution
System

16025

Broome

PARK TERRACE WATER


SYSTEM / Binghamton (T)

Extend system to serve area with private contaminated wells. , Extend


Distribution System

455

$1,101,456

55

$91,032,652

16804

Broome

STILLWATER RD WD#6 /
Conklin (T)

Extend Distribution System

173

$412,782

55

$91,445,434

17547

Broome

WHITNEY POINT VILLAGE


/ Whitney Point (V)

New Wells, Main Street Wellfield/Pumphouse Improvements.,


Upgrade Ground Water Source, New Ground Water Source

1,054

$569,400

55

$92,014,834

17453

Broome

LILIAN DRIVE WD /
Binghamton (T)

New Pump Station, Upgrade Distribution System, New


Inter-Connection, New System Consolidation, New Water District

120

$281,000

45

$92,295,834

16801

Broome

CHENANGO WD #8 /
Chenango (T)

New Water District

100

$121,000

45

$92,416,834

16541

Broome

UNION TOWN WATER


SYSTEM NO. 1 / Union (T)

Extend Distribution System

5,000

$6,400,225

45

$98,817,059

16802

Broome

CHENANGO WD #4 /
Chenango (T)

New Water District

100

$112,450

45

$98,929,509

17852

Broome

ENDICOTT MUNICIPAL
WATER WORKS / Endicott
(V)

Replace Bean Hill Road Tank., New Storage

45,000

$250,000

40

$99,179,509

16799

Broome

CHENANGO WD #25 /
Chenango (T)

New WD to serve private insufficient yielding wells area of Poplar Hill


Road , New Complete System (New System)

100

$383,500

40

$99,563,009

15969

Broome

VESTAL CONSOLIDATED
W.D. #1 / Vestal (T)

New Water Treatment Plant

20,950

$1,700,000

40

$101,263,009

15215

Broome

DICKINSON WD #2 /
Dickinson (T)

Upgrade Pump Station, Upgrade Distribution System

56

$220,100

35

$101,483,109

Page 3 of 86

NYS Drinking Water State Revolving Fund DRAFT IUP Multiyear List

October 1, 2012 to September 30, 2013

Project County

System Name/
Borrower

Description

Pop.

Project Cost

Score

Cumulative
Total

Broome County
15489

Broome

BINGHAMTON, CITY OF /
Binghamton (C)

South Side Water Storage Reservoir replacement,Hotchkins St.,


Upgrade Storage

15764

Broome

WINDSOR, VILLAGE OF /
Windsor (V)

Upgrade Pump Station, Upgrade Distribution System

15975

Broome

VESTAL CONSOLIDATED
W.D. #1 / Vestal (T)

15973

Broome

15905

47,600

$1,236,000

35

$102,719,109

1,051

$1,660,000

30

$104,379,109

Upgrade Pump Station

20,950

$187,718

10

$104,566,827

VESTAL CONSOLIDATED
W.D. #1 / Vestal (T)

Upgrade Pump Station, Upgrade Distribution System

20,950

$319,815

10

$104,886,642

Broome

CHENANGO
CONSOLIDATED WD #1 /
Chenango (T)

Upgrade Ground Water Source

9,200

$574,500

10

$105,461,142

15977

Broome

VESTAL CONSOLIDATED
W.D. #1 / Vestal (T)

New Storage

20,950

$1,668,600

10

$107,129,742

15971

Broome

VESTAL CONSOLIDATED
W.D. #1 / Vestal (T)

Upgrade Water Treatment Plant

20,950

$415,296

$107,545,038

Cattaraugus County
18022

Cattaraugus

PERRYSBURG (V) /
Perrysburg (T)

Phase 2 (DWSRF 17192) based on cost increase to address


unresolved deficiencies in the initial project construction, New Water
Treatment Plant, Upgrade Ground Water Source, Upgrade Storage,
New Pump Station

404

$729,657

2095

$108,274,695

18013

Cattaraugus

RANDOLPH VILLAGE /
Randolph (T)

East Randolph and Randolph (V)'s project includes meters, Upgrade


Other Expenses, New Surface Water Treatment Rule Compliance
Facility, New Ground Water Source, New System Consolidation,
Upgrade Other (OT)

1,250

$3,740,000

200

$112,014,695

17589

Cattaraugus

CRYSTAL WATER CO
(WEST VALLEY) / Ashford
(T)

New Surface Water Treatment Rule Compliance Facility, Upgrade


Ground Water Source

880

$3,208,500

180

$115,223,195

17514

Cattaraugus

DELEVAN VILLAGE /
Delevan (V)

New Surface Water Treatment Rule Compliance Facility, Upgrade


Ground Water Source, Upgrade Storage, Upgrade Distribution System

1,090

$1,690,350

145

$116,913,545

18071

Cattaraugus

RANDOLPH VILLAGE /
Randolph (T)

East Randolph and Randolph (V)'s Repalcement of Water Mains,


Upgrade Distribution System

1,250

$7,075,000

55

$123,988,545

17770

Cattaraugus

OLEAN CITY / Olean (C)

Upgrade Pump Station, Upgrade Distribution System

15,500

$3,977,087

40

$127,965,632

15763

Cattaraugus

PORTVILLE VILLAGE /
Portville (V)

Upgrade Distribution System

1,040

$437,673

35

$128,403,305

18025

Cattaraugus

SALAMANCA CITY /
Salalmanca (C)

Upgrade Distribution System

7,000

$1,688,000

30

$130,091,305

600

$6,875,100

185

$136,966,405

1,400

$5,657,000

160

$142,623,405

Cayuga County
16114

Cayuga

CAYUGA VILLAGE /
Cayuga (V)

New Surface Water Treatment Rule Compliance Facility, Upgrade


Distribution System, New Inter-Connection

17931

Cayuga

PORT BYRON VILLAGE /


Port Byron (V)

Joint project with (V) Port Byron, (T) Montezuma & (T) Mentz.,
Upgrade Distribution System, Extend Distribution System, New System
Consolidation

15780

Cayuga

AURORA VILLAGE / Aurora


(V)

New Water Treatment Plant, New Surface Water Source

426

$862,457

110

$143,485,862

15970

Cayuga

LOCKE W D / Locke (T)

Upgrade Ground Water Source, Upgrade Distribution System

600

$500,650

80

$143,986,512

Page 4 of 86

NYS Drinking Water State Revolving Fund DRAFT IUP Multiyear List

October 1, 2012 to September 30, 2013

Project County

System Name/
Borrower

Description

Pop.

Project Cost

Score

Cumulative
Total

Cayuga County
15127

Cayuga

FAIR HAVEN VILLAGE /


Fair Haven (V)

Upgrade Ground Water Source, New Storage, Upgrade Distribution


System

17681

Cayuga

NORTH WEEDSPORT
WD#7 / Brutus (T)

15751

Cayuga

17803

1,000

$934,500

80

$144,921,012

Water District #7 (North Weedsport Water District), New Distribution


System

100

$561,000

80

$145,482,012

GENOA-KING FERRY WD /
Genoa (T)

Upgrade Water Treatment Plant, Upgrade Storage, Upgrade


Distribution System

900

$1,040,000

75

$146,522,012

Cayuga

AUBURN / Auburn (C)

Upgrade Water Treatment Plant, Upgrade Distribution System

29,788

$3,975,262

70

$150,497,274

17972

Cayuga

(T) BRUTUS WATER


DISTRICT #8 / Brutus (T)

New (T) Brutus WD #8 (Cottle Road), Upgrade Distribution System,


New Water District

400

$1,920,334

70

$152,417,608

16762

Cayuga

UNION SPRINGS VILLAGE


/ Union Springs (V)

New Water Treatment Plant

2,000

$165,000

65

$152,582,608

16163

Cayuga

THROOP WD NO1 / Throop


(T)

Extend Distribution System, Upgrade Distribution System

400

$1,960,142

60

$154,542,750

17220

Cayuga

VICTORY (T) WD #2 /
Victory (T)

Extend Distribution System

612

$3,389,601

55

$157,932,351

17315

Cayuga

MORAVIA (T) WATER


DISTRICT NO. 1 / Moravia
(T)

New Pump Station, Extend Distribution System

162

$663,320

55

$158,595,671

15026

Cayuga

AUBURN / Auburn (C)

Upgrade Transmission, Upgrade Pump Station

29,788

$321,875

50

$158,917,546

15904

Cayuga

AURELIUS WD NO 1 /
Aurelius (T)

Extend Distribution System

440

$2,142,690

50

$161,060,236

17989

Cayuga

FLEMING WD #1 / Fleming
(T)

West Lake Road Water Main Extension. , Extend Distribution System

1,800

$790,499

50

$161,850,735

17223

Cayuga

WEST GENESEE STREET


WATER DISTRICT /
Aurelius (T)

Extend Distribution System

175

$1,198,000

50

$163,048,735

16759

Cayuga

CAYUGA COUNTY W.S.A. /


Cayuga Co. W. S. A.

waterline installation, storage tank, pump station and WTP for Cayuga
County Water & Sewer Authority, New Water Treatment Plant, New
Storage, New Distribution System

5,900

$25,632,730

45

$188,681,465

15050

Cayuga

AUBURN / Auburn (C)

Upgrade Surface Water Source

29,788

$647,510

45

$189,328,975

17811

Cayuga

CAYUGA COUNTY WATER


& SEWER / Cayuga County
W&SA

New Centerport / Sine Roads WD in (T) Throop., Extend Distribution


System, New Water District

200

$818,850

45

$190,147,825

15043

Cayuga

AUBURN / Auburn (C)

Reservoir relining and leak repair., Upgrade Storage

29,788

$902,795

45

$191,050,620

15546

Cayuga

AUBURN / Auburn (C)

Upgrade Distribution System

29,788

$1,098,495

40

$192,149,115

17804

Cayuga

WELLS COLLEGE / Wells


College

Upgrade Water Treatment Plant, Upgrade Distribution System

400

$1,642,850

40

$193,791,965

17887

Cayuga

CATO VILLAGE / Cato (V)

New Storage

601

$1,152,505

35

$194,944,470

Page 5 of 86

NYS Drinking Water State Revolving Fund DRAFT IUP Multiyear List

October 1, 2012 to September 30, 2013

Project County

System Name/
Borrower

Description

Pop.

Project Cost

Score

Cumulative
Total

Cayuga County
15949

Cayuga

MORAVIA VILLAGE /
Moravia (V)

Upgrade Distribution System

1,950

$789,600

30

$195,734,070

17329

Cayuga

OWASCO WATER
DISTRICT / Owasco (T)

Upgrade Water Treatment Plant, New Storage, Upgrade Distribution


System

3,000

$6,180,000

30

$201,914,070

15634

Cayuga

SENNETT WD #1 / Sennett
(T)

Upgrade Distribution System

200

$470,339

25

$202,384,409

15631

Cayuga

SENNETT WD #3 / Sennett
(T)

Upgrade Distribution System

400

$307,760

20

$202,692,169

17990

Cayuga

FLEMING WD #1 / Fleming
(T)

Upgrade Distribution System

1,800

$3,386,228

20

$206,078,397

FORESTVILLE VILLAGE /
Forestville (V)

New Surface Water Treatment Rule Compliance Facility, New Ground


Water Source, Upgrade Distribution System

1230

$206,078,397

Chautauqua County
17561

Chautauqua

804

$0

NOTE: Short - Term Loan Closed, Project Cost Shown is


Remaining Balance Not Funded With Short Term Loan

17576

Chautauqua

CHERRY CREEK VILLAGE


/ Cherry Creek (V)

New Surface Water Treatment Rule Compliance Facility, Upgrade


Distribution System

650

$0

1205

$206,078,397

NOTE: Short - Term Loan Closed, Project Cost Shown is


Remaining Balance Not Funded With Short Term Loan

17637

Chautauqua

NORTH END WD / Pomfret


(T)

Extend distribution system to area with contaminated private wells and


consolidate PWS with Coliform, New Distribution System

17622

Chautauqua

BROCTON VILLAGE /
Brocton (V)

Address turbidity violations, Surface Water Treatment Rule


Compliance Facility, Upgrade Water Treatment Plant

17432

Chautauqua

CASSADAGA VILLAGE /
Cassadaga (V)

17481

Chautauqua

18004

900

$4,432,100

200

$210,510,497

4,000

$3,295,000

145

$213,805,497

New Ground Water Source, New Storage, Upgrade Distribution System

760

$5,047,000

125

$218,852,497

CHERRY CREEK VILLAGE


/ Cherry Creek (V)

New well to replace GUDI springs., New Ground Water Source

650

$392,275

125

$219,244,772

Chautauqua

WESTFIELD VILLAGE /
Westfield (V)

Address inadequate source capacity and insuffcient pressure, Upgrade


Storage, Upgrade Distribution System

3,450

$3,977,200

120

$223,221,972

17614

Chautauqua

DUNKIRK CITY / Dunkirk


(C)

Upgrade Water Treatment Plant, Upgrade Distribution System

15,310

$17,705,600

105

$240,927,572

17279

Chautauqua

SHOREHAVEN WATER
DISTRICT / Westfield (T)

Extend Distribution System, System Consolidation

120

$206,000

100

$241,133,572

17554

Chautauqua

PORTLAND (T) WATER


DISTRICT NO. 7 / Portland
(T)

Serve 218 parcels currently on insufficient private wells on portions of


Route 5 and Walker Road. Consolidate DJ's Campground., New
System Consolidation, New Water District

333

$1,700,000

100

$242,833,572

16613

Chautauqua

MAYVILLE VILLAGE /
Mayville (V)

Upgrade Ground Water Source, Upgrade Transmission, Upgrade


Storage, Upgrade Distribution System

1,856

$2,884,000

90

$245,717,572

18043

Chautauqua

BARCELONNA WD /
Westfield (T)

New Town WD to aquire private water system. Other funding sources


may be required to make project viable and eligible for DWSRF,
Upgrade Distribution System, New Water District

128

$1,792,125

85

$247,509,697

17377

Chautauqua

SILVER CREEK VILLAGE /


Silver Creek (V)

Upgrade Distribution System

3,100

$0

80

$247,509,697

15236

Chautauqua

SHERMAN VILLAGE /
Sherman (V)

Address total Coli violations., Upgrade Distribution System

917

$795,000

80

$248,304,697

16012

Chautauqua

WESTFIELD VILLAGE /
Westfield (V)

East Main St., Upgrade Distribution System

3,450

$950,000

70

$249,254,697

Page 6 of 86

NYS Drinking Water State Revolving Fund DRAFT IUP Multiyear List

October 1, 2012 to September 30, 2013

Project County

System Name/
Borrower

Description

Pop.

Project Cost

Score

Cumulative
Total

Chautauqua County
15617

Chautauqua

HANOVER WATER
DISTRICT #1 / Hanover (T)

Extension #4., Extend Distribution System

17218

Chautauqua

FREDONIA VILLAGE /
Fredonia (V)

Upgrade Water Treatment Plant

17482

Chautauqua

WESTFIELD VILLAGE /
Westfield (T)

16014

Chautauqua

15124

2,173

$666,300

70

$249,920,997

10,400

$1,287,500

65

$251,208,497

Extend Distribution System

3,450

$506,700

65

$251,715,197

WESTFIELD VILLAGE /
Westfield (T)

New Distribution System

3,450

$520,300

60

$252,235,497

Chautauqua

DUNKIRK CITY / Dunkirk


(C)

Extension to (T) of Portland and (V) of Brocton., New Transmission,


New Pump Station, System Consolidation

15,310

$2,915,000

60

$255,150,497

15021

Chautauqua

DUNKIRK CITY / Dunkirk


(C)

Extension to (T) of Sheridan and (V) of Silver Creek., New


Transmission, System Consolidation

15,310

$3,530,000

60

$258,680,497

16406

Chautauqua

FORESTVILLE VILLAGE /
Forestville (V)

Upgrade Distribution System

804

$200,000

60

$258,880,497

16188

Chautauqua

WESTFIELD VILLAGE /
Westfield (V)

Upgrade Water Treatment Plant

3,450

$2,150,000

50

$261,030,497

16559

Chautauqua

HANOVER WATER
DISTRICT #1 / Hanover (T)

Extend Distribution System

2,173

$1,287,500

50

$262,317,997

16908

Chautauqua

BUSTI (T) WATER


DISTRICT #3 / Busti (T)

Extend Distribution System

450

$750,000

50

$263,067,997

15724

Chautauqua

LAKEWOOD VILLAGE /
Lakewood (V)

New Transmission, New Pump Station, Inter-Connection

3,258

$870,000

45

$263,937,997

15022

Chautauqua

DUNKIRK CITY / Dunkirk


(C)

Upgrade Water Treatment Plant, Upgrade Distribution System

15,310

$2,726,000

40

$266,663,997

16296

Chautauqua

SINCLAIRVILLE VILLAGE /
Sinclairville (V)

Upgrade Ground Water Source, Upgrade Pump Station

772

$50,000

40

$266,713,997

16183

Chautauqua

WESTFIELD VILLAGE /
Westfield (V)

E. Main Street and Cass Street., Upgrade Distribution System

3,450

$257,206

35

$266,971,203

16022

Chautauqua

FREDONIA VILLAGE /
Fredonia (V)

New Transmission, Upgrade Distribution System, System Consolidation

10,400

$716,800

35

$267,688,003

16184

Chautauqua

WESTFIELD VILLAGE /
Westfield (V)

Oak St., Upgrade Distribution System

3,450

$90,305

35

$267,778,308

16024

Chautauqua

FREDONIA VILLAGE /
Fredonia (V)

New Transmission, New Storage

10,400

$779,200

30

$268,557,508

16181

Chautauqua

WESTFIELD VILLAGE /
Westfield (V)

Clean & reconstruct waterlines., Upgrade Distribution System

3,450

$600,000

30

$269,157,508

16665

Chautauqua

WESTFIELD VILLAGE /
Westfield (V)

Upgrade Distribution System

3,450

$54,167

30

$269,211,675

16609

Chautauqua

HANOVER WATER
DISTRICT #1 / Hanover (T)

Upgrade Distribution System

2,173

$939,000

30

$270,150,675

Page 7 of 86

NYS Drinking Water State Revolving Fund DRAFT IUP Multiyear List

October 1, 2012 to September 30, 2013

Project County

System Name/
Borrower

Description

Pop.

Project Cost

Score

Cumulative
Total

Chautauqua County
16294

Chautauqua

SINCLAIRVILLE VILLAGE /
Sinclairville (V)

Upgrade Distribution System

772

$45,000

30

$270,195,675

17483

Chautauqua

RIPLEY WATER DISTRICT


/ Ripley (T)

Upgrade Distribution System

1,300

$609,760

30

$270,805,435

17484

Chautauqua

WD#1 / Carroll (T)

New Storage

2,900

$695,250

25

$271,500,685

17955

Chautauqua

CHAUTAUQUA (T) WD 3 /
Chautauqua (T)

Rte 394 Chautauqua Institution, Upgrade Distribution System

200

$700,000

25

$272,200,685

15725

Chautauqua

LAKEWOOD VILLAGE /
Lakewood (V)

New Storage

3,258

$559,600

15

$272,760,285

Chemung County
17144

Chemung

CHEMUNG (T) WATER


SYSTEM / Chemung (T)

Consolidate PWS with Coliform contamination, extend to private


contaminated/poor yielding wells, New Complete System (New
System), New System Consolidation

280

$5,651,000

125

$278,411,285

17628

Chemung

BEAVER VALLEY WATER


DISTRICT / Catlin (T)

Develop a redundant groundwater source. New auxiliary power source.


recoat storage tank., New Ground Water Source, Upgrade Storage

550

$787,950

100

$279,199,235

16576

Chemung

NORTHSTAR MHP /
Leading Edge Properties

water softener system and, Upgrade Distribution System

400

$93,113

60

$279,292,348

16560

Chemung

ELMIRA WATER BOARD /


Elmira Water Board

Upgrade Distribution System

65,000

$1,545,000

45

$280,837,348

17998

Chemung

HORSEHEADS VILLAGE /
Horseheads (V)

New Storage

11,530

$2,541,709

45

$283,379,057

16260

Chemung

MILLPORT VILLAGE
WATER SUPPLY / Millport
(V)

Upgrade Ground Water Source

292

$125,000

40

$283,504,057

16577

Chemung

BELLAIR MOBILE HOME


PARK / Elmira LLC

Upgrade Distribution System

225

$131,250

35

$283,635,307

16723

Chemung

WELLSBURG VILLAGE /
Wellsburg (V)

Upgrade Distribution System

631

$644,700

35

$284,280,007

16427

Chemung

ROLLING ACRES MOBILE


HOME PARK / Ashford
Management Group, Inc.

Upgrade Distribution System

93

$139,000

10

$284,419,007

1,531

$1,300,000

2210

$285,719,007

Chenango County
17773

Chenango

SHERBURNE VILLAGE /
Sherburne (V)

Phase 2 of 15237. Arsenic Removal Treatment for wells funded under


first phase, Upgrade Ground Water Source

17425

Chenango

SO. NEW BERLIN WATER


DISTRICT / New Berlin (T)

New Ground Water Source, New Transmission, New Storage, Upgrade


Distribution System, System Consolidation

400

$3,272,000

215

$288,991,007

16991

Chenango

OXFORD WATER
DISTRICT #1 / Oxford (T)

Surface Water Treatment Rule Compliance Facility, New Transmission

50

$122,500

160

$289,113,507

16912

Chenango

NO. NORWICH (T) WD #1 /


North Norwich (T)

New system to serve area with private contaminated wells, consolidate


public water supply, eliminate public water supply with past total
coliform detection. , New Distribution System

100

$920,300

130

$290,033,807

17609

Chenango

NORWICH CITY / Norwich


(C)

New Water Treatment Plant

8,000

$8,652,000

65

$298,685,807

Page 8 of 86

NYS Drinking Water State Revolving Fund DRAFT IUP Multiyear List

October 1, 2012 to September 30, 2013

Project County

System Name/
Borrower

Description

Pop.

Project Cost

Score

Cumulative
Total

Chenango County
16687

Chenango

NORWICH TOWN WATER


DISTRICT #2 / Norwich (T)

Extend Distribution System

15944

Chenango

OXFORD VILLAGE / Oxford


(V)

18076

Chenango

OXFORD VILLAGE / Oxford


(V)

200

$390,885

45

$299,076,692

New Ground Water Source, Upgrade Distribution System

1,738

$154,039

40

$299,230,731

New Storage

1,738

$250,290

25

$299,481,021

1,000

$3,339,464

200

$302,820,485

90

$112,000

105

$302,932,485

260

$876,000

100

$303,808,485

18,000

$4,550,000

95

$308,358,485

Clinton County
15569

Clinton

ELLENBURG (T) / Ellenburg Development of public water system to serve area with contaminated
water sources, Extend Distribution System
(T)

17686

Clinton

SARANAC WD / Saranac
(T)

New Surface Water Treatment Rule Compliance Facility

17356

Clinton

ARCHIE BORDEAU WD /
Plattsburgh (T)

Extend Distribution System, New System Consolidation

17492

Clinton

PLATTSBURGH CITY /
Plattsburgh (C)

New Storage

17179

Clinton

SOUTH PLATTSBURGH
WATER DISTRICT /
Plattsburgh (T)

New Pump Station, New Distribution System, New System


Consolidation

2,000

$4,575,000

90

$312,933,485

16498

Clinton

CHAMPLAIN (T) /
Champlain (T)

Develop Source for Town Districts (4), New Ground Water Source,
Upgrade Transmission, Upgrade Storage, Upgrade Distribution System

1,350

$2,131,740

85

$315,065,225

17796

Clinton

STANDISH WATER
DISTRICT / Saranac (T)

Upgrade Water Treatment Plant, New Ground Water Source

110

$78,000

85

$315,143,225

17533

Clinton

CHAMPLAIN VILLAGE /
Champlain (V)

Upgrade Water Treatment Plant, New Storage, Upgrade Distribution


System

2,947

$1,883,226

75

$317,026,451

16371

Clinton

CHAMPLAIN VILLAGE /
Champlain (V)

Distribution Loops, Upgrade Distribution System

2,947

$531,675

65

$317,558,126

17729

Clinton

PERU WD / Peru (T)

New Other Expenses, New Other (OT)

2,600

$260,000

65

$317,818,126

17477

Clinton

SOUTH STREET WATER


DISTRICT / Champlain (T)

Extend Distribution System

30

$216,300

55

$318,034,426

17479

Clinton

WEST SERVICE ROAD WD Extend Distribution System


/ Champlain (T)

30

$675,284

55

$318,709,710

17227

Clinton

WATER DISTRICT
EXTENSION NO. 1 / Chazy
(T)

Extend Distribution System

40

$265,000

55

$318,974,710

17391

Clinton

NCCS JUNIOR-SENIOR
HIGH SCHOOL / NCCS

New Inter-Connection, New System Consolidation

1,121

$323,832

55

$319,298,542

17478

Clinton

ROUTE 11 WD / Champlain
(T)

Extend Distribution System

100

$1,267,380

55

$320,565,922

17821

Clinton

WATER DISTRICT NO. 1 /


Beekmantown (T)

Extend Distribution System

200

$2,280,875

50

$322,846,797

15660

Clinton

TOWN OF MOOERS
PROPOSED WD#1 /
Mooers (T)

Extend Distribution System

1,250

$6,212,250

50

$329,059,047

Page 9 of 86

NYS Drinking Water State Revolving Fund DRAFT IUP Multiyear List

October 1, 2012 to September 30, 2013

Project County

System Name/
Borrower

Description

Pop.

Project Cost

Score

Cumulative
Total

Clinton County
17680

Clinton

PLATTSBURGH CITY /
Plattsburgh (C)

Upgrade Water Treatment Plant, Upgrade Transmission

18,000

$7,370,000

50

$336,429,047

18027

Clinton

PLATTSBURGH AIRPORT /
Clinton County

Upgrade Distribution System

47,000

$10,402,825

40

$346,831,872

17309

Clinton

PLEASANT RIDGE
TRAILER PARK / Pleasant
Ridge MHP

New Storage

50

$8,096

40

$346,839,968

17850

Clinton

AUSABLE HEIGHTS
WATER SYSTEM / AuSable
(T)

Upgrade Distribution System

40

$425,000

35

$347,264,968

17687

Clinton

CHAMPLAIN VILLAGE /
Champlain (V)

Upgrade Distribution System

2,947

$438,265

30

$347,703,233

17731

Clinton

ROUSES POINT VILLAGE


WD / Rouses Point (V)

Upgrade Surface Water Source

2,550

$1,107,510

30

$348,810,743

17340

Clinton

GREATER PLATTSBURGH
WATER DISTRICT /
Plattsburgh (T)

New Other Expenses, New Other (OT)

10,000

$541,000

25

$349,351,743

17795

Clinton

MORRISONVILLE WATER
DISTRICT / Plattsburgh (T)

Upgrade Pump Station

1,300

$225,320

25

$349,577,063

17683

Clinton

PLEASANT RIDGE WD /
Plattsburgh (T)

New Storage

168

$3,190,000

25

$352,767,063

15401

Clinton

PERU WD / Peru (T)

Upgrade Surface Water Source, New Transmission

2,600

$620,000

25

$353,387,063

16230

Clinton

GREATER PLATTSBURGH
WATER DISTRICT /
Schuyler Falls (T)

New Storage

10,000

$565,000

20

$353,952,063

16227

Clinton

GREATER PLATTSBURGH
WATER DISTRICT /
Schuyler Falls (T)

Upgrade Pump Station

10,000

$142,000

20

$354,094,063

16494

Clinton

CHAMPLAIN (T) /
Champlain (T)

System Acquisition-"Benefit Area #1", New Ground Water Source, New


Distribution System

50

$497,200

20

$354,591,263

147

$233,295

165

$354,824,558

Columbia County
16394

Columbia

MAPLE LANE
ASSOCIATES / Maple Lane
Associates

New Ground Water Source, New Transmission, New Distribution


System

18031

Columbia

VALATIE VILLAGE / Valatie


(V)

New Surface Water Treatment Rule Compliance Facility, New Other


Expenses, New Ground Water Source, Upgrade Transmission,
Upgrade Distribution System, New Other (OT)

2,000

$1,982,750

135

$356,807,308

15532

Columbia

CHATHAM VILLAGE /
Chatham (V)

Upgrade Ground Water Source, Upgrade Storage

2,156

$724,800

85

$357,532,108

16444

Columbia

DARROW SCHOOL / The


Darrow School

New Ground Water Source, New Storage

150

$169,950

75

$357,702,058

16920

Columbia

HAMLET OF EAST
CHATHAM / Chatham (T)

New Complete System (New System)

65

$1,009,745

45

$358,711,803

15765

Columbia

GREENPORT WD NO1 /
Greenport (T)

Charles St., Janis St., Greenport Pkwy., and Rte. 9, Upgrade


Distribution System

4,050

$651,475

40

$359,363,278

15769

Columbia

GREENPORT WD NO1 /
Greenport (T)

Upgrade Pump Station

4,050

$637,313

35

$360,000,591

Page 10 of 86

NYS Drinking Water State Revolving Fund DRAFT IUP Multiyear List
October 1, 2012 to September 30, 2013
Project County

System Name/
Borrower

Description

Pop.

Project Cost

Score

Cumulative
Total

Columbia County
16489

Columbia

HHD CORP. NORTH


SHORE. / HHD
Development Corporation

Upgrade Distribution System

15535

Columbia

CHATHAM VILLAGE /
Chatham (V)

15761

Columbia

15757

15117

75

$225,000

35

$360,225,591

Upgrade Ground Water Source, Upgrade Distribution System

2,156

$1,240,000

35

$361,465,591

GREENPORT WD NO1 /
Greenport (T)

Control System Improvements, Upgrade Distribution System

4,050

$354,063

30

$361,819,654

Columbia

GREENPORT WD NO1 /
Greenport (T)

Upgrade Storage

4,050

$80,443

25

$361,900,097

Columbia

BREEZY HILLS
COMMUNITY / Hunt's
Homestead MHP

Upgrade Storage

51

$41,200

15

$361,941,297

Cortland County
15294

Cortland

HOMER
VILLAGE-NEWTON
WATER WORKS / Homer
(V)

New Transmission, New Pump Station

4,368

$325,000

100

$362,266,297

17992

Cortland

MCGRAW VILLAGE /
McGraw (V)

Upgrade Distribution System

1,306

$4,222,961

90

$366,489,258

18007

Cortland

MARATHON VILLAGE /
Marathon (V)

New Storage, New Pump Station, Upgrade Distribution System

1,107

$2,947,345

55

$369,436,603

15297

Cortland

HOMER
VILLAGE-NEWTON
WATER WORKS / Homer
(V)

Upgrade Distribution System

4,368

$440,000

50

$369,876,603

15287

Cortland

VIRGIL (T) / Virgil (T)

Upgrade Ground Water Source, New Storage, Extend Distribution


System, System Consolidation

345

$2,223,234

50

$372,099,837

17760

Cortland

MARATHON VILLAGE /
Marathon (V)

New Transmission, New Storage, Upgrade Distribution System

1,107

$1,706,000

40

$373,805,837

17190

Cortland

CINCINNATUS WATER
DISTRICT / Cincinnatus (T)

Upgrade Ground Water Source, Upgrade Transmission

650

$126,500

30

$373,932,337

15298

Cortland

HOMER
VILLAGE-NEWTON
WATER WORKS / Homer
(V)

New Transmission, New Storage

4,368

$528,750

25

$374,461,087

Delaware County
17866

Delaware

GRAND GORGE WATER


DISTRICT / Town of
Roxbury

Phase 3 of 15624 (Phase 2 was 17228): Treat or Replace GWUDI


Wells, New Surface Water Treatment Rule Compliance Facility

370

$992,000

2245

$375,453,087

15996

Delaware

FRANKLIN VILLAGE /
Franklin (V)

New Water Treatment Plant, New Ground Water Source, New Storage,
Extend Distribution System, Upgrade Distribution System

481

$2,301,077

195

$377,754,164

17537

Delaware

DOWNSVILLE WATER
DISTRICT / Colchester (T)

Package Filtration Plant for GWUDI Spring Source and Addition of


Corrosion Control Treatment., New Surface Water Treatment Rule
Compliance Facility, New Water Treatment Plant

500

$92,400

165

$377,846,564

16606

Delaware

DELHI VILLAGE / Delhi (V)

Upgrade Distribution System, New System Consolidation

3,833

$1,373,428

95

$379,219,992

15843

Delaware

MARGARETVILLE
VILLAGE / Margaretville (V)

Upgrade Storage, Upgrade Distribution System

700

$737,900

75

$379,957,892

17417

Delaware

ARKVILLE WATER
DISTRICT / Middletown (T)

Extend distribution, 100,000 gallons of storage, 100 gpm well, system


consolidation., New Ground Water Source, New Storage, Extend
Distribution System, Extend System Consolidation

400

$1,833,375

65

$381,791,267

Page 11 of 86

NYS Drinking Water State Revolving Fund DRAFT IUP Multiyear List

October 1, 2012 to September 30, 2013

Project County

System Name/
Borrower

Description

Pop.

Project Cost

Score

Cumulative
Total

Delaware County
16653

Delaware

WALTON VILLAGE / Walton


(V)

Upgrade Controls, Upgrade Ground Water Source, Upgrade


Distribution System

17940

Delaware

ROXBURY WATER
DISTRICT / Roxbury (T)

15316

Delaware

15836

3,070

$0

60

$381,791,267

Upgrade Storage, Upgrade Distribution System

755

$1,423,000

55

$383,214,267

ARKVILLE WATER
DISTRICT / Middletown (T)

Upgrade Ground Water Source

400

$494,400

35

$383,708,667

Delaware

MARGARETVILLE
VILLAGE / Margaretville (V)

Upgrade Distribution System

700

$1,011,000

35

$384,719,667

17791

Delaware

STAMFORD VILLAGE /
Stamford (V)

New Storage, Upgrade Distribution System

1,280

$2,575,000

35

$387,294,667

17956

Delaware

ROXBURY WATER
DISTRICT / Roxbury (T)

Installation of water meters.,

755

$358,178

30

$387,652,845

300

$3,575,000

160

$391,227,845

1,907

$1,270,000

155

$392,497,845

Dutchess County
16618

Dutchess

SHOREHAVEN CIVIC
ASSOC / DCWWA

DCWWA ZONE J SHOREHAVEN WATER SYSTEM, Upgrade Water


Treatment Plant, Upgrade Ground Water Source, Upgrade Distribution
System

16741

Dutchess

PAWLING VILLAGE /
Pawling (V)

New Surface Water Treatment Rule Compliance Facility, New Ground


Water Source

15292

Dutchess

WAPPINGER PARK
HOMES / Wappinger (T)

Central Wappinger Water Improvement Area, Ardmore Hills Water


Impr. Area, N. Wappinger Water Impr. Area, Cranberry Hills Water Impr.
Area, & Meadowood and Cedar Ridge Subdiv., New Storage, System
Consolidation

400

$14,676,600

155

$407,174,445

16876

Dutchess

BRETTVIEW ACRES
WATER CO / Brettview
Water Co. Inc.

New Surface Water Treatment Rule Compliance Facility

920

$40,800

115

$407,215,245

17071

Dutchess

BIRCH HILL MANOR /


DCWWA

DCWWA ZONE K BIRCH HILL WATER SYSTEM, Upgrade Water


Treatment Plant, New Ground Water Source

200

$575,000

115

$407,790,245

17574

Dutchess

PLEASANT VALLEY WD /
Pleasant Valley (T)

New Complete System (New System)

2,500

$7,855,000

110

$415,645,245

15301

Dutchess

TIVOLI VILLAGE WATER /


Tivoli (V)

Construct new supply well(s), upgrade treatment, new storage, upgrade


storage, upgrade distribution, Upgrade Water Treatment Plant, New
Ground Water Source, New Storage, Upgrade Pump Station, Upgrade
Distribution System

1,303

$3,729,700

105

$419,374,945

17021

Dutchess

ROKEBY HOMES,INC. /
DCWWA

DCWWA ZONE F PROJECT ROKEBY WATER SYSTEM , Upgrade


Water Treatment Plant, Upgrade Ground Water Source, Upgrade
Distribution System, New System Consolidation

160

$495,356

100

$419,870,301

17338

Dutchess

DUTCHESS ESTATES INC / Upgrade Ground Water Source, Upgrade Storage, Upgrade Pump
Station
Dutchess Estates Water
Company

500

$455,388

100

$420,325,689

16534

Dutchess

WAPPINGER PARK
HOMES / Wappinger (T)

Consolidation of Wappinger Park, Tall Trees, and Oakwood Water


Districts, New Transmission, New Inter-Connection

400

$7,649,165

95

$427,974,854

16111

Dutchess

BARD COLLEGE / Bard


College

Upgrade Water Treatment Plant, New Storage

1,400

$2,100,000

85

$430,074,854

17949

Dutchess

HIGH MEADOWS PARK


INC / High Meadows Co-op
Corp

New Ground Water Source, Upgrade Storage

500

$44,577

75

$430,119,431

17282

Dutchess

RHINEBECK VILLAGE
WATER / Rhinebeck (V)

Upgrade Water Treatment Plant

4,300

$365,200

65

$430,484,631

16737

Dutchess

DOVER RIDGE ESTATES /


Beekman (T)

Upgrade Ground Water Source

250

$266,500

65

$430,751,131

Page 12 of 86

NYS Drinking Water State Revolving Fund DRAFT IUP Multiyear List

October 1, 2012 to September 30, 2013

Project County

System Name/
Borrower

Description

Pop.

Project Cost

Score

Cumulative
Total

Dutchess County
16236

Dutchess

RED HOOK VILLAGE / Red


Hook (V)

New Ground Water Source, Upgrade Ground Water Source, New


Storage, Upgrade Distribution System

2,214

$9,328,300

60

$440,079,431

15740

Dutchess

AMENIA WATER DISTRICT


NO 1 / Amenia (T)

New Storage, Upgrade Distribution System

1,000

$1,480,000

55

$441,559,431

17868

Dutchess

WOODHILL GREEN /
Woodhill Green Condos

New Water Treatment Plant, Upgrade Ground Water Source

483

$1,450,000

55

$443,009,431

15295

Dutchess

BEEKMAN (T) / Beekman


(T)

New Complete System (New System), New Distribution System

80

$579,478

45

$443,588,909

17505

Dutchess

PAWLING WD #2 / Pawling
(T) WD #2

Upgrade Water Treatment Plant, Upgrade Ground Water Source,


Upgrade Pump Station

225

$218,820

45

$443,807,729

18080

Dutchess

POUGHKEEPSIE CITY /
Poughkeepsie JWB

Upgrade Surface Water Treatment Rule Compliance Facility

28,000

$17,252,706

45

$461,060,435

18028

Dutchess

POUGHKEEPSIE CITY /
City of Poughkeepsie

Upgrade Other Expenses, Upgrade Other (OT)

28,000

$4,311,035

40

$465,371,470

16803

Dutchess

LAGRANGE/MANCHESTER New Water District


/ LaGrange (T)

2,500

$7,813,000

40

$473,184,470

17957

Dutchess

BARD COLLEGE / Bard


College

New microfiltration plant.,

1,400

$991,620

40

$474,176,090

17421

Dutchess

POUGHKEEPSIE CITY /
Poughkeepsie (C)

College Hill Reservoir., New Storage

28,000

$6,746,500

40

$480,922,590

17420

Dutchess

POUGHKEEPSIE CITY /
Poughkeepsie (C)

Upgrade Distribution System

28,000

$4,223,000

40

$485,145,590

15645

Dutchess

POUGHKEEPSIE
TOWNWIDE WD /
Poughkeepsie (T)

System Consolidation

40,000

$6,650,000

35

$491,795,590

17725

Dutchess

DUTCHESS COUNTY
WATER/WASTEWATER
PLANT / DCWWA

New Distribution System, Extend System Consolidation

7,012

$4,417,000

35

$496,212,590

16246

Dutchess

LITTLE SWITZERLAND /
East Fishkill (T)

Upgrade Distribution System, System Consolidation

450

$428,900

35

$496,641,490

15938

Dutchess

TACONIC ESTATES
WATER DISTRICT / East
Fishkill (T)

New Ground Water Source, System Consolidation

185

$148,000

35

$496,789,490

16583

Dutchess

LAKE LODGES
APARTMENTS / Lake
Lodge Apts.

New Ground Water Source, Upgrade Pump Station, Upgrade


Distribution System

30

$85,000

35

$496,874,490

16461

Dutchess

STONY CREEK FARMS


(TOWN HOMES / Stoney
Creek Farms Homeowners

New Water Treatment Plant

21

$18,000

30

$496,892,490

16297

Dutchess

WINGDALE VILLAGE PARK Upgrade Water Treatment Plant, New Ground Water Source
/ Wingdale Village Park

150

$74,000

30

$496,966,490

16845

Dutchess

VICTORY LAKE NURSING


CENTER / Victory Lake
Nursing Center

Upgrade Storage, Upgrade Distribution System

190

$367,092

30

$497,333,582

16384

Dutchess

TOWN OF NORTHEAST
WD / Northeast (T)

Upgrade Distribution System, New Water District

411

$100,000

20

$497,433,582

Page 13 of 86

NYS Drinking Water State Revolving Fund DRAFT IUP Multiyear List
October 1, 2012 to September 30, 2013
Project County

System Name/
Borrower

Description

Pop.

Project Cost

Score

Cumulative
Total

Dutchess County
17419

Dutchess

WAPPINGERS FALLS
VILLAGE / Wappinger Falls
(V)

Upgrade Storage, New Storage, Upgrade Distribution System

18001

Dutchess

BEACON CITY / Beacon (C)

18000

Dutchess

17999

6,000

$6,238,532

20

$503,672,114

Upgrade Distribution System

19,000

$509,737

20

$504,181,851

BEACON CITY / Beacon (C)

Upgrade Distribution System

19,000

$972,907

20

$505,154,758

Dutchess

BEACON CITY / Beacon (C)

Upgrade Pump Station

19,000

$71,379

15

$505,226,137

17959

Dutchess

SHOREHAVEN CIVIC
ASSOC / DCWWA

Installation of water meters.,

300

$61,692

15

$505,287,829

15930

Dutchess

RHINEBECK VILLAGE
WATER / Rhinebeck (V)

Remediate backwash "Sludge Pond", Upgrade Water Treatment Plant

4,300

$223,000

15

$505,510,829

17938

Dutchess

DUTCHESS COUNTY
WATER/WASTEWATER
PLANT / DCWWA

North Tank Rehab, Upgrade Storage

7,012

$511,500

15

$506,022,329

15927

Dutchess

RHINEBECK VILLAGE
WATER / Rhinebeck (V)

Upgrade Distribution System

4,300

$1,569,000

15

$507,591,329

17937

Dutchess

DUTCHESS COUNTY
WATER/WASTEWATER
PLANT / DCWWA

South Tank Rehab, Upgrade Storage

7,012

$679,800

15

$508,271,129

16514

Dutchess

DUTCHESS CO WATER
AUTH - VALLEYDALE /
DCWWA

Dutchess County Water and Waste Water Authority Zone VDW, New
Ground Water Source, Upgrade Distribution System

500

$1,626,100

15

$509,897,229

17688

Dutchess

WOODHILL GREEN /
Woodhill Green Condos

New Water Treatment Plant, Upgrade Ground Water Source

483

$1,450,000

15

$511,347,229

17709

Dutchess

DUTCHESS COUNTY
WATER/WASTEWATER
PLANT / DCWWA

Replace asbestos cement water mains, Upgrade Distribution System

7,012

$2,133,000

15

$513,480,229

15662

Dutchess

PINE PLAINS WATER


IMPROVEMENT / Pine
Plains (T)

Upgrade Distribution System

860

$1,617,284

15

$515,097,513

17424

Dutchess

LEIGH MANOR / Leona


Darrow

Upgrade Ground Water Source

15

$100,000

15

$515,197,513

16540

Dutchess

CHARLOTTE GROVE
MOBILE HOME CT /
Charlette Grove MH Court

Upgrade Distribution System

112

$302,820

10

$515,500,333

17705

Dutchess

STAATSBURG WATER
SYSTEM / DCWWA

Replace approximately 19,200 linear feet of aged water main in Zone


C., Upgrade Distribution System

1,072

$6,180,000

10

$521,680,333

17703

Dutchess

STAATSBURG WATER
SYSTEM / DCWWA

Rehabilitate approximately 3,000 linear feet of water main in Zone C.,


Upgrade Distribution System

1,072

$773,000

10

$522,453,333

17707

Dutchess

STAATSBURG WATER
SYSTEM / DCWWA

Replacement of approximately 15,780 linear feet of aged water main,


Upgrade Distribution System

1,072

$4,876,000

10

$527,329,333

17691

Dutchess

DUTCHESS COUNTY
WATER/WASTEWATER
PLANT / DCWWA

Replace Route 9 water main from Horseshoe Lane to St. Andrews


Road., Upgrade Distribution System

7,012

$3,646,200

10

$530,975,533

17700

Dutchess

DUTCHESS COUNTY
WATER/WASTEWATER
PLANT / DCWWA

Rehabilitate/replace approximately 35,800 linear feet of water main


associated with Crumwold Acres Subdivision., Upgrade Distribution
System

7,012

$8,806,500

10

$539,782,033

Page 14 of 86

NYS Drinking Water State Revolving Fund DRAFT IUP Multiyear List

October 1, 2012 to September 30, 2013

Project County

System Name/
Borrower

Description

Pop.

Project Cost

Score

Cumulative
Total

Dutchess County
17958

Dutchess

BEACON CITY / Beacon (C)

Installation of leak detection equipment., Upgrade Other Expenses,


Upgrade Other (OT)

19,000

$233,100

10

$540,015,133

15644

Dutchess

POUGHKEEPSIE
TOWNWIDE WD /
Poughkeepsie (T)

Upgrade Distribution System

40,000

$410,000

10

$540,425,133

17695

Dutchess

DUTCHESS COUNTY
WATER/WASTEWATER
PLANT / DCWWA

Upgrade Distribution System

7,012

$5,677,875

10

$546,103,008

17693

Dutchess

DUTCHESS COUNTY
WATER/WASTEWATER
PLANT / DCWWA

Replace Route 9 water main from Horseshoe Lane to Vanderbilt Lane.,

7,012

$5,014,200

10

$551,117,208

CHAFFEE WATER CO /
Chaffee Water Co.

New Surface Water Treatment Rule Compliance Facility, New Ground


Water Source, New Storage

1165

$551,117,208

Erie County
17457

Erie

200

$0

NOTE: Short - Term Loan Closed, Project Cost Shown is


Remaining Balance Not Funded With Short Term Loan

17442

Erie

BRANDT (T), NORTH


COLLINS (T)&(V) / North
Collins (V)

WTP improvements for lead and copper violations, Fe violations,


Asbestos Main replacement, inadequate pressures, Upgrade Water
Treatment Plant, Upgrade Transmission, Upgrade Distribution System,
New System Consolidation

17337

Erie

HUNTERS CREEK MOBILE


HOME PARK / Hunters
Creek MHP

Address total coliform detections and organic exceedances, Upgrade


Water Treatment Plant, New Storage, New Pump Station, Upgrade
Distribution System

17339

Erie

S. EAST ERIE CO.


REGIONAL WATER
PROJECT / Aurora (T)

Aurora WD19, Wales WD's2&3. Extend to serve private contaminated


wells, consolidate public water supplies, eliminate public water supply
with past coliform detections, Storage, Pump Station, Extend
Distribution System, System Consolidation

17169

Erie

ECWA DIRECT / Erie


County Water Authority

Consolidation of the (C) Buffalo's system into ECWA,, New System


Consolidation

17151

Erie

AURORA WATER
DISTRICT 18 / Aurora (T)

17592

1,915

$5,430,000

210

$556,547,208

150

$175,100

185

$556,722,308

2,950

$6,400,000

150

$563,122,308

228,869

$122,000,000

125

$685,122,308

Extend system to serve area with private contaminated wells,


consolidate public water supply, eliminate public water supply with past
total coliform detection. WD 18., Extend Distribution System

1,288

$15,704,100

120

$700,826,408

Erie

TOWN OF NEWSTEAD WD Serve area of private contaminated or poor yielding private wells, New
Distribution System, New System Consolidation
#10 PHASE 3 / Newstead
(T)

475

$3,250,000

105

$704,076,408

15922

Erie

ALDEN VILLAGE / Alden (V) Upgrade Ground Water Source

2,666

$640,003

105

$704,716,411

15736

Erie

COLLINS WD #3 / Collins
(T)

Upgrade Transmission, New Storage, Upgrade Distribution System

760

$625,000

80

$705,341,411

15982

Erie

EDEN (T) PROPOSED


WATER DISTRICT / Eden
(T)

Extend Distribution System

300

$725,000

70

$706,066,411

15981

Erie

AKRON VILLAGE / Akron


(V)

Upgrade Water Treatment Plant

2,971

$2,380,000

65

$708,446,411

17980

Erie

WATER DISTRICT NO. 2 /


Colden (T)

New Storage, New Distribution System

1,140

$16,075,000

60

$724,521,411

15880

Erie

EVANS, TOWN WATER


DEPARTMENT / Evans (T)

Angola Service Area of the NYS Thruway Authority., Extend


Distribution System

3,882

$225,000

60

$724,746,411

17395

Erie

ECWA DIRECT / Erie


County Water Authority

Consolidation of the Village of Williamsville's water system into


ECWA's., New System Consolidation

228,869

$3,723,500

60

$728,469,911

16501

Erie

BLASDELL VILLAGE /
Blasdell (V)

Consolidation of the Village system with Erie County Water Authority,


Upgrade Distribution System, New System Consolidation

3,200

$2,515,000

55

$730,984,911

15339

Erie

EAST HILL WATER


DISTRICT NO. 3 / Boston
(T)

New Storage, New Pump Station, Extend Distribution System

800

$3,708,000

55

$734,692,911

Page 15 of 86

NYS Drinking Water State Revolving Fund DRAFT IUP Multiyear List

October 1, 2012 to September 30, 2013

Project County

System Name/
Borrower

Description

Pop.

Project Cost

Score

Cumulative
Total

Erie County
18049

Erie

CONCORD TOWN WATER


SYSTEM / Town of Concord

Extend Distribution System

17670

Erie

EDEN WD#7 / Eden (T)

Eden WD#7, New Storage, New Distribution System

16851

Erie

AURORA (T) WATER IMP.


AREA NO. 5 / Aurora (T)

17673

Erie

15508

125

$335,000

55

$735,027,911

1,800

$5,460,000

55

$740,487,911

Extend Distribution System

210

$613,500

55

$741,101,411

EDEN WD#2 / Eden (T)

Eden WD#2 Shadagee Road Water Project Pump Station and


Waterlines, New Pump Station, New Distribution System

500

$5,280,000

55

$746,381,411

Erie

TOWN OF MARILLA
WATER DISTRICT #3 /
Marilla (T)

Extend Distribution System

1,530

$2,420,500

50

$748,801,911

15497

Erie

TOWN OF MARILLA
WATER DISTRICT NO. 4 /
Marilla (T)

Extend Distribution System

760

$2,249,845

50

$751,051,756

17918

Erie

BUFFALO WATER
AUTHORITY / Buffalo (C)

Upgrade Other Expenses, Upgrade Other (OT)

276,000

$7,945,178

50

$758,996,934

17394

Erie

ECWA DIRECT / Erie


County Water Authority

Consolidation of the Town of Lancaster's water system into ECWA's.,


New System Consolidation

228,869

$7,480,000

50

$766,476,934

16557

Erie

TOWN OF NEWSTEAD
WD#7 / Newstead (T)

Fletcher Road, Extend Distribution System

30

$127,300

50

$766,604,234

15439

Erie

ANGOLA VILLAGE / Angola


(V)

New Storage, Upgrade Distribution System

4,200

$4,090,000

45

$770,694,234

18012

Erie

WATER IMPROVEMENT
AREA NO. 5 / Alden (T)

Extend Distribution System

1,650

$10,873,000

45

$781,567,234

17672

Erie

EDEN WD#6 / Eden (T)

Eden WD#6, New Distribution System

500

$420,000

45

$781,987,234

17671

Erie

EDEN WD#5 / Eden (T)

Eden WD#5, New Distribution System

150

$5,880,000

45

$787,867,234

15738

Erie

COLLINS WDS #1 AND #2 /


Collins (T)

New Transmission, New Storage, Upgrade Distribution System

1,300

$566,500

45

$788,433,734

17724

Erie

GRAND ISLAND TOWN


WATER DEPT. / Grand
Island (T)

Upgrade Water Treatment Plant

19,500

$2,303,000

40

$790,736,734

15004

Erie

BOSTON (T) WD#2 /


Boston (T)

New Storage, New Pump Station, Extend Distribution System

180

$1,230,000

40

$791,966,734

17757

Erie

HAMBURG - 1 / Hamburg
(V)

Upgrade Distribution System

1,125

$1,261,000

35

$793,227,734

15606

Erie

EVANS WD #3 / Evans (T)

Extend Distribution System

457

$310,000

35

$793,537,734

17758

Erie

HAMBURG - 2 / Hamburg
(V)

Upgrade Distribution System

1,700

$2,844,000

35

$796,381,734

17730

Erie

GRAND ISLAND TOWN


WATER DEPT. / Grand
Island (T)

Upgrade Water Treatment Plant, Upgrade Pump Station

19,500

$3,130,000

35

$799,511,734

Page 16 of 86

NYS Drinking Water State Revolving Fund DRAFT IUP Multiyear List

October 1, 2012 to September 30, 2013

Project County

System Name/
Borrower

Description

Pop.

Project Cost

Score

Cumulative
Total

Erie County
15898

Erie

GOWANDA VILLAGE /
Gowanda (V)

New Transmission

15961

Erie

ELMA WATER DISTRICT


NO. 1 / Elma (T)

Upgrade Distribution System

17396

Erie

ECWA DIRECT / Erie


County Water Authority

17398

Erie

17397

2,800

$885,250

35

$800,396,984

10,287

$145,300

30

$800,542,284

Parallel 48 inch transmission mains between Van de Water WTP & Ball
Pump Station., New Transmission

228,869

$16,620,000

30

$817,162,284

ECWA DIRECT / Erie


County Water Authority

Parallel 48 inch raw water line between Van de Water raw water pump
station & WTP., New Transmission

228,869

$5,544,000

30

$822,706,284

Erie

ECWA DIRECT / Erie


County Water Authority

36 inch transmission main on Sweet Home Road., New Transmission

228,869

$5,323,909

30

$828,030,193

15534

Erie

COLLINS (T) / Collins (T)

New Pump Station

105

$235,000

30

$828,265,193

17399

Erie

ECWA DIRECT / Erie


County Water Authority

36 inch transmission main on Maple Road., New Transmission

228,869

$17,706,000

25

$845,971,193

15133

Erie

HOLLAND WATER
DISTRICT / Holland (T)

Upgrade Water Treatment Plant, New Ground Water Source

1,680

$200,000

25

$846,171,193

16016

Erie

DEPEW VILLAGE / Depew


(V)

Extend Distribution System

7,500

$112,500

25

$846,283,693

17759

Erie

WATER MAIN
REPLACEMENT / Hamburg
(T)

Upgrade Distribution System

43,425

$3,103,000

20

$849,386,693

15479

Erie

ECWA DIRECT / ECWA/


Amherst (T)

Town of Amherst-Sheridan Dr. to Klein Rd., Upgrade Distribution


System

228,869

$550,000

20

$849,936,693

17620

Erie

WINDOVER WATER CO
WM REPLACEMENT /
Windover Water Co

Upgrade Distribution System

20

$189,000

20

$850,125,693

16578

Erie

SPRINGVILLE MOBILE
VILLAGE / Parss Properties

New Ground Water Source

90

$48,600

20

$850,174,293

15484

Erie

ECWA DIRECT / ECWA/


Amherst (T)

Town of Amherst WD 15C - Niagara Falls Blvd., Upgrade Distribution


System

228,869

$300,000

20

$850,474,293

16758

Erie

W. SENECA WD#3 / West


Seneca (T)

Orchard Park Road Watermain, Upgrade Distribution System

520

$460,000

20

$850,934,293

16042

Erie

EAST AURORA VILLAGE /


East Aurora (V)

Upgrade Distribution System

7,200

$1,707,950

20

$852,642,243

15486

Erie

ECWA DIRECT / ECWA/


Amherst (T)

Town of Amherst WD 15C - Casey Rd., Upgrade Distribution System

228,869

$250,000

20

$852,892,243

16167

Erie

GRAND ISLAND (T) / Grand


Island (T)

Upgrade Water Treatment Plant

18,000

$1,459,374

20

$854,351,617

15477

Erie

ECWA DIRECT / ECWA/


Amherst (T)

Town of Amherst WD 15C - Country Parkway., Upgrade Distribution


System

228,869

$275,000

20

$854,626,617

16815

Erie

LANCASTER (V) /
Lancaster (V)

Upgrade Distribution System

11,940

$1,670,454

15

$856,297,071

Page 17 of 86

NYS Drinking Water State Revolving Fund DRAFT IUP Multiyear List
October 1, 2012 to September 30, 2013
Project County

System Name/
Borrower

Description

Pop.

Project Cost

Score

Cumulative
Total

Erie County
17726

Erie

GRAND ISLAND TOWN


WATER DEPT. / Grand
Island (T)

New Transmission

15469

Erie

WILLIAMSVILLE (V) /
Williamsville (V)

Los Robles Street water reconstruction project., Upgrade Distribution


System

18003

Erie

CATTARAUGUS STREET
WATER DISTRICT /
Concord (T)

New Distribution System, New Water District

17734

Erie

GRAND ISLAND TOWN


WATER DEPT. / Grand
Island (T)

Upgrade Storage

15444

Erie

WILLIAMSVILLE (V) /
Williamsville (V)

Northeast quadrant transmission system improvements., Upgrade


Distribution System

17733

Erie

GRAND ISLAND TOWN


WATER DEPT. / Grand
Island (T)

New Transmission

17690

Erie

CONSOLIDATED WATER
DISTRICT / Lancaster (T)

Upgrade Distribution System

16740

Erie

ORCHARD PARK (T) /


Orchard Park (T)

2000 water system improvements., Upgrade Distribution System

17335

Erie

WILLIAMSVILLE (V) /
Williamsville (V)

16396

Erie

16187

19,500

$500,000

15

$856,797,071

6,017

$408,447

15

$857,205,518

13

$325,000

15

$857,530,518

19,500

$2,100,000

15

$859,630,518

6,017

$808,396

15

$860,438,914

19,500

$1,250,000

15

$861,688,914

500

$2,725,000

10

$864,413,914

28,000

$7,081,000

10

$871,494,914

Upgrade Distribution System

6,017

$2,700,000

10

$874,194,914

ORCHARD PARK VILLAGE


/ Orchard Park (V)

Upgrade Distribution System

3,100

$50,000

10

$874,244,914

Erie

GRAND ISLAND TOWN


WATER DEPT. / Grand
Island (T)

Upgrade Water Treatment Plant

19,500

$340,000

10

$874,584,914

16185

Erie

GRAND ISLAND TOWN


WATER DEPT. / Grand
Island (T)

Sandy Beach waterline improvements., Upgrade Distribution System

19,500

$986,154

$875,571,068

15118

Erie

CLARENCE, TOWN
WATER DEPT. / Clarence
(T)

Sheridan Drive watermain replacement., Upgrade Distribution System

15,000

$1,597,700

$877,168,768

15119

Erie

CLARENCE, TOWN
WATER DEPT. / Clarence
(T)

Main Street watermain replacement., Upgrade Distribution System

15,000

$2,650,000

$879,818,768

16556

Erie

WILLIAMSVILLE (V) /
Williamsville (V)

Mill Street, Upgrade Distribution System

6,017

$141,000

$879,959,768

17532

Erie

WD#2 / Boston (T)

Extend Water District

100

$2,324,177

$882,283,945

15627

Erie

HAMBURG (T) WD'S /


Hamburg (T)

New Distribution System

35,000

$1,346,725

$883,630,670

16182

Erie

GRAND ISLAND TOWN


WATER DEPT. / Grand
Island (T)

Bush Road waterline improvements., Upgrade Distribution System

19,500

$228,113

$883,858,783

17531

Erie

BOSTON (T) WD#2 /


Boston (T)

Extend Water District

100

$2,499,100

$886,357,883

16178

Erie

GRAND ISLAND TOWN


WATER DEPT. / Grand
Island (T)

Ransom Road waterline improvements., Upgrade Distribution System

19,500

$111,453

$886,469,336

Page 18 of 86

NYS Drinking Water State Revolving Fund DRAFT IUP Multiyear List
October 1, 2012 to September 30, 2013
Project County

System Name/
Borrower

Description

Pop.

Project Cost

Score

Cumulative
Total

Erie County
15121

Erie

CLARENCE, TOWN
WATER DEPT. / Clarence
(T)

Harris Hill Road & Arondale Drive watermain replacements., Upgrade


Distribution System

15,000

$726,200

$887,195,536

15120

Erie

CLARENCE, TOWN
WATER DEPT. / Clarence
(T)

Goodrich Road Watermain Extension., Extend Distribution System

15,000

$165,000

$887,360,536

$406,500

2175

$887,767,036

$0

1240

$887,767,036

Essex County
17631

Essex

WILMINGTON WD /
Wilmington (T)

Phase 2 (Juniper Hill Road) of DWSRF 15803, New Surface Water


Treatment Rule Compliance Facility, New Storage, Upgrade Distribution
System

980

15881

Essex

WADHAMS WD / Westport
(T)

New Surface Water Treatment Rule Compliance Facility, New


Inter-Connection, New System Consolidation

140

NOTE: Short - Term Loan Closed, Project Cost Shown is


Remaining Balance Not Funded With Short Term Loan

17388

Essex

PORT KENT WD /
Chesterfield (T)

New Surface Water Treatment Rule Compliance Facility, New Ground


Water Source, New Storage

202

$0

1240

$887,767,036

NOTE: Short - Term Loan Closed, Project Cost Shown is


Remaining Balance Not Funded With Short Term Loan

17163

Essex

TICONDEROGA WD /
Ticonderoga (T)

New Surface Water Treatment Rule Compliance Facility, New Storage,


Upgrade Distribution System

17629

Essex

ESSEX WD / Essex (T)

17513

Essex

15827

5,000

$13,954,315

265

$901,721,351

Address turbidity and organic violations, New Ground Water Source,


Upgrade Distribution System

300

$1,515,954

165

$903,237,305

WINEBROOK HILLS WD /
Newcomb (T)

New Ground Water Source, Upgrade Distribution System

250

$5,302,728

145

$908,540,033

Essex

MINERVA WD / Minerva (T)

New Storage, Upgrade Distribution System

800

$175,000

75

$908,715,033

17684

Essex

KEESEVILLE V / Keeseville
(V)

Upgrade Water Treatment Plant

2,300

$3,442,280

75

$912,157,313

15797

Essex

PORT HENRY V / Port


Henry (V)

Upgrade Transmission, Upgrade Distribution System

1,831

$511,910

65

$912,669,223

16589

Essex

MORIAH WD / Moriah (T)

Upgrade Distribution System

3,100

$239,450

65

$912,908,673

16659

Essex

PORT HENRY V / Port


Henry (V)

Upgrade Distribution System

1,831

$4,315,148

65

$917,223,821

17193

Essex

AUSABLE FORKS WD / Jay Upgrade Water Treatment Plant, New Storage


(T)

900

$5,201,603

60

$922,425,424

15846

Essex

MORIAH WD / Moriah (T)

Upgrade Distribution System

3,100

$606,876

60

$923,032,300

15849

Essex

MORIAH WD / Moriah (T)

New Other Expenses, Upgrade Distribution System, New Other (OT)

3,100

$1,573,733

60

$924,606,033

17031

Essex

CROWN POINT WD /
Crown Point (T)

Upgrade Distribution System

995

$2,795,678

55

$927,401,711

15841

Essex

LEWIS WD / Lewis (T)

Upgrade Distribution System

428

$792,076

55

$928,193,787

16045

Essex

NEW RUSSIA WD /
Elizabethtown (T)

Upgrade Water Treatment Plant, New Storage, Upgrade Distribution


System

60

$135,000

45

$928,328,787

17595

Essex

Upgrade Ground Water Source, Upgrade Storage, Upgrade Pump


FOREVER WILD WATER
CO-SIGNOR / Forever Wild
Station
Water Company

900

$2,247,987

35

$930,576,774

Page 19 of 86

NYS Drinking Water State Revolving Fund DRAFT IUP Multiyear List

October 1, 2012 to September 30, 2013

Project County

System Name/
Borrower

Description

Pop.

Project Cost

Score

Cumulative
Total

Essex County
16897

Essex

CROWN POINT WD /
Crown Point (T)

Upgrade Distribution System

995

$1,000,000

35

$931,576,774

17578

Essex

BOLTONS ACRES / Bolton


Acres MHP

New Ground Water Source, Upgrade Distribution System

100

$90,000

30

$931,666,774

17630

Essex

WILLSBORO BAY WATER


SUPPLY / Willsboro (T)

Upgrade Distribution System

140

$1,091,985

25

$932,758,759

SARANAC LAKE V /
Saranac Lake (V)

New SCADA equipment., New Surface Water Treatment Rule


Compliance Facility, Upgrade Distribution System

1245

$932,758,759

Franklin County
17611

Franklin

5,800

$0

NOTE: Short - Term Loan Closed, Project Cost Shown is


Remaining Balance Not Funded With Short Term Loan

18061

Franklin

TUPPER LAKE V / Tupper


Lake (V)

New wells to replace SW source and inadequate DE plant., New


Ground Water Source, Upgrade Distribution System

17455

Franklin

WATER DISTRICT #3 /
Malone (T)

Consolidate a MHP with nitrate violations, New Distribution System,


System Consolidation, New System Consolidation

15246

Franklin

ST REGIS MOHAWK
WATER SYSTEM / St.
Regis Mohawk Tribe

Upgrade Water Treatment Plant, New Pump Station

16866

Franklin

TUPPER LAKE V / Tupper


Lake (V)

Upgrade Water Treatment Plant, Upgrade Transmission

17646

Franklin

WEST BANGOR
EXTENSION / Bangor (T)

Extend Distribution System

16957

Franklin

CHATEAUGAY V /
Chateaugay (V)

16571

Franklin

17304

5,500

$2,979,790

235

$935,738,549

300

$1,328,000

145

$937,066,549

20

$3,897,950

95

$940,964,499

5,500

$596,295

90

$941,560,794

150

$1,090,000

65

$942,650,794

Upgrade Distribution System

1,100

$2,750,000

55

$945,400,794

HARRIETSTOWN (T) /
Harrietstown (T)

Upgrade Distribution System

5,621

$710,800

55

$946,111,594

Franklin

FORT COVINGTON WD /
Fort Covington (T)

Upgrade Ground Water Source, Upgrade Distribution System

900

$1,241,050

50

$947,352,644

17226

Franklin

CHATEAUGAY (T) WD#1 /


Chateaugay (T)

New Water District

100

$114,075

45

$947,466,719

15712

Franklin

SARANAC LAKE V /
Saranac Lake (V)

Upgrade Storage, Upgrade Pump Station

5,800

$582,400

45

$948,049,119

16896

Franklin

SARANAC LAKE V /
Saranac Lake (V)

Upgrade Distribution System

5,800

$180,250

45

$948,229,369

17284

Franklin

MALONE V / Malone (V)

New Transmission

13,000

$498,963

40

$948,728,332

17960

Franklin

SARANAC LAKE V /
Saranac Lake (V)

Installation of water meters.,

5,800

$1,000,000

35

$949,728,332

17184

Franklin

BURKE V / Burke (V)

New Other Expenses, New Other (OT)

273

$250,000

20

$949,978,332

TWIN PINES ESTATES /


CVH Charter Corp.

MHP on Hagadorn Mills Road in the Town of Broadalbin, New Ground


Water Source, Upgrade Storage, New Pump Station

45

$39,655

150

$950,017,987

Fulton County
16538

Fulton

Page 20 of 86

NYS Drinking Water State Revolving Fund DRAFT IUP Multiyear List
October 1, 2012 to September 30, 2013
Project County

System Name/
Borrower

Description

Pop.

Project Cost

Score

Cumulative
Total

Fulton County
17732

Fulton

JOHNSTOWN (C) WATER


WORKS / Johnstown (C)

Replacement of Maylender finished water uncovered reservoir;


automation of water system operations, New Other Expenses, New
Storage, New Other (OT)

15331

Fulton

GLOVERSVILLE (C)
WATER WORKS /
Gloversville (C)

15330

Fulton

17575

8,511

$3,255,000

90

$953,272,987

Ayers Hill Reservoir water storage tanks, New Storage

17,991

$2,234,600

80

$955,507,587

GLOVERSVILLE (C)
WATER WORKS /
Gloversville (C)

Eagle Street Water Storage Tank, New Storage

17,991

$1,963,900

80

$957,471,487

Fulton

NORTHAMPTON (T)
WATER DISTRICT /
Northampton (T)

Upgrade Storage, Upgrade Distribution System

1,000

$6,303,627

65

$963,775,114

17545

Fulton

JOCKEYVILLE ESTATES II
/ Saratoga LLC

Install transmission main of 2000 feet length to connect existing MHP


with municipal PWS., Extend Transmission

126

$92,000

50

$963,867,114

17546

Fulton

SANDYLAND MHP /
Sandyland MHP

Transmission Main of 1200 feet to connect existing MHP to municipal


PWS extension., Extend Transmission

30

$60,000

50

$963,927,114

15935

Fulton

JOHNSTOWN (T) /
Johnstown (C)

Upgrade Distribution System

50

$86,725

50

$964,013,839

17882

Fulton

BROADALBAN (V) /
Broadalin (V)

Replace Aged Storage Tank, New Storage

1,500

$1,990,000

30

$966,003,839

15793

Fulton

MAYFIELD (V) WATER


WORKS / Mayfield (V)

New Ground Water Source

817

$78,000

30

$966,081,839

15253

Fulton

BROADALBIN (V) /
Broadalbin (V)

New Storage, Upgrade Distribution System

1,397

$1,268,960

30

$967,350,799

17748

Fulton

BROADALBIN (V) /
Broadalbin (V)

New Other Expenses, Upgrade Transmission, New Other (OT)

1,397

$91,207

25

$967,442,006

6,300

$916,000

75

$968,358,006

16,310

$2,067,500

70

$970,425,506

3,300

$119,000

65

$970,544,506

781

$880,425

65

$971,424,931

2,000

$3,860,000

60

$975,284,931

16,310

$19,113,000

60

$994,397,931

Genesee County
16162

Genesee

LEROY (V) / Leroy (V)

Upgrade Water Treatment Plant

17761

Genesee

BATAVIA CITY / Batavia (C)

Upgrade Water Treatment Plant, Upgrade Distribution System

15608

Genesee

MCWA, GENESEE WEST /


Corfu (V)

Upgrade Storage

15042

Genesee

ALEXANDER VILLAGE /
Alexander (V)

New Storage

17036

Genesee

TOWN OF PEMBROKE
WATER DISTRICT NO. 1 /
Pembroke (T)

Extend system to serve area with private contaminated wells. , Extend


Distribution System

16112

Genesee

BATAVIA CITY / Batavia (C)

New Water Treatment Plant

17065

Genesee

BYRON (T) WD NO. 2 /


Byron (T)

Extend to serve private contaminated wells in Hamlet of South Byron.,


Extend Distribution System

315

$1,854,000

55

$996,251,931

18047

Genesee

RTE 98 WD / Batavia (T)

New Water District the serve areas East and West of Rte. 98, New
Water District

318

$5,322,464

55

$1,001,574,395

18045

Genesee

CREEK RD. WD / Batavia


(T)

New Water District

136

$1,407,623

55

$1,002,982,018

Page 21 of 86

NYS Drinking Water State Revolving Fund DRAFT IUP Multiyear List

October 1, 2012 to September 30, 2013

Project County

System Name/
Borrower

Description

Pop.

Project Cost

Score

Cumulative
Total

Genesee County
18046

Genesee

PRATT RD. WD / Batavia


(T)

New Water District

17899

Genesee

WD II / Alabama (T)

17885

Genesee

16610

55

$1,067,974

55

$1,004,049,992

Extend Water District

1,056

$5,416,206

50

$1,009,466,198

WATER DISTRICT 2 /
Alabama (T)

Connect existing Hamlet to Niag Co WD, Extend Distribution System

1,056

$5,258,452

50

$1,014,724,650

Genesee

LEROY (V) / Le Roy (V)

Upgrade Water Treatment Plant

6,300

$2,150,000

50

$1,016,874,650

17768

Genesee

WATER DISTRICT #8 /
Stafford (T)

New Distribution System

90

$859,700

45

$1,017,734,350

16575

Genesee

BARBARY COAST MHP /


Affordable Great Locations

Extend Distribution System

50

$82,700

45

$1,017,817,050

17676

Genesee

WATER DISTRICT #7 /
Stafford (T)

Extend Distribution System

75

$679,700

45

$1,018,496,750

17066

Genesee

BYRON (T) WD NO. 3 /


Byron (T)

Extend to serve private contaminated wells in the Hamlet of North


Byron., Extend Distribution System

100

$148,000

45

$1,018,644,750

17764

Genesee

MCWA GENESEE / Byron


(T)

New Water District

13,250

$161,000

45

$1,018,805,750

17755

Genesee

MCWA GENESEE / Byron


(T)

New Distribution System

13,250

$148,000

45

$1,018,953,750

17677

Genesee

WATER DISTRICT #5 /
Stafford (T)

Extend Distribution System

123

$927,000

45

$1,019,880,750

16113

Genesee

BATAVIA CITY / Batavia (C)

New Ground Water Source

16,310

$628,830

45

$1,020,509,580

17032

Genesee

GOLDEN MOBILE HOME


PARK / Crystal Cole

Consolidation of PWS by connecting to (T) Stafford water system,


Upgrade Distribution System

25

$139,050

40

$1,020,648,630

17540

Genesee

OAKFIELD VILLAGE /
Oakfield (V)

Upgrade Transmission, Upgrade Storage, Upgrade Distribution System

1,805

$2,864,100

35

$1,023,512,730

15611

Genesee

MCWA, GENESEE WEST /


Corfu (V)

Upgrade Distribution System

3,300

$477,000

35

$1,023,989,730

17799

Genesee

MCWA GENESEE /
Genesee County

New Transmission, New Storage, New Pump Station

13,250

$8,570,000

25

$1,032,559,730

17383

Genesee

OAKFIELD VILLAGE /
Oakfield (T)

Upgrade Transmission

1,805

$1,661,600

20

$1,034,221,330

17527

Genesee

OAKFIELD VILLAGE /
Oakfield (V)

Upgrade Transmission, Upgrade Distribution System

1,805

$1,147,575

15

$1,035,368,905

18078

Genesee

WD #2 / Alexander (T)

Extend Distribution System

165

$1,747,910

$1,037,116,815

COXSACKIE VILLAGE /
Coxsackie (V)

Phase 2 of 15702, Upgrade Water Treatment Plant, Upgrade Water


Treatment Plant

3175

$1,037,116,815

Greene County
17444

Greene

4,010

$0

NOTE: Short - Term Loan Closed, Project Cost Shown is


Remaining Balance Not Funded With Short Term Loan

Page 22 of 86

NYS Drinking Water State Revolving Fund DRAFT IUP Multiyear List
October 1, 2012 to September 30, 2013
Project County

System Name/
Borrower

Description

Pop.

Project Cost

Score

Cumulative
Total

Greene County
17496

Greene

HUNTER VILLAGE / Hunter


(V)

Phase 2 of #16732 - Dolan's Lake Intake and Connection of Wells 1


and 3, Upgrade Water Treatment Plant, New Ground Water Source,
New Transmission

896

$1,518,150

2165

$1,038,634,965

16106

Greene

TANNERSVILLE VILLAGE /
Tannersville (V)

New Ground Water Source, Upgrade Transmission, Upgrade


Distribution System

448

$1,900,000

135

$1,040,534,965

17414

Greene

CATSKILL VILLAGE /
Catskill (V)

Upgrade Water Treatment Plant, New Storage, Upgrade Distribution


System

8,000

$10,270,000

110

$1,050,804,965

16169

Greene

ASHLAND WD#1 / Ashland


(T)

New Complete System (New System), New Inter-Connection

300

$2,873,620

105

$1,053,678,585

15958

Greene

PRATTSVILLE WATER
DISTRICT / Prattsville (T)

New Ground Water Source

410

$1,361,800

100

$1,055,040,385

15684

Greene

NEW BALTIMORE (T) / New Extend system to serve area with private contaminated wells,
consolidate public water supply. , Extend Distribution System, New
Baltimore (T)

1,300

$5,000,000

90

$1,060,040,385

4,010

$6,210,000

80

$1,066,250,385

System Consolidation

15704

Greene

COXSACKIE VILLAGE /
Coxsackie (V)

Upgrade Transmission, New Storage, Upgrade Distribution System

17948

Greene

HENSONVILLE (WINDHAM
W.D.) / Windham (T)

Upgrade Ground Water Source, New Storage, New Pump Station,


Extend Distribution System

402

$2,575,000

70

$1,068,825,385

16728

Greene

PRATTSVILLE WD #2 /
Prattsville (T)

New Ground Water Source, New Complete System (New System)

25

$468,585

65

$1,069,293,970

16105

Greene

TANNERSVILLE VILLAGE /
Tannersville (V)

Upgrade Distribution System

448

$467,000

45

$1,069,760,970

15415

Greene

CATSKILL VILLAGE /
Catskill (V)

Other Expenses, New Ground Water Source, New Transmission, Other


(OT)

8,000

$695,250

30

$1,070,456,220

15419

Greene

CATSKILL VILLAGE /
Catskill (V)

Upgrade Distribution System

8,000

$1,390,500

30

$1,071,846,720

17640

Greene

ATHENS VILLAGE / Athens


(V)

Upgrade Distribution System

1,850

$171,700

30

$1,072,018,420

15691

Greene

Upgrade Surface Water Source, Upgrade Storage


SLEEPY HOLLOW LAKE
WATER CO. / Sleepy Hollow
Lake Assoc.

2,000

$1,144,330

20

$1,073,162,750

1255

$1,073,162,750

Hamilton County
17456

Hamilton

INDIAN LAKE WD / Indian


Lake (T)

New Surface Water Treatment Rule Compliance Facility, Upgrade


Water Treatment Plant, New Ground Water Source, Upgrade
Distribution System

16278

Hamilton

LONG LAKE (T) / Long Lake New Ground Water Source, New Storage, Upgrade Distribution System
(T)

15600

Hamilton

ANTLERS OF RAQUETTE
LAKE, INC. / Antlers of
Raquette Lake Inc.

18083

Hamilton

17530

Hamilton

900

$0

NOTE: Short - Term Loan Closed, Project Cost Shown is


Remaining Balance Not Funded With Short Term Loan

750

$3,929,255

200

$1,077,092,005

New Surface Water Source, Inter-Connection

120

$243,595

150

$1,077,335,600

INDIAN LAKE WD#1 /


Indian Lake (T)

New Ground Water Source

150

$1,552,000

85

$1,078,887,600

HAMLET OF INLET / Inlet


(T)

New Ground Water Source, New Complete System (New System)

490

$2,674,765

65

$1,081,562,365

Page 23 of 86

NYS Drinking Water State Revolving Fund DRAFT IUP Multiyear List

October 1, 2012 to September 30, 2013

Project County

System Name/
Borrower

Description

Pop.

Project Cost

Score

Cumulative
Total

Herkimer County
17470

Herkimer

HERKIMER VILLAGE /
Herkimer (V)

Phase 2 of 16676, New Surface Water Treatment Rule Compliance


Facility

7,606

16692

Herkimer

VAN HORNESVILLE
WATER WORKS / Stark (T)

VanHornesville Water System, New Surface Water Treatment Rule


Compliance Facility, New Storage, Upgrade Distribution System

372

$300,000

2130

$1,081,862,365

$0

1200

$1,081,862,365

NOTE: Short - Term Loan Closed, Project Cost Shown is


Remaining Balance Not Funded With Short Term Loan

17552

Herkimer

NEWPORT VILLAGE /
Newport (V)

17499

Herkimer

New Surface Water Treatment Rule Compliance Facility, New Ground


Water Source, Upgrade Transmission, New Storage, Upgrade
Distribution System

740

$2,175,000

200

$1,084,037,365

ILION (V) WATER WORKS / Construction of Multilevel Water Intake in non-utilized reservoir, replace
old transmission main & valves to address disinfection byproducts,
Ilion (V)

8,610

$1,285,777

170

$1,085,323,142

Upgrade Surface Water Source

15557

Herkimer

POLAND VILLAGE / Poland


(V)

Surface Water Treatment Rule Compliance Facility, New Ground Water


Source, New Storage, Upgrade Distribution System

463

$246,000

165

$1,085,569,142

17330

Herkimer

VILLAGE OF COLD
BROOK / Cold Brook (V)

New Complete System (New System), New System Consolidation

336

$1,761,961

100

$1,087,331,103

16922

Herkimer

GRAHM, NEWPORT &


BROWN RD WD / Schuyler
(T)

New system to serve area with private contaminated wells. , New


Complete System (New System)

260

$1,280,000

85

$1,088,611,103

17422

Herkimer

HERKIMER (T), WD #3, #4,


#5 / Herkimer (T)

Upgrade Pump Station, Upgrade Distribution System, Extend


Distribution System

320

$299,112

85

$1,088,910,215

16203

Herkimer

EAST FRANKFORT
WATER SYSTEM /
Frankfort (T)

New Ground Water Source, New Storage, Upgrade Distribution System

1,000

$948,000

75

$1,089,858,215

17311

Herkimer

MANION HEIGHTS WD /
German Flatts (T)

New Complete System (New System)

105

$152,000

75

$1,090,010,215

17869

Herkimer

STARKVILLE WATER
SYSTEM / Stark (T)

New Complete System (New System)

250

$1,000,000

65

$1,091,010,215

17639

Herkimer

ILION (V) WATER WORKS / Upgrade Surface Water Treatment Rule Compliance Facility, Upgrade
Surface Water Treatment Rule Compliance Facility, Upgrade Surface
Ilion (V)

8,610

$4,343,510

60

$1,095,353,725

1,100

$5,828,000

55

$1,101,181,725

725

$3,453,415

45

$1,104,635,140

Water Treatment Rule Compliance Facility

17280

Herkimer

WEST FRANKFORT
WATER DISTRICT /
Frankfort (T)

New Complete System (New System)

17941

Herkimer

MIDDLEVILLE (V) WATER


WORKS / Middleville (V)

Upgrade Ground Water Source, Upgrade Pump Station, Upgrade


Distribution System

17055

Herkimer

FRANKFORT (V) WATER


WORKS / Frankfort (V)

New Ground Water Source

2,995

$481,691

45

$1,105,116,831

17057

Herkimer

FRANKFORT (V) WATER


WORKS / Frankfort (V)

Upgrade Distribution System

2,995

$1,971,007

45

$1,107,087,838

17048

Herkimer

DOLGEVILLE (V) PWS /


Dolgeville (V)

New Storage

2,166

$1,051,000

40

$1,108,138,838

17096

Herkimer

TRINITY CHRISTIAN
(LITTLE LAMB PRE-SCH) /
Trinity Christian School

New Other Expenses, New Other (OT)

15

$1,400

30

$1,108,140,238

17939

Herkimer

OLD FORGE (V) WATER


DISTRICT / Webb (T)

Upgrade Distribution System, Extend Distribution System

1,766

$561,350

25

$1,108,701,588

16101

Herkimer

MOHAWK (V) WATER


WORKS / Mohawk (V)

Fulmer Creek Stream Crossing., Upgrade Distribution System

2,985

$82,000

25

$1,108,783,588

Page 24 of 86

NYS Drinking Water State Revolving Fund DRAFT IUP Multiyear List

October 1, 2012 to September 30, 2013

Project County

System Name/
Borrower

Description

Pop.

Project Cost

Score

Cumulative
Total

Herkimer County
16103

Herkimer

MOHAWK (V) WATER


WORKS / Mohawk (V)

Michigan, Green, Henry, Church Streets Main replacement, Upgrade


Distribution System

LAFAVE ROAD WATER


DISTRICT / Le Ray (T)

Consolidation of existing public water systems with GUDI wells,


coliform and lead violations., New Distribution System, New System
Consolidation

600

Westcotts WD to serve along NYS Route 3. Consolidation of PWS


systems addressing SWTR & E-Coli violations. , Upgrade Storage,
New Distribution System, New System Consolidation

300

Extend distribution system to area of insufficient yielding or


cantaminated private wells. Consolidate Watertown International
Airport., New Distribution System, New System Consolidation

345

New Surface Water Treatment Rule Compliance Facility, New


Distribution System, New System Consolidation

352

2,985

$266,000

25

$1,109,049,588

1280

$1,109,049,588

Jefferson County
17473

17321

15603

17306

Jefferson

Jefferson

Jefferson

Jefferson

WESTCOTTS WATER
DISTRICT / Hounsfield (T)

WATER DISTRICT NO. 5 /


Hounsfield (T)

WATER DISTRICT #2 /
Henderson (T)

$0

NOTE: Short - Term Loan Closed, Project Cost Shown is


Remaining Balance Not Funded With Short Term Loan

$0

1260

$1,109,049,588

NOTE: Short - Term Loan Closed, Project Cost Shown is


Remaining Balance Not Funded With Short Term Loan

$0

1210

$1,109,049,588

NOTE: Short - Term Loan Closed, Project Cost Shown is


Remaining Balance Not Funded With Short Term Loan

$0

1190

$1,109,049,588

NOTE: Short - Term Loan Closed, Project Cost Shown is


Remaining Balance Not Funded With Short Term Loan

17529

Jefferson

TIBBETS POINT WATER


DISTRICT / Cape Vincent
(T)

Serve area with private contaminated wells, New Surface Water


Treatment Rule Compliance Facility, New System Consolidation, New
Water District

200

$2,645,000

180

$1,111,694,588

17562

Jefferson

HERRINGS VILLAGE /
Herrings (V)

Distribution and storage improvements., Upgrade Storage, Upgrade


Distribution System

120

$3,429,000

170

$1,115,123,588

16117

Jefferson

ALEXANDRIA TOWN WD
#1 - OTTER STREET /
Alexandria (T)

Extend Distribution System, Upgrade Distribution System

60

$3,600,000

150

$1,118,723,588

16339

Jefferson

WELLESLEY ISLAND
WATER CORP. / Wellesley
Island Water Corp.

New Water Treatment Plant, New Surface Water Source

548

$2,336,000

140

$1,121,059,588

17201

Jefferson

ELLISBURG (V) / Ellisburg


(V)

Extend system to serve area with private contaminated wells,


consolidate public water supply, eliminate public water supply with past
total coliform detection. , Extend Distribution System, New System
Consolidation

269

$0

135

$1,121,059,588

17978

Jefferson

NORTHEAST WATER
DISTRICT / Waertown (T)

New Ground Water Source, New Storage, New Distribution System

550

$6,260,705

105

$1,127,320,293

16701

Jefferson

LAFARGEVILLE (T.
ORLEANS) / Orleans (T)

New Ground Water Source

750

$246,731

85

$1,127,567,024

15531

Jefferson

TOWN OF PAMELIA RT. 3,


WATER DISTRICT /
Pamelia (T)

Extend system to serve area with private contaminated wells,


consolidate public water supply. , Extend Distribution System

96

$474,160

85

$1,128,041,184

17474

Jefferson

DEPAUVILLE WATER
DISTRICT / Clayton (T)

New Distribution System, New System Consolidation

200

$6,333,529

85

$1,134,374,713

15909

Jefferson

TOWN OF WILNA WATER


DISTRICTS NOS. 1,2,3, &
4 / Wilna (T)

New Surface Water Source, Upgrade Distribution System

475

$400,000

75

$1,134,774,713

17098

Jefferson

WILNA WD#1 / Wilna (T)

Extend system to serve area with private contaminated wells. , New


Distribution System

85

$569,590

75

$1,135,344,303

17979

Jefferson

WATRE DISTRICT NO. 8 /


Watertown (T)

Extend Distribution System, New System Consolidation

119

$1,929,000

75

$1,137,273,303

16921

Jefferson

ADAMS (T) WD #2 / Adams


(T)

New system to serve area with private contaminated wells. , New


Complete System (New System)

190

$1,509,000

65

$1,138,782,303

15825

Jefferson

CLAYTON (T) WD NO. 1 /


Clayton (T)

New Complete System (New System)

75

$451,217

60

$1,139,233,520

15561

Jefferson

WATERTOWN (T) /
Watertown (T)

New system to serve area with private contaminated wells. , New


Complete System (New System), New Storage, New Distribution
System

530

$2,547,476

60

$1,141,780,997

Page 25 of 86

NYS Drinking Water State Revolving Fund DRAFT IUP Multiyear List

October 1, 2012 to September 30, 2013

Project County

System Name/
Borrower

Description

Pop.

Project Cost

Score

Cumulative
Total

Jefferson County
17189

Jefferson

WATER DISTRICT #5 /
Cape Vincent (T)

New system to serve area with private contaminated wells. , New


Distribution System

100

$1,085,200

55

$1,142,866,197

17185

Jefferson

WATERTOWN TOWN WD
2 / Watertown (T)

New Distribution System

100

$1,435,865

50

$1,144,302,062

17058

Jefferson

HOUNSFIELD (T) WD #2
EXTENSION / Hounsfield
(T)

Extend Distribution System

123

$794,439

50

$1,145,096,501

17924

Jefferson

WD#3 EXTENSION /
Hounsfield (T)

Extend Distribution System

37

$2,635,000

50

$1,147,731,501

18006

Jefferson

WATER DISTRICT NO. 6 /


Hounsfield (T)

Extend Distribution System

450

$17,521,000

50

$1,165,252,501

15240

Jefferson

ALEXANDRIA VILLAGE /
Alexandria Bay (V)

Upgrade Surface Water Source, Upgrade Storage, Upgrade


Distribution System

1,900

$3,048,188

50

$1,168,300,689

17466

Jefferson

SACKETS HARBOR
VILLAGE / Sackets Harbor
(V)

Upgrade Water Treatment Plant

1,300

$3,090,000

50

$1,171,390,689

17320

Jefferson

HOUNSFIELD WD#2
EXTENSION / Hounsfield
(T)

New Distribution System

200

$3,900,000

50

$1,175,290,689

17305

Jefferson

MORGIAS BEACH WATER


SYSTEM / Sackets Harbor
(V)

New Distribution System

65

$500,000

50

$1,175,790,689

18052

Jefferson

CAPE VINCENT VILLAGE /


Cape Vincent (V)

Upgrade Water Treatment Plant

1,500

$3,200,000

45

$1,178,990,689

16096

Jefferson

DEXTER VILLAGE / Dexter


(V)

New Storage, Upgrade Distribution System

1,100

$757,125

40

$1,179,747,814

15309

Jefferson

WATERTOWN, CITY OF /
Watertown (C)

Upgrade Distribution System

27,861

$152,955

35

$1,179,900,769

16256

Jefferson

PHILADELPHIA VILLAGE /
Philadelphia (V)

Upgrade Distribution System

1,800

$257,440

35

$1,180,158,209

17465

Jefferson

HIGHWAY GARAGE WD /
Hounsfield (T)

Upgrade Distribution System

200

$3,035,853

35

$1,183,194,062

15789

Jefferson

CHAUMONT VILLAGE /
Chaumont (V)

Upgrade Storage, Upgrade Distribution System

625

$178,961

30

$1,183,373,023

17585

Jefferson

CLAYTON VILLAGE /
Clayton (V)

Upgrade Distribution System

2,100

$551,000

30

$1,183,924,023

15893

Jefferson

ADAMS (T) WD #1 & 2


(ADAMS CENTER) / Adams
Center (T)

Upgrade Storage

1,000

$121,954

25

$1,184,045,977

16481

Jefferson

VILLAGE OF CLAYTON /
Clayton (V)

New Transmission, New Distribution System

2,160

$214,000

25

$1,184,259,977

17961

Jefferson

LAFARGEVILLE (T.
ORLEANS) / Orleans (T)

Installation of water meters.,

750

$208,078

25

$1,184,468,055

17308

Jefferson

BROWNVILLE VILLAGE /
Brownville (V)

Upgrade Distribution System

1,200

$574,000

25

$1,185,042,055

Page 26 of 86

NYS Drinking Water State Revolving Fund DRAFT IUP Multiyear List

October 1, 2012 to September 30, 2013

Project County

System Name/
Borrower

Description

Pop.

Project Cost

Score

Cumulative
Total

Jefferson County
16549

Jefferson

NORTHLAND ESTATES /
Northland Park Inc.

New Storage

17802

Jefferson

MADISON BARRACKS
WATER SYSTEM / Sackets
Harbor (V)

Upgrade Distribution System

18021

Jefferson

WATER DISTRICT #3 /
Ellisburg (T)

17464

Jefferson

540

$82,416

20

$1,185,124,471

1,000

$1,700,000

20

$1,186,824,471

Serve private contaminated/poor yielding wells., Extend Distribution


System

200

$9,000,000

15

$1,195,824,471

ROUTE 12F WD /
Hounsfield (T)

Upgrade Distribution System

144

$5,406,750

15

$1,201,231,221

240

$507,000

65

$1,201,738,221

1,500

$12,389,600

60

$1,214,127,821

Lewis County
17826

Lewis

WATER DISTRICT NO. 10 /


Lowville (T)

New Distribution System

17927

Lewis

CONSOLIDATED WATER
DISTRICT / Watson (T)

New Ground Water Source, New Storage, Extend Distribution System

16482

Lewis

PORT LEYDEN VILLAGE /


Port Leyden (V)

Upgrade Distribution System

820

$910,000

30

$1,215,037,821

16667

Lewis

TURIN VILLAGE / Turin (V)

Upgrade Distribution System

350

$611,588

25

$1,215,649,409

16683

Lewis

CONSTABLEVILLE
VILLAGE / Constableville
(V)

Upgrade Transmission

310

$1,274,936

20

$1,216,924,345

18020

Lewis

WATER DISTRICT #1 /
Denmark (T)

Serve private contaminated/poor yielding wells., Extend Distribution


System

275

$2,603,000

15

$1,219,527,345

7,600

$813,000

135

$1,220,340,345

Livingston County
17619

Livingston

GENESEO VILLAGE /
LCWSA

New Surface Water Treatment Rule Compliance Facility

17317

Livingston

LIVINGSTON COUNTY
WATER DISTRICT NO . 2 /
Livingston County

Extend Distribution System, System Consolidation

835

$3,200,000

80

$1,223,540,345

17182

Livingston

TOWN OF MOUNT
MORRIS / Mount Morris (T)

Route 408 into Tuscarora., Extend Distribution System

700

$5,824,804

65

$1,229,365,149

15322

Livingston

TOWN OF MT. MORRIS /


Mount Morris (T)

Extend Distribution System

100

$1,574,600

60

$1,230,939,749

15706

Livingston

LIVINGSTON COUNTY
WATER DISTRICT /
Livingston County

Extend water system along swamp road in (T) Conesus to Hamlet of


Scottsburg in (T) Sparta., Extend Distribution System

250

$1,627,400

60

$1,232,567,149

15697

Livingston

LIVINGSTON COUNTY
WATER DISTRICT /
Livingston County

Hamlet of Conesus., Extend Distribution System

230

$1,326,575

55

$1,233,893,724

15613

Livingston

YORK (T) WD NO. 2 / York


(T)

Extend Distribution System

350

$526,330

55

$1,234,420,054

17895

Livingston

LONG POINT ROAD WD /


Geneseo(T)

Extend Water District

100

$1,115,000

50

$1,235,535,054

17897

Livingston

LIMA/NORTH/ELM ROADS
WD / Geneseo (T)

New Distribution System

500

$2,920,000

50

$1,238,455,054

Page 27 of 86

NYS Drinking Water State Revolving Fund DRAFT IUP Multiyear List
October 1, 2012 to September 30, 2013
Project County

System Name/
Borrower

Description

Pop.

Project Cost

Score

Cumulative
Total

Livingston County
15693

Livingston

LIVINGSTON COUNTY
WATER DISTRICT /

Livingston County

East Lake Rd. in (T) of Conesus., Extend Distribution System

15604

Livingston

COWAN ROAD WATER


DISTRICT / York (T)

15308

Livingston

15154

1,200

$2,306,055

45

$1,240,761,109

Extend Distribution System

120

$885,548

45

$1,241,646,657

EAST LAKE ROAD WATER


DISTRICT / Livonia (T)

Extend Distribution System

1,450

$2,093,140

40

$1,243,739,797

Livingston

NUNDA VILLAGE / Nunda


(V)

Upgrade Ground Water Source, New Transmission

2,000

$640,155

25

$1,244,379,952

16678

Livingston

AVON VILLAGE PWS /


Avon (V)

Upgrade Transmission

2,993

$1,442,000

25

$1,245,821,952

16584

Livingston

GENESEO (T) WD #1 /
Geneseo (T)

New Storage, Upgrade Distribution System

215

$819,000

25

$1,246,640,952

16585

Livingston

GENESEO (T) WD #2 /
Geneseo (T)

New Storage, Upgrade Distribution System

436

$1,377,000

25

$1,248,017,952

16689

Livingston

GROVELAND STATION
WATER CO / Groveland
Station Water Corp.

New Ground Water Source

680

$93,730

20

$1,248,111,682

16961

Livingston

AVON TOWN WATER


DISTRICT / Avon (T)

Airport Tank to Village of Avon Water Treatment Plant., New


Transmission

3,000

$593,048

20

$1,248,704,730

16972

Livingston

AVON TOWN WATER


DISTRICT / Avon (T)

Poplar Hill Road to Bronson Hill Road., New Transmission

3,000

$1,322,712

20

$1,250,027,442

16973

Livingston

AVON TOWN WATER


DISTRICT / Avon (T)

Route 5&20 Storage Tank Cleaning and Repair., Upgrade Storage

3,000

$139,050

15

$1,250,166,492

16964

Livingston

AVON TOWN WATER


DISTRICT / Avon (T)

Fowlerville Road watermain., New Transmission

3,000

$354,577

15

$1,250,521,069

16958

Livingston

AVON TOWN WATER


DISTRICT / Avon (T)

Agar Road watermain., New Transmission

3,000

$198,842

15

$1,250,719,911

16962

Livingston

AVON TOWN WATER


DISTRICT / Avon (T)

Paper Mill Road., New Transmission

3,000

$757,822

15

$1,251,477,733

16971

Livingston

AVON TOWN WATER


DISTRICT / Avon (T)

Henty Road Watermain., New Transmission

3,000

$396,988

15

$1,251,874,721

16974

Livingston

AVON TOWN WATER


DISTRICT / Avon (T)

Lima Town Line Storage Tank Cleaning and Repair., Upgrade Storage

3,000

$132,098

15

$1,252,006,819

17257

Livingston

CALEDONIA VILLAGE /
Caledonia (V)

State Street watermain replacement., Upgrade Transmission

2,510

$528,678

15

$1,252,535,497

16975

Livingston

AVON TOWN WATER


DISTRICT / Avon (T)

Telemetry System., Upgrade Storage

3,000

$243,338

10

$1,252,778,835

16970

Livingston

AVON TOWN WATER


DISTRICT / Avon (T)

Jones Lane/Darby Road., Upgrade Distribution System

3,000

$356,315

10

$1,253,135,150

16968

Livingston

AVON TOWN WATER


DISTRICT / Avon (T)

Genesee Street and Lake Road PRV Station., New Distribution


System

3,000

$18,077

10

$1,253,153,227

Page 28 of 86

NYS Drinking Water State Revolving Fund DRAFT IUP Multiyear List

October 1, 2012 to September 30, 2013

Project County

System Name/
Borrower

Description

Pop.

Project Cost

Score

Cumulative
Total

Livingston County
16967

Livingston

AVON TOWN WATER


DISTRICT / Avon (T)

Lakeville Road PRV Station., New Distribution System

3,000

$111,240

10

$1,253,264,467

16965

Livingston

AVON TOWN WATER


DISTRICT / Avon (T)

Pole Bridge Road., Upgrade Distribution System

3,000

$245,840

10

$1,253,510,307

15131

Livingston

LIVONIA VILLAGE / Livonia


(V)

Upgrade Distribution System

1,360

$1,105,325

10

$1,254,615,632

450

$103,500

135

$1,254,719,132

2,456

$1,300,000

95

$1,256,019,132

56

$424,923

85

$1,256,444,055

Madison County
16705

Madison

MADISON VILLAGE /
Madison (V)

New Ground Water Source, Upgrade Distribution System

16654

Madison

MORRISVILLE VILLAGE /
Morrisville (V)

To provide adequate pressure, Upgrade Distribution System

17360

Madison

NEW BOSTON ROAD


WATER DISTRICT / Lenox
(T)

New System Consolidation, New Water District

18075

Madison

CLOCKVILLE WATER
DISTRICT / Lincoln (T)

New Storage, New Distribution System, New Water District

816

$7,258,100

70

$1,263,702,155

17359

Madison

LEWIS POINT/PINE RIDGE


ROAD / Lenox (T)

New Water District

210

$1,192,230

70

$1,264,894,385

17935

Madison

LENOX (T) / Lenox (T)

Water District No. 12., New Water District

750

$5,000,000

65

$1,269,894,385

16410

Madison

ONEIDA CITY / Oneida (C)

Extend Distribution System

12,000

$350,000

65

$1,270,244,385

17278

Madison

MOUNT PLEASANT
(CAZ.CNTRY EST) /
Cazenovia (T)

Upgrade Ground Water Source, Upgrade Storage

75

$225,000

65

$1,270,469,385

16408

Madison

ONEIDA CITY / Oneida (C)

New Distribution System

12,000

$1,600,000

60

$1,272,069,385

17415

Madison

STOCKBRIDGE WATER
DISTRICT / Stockbridge (T)

Extend Distribution System

600

$2,275,000

55

$1,274,344,385

18069

Madison

HAMILTON VILLAGE /
Hamilton (V)

New Ground Water Source, Upgrade Distribution System

3,904

$4,100,000

50

$1,278,444,385

16404

Madison

ONEIDA CITY / Oneida (C)

Replace lead water lines., Upgrade Distribution System

12,000

$400,000

50

$1,278,844,385

18082

Madison

ONEIDA CITY / Oneida (C)

Replace RW transmission main crossing of Fish Creek., Upgrade


Transmission

12,000

$2,309,000

45

$1,281,153,385

16407

Madison

ONEIDA CITY / Oneida (C)

construct 300,000 water storage tank., New Storage

12,000

$750,000

40

$1,281,903,385

17286

Madison

COBBLEFIELD /
WELLINGTON ESTATES
W.D. / Cazenovia (T)

Upgrade Water Treatment Plant

120

$225,000

30

$1,282,128,385

15268

Madison

EARLVILLE VILLAGE /
Earlville (V)

East Main Street., Upgrade Distribution System

790

$96,509

25

$1,282,224,894

15156

Madison

EARLVILLE VILLAGE /
Earlville (V)

Upgrade Distribution System

790

$665,020

25

$1,282,889,914

Page 29 of 86

NYS Drinking Water State Revolving Fund DRAFT IUP Multiyear List
October 1, 2012 to September 30, 2013
Project County

System Name/
Borrower

Description

Pop.

Project Cost

Score

Cumulative
Total

Madison County
16708

Madison

O-WE-RA POINT WATER


SUPPLY / Owera Water
Works Trans. Corp.

Upgrade Distribution System

100

$21,000

15

$1,282,910,914

Monroe County
16324

Monroe

MCWA EASTSIDE WTP /


MCWA

Eastside Water Supply Project Regional Water Treatment Plant Phase


2, Raw Water Pump Station, New Water Treatment Plant, New Pump
Station

222,503

$15,000,000

100

$1,297,910,914

16325

Monroe

MCWA EASTSIDE WTP /


MCWA

Eastside Water Supply Project Regional Water Treatment Plant Phase


3, Construction of WTP., New Water Treatment Plant

222,503

$60,000,000

100

$1,357,910,914

16326

Monroe

MCWA EASTSIDE WTP /


MCWA

Eastside Water Supply Project Regional Water Treatment Plant Phase


4, Raw Water Transmission Main & Backwash Return Line, New
Water Treatment Plant, New Transmission

222,503

$16,000,000

100

$1,373,910,914

16323

Monroe

MCWA EASTSIDE WTP /


MCWA

Eastside WTP Phase 1, Raw Water Intake System and a portion of


Phase 5 finished water transmission main work, New Surface Water
Source, New Transmission

222,503

$0

100

$1,373,910,914

16327

Monroe

MCWA EASTSIDE WTP /


MCWA

Eastside Water Supply Project Regional Water Treatment Plant Phase


5, Finished Water Transmission Mains, New Water Treatment Plant,
New Transmission

222,503

$28,000,000

100

$1,401,910,914

17155

Monroe

ROCHESTER CITY /
Rochester (C)

2006 Watermain Extensions and Improvements., Upgrade Distribution


System

214,000

$1,261,000

75

$1,403,171,914

17153

Monroe

ROCHESTER CITY /
Rochester (C)

2004 Watermain Extensions and Improvements., Upgrade Distribution


System

214,000

$1,219,000

75

$1,404,390,914

16879

Monroe

ROCHESTER CITY /
Rochester (C)

2003 Watermain Extensions and Improvements., Upgrade Distribution


System

214,000

$1,348,000

75

$1,405,738,914

17154

Monroe

ROCHESTER CITY /
Rochester (C)

2005 Watermain Extensions and Improvements., Upgrade Distribution


System

214,000

$1,240,000

75

$1,406,978,914

17812

Monroe

ROCHESTER CITY /
Rochester (C)

Upgrade Storage

214,000

$11,900,000

65

$1,418,878,914

16328

Monroe

MCWA SHOREMONT
WTP / Monroe Co. Water
Authority

Upgrade Surface Water Source

310,000

$1,854,000

55

$1,420,732,914

17721

Monroe

MCWA RIGA WD / Riga (T) New Distribution System

25

$4,500,000

55

$1,425,232,914

16333

Monroe

MCWA MENDON WD /
Monroe Co. Water Authority

25

$1,085,842

45

$1,426,318,756

16884

Monroe

SOUTH CHILI WATER IMP. Extend Distribution System


BENEFIT AREA NO. 2 / Chili
(T)

100

$386,250

45

$1,426,705,006

16331

Monroe

MCWA MENDON WD /
MCWA/Mendon (T)

Mendon-Ionia Road., Extend Distribution System

25

$342,580

45

$1,427,047,586

16332

Monroe

MCWA MENDON WD /
MCWA/Mendon (T)

Parrish Road., Extend Distribution System

25

$745,662

45

$1,427,793,248

15759

Monroe

MCWA MENDON WD /
MCWA/ Mendon (T)

Semmel Road water main., Extend Distribution System

25

$267,615

40

$1,428,060,862

17813

Monroe

ROCHESTER CITY /
Rochester (C)

New Other Expenses, New Other (OT)

214,000

$10,090,000

40

$1,438,150,862

15198

Monroe

ROCHESTER CITY /
Rochester (C)

Water Main Extensions and Improvements., Upgrade Transmission

214,000

$1,946,200

40

$1,440,097,062

Page 30 of 86

Boughton Hill Road., Extend Distribution System

NYS Drinking Water State Revolving Fund DRAFT IUP Multiyear List
October 1, 2012 to September 30, 2013
Project County

System Name/
Borrower

Description

Pop.

Project Cost

Score

Cumulative
Total

Monroe County
15659

Monroe

MONROE CO. WATER


AUTHORITY / Wheatland
(T)

Wheatland Center Road water extension to Blue Pond and South


Road., Extend Distribution System

15620

Monroe

HAMLIN CONSOLIDATED
WATER DIST / Hamlin (T)

Route 18., Extend Distribution System

16738

Monroe

SPRUCE LANE WATER


DISTRICT / Pittsford (T)

16605

Monroe

16603

250

$1,252,600

40

$1,441,349,662

10,000

$876,742

40

$1,442,226,404

Upgrade Distribution System

30

$60,770

40

$1,442,287,174

MCWA MENDON WD /
Mendon (T)

Main Street Fishers and Mile Square Rd., Extend Distribution System

25

$148,686

40

$1,442,435,860

Monroe

MCWA MENDON WD /
Mendon (T)

Rte. 251-Rush/Mendon Road., Extend Distribution System

25

$159,650

40

$1,442,595,510

15623

Monroe

HAMLIN CONSOLIDATED
WATER DIST / Hamlin (T)

Walker - Lake Ontario Road., Extend Distribution System

10,000

$378,657

40

$1,442,974,167

15148

Monroe

OGDEN (T) / Ogden (T)

Extend Distribution System

171

$429,330

40

$1,443,403,497

16330

Monroe

MCWA SHOREMONT
WTP / Monroe Co. Water
Authority

System Consolidation

310,000

$1,772,057

40

$1,445,175,554

15037

Monroe

MCWA RIGA WD /
MCWA/Riga (T)

Betteridge-Griffin Roads., Extend Distribution System

25

$199,893

40

$1,445,375,447

15035

Monroe

MCWA RIGA WD /
MCWA/Riga (T)

Route 36 - Sanford Road., Extend Distribution System

25

$221,610

40

$1,445,597,057

17810

Monroe

ROCHESTER CITY /
Rochester (C)

Upgrade Storage

214,000

$7,025,000

40

$1,452,622,057

17805

Monroe

ROCHESTER CITY /
Rochester (C)

Upgrade Distribution System

214,000

$1,660,000

35

$1,454,282,057

17809

Monroe

ROCHESTER CITY /
Rochester (C)

Upgrade Transmission

214,000

$5,800,000

35

$1,460,082,057

17808

Monroe

ROCHESTER CITY /
Rochester (C)

Upgrade Distribution System

214,000

$2,040,000

35

$1,462,122,057

17806

Monroe

ROCHESTER CITY /
Rochester (C)

Upgrade Distribution System

214,000

$509,500

35

$1,462,631,557

17542

Monroe

WEBSTER VILLAGE /
Webster (V)

Upgrade Storage

7,500

$400,826

25

$1,463,032,383

17878

Monroe

SWEDEN (T) / MCWA

New Transmission, New Storage

4,400

$4,672,000

20

$1,467,704,383

17881

Monroe

WEBSTER (T) / MCWA

replace 5000 lf of main in Hard Road, Upgrade Distribution System

2,400

$810,170

20

$1,468,514,553

16777

Monroe

HENRIETTA WD #1 /
Henrietta (T)

RIT Backflow Prevention Project., Upgrade Distribution System

36,400

$360,500

15

$1,468,875,053

17216

Monroe

FAIRPORT VILLAGE /
Fairport (V)

Replace distribution main on South Avenue., Upgrade Distribution


System

9,800

$86,310

10

$1,468,961,363

Page 31 of 86

NYS Drinking Water State Revolving Fund DRAFT IUP Multiyear List

October 1, 2012 to September 30, 2013

Project County

System Name/
Borrower

Description

Pop.

Project Cost

Score

Cumulative
Total

Monroe County
17871

Monroe

BRIGHTON (T) / MCWA

main replacement on Howard Ave, Summitt Dr, Edgeview La, Holyvale


Dr., and Lynwood Dr, Upgrade Distribution System

750

$920,100

10

$1,469,881,463

17879

Monroe

FAIRPORT (V) / MCWA

Replacement 2650 lf main on Summit St., Upgrade Distribution


System

300

$492,500

10

$1,470,373,963

17874

Monroe

GATES (T)& PERITON (T) /


MCWA

Pipe Bridge Rehabilitation Cairn St in Gates & Marsh Rd. in Periton,


Upgrade Distribution System

90,000

$434,678

10

$1,470,808,641

17875

Monroe

Cement line 23,470 lf mains in (T)'s Pittsford & Brighton & (V) E.
PITTSFORD & BRIGHTON
(T)'S & E. ROCHESTER(V) / Rochester, Upgrade Distribution System
MCWA

12,000

$1,490,455

10

$1,472,299,096

17880

Monroe

PENFIELD (T) / MCWA

Replace 3900 lf main on Five mile Line Rd., Upgrade Distribution


System

600

$607,600

10

$1,472,906,696

17877

Monroe

PITTSFORD (T) &


BRIGHTON (T) / MCWA

Main replacement Clover Street in Pittsford (T) & Brighton (T),


Upgrade Distribution System

3,300

$739,200

10

$1,473,645,896

17876

Monroe

PERINTON (T) &


FAIRPORT (V) / MCWA

Main replacement Creekside Rd., Potter Pl, Lewis St, E. Church St in


Perinton (T) & Fairport (V), Upgrade Distribution System

1,500

$668,200

10

$1,474,314,096

17873

Monroe

BERGEN (V) &


IRONDEQUOIT (T) / MCWA

Cement lining 23,300 lf water main Bergen (V) & Irondequoit (T),
Upgrade Distribution System

3,700

$1,647,500

10

$1,475,961,596

17767

Monroe

SHOEMAKER WD EXT. #5 / New Distribution System


Webster (T)

18

$56,000

$1,476,017,596

17763

Monroe

KLEM ROAD WD / Webster


(T)

New Distribution System

25

$200,000

$1,476,217,596

20,700

$737,000

220

$1,476,954,596

2,400

$1,565,600

150

$1,478,520,196

Montgomery County
17497

Montgomery

AMSTERDAM (C) /
Amsterdam (C)

Upgrade Surface Water Treatment Rule Compliance Facility, Upgrade


Water Treatment Plant, Upgrade Water Treatment Plant, Upgrade
Water Treatment Plant

17469

Montgomery

FORT PLAIN (V) WATER


WORKS / Fort Plain (V)

Upgrade Water Treatment Plant, Upgrade Ground Water Source,


Upgrade Storage, Upgrade Distribution System

16765

Montgomery

PALATINE WATER
DISTRICT / Palatine (T)

Creation of a water quality treatment district and provision of filtration.,


New Water District

108

$167,000

130

$1,478,687,196

18051

Montgomery

FULTONVILLE VILLAGE
PWS / Fultonville (V)

Upgrade Water Treatment Plant, Upgrade Ground Water Source,


Upgrade Distribution System

740

$1,262,150

80

$1,479,949,346

15040

Montgomery

PALATINE BRIDGE (V)


WATER WORKS / Palantine
Bridge (V)

Upgrade Water Treatment Plant, Upgrade Ground Water Source,


Upgrade Distribution System

890

$985,750

65

$1,480,935,096

17610

Montgomery

AMSTERDAM (T) /
Amsterdam(T)

New Storage, New Pump Station, Extend Distribution System

400

$4,506,250

65

$1,485,441,346

16272

Montgomery

VILLAGE OF FORT
JOHNSON / Fort Johnson
(V)

Extend Distribution System

671

$2,905,751

55

$1,488,347,097

15276

Montgomery

GLEN (T) W.D.#1 / Glen (T)

Extend Distribution System

5,000

$950,000

45

$1,489,297,097

17953

Montgomery

NELLISTON VILLAGE /
Nelliston (V)

New Storage, Upgrade Distribution System

375

$4,493,000

45

$1,493,790,097

17752

Montgomery

AMSTERDAM (C) /
Amsterdam (C)

Replace sections of 14 mile transmission main from Glen Wild


Reservoir to City Water Filtration Plant; install new water valves and air
relief valves., Upgrade Transmission

20,700

$2,060,000

35

$1,495,850,097

Page 32 of 86

NYS Drinking Water State Revolving Fund DRAFT IUP Multiyear List

October 1, 2012 to September 30, 2013

Project County

System Name/
Borrower

Description

Pop.

Project Cost

Score

Cumulative
Total

Montgomery County
16919

Montgomery

CANAJOHARIE (V) WATER


WORKS / Canajoharie (V)

Upgrade Distribution System

17751

Montgomery

AMSTERDAM (C) /
Amsterdam (C)

17750

Montgomery

15274

17634

2,300

$453,948

35

$1,496,304,045

Phase II - Install approximately 6 miles of new water distribution main.,


Upgrade Distribution System

20,700

$5,159,682

35

$1,501,463,727

AMSTERDAM (C) /
Amsterdam (C)

Phase I - Install approximately 6 miles of new distribution water main


and 30 new hydrants., Upgrade Distribution System

20,700

$5,276,948

35

$1,506,740,675

Montgomery

GLEN (T) W.D.#2 / Glen (T)

Upgrade Distribution System

7,626

$95,000

15

$1,506,835,675

Montgomery

FLORIDA (T) WATER


DISTRICT / Florida (T)

Extend Distribution System

375

$2,977,442

10

$1,509,813,117

230

$2,021,375

145

$1,511,834,492

Nassau County
17944

Nassau

MILL NECK ESTATES / Mill


Neck Estates Association

Transmission main to connect with Locust Valley WD and upgrade


distribution, Upgrade Distribution System, New Inter-Connection

15048

Nassau

MINEOLA (V) / Mineola (V)

New Water Treatment Plant

20,600

$1,855,238

120

$1,513,689,730

17405

Nassau

PLAINVIEW WD / Oyster
Bay (T)

Airstripper and Ion Exchange at Plant 3, New Water Treatment Plant

35,000

$5,889,600

120

$1,519,579,330

17659

Nassau

HICKSVILLE WD / Hicksville Upgrade Water Treatment Plant


Water District

47,810

$4,326,000

105

$1,523,905,330

16791

Nassau

GLEN COVE CITY / Glen


Cove (C)

GAC treatment for wells 30 and 31 Duck Pond Rd., New Water
Treatment Plant, Upgrade Ground Water Source

28,000

$490,486

85

$1,524,395,816

16789

Nassau

GLEN COVE CITY / Glen


Cove (C)

Seaman Road Well., New Water Treatment Plant, Upgrade Ground


Water Source

28,000

$805,059

85

$1,525,200,875

17900

Nassau

BETHPAGE WD / Bethpage
Water District

Nitrate removal at Plant #1, Upgrade Water Treatment Plant

33,000

$4,271,616

80

$1,529,472,491

17406

Nassau

PLAINVIEW WD / Oyster
Bay (T)

Ion exchange treatment at Plant 4., Upgrade Water Treatment Plant

35,000

$3,667,600

80

$1,533,140,091

17699

Nassau

GARDEN CITY (V) / Village


of Garden City

New Water Treatment Plant, Upgrade Pump Station

25,000

$2,221,556

80

$1,535,361,647

17911

Nassau

WA OF GREAT NECK
NORTH / Water Auth of
Great Neck North

VOC treatment at Well #6, Upgrade Water Treatment Plant

31,400

$1,400,000

70

$1,536,761,647

15678

Nassau

MANHASSET LAKEVILLE
WD / North Hempstead (T)

Install carbon absorption system at Eden Well, New Water Treatment


Plant

43,000

$477,920

70

$1,537,239,567

17942

Nassau

WATER AUTHORITY OF
WESTERN NASSAU CO. /
Water Auth of Western
Nassau

VOC treatment at Wells 15A & !5B, Upgrade Water Treatment Plant

20,000

$2,817,050

70

$1,540,056,617

17902

Nassau

BETHPAGE WD / Bethpage
Water District

VOC removal at Plant #6, Upgrade Water Treatment Plant

33,000

$2,409,376

70

$1,542,465,993

15675

Nassau

MANHASSET LAKEVILLE
WD / North Hempstead (T)

Campbell Station, New Water Treatment Plant

43,000

$5,974,000

70

$1,548,439,993

17901

Nassau

BETHPAGE WD / Bethpage
Water District

VOC removal at Plant # 4, Upgrade Water Treatment Plant

33,000

$4,056,717

70

$1,552,496,710

Page 33 of 86

NYS Drinking Water State Revolving Fund DRAFT IUP Multiyear List

October 1, 2012 to September 30, 2013

Project County

System Name/
Borrower

Description

Pop.

Project Cost

Score

Cumulative
Total

Nassau County
17404

Nassau

PLAINVIEW WD / Oyster
Bay (T)

New air stripper at Plant 7, New Water Treatment Plant

35,000

$1,287,500

70

$1,553,784,210

17702

Nassau

GARDEN CITY (V) / Village


of Garden City

VOC Removal at Hilton Park Plant (Wells 15 and 16), New Water
Treatment Plant

25,000

$2,580,150

70

$1,556,364,360

17408

Nassau

PLAINVIEW WD / Oyster
Bay (T)

Air stripper at Plant 1, New Water Treatment Plant

35,000

$6,759,000

70

$1,563,123,360

16423

Nassau

MASSAPEQUA WD / Oyster Wells #1, 2R, 3, 8, New Water Treatment Plant


Bay (T)

43,000

$2,895,330

70

$1,566,018,690

16411

Nassau

GLEN COVE CITY / Glen


Cove (C)

New Water Treatment Plant

28,000

$2,100,000

70

$1,568,118,690

17662

Nassau

MANHASSET LAKEVILLE
WD / Manhasset-Lakeville
WD

Nitrate Removal Searingtown Station, Upgrade Water Treatment Plant

43,000

$3,409,300

65

$1,571,527,990

17657

Nassau

HICKSVILLE WD / Hicksville Reactivation of Plant No. 3, Upgrade Water Treatment Plant


Water District

47,810

$5,459,000

65

$1,576,986,990

17655

Nassau

HICKSVILLE WD / Hicksville Nitrate Treatment at Plant No. 8, Upgrade Water Treatment Plant
Water District

47,810

$3,144,322

65

$1,580,131,312

17656

Nassau

HICKSVILLE WD / Hicksville Nitrate Treatment at Plant No.1, Upgrade Water Treatment Plant
Water District

47,810

$4,017,000

65

$1,584,148,312

17037

Nassau

EAST WILLISTON (V) / East Replacement of lead service lines to about 120 residences, New Other
Expenses, New Other (OT)
Williston (V)

2,503

$456,000

60

$1,584,604,312

16267

Nassau

HEMPSTEAD (V) /
Hempstead (V)

56,000

$5,483,200

60

$1,590,087,512

15213

Nassau

WESTBURY WD / Westbury New Water Treatment Plant


W.D.

20,500

$4,120,000

60

$1,594,207,512

17271

Nassau

ALBERTSON WD / North
Hempstead (T)

New treatment plant, rehab control building, chemical containment,


instrumentation, transmission lines and booster pump, New Water
Treatment Plant

13,500

$3,613,900

60

$1,597,821,412

17859

Nassau

JERICHO WD / Oyster Bay


(T)

VOC treatment and rehabilitation of pump station # 5 at District office.,


Upgrade Water Treatment Plant, Upgrade Storage

58,000

$1,040,000

55

$1,598,861,412

16456

Nassau

EAST MEADOW WD /
Hempstead (T)

New Ground Water Source, Upgrade Distribution System

46,950

$3,100,000

55

$1,601,961,412

17719

Nassau

PORT WASHINGTON WD /
Port Washington Water
District

Nitrate Removal at Well No.4, New Water Treatment Plant

34,000

$2,586,330

55

$1,604,547,742

17660

Nassau

HICKSVILLE WD / Hicksville Upgrade Water Treatment Plant


Water District

47,810

$2,472,000

55

$1,607,019,742

17658

Nassau

HICKSVILLE WD / Hicksville VOC treatment at Plant No. 5, Upgrade Water Treatment Plant
Water District

47,810

$4,429,000

55

$1,611,448,742

15046

Nassau

MINEOLA (V) / Mineola (V)

New Water Treatment Plant

20,600

$846,248

50

$1,612,294,990

16760

Nassau

ROCKVILLE CENTRE (V) /


Rockville (V)

Design & construction new iron filtration facility at wellfield # 1,


southside high school, iron removing plant, New Water Treatment
Plant

24,700

$3,012,750

50

$1,615,307,740

Page 34 of 86

Upgrade Storage

NYS Drinking Water State Revolving Fund DRAFT IUP Multiyear List

October 1, 2012 to September 30, 2013

Project County

System Name/
Borrower

Description

Pop.

Project Cost

Score

Cumulative
Total

Nassau County
16627

Nassau

CARLE PLACE WD / Carle


Place WD

Wells #3 & #4, Terrace Drive, Carle Place, NY, New Water Treatment
Plant

15335

Nassau

SOUTH FARMINGDALE
WD / South Farmingdale
W.D.

17410

Nassau

17904

9,005

$1,510,800

50

$1,616,818,540

Iron Removal at Plants 5 & 6, Upgrade Water Treatment Plant

44,700

$2,369,000

50

$1,619,187,540

PLAINVIEW WD / Oyster
Bay (T)

Upgrade booster pump at Plant 6 and new well at Plant 7, New Ground
Water Source, Upgrade Pump Station

35,000

$2,206,200

50

$1,621,393,740

Nassau

BETHPAGE WD / Bethpage
Water District

Water District plant control and monitoring system upgrade(SCADA),


Upgrade Other Expenses, Upgrade Other (OT)

33,000

$3,355,328

45

$1,624,749,068

17914

Nassau

WA OF GREAT NECK
NORTH / Water Auth of
Great Neck North

Contruction of new Well #14 at Community Drive, New Ground Water


Source

31,400

$2,000,000

45

$1,626,749,068

17995

Nassau

WA OF WESTERN
NASSAU CO / WA of
Western Nassau County

VOC removal at Wells 15C and 15E in Elmont, Upgrade Water


Treatment Plant

20,000

$109,200

45

$1,626,858,268

17861

Nassau

JERICHO WD / Oyster Bay


(T)

VOC treatment at Well #9., Upgrade Water Treatment Plant

58,000

$730,000

45

$1,627,588,268

17865

Nassau

MINEOLA (V) / Mineola (V)

VOC removal at Elm Place Well #1., New Water Treatment Plant

20,600

$2,352,900

45

$1,629,941,168

17860

Nassau

JERICHO WD / Oyster Bay


(T)

VOC treatment at Kirby Lane., Upgrade Water Treatment Plant

58,000

$2,215,000

45

$1,632,156,168

17862

Nassau

JERICHO WD / Oyster Bay


(T)

New well at Well #28 site., New Ground Water Source

58,000

$2,150,000

45

$1,634,306,168

15369

Nassau

WA OF GREAT NECK
NORTH / Water Auth. of
Great Neck No.

2 new well sources, New Ground Water Source

31,400

$6,118,000

40

$1,640,424,168

17409

Nassau

PLAINVIEW WD / Oyster
Bay (T)

Air stripper at Plant 2, New Water Treatment Plant

35,000

$4,403,400

40

$1,644,827,568

17318

Nassau

AQUA NY OF SEA CLIFF /


Sea Cliff Water Company

New Storage

15,000

$1,371,000

40

$1,646,198,568

16429

Nassau

MASSAPEQUA WD / Oyster Proposed New Well No 9, New Ground Water Source


Bay (T)

43,000

$1,588,650

25

$1,647,787,218

17785

Nassau

LONG ISLAND AMERICAN Plant No. 8 Iron Removal, New Water Treatment Plant
WATER CORP / Long Island
American Water

230,300

$7,100,000

20

$1,654,887,218

16385

Nassau

HEMPSTEAD (V) /
Hempstead (V)

Upgrade Ground Water Source

56,000

$4,715,340

20

$1,659,602,558

15668

Nassau

MANHASSET LAKEVILLE
WD / North Hempstead (T)

Replace aged and/or undersized mains, Upgrade Distribution System

43,000

$716,880

20

$1,660,319,438

15281

Nassau

ALBERTSON WD / North
Hempstead (T)

Well #4 Replacement of Screen and Well Pump, Upgrade Ground


Water Source

13,500

$188,044

20

$1,660,507,482

17583

Nassau

OYSTER BAY WD / Oyster


Bay (T)

VOC removal at Plant #2., New Water Treatment Plant

8,700

$1,597,530

20

$1,662,105,012

16630

Nassau

CARLE PLACE WD / Carle


Place WD

Old Country Road, Carle Place, NY, New Storage

9,005

$1,778,200

20

$1,663,883,212

Page 35 of 86

NYS Drinking Water State Revolving Fund DRAFT IUP Multiyear List

October 1, 2012 to September 30, 2013

Project County

System Name/
Borrower

Description

Pop.

Project Cost

Score

Cumulative
Total

Nassau County
17343

Nassau

WILLISTON PARK (V) /


Williston Park (V)

Replace underground fuel tank, Emergency power Well#4, New Other


Expenses, New Other (OT)

18035

Nassau

PORT WASHINGTON WD /
Port Washington Water
District

17996

Nassau

15341

7,516

$415,605

20

$1,664,298,817

New Storage, New Pump Station

34,000

$3,476,250

15

$1,667,775,067

WA OF WESTERN
NASSAU CO / WA of
Western Nassau County

Iron removal at Wells 28A and 28B in Elmont, Upgrade Water


Treatment Plant

10,000

$4,429,000

15

$1,672,204,067

Nassau

SOUTH FARMINGDALE
WD / South Farmingdale
W.D.

Filter at Plant 2 Modernization, Upgrade Water Treatment Plant

44,700

$308,000

15

$1,672,512,067

15672

Nassau

MANHASSET LAKEVILLE
WD / North Hempstead (T)

Install new water mains to eliminate dead ends, Upgrade Distribution


System

43,000

$1,075,320

15

$1,673,587,387

15384

Nassau

ROCKVILLE CENTRE (V) /


Rockville Centre (V)

Rehab tank #3, Upgrade Storage

24,700

$911,550

15

$1,674,498,937

16433

Nassau

MASSAPEQUA WD / Oyster Replacement of asbestos cement water mains, Upgrade Distribution


System
Bay (T)

43,000

$1,353,111

15

$1,675,852,048

15676

Nassau

ROSLYN WD / North
Hempstead (T)

Roslyn Estate Pressure Zone, New Pump Station

17,000

$852,135

15

$1,676,704,183

15663

Nassau

ROSLYN WD / North
Hempstead (T)

Convert Well #3 DWTP to water lubrication, Upgrade Ground Water


Source

17,000

$79,725

15

$1,676,783,908

15682

Nassau

MANHASSET LAKEVILLE
WD / North Hempstead (T)

New transmission from wells to the Campbell treatment facility, New


Transmission

43,000

$836,360

15

$1,677,620,268

18034

Nassau

PORT WASHINGTON WD /
Port Washington Water
District

Upgrade Pump Station

34,000

$500,580

15

$1,678,120,848

15359

Nassau

ROCKVILLE CENTRE (V) /


Rockville Centre (V)

Rehab. wells 1a & 1b, Upgrade Ground Water Source

24,700

$153,017

15

$1,678,273,865

15262

Nassau

PLAINVIEW WD / Oyster
Bay (T)

Repair 1.5 MG ground storage tank at Plant 4, Upgrade Storage

35,000

$258,694

15

$1,678,532,559

15380

Nassau

ROCKVILLE CENTRE (V) /


Rockville Centre (V)

Rehab well 4c, Upgrade Ground Water Source

24,700

$257,500

15

$1,678,790,059

17997

Nassau

WA OF WESTERN
NASSAU CO / WA of
Western Nassau County

Iron removal at Well 30 in Franklin Square, Upgrade Water Treatment


Plant

10,000

$2,240,250

15

$1,681,030,309

15378

Nassau

ROCKVILLE CENTRE (V) /


Rockville Centre (V)

Rehab well 2c, Upgrade Ground Water Source

24,700

$257,500

15

$1,681,287,809

15261

Nassau

PLAINVIEW WD / Oyster
Bay (T)

Upgrade Water Treatment Plant

35,000

$2,465,614

15

$1,683,753,423

16425

Nassau

MASSAPEQUA WD / Oyster Well No 4 Replacement of screen and well pump, Upgrade Ground
Water Source
Bay (T)

43,000

$304,906

15

$1,684,058,329

15381

Nassau

WA OF GREAT NECK
NORTH / Water Auth. of
Great Neck No.

Transmission main from the Weybridge Road tank to Oxford


Boulevard, New Transmission

31,400

$431,000

15

$1,684,489,329

15377

Nassau

WA OF GREAT NECK
NORTH / Water Auth. of
Great Neck No.

Water Mill Lane, New Storage, New Pump Station

31,400

$2,567,000

15

$1,687,056,329

Page 36 of 86

NYS Drinking Water State Revolving Fund DRAFT IUP Multiyear List
October 1, 2012 to September 30, 2013
Project County

System Name/
Borrower

Description

Pop.

Project Cost

Score

Cumulative
Total

Nassau County
17913

Nassau

WA OF GREAT NECK
NORTH / Water Auth of
Great Neck North

Replacement of Waybridge Road storage tank,

31,400

$1,545,000

15

$1,688,601,329

15375

Nassau

WA OF GREAT NECK
NORTH / Water Auth. of
Great Neck No.

Transmission from Weybridge Rd. tank to King Point Rd. and Red
Brook Rd., New Transmission

31,400

$1,934,000

15

$1,690,535,329

15373

Nassau

WA OF GREAT NECK
NORTH / Water Auth. of
Great Neck No.

Construction of a replacement well for well no. 2, Upgrade Ground


Water Source

31,400

$292,600

15

$1,690,827,929

15363

Nassau

ROCKVILLE CENTRE (V) /


Rockville Centre (V)

Rehab. Tank #1, Upgrade Storage

24,700

$999,100

15

$1,691,827,029

15351

Nassau

ROCKVILLE CENTRE (V) /


Rockville Centre (V)

Rehab Wells 4a & 4b, Upgrade Ground Water Source

24,700

$600,000

15

$1,692,427,029

15340

Nassau

SOUTH FARMINGDALE
WD / South Farmingdale
W.D.

Well Rehabilitation & Well Pump/Motor Replacement-Various well sites,


Upgrade Ground Water Source

44,700

$597,000

15

$1,693,024,029

17864

Nassau

WEST HEMPSTEAD
WATER DISTRICT / West
Hempstead (T)

Rehabilitation of Birch Street storage tank., Upgrade Storage

32,000

$1,603,710

15

$1,694,627,739

15332

Nassau

SOUTH FARMINGDALE
WD / South Farmingdale
W.D.

Elevated Tank Repairs & Repainting, Upgrade Storage

44,700

$616,000

15

$1,695,243,739

15257

Nassau

PLAINVIEW WD / Oyster
Bay (T)

Repair 2.0 mg ground storage tank at Plant 5, Upgrade Storage

35,000

$309,834

15

$1,695,553,573

15370

Nassau

ROCKVILLE CENTRE (V) /


Rockville Centre (V)

Rehab well 2b, Upgrade Ground Water Source

24,700

$161,916

15

$1,695,715,489

15313

Nassau

ROCKVILLE CENTRE (V) /


Rockville Centre (V)

Tank #4 rehabilitation, Upgrade Storage

24,700

$2,500,000

15

$1,698,215,489

15673

Nassau

ROSLYN WD / North
Hempstead (T)

Upgrade Water Treatment Plant

17,000

$234,068

15

$1,698,449,557

15285

Nassau

ALBERTSON WD / North
Hempstead (T)

Wells no. 2 & 3 Replacement of screen and well pump, Upgrade


Ground Water Source

13,500

$386,686

15

$1,698,836,243

15374

Nassau

ROCKVILLE CENTRE (V) /


Rockville Centre (V)

Rehab well 3a, Upgrade Ground Water Source

24,700

$290,975

15

$1,699,127,218

16458

Nassau

LEVITTOWN WD /
Hempstead (T)

New Ground Water Source, New Transmission

41,800

$4,025,000

15

$1,703,152,218

16453

Nassau

GARDEN CITY (V) / Garden


City (V)

New Water Treatment Plant

25,000

$1,601,702

15

$1,704,753,920

15364

Nassau

ROCKVILLE CENTRE (V) /


Rockville Centre (V)

Rehab. well 4a, Upgrade Ground Water Source

24,700

$337,325

15

$1,705,091,245

16421

Nassau

MASSAPEQUA WD / Oyster Well No 3 Replacement of Screen and Well Pump, Upgrade Ground
Water Source
Bay (T)

43,000

$237,278

15

$1,705,328,523

15605

Nassau

MANHASSET LAKEVILLE
WD / North Hempstead (T)

Construct a new booster pumping station, New Pump Station

43,000

$477,920

15

$1,705,806,443

15383

Nassau

WA OF GREAT NECK
NORTH / Water Auth. of
Great Neck No.

0.5 MG storage tank, New Storage

31,400

$1,566,500

15

$1,707,372,943

Page 37 of 86

NYS Drinking Water State Revolving Fund DRAFT IUP Multiyear List

October 1, 2012 to September 30, 2013

Project County

System Name/
Borrower

Description

Pop.

Project Cost

Score

Cumulative
Total

Nassau County
17711

Nassau

FARMINGDALE (V) / Village


of Farmingdale

Upgrade Storage

8,405

$1,099,010

15

$1,708,471,953

17710

Nassau

OYSTER BAY WD / Oyster


Bay Water District

Rehabilitation of Plant No. 8 Water Storage Tank, Upgrade Storage

8,700

$1,030,000

15

$1,709,501,953

15671

Nassau

ROSLYN WD / North
Hempstead (T)

Upgrade Ground Water Source

17,000

$83,224

15

$1,709,585,177

17698

Nassau

GARDEN CITY (V) / Village


of Garden City

Rehabilitation of Maria Street Tank, Upgrade Storage

25,000

$2,575,000

15

$1,712,160,177

16417

Nassau

MASSAPEQUA WD / Oyster Well No 1 Replacement of screen and well pump, Upgrade Ground
Water Source
Bay (T)

43,000

$290,769

15

$1,712,450,946

15597

Nassau

MANHASSET LAKEVILLE
WD / North Hempstead (T)

Construct new ground level storage tank, New Storage

43,000

$955,840

15

$1,713,406,786

17706

Nassau

WA OF WESTERN
NASSAU / Water Authority
Western Nassau

Upgrade Transmission

2,000

$109,200

15

$1,713,515,986

17661

Nassau

MANHASSET LAKEVILLE
WD / Manhasset-Lakeville
WD

Thomaston Tank Rehabilitation, Upgrade Storage

43,000

$3,630,750

15

$1,717,146,736

15356

Nassau

ROCKVILLE CENTRE (V) /


Rockville Centre (V)

Rehab tank #2, Upgrade Storage

24,700

$1,900,000

15

$1,719,046,736

17786

Nassau

LONG ISLAND AMERICAN Water main replacements, Upgrade Distribution System


WATER CORP / Long Island
American Water

230,300

$10,900,000

15

$1,729,946,736

15371

Nassau

WA OF GREAT NECK
NORTH / Water Auth. of
Great Neck No.

Construction of a replacement well for well no. 10, Upgrade Ground


Water Source

31,400

$301,200

15

$1,730,247,936

15366

Nassau

ROCKVILLE CENTRE (V) /


Rockville Centre (V)

Replace treatment pump, Upgrade Water Treatment Plant

24,700

$45,320

15

$1,730,293,256

15041

Nassau

MINEOLA (V) / Mineola (V)

Upgrade Water Treatment Plant

20,600

$278,409

15

$1,730,571,665

16428

Nassau

MASSAPEQUA WD / Oyster Well No 7 Replacement of screen and well pump, Upgrade Ground
Water Source
Bay (T)

43,000

$335,131

15

$1,730,906,796

16426

Nassau

MASSAPEQUA WD / Oyster Well No 6 Replacement of screen and well pump, Upgrade Ground
Water Source
Bay (T)

43,000

$319,588

15

$1,731,226,384

16419

Nassau

SANDS POINT (V) / Sands


Point (V)

Upgrade Ground Water Source, New Ground Water Source

2,800

$1,500,000

15

$1,732,726,384

18032

Nassau

PORT WASHINGTON WD /
Port Washington Water
District

Upgrade Ground Water Source

34,000

$104,300

15

$1,732,830,684

17407

Nassau

PLAINVIEW WD / Oyster
Bay (T)

Rehabilitation of Plant 5, Upgrade Water Treatment Plant

35,000

$5,584,500

15

$1,738,415,184

15628

Nassau

MANHASSET LAKEVILLE
WD / North Hempstead (T)

Replace 4 inch mains, Upgrade Distribution System

43,000

$1,075,320

15

$1,739,490,504

15461

Nassau

PORT WASHINGTON WD /
North Hempstead (T)

New Transmission

34,000

$476,000

15

$1,739,966,504

Page 38 of 86

NYS Drinking Water State Revolving Fund DRAFT IUP Multiyear List

October 1, 2012 to September 30, 2013

Project County

System Name/
Borrower

Description

Pop.

Project Cost

Score

Cumulative
Total

Nassau County
15460

Nassau

PORT WASHINGTON WD /
North Hempstead (T)

Construct New Well #4, Upgrade Ground Water Source

17344

Nassau

WILLISTON PARK (V) /


Williston Park (V)

Secondary Containment for Caustic Soda, Upgrade Other Expenses,


Upgrade Other (OT)

15452

Nassau

PORT WASHINGTON WD /
Port Washington Water
District

Upgrade Storage

15939

Nassau

FARMINGDALE (V) /
Farmingdale (V)

Upgrade Water Treatment Plant

15459

Nassau

PORT WASHINGTON WD /
North Hempstead (T)

18057

Nassau

15456

34,000

$1,428,000

15

$1,741,394,504

7,516

$161,350

15

$1,741,555,854

34,000

$2,781,000

15

$1,744,336,854

8,405

$75,000

15

$1,744,411,854

Install new mains to eliminate dead head mains #3, New Distribution
System

34,000

$714,000

10

$1,745,125,854

FREEPORT (V) /

Upgrade Distribution System

43,007

$1,995,624

10

$1,747,121,478

Nassau

PORT WASHINGTON WD /
North Hempstead (T)

Replace approx. 4000 lf of 4" mains #2, Upgrade Distribution System

34,000

$714,000

10

$1,747,835,478

15376

Nassau

ROCKVILLE CENTRE (V) /


Rockville Centre (V)

Pipeline replacement, Upgrade Distribution System

24,700

$792,588

10

$1,748,628,066

15670

Nassau

ROSLYN WD / North
Hempstead (T)

Upgrade Ground Water Source

17,000

$104,650

10

$1,748,732,716

15642

Nassau

WILLISTON PARK (V) /


Williston Park (V)

Upgrade Ground Water Source

7,516

$800,000

10

$1,749,532,716

15367

Nassau

ROCKVILLE CENTRE (V) /


Rockville Centre (V)

SCADA - Phase 2, Upgrade Water Treatment Plant

24,700

$430,540

10

$1,749,963,256

15382

Nassau

ROCKVILLE CENTRE (V) /


Rockville Centre (V)

Upgrade Distribution System

24,700

$727,600

10

$1,750,690,856

15379

Nassau

ROCKVILLE CENTRE (V) /


Rockville Centre (V)

Pipeline replacement, Upgrade Distribution System

24,700

$561,549

10

$1,751,252,405

16457

Nassau

LIDO-POINT LOOKOUT
WD / Hempstead (T)

Upgrade Distribution System

6,000

$8,876,000

10

$1,760,128,405

15385

Nassau

WA OF GREAT NECK
NORTH / Water Auth. of
Great Neck No.

Construction of automatic blow off valves for well nos. 2,5,6,7,8,9 & 10,
Upgrade Ground Water Source

31,400

$355,000

10

$1,760,483,405

17912

Nassau

WA OF GREAT NECK
NORTH / Water Auth of
Great Neck North

Water main replacement, Upgrade Distribution System

31,400

$500,000

10

$1,760,983,405

17907

Nassau

VILLAGE OF PLANDOME /
Plandome (V)

Replace aged mains in distribution system, Upgrade Distribution


System

1,350

$5,113,950

10

$1,766,097,355

17903

Nassau

BETHPAGE WD / Bethpage
Water District

Construction of new South Park Drive well, New Ground Water Source

33,000

$725,120

10

$1,766,822,475

17782

Nassau

ROCKVILLE CENTRE (V) /


Rockville Center (V)

Water Main Replacement, Upgrade Distribution System

24,700

$1,200,000

10

$1,768,022,475

15372

Nassau

ROCKVILLE CENTRE (V) /


Rockville Centre (V)

Upgrade Distribution System

24,700

$755,307

10

$1,768,777,782

Page 39 of 86

NYS Drinking Water State Revolving Fund DRAFT IUP Multiyear List
October 1, 2012 to September 30, 2013
Project County

System Name/
Borrower

Description

Pop.

Project Cost

Score

Cumulative
Total

Nassau County
15338

Nassau

SOUTH FARMINGDALE
WD / South Farmingdale
W.D.

Natural Gas Services/Engine-Generator for Plants 2, 3 & 5, Upgrade


Water Treatment Plant

44,700

$603,000

10

$1,769,380,782

15368

Nassau

ROCKVILLE CENTRE (V) /


Rockville Centre (V)

Pipeline replacement, Upgrade Distribution System

24,700

$402,832

10

$1,769,783,614

16263

Nassau

FARMINGDALE (V) /
Farmingdale (V)

Upgrade Distribution System

8,405

$400,000

10

$1,770,183,614

15612

Nassau

MANHASSET LAKEVILLE
WD / North Hempstead (T)

Replace existing asbestos cement pipe, Upgrade Distribution System

43,000

$1,433,760

10

$1,771,617,374

17962

Nassau

OYSTER BAY WD / Oyster


Bay Water District

Solar power at administration building.,

8,700

$28,005

10

$1,771,645,379

17720

Nassau

PORT WASHINGTON WD /
Port Washington Water
District

Replacement of water mains, Upgrade Distribution System

34,000

$2,575,000

10

$1,774,220,379

17708

Nassau

SOUTH FARMINGDALE
WD / South Farmingdale
Water Dist

Construction of Well 1-5, New Ground Water Source

44,700

$644,350

10

$1,774,864,729

15328

Nassau

SOUTH FARMINGDALE
WD / South Farmingdale
W.D.

Caustic Soda Conversion at Plants 1, 5 & 6, Upgrade Water Treatment


Plant

44,700

$638,000

10

$1,775,502,729

15609

Nassau

MANHASSET LAKEVILLE
WD / North Hempstead (T)

Install computerized remote and local data transmission system,


Upgrade Water Treatment Plant

43,000

$238,960

10

$1,775,741,689

15357

Nassau

ROCKVILLE CENTRE (V) /


Rockville Centre (V)

SCADA - Phase I, Upgrade Water Treatment Plant

24,700

$550,000

10

$1,776,291,689

17704

Nassau

WA OF WESTERN
NASSAU / Water Authority
Western Nassau

Replace water mains Franklin Square, Upgrade Distribution System

1,000

$2,169,200

10

$1,778,460,889

16290

Nassau

BETHPAGE WD / Bethpage
W.D.

Upgrade Water Treatment Plant

33,000

$200,850

10

$1,778,661,739

15476

Nassau

PORT WASHINGTON WD /
North Hempstead (T)

Transfer Services (#8), Upgrade Distribution System

34,000

$89,250

10

$1,778,750,989

15264

Nassau

PLAINVIEW WD / Oyster
Bay (T)

New Pump Station

35,000

$4,663,248

10

$1,783,414,237

15470

Nassau

PORT WASHINGTON WD /
North Hempstead (T)

Construct new back pressure regulating valve vault on Radcliffe


Avenue (#7), Upgrade Distribution System

34,000

$82,600

10

$1,783,496,837

15467

Nassau

PORT WASHINGTON WD /
North Hempstead (T)

Construct new pressure regulating valve vault in West Shore Road


(#6), Upgrade Distribution System

34,000

$119,000

10

$1,783,615,837

18033

Nassau

PORT WASHINGTON WD /
Port Washington Water
District

Upgrade Ground Water Source

34,000

$2,502,900

$1,786,118,737

15326

Nassau

WATER AUTH. OF WEST.


NASSAU COUNTY / Water
Auth. of West. Nassau Co

Upgrade Distribution System

85,000

$8,259,240

$1,794,377,977

16452

Nassau

GARDEN CITY (V) / Garden


City (V)

Upgrade Distribution System

25,000

$253,287

$1,794,631,264

BARKER VILLAGE / Barker


(V)

Upgrade Distribution System

577

$835,085

95

$1,795,466,349

Niagara County
16062

Niagara

Page 40 of 86

NYS Drinking Water State Revolving Fund DRAFT IUP Multiyear List
October 1, 2012 to September 30, 2013
Project County

System Name/
Borrower

Description

Score

Cumulative
Total

Pop.

Project Cost

150,000

$20,600,000

65

$1,816,066,349

Niagara County
17793

Niagara

CAPITAL IMPROVEMENT
PHASE I / Niagara County
Water District

Upgrade Water Treatment Plant, New Transmission

16420

Niagara

LOCKPORT CITY WTP /


Lockport (C)

Extend Distribution System

22,279

$400,000

55

$1,816,466,349

16009

Niagara

NIAGARA FALLS WATER


BOARD / Niagara Falls (C)

D Street to Falls Street., New Distribution System

55,593

$77,000

55

$1,816,543,349

15990

Niagara

NIAGARA FALLS WATER


BOARD / Niagara Falls (C)

Ontario Avenue., Upgrade Distribution System

55,593

$281,200

55

$1,816,824,549

16211

Niagara

NIAGARA WATER
IMPROVEMENT AREA /
Niagara County

Contract 15G, E., Upgrade Water Treatment Plant, Upgrade


Transmission

8,978

$6,526,857

50

$1,823,351,406

15664

Niagara

HARTLAND WD / Hartland
(T)

Extend Distribution System

4,165

$726,500

45

$1,824,077,906

15986

Niagara

NIAGARA FALLS WATER


BOARD / Niagara Falls (C)

Upgrade Distribution System

55,593

$390,000

45

$1,824,467,906

15988

Niagara

NIAGARA FALLS WATER


BOARD / Niagara Falls (C)

McKoon Ave., West Rivershore Dr., Upgrade Distribution System

55,593

$466,920

45

$1,824,934,826

15989

Niagara

NIAGARA FALLS WATER


BOARD / Niagara Falls (C)

Hydraulic distribution system model., Upgrade Distribution System

55,593

$206,000

40

$1,825,140,826

15995

Niagara

NIAGARA FALLS WATER


BOARD / Niagara Falls (C)

valve replacement., Upgrade Distribution System

55,593

$575,800

40

$1,825,716,626

17166

Niagara

NEWFANE WD NO1,2,3
CONSOL / Newfane (T)

Upgrade Distribution System

3,485

$2,489,200

35

$1,828,205,826

17064

Niagara

MIDDLEPORT VILLAGE /
Middleport (V)

New Storage

1,917

$927,000

35

$1,829,132,826

16002

Niagara

NIAGARA FALLS WATER


BOARD / Niagara Falls (C)

Niagara Falls Blvd., Upgrade Distribution System

55,593

$650,000

35

$1,829,782,826

16586

Niagara

NIAGARA WATER
IMPROVEMENT AREA /
Niagara (T)

New Transmission

8,978

$400,000

35

$1,830,182,826

16011

Niagara

NIAGARA FALLS WATER


BOARD / Niagara Falls (C)

Niagara Avenue to Parkview., New Distribution System

55,593

$308,000

35

$1,830,490,826

16006

Niagara

NIAGARA FALLS WATER


BOARD / Niagara Falls (C)

Buffalo Avenue Water Main Replacements., Upgrade Distribution


System

55,593

$5,460,000

35

$1,835,950,826

16004

Niagara

NIAGARA FALLS WATER


BOARD / Niagara Falls (C)

Rivershore Drive., Upgrade Distribution System

55,593

$277,200

35

$1,836,228,026

16001

Niagara

NIAGARA FALLS WATER


BOARD / Niagara Falls (C)

Hennepin Avenue., Upgrade Distribution System

55,593

$123,200

35

$1,836,351,226

15998

Niagara

NIAGARA FALLS WATER


BOARD / Niagara Falls (C)

Laughlin Drive., Upgrade Distribution System

55,593

$277,200

35

$1,836,628,426

15997

Niagara

NIAGARA FALLS WATER


BOARD / Niagara Falls (C)

Pierce Avenue., Upgrade Distribution System

55,593

$508,150

35

$1,837,136,576

Page 41 of 86

NYS Drinking Water State Revolving Fund DRAFT IUP Multiyear List

October 1, 2012 to September 30, 2013

Project County

System Name/
Borrower

Description

Pop.

Project Cost

Score

Cumulative
Total

Niagara County
15994

Niagara

NIAGARA FALLS WATER


BOARD / Niagara Falls (C)

Mckoon Avenue., Upgrade Distribution System

55,593

$593,500

35

$1,837,730,076

15992

Niagara

NIAGARA FALLS WATER


BOARD / Niagara Falls (C)

Hydrant repalcement project., Upgrade Distribution System

55,593

$542,300

35

$1,838,272,376

15991

Niagara

NIAGARA FALLS WATER


BOARD / Niagara Falls (C)

Hennepin Avenue., Upgrade Distribution System

55,593

$294,270

35

$1,838,566,646

16209

Niagara

NIAGARA WATER
IMPROVEMENT AREA /
Niagara County

Contract 14A, E, G & H., Upgrade Water Treatment Plant

8,978

$2,859,246

35

$1,841,425,893

17792

Niagara

W.D. IMPROVEMENTS /
Niagara County Water
District

Upgrade Water Treatment Plant

150,000

$1,125,000

30

$1,842,550,893

15999

Niagara

NIAGARA FALLS WATER


BOARD / Niagara Falls (C)

lead service line replacement., Upgrade Distribution System

55,593

$1,005,000

30

$1,843,555,893

17517

Niagara

LOCKPORT CITY WTP /


Lockport (C)

Replace waterline on Market St. between Union and Spring , Upgrade


Distribution System

22,279

$640,000

30

$1,844,195,893

16218

Niagara

NIAGARA COUNTY WD /
Niagara County

Ward-Shawnee Transmission Main., New Transmission

109,000

$2,400,000

25

$1,846,595,893

16217

Niagara

NIAGARA COUNTY WD /
Niagara County

Upgrade Surface Water Source

109,000

$40,000

25

$1,846,635,893

16216

Niagara

NIAGARA COUNTY WD /
Niagara County

New Pump Station

109,000

$200,000

25

$1,846,835,893

16248

Niagara

NIAGARA COUNTY WD /
Niagara County

sludge lagoon modifications., Upgrade Water Treatment Plant

109,000

$220,000

25

$1,847,055,893

15071

Niagara

NORTH TONAWANDA CITY Upgrade Surface Water Source


/ North Tonawanda (C)

33,262

$61,875

25

$1,847,117,768

15064

Niagara

NORTH TONAWANDA CITY Filter improvments., Upgrade Water Treatment Plant


/ North Tonawanda (C)

33,262

$369,675

25

$1,847,487,443

15063

Niagara

NORTH TONAWANDA CITY Clean coagulation basin piping and water intake conduit., Upgrade
Water Treatment Plant
/ North Tonawanda (C)

33,262

$236,950

25

$1,847,724,393

16224

Niagara

NIAGARA COUNTY WD /
Niagara County

carbon feed system., Upgrade Water Treatment Plant

109,000

$100,000

25

$1,847,824,393

16222

Niagara

NIAGARA COUNTY WD /
Niagara County

Filter and valve rehabilitation., Upgrade Water Treatment Plant

109,000

$240,000

25

$1,848,064,393

16220

Niagara

NIAGARA COUNTY WD
IMPROVEMENTS / Niagara
County

Coagulation Basin Refurbishment., Upgrade Water Treatment Plant

109,000

$450,000

25

$1,848,514,393

16214

Niagara

NIAGARA COUNTY WD /
Niagara County

Shawnee-Robinson Transmission main., Upgrade Transmission

109,000

$6,200,000

25

$1,854,714,393

17692

Niagara

NEWFANE WD NO1,2,3
CONSOL / Newfane (T)

Upgrade Distribution System

3,485

$300,000

20

$1,855,014,393

15473

Niagara

LEWISTON WATER
IMPROVEMENTAREA /
Lewiston (T)

Upgrade Transmission, Upgrade Distribution System

16,257

$4,842,107

20

$1,859,856,500

Page 42 of 86

NYS Drinking Water State Revolving Fund DRAFT IUP Multiyear List

October 1, 2012 to September 30, 2013

Project County

System Name/
Borrower

Description

Pop.

Project Cost

Score

Cumulative
Total

Niagara County
New lab., Upgrade Water Treatment Plant

16223

Niagara

NIAGARA COUNTY WD /
Niagara County

15065

Niagara

NORTH TONAWANDA CITY Dead-end main elimination., New Distribution System


/ North Tonawanda (C)

17846

Niagara

LOCKPORT CITY WTP /


Lockport (C)

Repair deteriorated raw water line, intake structure, and chemical feed,
Upgrade Other Expenses, Upgrade Transmission, Upgrade Other (OT)

16053

Niagara

CAMBRIA WATER
DISTRICT / Cambria (T)

New Storage, New Pump Station, Upgrade Distribution System

15069

Niagara

15060

109,000

$100,000

20

$1,859,956,500

33,262

$600,250

20

$1,860,556,750

22,279

$612,850

20

$1,861,169,600

5,393

$1,000,000

20

$1,862,169,600

NORTH TONAWANDA CITY Abandon/replace 2" mains., Upgrade Distribution System


/ North Tonawanda (C)

33,262

$130,800

20

$1,862,300,400

Niagara

NORTH TONAWANDA CITY Distribution system improvements, various locations throughout city.,
Upgrade Distribution System
/ North Tonawanda (C)

33,262

$16,050,000

20

$1,878,350,400

17264

Niagara

LEWISTON WATER
IMPROVEMENTAREA /
Lewiston (T)

Upgrade Transmission, Upgrade Distribution System

16,257

$5,000,000

20

$1,883,350,400

16599

Niagara

WILSON TOWN WATER


DISTRICT / Wilson (T)

Sunset Island water main project., Upgrade Distribution System

4,907

$882,400

15

$1,884,232,800

17820

Niagara

STORAGE TANKS
REHABILITATION / Porter
(T)

Upgrade Storage

6,920

$504,700

15

$1,884,737,500

17815

Niagara

NIAGARA WATER
IMPROVEMENT AREA /
Niagara(T)

Upgrade Storage

8,978

$206,000

15

$1,884,943,500

16397

Niagara

LOCKPORT WD#3 /
Lockport (T)

Transit Road., Upgrade Distribution System

19,653

$1,350,000

15

$1,886,293,500

17381

Niagara

YOUNGSTOWN (V) /
Youngstown (V)

Upgrade Transmission

2,021

$544,613

15

$1,886,838,113

17715

Niagara

NEWFANE WD NO1,2,3
CONSOL / Newfane (T)

Upgrade Distribution System

3,485

$2,000,000

10

$1,888,838,113

16398

Niagara

LOCKPORT WD#3 /
Lockport (T)

Sunset Drive., Upgrade Distribution System

19,653

$1,080,000

10

$1,889,918,113

16399

Niagara

LOCKPORT WD#3 /
Lockport (T)

Lincoln Avenue., Upgrade Distribution System

19,653

$765,000

$1,890,683,113

16393

Niagara

LOCKPORT WD#3 /
Lockport (T)

Stone Road., Upgrade Distribution System

19,653

$1,305,000

$1,891,988,113

NY City County
18081

NY City

NEW YORK CITY CROTON SYSTEM /


NYCMWFA

Croton Filtration Plant (Phase 10 of 16479), New Surface Water


Treatment Rule Compliance Facility

1,000,000

$456,789,100

2115

$2,348,777,213

18054

NY City

NEW YORK CITY CROTON SYSTEM /


NYCMWFA

Croton filtration plant(Phase 9 of 16479), New Surface Water


Treatment Rule Compliance Facility

1,000,000

$205,462,340

2115

$2,554,239,553

17604

NY City

NEW YORK
CITY-CATSKILL/DELAWARE
SYSTEM / NYCMWFA

Hillview Reservoir Chambers Reconstruction-(Phase 4 of 17171),


General Chamber Improvements, Flow Control & New Chemical
Facilities, SCADA (C519A,C519B,C519C,C519D), Upgrade Surface
Water Treatment Rule Compliance Facility

6,552,718

$5,607,922

2110

$2,559,847,475

17607

NY City

Kensico flow control structure(566C, 566CM)(phase 8 of 16875),


NEW YORK
CITY-CATSKILL/DELAWARE Upgrade Storage
SYSTEM / NYCMWFA

6,552,718

$4,092,390

2105

$2,563,939,865

Page 43 of 86

NYS Drinking Water State Revolving Fund DRAFT IUP Multiyear List
October 1, 2012 to September 30, 2013
Project County

System Name/
Borrower

Description

Pop.

Project Cost

Score

Cumulative
Total

NY City County
16999

NY City

Hillview Reservoir Chem Addl. Bldg, Equipment Storage Bldg(C529A


NEW YORK
CITY-CATSKILL/DELAWARE CM, C529A, C545E)Phase3 (Phase1=16265, Phase 2=16463),
Upgrade Storage, New Storage
SYSTEM / NYCMWFA

6,552,718

$5,000,000

2105

$2,568,939,865

16660

NY City

Hillview Reservoir cover, phase 2 of DWSRF #16477 (C565, 566D)


NEW YORK
CITY-CATSKILL/DELAWARE portion of phase 3 brought forward from m.y. list to R.List., Upgrade
Storage
SYSTEM / NYCMWFA

6,552,718

$20,000,000

2105

$2,588,939,865

17606

NY City

3rd city tunnel, stage2 Bkln/Qns, shafts 20,21 and 22B(C545B) (Bkln),
NEW YORK
CITY-CATSKILL/DELAWARE Shaft 23B (C545C)(Bkln), crit redund, dist. press(phase 8 of 16266),
New Transmission
SYSTEM / NYCMWFA

6,552,718

$4,271,491

2060

$2,593,211,356

17605

NY City

3rd city tunnel, stage2 Bkln/Qns, shaft19B(C545A)(Qns), crit redund,


NEW YORK
CITY-CATSKILL/DELAWARE dist. press(phase 8 of 16996), Instr. and Tele;Bkln,Qns, Manh (C545D),
New Transmission
SYSTEM / NYCMWFA

6,552,718

$1,071,895

2060

$2,594,283,251

16476

NY City

Transmission to Jamaica area, dist press improv, Upgrade


NEW YORK
CITY-CATSKILL/DELAWARE Transmission
SYSTEM / NYCMWFA

6,552,718

$100,000,000

85

$2,694,283,251

17203

NY City

City Tunnel 3, Stage 1, Shafts 8B and 15B, Phase 1 - Completion of


NEW YORK
CITY-CATSKILL/DELAWARE Chlorination Booster Stations, Upgrade Distribution System
SYSTEM / NYCMWFA

6,552,718

$1,000,000

60

$2,695,283,251

17167

NY City

City Tunnel 3, Stage 2, Shaft 15B East-Phase 1, Brooklyn-Queens


NEW YORK
CITY-CATSKILL/DELAWARE (C545G), New Pump Station
SYSTEM / NYCMWFA

6,552,718

$8,000,000

60

$2,703,283,251

17011

NY City

City tunnel 3 stage 2, shafts19B-22B (C544B, C, E, H, P), Upgrade


NEW YORK
CITY-CATSKILL/DELAWARE Transmission
SYSTEM / NYCMWFA

6,552,718

$35,000,000

60

$2,738,283,251

17009

NY City

City Tunnel 3 stage 2 Mnhtn segment, shaft 18B completion(C541R),


NEW YORK
CITY-CATSKILL/DELAWARE Upgrade Transmission
SYSTEM / NYCMWFA

6,552,718

$35,000,000

60

$2,773,283,251

16478

NY City

3rd City tunnel and shafts, crit redund, dist press,Field services(C538B
NEW YORK
CITY-CATSKILL/DELAWARE CM), Upgrade Transmission
SYSTEM / NYCMWFA

6,552,718

$470,000,000

60

$3,243,283,251

16474

NY City

3rd City Tunnel, mnhtn borings; Restore shaft 23(C604); Riser Valve
NEW YORK
CITY-CATSKILL/DELAWARE Controls, Delaware system(C347), Upgrade Transmission
SYSTEM / NYCMWFA

6,552,718

$35,000,000

60

$3,278,283,251

17437

NY City

Catskill& Delaware UV Disinfection, New Water Treatment Plant


NEW YORK
CITY-CATSKILL/DELAWARE
SYSTEM / NYCWMFA

6,552,718

1,400,000,000

55

$4,678,283,251

17371

NY City

Inspection and Rehabilitation of New Croton Aqueduct, Upgrade


NEW YORK
CITY-CATSKILL/DELAWARE Transmission
SYSTEM / NYCMWFA

6,552,718

$28,130,420

30

$4,706,413,671

17370

NY City

Reconstruction of Delaware Aqueduct, Shafts 9,10 & 17, Upgrade


NEW YORK
CITY-CATSKILL/DELAWARE Transmission
SYSTEM / NYCMWFA

6,552,718

$35,066,289

30

$4,741,479,960

17559

NY City

Reconstruction of Kensico Fluoride Facilities, Upgrade Water


NEW YORK
CITY-CATSKILL/DELAWARE Treatment Plant
SYSTEM / NYCMWFA

6,552,718

$8,048,360

25

$4,749,528,320

17198

NY City

Test Borings for City Tunnel 3 and Upstate Tunnel Sites, Phase 1
NEW YORK
CITY-CATSKILL/DELAWARE (C554), NYC & Westchester, Upgrade Transmission
SYSTEM / NYCMWFA

6,552,718

$5,982,162

15

$4,755,510,482

Oneida County
18023

Oneida

ROME CITY / Rome (C)

Phase 2 of project 17438. Filter plant upgrades and new 20 MG


storage tank., Upgrade Water Treatment Plant, New Storage, Upgrade
Storage

32,000

$20,000,000

160

$4,775,510,482

17438

Oneida

ROME CITY / Rome (C)

New 10 MG storage tank. (Phase 1 of covering city's open finished


water storage, Phase 2 is Proj. # 18023 on multiyear list) , Upgrade
Water Treatment Plant, New Storage, Upgrade Storage

32,000

$10,000,000

160

$4,785,510,482

17487

Oneida

SAUQUOIT
CONSOLIDATED WD
(T/O/PARIS) / Paris (T)

New wells for GUDI source compliance., New Ground Water Source

2,639

$3,100,000

155

$4,788,610,482

17648

Oneida

DEERFIELD RTE 8/28


WATER DISTRICT /
Deerfield (T)

New Surface Water Treatment Rule Compliance Facility, New


Distribution System, New Inter-Connection, New Water District

100

$600,000

130

$4,789,210,482

Page 44 of 86

NYS Drinking Water State Revolving Fund DRAFT IUP Multiyear List

October 1, 2012 to September 30, 2013

Project County

System Name/
Borrower

Description

Pop.

Project Cost

Score

Cumulative
Total

Oneida County
17230

Oneida

BENEFITED AREA E / Floyd New Distribution System, New System Consolidation


(T)

17462

Oneida

CLINTON VILLAGE /
Clinton (V)

New Surface Water Treatment Rule Compliance Facility

15139

Oneida

MOHAWK VALLEY WATER


AUTHORITY / Upper
Mohawk Valley Reg. WB

17263

Oneida

17650

115

$325,000

115

$4,789,535,482

3,000

$2,720,000

110

$4,792,255,482

New 6 MG storage tank at Toby Road., Upgrade Storage

120,000

$8,375,000

105

$4,800,630,482

MOHAWK VALLEY WATER


AUTHORITY / Upper M V
Regional WB

New System Consolidation

120,000

$7,210,000

100

$4,807,840,482

Oneida

MOHAWK VALLEY WATER


AUTHORITY / Upper M V
Regional WB

New Storage

120,000

$4,326,000

95

$4,812,166,482

16889

Oneida

KIRKLAND (T) ROUTE 5


WATER DISTRICT /
Kirkland (T)

New system to serve area with private contaminated wells, consolidate


public water supply. , New Complete System (New System)

300

$1,578,872

90

$4,813,745,354

17145

Oneida

TIBBITS/SNOWDEN HILL
WD / New Hartford (T)

New system to serve area with private contaminated wells. , New


Complete System (New System)

450

$2,400,000

80

$4,816,145,354

16588

Oneida

TOWN OF TRENTON /
Trenton (T)

Extend Distribution System

150

$848,900

80

$4,816,994,254

17277

Oneida

CLAYVILLE VILLAGE /
Clayville(V)

New Inter-Connection

445

$220,000

80

$4,817,214,254

16899

Oneida

FLOYD BENEFIT (T) AREA


"D" / Floyd (T)

New Complete System (New System)

900

$7,750,000

75

$4,824,964,254

16806

Oneida

MOHAWK VALLEY WATER


AUTHORITY / Upper M V
Regional WB

Replace undersized and unlined mains in the North Utica and Cornhill
area, Upgrade Transmission, Upgrade Transmission

120,000

$486,200

75

$4,825,450,454

15794

Oneida

MOHAWK VALLEY WATER


AUTHORITY / Upper
Mohawk Valley Reg. WB

Shacksbury Storage Tank and Mains, Replacement. , Upgrade


Storage

120,000

$400,000

70

$4,825,850,454

16800

Oneida

MOHAWK VALLEY WATER


AUTHORITY / Upper M V
Regional WB

Wilcox tank renovation and expansion, Upgrade Storage

120,000

$982,800

70

$4,826,833,254

15560

Oneida

VERNON VILLAGE (SWP) /


Vernon (V)

New Transmission, New Storage, New Distribution System, New


Inter-Connection

1,155

$5,610,300

70

$4,832,443,554

16435

Oneida

DEERFIELD (T), SMITH


HILL EXT. / Deerfield (T)

Extend system to serve area with private contaminated wells,


consolidate public water supply. , Extend Distribution System

200

$638,000

70

$4,833,081,554

15205

Oneida

BOONVILLE VILLAGE /
Boonville (V)

New Transmission, New Storage, Upgrade Distribution System

2,300

$801,144

70

$4,833,882,698

17886

Oneida

HALSTEAD ROAD WD /
Vienna (T)

Extend Distribution System

75

$692,400

60

$4,834,575,098

17616

Oneida

VIENNA (T) / Vienna (T)

New Distribution System

150

$210,000

60

$4,834,785,098

15865

Oneida

MOHAWK VALLEY WATER


AUTHORITY / UMVRWB

Pleasant Street. Upper Mohawk Valley Regional Water Board,


Upgrade Distribution System

120,000

$1,600,000

55

$4,836,385,098

15786

Oneida

MOHAWK VALLEY WATER


AUTHORITY / Upper
Mohawk Valley Reg. WB

Gilbert Road Storage Tank., Upgrade Storage

120,000

$150,000

55

$4,836,535,098

Page 45 of 86

NYS Drinking Water State Revolving Fund DRAFT IUP Multiyear List
October 1, 2012 to September 30, 2013
Project County

System Name/
Borrower

Description

Pop.

Project Cost

Score

Cumulative
Total

Oneida County
17027

Oneida

MOHAWK VALLEY WATER


AUTHORITY / Whitestown
(T)

The UMVRWB will extend the 12 inch line along Sutliff Road and NYS
route 233 and connect to Village of Camelot., Extend System
Consolidation

18011

Oneida

ROUTE 5 WD / Vernon (T)

Serve private contaminated/poor yielding wells., Extend Distribution


System

18064

Oneida

FORESTPORT WATER
DISTRICT / Foresport (T)

New Ground Water Source

15869

Oneida

MOHAWK VALLEY WATER


AUTHORITY / Upper
Mohawk Valley Reg. WB

15878

Oneida

16805

120,000

$629,000

55

$4,837,164,098

30

$244,000

55

$4,837,408,098

900

$390,000

55

$4,837,798,098

Burrstone Road and Dewey Row, (T) of Whitestone., Upgrade


Distribution System

120,000

$756,000

55

$4,838,554,098

MOHAWK VALLEY WATER


AUTHORITY / Upper
Mohawk Valley Reg. WB

Southern Pump and Chemical Treatment Station, Upgrade Pump and


Chemical Station., Upgrade Pump Station

120,000

$420,000

50

$4,838,974,098

Oneida

MOHAWK VALLEY WATER


AUTHORITY / Upper M V
Regional WB

High Service Zone Interconnecting Mains, Oxford Road, Upgrade


Transmission

120,000

$1,159,000

50

$4,840,133,098

17921

Oneida

EUREKA ROAD WD /
Westmoreland (T)

New Pump Station, New Distribution System

35

$180,000

50

$4,840,313,098

17307

Oneida

NEW LONDON WATER


SYSTEM / Verona (T)

New Storage, New Distribution System

500

$6,150,000

50

$4,846,463,098

15748

Oneida

MOHAWK VALLEY WATER


AUTHORITY / Upper
Mohawk Valley Reg. Water

Upgrade Pump Station

120,000

$120,000

45

$4,846,583,098

16774

Oneida

TOWN OF NEW
HARTFORD / New Hartford
(T)

New Complete System (New System)

450

$1,483,200

45

$4,848,066,298

15077

Oneida

MILLER/WALKER RD. W.D.


- (T)DEERFIELD / Deerfield
(T)

New Complete System (New System), Extend Distribution System

200

$306,400

45

$4,848,372,698

17922

Oneida

NORTHEASTERN WD /
Westmoreland (T)

New Storage, New Pump Station, New Distribution System

880

$6,700,000

45

$4,855,072,698

17652

Oneida

MOHAWK VALLEY WATER


AUTHORITY / Upper M V
Regional WB

New Transmission

120,000

$10,300,000

45

$4,865,372,698

17651

Oneida

MOHAWK VALLEY WATER


AUTHORITY / Upper M V
Regional WB

Upgrade Distribution System

120,000

$9,270,000

40

$4,874,642,698

15062

Oneida

TAURUSEL, INC (POND


HILL) / Taurusel, Inc.

Upgrade Ground Water Source, Upgrade Distribution System, System


Consolidation

54

$164,000

35

$4,874,806,698

17472

Oneida

MOHAWK VALLEY WATER


AUTHORITY / Upper
Mohawk Valley Reg. WB

New Storage

120,000

$4,271,400

35

$4,879,078,098

15703

Oneida

ROME CITY / Rome (C)

Transmission main for western portion of city., New Transmission

32,000

$7,000,000

30

$4,886,078,098

15731

Oneida

ROME CITY / Rome (C)

New Storage

32,000

$1,000,000

30

$4,887,078,098

15700

Oneida

ROME CITY / Rome (C)

Replace two 30" diameter main water transmission lines., Upgrade


Transmission

32,000

$5,000,000

30

$4,892,078,098

15721

Oneida

ROME CITY / Rome (C)

Upgrade Transmission

32,000

$600,000

25

$4,892,678,098

Page 46 of 86

NYS Drinking Water State Revolving Fund DRAFT IUP Multiyear List

October 1, 2012 to September 30, 2013

Project County

System Name/
Borrower

Description

Pop.

Project Cost

Score

Cumulative
Total

Oneida County
15737

Oneida

ROME CITY / Rome (C)

Water meters., Upgrade Distribution System

32,000

$1,000,000

25

$4,893,678,098

15726

Oneida

ROME CITY / Rome (C)

Upgrade Distribution System

32,000

$2,200,000

25

$4,895,878,098

16250

Oneida

J.E. BARRETT WD /
Prospect (V)

Upgrade Ground Water Source, New Storage, Upgrade Distribution


System

150

$326,000

25

$4,896,204,098

15711

Oneida

ROME CITY / Rome (C)

Hydrant replacement., Upgrade Distribution System

32,000

$750,000

25

$4,896,954,098

15045

Oneida

CLINTON VILLAGE /
Clinton (V)

Upgrade Distribution System

3,000

$822,000

20

$4,897,776,098

16693

Oneida

CLINTON VILLAGE /
Clinton (V)

New Storage

3,000

$521,180

20

$4,898,297,278

17920

Oneida

WESTMORELAND WD NO
1 (GU) / Westmoreland (T)

New Ground Water Source, Upgrade Storage

600

$2,850,000

20

$4,901,147,278

17825

Oneida

VERONA WATER
DISTRICT (SWP) / Verona
(T)

New Transmission

1,050

$26,553,000

20

$4,927,700,278

17485

Oneida

BARNEVELD VILLAGE
(GU) / Barneveld (V)

Upgrade Distribution System

600

$219,000

15

$4,927,919,278

LIMELEDGE WD /
Marcellus (T) & (V)

New Water District to serve area with insufficient private wells.


Interconnection with GWUDI system., New Surface Water Treatment
Rule Compliance Facility, Extend Distribution System

700

1160

$4,927,919,278

250

$535,600

145

$4,928,454,878

Onondaga County
16882

Onondaga

$0

NOTE: Short - Term Loan Closed, Project Cost Shown is


Remaining Balance Not Funded With Short Term Loan

17385

Onondaga

NORTHEAST LAFAYETTE
WD / East Syracuse (V)

Inter-connection to eliminate GWUDI source., New Transmission, New


Inter-Connection

17612

Onondaga

ELBRIDGE VILLAGE /
Elbridge (V)

New UV treatment for LT2ESWTR compliance., New Surface Water


Treatment Rule Compliance Facility

1,519

$0

135

$4,928,454,878

17728

Onondaga

SKANEATELES VILLAGE /
Skaneateles

Install UV Disinfection for LT2 compliance., Upgrade Water Treatment


Plant

2,610

$793,100

115

$4,929,247,978

17855

Onondaga

SYRACUSE CITY /
Syracuse (C)

Woodland Reservoir UV for LT2SWTR compliance., New Surface


Water Treatment Rule Compliance Facility

192,000

$10,042,500

95

$4,939,290,478

17638

Onondaga

OCWA / Onondaga County


Water Authorit

Eastern 20 MG Reservoir storage. Replacing uncovered finished water


storage reservoir with concrete tank., Upgrade Storage

256,000

$22,500,000

90

$4,961,790,478

17460

Onondaga

CLAY WDS / Metropolitan


Water Board

Replace uncovered finished 30 MG Terminal Reservoir with two 15 MG


tanks, Upgrade Storage

16,000

$16,050,000

90

$4,977,840,478

17458

Onondaga

OCWA / Onondaga County


Water Authorit

Western Reservoir 20 mg storage. Replacing uncovered finished water


storage reservoir with concrete tank, Upgrade Storage

256,000

$0

90

$4,977,840,478

17934

Onondaga

LAFAYETTE (T) / LaFayette


(T)

Creation of Central LaFayette Water District., New Water District

2,000

$5,700,000

80

$4,983,540,478

16564

Onondaga

NORTHEAST LAFAYETTE
WD / East Syracuse (V)

New well to replace shallow wells and a lead and copper corrosion
control system., New Ground Water Source

250

$227,040

75

$4,983,767,518

17988

Onondaga

OCWA / Onondaga County


Water Authorit

Southern branch pump station improvements. , Upgrade Pump Station

256,000

$2,500,000

70

$4,986,267,518

Page 47 of 86

NYS Drinking Water State Revolving Fund DRAFT IUP Multiyear List

October 1, 2012 to September 30, 2013

Project County

System Name/
Borrower

Description

Pop.

Project Cost

Score

Cumulative
Total

Onondaga County
17884

Onondaga

MARCELLUS (T) / Marcellus Pheasant Valley Road WD., New Distribution System, New
Inter-Connection
(T)

17856

Onondaga

SYRACUSE CITY /
Syracuse (C)

17857

Onondaga

17025

93

$782,000

70

$4,987,049,518

Westcott Reservoir UV for LT2SWTR compliance., New Surface


Water Treatment Rule Compliance Facility

192,000

$4,805,000

70

$4,991,854,518

SYRACUSE CITY /
Syracuse (C)

Lead service replacement., Upgrade Distribution System

192,000

$16,377,000

70

$5,008,231,518

Onondaga

NORTHEAST LAFAYETTE
WD / East Syracuse (V)

Contruct a building around Gifford finished water reservoir. , Upgrade


Storage

250

$1,990,503

65

$5,010,222,021

17389

Onondaga

NORTHEAST LAFAYETTE
WD / East Syracuse (V)

Replace lead service lines from the watermain to the property line to
correct lead & copper exceedances., Upgrade Distribution System

250

$444,445

65

$5,010,666,466

15811

Onondaga

SKANEATELES VILLAGE /
Skaneateles (V)

Improve disinfection contact time., Upgrade Transmission

2,610

$1,600,000

55

$5,012,266,466

17327

Onondaga

CROSS LAKE/N.
ELBRIDGE AREA WD /
Elbridge (T)

New Storage, New Pump Station, Extend Distribution System

534

$2,590,450

50

$5,014,856,916

15116

Onondaga

ROUTE 5 WEST W.D. - (T)


ELBRIDGE / Elbridge (T)

Route 5 West WD., New Complete System (New System), New


Distribution System

6,192

$306,966

50

$5,015,163,882

15115

Onondaga

ROUTE 5 EAST W.D. - (T)


ELBRIDGE / Elbridge (T)

Route 5 East WD., New Complete System (New System), New


Transmission, New Storage, New Distribution System

6,192

$2,008,500

50

$5,017,172,382

17328

Onondaga

HALFWAY ROAD WATER


DISTRICT / Elbridge (T)

New Storage, Extend Distribution System

120

$906,400

50

$5,018,078,782

17326

Onondaga

LAIRD ROAD WATER


DISTRICT / Elbridge (T)

Extend Distribution System

29

$378,000

50

$5,018,456,782

17971

Onondaga

GILLIE BROOK ROAD WD / Gillie Brook Road Water District., Extend Distribution System
Camillus (T)

27

$432,565

45

$5,018,889,347

16313

Onondaga

TOWN OF LYSANDER
W.D. / Lysander (T)

Lamson Road Water District., New Distribution System, New Water


District

500

$5,284,000

45

$5,024,173,347

16669

Onondaga

SOUTH ONONDAGA
WATER DISTRICT /
Onondaga (T)

Extend Distribution System

400

$1,589,000

45

$5,025,762,347

18008

Onondaga

CLAY WDS / Clay (T)

Extend Distribution System

16,000

$260,000

45

$5,026,022,347

16644

Onondaga

CICERO WDS / Cicero (T)

Extend Distribution System

14,108

$49,500

45

$5,026,071,847

16565

Onondaga

NORTHEAST LAFAYETTE
WD / Onondaga County
Parks

Jamesville Beach Water Supply Upgrade., New Storage, New


Distribution System

250

$102,000

45

$5,026,173,847

16177

Onondaga

NORTHEAST LAFAYETTE
WD / East Syracuse (V)

New Pump Station

250

$105,869

45

$5,026,279,716

16308

Onondaga

COYE ROAD W. D. /
Lafayette (T)

New Complete System (New System)

320

$804,000

45

$5,027,083,716

16306

Onondaga

TOWN OF LAFAYETTE /
Lafayette (T)

Tully Valley potable water supply., New Complete System (New


System)

250

$2,000,000

45

$5,029,083,716

Page 48 of 86

NYS Drinking Water State Revolving Fund DRAFT IUP Multiyear List

October 1, 2012 to September 30, 2013

Project County

System Name/
Borrower

Description

Pop.

Project Cost

Score

Cumulative
Total

Onondaga County
15061

Onondaga

TULLY VILLAGE / Tully (V)

New Ground Water Source, Upgrade Distribution System

930

$226,600

45

$5,029,310,316

17024

Onondaga

NORTHEAST LAFAYETTE
WD / East Syracuse (V)

Cleaning and dredging of Gifford Finished WaterReservoir., Upgrade


Storage

250

$158,862

40

$5,029,469,178

17963

Onondaga

SYRACUSE CITY /
Syracuse (C)

Install hydroturbine at Westcott Reservoir.,

192,000

$315,000

35

$5,029,784,178

17917

Onondaga

CAMILLUS
CONSOLIDATED WD /
Camillus (T)

Upgrade Distribution System

22,000

$5,035,497

35

$5,034,819,675

15224

Onondaga

OCWA / Onondaga Co.


Water Authority

New Storage

256,000

$2,210,120

35

$5,037,029,795

17964

Onondaga

SYRACUSE CITY /
Syracuse (C)

Install solar power at Westcott Reservoir.,

192,000

$487,273

35

$5,037,517,068

16432

Onondaga

JORDAN VILLAGE / Jordan


(V)

Upgrade Pump Station

1,400

$63,000

30

$5,037,580,068

15144

Onondaga

BALDWINSVILLE VILLAGE
/ Baldwinsville (V)

Upgrade Ground Water Source, Upgrade Distribution System

8,000

$3,887,530

25

$5,041,467,598

15145

Onondaga

BALDWINSVILLE VILLAGE
/ Baldwinsville (V)

New Water Treatment Plant, New Ground Water Source, New


Transmission

8,000

$425,390

20

$5,041,892,988

15155

Onondaga

VAN BUREN WDS / Van


Buren (T)

Upgrade Distribution System

10,000

$858,000

20

$5,042,750,988

16120

Onondaga

DEWITT WDS - SOUTH /


Dewitt (T)

New Storage, Upgrade Pump Station, Upgrade Distribution System

15,705

$1,750,000

20

$5,044,500,988

17325

Onondaga

MINOA VILLAGE / Minoa


(V)

Upgrade Distribution System

3,745

$307,336

20

$5,044,808,324

17334

Onondaga

CAMILLUS
CONSOLIDATED WD /
Camillus (T)

Upgrade Distribution System

22,000

$2,178,450

15

$5,046,986,774

16616

Onondaga

SKANEATELES VILLAGE /
Skaneateles (V)

Upgrade Distribution System

2,610

$574,000

10

$5,047,560,774

16155

Onondaga

CAMILLUS
CONSOLIDATED WD /
Camillus (T)

Upgrade Distribution System

22,000

$1,613,997

10

$5,049,174,771

16119

Onondaga

DEWITT WDS - SOUTH /


Dewitt (T)

Inter-Connection

15,705

$1,432,000

10

$5,050,606,771

15058

Onondaga

ELBRIDGE VILLAGE /
Elbridge (V)

Upgrade Transmission

1,519

$769,681

10

$5,051,376,451

17853

Onondaga

OCWA / Onondaga County


Water Authorit

Roof and siding improvements for Water System Maintenance and


Operations Facility., Upgrade Other Expenses, Upgrade Other (OT)

256,000

$1,620,000

$5,052,996,451

1,100

$1,530,700

170

$5,054,527,151

750

$298,750

110

$5,054,825,901

Ontario County
17522

Ontario

NAPLES VILLAGE / Naples


(V)

Address GWUDI spring sources., New Surface Water Treatment Rule


Compliance Facility, Upgrade Ground Water Source, Upgrade
Distribution System

17591

Ontario

BLOOMFIELD (V) OAKMOUNT AVE /


Bloomfield (V)

Upgrade Ground Water Source

Page 49 of 86

NYS Drinking Water State Revolving Fund DRAFT IUP Multiyear List
October 1, 2012 to September 30, 2013
Project County

System Name/
Borrower

Description

Pop.

Project Cost

Score

Cumulative
Total

Ontario County
15734

Ontario

MANCHESTER CENTRAL
WATER DISTRICT /
Manchester (T)

New Storage, Extend Distribution System, System Consolidation

17082

Ontario

CLIFTON SPRINGS
VILLAGE / Clifton Springs
(V)

New Storage, Upgrade Distribution System

17746

Ontario

RUSHVILLE VILLAGE /
Rushville (V)

Upgrade Surface Water Treatment Rule Compliance Facility

15159

Ontario

NAPLES VILLAGE / Naples


(V)

16886

Ontario

16814

581

$2,664,600

85

$5,057,490,501

2,190

$618,000

70

$5,058,108,501

621

$1,969,200

65

$5,060,077,701

Upgrade Transmission, New Storage, Upgrade Distribution System

1,100

$1,465,000

65

$5,061,542,701

WEST BLOOMFIELD WD /
West Bloomfield (T)

County Road 35 and Dugway Road. , Extend Distribution System

1,500

$195,513

60

$5,061,738,214

Ontario

WEST BLOOMFIELD WD /
West Bloomfield (T)

Extend system to serve area with private contaminated wells. , Extend


Distribution System

1,500

$231,750

60

$5,061,969,964

15545

Ontario

OAKMOUNT ROAD WATER New Storage, Extend Distribution System


SYSTEM / East Bloomfield
(T)

150

$2,224,000

55

$5,064,193,964

17378

Ontario

GORHAM TOWN WD /
Gorham (T)

Extension No. 9., Extend Distribution System

4,500

$732,000

50

$5,064,925,964

16792

Ontario

PHELPS (T) WATER


DISTRICT NO. 3 / Phelps
(T)

Extend Distribution System

310

$1,295,000

45

$5,066,220,964

16793

Ontario

PHELPS (T) WATER


DISTRICT NO. 4 / Phelps
(T)

Extend Distribution System

230

$710,000

45

$5,066,930,964

16698

Ontario

GENEVA (T) / Geneva (T)

New Storage, New Distribution System

1,500

$2,541,000

45

$5,069,471,964

16612

Ontario

NORTH FARMINGTON WD
/ Farmington (T)

Fox Road & County Road 28., Extend Distribution System

2,300

$155,128

45

$5,069,627,092

17747

Ontario

CANANDAIGUA-FARMINGT Distribution Main Installation for Canandaigua-Farmington Consolidated


Water District, Upgrade Distribution System
CONSOLIDATED W.D. / C
& F Cosolidated WD

11,400

$2,511,140

45

$5,072,138,232

16040

Ontario

GORHAM TOWN WD /
Gorham (T)

New Pump Station, Extend Distribution System

4,500

$489,370

45

$5,072,627,602

17521

Ontario

RUSHVILLE VILLAGE /
Rushville (V)

New Pump Station

621

$473,800

45

$5,073,101,402

17507

Ontario

SENECA WD NO.1 /
Seneca (T)

New Complete System (New System), New Pump Station, New


Distribution System

75

$1,529,500

45

$5,074,630,902

15549

Ontario

CANANDAIGUA TOWN
CONS. WD / Canandaigua
(T)

Extend Distribution System

6,300

$207,300

40

$5,074,838,202

15541

Ontario

CANANDAIGUA TOWN
CONS. WD / Canandaigua
(T)

Extend Distribution System

6,300

$1,120,537

40

$5,075,958,739

16151

Ontario

NORTH FARMINGTON WD
/ Farmington (T)

Extend Distribution System

2,300

$159,990

40

$5,076,118,729

15210

Ontario

PHELPS VILLAGE / Phelps


(V)

New Transmission

2,118

$862,000

40

$5,076,980,729

Page 50 of 86

NYS Drinking Water State Revolving Fund DRAFT IUP Multiyear List
October 1, 2012 to September 30, 2013
Project County

System Name/
Borrower

Description

Pop.

Project Cost

Score

Cumulative
Total

Ontario County
15554

Ontario

WEST LAKE RD BENEFIT


BASIS DIS / Canandaigua
(T)

Canandaigua. (T), Extend Distribution System

220

$1,243,100

40

$5,078,223,829

15209

Ontario

PHELPS (T) - ROUTE 96


WEST WD / Phelps (T)

Extend Distribution System

300

$1,132,000

40

$5,079,355,829

15516

Ontario

MAXWELL WATER
DISTRICT EXT. 1 /
Farmington (T)

County Road 28 from Maxwell Rd. to Fox Rd., Extend Distribution


System

40

$90,813

40

$5,079,446,642

15208

Ontario

PHELPS (T) - ROUTE 14


WD / Phelps (T)

Extend Distribution System

200

$1,125,000

40

$5,080,571,642

15542

Ontario

COUNTY ROAD 30 - EAST


BLOOMFIELD / East
Bloomfield (T)

System Consolidation

60

$86,000

35

$5,080,657,642

17511

Ontario

CANANDAIGUA CITY /
Canandaigua (C)

Upgrade Storage, New Storage

11,264

$4,893,145

30

$5,085,550,787

16072

Ontario

GENEVA CITY / Geneva (C)

Upgrade Distribution System

13,617

$1,223,640

30

$5,086,774,427

15520

Ontario

VICTOR VILLAGE / Victor


(V)

Upgrade Transmission, Upgrade Distribution System

2,443

$606,387

25

$5,087,380,814

15548

Ontario

NYS RT. 5 EXTENSION EAST BLOOMFIELD / East


Bloomfield (T)

Inter-Connection

120

$199,563

25

$5,087,580,377

16357

Ontario

CANANDAIGUA CITY /
Canandaigua (C)

New Storage

11,264

$1,375,000

25

$5,088,955,377

16885

Ontario

WEST BLOOMFIELD WD /
West Bloomfield (T)

Cathodic protection system., Upgrade Storage

1,500

$13,390

20

$5,088,968,767

17898

Ontario

RUSHVILLE VILLAGE /
Rushville (V)

Upgrade Water Treatment Plant

621

$1,969,200

20

$5,090,937,967

15217

Ontario

BLOOMFIELD (V) OAKMOUNT AVE /


Bloomfield (V)

New Ground Water Source, New Storage

750

$978,500

20

$5,091,916,467

16041

Ontario

GORHAM TOWN WD /
Gorham (T)

New Pump Station, Upgrade Distribution System

4,500

$141,280

20

$5,092,057,747

16358

Ontario

CANANDAIGUA CITY /
Canandaigua (C)

Replacement of water reservoir cover., Upgrade Storage

11,264

$375,000

20

$5,092,432,747

16356

Ontario

CANANDAIGUA CITY /
Canandaigua (C)

Painting of storage tanks., Upgrade Storage

11,264

$450,000

20

$5,092,882,747

16353

Ontario

CANANDAIGUA CITY /
Canandaigua (C)

Upgrade Transmission

11,264

$445,000

20

$5,093,327,747

15559

Ontario

HOPEWELL WD #2 /
Hopewell (T)

New Pump Station

1,148

$435,600

15

$5,093,763,347

17896

Ontario

WHITE ROAD WD / Phelps


(T)

Upgrade Distribution System

45

$213,700

15

$5,093,977,047

17753

Ontario

CANANDAIGUA-FARMINGT Transmisstion Main for Canandaigua-Farmington Consolidated Water


District, New Transmission
CONSOLIDATED W.D. / C
& F Cosolidated WD

11,400

$2,866,490

15

$5,096,843,537

Page 51 of 86

NYS Drinking Water State Revolving Fund DRAFT IUP Multiyear List

October 1, 2012 to September 30, 2013

Project County

System Name/
Borrower

Description

Pop.

Project Cost

Score

Cumulative
Total

Ontario County
18040

Ontario

BLOOMFIELD VILLAGE /
Bloomfield (V)

Upgrade Distribution System

1,675

$1,340,697

15

$5,098,184,234

16039

Ontario

GORHAM TOWN WD /
Gorham (T)

New Storage

4,500

$1,150,000

15

$5,099,334,234

16038

Ontario

GORHAM TOWN WD /
Gorham (T)

Upgrade Storage

4,500

$77,500

15

$5,099,411,734

16037

Ontario

GORHAM TOWN WD /
Gorham (T)

Upgrade Water Treatment Plant

4,500

$108,500

15

$5,099,520,234

16355

Ontario

CANANDAIGUA CITY /
Canandaigua (C)

Muar Lakes Water Main Replacement., Upgrade Distribution System

11,264

$110,000

15

$5,099,630,234

16354

Ontario

CANANDAIGUA CITY /
Canandaigua (C)

North Street water main replacement., Upgrade Distribution System

11,264

$294,000

15

$5,099,924,234

16352

Ontario

CANANDAIGUA CITY /
Canandaigua (C)

West Gibson Street water main., Upgrade Distribution System

11,264

$200,000

15

$5,100,124,234

16757

Ontario

SHORTSVILLE VILLAGE /
Shortsville (V)

Upgrade Distribution System

1,320

$134,000

10

$5,100,258,234

15226

Ontario

CLIFTON SPRINGS
THRUWAY SERVICE AREA
/ NYS Thruway Authority

New Storage

1,643

$208,000

10

$5,100,466,234

Orange County
17579

Orange

NEWBURGH
CONSOLIDATED WD /
Newburgh (T)

Delaware Aqueduct Tap Filatration Plant& Chadwick Lake plant


improvements Phase 2 of 17566, New Surface Water Treatment Rule
Compliance Facility

22,800

$19,650,000

2185

$5,120,116,234

17515

Orange

NEWBURGH CITY /
Newburgh (C)

Phase 2 of project 16754 Cost overrun, Upgrade Water Treatment


Plant, Upgrade Transmission

28,000

$2,577,162

2165

$5,122,693,396

17449

Orange

HIGHLANDS (T) WD #2 /
Highlands (T)

Phase 2 of DWSRF 16454 to provide well source capacity for Phase 1


which included, Upgrade Water Treatment Plant, New Ground Water
Source, New Storage, Extend Distribution System

1,379

$4,748,700

2095

$5,127,442,096

17461

Orange

PHEASANT HILL /
Pheasant Hill Water Corp

Rehabilitation of water system to address e-coli contamination,


Upgrade Water Treatment Plant, New Ground Water Source, New
Storage

154

$0

1220

$5,127,442,096

BEAVER DAM LAKE


WATER CORP. / Beaver
Dam Lake Corp.

New Surface Water Treatment Rule Compliance Facility, New Ground


Water Source, New Storage, Upgrade Distribution System

487

15072

Orange

NOTE: Short - Term Loan Closed, Project Cost Shown is


Remaining Balance Not Funded With Short Term Loan

$0

1215

$5,127,442,096

NOTE: Short - Term Loan Closed, Project Cost Shown is


Remaining Balance Not Funded With Short Term Loan

17493

Orange

WARWICK VILLAGE /
Warwick (V)

New Surface Water Treatment Rule Compliance Facility, Upgrade


Water Treatment Plant

6,083

$0

190

$5,127,442,096

18060

Orange

HIGHLANDS WATER
DISTRCIT 2 EXTENTION /
Highlands (T)

Extention of the existing WD #2 to serve private wells with


contamination and consolidation of several PWS's, Extend Distribution
System, Extend System Consolidation

1,379

$1,601,238

155

$5,129,043,334

16751

Orange

KIRYAS JOEL VILLAGE /


Kiryas Joel (V)

Expansion of service area to El Roi Estates, Monroe (T), Extend


Distribution System

21,750

$2,245,040

145

$5,131,288,374

15722

Orange

MONROE WD #8
(SKYVIEW HILLS) / Monroe
(T)

Extend system to serve area with private contaminated wells. ,


Upgrade Distribution System

544

$1,000,000

135

$5,132,288,374

16673

Orange

MIDDLETOWN CITY /
Middletown (C)

New Transmission, New Storage, New Distribution System

26,500

$8,000,000

130

$5,140,288,374

17617

Orange

BLOOMING GROVE WD
#1-WORLEY HE / South
Blooming Grove (V)

Transmission main with treatment plant to connect Water District 1 and


6 to Orange and Rockland Well., New Water Treatment Plant, New
Transmission

1,500

$3,193,000

130

$5,143,481,374

Page 52 of 86

NYS Drinking Water State Revolving Fund DRAFT IUP Multiyear List
October 1, 2012 to September 30, 2013
Project County

System Name/
Borrower

Description

Pop.

Project Cost

Score

Cumulative
Total

Orange County
15669

Orange

MONROE WD #12
(MONROE HILLS
ESTATES) / Monroe (T)

Upgrade Ground Water Source, Upgrade Pump Station, Upgrade


Distribution System

17986

Orange

PORT JERVIS CITY / Port


Jervis (C)

15227

Orange

16075

120

$1,250,000

125

$5,144,731,374

Addition of clarification, Upgrade Water Treatment Plant

9,000

$3,610,000

115

$5,148,341,374

MAYBROOK VILLAGE /
Maybrook (V)

New Water Treatment Plant, New Ground Water Source

3,093

$238,000

110

$5,148,579,374

Orange

CHESTER VILLAGE /
Chester (V)

Upgrade Water Treatment Plant, New Ground Water Source, Upgrade


Storage, New Storage, New Distribution System

3,448

$2,097,850

110

$5,150,677,224

15819

Orange

KIRYAS JOEL VILLAGE /


Kiryas Joel (V)

Upgrade Water Treatment Plant

21,750

$734,500

105

$5,151,411,724

16591

Orange

GREENVILLE (T) MUNI.L


WATER SYSTEM 'A' /
Greenville (T)

Complete System (New System)

400

$2,319,060

90

$5,153,730,784

17523

Orange

MONTGOMERY W.D. #1 /
Montgomery (T)

Extend WD #1 to consolidate several water supplies, New System


Consolidation

605

$13,500,000

90

$5,167,230,784

17294

Orange

MONROE WATER
DISTRICT / Monroe (T)

Upgrade Ground Water Source, New Transmission, Upgrade


Distribution System

15,000

$6,344,800

90

$5,173,575,584

15718

Orange

MONROE WD #10 - PINE


TREE ROAD / Monroe (T)

New system to serve area with private contaminated wells. , New


Transmission

50

$215,000

75

$5,173,790,584

17413

Orange

WALLKILL
CONSOLIDATED WD /
Wallkill (T)

Rykoski Lane Water Treatment Plant, Upgrade Water Treatment Plant,


New Pump Station, New Pump Station

15,000

$7,000,000

75

$5,180,790,584

17042

Orange

MONROE VILLAGE /
Monroe (V)

Upgrade Distribution System

8,892

$986,000

70

$5,181,776,584

17368

Orange

GOSHEN VILLAGE /
Goshen (V)

New Water Treatment Plant, New Ground Water Source, New


Transmission

5,676

$5,311,500

70

$5,187,088,084

16144

Orange

GOSHEN W.D. #1
(HAMBLETONIAN PARK) /
Goshen (T)

New Ground Water Source, New Storage, Upgrade Distribution System

509

$2,605,900

65

$5,189,693,984

17412

Orange

MONROE WD #12
(MONROE HILLS
ESTATES) / Monroe (T)

Upgrade Water Treatment Plant, New Surface Water Source, Upgrade


Storage

120

$1,370,930

65

$5,191,064,914

16027

Orange

BLOOMING GROVE WD
#1-WORLEY HE / Blooming
Grove (T)

New Ground Water Source, Upgrade Storage

1,500

$392,000

65

$5,191,456,914

15816

Orange

KIRYAS JOEL VILLAGE /


Kiryas Joel (V)

New Storage

21,750

$1,000,000

60

$5,192,456,914

16906

Orange

KIRYAS JOEL VILLAGE /


Kiryas Joel (V)

Pump Station and transmission main from NYC Aqueduct to (V) K.J.,
New Transmission, New Pump Station

21,750

$28,907,400

55

$5,221,364,314

17952

Orange

KIRYAS JOEL VILLAGE /


Kiryas Joel (V)

Redevelop wells at the Star Expansion Well Field, Upgrade Ground


Water Source

21,750

$1,658,712

55

$5,223,023,026

17950

Orange

KIRYAS JOEL VILLAGE /


Kiryas Joel (V)

New wells on Site 1, Site 2, Site 3, Site 4, Site 5, New Ground Water
Source

21,750

$14,246,909

55

$5,237,269,935

17951

Orange

KIRYAS JOEL VILLAGE /


Kiryas Joel (V)

Redevelopment of Wells 6 and 13A and new well at Well 13 Well Field,
New Ground Water Source, Upgrade Ground Water Source

21,750

$3,805,747

55

$5,241,075,682

Page 53 of 86

NYS Drinking Water State Revolving Fund DRAFT IUP Multiyear List

October 1, 2012 to September 30, 2013

Project County

System Name/
Borrower

Description

Pop.

Project Cost

Score

Cumulative
Total

Orange County
16749

Orange

KIRYAS JOEL VILLAGE /


Kiryas Joel (V)

Upgrade Pump Station

17994

Orange

DEERPARK WATER
DISTRICT #1 / Deerpark (T)

New water system, New Complete System (New System)

15078

Orange

HOLIDAY MOBILE PARK


INC. / Mid-Hudson Park
Management

Upgrade Distribution System, System Consolidation

17450

Orange

HIGHLANDS (T) WD #3 /
Highlands (T)

New Water District

16150

Orange

WARWICK (T) / Warwick (T) New Storage, Upgrade Pump Station, Upgrade Distribution System,

17293

Orange

WAYAWANDA WD #1 /
Wawayanda (T)

Extend Distribution System

15229

Orange

SLEEPY HOLLOW MOBILE


PARK / Sleepy Hollow MHP,
LLC

Upgrade Transmission, Upgrade Distribution System

16321

Orange

NEWBURGH CITY /
Newburgh (C)

Grand Street waterline replacement and lead service removal,


Upgrade Distribution System

16036

Orange

BLOOMING GROVE WD
#3-TOMAHAWK / Blooming
Grove (T)

17348

Orange

18056

21,750

$872,247

45

$5,241,947,929

2,000

$6,180,000

45

$5,248,127,929

250

$412,000

45

$5,248,539,929

1,548

$8,105,700

45

$5,256,645,629

300

$312,500

45

$5,256,958,129

50

$208,941

45

$5,257,167,070

400

$386,250

40

$5,257,553,320

28,000

$4,635,000

40

$5,262,188,320

New Ground Water Source

208

$306,000

40

$5,262,494,320

BELLVALE PARK W.D. /


Warwick (T)

Replace wells, upgrade pump house and storage, New Ground Water
Source, Upgrade Pump Station

100

$453,200

40

$5,262,947,520

Orange

WARWICK VILLAGE /
Warwick (V)

Upgrade Water Treatment Plant, New Ground Water Source

6,083

$323,725

35

$5,263,271,245

16147

Orange

WESTSIDE GREENWOOD
LAKE W.D. / Warwick (T)

Upgrade Distribution System

1,160

$100,000

35

$5,263,371,245

15440

Orange

NEW WINDSOR
CONSOLIDATED WD /
Windsor (T)

New Storage

30,000

$154,500

35

$5,263,525,745

15182

Orange

WOODBURY CONS. W.D. /


Woodbury (T)

New Storage, New Pump Station, Upgrade Distribution System

10,105

$1,564,500

35

$5,265,090,245

16312

Orange

NEWBURGH CITY /
Newburgh (C)

Upgrade Distribution System

28,000

$1,545,000

35

$5,266,635,245

15666

Orange

ORCHARD HILL ESTATES /


Orchard Hill Water Co. Inc.

Upgrade Ground Water Source, New Storage, Upgrade Distribution


System

196

$1,123,730

30

$5,267,758,975

15635

Orange

WASHINGTONVILLE
VILLAGE / Washingtonville
(V)

Upgrade Ground Water Source, Upgrade Distribution System

7,000

$435,000

30

$5,268,193,975

17602

Orange

GREENWOOD LAKE
VILLAGE / Greenwood Lake
(V)

Upgrade Water Treatment Plant

3,411

$395,520

30

$5,268,589,495

17159

Orange

KNOLLS WATER CO., INC.


/ Knolls Water Company

New Ground Water Source, Upgrade Storage, New Pump Station

230

$250,000

25

$5,268,839,495

15674

Orange

SCOTT ACRES / Scott


Acres Water Co.

New Water Treatment Plant, New Ground Water Source, Upgrade


Distribution System

117

$168,920

25

$5,269,008,415

System Consolidation

Page 54 of 86

NYS Drinking Water State Revolving Fund DRAFT IUP Multiyear List
October 1, 2012 to September 30, 2013
Project County

System Name/
Borrower

Description

Pop.

Project Cost

Score

Cumulative
Total

Orange County
15465

Orange

NEW WINDSOR
CONSOLIDATED WD /
Windsor (T)

Water filter plant expansion 3 mgd to 6 mgd, Upgrade Water


Treatment Plant

16621

Orange

HARRIMAN VILLAGE /
Harriman (V)

River Road Pump Station, New Ground Water Source, New Pump
Station

15471

Orange

NEW WINDSOR
CONSOLIDATED WD /
Windsor (T)

New Pump Station

15228

Orange

PINE GROVE MOBILE


HOME PARK / Pine Grove
MHP, LLC

New Water Treatment Plant, Upgrade Transmission, New Storage,


Upgrade Distribution System

16389

Orange

NEWBURGH
CONSOLIDATED WD /
Newburgh (T)

Upgrade Pump Station

15966

Orange

CORNWALL-ON-HUDSON / Upgrade Water Treatment Plant


Cornwall-On-Hudson (V)

17038

Orange

WARWICK VILLAGE /
Warwick (V)

Upgrade Storage

17977

Orange

NEW WINDSOR
CONSOLIDATED WD / New
Windsor (T)

Rehabilitate St. Anne Well Field, Upgrade Water Treatment Plant,


Upgrade Ground Water Source

16529

Orange

WHITLOCK FARMS /
Whitlock Farms Water Corp.

New Water Treatment Plant, Upgrade Distribution System

17816

Orange

NEW WINDSOR
CONSOLIDATED WD / New
Winsor (T)

15175

Orange

17565

30,000

$15,450,000

25

$5,284,458,415

4,500

$128,750

25

$5,284,587,165

30,000

$515,000

25

$5,285,102,165

516

$484,100

25

$5,285,586,265

22,800

$120,000

25

$5,285,706,265

9,300

$2,935,257

25

$5,288,641,522

6,083

$263,433

20

$5,288,904,955

30,000

$748,000

20

$5,289,652,955

100

$83,740

20

$5,289,736,695

Reactivation of St. Anne's Well, Upgrade Ground Water Source

30,000

$748,000

20

$5,290,484,695

WOODBURY CONS. W.D. /


Woodbury (T)

New Ground Water Source, New Pump Station

10,105

$291,500

20

$5,290,776,195

Orange

BRITTANY TERRACE /
Brittany Terrace, Inc.

New water storage tank, New Storage

169

$215,000

20

$5,290,991,195

17551

Orange

ARLUCK WATER
DISTRICT / Wawayanda (T)

Replacement of existing hydropneumatic system for the Arluck WD,


Upgrade Pump Station

118

$85,000

20

$5,291,076,195

16424

Orange

WARWICK VILLAGE /
Warwick (V)

Taste & odor control, Upgrade Water Treatment Plant

6,083

$100,000

20

$5,291,176,195

17400

Orange

HIGHLAND FALLS
VILLAGE / Highland Falls
(V)

Water Treatment Plant Filter Upgrades, Upgrade Water Treatment


Plant

4,400

$800,000

20

$5,291,976,195

17346

Orange

WOODBURY CONS. W.D. /


Woodbury (T)

Repaint Overlook Storage Tank, Upgrade Storage

10,105

$218,360

20

$5,292,194,555

15178

Orange

WOODBURY CONS. W.D. /


Woodbury (T)

New Water Treatment Plant, New Ground Water Source

10,105

$2,127,000

20

$5,294,321,555

15951

Orange

VALLEY VIEW CTR FOR


NURSING CARE & REHAB
/ Orange County

New Water Treatment Plant, New Ground Water Source, New Storage,
Upgrade Distribution System

851

$572,474

20

$5,294,894,029

17291

Orange

PINE BUSH WATER


DISTRICT / Crawford (T)

New Ground Water Source

7,000

$165,000

20

$5,295,059,029

17131

Orange

TUXEDO PARK VILLAGE /


Tuxedo Park (V)

Upgrade Distribution System

1,100

$263,000

15

$5,295,322,029

Page 55 of 86

NYS Drinking Water State Revolving Fund DRAFT IUP Multiyear List
October 1, 2012 to September 30, 2013
Project County

System Name/
Borrower

Description

Pop.

Project Cost

Score

Cumulative
Total

Orange County
15398

Orange

WASHINGTONVILLE
VILLAGE / Washingtonville
(V)

New Ground Water Source

16594

Orange

CAMPBELLS WATER
SUPPLY / Campbells Water
Supply

Upgrade Pump Station

15405

Orange

WASHINGTONVILLE
VILLAGE / Washingtonville
(V)

Upgrade Water Treatment Plant

15396

Orange

NEW WINDSOR
CONSOLIDATED WD / New
Windsor (T)

Water treatment plant modification raw water treatment, Upgrade


Water Treatment Plant

17916

Orange

GREENWOOD LAKE (V) /


Greenwood Lake (V)

16548

Orange

17843

7,000

$300,000

15

$5,295,622,029

40

$115,000

15

$5,295,737,029

7,000

$50,000

15

$5,295,787,029

30,000

$8,050,000

15

$5,303,837,029

Cleaning and painting storage tank, Upgrade Storage

3,400

$245,660

15

$5,304,082,689

WALDEN VILLAGE /
Walden (V)

New Storage

6,164

$716,500

15

$5,304,799,189

Orange

TUXEDO PARK (V) /


Tuxedo (V)

West Lake Road Transmission Line, Upgrade Transmission

1,100

$487,000

15

$5,305,286,189

17841

Orange

TUXEDO PARK (V) /


Tuxedo (V)

East Village Transmission Line Replacement, Upgrade Transmission

1,100

$987,000

15

$5,306,273,189

17842

Orange

TUXEDO PARK (V) /


Tuxedo (V)

Trans-Tuxedo Lake Transmission Line, Upgrade Transmission

1,100

$757,000

15

$5,307,030,189

17835

Orange

MONTGOMERY (V) /
Montgomery (V)

New Storage Tank, New Storage

3,696

$825,030

15

$5,307,855,219

15458

Orange

FLORIDA VILLAGE / Florida


(V)

New Storage

2,757

$515,000

15

$5,308,370,219

15404

Orange

WASHINGTONVILLE
VILLAGE / Washingtonville
(V)

New Storage

7,000

$665,000

15

$5,309,035,219

16391

Orange

NEWBURGH
CONSOLIDATED WD /
Newburgh (T)

Upgrade Storage

22,800

$45,000

15

$5,309,080,219

17316

Orange

HIGHLAND FALLS
VILLAGE / Highland Falls
(V)

Upgrade Water Treatment Plant

4,400

$464,500

15

$5,309,544,719

17290

Orange

WOODBURY CONS. W.D. /


Woodbury (T)

Upgrade Storage

10,105

$218,360

15

$5,309,763,079

16141

Orange

MONROE VILLAGE /
Monroe (V)

Water meter replacement, Other Expenses, Other (OT)

8,892

$679,800

10

$5,310,442,879

15400

Orange

WASHINGTONVILLE
VILLAGE / Washingtonville
(V)

Upgrade Distribution System

7,000

$1,500,000

10

$5,311,942,879

16545

Orange

WALDEN VILLAGE /
Walden (V)

Upgrade Distribution System

6,164

$1,545,000

10

$5,313,487,879

16547

Orange

WALDEN VILLAGE /
Walden (V)

Replacement of all water meters., Upgrade Other Expenses, Upgrade


Other (OT)

6,164

$536,500

10

$5,314,024,379

16546

Orange

WALDEN VILLAGE /
Walden (V)

New Ground Water Source

6,164

$865,000

10

$5,314,889,379

Page 56 of 86

NYS Drinking Water State Revolving Fund DRAFT IUP Multiyear List
October 1, 2012 to September 30, 2013
Project County

System Name/
Borrower

Description

Pop.

Project Cost

Score

Cumulative
Total

Orange County
17818

Orange

WASHINGTONVILLE
VILLAGE / Washingtonville
(V)

Replace watermains in Dutch Arms area., Upgrade Distribution System

7,000

$1,654,700

10

$5,316,544,079

17817

Orange

WASHINGTONVILLE
VILLAGE / Washingtonville
(V)

Watermain replacement Patricia and Beverly Lane, Upgrade


Distribution System

7,000

$961,000

10

$5,317,505,079

16451

Orange

NEW WINDSOR
CONSOLIDATED WD / New
Windsor (T)

Upgrade Distribution System

30,000

$618,500

10

$5,318,123,579

16031

Orange

BLOOMING GROVE WD
#4-TAPPAN HO / Blooming
Grove (T)

New Ground Water Source

500

$97,000

10

$5,318,220,579

15180

Orange

WOODBURY CONS. W.D. /


Woodbury (T)

Upgrade Distribution System

10,105

$528,000

10

$5,318,748,579

17644

Orange

KINGS ESTATES / Warwick


Water Corp

Upgrade distribution system., Upgrade Distribution System

1,144

$125,000

10

$5,318,873,579

16179

Orange

MONROE VILLAGE /
Monroe (V)

Repainting of two water storage tanks, Upgrade Storage

8,892

$134,415

10

$5,319,007,994

16153

Orange

MONROE VILLAGE /
Monroe (V)

500,000 gallon water storage tank, New Storage

8,892

$457,552

10

$5,319,465,546

16076

Orange

CHESTER VILLAGE /
Chester (V)

New Storage

3,448

$566,500

10

$5,320,032,046

16392

Orange

NEWBURGH
CONSOLIDATED WD /
Newburgh (T)

New water quality monitoring equipment, Other Expenses, Other (OT)

22,800

$20,000

10

$5,320,052,046

16035

Orange

BLOOMING GROVE WD
#3-TOMAHAWK / Blooming
Grove (T)

New Ground Water Source

208

$99,000

10

$5,320,151,046

16034

Orange

BLOOMING GROVE WD
#3-TOMAHAWK / Blooming
Grove (T)

New Ground Water Source

208

$99,000

10

$5,320,250,046

16369

Orange

BRAESIDE AQUA
CORPORATION / Braeside
Aqua Corp.

Upgrade Distribution System

330

$500,000

10

$5,320,750,046

16143

Orange

MONROE VILLAGE /
Monroe (V)

Barnett Rd, East & West, Upgrade Distribution System

8,892

$2,626,696

$5,323,376,742

16484

Orange

HIGHLAND FALLS
VILLAGE / Highland Falls
(V)

Upgrade Distribution System

4,400

$233,100

$5,323,609,842

15347

Orange

PINE BUSH WATER


DISTRICT / Crawford (T)

New Ground Water Source

7,000

$124,500

$5,323,734,342

15234

Orange

GOSHEN VILLAGE /
Goshen (V)

Upgrade Water Treatment Plant

5,676

$417,850

$5,324,152,192

15937

Orange

MONROE VILLAGE /
Monroe (V)

New Ground Water Source

8,892

$379,555

$5,324,531,747

16148

Orange

MONROE VILLAGE /
Monroe (V)

Round Lake Park, Upgrade Distribution System

8,892

$854,902

$5,325,386,649

16388

Orange

NEWBURGH
CONSOLIDATED WD /
Newburgh (T)

Upgrade Distribution System

22,800

$80,000

$5,325,466,649

Page 57 of 86

NYS Drinking Water State Revolving Fund DRAFT IUP Multiyear List

October 1, 2012 to September 30, 2013

Project County

System Name/
Borrower

Description

Pop.

Project Cost

Score

Cumulative
Total

Orange County
15963

Orange

CORNWALL-ON-HUDSON / Upgrade Distribution System


Cornwall-On-Hudson (V)

9,300

$520,000

$5,325,986,649

Orleans County
16032

Orleans

HOLLEY VILLAGE / Holley


(V)

New Ground Water Source, New Pump Station, Upgrade Distribution


System

2,150

$456,000

130

$5,326,442,649

16381

Orleans

LYNDONVILLE VILLAGE /
Lyndonville (V)

Upgrade Transmission, Upgrade Distribution System

1,418

$1,612,864

75

$5,328,055,513

15183

Orleans

SHELBY (T) / Shelby (T)

Extend system to serve area with private contaminated wells. Water


Improvement No. 4 - Phase I., Extend Distribution System

240

$249,700

65

$5,328,305,213

15185

Orleans

TOWN OF SHELBY /
Shelby (T)

Water Improvement No. 4 - Phase II., Extend Distribution System

240

$166,500

65

$5,328,471,713

17097

Orleans

MEDINA VILLAGE / Medina


(V)

Upgrade Distribution System

6,500

$4,088,085

60

$5,332,559,798

15168

Orleans

MURRAY W.D. #1 / Murray


(T)

Extend Distribution System

225

$154,677

60

$5,332,714,475

15166

Orleans

GAINES W.D. #1 / Gaines


(T)

Extend Distribution System

1,152

$531,885

60

$5,333,246,360

15165

Orleans

CLARENDON W.D. #1 /
Clarendon (T)

Extension to Water District No. 3., Extend Distribution System

600

$1,008,000

50

$5,334,254,360

15164

Orleans

BARRE W.D. #1 / Barre (T)

Extend Distribution System

375

$473,800

50

$5,334,728,160

15167

Orleans

KENDALL W.D. #1 / Kendall


(T)

Extend Distribution System

1,418

$581,950

50

$5,335,310,110

17723

Orleans

WATER SYS.
IMPROVEMENTS /
Clarendon (T)

New Distribution System, Upgrade Distribution System

54

$129,000

45

$5,335,439,110

17262

Orleans

HOLLEY VILLAGE / Holley


(V)

NYS Route 31., Upgrade Distribution System

2,150

$210,243

35

$5,335,649,353

15741

Orleans

CARLTON WATER
DISTRICT / Carlton (T)

Upgrade Transmission

2,800

$250,000

15

$5,335,899,353

18068

Orleans

WATER IMPROVEMENT
BENEFIT AREA #10 /
Clarendon (T)

Extend Distribution System

250

$1,634,949

$5,337,534,302

HANNIBAL (T) / Hannibal


(T)

Extend system to serve area with private contaminated wells,


consolidate public water supply. , Extend Distribution System, New
System Consolidation

1,200

1210

$5,337,534,302

TOAD
HARBOR/CONSTANTIA
WD / Constantia (T)

New Surface Water Treatment Rule Compliance Facility, New Storage,


New Pump Station, New Distribution System, New Inter-Connection,
New System Consolidation

2,765

WATER DISTRICT #2 /
Richland (T)

New Surface Water Treatment Rule Compliance Facility, New Ground


Water Source, New Transmission, New Storage, New Distribution
System

1,662

Extend distribution system to area with contaminated private wells and


consolidate PWS with GWUDI source, New Distribution System, New
System Consolidation

800

Oswego County
15204

16261

17538

17372

Oswego

Oswego

Oswego

Oswego

MEXICO (T) WD#2 /


Mexico (T)

Page 58 of 86

$0

NOTE: Short - Term Loan Closed, Project Cost Shown is


Remaining Balance Not Funded With Short Term Loan

$0

1200

$5,337,534,302

NOTE: Short - Term Loan Closed, Project Cost Shown is


Remaining Balance Not Funded With Short Term Loan

$0

1200

$5,337,534,302

NOTE: Short - Term Loan Closed, Project Cost Shown is


Remaining Balance Not Funded With Short Term Loan

$0

1200

$5,337,534,302

NOTE: Short - Term Loan Closed, Project Cost Shown is


Remaining Balance Not Funded With Short Term Loan

NYS Drinking Water State Revolving Fund DRAFT IUP Multiyear List

October 1, 2012 to September 30, 2013

Project County

System Name/
Borrower

Description

Pop.

Cumulative
Total

Project Cost

Score

2,503

$13,988,000

200

$5,351,522,302

150

$115,102

135

$5,351,637,404

3,200

$11,312,382

130

$5,362,949,786

1,200

$3,106,480

120

$5,366,056,266

790

$5,890,000

95

$5,371,946,266

1,500

$7,678,916

90

$5,379,625,182

238

$8,357,978

85

$5,387,983,160

Oswego County
17625

Oswego

EASTERN SHORE WATER


SYSTEM / Sandy Creek (T)

Consolidation of PWS with GWDI source., New Storage, New


Distribution System, New System Consolidation

17685

Oswego

ORWELL WD / Orwell (T)

New Surface Water Treatment Rule Compliance Facility

17597

Oswego

AREA 1 WATER SYSTEM /


Schroeppel (T)

Address organic contaminant violations, New Distribution System, New


System Consolidation

17594

Oswego

ROUTE 11 NORTH/FULLER Extend distribution system to area of insufficient yielding or


cantaminated private wells., Extend Distribution System, New System
ROAD WD PHASE D /
Consolidation
Hastings (T)

17564

Oswego

BERNHARDS BAY WD /
Constantia (T)

Extend Distribution System, New System Consolidation

17598

Oswego

AREA 3,4 & 8 WATER


SYSTEM / Schroeppel (T)

New Distribution System, New System Consolidation

17858

Oswego

WD#3 EXPANSION /
Granby (T)

Extend Distribution System

17510

Oswego

NORTH AREA WD / Volney


(T)

New Distribution System, New System Consolidation

1,000

$6,604,000

80

$5,394,587,160

16314

Oswego

MINETTO TOWN WATER


DISTRICT / Minetto (T)

Extend Distribution System

1,589

$412,000

70

$5,394,999,160

16903

Oswego

PARISH (V) / Parish (V)

New Complete System (New System)

600

$2,980,000

60

$5,397,979,160

17285

Oswego

HANNIBAL TOWN WATER


DISTRICT #2 / Hannibal (T)

Extend Distribution System

2,000

$1,715,000

60

$5,399,694,160

18010

Oswego

TOWN/VILLAGE JOINT
WATER PROJECT / Parish
(T)

Serve private contaminated/poor yielding wells., Extend Distribution


System

1,200

$10,150,000

55

$5,409,844,160

16978

Oswego

OSWEGO CITY / Oswego


(C)

Upgrade Water Treatment Plant

29,400

$4,532,000

50

$5,414,376,160

18062

Oswego

CLEVELAND VILLAGE /
Cleveland (V)

Upgrade Ground Water Source, Upgrade Storage, Upgrade Distribution


System

925

$1,576,930

50

$5,415,953,090

16205

Oswego

SENECA HILLS HEALTH


CAMPUS / Volney (T)

Upgrade Distribution System

450

$1,115,000

50

$5,417,068,090

16173

Oswego

PONDEROSA TRAILER
PARK, INC. / Ponderosa
Trailer Park Inc.

Upgrade Water Treatment Plant

60

$17,400

50

$5,417,085,490

15833

Oswego

TOWN OF WEST MONROE New Complete System (New System), Extend Distribution System
/ West Monroe (T)

500

$979,000

50

$5,418,064,490

15677

Oswego

FULTON CITY / Fulton (C)

Upgrade Storage

15,400

$412,000

40

$5,418,476,490

18074

Oswego

OSWEGO CITY / Oswego


(C)

Upgrade Storage

29,400

$3,057,000

40

$5,421,533,490

17187

Oswego

OSWEGO CITY / Oswego


(C)

Upgrade Distribution System

29,400

$734,367

35

$5,422,267,857

Page 59 of 86

NYS Drinking Water State Revolving Fund DRAFT IUP Multiyear List

October 1, 2012 to September 30, 2013

Project County

System Name/
Borrower

Description

Pop.

Project Cost

Score

Cumulative
Total

Oswego County
15681

Oswego

FULTON CITY / Fulton (C)

Upgrade Pump Station

15,400

$82,700

35

$5,422,350,557

15690

Oswego

FULTON CITY / Fulton (C)

Upgrade Distribution System

15,400

$720,000

35

$5,423,070,557

16138

Oswego

PHOENIX VILLAGE /
Phoenix (V)

State Street water main replacement., Upgrade Distribution System

2,138

$90,125

35

$5,423,160,682

17302

Oswego

PULASKI VILLAGE / Pulaski New Transmission, Upgrade Distribution System


(V)

2,398

$762,200

35

$5,423,922,882

15686

Oswego

FULTON CITY / Fulton (C)

New Storage

15,400

$1,000,000

30

$5,424,922,882

15683

Oswego

FULTON CITY / Fulton (C)

Upgrade Ground Water Source

15,400

$2,300,000

30

$5,427,222,882

16600

Oswego

MEXICO VILLAGE / Mexico


(V)

New Storage

1,600

$1,000,000

30

$5,428,222,882

17965

Oswego

RICHLAND TOWN PWS /


Richland (T)

Wind power generation at Schoeller well site.,

2,350

$585,000

25

$5,428,807,882

15784

Oswego

GRANBY (T) -HANNIBAL


STREET / Granby (T)

New Complete System (New System), Upgrade Distribution System

50

$195,000

20

$5,429,002,882

UNADILLA VILLAGE /
Unadilla (V)

Install new well, pumphouse, controls, chlorination system to replace


GWUDI springs, New Surface Water Treatment Rule Compliance
Facility, New Ground Water Source, Upgrade Pump Station, Upgrade
Distribution System

1215

$5,429,002,882

Otsego County
15343

Otsego

1,350

$0

NOTE: Short - Term Loan Closed, Project Cost Shown is


Remaining Balance Not Funded With Short Term Loan

15254

Otsego

EDMESTON WATER
DISTRICT / Edmeston (T)

Upgrade Ground Water Source, Upgrade Transmission, Upgrade


Distribution System

490

$2,065,150

165

$5,431,068,032

16146

Otsego

MILFORD VILLAGE /
Milford (V)

Address nitrate contamination, New Ground Water Source, Upgrade


Distribution System

510

$3,502,000

145

$5,434,570,032

17976

Otsego

SOUTHSIDE WATER
DISTRICT / Oneonta (T)

New Complete System (New System), New Water District

1,570

$8,808,000

130

$5,443,378,032

18067

Otsego

GILBERTSVILLE VILLAGE / New Ground Water Source, New Storage, Upgrade Distribution System
Gilbertsville (V)

477

$3,865,000

100

$5,447,243,032

17093

Otsego

HARTWICK WATER
DISTRICT / Hartwick (T)
WD

New Ground Water Source, New Storage, Upgrade Distribution System

416

$1,745,850

95

$5,448,988,882

16335

Otsego

MORRIS VILLAGE / Morris


(V)

New Water Treatment Plant, New Ground Water Source, New Storage

642

$2,475,000

85

$5,451,463,882

17092

Otsego

LAURENS VILLAGE /
Laurens (V)

New Storage, Upgrade Distribution System

381

$1,236,000

60

$5,452,699,882

17926

Otsego

WEST ONEONTA WATER


DISTRICT / Oneonta (T)

New Complete System (New System)

520

$4,996,000

60

$5,457,695,882

16255

Otsego

GILBERTSVILLE VILLAGE / Upgrade Water Treatment Plant, Upgrade Distribution System


Gilbertsville (V)

477

$206,200

40

$5,457,902,082

15079

Otsego

MILL CREEK AT
RIVERSIDE, LLC MHP /
Riverside Village MHP

145

$20,600

25

$5,457,922,682

Page 60 of 86

Upgrade Distribution System

NYS Drinking Water State Revolving Fund DRAFT IUP Multiyear List

October 1, 2012 to September 30, 2013

Project County

System Name/
Borrower

Description

Pop.

Project Cost

Score

Cumulative
Total

Putnam County
15862

Putnam

SPRINGHOUSE ESTATES
W.W. CORP. / Southeast (T)

New Ground Water Source, New Storage

212

$1,700,500

200

$5,459,623,182

16598

Putnam

BREWSTER HEIGHTS /
Southeast (T)

Remaining portion of 15857 which was funded 3/26/98., New Water


Treatment Plant

698

$689,650

155

$5,460,312,832

18072

Putnam

GIPSY TRAIL CLUB / Gipsy


Trail Club Inc

Develop additional well source capacity, New Ground Water Source,


New Pump Station

300

$430,540

150

$5,460,743,372

17298

Putnam

BREWSTER VILLAGE /
Brewster (V)

New Ground Water Source, New Pump Station

2,000

$1,610,920

80

$5,462,354,292

16634

Putnam

KENT (T) WD #3 / Kent (T)

New Water Treatment Plant, New Ground Water Source, New Storage,
New Pump Station, New Distribution System

8,000

$15,235,451

75

$5,477,589,743

17790

Putnam

PUTNAM VALLEY (T) /


Putnam Valley (T)

New water system for Croft Corners area, New Complete System
(New System)

11,500

$25,755,000

70

$5,503,344,743

16579

Putnam

Wiiliamsburg Ridge Condominiums, Mahopac, NY, New Ground Water


WILLIAMSBURG RIDGE
CONDO W.S. / Williamsburg Source
Ridge HOA, Inc.

230

$40,000

60

$5,503,384,743

16083

Putnam

MILL POND WATER


SUPPLY / Mill Ponds Water
Co.

New Ground Water Source

70

$100,000

60

$5,503,484,743

15430

Putnam

BREWSTER VILLAGE /
Brewster (V)

New Storage

2,000

$1,628,000

50

$5,505,112,743

17319

Putnam

MOUNTAIN BROOK
HOMES / Southeast (T)

New Water Treatment Plant, New Ground Water Source

176

$427,000

50

$5,505,539,743

17601

Putnam

GARRISON LANDING WS /
Philipstown (T)

New Complete System (New System)

84

$325,146

45

$5,505,864,889

17297

Putnam

BREWSTER VILLAGE /
Brewster (V)

Upgrade Distribution System

2,000

$8,102,487

45

$5,513,967,376

18041

Putnam

COLD SPRING VILLAGE /


Cold Spring (V)

Upgrade Transmission

2,666

$958,000

20

$5,514,925,376

16633

Putnam

KENT WD 2 / Kent (T)

Upgrade Water Treatment Plant, Upgrade Storage, Upgrade Pump


Station, Upgrade Distribution System

276

$927,000

20

$5,515,852,376

16632

Putnam

KENT WD 1 / Kent (T)

Upgrade Water Treatment Plant, Upgrade Storage, Upgrade Pump


Station, Upgrade Distribution System

360

$1,152,261

20

$5,517,004,637

15792

Putnam

CONTINENTAL VILLAGE
WD / Philipstown (T)

Upgrade Distribution System

1,509

$1,350,000

15

$5,518,354,637

16506

Putnam

GLENMAR GARDENS
IMPROVMT DIST / Putnam
Valley (T)

Upgrade Distribution System

130

$25,500

15

$5,518,380,137

17411

Putnam

SUNRISE RIDGE / Sunrise


Ridge Water Company

Replace pumps and storage, Upgrade Storage, Upgrade Pump Station

178

$250,000

15

$5,518,630,137

17854

Putnam

SOUTHEAST (T)
PEACEABLE WATER
DISTRICT / Southeast (T)

Development new water source instead of continuing to purchase from


Brewster (V), New Ground Water Source

440

$1,700,000

$5,520,330,137

HOOSICK FALLS (V) PWS /


Hoosick Falls (V)

Phase 2 of Project 15080 , Upgrade Storage, Upgrade Distribution


System

3225

$5,520,330,137

Rensselaer County
18029

Rensselaer

4,000

$0

NOTE: Short - Term Loan Closed, Project Cost Shown is


Remaining Balance Not Funded With Short Term Loan

Page 61 of 86

NYS Drinking Water State Revolving Fund DRAFT IUP Multiyear List
October 1, 2012 to September 30, 2013
Project County

System Name/
Borrower

Description

Pop.

Project Cost

Score

Cumulative
Total

Rensselaer County
17936

Rensselaer

BRUNSWICK WATER
DISTRICT # 6 / Brunswick
(T)

Distribution Modifications for Flow & Pressure Improvements to Support


Consecutive System; Emergency Generator, Upgrade Pump Station,
Upgrade Distribution System

17331

Rensselaer

POESTENKILL (T) WD #1 /
Poestenkill (T)

15749

Rensselaer

RENSSELAER CITY PWS /


Rensselaer (C)

17068

Rensselaer

SCHAGHTICOKE (V) PWS / Upgrade Water Treatment Plant, Upgrade Storage, Upgrade
Distribution System, Extend Distribution System
Schaghticoke (V)

17358

Rensselaer

SCHODACK WATER
DISTRICT # 3 / Schodack
(T)

17445

Rensselaer

17077

927

$504,000

185

$5,520,834,137

New Complete System (New System), New System Consolidation

2,300

$0

185

$5,520,834,137

New Storage, New Distribution System, System Consolidation

7,500

$7,175,300

145

$5,528,009,437

675

$6,585,700

115

$5,534,595,137

Connect WD #3 (Maple Crest) to WD #1 (Clearview), Extend


Distribution System, New System Consolidation

140

$0

105

$5,534,595,137

NORTH GREENBUSH (T)


WATER DISTRICT NO. 18 /
North Greenbush (T)

Purchase existing Private Water System, Connect to Municipal Water


System , New System Consolidation, New Water District

212

$437,750

85

$5,535,032,887

Rensselaer

NORTH GREENBUSH WD
#13 / North Greenbush (T)

New system to serve area with private contaminated wells (Snyder's


Lake Area). , New System Consolidation, New Water District

1,050

$4,635,000

80

$5,539,667,887

15580

Rensselaer

CASTLETON VILLAGE
PWS / Castleton-on-Hudson
(V)

Upgrade Ground Water Source, Upgrade Transmission, Upgrade


Pump Station, Upgrade Distribution System

2,013

$2,000,000

80

$5,541,667,887

17229

Rensselaer

NORTH GREENBUSH WD
#14 / North Greenbush (T)

New system to serve inadequate private wells in Northeast corner of


Town , New Inter-Connection, New System Consolidation, New Water
District

3,000

$7,313,000

75

$5,548,980,887

17139

Rensselaer

EAST GREENBUSH
GENERAL W.D. / East
Greenbush (T)

Upgrade Storage, New Storage

10,200

$3,279,680

75

$5,552,260,567

15688

Rensselaer

HOOSICK (T) WD / Hoosick


(T)

Extend Distribution System

400

$1,544,000

70

$5,553,804,567

15907

Rensselaer

TOWN OF SAND LAKE /


Sand Lake (T)

New Complete System (New System)

5,100

$4,738,000

70

$5,558,542,567

15709

Rensselaer

TROY CITY PWS / Troy (C)

New Transmission, Upgrade Distribution System, System Consolidation

49,170

$387,500

60

$5,558,930,067

17149

Rensselaer

PETERSBURGH WATER
DISTRICT / Petersburgh (T)

Upgrade Water Treatment Plant, New Ground Water Source, Upgrade


Distribution System

240

$842,025

45

$5,559,772,092

16302

Rensselaer

GRAFTON WATER
SYSTEM / Grafton (T)

New Complete System (New System)

1,700

$1,905,000

45

$5,561,677,092

15286

Rensselaer

SCHAGHTICOKE OLD
WATER DISTRICT #1
INACT / Schaghticoke (T)

Extend Distribution System

1,710

$215,644

40

$5,561,892,736

17867

Rensselaer

TROY CITY PWS / Troy (C)

New Transmission

49,170

$1,030,000

40

$5,562,922,736

15216

Rensselaer

VALLEY FALLS WATER


SYSTEM / Valley Falls (V)

New Ground Water Source, New Storage, Upgrade Distribution System

538

$2,277,000

40

$5,565,199,736

17387

Rensselaer

TROY CITY PWS / Troy (C)

Upgrade Distribution System

49,170

$736,000

40

$5,565,935,736

18030

Rensselaer

RENSSELAER CITY PWS /


Rensselaer (C)

Washington Ave Corridor Improvements, Upgrade Distribution System

7,500

$3,169,952

35

$5,569,105,688

Page 62 of 86

NYS Drinking Water State Revolving Fund DRAFT IUP Multiyear List

October 1, 2012 to September 30, 2013

Project County

System Name/
Borrower

Description

Pop.

Project Cost

Score

Cumulative
Total

Rensselaer County
17967

Rensselaer

TROY CITY PWS / Troy (C)

Installation of leak detection equipment.,

16073

Rensselaer

PETERSBURGH WATER
DISTRICT / Petersburg (T)

Upgrade Ground Water Source

16303

Rensselaer

TROY CITY PWS / Troy (C)

15752

Rensselaer

15766

49,170

$450,000

35

$5,569,555,688

240

$109,154

35

$5,569,664,842

Upgrade Distribution System

49,170

$2,100,000

35

$5,571,764,842

EAST GREENBUSH
GENERAL W.D. / East
Greenbush (T)

Distribution improvements installing four (4) pressure regulators,


Upgrade Distribution System

10,200

$146,200

30

$5,571,911,042

Rensselaer

EAST GREENBUSH
GENERAL W.D. / East
Greenbush (T)

Hampton Manor upper service area, Upgrade Distribution System

10,200

$187,500

25

$5,572,098,542

15771

Rensselaer

EAST GREENBUSH
GENERAL W.D. / East
Greenbush (T)

Distribution improvements to the Hampton Manor lower service area,


Upgrade Distribution System

10,200

$139,000

20

$5,572,237,542

16334

Rensselaer

HOOSICK FALLS (V) PWS /


Hoosick Falls (V)

Upgrade Distribution System

4,000

$569,000

20

$5,572,806,542

16292

Rensselaer

BRUNSWICK WATER
SYSTEM / Brunswick (T)

New Water Treatment Plant, Upgrade Distribution System

10,000

$2,896,500

20

$5,575,703,042

15687

Rensselaer

EAST GREENBUSH
GENERAL W.D. / East
Greenbush (T)

New Storage

10,200

$757,000

20

$5,576,460,042

17966

Rensselaer

SCHAGHTICOKE (V) PWS / Installation of water meters.,


Schaghticoke (V)

675

$75,000

20

$5,576,535,042

15410

Rensselaer

BERLIN WATER DISTRICT


# 2 / Berlin (T)

Upgrade Distribution System

700

$1,232,004

20

$5,577,767,046

16149

Rensselaer

SCHAGHTICOKE (V) PWS / Upgrade Storage, Upgrade Pump Station


Schaghticoke (V)

675

$581,198

20

$5,578,348,244

17506

Rensselaer

NASSAU (V) PWS / Nassau


(V)

Upgrade Storage

1,250

$133,190

20

$5,578,481,434

15717

Rensselaer

EAST GREENBUSH
GENERAL W.D. / East
Greenbush (T)

Distribution extension, loop water main on Gilligan Road to Hays Road,


Upgrade Distribution System

10,200

$409,000

15

$5,578,890,434

17539

Rensselaer

CASTLETON VILLAGE
PWS / Castleton-on-Hudson
(V)

Replacement in-kind of aged water mains., Upgrade Distribution


System

2,013

$1,661,400

15

$5,580,551,834

15679

Rensselaer

EAST GREENBUSH
GENERAL W.D. / East
Greenbush (T)

Distribution extension loop on Red Mill Road and loop through OC


Zoning District, Extend Distribution System

10,200

$2,791,000

10

$5,583,342,834

15564

Rensselaer

NASSAU (V) PWS / Nassau


(V)

Upgrade Distribution System

1,250

$258,600

10

$5,583,601,434

17781

Rensselaer

WATER DISTRICT 15 /
North Greenbush (T)

Extend Distribution System

4,000

$9,785,000

$5,593,386,434

Rockland County
16298

Rockland

NYACK VILLAGE WATER


SUPPLY / Nyack (V)

Relocation of intake to correct turbidity violations., New Transmission

14,700

$1,340,000

110

$5,594,726,434

17313

Rockland

LAKE WELCH BEACH W.S.


/ Palisades Interstate Park
Comm

New Water Treatment Plant, New Transmission

15,000

$20,000,000

100

$5,614,726,434

Page 63 of 86

NYS Drinking Water State Revolving Fund DRAFT IUP Multiyear List

October 1, 2012 to September 30, 2013

Project County

System Name/
Borrower

Description

Pop.

Project Cost

Score

Cumulative
Total

Rockland County
17777

Rockland

UNITED WATER NEW


YORK / United Water NY

Membrand Filtration at Pascack 65 Wel, Upgrade Water Treatment


Plant

270,000

$1,390,500

15

$5,616,116,934

17779

Rockland

UNITED WATER NEW


YORK / United Water NY

Construction of 2 MGD pump station, Upgrade Pump Station

270,000

$2,368,084

15

$5,618,485,018

16018

Rockland

SUFFERN VILLAGE /
Suffern (V)

Upgrade Distribution System

12,000

$603,600

$5,619,088,618

$587,100

2090

$5,619,675,718

$0

1215

$5,619,675,718

Saratoga County
17742

Saratoga

MECHANICVILLE CITY /
Mechanicville (C)

Phase 2 of 15284; Construct additional sludge drying bed capacity,


New Other Expenses, New Water Treatment Plant, New Other (OT)

5,100

17647

Saratoga

STILLWATER VILLAGE /
Stillwater (V)

Alternative Water Source for Surface Water Treatment Rule


compliance., New Transmission, New Inter-Connection

1,572

NOTE: Short - Term Loan Closed, Project Cost Shown is


Remaining Balance Not Funded With Short Term Loan

17543

Saratoga

MOREAU WD
7/CONNECTION TO SCWA
/ Moreau (T)

Consolidate 3 small CWSs, consolidate WD 1, connect Town with


SCWA, New Storage, Extend Distribution System, New
Inter-Connection, Extend System Consolidation, New Water District

1,100

$0

1210

$5,619,675,718

NOTE: Short - Term Loan Closed, Project Cost Shown is


Remaining Balance Not Funded With Short Term Loan

17623

Saratoga

CORINTH VILLAGE /
Village of Corinth

New Surface Water Treatment Rule Compliance Facility, Upgrade


Distribution System

4,700

$6,200,000

160

$5,625,875,718

17535

Saratoga

SOUTH GLENS FALLS


VILLAGE / South Glens
Falls (V)

Proposed Cartridge Filtration Plant with SCADA to treat Village GWUDI


spring sources., New Surface Water Treatment Rule Compliance
Facility, New Surface Water Treatment Rule Compliance Facility

3,700

$1,565,000

145

$5,627,440,718

17143

Saratoga

SARATOGA GLEN
HOLLOW / Saratoga Glen
Hollow W.C.

Extend system to serve area with private contaminated wells,


consolidate public water supply, eliminate public water supply with past
totalcoliform detection. , Extend Distribution System, New System
Consolidation

750

$1,096,804

125

$5,628,537,522

17104

Saratoga

CLIFTON PARK WATER


AUTHORITY / Clifton Park
(T)

East Side Drive WD connection to CPWA, to serve private


contaminated wells, consolidation of public water supplies, Extend
Distribution System

29,000

$1,329,730

105

$5,629,867,252

15451

Saratoga

STILLWATER WD #1
(STILLWATER VLG) /
Stillwater (T)

New Transmission, New Storage

1,560

$4,912,000

90

$5,634,779,252

17870

Saratoga

SCWA STILLWATER
EXTENSION / Saratoga
County Water Authorit

Extend Transmission

2,100

$3,035,000

90

$5,637,814,252

17336

Saratoga

SCHUYLERVILLE-VICTORY New Storage


JWC / Victory (V)

2,170

$430,000

80

$5,638,244,252

18038

Saratoga

MECHANICVILLE CITY /
Mechanicville (C)

Interconnection to SCWA, Alternative to Project 17742, New


Transmission

5,100

$9,465,623

60

$5,647,709,875

15140

Saratoga

CLIFTON PARK WATER


AUTHORITY / Clifton Park
Water Authority

Upgrade Ground Water Source

29,000

$214,327

50

$5,647,924,202

15134

Saratoga

CLIFTON PARK WATER


AUTHORITY / Clifton Park
Water Authority

Inter-Connection

29,000

$252,041

50

$5,648,176,243

17234

Saratoga

REXFORD WD #2
(GLENVILLE #11) / Clifton
Park (T)

Extend Water District

1,200

$183,657

45

$5,648,359,900

16168

Saratoga

SARATOGA SPRINGS CITY Upgrade Water Treatment Plant, Upgrade Surface Water Source, New
Transmission, New Pump Station
/ Saratoga Springs (C)

26,525

$15,820,000

45

$5,664,179,900

15719

Saratoga

CORINTH VILLAGE /
Corinth (V)

New Storage, Upgrade Pump Station, Upgrade Distribution System

4,700

$3,277,000

40

$5,667,456,900

17947

Saratoga

HADLEY SOUTH WD#1 /


Hadley (T)

Upgrade Storage, Upgrade Distribution System

800

$278,239

40

$5,667,735,139

Page 64 of 86

NYS Drinking Water State Revolving Fund DRAFT IUP Multiyear List

October 1, 2012 to September 30, 2013

Project County

System Name/
Borrower

Description

Pop.

Project Cost

Score

Cumulative
Total

Saratoga County
16946

Saratoga

WATERFORD WATER
WORKS / Waterford (T)

New Water Treatment Plant

16523

Saratoga

CLIFTON PARK WATER


AUTHORITY / Clifton Park
Water Authority

New interconnection CPWA system to Rexford water system, New


Inter-Connection

15277

Saratoga

MECHANICVILLE CITY /
Mechanicville (C)

15449

Saratoga

16524

9,800

$4,635,000

35

$5,672,370,139

29,000

$1,077,000

30

$5,673,447,139

Upgrade Surface Water Source

5,100

$178,000

25

$5,673,625,139

STILLWATER WD #1
(STILLWATER VLG) /
Stillwater (T)

Upgrade Distribution System

1,560

$483,981

25

$5,674,109,120

Saratoga

CLIFTON PARK WATER


AUTHORITY / Clifton Park
Water Authority

New Ground Water Source, New Transmission

29,000

$2,039,420

25

$5,676,148,540

15123

Saratoga

CLIFTON PARK WATER


AUTHORITY / Clifton Park
Water Authority

New Ground Water Source

29,000

$5,020,918

25

$5,681,169,458

15135

Saratoga

CLIFTON PARK WATER


AUTHORITY / Clifton Park
Water Authority

New Storage

29,000

$586,438

25

$5,681,755,896

15289

Saratoga

MECHANICVILLE CITY /
Mechanicville (C)

Upgrade Distribution System

5,100

$236,000

20

$5,681,991,896

17772

Saratoga

BURNT HILLS-BALLSTON
LK WD (GLENVILLE) /
Ballston (T)

New Pump Station, Extend Distribution System

4,500

$606,052

20

$5,682,597,948

16258

Saratoga

WATERFORD WATER
WORKS / Waterford (T)

New Storage, Upgrade Distribution System

9,800

$6,706,875

15

$5,689,304,823

17798

Saratoga

COUNTY
REGIONALIZATION /
Saratoga Cnty W.A.

Extend Saratoga County Water Authority water transmission mains to


the Village and Town of Stillwater, the Village and Town of Waterford,
the Town of Halfmoon, and the Clifton Park Water Authority., Extend
Transmission

5,000

$20,000,000

15

$5,709,304,823

16376

Saratoga

SARATOGA WATER
SERVICES / Saratoga
Water Services

New Storage, New Pump Station

6,000

$434,850

15

$5,709,739,673

15136

Saratoga

CLIFTON PARK WATER


AUTHORITY / Clifton Park
Water Authority

New Water Treatment Plant

29,000

$1,005,713

15

$5,710,745,386

15694

Saratoga

HALFMOON WATER
DISTRICT / Halfmoon (T)

New Storage, Upgrade Pump Station

14,000

$2,074,163

15

$5,712,819,549

15776

Saratoga

REXFORD WD #2
(GLENVILLE #11) / Clifton
Park (T)

New Transmission

1,200

$645,300

10

$5,713,464,849

17754

Saratoga

SARATOGA CWA /
SaratogaCounty Water
Authority

New security system for county water sysem, New Other Expenses,
New Other (OT)

300

$751,900

10

$5,714,216,749

15699

Saratoga

HALFMOON WATER
DISTRICT / Halfmoon (T)

Upgrade Distribution System

14,000

$726,993

$5,714,943,742

428

$4,594,000

180

$5,719,537,742

Schenectady County
16510

Schenectady

Upper resevoir raw water transmission main, new intake, new controls
DELANSON VILLAGE
WATER WORKS / Delanson & meters at filter plant., New Transmission, Extend Distribution
System, Upgrade Distribution System
(V)

17635

Schenectady

PRINCETOWN WATER
SUPPLY / Princetown (T)

New Transmission, New Storage, New Pump Station, Extend


Distribution System

600

$360,500

70

$5,719,898,242

16949

Schenectady

PRINCETOWN WATER
SUPPLY / Princetown (T)

Extend Distribution System

600

$495,430

55

$5,720,393,672

Page 65 of 86

NYS Drinking Water State Revolving Fund DRAFT IUP Multiyear List

October 1, 2012 to September 30, 2013

Project County

System Name/
Borrower

Description

Pop.

Project Cost

Score

Cumulative
Total

Schenectady County
17636

Schenectady

PRINCETOWN WATER
SUPPLY / Princetown (T)

Extend Distribution System

600

$286,340

55

$5,720,680,012

15092

Schenectady

PRINCETOWN WATER
SUPPLY / Princetown (T)

Extend Distribution System

600

$632,420

55

$5,721,312,432

15090

Schenectady

PRINCETOWN WATER
SUPPLY / Princetown (T)

Extend Distribution System

600

$929,060

55

$5,722,241,492

15089

Schenectady

PRINCETOWN (T) - WD#1 / Extend Distribution System


Princetown (T)

183

$860,050

55

$5,723,101,542

15713

Schenectady

SCHENECTADY CITY
WATER WORKS /
Schenectady (C)

New Ground Water Source, New Pump Station

61,821

$1,916,000

50

$5,725,017,542

15355

Schenectady

SCHENECTADY CITY
WATER WORKS /
Schenectady (C)

Corrosion Control & Cleaning of Tansmission Mains, Upgrade


Transmission

61,821

$1,248,389

50

$5,726,265,931

15353

Schenectady

SCHENECTADY CITY
WATER WORKS /
Schenectady (C)

Distribution improvements - Elimination of deadends, Upgrade


Distribution System

61,821

$1,170,150

45

$5,727,436,081

15348

Schenectady

SCHENECTADY CITY
WATER WORKS /
Schenectady (C)

Valve replacement program, Upgrade Transmission

61,821

$2,472,000

45

$5,729,908,081

15349

Schenectady

SCHENECTADY CITY
WATER WORKS /
Schenectady (C)

Under sized mains and lead service line replacement, Upgrade


Distribution System

61,821

$1,136,000

45

$5,731,044,081

15955

Schenectady

GLENVILLE WD #11 /
Glenville (T)

Extend Distribution System

15,000

$558,260

45

$5,731,602,341

15967

Schenectady

GLENVILLE WD #11 /
Glenville (T)

Extend Distribution System

15,000

$812,670

40

$5,732,415,011

15346

Schenectady

SCHENECTADY CITY
WATER WORKS /
Schenectady (C)

Upgrade Pump Station

61,821

$1,800,476

35

$5,734,215,487

17741

Schenectady

ROTTERDAM WD #3 /
Rotterdam (T)

Construction of new storage tank and transmission main, New


Transmission, New Storage

2,000

$2,060,000

25

$5,736,275,487

16607

Schenectady

ROTTERDAM WD #5 /
Rotterdam (T)

Upgrade Ground Water Source

28,000

$566,500

15

$5,736,841,987

15964

Schenectady

GLENVILLE WD #11 /
Glenville (T)

Upgrade Ground Water Source

15,000

$622,120

15

$5,737,464,107

15962

Schenectady

GLENVILLE WD #11 /
Glenville (T)

Charlton Road - Lake Hill Road Transmission Main Connection, New


Transmission

15,000

$387,280

10

$5,737,851,387

15957

Schenectady

GLENVILLE WD #11 /
Glenville (T)

Install parallel transmission main from well field to storage facility., New
Transmission

15,000

$2,266,000

$5,740,117,387

15959

Schenectady

GLENVILLE WD #11 /
Glenville (T)

Upgrade Distribution System

15,000

$366,680

$5,740,484,067

New Water Treatment Plant, Upgrade Transmission, Upgrade Storage,


Upgrade Distribution System

1,061

$1,045,000

135

$5,741,529,067

500

$4,899,004

115

$5,746,428,071

Schoharie County
15179

Schoharie

CENTRAL BRIDGE WATER


DISTRICT / Central Bridge
WD

18053

Schoharie

COBLESKILL / Cobleskill (T) Howe Caverns/Route 7 Service Area Extension, Extend Distribution
System

Page 66 of 86

NYS Drinking Water State Revolving Fund DRAFT IUP Multiyear List

October 1, 2012 to September 30, 2013

Project County

System Name/
Borrower

Description

Pop.

Project Cost

Score

Cumulative
Total

Schoharie County
17361

Schoharie

COBLESKILL VILLAGE /
Cobleskill (V)

Upgrade Water Treatment Plant, New Storage, Upgrade Distribution


System

4,533

$4,120,000

105

$5,750,548,071

17504

Schoharie

CENTRAL BRIDGE WATER


DISTRICT / Central Bridge
WD

DBP Control , Upgrade Water Treatment Plant

1,061

$1,773,000

65

$5,752,321,071

16068

Schoharie

COBLESKILL VILLAGE /
Cobleskill (V)

New Storage, Upgrade Distribution System

4,533

$2,091,000

55

$5,754,412,071

16691

Schoharie

JEFFERSON WD /
Jefferson (T)

Upgrade Water Treatment Plant, Upgrade Ground Water Source,


Upgrade Transmission, Upgrade Distribution System

198

$150,000

45

$5,754,562,071

16067

Schoharie

COBLESKILL VILLAGE /
Cobleskill (V)

Upgrade Distribution System

4,533

$464,049

45

$5,755,026,120

17572

Schoharie

SHARON SPRINGS
VILLAGE / (V) Sharon
Springs

Water system improvements., Upgrade Water Treatment Plant,


Upgrade Ground Water Source, Upgrade Storage, Upgrade Distribution
System

547

$2,900,000

45

$5,757,926,120

16745

Schoharie

SHARON SPRINGS
VILLAGE / Sharon Springs
(V)

Upgrade Transmission

547

$127,000

35

$5,758,053,120

16492

Schoharie

OORAH RESORT, LLC /


Deer Run Village
Homeowners As

New Ground Water Source, Upgrade Storage

50

$231,507

30

$5,758,284,627

17787

Schoharie

SCHOHARIE VILLAGE /
Schoharie (V)

Upgrade Distribution System

1,030

$2,570,000

30

$5,760,854,627

17968

Schoharie

SHARON SPRINGS
VILLAGE / Sharon Springs
(V)

Installation of water meters.,

547

$203,148

20

$5,761,057,775

150

$1,104,000

105

$5,762,161,775

Schuyler County
16768

Schuyler

SCHUYLER COUNTY
WATER EXTENSION / Dix
(T)

Extend watermain from (V) Watkins Glen to Watkins Glen International


Race Track., Extend Distribution System

17925

Schuyler

MONTOUR FALLS /
Montour Falls (V)

Upgrade Storage, Upgrade Distribution System

1,800

$5,852,501

90

$5,768,014,276

17679

Schuyler

WATKINS GLEN VILLAGE /


Watkins Glen (V)

Upgrade Surface Water Source

2,149

$1,145,000

40

$5,769,159,276

400

$3,198,000

95

$5,772,357,276

7,400

$2,885,000

85

$5,775,242,276

Seneca County
15933

Seneca

FAYETTE HAMLET WATER


DISTRICT / Fayette (T)

Extend Distribution System

17183

Seneca

SENECA FALLS VILLAGE /


Seneca Falls (V)

Upgrade Water Treatment Plant, Upgrade Pump Station

15599

Seneca

FAYETTE WATER
PROJECT / Varick (T)

Extend Distribution System

520

$1,406,800

80

$5,776,649,076

16679

Seneca

JUNIUS WATER DISTRICT


#1 / Junius (T)

Extend system to serve area with private contaminated wells. W.D. Ext.
#2., Extend Distribution System

300

$623,607

65

$5,777,272,683

15107

Seneca

SENECA FALLS (T) BRIDGEPORT AREA /


Seneca Falls (T)

Extend system to serve area with private contaminated wells. ,


Upgrade Distribution System

35

$256,000

65

$5,777,528,683

16767

Seneca

ROUTE 96 WATER
DISTRICT / Waterloo (T)

Extend system to serve area with private contaminated wells. , Extend


Distribution System

202

$1,845,512

60

$5,779,374,195

Page 67 of 86

NYS Drinking Water State Revolving Fund DRAFT IUP Multiyear List

October 1, 2012 to September 30, 2013

Project County

System Name/
Borrower

Description

Pop.

Project Cost

Score

Cumulative
Total

Seneca County
16555

Seneca

CENTRAL SENECA
COUNTY WD / Varick (T)

Town of Varick & Town of Fayette, New Transmission

550

$3,267,871

60

$5,782,642,066

15578

Seneca

BURGESS ROAD WATER


DISTRICT / Junius (T)

Extend system to serve area with private contaminated wells. , Extend


Distribution System

200

$699,100

60

$5,783,341,166

15512

Seneca

WATERLOO VILLAGE /
Waterloo (V)

New Transmission, Upgrade Distribution System

7,000

$1,232,500

60

$5,784,573,666

15109

Seneca

VARICK/ROMULUS WATER Extend Distribution System


PROJECT / Varick (T)

850

$3,100,000

55

$5,787,673,666

16787

Seneca

Extend Distribution System


YALE FARM RD/ARMY
DEPOT WATER PROJECT /

Varick (T)

100

$794,800

55

$5,788,468,466

15270

Seneca

SENECA FALLS VILLAGE /


Seneca Falls (T)

Route 414 waterline., Extend Distribution System

7,400

$816,000

55

$5,789,284,466

16724

Seneca

TYRE (T) WATER


DISTRICT / Tyre (T)

Extend system to serve area with private contaminated wells. , Extend


Distribution System

260

$992,508

55

$5,790,276,974

15272

Seneca

SENECA FALLS VILLAGE /


Seneca Falls (T)

Balsey Road., Extend Distribution System

7,400

$257,000

55

$5,790,533,974

17697

Seneca

OVID VILLAGE / Ovid (V)

Upgrade Water Treatment Plant

1,356

$1,632,500

55

$5,792,166,474

15283

Seneca

LODI AREA WATER


SYSTEM / Lodi (T)

New Complete System (New System), New Storage, New Pump


Station, New Distribution System

850

$2,350,000

50

$5,794,516,474

17026

Seneca

BOODY'S HILL WD
(WATER DISTRICT #5) /

Fayette (T)

Extend to serve private contaminated wells. , Extend Distribution


System

151

$788,980

50

$5,795,305,454

16880

Seneca

INTERLAKEN VILLAGE /
Interlaken (V)

Upgrade Ground Water Source

650

$320,807

50

$5,795,626,261

15361

Seneca

OVID VILLAGE / Ovid (V)

Upgrade Distribution System

1,356

$161,000

40

$5,795,787,261

17701

Seneca

OVID VILLAGE / Ovid (V)

Upgrade Distribution System

1,356

$2,068,000

35

$5,797,855,261

15086

Seneca

BORDER CITY WATER


DISTRICT / Waterloo (T)

Upgrade Distribution System

1,600

$161,340

35

$5,798,016,601

17689

Seneca

INTERLAKEN VILLAGE /
Interlaken (V)

Upgrade Distribution System

650

$1,850,000

30

$5,799,866,601

LOUISVILLE WATER
DISTRICT #2 / Louisville (T)

New Storage, Upgrade Distribution System, System Consolidation

1105

$5,799,866,601

St.Lawrence County
17140

St.Lawrence

1,000

$0

NOTE: Short - Term Loan Closed, Project Cost Shown is


Remaining Balance Not Funded With Short Term Loan

17454

St.Lawrence

EAST LOUISVILLE WD#3 /


Louisville (T)

Consolidation of water systems with past coliform detections., New


Storage, New Distribution System, New System Consolidation

1,030

$9,275,000

160

$5,809,141,601

17618

St.Lawrence

GOUVERNEUR VILLAGE /
Gouverneur (V)

Upgrade Water Treatment Plant

4,263

$2,160,600

130

$5,811,302,201

17516

St.Lawrence

OSWEGATCHIE (T) /
Oswegatchie (T)

Joint water system improvement project between (T) Oswegatchie, (T)


Lisbon and (V) Huevelton, Upgrade Ground Water Source, Upgrade
Storage, Upgrade Distribution System, New Inter-Connection, New
System Consolidation

2,100

$13,973,000

130

$5,825,275,201

Page 68 of 86

NYS Drinking Water State Revolving Fund DRAFT IUP Multiyear List

October 1, 2012 to September 30, 2013

Project County

System Name/
Borrower

Description

Pop.

Project Cost

Score

Cumulative
Total

St.Lawrence County
17615

St.Lawrence

NORFOLK WATER
DISTRICT / Norfolk (T)

New Surface Water Treatment Rule Compliance Facility, New Ground


Water Source

17375

St.Lawrence

CANTON (T) E. SIDE WD /


Canton (T)

New Ground Water Source, New Storage, New Distribution System

16139

St.Lawrence

MASSENA VILLAGE /
Massena (V)

Upgrade Water Treatment Plant

16798

St.Lawrence

EAST NORFOLK WATER


DISTRICT / Norfolk (T)

New system to serve area with private contaminated wells. , New


Complete System (New System)

16881

St.Lawrence

GOUVERNEUR VILLAGE /
Gouverneur (V)

Upgrade Water Treatment Plant, Upgrade Distribution System

15493

St.Lawrence

VILLAGE OF
RENSSELAER FALLS WS

SYSTEM / Rensselaer Falls

(V)

15852

St.Lawrence

16077

2,300

$1,279,000

125

$5,826,554,201

350

$3,112,660

90

$5,829,666,861

11,209

$3,134,000

80

$5,832,800,861

270

$750,000

65

$5,833,550,861

4,263

$857,697

60

$5,834,408,558

New Complete System (New System), New Distribution System

140

$2,795,420

60

$5,837,203,978

MADRID WATER DISTRICT


/ Madrid (T)

Upgrade Storage, Upgrade Distribution System

800

$674,000

55

$5,837,877,978

St.Lawrence

LISBON WATER DISTRICT


/ Lisbon (T)

Extend Distribution System

500

$340,695

55

$5,838,218,673

17632

St.Lawrence

CANTON VILLAGE / Canton New Ground Water Source, Upgrade Distribution System
(V)

7,055

$3,612,725

55

$5,841,831,398

15729

St.Lawrence

POTSDAM VILLAGE /
Potsdam (V)

New Storage

9,425

$1,245,000

40

$5,843,076,398

16761

St.Lawrence

OGDENSBURG (C) /
Ogdensburg (C)

New Distribution System

13,500

$566,500

40

$5,843,642,898

17827

St.Lawrence

OGDENSBURG CITY /
Ogdensburg (C)

Upgrade Transmission

13,500

$351,250

40

$5,843,994,148

15732

St.Lawrence

POTSDAM VILLAGE /
Potsdam (V)

Upgrade Distribution System

9,425

$567,000

35

$5,844,561,148

15815

St.Lawrence

WADDINGTON VILLAGE /
Waddington (V)

Upgrade Storage

944

$295,000

30

$5,844,856,148

17906

St.Lawrence

MASSENA VILLAGE /
Massena (V)

Upgrade Distribution System

11,209

$320,000

30

$5,845,176,148

Steuben County
17379

Steuben

COOPERS PLAINS/LONG
ACRES WATER SYST /
Erwin (T)

New Ground Water Source, Extend Distribution System, New System


Consolidation

1,400

$0

205

$5,845,176,148

17333

Steuben

SPAULDING DR/LAKE
SALUBRIA WATER DISTR.
/ Bath (T)

Consolidation of 18 public water systems, eliminate PWS with organic


exceedance., Extend Distribution System, Upgrade Distribution
System, System Consolidation

1,195

$5,460,087

205

$5,850,636,235

15555

Steuben

ARKPORT VILLAGE /
Arkport (V)

Upgrade Transmission, Inter-Connection

835

$376,000

150

$5,851,012,235

16279

Steuben

COLONIAL COACH
ESTATES IV (MGRE) /
Merlyn Cavallaro

New Chlorination system., Upgrade Ground Water Source

79

$65,900

130

$5,851,078,135

17668

Steuben

HORNELL CITY / Hornell


(C)

Upgrade Water Treatment Plant, Upgrade Ground Water Source,


Upgrade Storage

9,019

$1,596,000

125

$5,852,674,135

Page 69 of 86

NYS Drinking Water State Revolving Fund DRAFT IUP Multiyear List

October 1, 2012 to September 30, 2013

Project County

System Name/
Borrower

Description

Pop.

Project Cost

Score

Cumulative
Total

Steuben County
16811

Steuben

RIVERSIDE PARK / Carol


Naar

New chlorination system., Upgrade Ground Water Source

125

$45,735

115

$5,852,719,870

17588

Steuben

CORNING MANOR WATER


DISTRICT / Corning (T)

Extend to ontaminated private wells, consolidate 5 small PWS's,


Upgrade Storage, New System Consolidation

350

$1,315,187

105

$5,854,035,057

17102

Steuben

SHOWBOAT MOBILE
HOME PARK / Affordable
Great Locations Inc

Connect to public water system in Village of Wayland., New System


Consolidation

48

$86,520

85

$5,854,121,577

15810

Steuben

VICTORY PLACE / Merlyn


Cavallaro

Upgrade Ground Water Source

11

$112,800

80

$5,854,234,377

16447

Steuben

CORNING CITY / Corning


(C)

Address total coliform violations, New Storage, New Distribution


System

10,842

$2,000,000

80

$5,856,234,377

18002

Steuben

HAMLET OF WOODHULL
MUNICIPAL WS / Woodhull
(T)

System to serve former Village (now hamlet) with private contaminated


wells., New Ground Water Source, New Storage, New Distribution
System

483

$4,489,928

80

$5,860,724,305

17567

Steuben

URBANA WATER
DISTRICT #2 / Urbana (T)

Proposed WD #3. Extend system to serve private contaminated wells


and consolidate public water supplies., Extend Distribution System,
New System Consolidation, New Water District

33

$3,565,111

80

$5,864,289,416

17633

Steuben

SYLVAN BEACH WANETA


LAKE WATER DISTRICT /
Wayne (T)

New Complete System (New System)

921

$4,175,175

75

$5,868,464,591

17186

Steuben

REXVILLE WATER
DISTRICT / West Union (T)

New system to serve area with private contaminated wells. , New


Complete System (New System)

60

$100,000

70

$5,868,564,591

16047

Steuben

MORNINGSIDE HEIGHTS
WATER DIST / Erwin (T)

Extend Distribution System

2,950

$1,153,260

70

$5,869,717,851

15177

Steuben

AVOCA (T) / Avoca (T)

New Distribution System

96

$294,600

65

$5,870,012,451

18016

Steuben

WD #3 / Campbell (T)

Serve private contaminated/poor yielding wells., Extend Water District

1,025

$908,687

65

$5,870,921,138

16643

Steuben

HORNELLSVILLE (T) /
Hornellsville (T)

Extend Distribution System

300

$1,024,500

55

$5,871,945,638

16383

Steuben

PAINTED POST VILLAGE /


Painted Post (V)

New Storage, Upgrade Distribution System

1,842

$2,480,000

55

$5,874,425,638

17982

Steuben

PRATTSBURGH WATER
DISTRICT / Prattsburgh (T)

Upgrade Storage, Upgrade Distribution System

850

$1,485,415

50

$5,875,911,053

17929

Steuben

Upgrade Storage, Upgrade Pump Station, Upgrade Distribution System


PINEWOOD ACRES
WATER DISTRICT / Corning

168

$3,426,552

45

$5,879,337,605

15492

Steuben

NORTH HORNELL
VILLAGE / North Hornell (V)

Upgrade Distribution System

851

$850,000

40

$5,880,187,605

17975

Steuben

PINEWOOD ACRES WD /
Corning(T)

Upgrade Distribution System

168

$3,302,438

40

$5,883,490,043

15629

Steuben

HAMMONDSPORT
VILLAGE / Hammondsport
(V)

Upgrade Distribution System

741

$405,000

40

$5,883,895,043

15902

Steuben

ADDISON VILLAGE /
Addison (V)

Upgrade Storage, Upgrade Distribution System

1,797

$1,356,000

40

$5,885,251,043

Page 70 of 86

NYS Drinking Water State Revolving Fund DRAFT IUP Multiyear List

October 1, 2012 to September 30, 2013

Project County

System Name/
Borrower

Description

Pop.

Project Cost

Score

Cumulative
Total

Steuben County
17035

Steuben

MEADOWS PARK (THE) /


The Meadows Park

Upgrade Distribution System

17974

Steuben

SOUTH CORNING
VILLAGE / South Corning
(V)

17969

Steuben

16056

39

$25,544

35

$5,885,276,587

Upgrade Storage, Upgrade Distribution System

1,147

$7,763,007

35

$5,893,039,594

BATH VILLAGE / Bath (V)

Installation of solar powered storage tank water circulators.,

5,641

$437,400

35

$5,893,476,994

Steuben

CORNING CITY / Corning


(C)

Upgrade Storage

10,842

$80,000

30

$5,893,556,994

16054

Steuben

CORNING CITY / Corning


(C)

New Transmission

10,842

$350,000

30

$5,893,906,994

16046

Steuben

MORNINGSIDE HEIGHTS
WATER DIST / Erwin (T)

New Ground Water Source

2,950

$327,500

25

$5,894,234,494

15550

Steuben

ARKPORT VILLAGE /
Arkport (V)

Upgrade Distribution System

835

$780,850

25

$5,895,015,344

17844

Steuben

CAMPBELL WATER
DISTRICT / Campbell (T)

Extend Distribution System

280

$216,744

15

$5,895,232,088

1,009,264

$3,843,000

110

$5,899,075,088

80

$227,000

100

$5,899,302,088

Suffolk County
16863

Suffolk

SUFFOLK COUNTY
WATER AUTHORITY /
SCWA

Browns Hills Road area. Address nitrate contamination and


consolodate PWS, New Transmission, Upgrade Distribution System

16051

Suffolk

CAMP HERO WATER


DISTRICT / East Hampton
(T)

New Ground Water Source

16850

Suffolk

SUFFOLK COUNTY
WATER AUTHORITY /
Suffolk Co. Water Authority

Bull Path Pump Station, Northwest, New Ground Water Source, New
Pump Station

1,009,264

$1,166,000

90

$5,900,468,088

17433

Suffolk

SUFFOLK COUNTY
WATER AUTHORITY /
SCWA

New Wells/Upgrade Wells in various locations throughout the system,


Upgrade Ground Water Source, New Ground Water Source

1,009,264

$9,313,000

90

$5,909,781,088

17364

Suffolk

SOUTH HUNTINGTON WD
/ Huntington (T)

Well 19-2, New Ground Water Source

81,760

$1,515,842

90

$5,911,296,930

16862

Suffolk

SUFFOLK COUNTY
WATER AUTHORITY /
Suffolk Co. Water Authority

Northport Aqueduct Project to reduce nitrate contamination through


source blending, Upgrade Transmission, New Distribution System

1,009,264

$22,166,771

80

$5,933,463,701

16273

Suffolk

DERING HARBOR CORP /


Dearing Harbor (V)

Upgrade Water Treatment Plant

250

$20,791

75

$5,933,484,492

16926

Suffolk

SOUTH HUNTINGTON WD
/ Huntington (T)

Upgrade Water Treatment Plant

81,760

$1,043,000

70

$5,934,527,492

17663

Suffolk

EAST FARMINGDALE WD /
Babylon East Farmingdale
WD

VOC Treatment at Plant No. 4, Upgrade Water Treatment Plant

7,500

$4,398,512

65

$5,938,926,004

17891

Suffolk

SOUTH HUNTINGTON WD
/ Huntington (T)

Plant 3 VOC Removal, Upgrade Water Treatment Plant

81,760

$3,530,840

60

$5,942,456,844

17892

Suffolk

SOUTH HUNTINGTON WD
/ Huntington (T)

Plant 7 VOC Removal, Upgrade Water Treatment Plant

81,760

$5,575,390

60

$5,948,032,234

17893

Suffolk

SOUTH HUNTINGTON WD
/ Huntington (T)

Plant 4 VOC Removal, Upgrade Water Treatment Plant

81,760

$973,350

60

$5,949,005,584

Page 71 of 86

NYS Drinking Water State Revolving Fund DRAFT IUP Multiyear List

October 1, 2012 to September 30, 2013

Project County

System Name/
Borrower

Description

Pop.

Project Cost

Score

Cumulative
Total

Suffolk County
16069

Suffolk

RIVERHEAD WD /
Riverhead (T)

Upgrade Ground Water Source

28,000

$1,211,000

60

$5,950,216,584

17352

Suffolk

SOUTH HUNTINGTON WD
/ Huntington (T)

Plant No. 10 VOC Removal, Upgrade Water Treatment Plant

81,760

$3,913,790

60

$5,954,130,374

16516

Suffolk

WEST NECK WATER


SUPPLY / Shelter Island (T)

Upgrade Distribution System

100

$550,000

55

$5,954,680,374

17665

Suffolk

GREENLAWN WATER
DISTRICT / Greenlawn
Water District

VOC Treatment at Plant No. 11, Upgrade Water Treatment Plant

42,000

$1,930,784

55

$5,956,611,158

17664

Suffolk

DIX HILLS WD / Town of


Huntington / Dix Hills

VOC Treatment at Plant No.11, Upgrade Water Treatment Plant

34,522

$2,277,330

55

$5,958,888,488

15831

Suffolk

DIX HILLS WD / Huntington


(T)

Preventative maintenance, Upgrade Ground Water Source

34,522

$459,000

50

$5,959,347,488

16836

Suffolk

SUFFOLK COUNTY
WATER AUTHORITY /
Suffolk Co. Water Authority

Montauk Point State Blvd., Iron Removal, Montauk, New Water


Treatment Plant

1,009,264

$318,000

50

$5,959,665,488

15858

Suffolk

DIX HILLS WD / Huntington


(T)

VOC removal - GAC filters plant #8, Upgrade Ground Water Source

34,522

$1,271,500

45

$5,960,936,988

16715

Suffolk

OCEAN BEACH WATER


DISTRICT / Ocean Beach
(V)

Ground Water Source

4,500

$1,130,000

45

$5,962,066,988

16442

Suffolk

NORTHEAST WOODS /
East Hampton (T)

Northeast Woods, East Hampton (T), Extend Distribution System

675

$2,524,278

45

$5,964,591,266

16202

Suffolk

SUFFOLK COUNTY
WATER AUTHORITY /
Suffolk Co. Water Authority

Lloyds Neck watermain installation, Extend Distribution System

1,009,264

$6,345,254

45

$5,970,936,520

17402

Suffolk

WEST NECK WATER


SUPPLY / Shelter Island (T)

New Well, New Ground Water Source

100

$2,000

45

$5,970,938,520

16071

Suffolk

RIVERHEAD WD /
Riverhead (T)

Water District Extension No. 49 Middle Rd. & Harrison Ave., Extend
Distribution System

28,000

$135,600

45

$5,971,074,120

16066

Suffolk

RIVERHEAD WD /
Riverhead (T)

New Ground Water Source, New Pump Station

28,000

$1,413,000

45

$5,972,487,120

16065

Suffolk

RIVERHEAD WD /
Riverhead (T)

Water District Extension No. 47-Herricks Lane., Extend Distribution


System

28,000

$1,165,000

45

$5,973,652,120

16020

Suffolk

SOUTH HUNTINGTON WD
/ Huntington (T)

treatment modifications to plant No. 5, Upgrade Ground Water Source

81,760

$486,000

40

$5,974,138,120

16274

Suffolk

FISHERS ISLAND WW
CORP / Fishers Island WW
Corp.

Upgrade Ground Water Source, Upgrade Distribution System

2,500

$257,500

30

$5,974,395,620

17908

Suffolk

SALTARE WATER
DISTRICT / Saltaire (V)

Infrastructure upgrade, Upgrade Water Treatment Plant, Upgrade


Storage

1,400

$668,000

25

$5,975,063,620

17366

Suffolk

SOUTH HUNTINGTON WD
/ Huntington (T)

Operations Building Improvements, Upgrade Other Expenses,


Upgrade Other (OT)

81,760

$731,300

25

$5,975,794,920

15753

Suffolk

SHELTER ISLAND
HEIGHTS ASSOCIATION /
Shelter Island Hgts. Assoc.

Upgrade Storage, Upgrade Distribution System

463

$1,813,500

20

$5,977,608,420

Page 72 of 86

NYS Drinking Water State Revolving Fund DRAFT IUP Multiyear List

October 1, 2012 to September 30, 2013

Project County

System Name/
Borrower

Description

Pop.

Project Cost

Score

Cumulative
Total

Suffolk County
17890

Suffolk

SOUTH HUNTINGTON WD
/ Huntington (T)

Plant 14 Standpipe Rehabilitation, Upgrade Storage

81,760

$1,905,500

15

$5,979,513,920

17718

Suffolk

RIVERHEAD WD / River
Head WD / Riverhead (T)

Rehabiitation of Route 58 Storage Tank, Upgrade Storage

28,000

$2,060,000

15

$5,981,573,920

17365

Suffolk

SOUTH HUNTINGTON WD
/ Huntington (T)

Contruction of Plant 20, New Water Treatment Plant

81,760

$3,270,250

15

$5,984,844,170

17351

Suffolk

SOUTH HUNTINGTON WD
/ Huntington (T)

Rehabilitation of Plant No. 4, Upgrade Water Treatment Plant

81,760

$1,551,077

15

$5,986,395,247

16019

Suffolk

SOUTH HUNTINGTON WD
/ Huntington (T)

caustic tank replacement at various plant sites, Upgrade Ground


Water Source

81,760

$327,500

15

$5,986,722,747

15837

Suffolk

DIX HILLS WD / Huntington


(T)

New Storage

34,522

$1,106,800

15

$5,987,829,547

15835

Suffolk

DIX HILLS WD / Huntington


(T)

Iron removal plant - Well No. 10-1, Upgrade Ground Water Source

34,522

$374,900

15

$5,988,204,447

15854

Suffolk

DIX HILLS WD / Huntington


(T)

Elevated water storage tank #1, Upgrade Storage

34,522

$399,800

10

$5,988,604,247

15851

Suffolk

DIX HILLS WD / Huntington


(T)

Elevated water storage tank #2, Upgrade Storage

34,522

$740,900

10

$5,989,345,147

16915

Suffolk

NAPEAQUE MOBILE
HOME PARK / Napeaque
Camping Club

Upgrade Distribution System

120

$21,000

10

$5,989,366,147

17993

Suffolk

WEST NECK WATER


SUPPLY / Shelter Island (T)

Water main replacement, Upgrade Distribution System

100

$669,093

10

$5,990,035,240

17717

Suffolk

RIVERHEAD WD / River
Head WD / Riverhead (T)

Contruction of New Wells at Plant no. 15, New Ground Water Source

28,000

$1,973,480

10

$5,992,008,720

17696

Suffolk

SUFFOLK COUNTY
WATER AUTHORITY /
SCWA

Automated Meter Reading / Leak Detection, Upgrade Distribution


System

1,009,264

$7,273,000

10

$5,999,281,720

15856

Suffolk

DIX HILLS WD / Huntington


(T)

Double containment - above ground caustic soda tanks - plants #1, 4,


6, 7, 8, 9, 10, Upgrade Ground Water Source

34,522

$411,600

10

$5,999,693,320

Sullivan County
17560

Sullivan

THE CALLICOON WATER


COMPANY INC / Callicoon
Water Co., Inc.

New Surface Water Treatment Rule Compliance Facility, New Storage

854

$399,485

135

$6,000,092,805

17210

Sullivan

WURTSBORO HILLS
WATER COMPANY /
Mamakating (T)

New Ground Water Source, Upgrade Storage, New Distribution System

120

$8,610,800

125

$6,008,703,605

16446

Sullivan

WOODRIDGE VILLAGE /
Woodridge (V)

Upgrade Water Treatment Plant

902

$351,430

105

$6,009,055,035

17403

Sullivan

WOODRIDGE VILLAGE /
Woodridge (V)

New Ground Water Source

902

$450,000

100

$6,009,505,035

16735

Sullivan

TOWN OF LIBERTY WS /
Liberty (T)

Upgrade Transmission, Upgrade Storage, New Inter-Connection, New


System Consolidation

5,000

$4,890,265

95

$6,014,395,300

16640

Sullivan

BLOOMINGBURG VILLAGE New Water Treatment Plant, New Ground Water Source, New Storage,
New Distribution System
/ Bloomingburg (V)

450

$2,071,985

75

$6,016,467,285

Page 73 of 86

NYS Drinking Water State Revolving Fund DRAFT IUP Multiyear List
October 1, 2012 to September 30, 2013
Project County

System Name/
Borrower

Description

Pop.

Project Cost

Score

Cumulative
Total

Sullivan County
Water Treatment Plant Upgrade, Upgrade Water Treatment Plant

17401

Sullivan

EMERALD GREEN LAKE


LOUISE MARIE WS / Lake
Louise Marie Water

17599

Sullivan

EDGEWOOD LAKES, INC. / Replace hydropneumatic tank, New Storage


Edgewood Lakes Inc.

15912

Sullivan

JD WATER COMPANY INC.


/ JD Water Co.

Upgrade Pump Station, Upgrade Distribution System

17945

Sullivan

MONTICELLO VILLAGE /
Monticello (V)

18042

Sullivan

16543

1,200

$3,244,500

60

$6,019,711,785

17

$9,000

55

$6,019,720,785

800

$49,000

45

$6,019,769,785

Upgrade storage and distribution piping, Upgrade Storage, Upgrade


Distribution System

8,000

$7,395,000

45

$6,027,164,785

LIBERTY VILLAGE / Liberty


(V)

New Storage

4,800

$975,000

40

$6,028,139,785

Sullivan

MONTICELLO VILLAGE /
Monticello (V)

Upgrade Distribution System

8,000

$285,300

35

$6,028,425,085

15087

Sullivan

ROUTE 55 WATER
DISTRICT / Liberty (T)

New Storage, New Pump Station, Upgrade Distribution System

500

$400,000

35

$6,028,825,085

17436

Sullivan

MELODY LAKE ACRES /


National Aqueous Corp.

Replace distribution system, Upgrade Distribution System

150

$134,090

35

$6,028,959,175

15365

Sullivan

WURTSBORO VILLAGE
WATER SUPPLY /
Wurtsboro (V)

New 400,000 gallon potable water stand pipe and distribution system
improvements, New Storage, Upgrade Distribution System

1,060

$1,545,000

30

$6,030,504,175

16439

Sullivan

FALLSBURG WHO-LS-SF /
Fallsburgh (T)

Upgrade Distribution System

8,355

$430,000

30

$6,030,934,175

17970

Sullivan

WURTSBORO VILLAGE
WATER SUPPLY /
Wurtsboro (V)

Installation of water meters.,

1,060

$201,438

20

$6,031,135,613

Tioga County
15782

Tioga

WAVERLY VILLAGE /
Waverly (V)

New Ground Water Source

4,830

$865,000

80

$6,032,000,613

17667

Tioga

NEWARK VALLEY
VILLAGE / Newark Valley
(V)

Upgrade Distribution System

1,253

$4,813,000

70

$6,036,813,613

18026

Tioga

CANDOR VILLAGE WATER


DEPT. / Candor (V)

Upgrade Storage, Upgrade Distribution System

1,020

$3,047,237

60

$6,039,860,850

15790

Tioga

WAVERLY VILLAGE /
Waverly (V)

New Transmission, New Storage, Upgrade Distribution System

4,830

$1,999,400

55

$6,041,860,250

17596

Tioga

SPENCER (V) / Spencer (V)

New Complete System (New System), New System Consolidation

731

$7,865,000

50

$6,049,725,250

16170

Tioga

OWEGO W D NO 4 /
Owego (T)

Extend Distribution System

3,196

$1,147,202

45

$6,050,872,452

17324

Tioga

CONSOLIDATED WATER
DISTRICT / Owego (T)

Upgrade Storage, Upgrade Pump Station

10,306

$3,669,000

30

$6,054,541,452

17508

Tioga

BARTON (T) WD#1 / Barton


(T)

New Complete System (New System), New Water District

700

$2,553,000

25

$6,057,094,452

17039

Tioga

OWEGO W D NO 4 /
Owego (T)

Upgrade Distribution System

3,196

$192,610

20

$6,057,287,062

Page 74 of 86

NYS Drinking Water State Revolving Fund DRAFT IUP Multiyear List

October 1, 2012 to September 30, 2013

Project County

System Name/
Borrower

Description

Pop.

Project Cost

Score

Cumulative
Total

Tioga County
17749

Tioga

OWEGO W D NO 3 /
Owego (T)

Pennsylvania Ave. Water Main Replacement., Upgrade Distribution


System

2,150

$2,215,865

15

$6,059,502,927

16172

Tioga

OWEGO W D NO 3 /
Owego (T)

Inter-Connection

2,150

$312,576

10

$6,059,815,503

17678

Tioga

OWEGO W D NO 3 /
Owego (T)

Upgrade Distribution System

2,150

$525,300

10

$6,060,340,803

Tompkins County
17888

Tompkins

TRUMANSBURG VILLAGE
/ Trumansburg (V)

New well to provide source redundancy. New transmission main to


provide adequate CT., New Ground Water Source, New Transmission

2,300

$1,374,000

120

$6,061,714,803

16093

Tompkins

TRUMANSBURG VILLAGE
/ Trumansburg (V)

New Transmission, New Storage, New Pump Station

2,300

$2,501,000

115

$6,064,215,803

15488

Tompkins

ITHACA CITY / Ithaca (C)

Upgrade Water Treatment Plant, Upgrade Transmission, New Storage,


Upgrade Pump Station, Inter-Connection

29,457

$14,227,569

100

$6,078,443,372

18009

Tompkins

DRYDEN VILLAGE / Dryden New Ground Water Source, New Storage, Upgrade Distribution System
(V)

2,000

$5,924,000

70

$6,084,367,372

15993

Tompkins

LANSING (V) / Lansing (V)

Upgrade Distribution System

3,100

$316,000

50

$6,084,683,372

16095

Tompkins

TRUMANSBURG VILLAGE
/ Trumansburg (V)

Upgrade Distribution System

2,300

$94,700

40

$6,084,778,072

15552

Tompkins

DRYDEN WD / Dryden (T)

New Distribution System

725

$4,286,000

35

$6,089,064,072

18079

Tompkins

YELLOW BARN WATER


CO /

New Water Treatment Plant, New Storage

250

$540,660

30

$6,089,604,732

16590

Tompkins

WILLIAM GEORGE
AGENCY / George Jr.
Republic, Inc.

New Ground Water Source, New Storage, Upgrade Distribution System

250

$565,799

25

$6,090,170,531

15946

Tompkins

SOUTHERN CAYUGA
LAKE INTERMUN. WC /
Lansing (T)

Town of Lansing, Drake Road., Extend Distribution System

110

$328,200

25

$6,090,498,731

15945

Tompkins

SOUTHERN CAYUGA
LAKE INTERMUN. WC /
Lansing (T)

Town of Lansing, Franklyn and Maple Drives., Extend Distribution


System

140

$463,000

25

$6,090,961,731

15538

Tompkins

LANSING WD #2 / Lansing
(T)

New Storage, New Pump Station, Upgrade Distribution System

400

$443,500

20

$6,091,405,231

18073

Tompkins

WEST DANBY WD /
Danbury(T)

New Storage

265

$384,600

20

$6,091,789,831

16566

Tompkins

SHELTER VALLEY M.H.P. /


Shelter Valley Waterworks

Upgrade Distribution System

175

$23,350

20

$6,091,813,181

15556

Tompkins

LANSING WD #2 / Lansing
(T)

Extend Distribution System

400

$117,300

15

$6,091,930,481

15899

Tompkins

YELLOW BARN WATER


CO / Yellow Barn Water Co

Upgrade Storage

250

$32,000

15

$6,091,962,481

15901

Tompkins

YELLOW BARN WATER


CO / Yellow Barn Water Co

Foot Hill Road., Upgrade Distribution System

250

$37,500

10

$6,091,999,981

Page 75 of 86

NYS Drinking Water State Revolving Fund DRAFT IUP Multiyear List

October 1, 2012 to September 30, 2013

Project County

System Name/
Borrower

Description

Pop.

Project Cost

Score

Cumulative
Total

Tompkins County
Yellow Barn Road., Upgrade Distribution System

15900

Tompkins

YELLOW BARN WATER


CO / Yellow Barn Water Co

15886

Tompkins

DRYDEN VILLAGE / Dryden Upgrade Distribution System


(V)

250

$25,000

10

$6,092,024,981

2,000

$23,983

$6,092,048,964

992

$150,000

2130

$6,092,198,964

4,323

$7,136,870

215

$6,099,335,834

4,100

$3,573,894

130

$6,102,909,728

4,000

$2,369,000

90

$6,105,278,728

24,000

$0

85

$6,105,278,728

Ulster County
17649

Ulster

PHOENICIA WATER
DISTRICT / Shandaken (T)

Phase 2, see Project #16491 for Phase 1., New Surface Water
Treatment Rule Compliance Facility, Upgrade Ground Water Source

15003

Ulster

ELLENVILLE (VILLAGE)
WATER DIS / Ellenville (V)

Water system improvements, Upgrade Surface Water Treatment Rule


Compliance Facility, Upgrade Storage, Upgrade Distribution System

17467

Ulster

Upgrade water mains and appurtenances; distribution extension to


SAUGERTIES (VILLAGE)
WATER DIS / Saugerties (V) connect 15 existing homes w/ wells to PWS; upgrade raw water

reservoir., Upgrade Other Expenses, Upgrade Distribution System,


Extend Distribution System, Upgrade Other (OT)

16390

Ulster

HIGHLAND WATER
DISTRICT / Lloyd (T)

New Storage, Extend Distribution System

17727

Ulster

KINGSTON (CITY) WATER


DISTRICT / Kingston (C)

Upgrade Water Treatment Plant

17643

Ulster

PORT EWEN WATER


DISTRICT / Port Ewen
Water District

New Water Treatment Plant

4,800

$2,250,000

85

$6,107,528,728

17076

Ulster

ELLENVILLE (VILLAGE)
WATER DIS / Ellenville (V)

Upgrade Surface Water Source

4,323

$173,600

75

$6,107,702,328

17626

Ulster

NEW PALTZ (VILLAGE)


WATER DIST / New Paltz
(V)

Upgrade Water Treatment Plant, New Storage, Upgrade Distribution


System

5,600

$5,675,916

70

$6,113,378,244

17571

Ulster

WEST HURLEY WATER


DISTRICT #1 (PROPOSED)
/ Hurley (T)

New Complete System (New System)

450

$4,713,160

70

$6,118,091,404

17883

Ulster

NEW PALTZ (V) / New Paltz


(V)

Construct mains in Northern portion of Village to loop system, Upgrade


Distribution System

6,000

$759,625

60

$6,118,851,029

17095

Ulster

EAST KINGSTON WATER


DISTRICT / Ulster (T)

New Complete System (New System)

350

$2,899,450

55

$6,121,750,479

16671

Ulster

NEW PALTZ (TOWN)


WATER DISTRIC / New
Paltz (T)

New source and storage for the Ohioville Water System, New Ground
Water Source, New Storage

810

$2,647,000

55

$6,124,397,479

17581

Ulster

GARDINER TOWN HOUSE


APTS / Gardiner
Townhouses

Upgrade Water Treatment Plant

96

$20,000

55

$6,124,417,479

15160

Ulster

NYS THRUWAY- ULSTER


SERVICE AREA / NYS
Thruway Authority

Extend Distribution System

2,055

$375,000

50

$6,124,792,479

16515

Ulster

EAST KINGSTON / East


Kingston

Extend Distribution System

270

$2,472,000

45

$6,127,264,479

16450

Ulster

GLENERIE WATER
DISTRICT / Ulster (T)

New Complete System (New System)

540

$2,636,800

45

$6,129,901,279

15616

Ulster

PORT EWEN WATER


DISTRICT / Esopus (T)

New Storage

4,800

$2,100,000

40

$6,132,001,279

15093

Ulster

ROSENDALE WATER
DISTRICT / Rosendale (T)

New Water Treatment Plant

2,200

$18,911

35

$6,132,020,190

Page 76 of 86

NYS Drinking Water State Revolving Fund DRAFT IUP Multiyear List

October 1, 2012 to September 30, 2013

Project County

System Name/
Borrower

Description

Pop.

Project Cost

Score

Cumulative
Total

Ulster County
18037

Ulster

MARLBOROUGH WATER
DISTRICT / (T) Marlborough

New Transmission, New Storage, Upgrade Distribution System

3,248

$16,879,640

30

$6,148,899,830

15639

Ulster

NEW PALTZ (VILLAGE)


WATER DIST / New Paltz
(V)

Upgrade Surface Water Source

5,600

$200,000

30

$6,149,099,830

18059

Ulster

HIGHLAND WATER
DISTRICT / Lloyd (T)

Upgrade Water Treatment Plant

4,000

$6,583,451

25

$6,155,683,281

17586

Ulster

GARDINER TOWN HOUSE


APTS / Gardiner
Townhouse/Condo APTS

Upgrade Ground Water Source, Upgrade Distribution System

96

$30,000

25

$6,155,713,281

16527

Ulster

ROSENDALE WATER
DISTRICT / Rosendale (T)

Main St.,Snyder Ave,Hardenburg Lane, Upgrade Distribution System

2,200

$420,000

20

$6,156,133,281

16401

Ulster

MARLBOROUGH WATER
DISTRICT / Marlborough (T)

Upgrade Water Treatment Plant, New Storage, Upgrade Distribution


System

3,248

$1,700,000

20

$6,157,833,281

15088

Ulster

ROSENDALE WATER
DISTRICT / Rosendale (T)

New Transmission

2,200

$158,000

20

$6,157,991,281

17498

Ulster

PORT EWEN WATER


DISTRICT / Esopus (T)

Upgrade Distribution System

4,800

$813,000

20

$6,158,804,281

16537

Ulster

VALLEY VIEW
APARTMENTS / Valley View
Apts.

New Ground Water Source

48

$13,802

15

$6,158,818,083

16525

Ulster

ROSENDALE WATER
DISTRICT / Rosendale (T)

System wide telemetry upgrade, Upgrade Other Expenses, Upgrade


Other (OT)

2,200

$65,000

15

$6,158,883,083

16526

Ulster

ROSENDALE WATER
DISTRICT / Rosendale (T)

New Ground Water Source

2,200

$880,000

15

$6,159,763,083

15503

Ulster

WALLKILL
CONSOLIDATED WD /
Shawangunk (T)

New Ground Water Source

15,000

$660,500

15

$6,160,423,583

16142

Ulster

NEW PALTZ (TOWN)


WATER DISTRIC / New
Paltz (T)

Upgrade Distribution System

810

$1,401,006

15

$6,161,824,589

15091

Ulster

ROSENDALE WATER
DISTRICT / Rosendale (T)

Upgrade Distribution System

2,200

$360,000

10

$6,162,184,589

15478

Ulster

SPRING LAKE MHP /


Mid-Hudson Park
Management

Upgrade Distribution System

420

$311,575

10

$6,162,496,164

Warren County
16969

Warren

HAGUE (T) WATER


DISTRICT #1 / Hague (T)

New Surface Water Treatment Rule Compliance Facility, New Storage,


New Distribution System

480

$4,355,081

180

$6,166,851,245

17392

Warren

PIONEER VILLAGE /
Pioneer Village Imp. Assoc.

Serve private contaminated wells., New Surface Water Treatment Rule


Compliance Facility, New Inter-Connection, New System Consolidation

144

$208,575

175

$6,167,059,820

15097

Warren

HAGUE HOA / Hague HOA

Hague Home Owners Association, New Surface Water Treatment Rule


Compliance Facility

18

$119,190

155

$6,167,179,010

16772

Warren

GORE MT SKI AREA /


Olympic Regional Dev
Authority

New Ground Water Source, New Transmission, New Storage

180

$1,010,945

145

$6,168,189,955

17214

Warren

ARCADY BAY ESTATES /


Arcady Bay Estates

New Surface Water Treatment Rule Compliance Facility, New Ground


Water Source, Upgrade Storage

332

$154,500

130

$6,168,344,455

Page 77 of 86

NYS Drinking Water State Revolving Fund DRAFT IUP Multiyear List

October 1, 2012 to September 30, 2013

Project County

System Name/
Borrower

Description

Pop.

Project Cost

Score

Cumulative
Total

Warren County
15490

Warren

NORTH CREEK WATER


DISTRICT / Johnsburg (T)

Upgrade Water Treatment Plant, New Ground Water Source, Upgrade


Storage

15798

Warren

QUEENSBURY WATER
DISTRICT / Queensbury (T)

Upgrade Distribution System

15895

Warren

CHESTERTOWN WATER
DISTRICT / Chester (T)

Corrosion Control , Upgrade Ground Water Source

16651

Warren

GLENS FALLS CITY / Glens


Falls (C)

17823

Warren

15884

1,000

$1,112,250

85

$6,169,456,705

21,200

$2,762,400

50

$6,172,219,105

1,300

$2,500

40

$6,172,221,605

Upgrade Distribution System

13,000

$1,300,000

40

$6,173,521,605

GLENS FALLS CITY / Glens


Falls (C)

Upgrade Storage

13,000

$300,000

40

$6,173,821,605

Warren

POTTERSVILLE WATER
DISTRICT / Chester (T)

Upgrade Ground Water Source

325

$14,400

40

$6,173,836,005

17822

Warren

GLENS FALLS CITY / Glens


Falls (C)

Upgrade Distribution System

13,000

$1,200,000

35

$6,175,036,005

17905

Warren

LAKE GEORGE VILLAGE /


Lake George (V)

Upgrade Distribution System

2,160

$1,650,675

30

$6,176,686,680

15805

Warren

Upgrade Ground Water Source


WARRENSBURG WATER
DISTRICT / Warrensburg (T)

3,600

$375,000

25

$6,177,061,680

15896

Warren

CHESTERTOWN WATER
DISTRICT / Chester (T)

Well #1 - Rehab and Testing, Upgrade Ground Water Source

1,300

$15,500

25

$6,177,077,180

15897

Warren

CHESTERTOWN WATER
DISTRICT / Chester (T)

Upgrade Distribution System

1,300

$42,200

20

$6,177,119,380

15894

Warren

CHESTERTOWN WATER
DISTRICT / Chester (T)

Upgrade Storage

1,300

$56,700

20

$6,177,176,080

15891

Warren

CHESTERTOWN WATER
DISTRICT / Chester (T)

Well #1 - New Pump House, Upgrade Ground Water Source

1,300

$108,100

20

$6,177,284,180

15888

Warren

POTTERSVILLE WATER
DISTRICT / Chester (T)

Upgrade Distribution System

325

$619,000

20

$6,177,903,180

15095

Warren

BOLTON WATER DISTRICT Upgrade Distribution System


/ Bolton (T)

1,800

$672,000

10

$6,178,575,180

1220

$6,178,575,180

Washington County
17642

Washington

GRANVILLE VILLAGE /
Granville (V)

New Surface Water Treatment Rule Compliance Facility, Upgrade


Ground Water Source, Upgrade Transmission, Upgrade Distribution
System

2,645

2,000

$0

140

$6,178,575,180

25

$69,834

95

$6,178,645,014

$0

NOTE: Short - Term Loan Closed, Project Cost Shown is


Remaining Balance Not Funded With Short Term Loan

17645

Washington

GREENWICH VILLAGE /
Greenwich (V)

New Surface Water Treatment Rule Compliance Facility, New Storage

16619

Washington

HULETTS ON LAKE
GEORGE / Huletts on Lake
George

New Water Treatment Plant

17448

Washington

KINGSBURY WD
(QUEENSBURY) /
Kingsbury (T)

New water district to serve residents in area of groundwater


contamination , New Distribution System, New Water District

1,300

$845,000

85

$6,179,490,014

17342

Washington

CAMBRIDGE VILLAGE /
Cambridge (V)

Aquisition of existing Cambridge Water Works, New Storage, Upgrade


Distribution System

1,524

$2,500,000

80

$6,181,990,014

Page 78 of 86

NYS Drinking Water State Revolving Fund DRAFT IUP Multiyear List

October 1, 2012 to September 30, 2013

Project County

System Name/
Borrower

Description

Pop.

Project Cost

Score

Cumulative
Total

Washington County
15435

Washington

FORT EDWARD WD #2 /
Fort Edward (T)

Extend Distribution System

126

$650,000

70

$6,182,640,014

16240

Washington

PLEASANT VALLEY
INFIRMARY / Pleasant
Valley Infirmary

Upgrade Ground Water Source

160

$8,410

55

$6,182,648,424

17536

Washington

FORT EDWARD VILLAGE /


Fort Edward (V)

Replacement of water main beneath Hudson River to Rogers Island.,


Upgrade Transmission

3,150

$160,200

50

$6,182,808,624

15106

Washington

CAMBRIDGE WATER
WORKS / Cambridge Water
Works/Aqua. Am

New Storage

2,313

$136,000

40

$6,182,944,624

15830

Washington

WHITEHALL VILLAGE /
Whitehall (V)

Upgrade Distribution System

2,800

$576,281

30

$6,183,520,905

SAVANNAH WD #1 /
Savannah (T)

New Surface Water Treatment Rule Compliance Facility, New Storage,


Upgrade Distribution System, Extend Distribution System

1215

$6,183,520,905

Wayne County
18005

Wayne

900

$0

NOTE: Short - Term Loan Closed, Project Cost Shown is


Remaining Balance Not Funded With Short Term Loan

17289

Wayne

WOLCOTT VILLAGE /
Wolcott (V)

New Water Treatment Plant, Upgrade Ground Water Source

2,200

$1,250,000

145

$6,184,770,905

17932

Wayne

ROSE - NORTH ROSE WD


/ Rose (T)

Upgrade Ground Water Source, Upgrade Distribution System, Extend


Distribution System, New System Consolidation

1,950

$11,434,000

120

$6,196,204,905

16415

Wayne

ARCADIA MOBILE HOME


PARK / James Taccone

New Transmission, Upgrade Distribution System, System Consolidation

75

$180,000

95

$6,196,384,905

15325

Wayne

WOLCOTT VILLAGE /
Wolcott (V)

Upgrade Water Treatment Plant, Upgrade Surface Water Source

2,200

$3,300,000

80

$6,199,684,905

15324

Wayne

LYONS VILLAGE / Lyons


(V)

Upgrade Surface Water Source, New Ground Water Source, Upgrade


Transmission

3,695

$2,550,000

70

$6,202,234,905

16916

Wayne

ARCADIA (T) WATER


SYSTEM / Arcadia (T)

Extend Distribution System

60

$150,000

55

$6,202,384,905

16780

Wayne

MARION WD #1 / Marion
(T)

Northeast Quadrant Water District., Extend Distribution System

2,616

$480,000

55

$6,202,864,905

17743

Wayne

PALMYRA VILLAGE /
Palmyra (V)

Replace existing WTP and RW transmission main., New Water


Treatment Plant, New Transmission

3,550

$8,315,400

55

$6,211,180,305

17712

Wayne

WOLCOTT VILLAGE /
Wolcott (V)

Upgrade Water Treatment Plant

2,200

$2,987,000

55

$6,214,167,305

15834

Wayne

PALMYRA VILLAGE /
Palmyra (V)

New Pump Station

3,550

$102,700

45

$6,214,270,005

16779

Wayne

WALWORTH WD #1 /
Walworth (T)

Extension No. 19 & 20., Extend Distribution System

5,400

$598,000

45

$6,214,868,005

16778

Wayne

TOWN OF ROSE WATER


DISTRICT NO. 2 / Rose (T)

Extend Distribution System

680

$2,317,000

45

$6,217,185,005

16561

Wayne

ROSE - NORTH ROSE WD


/ Rose (T)

Extend Distribution System

1,950

$1,340,000

45

$6,218,525,005

16512

Wayne

OLD LYONS-NEWARK
ROAD WATER DISTRICT /
Lyons (T)

New Transmission

300

$207,000

45

$6,218,732,005

Page 79 of 86

NYS Drinking Water State Revolving Fund DRAFT IUP Multiyear List

October 1, 2012 to September 30, 2013

Project County

System Name/
Borrower

Description

Pop.

Project Cost

Score

Cumulative
Total

Wayne County
15218

Wayne

WALWORTH WD #1 /
Walworth (T)

Extend Distribution System

5,400

$2,730,000

40

$6,221,462,005

18070

Wayne

TRANSMISSION MAIN
REPLACEMENT / Clyde(V)

Upgrade Transmission

2,270

$357,900

40

$6,221,819,905

17714

Wayne

WOLCOTT VILLAGE /
Wolcott (V)

Upgrade Surface Water Source

2,200

$1,082,000

40

$6,222,901,905

17713

Wayne

WOLCOTT VILLAGE /
Wolcott (V)

Upgrade Storage

2,200

$757,000

40

$6,223,658,905

17716

Wayne

WOLCOTT VILLAGE /
Wolcott (V)

Upgrade Distribution System

2,200

$3,884,000

40

$6,227,542,905

15101

Wayne

ONTARIO TOWN BENEFIT


AREA #1 / Ontario (T)

New Transmission, New Storage

10,462

$4,913,000

40

$6,232,455,905

15480

Wayne

CLYDE VILLAGE / Clyde (V) New Ground Water Source

2,269

$232,780

35

$6,232,688,685

16720

Wayne

RED CREEK VILLAGE /


Red Creek (V)

Upgrade Distribution System

526

$102,935

30

$6,232,791,620

16174

Wayne

NEWARK VILLAGE /
Newark (V)

Upgrade Transmission

9,682

$1,556,038

30

$6,234,347,658

15832

Wayne

PALMYRA VILLAGE /
Palmyra (V)

Upgrade Surface Water Source

3,550

$291,050

20

$6,234,638,708

15914

Wayne

PALMYRA VILLAGE /
Palmyra (V)

Upgrade Transmission

3,550

$1,581,250

20

$6,236,219,958

17745

Wayne

ONTARIO TOWN BENEFIT


AREA #1 / Ontario (T)

Replace Ridge Road Storage Tank., New Storage

10,462

$1,911,500

20

$6,238,131,458

15918

Wayne

PALMYRA VILLAGE /
Palmyra (V)

Upgrade Storage

3,550

$189,750

20

$6,238,321,208

17737

Wayne

WCW&SA / Wayne County


Water&Sewer Auth.

Blaker Hill Storage Tank Improvements (Town of Macedon) Served by


Wayne County Water and Sewer Authority., Upgrade Storage

7,000

$521,000

15

$6,238,842,208

17744

Wayne

ONTARIO TOWN BENEFIT


AREA #1 / Ontario (T)

Clarifier rehabilitation., Upgrade Water Treatment Plant

10,462

$2,550,000

15

$6,241,392,208

17739

Wayne

WAYNE COUNTY
WATER&SEWER
AUTHORITY / Wayne
County Water&Sewer Auth.

Bunker Hill Storage Tank Improvements (Town of Macedon)., Upgrade


Storage

5,000

$310,000

15

$6,241,702,208

17736

Wayne

WAYNE COUNTY W. &S.A.


/ Wayne C'nty Water&Sewer
Auth.

Wallworth Storage Tank Improvements., Upgrade Storage

8,000

$533,000

15

$6,242,235,208

Extention #6 ( Phase III of 16239)Consolidation Amawalk-Shenorock


WD and other small water districts to become Somers W.D, New
Storage, New Distribution System

3,800

$1,042,875

2160

$6,243,278,083

22,400

$5,742,500

2080

$6,249,020,583

8,831

$0

225

$6,249,020,583

Westchester County
16983

Westchester

AMAWALK-SHENOROCK
WATER DIST. / Somers (T)

17849

Westchester

PEEKSKILL CITY / Peekskill Finished Water Storage Tanks (Phase 3 of 17152), New Storage
(C)

16013

Westchester

BRIARCLIFF MANOR
VILLAGE / Briarcliff
Manor(V)

Page 80 of 86

New Surface Water Treatment Rule Compliance Facility

NYS Drinking Water State Revolving Fund DRAFT IUP Multiyear List

October 1, 2012 to September 30, 2013

Project County

System Name/
Borrower

Description

Pop.

Project Cost

Score

Cumulative
Total

Westchester County
Installation of new wells to replace existing wells, New Ground Water
Source

15220

Westchester

CROTON FALLS WATER


DISTRICT / North Salem (T)

17488

Westchester

New Surface Water Treatment Rule Compliance Facility


WESTCHESTER JOINT
WATER WORKS /
Harrison&Mamaroneck(T)s&(

15923

Westchester

OSSINING WATER
DEPARTMENT / Ossining
(V)

15626

Westchester

16984

175

$400,000

135

$6,249,420,583

55,210

$65,000,000

130

$6,314,420,583

Upgrade Water Treatment Plant

30,000

$1,400,000

95

$6,315,820,583

GREENBURGH
CONSOLIDATED WD #1 /
Greenburgh (T)

Upgrade Water Treatment Plant

38,489

$1,000,000

75

$6,316,820,583

Westchester

KITCHAWAN WATER
DISTRICT / Yorktown (T)

correct organic exceedances., New Transmission

240

$500,000

70

$6,317,320,583

15750

Westchester

CORTLANDT
CONSOLIDATED WD /
Cortlandt (T)

Upgrade Storage, Upgrade Distribution System

28,369

$4,000,000

65

$6,321,320,583

16722

Westchester

SLEEPY HOLLOW
VILLAGE / Sleepy Hollow
(V)

Upgrade Transmission, Upgrade Storage, Upgrade Pump Station,


Distribution System

8,146

$6,514,750

60

$6,327,835,333

16699

Westchester

SUNSET RIDGE WATER


DISTRICT / North Salem (T)

Replacement of pump control equipment, storage tank cleaning &


coating, water main replacement & installation, pump house reapirs,
pump house fencing and driveway, Upgrade Storage, Upgrade Pump
Station, Upgrade Distribution System

625

$400,000

60

$6,328,235,333

17832

Westchester

KENSICO WATER
DISTRICT / Mount Pleasant

Locust Road Water Main Extension, Extend Distribution System

17,857

$8,000,000

55

$6,336,235,333

15921

Westchester

OSSINING WATER
DEPARTMENT / Ossining
(V)

Upgrade Distribution System

30,000

$7,550,000

50

$6,343,785,333

18039

Westchester

KHAL ADAS KASHAU / Khal New chlorination system. , New Water Treatment Plant
Adas Kashau

650

$60,000

50

$6,343,845,333

16572

Westchester

RIPPOWAM CISQUA
SCHOOL - BEDFORD /
Rippowam Cisqua School

Route 22, Bedford(T), Other Expenses, New Water Treatment Plant,


Other (OT)

350

$48,590

50

$6,343,893,923

16098

Westchester

YONKERS CITY / Yonkers


(C)

New Transmission

196,086

$1,325,000

50

$6,345,218,923

17776

Westchester

WESTCHESTER COUNTY
WD #3 / Westchester
County #3

Water District #3 Improvements at Gate of Heaven Cemetery, New


Water Treatment Plant, Upgrade Pump Station

6,000

$9,800,000

50

$6,355,018,923

17584

Westchester

ARBOR HILLS WATER


WORKS / Arbor Hills
Waterworks

New wells, storage and booster pump., New Ground Water Source,
New Storage

180

$725,000

50

$6,355,743,923

16684

Westchester

NORTH CASTLE WD #1 /
North Castle (T)

New Transmission, New Transmission, Upgrade Storage, New Pump


Station

2,500

$610,000

45

$6,356,353,923

15527

Westchester

NEW CASTLE/STANWOOD New Storage


W.D. / New Castle (T)

16,800

$3,979,500

45

$6,360,333,423

17833

Westchester

KENSICO WATER
DISTRICT / Mount Pleasant

Choate Lane Water Main Extension, Extend Distribution System

17,857

$532,000

45

$6,360,865,423

17831

Westchester

KENSICO WATER
DISTRICT / Mount Pleasant

Hardscrabble Road Water Main, Extend Distribution System

17,857

$4,588,500

45

$6,365,453,923

16136

Westchester

ELMSFORD VILLAGE /
Elmsford (V)

Upgrade Water Treatment Plant

4,600

$1,000,000

45

$6,366,453,923

Page 81 of 86

NYS Drinking Water State Revolving Fund DRAFT IUP Multiyear List

October 1, 2012 to September 30, 2013

Project County

System Name/
Borrower

Description

Pop.

Project Cost

Score

Cumulative
Total

Westchester County
16242

Westchester

TOWN OF NORTH CASTLE New Distribution System


/ North Castle (T)

16102

Westchester

YONKERS CITY / Yonkers


(C)

Upgrade Water Treatment Plant

15239

Westchester

MOUNT VERNON WATER


DEPARTMENT / Mount
Vernon (C)

New Transmission

16400

Westchester

CROTON FALLS WATER


DISTRICT / North Salem (T)

New Storage, Upgrade Distribution System

17910

Westchester

YONKERS CITY / Yonkers


(C)

17909

Westchester

17582

2,500

$1,200,000

40

$6,367,653,923

196,086

$500,000

40

$6,368,153,923

68,381

$7,000,000

35

$6,375,153,923

175

$314,150

30

$6,375,468,073

Upgrade electrical service and pumps at Hillview Pump Station,


Upgrade Pump Station

196,086

$3,180,691

25

$6,378,648,764

YONKERS CITY / Yonkers


(C)

Upgrade electrical service and pumps Nepperhan Ave. and Tuckhoe


Road, Upgrade Pump Station

196,086

$3,968,048

25

$6,382,616,812

Westchester

SCARSDALE WATER
DEPARTMENT / Scarsdale
(V)

Upgrade Ardsley Road Pumping Station, Upgrade Pump Station

20,883

$3,700,000

25

$6,386,316,812

17524

Westchester

NORTH CASTLE WD #2 /
North Castle (T)

New well and storage, New Ground Water Source, New Storage

1,200

$1,458,695

25

$6,387,775,507

17434

Westchester

WESTCHESTER COUNTY
WATER DISTRICT #1 /
Westchester County

Distribution system improvements, Upgrade Distribution System

187,000

$1,000,000

25

$6,388,775,507

16015

Westchester

BRIARCLIFF MANOR
VILLAGE / Briarcliff Manor
(V)

Upgrade Distribution System

8,831

$2,845,400

25

$6,391,620,907

17840

Westchester

WESTCHESTER JOINT
WATER WORKS / WJWW

York Road Transmission Main, Upgrade Transmission

65,000

$630,000

20

$6,392,250,907

15312

Westchester

CROTON FALLS WATER


DISTRICT / North Salem (T)

Upgrade Distribution System

175

$121,339

20

$6,392,372,246

17839

Westchester

WESTCHESTER JOINT
WATER WORKS / WJWW

Flagler Drive Transmission Main, Upgrade Transmission

55,210

$840,000

20

$6,393,212,246

17778

Westchester

UNITED WATER NEW


ROCHELLE / United Water
New Rochelle

Replace Distribution and Transmission, Upgrade Transmission,


Upgrade Distribution System

141,000

$4,120,000

20

$6,397,332,246

17435

Westchester

WESTCHESTER COUNTY
WATER DISTRICT #1 /
Westchester County

Interconnection to service Mt. Vernon and Yonkers, New


Inter-Connection

187,000

$10,000,000

20

$6,407,332,246

17162

Westchester

LARCHMONT VILLAGE /
Larchmont (V)

Replacement of two water storage tanks at 250,000 gallons each/


Byron Place, Upgrade Storage

6,485

$670,000

15

$6,408,002,246

17129

Westchester

WEST EXCEPTIONAL
CHILDRENS SCH /
Westchester Exceptional

Install UV disinfection unit, Upgrade Water Treatment Plant

70

$19,700

15

$6,408,021,946

15423

Westchester

MOUNT KISCO WATER


DEPARTMENT / Mount
Kisco (V)

New Distribution System

9,600

$3,738,900

15

$6,411,760,846

17061

Westchester

LAKE KATONAH CLUB INC


/ Lake Katonah Club Inc

Upgrade Storage

356

$131,910

15

$6,411,892,756

15594

Westchester

IRVINGTON WATER
SUPPLY / Irvington (V)

Upgrade Distribution System

6,631

$435,000

15

$6,412,327,756

Page 82 of 86

NYS Drinking Water State Revolving Fund DRAFT IUP Multiyear List

October 1, 2012 to September 30, 2013

Project County

System Name/
Borrower

Description

Pop.

Project Cost

Score

Cumulative
Total

Westchester County
16733

Westchester

PLEASANTVILLE WATER
DISTRICT / Pleasantville (V)

Upgrade Water Treatment Plant

18048

Westchester

YONKERS CITY / Yonkers


(C)

Upgrade Distribution System

16672

Westchester

PLEASANTVILLE WATER
DISTRICT / Pleasantville (V)

16608

Westchester

17946

9,500

$78,200

15

$6,412,405,956

196,086

$7,279,450

15

$6,419,685,406

Upgrade Storage, Upgrade Pump Station

9,500

$386,250

15

$6,420,071,656

PACE UNIVERSITY / Pace


University

Pace University, Pleasantville Campus., New Ground Water Source,


Upgrade Ground Water Source

2,753

$143,900

15

$6,420,215,556

Westchester

MOUNT VERNON (C) / Mt


Vernon Board Water Supply

Upgrade distribution system, Upgrade Distribution System

15,000

$3,700,000

15

$6,423,915,556

15407

Westchester

MOUNT KISCO WATER


DEPARTMENT / Mount
Kisco (V)

Upgrade Metered Interconnections w/Town of New Castle, Upgrade


Distribution System

9,600

$343,608

15

$6,424,259,164

17889

Westchester

MT VERNON BOARD OF
WATER SUPPLY / Mt
Vernon B'rd Water Supply

Cleaning and lining 36,800 feet of distribution main., Upgrade


Distribution System

15,000

$3,700,000

15

$6,427,959,164

15632

Westchester

OSSINING WATER
DEPARTMENT / Ossining
(V)

Upgrade Storage

30,000

$300,000

15

$6,428,259,164

17837

Westchester

WESTCHESTER JOINT
WATER WORKS / WJWW

Anderson Hill Road Booster Pump Station, New Pump Station

65,000

$400,000

15

$6,428,659,164

17838

Westchester

WESTCHESTER JOINT
WATER WORKS / WJWW

Rye Lake generator, Upgrade Water Treatment Plant

55,210

$475,000

15

$6,429,134,164

17829

Westchester

PLEASANTVILLE /
Pleasantville (V)

Replacement of water mains., Upgrade Distribution System

7,166

$1,955,000

15

$6,431,089,164

17774

Westchester

WESTCHESTER COUNTY
WD #1 / Westchester
County #1

Shaft 22 Chlorination Facility Security Improvements, Upgrade Water


Treatment Plant

187,004

$1,000,000

15

$6,432,089,164

16005

Westchester

HARRISON WATER
DISTRICT #1 / Harrison (T)

Upgrade Distribution System

6,940

$480,000

15

$6,432,569,164

17525

Westchester

NORTH CASTLE WD #1 /
North Castle (T)

Rehabilitation of water storage tanks, Upgrade Storage

2,500

$813,500

15

$6,433,382,664

16405

Westchester

BRIARCLIFF MANOR
VILLAGE / Briarcliff Manor
(V)

Upgrade Storage

8,831

$50,000

15

$6,433,432,664

16100

Westchester

YONKERS CITY / Yonkers


(C)

New Distribution System

196,086

$1,820,000

15

$6,435,252,664

16402

Westchester

CORTLANDT
CONSOLIDATED WD /
Cortlandt (T)

Upgrade Distribution System

28,369

$14,000,000

15

$6,449,252,664

16003

Westchester

HARRISON WATER
DISTRICT #1 / Harrison (T)

Upgrade Water Treatment Plant

6,940

$520,000

15

$6,449,772,664

15437

Westchester

MOUNT KISCO WATER


DEPARTMENT / Mount
Kisco (V)

Automated water meter reading system, Upgrade Distribution System

9,600

$1,003,014

15

$6,450,775,678

15911

Westchester

OSSINING WATER
DEPARTMENT / Ossining
(V)

Water distribution main replacement - Ellis Place, Upgrade Distribution


System

30,000

$498,500

10

$6,451,274,178

Page 83 of 86

NYS Drinking Water State Revolving Fund DRAFT IUP Multiyear List

October 1, 2012 to September 30, 2013

Project County

System Name/
Borrower

Description

Pop.

Project Cost

Score

Cumulative
Total

Westchester County
17160

Westchester

LARCHMONT VILLAGE /
Larchmont (V)

Upgrade Distribution System

6,485

$241,000

10

$6,451,515,178

15708

Westchester

BIRCH DRIVE WATER


DISTRICT / New Castle (T)

Upgrade Distribution System

50

$108,700

10

$6,451,623,878

15514

Westchester

PLEASANTVILLE WATER
DISTRICT / Pleasantville (V)

Water Mains for Sarles Lane, Upgrade Distribution System

9,500

$343,291

10

$6,451,967,169

17985

Westchester

BEAR RIDGE LAKE


WATER DISTRICT / Mount

Pleasant (T)

Water main replacement-Highland Place, Mountain Trail and Woodland


Road, Upgrade Distribution System

170

$1,436,085

10

$6,453,403,254

16542

Westchester

TARRYTOWN WATER
SUPPLY / Tarrytown (V)

Upgrade Distribution System

11,000

$10,620,000

10

$6,464,023,254

15633

Westchester

OSSINING WATER
DEPARTMENT / Ossining
(V)

Cement lining of water lines at various locations, Upgrade Distribution


System

30,000

$900,000

10

$6,464,923,254

17836

Westchester

YONKERS CITY / Yonkers


(C)

Water main replacement Mulford Gardens, Upgrade Distribution


System

196,086

$1,259,000

10

$6,466,182,254

17834

Westchester

KENSICO WATER
DISTRICT / Mount Pleasant

Cement lining of water mains, Upgrade Distribution System

17,857

$4,560,500

10

$6,470,742,754

17830

Westchester

KENSICO WATER
DISTRICT / Mount Pleasant

Phase VI Water Main Replacement, Upgrade Distribution System

17,857

$4,503,500

10

$6,475,246,254

17784

Westchester

TARRYTOWN WATER
SUPPLY / Tarrytown (V)

Cement line existing water main, Upgrade Distribution System

11,000

$1,892,110

10

$6,477,138,364

17783

Westchester

TARRYTOWN WATER
SUPPLY / Tarrytown (V)

Water main improvements, Upgrade Distribution System

11,000

$2,549,250

10

$6,479,687,614

17775

Westchester

WESTCHESTER COUNTY
WD #3 / Westchester

County #3

Lateral Main Rehabilitation, Upgrade Distribution System

6,000

$670,000

10

$6,480,357,614

16050

Westchester

WHITE PLAINS CITY /


White Plains (C)

Previously completed water mains, Upgrade Distribution System

53,077

$2,221,356

10

$6,482,578,970

16099

Westchester

YONKERS CITY / Yonkers


(C)

Upgrade Transmission

196,086

$1,024,600

10

$6,483,603,570

15507

Westchester

PLEASANTVILLE WATER
DISTRICT / Pleasantville (V)

Refinance '93 bonds for relining water mains, Upgrade Distribution


System

9,500

$4,155,408

10

$6,487,758,978

16052

Westchester

WHITE PLAINS CITY /


White Plains (C)

Davis and Whitney Ave. replacement and reconditioning, Upgrade


Distribution System

53,077

$1,000,000

10

$6,488,758,978

16007

Westchester

HARRISON WATER
DISTRICT #1 / Harrison (T)

Upgrade Distribution System

6,940

$215,000

10

$6,488,973,978

15929

Westchester

OSSINING WATER
DEPARTMENT / Ossining
(V)

Interconnection with (V) Briarcliff Manor with new 12" water main,
Upgrade Distribution System, Inter-Connection

30,000

$348,000

10

$6,489,321,978

15482

Westchester

ARDSLEY TRAVEL PLAZA /


NYS Thruway Authority

Upgrade Distribution System

6,000

$770,000

$6,490,091,978

CASTILE VILLAGE / Castile


(V)

Upgrade Water Treatment Plant, Upgrade Ground Water Source,


Upgrade Storage

1,135

1215

$6,490,091,978

Wyoming County
17928

Wyoming

$0

NOTE: Short - Term Loan Closed, Project Cost Shown is


Remaining Balance Not Funded With Short Term Loan

Page 84 of 86

NYS Drinking Water State Revolving Fund DRAFT IUP Multiyear List

October 1, 2012 to September 30, 2013

Project County

System Name/
Borrower

Description

Pop.

Project Cost

Score

Cumulative
Total

Wyoming County
15733

Wyoming

GARDEAU WATER
DISTRICT / Castile (T)

Upgrade Distribution System

17062

Wyoming

PIKE VILLAGE / Pike (V)

New Ground Water Source, Upgrade Ground Water Source, Upgrade


Transmission, Upgrade Distribution System

15778

Wyoming

ATTICA VILLAGE / Attica


(V)

17919

Wyoming

17845

60

$977,470

105

$6,491,069,448

369

$494,596

100

$6,491,564,044

Upgrade Storage, Upgrade Distribution System

2,700

$1,706,000

55

$6,493,270,044

ARCADE VILLAGE / Arcade


(V)

New Storage, New Distribution System

2,400

$2,458,000

55

$6,495,728,044

Wyoming

NORTH JAVA WATER


DISTRICT / Java (T)

New Ground Water Source

270

$441,190

55

$6,496,169,234

15716

Wyoming

WARSAW VILLAGE /
Warsaw (V)

Upgrade Ground Water Source

3,850

$338,870

50

$6,496,508,104

18018

Wyoming

CASTILE VILLAGE / Castile


(V)

Upgrade Other Expenses, Upgrade Storage, Upgrade Distribution


System, New System Consolidation, Upgrade Other (OT)

1,135

$2,444,813

50

$6,498,952,917

17384

Wyoming

PERRY VILLAGE / Perry (V)

Upgrade Transmission, Upgrade Distribution System

3,945

$1,421,200

45

$6,500,374,117

15225

Wyoming

CASTILE VILLAGE / Castile


(V)

Upgrade Ground Water Source, Upgrade Distribution System

1,135

$2,232,401

35

$6,502,606,518

17722

Wyoming

COWLESVILLE WATER
DISTRICT / Bennington (T)

New Other Expenses, New Other (OT)

375

$99,930

35

$6,502,706,448

16074

Wyoming

PERRY VILLAGE / Perry (V)

Upgrade Storage, Upgrade Distribution System

3,945

$2,369,188

35

$6,505,075,635

18063

Wyoming

WATER SYSTEM
UPGRADES /

Upgrade Distribution System

400

$775,000

10

$6,505,850,635

Yates County
15592

Yates

FREEDOM VILLAGE U.S.A.


/ Freedom Village USA

New Water Treatment Plant

160

$287,000

125

$6,506,137,635

17355

Yates

DRESDEN VILLAGE /
Dresden (V)

New Transmission, Upgrade Storage, New Inter-Connection

700

$515,000

125

$6,506,652,635

17801

Yates

WD #1 / Torrey (T)

New Distribution System

375

$3,079,875

115

$6,509,732,510

15483

Yates

BENTON TOWN WATER


DISTRICT NO. 1 / Benton
(T)

Extend system to serve area with private contaminated wells. , Extend


Distribution System

97

$639,000

65

$6,510,371,510

18050

Yates

BENTON WD #1 /

Extend Distribution System

308

$731,000

55

$6,511,102,510

18015

Yates

WS IMPROVEMENTS /
Dundee (V)

Upgrade Storage, Upgrade Distribution System

1,690

$6,913,360

55

$6,518,015,870

16568

Yates

PENN YAN FLYING CLUB


INC / Penn Yan Flying Club

Upgrade Distribution System

46

$396,000

55

$6,518,411,870

17191

Yates

PENN YAN VILLAGE / Penn


Yan (V)

Upgrade Water Treatment Plant

5,248

$1,300,000

50

$6,519,711,870

Page 85 of 86

NYS Drinking Water State Revolving Fund DRAFT IUP Multiyear List

October 1, 2012 to September 30, 2013

Project County

System Name/
Borrower

Description

Pop.

Project Cost

Score

Cumulative
Total

Yates County
16944

Yates

POTTER WATER
DISTRICT NO. 1 / Potter (T)

New Complete System (New System)

15695

Yates

PENN YAN VILLAGE / Penn


Yan (V)

17431

Yates

17430

285

$1,702,900

50

$6,521,414,770

Upgrade Transmission, Upgrade Distribution System

5,248

$1,310,300

40

$6,522,725,070

PENN YAN VILLAGE / Penn


Yan (V)

Seneca Street water main improvements., Upgrade Distribution


System

5,248

$412,000

40

$6,523,137,070

Yates

PENN YAN VILLAGE / Penn


Yan (V)

Sheppard Street water main improvements., Upgrade Distribution


System

5,248

$590,000

40

$6,523,727,070

18036

Yates

PENN YAN VILLAGE / Penn


Yan (V)

New Transmission

5,248

$1,340,000

35

$6,525,067,070

18077

Yates

EXT #1 TO WD #1 / Benton
(T)

Extend Distribution System

42

$800,000

15

$6,525,867,070

Total # Projects

Total Cost

1698

$6,525,867,070

Page 86 of 86

CATEGORY C LIST

HARDSHIP

Project County
17473

17321

17456

17611

17388

15881

17561

17461

15072

17647

15343

17928

18005

15603

15204

17543

17576

16692

16261

17538

Jefferson

Jefferson

Hamilton

Franklin

Essex

Essex

Chautauqua

Orange

Orange

Saratoga

Otsego

Wyoming

Wayne

Jefferson

Oswego

Saratoga

Chautauqua

Herkimer

Oswego

Oswego

NYS Drinking Water State Revolving Fund


DRAFT IUP Category C Hardship List for October 1, 2012 to September 30, 2013
System Name/
Borrower
Description
Pop.
Project Cost Score
LAFAVE ROAD WATER
DISTRICT / Le Ray (T)

Consolidation of existing public water systems with GUDI wells,


coliform and lead violations., New Distribution System, New System
Consolidation

600

WESTCOTTS WATER
DISTRICT / Hounsfield (T)

Westcotts WD to serve along NYS Route 3. Consolidation of PWS


systems addressing SWTR & E-Coli violations. , Upgrade Storage,
New Distribution System, New System Consolidation

300

INDIAN LAKE WD / Indian


Lake (T)

New Surface Water Treatment Rule Compliance Facility, Upgrade


Water Treatment Plant, New Ground Water Source, Upgrade
Distribution System

900

SARANAC LAKE V / Saranac


Lake (V)

New SCADA equipment., New Surface Water Treatment Rule


Compliance Facility, Upgrade Distribution System

PORT KENT WD /
Chesterfield (T)

New Surface Water Treatment Rule Compliance Facility, New Ground


Water Source, New Storage

WADHAMS WD / Westport
(T)

New Surface Water Treatment Rule Compliance Facility, New


Inter-Connection, New System Consolidation

FORESTVILLE VILLAGE /
Forestville (V)

New Surface Water Treatment Rule Compliance Facility, New Ground


Water Source, Upgrade Distribution System

PHEASANT HILL / Pheasant


Hill Water Corp

Rehabilitation of water system to address e-coli contamination,


Upgrade Water Treatment Plant, New Ground Water Source, New
Storage

154

BEAVER DAM LAKE WATER


CORP. / Beaver Dam Lake
Corp.

New Surface Water Treatment Rule Compliance Facility, New Ground


Water Source, New Storage, Upgrade Distribution System

487

STILLWATER VILLAGE /
Stillwater (V)

Alternative Water Source for Surface Water Treatment Rule


compliance., New Transmission, New Inter-Connection

UNADILLA VILLAGE /
Unadilla (V)

Install new well, pumphouse, controls, chlorination system to replace


GWUDI springs, New Surface Water Treatment Rule Compliance
Facility, New Ground Water Source, Upgrade Pump Station, Upgrade
Distribution System

1,350

CASTILE VILLAGE / Castile


(V)

Upgrade Water Treatment Plant, Upgrade Ground Water Source,


Upgrade Storage

1,135

SAVANNAH WD #1 /
Savannah (T)

New Surface Water Treatment Rule Compliance Facility, New


Storage, Upgrade Distribution System, Extend Distribution System

WATER DISTRICT NO. 5 /


Hounsfield (T)

Extend distribution system to area of insufficient yielding or


cantaminated private wells. Consolidate Watertown International
Airport., New Distribution System, New System Consolidation

HANNIBAL (T) / Hannibal (T)

Extend system to serve area with private contaminated wells,


consolidate public water supply. , Extend Distribution System, New
System Consolidation

1,200

MOREAU WD
7/CONNECTION TO SCWA /
Moreau (T)

Consolidate 3 small CWSs, consolidate WD 1, connect Town with


SCWA, New Storage, Extend Distribution System, New
Inter-Connection, Extend System Consolidation, New Water District

1,100

CHERRY CREEK VILLAGE /


Cherry Creek (V)

New Surface Water Treatment Rule Compliance Facility, Upgrade


Distribution System

VAN HORNESVILLE WATER


WORKS / Stark (T)

VanHornesville Water System, New Surface Water Treatment Rule


Compliance Facility, New Storage, Upgrade Distribution System

TOAD
HARBOR/CONSTANTIA WD /
Constantia (T)

New Surface Water Treatment Rule Compliance Facility, New


Storage, New Pump Station, New Distribution System, New
Inter-Connection, New System Consolidation

2,765

WATER DISTRICT #2 /
Richland (T)

New Surface Water Treatment Rule Compliance Facility, New Ground


Water Source, New Transmission, New Storage, New Distribution
System

1,662

Page 1 of 3

$0

Cumulative
Total

$0

NOTE: Short - Term Loan Closed, Project Cost Shown is


Remaining Balance Not Funded With Short Term Loan

$0

$0

NOTE: Short - Term Loan Closed, Project Cost Shown is


Remaining Balance Not Funded With Short Term Loan

$0

$0

NOTE: Short - Term Loan Closed, Project Cost Shown is


Remaining Balance Not Funded With Short Term Loan

5,800

$0

$0

NOTE: Short - Term Loan Closed, Project Cost Shown is


Remaining Balance Not Funded With Short Term Loan

202

$0

$0

NOTE: Short - Term Loan Closed, Project Cost Shown is


Remaining Balance Not Funded With Short Term Loan

140

$0

$0

NOTE: Short - Term Loan Closed, Project Cost Shown is


Remaining Balance Not Funded With Short Term Loan

804

$0

$0

NOTE: Short - Term Loan Closed, Project Cost Shown is


Remaining Balance Not Funded With Short Term Loan

$0

$0

NOTE: Short - Term Loan Closed, Project Cost Shown is


Remaining Balance Not Funded With Short Term Loan

$0

$0

NOTE: Short - Term Loan Closed, Project Cost Shown is


Remaining Balance Not Funded With Short Term Loan

1,572

$0

$0

NOTE: Short - Term Loan Closed, Project Cost Shown is


Remaining Balance Not Funded With Short Term Loan

$0

$0

NOTE: Short - Term Loan Closed, Project Cost Shown is


Remaining Balance Not Funded With Short Term Loan

$0

$0

NOTE: Short - Term Loan Closed, Project Cost Shown is


Remaining Balance Not Funded With Short Term Loan

900

$0

$0

NOTE: Short - Term Loan Closed, Project Cost Shown is


Remaining Balance Not Funded With Short Term Loan

345

$0

$0

NOTE: Short - Term Loan Closed, Project Cost Shown is


Remaining Balance Not Funded With Short Term Loan

$0

$0

NOTE: Short - Term Loan Closed, Project Cost Shown is


Remaining Balance Not Funded With Short Term Loan

$0

$0

NOTE: Short - Term Loan Closed, Project Cost Shown is


Remaining Balance Not Funded With Short Term Loan

650

$0

$0

NOTE: Short - Term Loan Closed, Project Cost Shown is


Remaining Balance Not Funded With Short Term Loan

372

$0

$0

NOTE: Short - Term Loan Closed, Project Cost Shown is


Remaining Balance Not Funded With Short Term Loan

$0

$0

NOTE: Short - Term Loan Closed, Project Cost Shown is


Remaining Balance Not Funded With Short Term Loan

$0

NOTE: Short - Term Loan Closed, Project Cost Shown is


Remaining Balance Not Funded With Short Term Loan

$0

Project County
17372

17306

17382

17457

16882

17140

Oswego

Jefferson

Allegany

Erie

Onondaga

St.Lawrence

NYS Drinking Water State Revolving Fund


DRAFT IUP Category C Hardship List for October 1, 2012 to September 30, 2013
System Name/
Borrower
Description
Pop.
Project Cost Score
MEXICO (T) WD#2 / Mexico
(T)

Extend distribution system to area with contaminated private wells


and consolidate PWS with GWUDI source, New Distribution System,
New System Consolidation

800

WATER DISTRICT #2 /
Henderson (T)

New Surface Water Treatment Rule Compliance Facility, New


Distribution System, New System Consolidation

352

HOUGHTON WATER
DISTRICT / Caneadea (T)

Upgrade Water Treatment Plant, New Ground Water Source, New


Transmission, Upgrade Distribution System

CHAFFEE WATER CO /
Chaffee Water Co.

New Surface Water Treatment Rule Compliance Facility, New Ground


Water Source, New Storage

LIMELEDGE WD / Marcellus
(T) & (V)

New Water District to serve area with insufficient private wells.


Interconnection with GWUDI system., New Surface Water Treatment
Rule Compliance Facility, Extend Distribution System

LOUISVILLE WATER
DISTRICT #2 / Louisville (T)

New Storage, Upgrade Distribution System, System Consolidation

$0

Cumulative
Total

$0

NOTE: Short - Term Loan Closed, Project Cost Shown is


Remaining Balance Not Funded With Short Term Loan

$0

$0

NOTE: Short - Term Loan Closed, Project Cost Shown is


Remaining Balance Not Funded With Short Term Loan

2,000

$0

$0

NOTE: Short - Term Loan Closed, Project Cost Shown is


Remaining Balance Not Funded With Short Term Loan

200

$0

$0

NOTE: Short - Term Loan Closed, Project Cost Shown is


Remaining Balance Not Funded With Short Term Loan

700

$0

$0

NOTE: Short - Term Loan Closed, Project Cost Shown is


Remaining Balance Not Funded With Short Term Loan

1,000

$0

$0

NOTE: Short - Term Loan Closed, Project Cost Shown is


Remaining Balance Not Funded With Short Term Loan

17163

Essex

TICONDEROGA WD /
Ticonderoga (T)

New Surface Water Treatment Rule Compliance Facility, New


Storage, Upgrade Distribution System

5,000

$13,954,315

$13,954,315

18061

Franklin

TUPPER LAKE V / Tupper


Lake (V)

New wells to replace SW source and inadequate DE plant., New


Ground Water Source, Upgrade Distribution System

5,500

$2,979,790

$16,934,105

16746

Allegany

CANASERAGA VILLAGE
PUBLIC WATER /
Canaseraga (V)

New Ground Water Source, Upgrade Storage

900

$3,666,749

$20,600,854

17497

Montgomery

AMSTERDAM (C) /
Amsterdam (C)

Upgrade Surface Water Treatment Rule Compliance Facility,


Upgrade Water Treatment Plant, Upgrade Water Treatment Plant,
Upgrade Water Treatment Plant

20,700

$737,000

$21,337,854

15003

Ulster

ELLENVILLE (VILLAGE)
WATER DIS / Ellenville (V)

Water system improvements, Upgrade Surface Water Treatment


Rule Compliance Facility, Upgrade Storage, Upgrade Distribution
System

4,323

$7,136,870

$28,474,724

17425

Chenango

SO. NEW BERLIN WATER


DISTRICT / New Berlin (T)

New Ground Water Source, New Transmission, New Storage,


Upgrade Distribution System, System Consolidation

400

$3,272,000

$31,746,724

17427

Albany

NEW SALEM WATER


DISTRICT / New Scotland (T)

New Surface Water Treatment Rule Compliance Facility, New


Storage, New Pump Station, New Inter-Connection, New Water
District

486

$3,048,000

$34,794,724

17442

Erie

BRANDT (T), NORTH


COLLINS (T)&(V) / North
Collins (V)

WTP improvements for lead and copper violations, Fe violations,


Asbestos Main replacement, inadequate pressures, Upgrade Water
Treatment Plant, Upgrade Transmission, Upgrade Distribution
System, New System Consolidation

1,915

$5,430,000

$40,224,724

17379

Steuben

COOPERS PLAINS/LONG
ACRES WATER SYST / Erwin
(T)

New Ground Water Source, Extend Distribution System, New System


Consolidation

1,400

$0

$40,224,724

17552

Herkimer

NEWPORT VILLAGE /
Newport (V)

New Surface Water Treatment Rule Compliance Facility, New Ground


Water Source, Upgrade Transmission, New Storage, Upgrade
Distribution System

740

$2,175,000

$42,399,724

16278

Hamilton

LONG LAKE (T) / Long Lake


(T)

New Ground Water Source, New Storage, Upgrade Distribution


System

750

$3,929,255

$46,328,979

18013

Cattaraugus

RANDOLPH VILLAGE /
Randolph (T)

East Randolph and Randolph (V)'s project includes meters, Upgrade


Other Expenses, New Surface Water Treatment Rule Compliance
Facility, New Ground Water Source, New System Consolidation,
Upgrade Other (OT)

1,250

$3,740,000

$50,068,979

17625

Oswego

EASTERN SHORE WATER


SYSTEM / Sandy Creek (T)

Consolidation of PWS with GWDI source., New Storage, New


Distribution System, New System Consolidation

2,503

$13,988,000

$64,056,979

17637

Chautauqua

NORTH END WD / Pomfret


(T)

Extend distribution system to area with contaminated private wells


and consolidate PWS with Coliform, New Distribution System

$4,432,100

$68,489,079

Page 2 of 3

900

Project County

NYS Drinking Water State Revolving Fund


DRAFT IUP Category C Hardship List for October 1, 2012 to September 30, 2013
System Name/
Borrower
Description
Pop.
Project Cost Score

Cumulative
Total

15996

Delaware

FRANKLIN VILLAGE /
Franklin (V)

New Water Treatment Plant, New Ground Water Source, New


Storage, Extend Distribution System, Upgrade Distribution System

481

$2,301,077

$70,790,156

16114

Cayuga

CAYUGA VILLAGE / Cayuga


(V)

New Surface Water Treatment Rule Compliance Facility, Upgrade


Distribution System, New Inter-Connection

600

$6,875,100

$77,665,256

17331

Rensselaer

POESTENKILL (T) WD #1 /
Poestenkill (T)

New Complete System (New System), New System Consolidation

2,300

$0

$77,665,256

17589

Cattaraugus

CRYSTAL WATER CO
(WEST VALLEY) / Ashford (T)

New Surface Water Treatment Rule Compliance Facility, Upgrade


Ground Water Source

880

$3,208,500

$80,873,756

18017

Allegany

RICHBURG VILLAGE
PUBLIC WATER / Richburg
(V)

(V) Richburg & (V) Bolivar Consolidation., New Surface Water


Treatment Rule Compliance Facility, New Ground Water Source,
Upgrade Storage, Upgrade Distribution System, New System
Consolidation

600

$7,038,640

$87,912,396

16510

Schenectady

DELANSON VILLAGE
WATER WORKS / Delanson
(V)

Upper resevoir raw water transmission main, new intake, new


controls & meters at filter plant., New Transmission, Extend
Distribution System, Upgrade Distribution System

428

$4,594,000

$92,506,396

17562

Jefferson

HERRINGS VILLAGE /
Herrings (V)

Distribution and storage improvements., Upgrade Storage, Upgrade


Distribution System

120

$3,429,000

$95,935,396

17629

Essex

ESSEX WD / Essex (T)

Address turbidity and organic violations, New Ground Water Source,


Upgrade Distribution System

300

$1,515,954

$97,451,350

17621

Allegany

ANGELICA VILLAGE PUBLIC


WATER / Angelica (V)

Surface Water Treatment Rule Compliance Facility

950

$1,061,847

$98,513,197

16618

Dutchess

SHOREHAVEN CIVIC
ASSOC / DCWWA

DCWWA ZONE J SHOREHAVEN WATER SYSTEM, Upgrade


Water Treatment Plant, Upgrade Ground Water Source, Upgrade
Distribution System

300

$3,575,000

$102,088,197

17623

Saratoga

CORINTH VILLAGE / Village


of Corinth

New Surface Water Treatment Rule Compliance Facility, Upgrade


Distribution System

4,700

$6,200,000

$108,288,197

17931

Cayuga

PORT BYRON VILLAGE /


Port Byron (V)

Joint project with (V) Port Byron, (T) Montezuma & (T) Mentz.,
Upgrade Distribution System, Extend Distribution System, New
System Consolidation

1,400

$5,657,000

$113,945,197

17454

St.Lawrence

EAST LOUISVILLE WD#3 /


Louisville (T)

Consolidation of water systems with past coliform detections., New


Storage, New Distribution System, New System Consolidation

1,030

$9,275,000

$123,220,197

18060

Orange

HIGHLANDS WATER
DISTRCIT 2 EXTENTION /
Highlands (T)

Extention of the existing WD #2 to serve private wells with


contamination and consolidation of several PWS's, Extend
Distribution System, Extend System Consolidation

1,379

$1,601,238

$124,821,435

17469

Montgomery

FORT PLAIN (V) WATER


WORKS / Fort Plain (V)

Upgrade Water Treatment Plant, Upgrade Ground Water Source,


Upgrade Storage, Upgrade Distribution System

2,400

$1,565,600

$126,387,035

17513

Essex

WINEBROOK HILLS WD /
Newcomb (T)

New Ground Water Source, Upgrade Distribution System

250

$5,302,728

$131,689,763

17622

Chautauqua

BROCTON VILLAGE /
Brocton (V)

Address turbidity violations, Surface Water Treatment Rule


Compliance Facility, Upgrade Water Treatment Plant

4,000

$3,295,000

$134,984,763

15749

Rensselaer

RENSSELAER CITY PWS /


Rensselaer (C)

New Storage, New Distribution System, System Consolidation

7,500

$7,175,300

$142,160,063

Total # Projects

Total Cost

58

$142,160,063

Page 3 of 3

ATTACHMENTS

TO THE INTENDED USE PLAN

FOR THE

NEW YORK STATE DRINKING WATER STATE

REVOLVING FUND

ATTACHMENT I

PROJECT PRIORITY RANKING SYSTEM

Project Priority Ranking System for the

Drinking Water State Revolving Fund (DWSRF)

(I) Priority Ranking System and Intended Use Plan


A. Priority Ranking System
The purpose of the priority ranking system is to establish a list of eligible projects to be funded in
a manner that the most serious risks to public health are given the highest priority. The New
York State Department of Health (NYSDOH) proposes that the highest priority be given to acute
public health risks, particularly those related to microbiological organisms. The next priority has
been given to situations that pose chronic and longer-term risks to consumers, such as organic
chemical contamination. The scoring criteria also considers issues that are related to
infrastructure upgrading or replacement. Consistent with these priorities, the numerical scores in
the Drinking Water State Revolving Fund (DWSRF) priority ranking system are based on the
following criteria:
Technical Factors
A. MCL/Treatment Technique Violations
B. Other Sanitary Code Violations
C. System Reliability/Dependability Issues
Non-Technical Factors
D. Governmental Needs
E. Financial Needs
The total numerical score for a project or a project segment will be the sum of the scores for
criteria A, B, C, D and E.
B. Intended Use Plan
The State will prepare a document called the Intended Use Plan (IUP) that describes how the
State intends to use available DWSRF resources for the year to meet the objectives of the Safe
Drinking Water Act (SDWA) and to further the goal of protecting public health. The IUP will
include specific detail on how the State will use all funds available. The IUP will also include a
list of projects expected to qualify for financing within the fiscal period addressed by the IUP. A
project must be listed in an IUP to be eligible for financing.

I-1

(II)Project Ranking
A. Special Allocations and Restrictions
The federal Safe Drinking Water Act Amendments of 1996 (SDWA) require that, on an annual
basis, water systems serving fewer than 10,000 persons must receive a minimum of 15% of the
DWSRF. This minimum allocation for systems serving less than 10,000 persons will occur to the
extent that there are a sufficient number of eligible projects to fund.
The SDWA also states that up to 30% of the annual DWSRF federal capitalization grant can be
used to give loan subsidies to disadvantaged communities.
The State of New York will impose an annual cap or ceiling of 50% of DWSRF resources that
can be received by any single applicant. In addition, the State may limit DWSRF financing to
the demonstrated annual cash flow needs of any single applicant.
The New York State Clean Water/Clean Air Bond Act of 1996 requires the development of a
Memorandum of Understanding among the Governor and Legislative Leaders regarding selection
of projects to be funded from the Drinking Water provisions of the Bond Act. Projects identified
in the Memorandum of Understanding will be incorporated into an annual funding list for Bond
Act financing in conjunction with projects selected according to the Priority Ranking System.
B. Project Ranking Categories
Projects will be placed in categories to allow priority ranking within a specific grouping of
projects. Federal legislation requires that, on an annual basis, a minimum of 15% of the DWSRF
be received by water systems serving fewer than 10,000 people. Also, water systems that qualify
for financial hardship have special conditions that require a separate category for these projects.
Therefore, three priority ranking categories will be created:
1. Category A. Water systems serving > 10,000 people.
2. Category B. Water systems serving < 10,000 people.
3. Category C. Water systems that have received written confirmation of
qualification for financial hardship assistance.
C. Description and Use of the Project Lists
Several lists of projects will be created to organize and manage projects with different levels of
priority and readiness. These listings will display the status of all projects in the system and
indicate the final list of projects that qualify for funding in the current IUP.
1. Multi-Year List:
This list will contain all eligible projects for which pre-application forms have
been submitted and reviewed. This list will contain projects from Categories A
and B. New projects can be added to this list on a continuous basis. Projects must
be on the Multi-Year List to be eligible for short-term loans when short-term loans
are made available.
I-2

Short-term loans for projects listed on the Multi-Year List will be limited to
projects that have a total numerical score greater than (or equal to) the project with
the lowest score (excluding bonus points awarded under Section II.E.2.) eligible to
be funded from the current Project Readiness List. Applications for short-term
loans, when available, will be approved on a first come/first served basis, up to the
total amount reserved in the IUP for that purpose.
NOTE: Short-term loans may not be offered in the initial years of the DWSRF
program.
2. Hardship List:
This list will contain all projects with written confirmation that they qualify for
financial hardship assistance (Category C). This written confirmation will be
limited to projects that have a total numerical score greater than (or equal to) the
project with the lowest score (excluding bonus points awarded under Section
II.E.2.) eligible to be funded from the current Project Readiness List. These
projects will be selected from the Multi-Year List. Written qualification for
financial hardship assistance will remain valid for two consecutive annual federal
funding cycles. If a project has not been selected for funding during this period, it
will be removed from the Hardship List (and re-listed on the Multi-Year List)
unless requalified for the Hardship List.
3. Project Readiness List:
This list will contain Category C projects and the projects from the Multi-Year List
which are anticipated to be ready for long-term financing during the effective
period of the IUP. Applicants for these projects are expected to apply for the funds
projected to be available during the fiscal period addressed by the IUP. Projects
from Categories A and B will be listed in descending order of total numerical score
(resulting from the Priority Ranking System Scoring Criteria).
4. Funding List:
This list will include all projects from the Project Readiness List expected to
qualify for long-term loans within a particular IUP. Projects will be listed
according to the three project categories. All Category C that are on the Project
Readiness List will qualify for funding. Projects in Category A will then be
selected from the Project Readiness List in priority order to meet the 15%
minimum requirement for water systems serving less than 10,000 people. All
remaining projects on the Project Readiness List will be selected in priority order
until the remaining annual DWSRF funding amount is encumbered. The project
selection is subject to Restrictions and Project By-pass Criteria in Sections II.A
and D of this document.

I-3

D. Project By-pass
Projects on the Project Readiness List can be by-passed, upon written notice, if any of the
following occurs:
1. Project is withdrawn by the applicant.
2. Project does not meet the dates and/or conditions in the project schedule or the
Project Financing and Loan Agreement.
3. The applicant has reached the 50% annual DWSRF resources cap for fundable
projects on the Project Readiness List. All other projects for the applicant that
would exceed the 50% cap will be by-passed.
E. Special Priorities
1. Emergencies:
An emergency is a catastrophic situation that results in an imminent threat to
public health. The determination of when an emergency exists will be made by the
NYS DOH. Imminent threats to public health include situations that result in the
unavailability of a source of potable drinking water for an extended period of time.
Projects designed to address emergencies will receive the highest priority ranking.
2. Projects with Prior Funding Agreements:
Projects with executed Project Financing and Loan Agreements for long-term and
short-term DWSRF loans will be given significant additional bonus points when
they are placed on the Project Readiness List. This will help to ensure the
availability of DWSRF financing needed for completion of on-going projects.
Phased or segmented projects for which additional funds have been conditionally
committed in an executed Project Financing and Loan Agreement (PFLA) for
long-term DWSRF financing will be listed, in descending priority score order.
These projects will be assigned 2000 points in addition to their total project
ranking system score.
Projects for which funds have been committed in an executed PFLA for short-term
DWSRF financing will be listed, in descending priority score order. These
projects will be assigned 1000 points in addition to their total project ranking
system score. Other projects will then be listed in descending priority score order.
F. Tie Breaking
In the event of a tie score for projects, the higher total score under Technical Factors (Criteria A,
B and C) will be used as a tie breaker. If this still results in a tie score, the size of the population
served by the system will be used as a tie breaker. The larger population will be given preference.

I-4

G. Eligible Project Limitation


Eligible projects are activities that address critical water system problems. The NYS DOH may
require separation of unrelated project components into separate projects if it is necessary to focus
on critical water system problems. These separate projects will be scored independently. Projects
must be adequately supported by technical documentation, data, reports, etc.
(III)

Priority Ranking System Scoring Criteria

The numerical scores in the DWSRF priority ranking system are based on technical and non
technical criteria. The technical criteria are A.) MCL/treatment technique violations; B.) Other
sanitary code violations; and C.) system reliability and dependability issues. The non-technical
criteria are D.) governmental needs and E). financial needs. The total numerical score for the
project or project segment being scored shall be the sum of the scores for criteria A, B, C, D and
E. Projects must be adequately supported by technical documentation, data, reports, etc.
Technical Factors
A. MCL/Treatment Technique Violations. Points awarded are based on treatment of MCL
exceedances and/or replacement with an alternate source of supply, and for
interconnection with, or purchase from adjacent water system(s) in lieu of treatment
(more than one item may apply):
1. Microbiological

Score
a) Surface Water Treatment Rule
i. Filtration

100
ii. Filtration Performance Criteria (NTU compliance)
50
iii. CT Disinfection
30
b) E. coli
80
c) Total Coliform
40
2. Organics
Organic chemicals (POC/UOC) and disinfection by-products
40
3. Lead and Copper/Corrosion (mandated)
30
4. Radiological
25
5. Inorganic/Physical
a) Nitrates
50
b) Other health-related
25
c) Aesthetic
10
B. Non-treatment Sanitary Code Violations (more than one item may apply):
The project need must be adequately supported by technical documentation, data,
reports, etc.
1. Inadequate Source Capacity (public health hazard)
2. Inadequate Distribution Pressure (public health hazard)
3. Uncovered Finished Water Storage (public health hazard)

I-5

50
25
25

C. System Reliability/Dependability Issues (more than one item may apply):


The project need must be adequately supported by technical documentation,
data, reports, etc.

Score

1. Complete replacement or major rehabilitation of existing


treatment facility for primary contaminants that has exceeded
design life and/or does not meet the design standards in the
current edition of Recommended Standards For Water Works.
In lieu of treatment, replacement with an alternate source of
supply, and/or interconnection with, or purchase from, adjacent
water system.

20

2. Upgrade, replace and/or install major vulnerable system


components to meet the design standards in the current edition
Recommended Standards For Water Works. Any of the
following apply.

10

a) A principal component integral to an existing filtration

process such as sedimentation, flocculation, filtration,

chemical feed, or backwashing (can only receive points

for Criteria C.2a. or C.1.)

b) Pump stations
c) Existing wells
d) Existing disinfection system for a groundwater/surface water supply
e) Transmission main
f) Finished water or distribution storage
g) Other water treatment systems for secondary contaminants only (or

replacement of source instead of treatment)

3. Aged mains and appurtenances


4. Redundancy of critical components
(pumps, valves, chemical feed-systems, etc.)
5. Asbestos main replacement
6. Control/automation for operational efficiency
(computerization, control valves, metering,
laboratory upgrading)
7. Inadequate source capacity which is not a public
health hazard (can only receive points for Criteria
B1 or C7)

I-6

5
5
5
5

Non-Technical Factors:

Score

D. Governmental Needs (more than one may apply)


Additional points will be assigned to a project on the basis of state or local
government needs, policies, and/or requirements.
1. Development of a water system or extending existing
system to service contaminated or insufficient
yielding private wells at existing residential housing
(new systems are not eligible for points under Criteria A,
B or C)

40

2. Consolidation of water systems (can include


improving technical, managerial and financial
capacity development)

25

3. System dependent on a Sole Source Aquifer for


its source. (These points can only be obtained if
system scores points from Criterion A, B, C.1. or C.2.g.)

25

4. A project that has received written commitment


of funding from another governmental source (e.g., co-funded
with Clean Water SRF, Rural Development, HUD, etc.)
These points do not apply to refinancing of projects.

10

5. Consistent with Water Resources Management Strategy

6. Proposes operational changes that improve and insure


adequate technical, managerial and financial capacity
of the system in order to insure compliance (guidelines
to be developed)

E. Financial Need
The Median Household Income (MHI) of the community in which the water service
area is located is used as a numerator and the Statewide MHI is used as the
denominator in the following equation to determine the financial need factor.
Community MHI x 100
Statewide MHI*
Factor
Points

= Factor

<70 >70 -<77.5 >77.5 - <85 >85 - <92.5 >92.5 - <100


25
20
15
10
5

>100
0

*2000 Statewide MHI is $43,393.


The MHI of the community in which the water service area is located and the Statewide MHI will be determined
from income data in the most recent United States census. If there is reason to believe that the census data are not
an accurate representation of the MHI within the area to be served, the reasons will be documented and the
applicant will furnish, or the Department may obtain, additional information regarding the MHI. Information will
consist of reliable data from local, regional, state or federal sources or from an income survey conducted by a
reliable impartial source.

I-7

Appendix A. Glossary of Terms

CT - The product of the free residual disinfectant concentration (C) in milligrams per liter determined
before or at the first customer, and corresponding disinfectant contact time (T) in minutes, expressed by
the formula (C) x (T) = CT. (10 New York Code of Rules and Regulations (NYCRR) Part 5, Subpart 5-1,
Public Water Systems.)
DWSRF - Drinking Water State Revolving Fund.
construction of drinking water projects.

A fund for financing, planning, design and

E. coli - Escherichia coli. A microscopic organism of fecal origin.


HUD - United States Department of Housing and Urban Development.
MCL - Maximum Contaminant Level. The maximum permissible level of a contaminant in water which
is delivered to any user of a public water system as specified in 10 NYCRR Part 5, Subpart 5-1, Public
Water Systems.
MHI - Median Household Income.
NTU - Nephelometric Turbidity Unit. The system under which measured turbidity is reported.
PFLA - Project Financing and Loan Agreement. An agreement between the NYS Environmental
Facilities Corporation and a loan recipient in order to provide financial assistance from the DWSRF for an
eligible project.
POC - Principal Organic Contaminant. Any organic chemical compound belonging to specific chemical
classes as described in 10 NYCRR Part 5, Subpart 5-1, Public Water Systems.
Primary Contaminants - Any contaminant for which a maximum contaminant level has been established
for protection of public health.
Secondary Contaminants - Any contaminant for which a maximum contaminant level has been
established for reasons other than protection of public health (i.e., aesthetic purposes such as taste, odor
and staining of fixtures).
Surface Water Treatment Rule - A regulation that requires that all surface water be treated in accordance
with 10 NYCRR Part 5, Subpart 5-1, Section 5-1.30, Public Water Systems.
UOC - Unspecified Organic Contaminant. Any organic chemical compound not otherwise specified in 10
NYCRR Part 5, Subpart 5-1, Public Water Systems.

I-8

ATTACHMENT II

ANTICIPATED INTENDED USE PLAN

SCHEDULE FOR THE

October 1, 2012 - SEPTEMBER 30, 2013

FUNDING PERIOD

Anticipated Intended Use Plan Schedule for the

October 1, 2012 to September 30, 2013 Funding Period

October 1, 2012

Start of the financing period

December 1, 2012

Cut-off date for receipt of complete


Hardship Applications by applicants seeking
grants

December 1, 2012

Cut-off date for receipt of complete


applications for non-hardship projects that
have been on the Project Annual List
(Formerly called Readiness List), above the
subsidized Funding Line for two or more
consecutive IUP periods

March 1, 2013

Cut-off date for receipt of complete


applications for subsidized financings from
this IUP

May 13, 2013

Cut-off date for receipt of complete


applications for unsubsidized financings
from this IUP

To be determined

Leveraged financing

September 30, 2013

End of financing period.

To be determined

Principal Payment Dates for Leveraged


Financing Projects. (Note: Principal and
Interest payments will be required in 2012
on new leveraged financings, and recipients
should contact EFC to discuss payment
schedules and redemption dates on BANs to
be refinanced with the DWSRF.)

II-1

ATTACHMENT III

FINANCING FEES
AND

FINANCING OPTIONS

Financing Fees

Issuance Costs
Fees associated with processing a DWSRF financing are based on the amount financed (i.e., project
costs). Issuance costs are calculated as follows:
Program Administration: This cost is calculated by multiplying the project costs by 1.1%. This fee is
used to support the administration of the DWSRF program. For non-hardship projects that receive shortterm financing, an administrative fee equal to 0.6% will be charged.
Direct Expenses: The direct expense is calculated by multiplying the project costs by 1.0%. Direct
Expenses represent the recipients proportionate share of EFCs costs to complete the transactions
necessary for a bond sale and include bond counsel costs, financial advisor fees, printing costs, rating
agency fees and trustee fees.
State Bond Issuance Charge: Public authorities that sell bonds, including EFC, must collect the State
Bond Issuance Charge. The State Bond Issuance Charge applies only to leveraged financings. The
Division of Budget approved an extension to the State Bond Issuance Charge waiver through March 31,
2011. The rate for leveraged financings through March 31, 2011 is determined as follows:
Financed Amount

Rate

$1,000,000 or less
$1,000,001 - $5,000,000
$5,000,001 - $10,000,000
$10,000,001 - $20,000,000
More than $20,000,000

0.168%
0.336%
0.504%
0.672%
0.840%

Maintenance Charge
An annual fee is charged to defray the cost of maintaining financing accounts during the life of the
financing. This fee is calculated as 0.11 percent of the outstanding financing balance.
Exceptions to the above fees apply to certain financings. EFC will work with the applicant to determine
the appropriate DWSRF financing type. Fees apply to the different types of DWSRF financing as
follows:
Long-Term Leveraged Financing

Program administration fee


Direct expenses
State bond issuance charge
Maintenance charge

Long-Term Direct Financing


Program administration fee
Direct expenses
Maintenance charge

III-1

Reduced Interest Rate Direct Financing

All fees waived

Short-Term Interest Free Financing

Program administration fee for non-hardship projects

Short-Term Market Rate Financing

All fees waived

SRF Bond Market Rate Program

Direct expenses
State bond issuance charge
Maintenance charge applies only if, and after, subsidy assistance becomes available

SRF Bond Guarantee Program

Direct expenses

Disbursement Requests
Once a financing has closed, the project funds not disbursed at closing will be available on a weekly
basis provided an acceptable disbursement request, supported with proper cost documentation, has been
submitted to EFC. Disbursement request forms will be included in the PFA that the recipient will
execute to obtain financing. The recipient should make certain proper financial coverage is in place in
the event that a disbursement is delayed, denied or adjusted.
Disbursement request forms can be submitted via:
1.

Mail to: NYS Environmental Facilities Corporation, 625 Broadway, Albany, NY 12207-2997

2.

Fax to: (518) 402-7085

3.
E-mail to: DisbursementRequests@nysefc.org. Note: This e-mail address should only be used for
the initial submission of each request and related documentation for the initial request. Follow-up
documentation or information should be sent directly to the assigned EFC analyst.
Further information about the disbursement request process is available in the Disbursement Request
Information Sheet which is one of the reference and guidance documents in the financing application
package.

III-2

Financing Options

The DWSRF provides short-term and long-term funding for eligible projects. In addition to the
traditional DWSRF interest subsidy for projects, the EFC has developed a second set of financing
options for projects that are either:
a) not reachable on the current Project Annual List (Formerly called Readiness List) in the
DWSRF IUP, or
b) need financing for eligible project costs above the subsidized amount available on the Project
Annual List (Formerly called Readiness List).
Please keep the following in mind:
All projects should be listed on the IUP Project Annual List (Formerly called Readiness List).
No financings may be for a term in excess of the useful life of the project.
The by-pass process may impact the availability of financing (see IUP for further information).
A project below the subsidized funding line but ready for financing may be financed with the
long-term market-rate or short-term market-rate options, which then may be automatically
converted to interest-subsidized financing if a project becomes reachable following the by-pass
process.
In addition to the Financing Options in the attached matrix, for projects that demonstrate a need for
hardship financing (see the IUP), the DWSRF provides for reduced interest rate financings (as low as
interest-free) and, for qualified projects, grants, to the extent that funds are available. In addition, the
SRF Bond Guarantee Program may be used to provide preferred AAA/Aaa rates for recipients issuing
bonds independently to finance SRF projects.
Short-term financing with either the short-term market-rate or the short-term interest-free program is
intended to provide a seamless transition for project financing (minimizing or eliminating the need for
other funding sources).

III-3

DWSRF Financing Options Matrix


Timing

Long-Term

Option

1. Bond Market Rate

SRF
Project Score

Below the subsidized


Funding Line

Short-Term

2. Subsidized3. Extended Term


Interest
Above the subsidized Funding Line

Benefit

AAA/Aaa Borrowing Rates


Plus 1/3rd interest rate subsidy for 20 years from project
completion

AAA/Aaa Borrowing
Rates

4 Market-Rate

5 Interest-Free

Below the subsidized


Funding Line or for project
costs above the amount
available interest-free

Above the
subsidized
Funding Line

AAA/Aaa Borrowing Rates,

0% Interest

Based on SRF borrowing


costs in the high-grade taxexempt short-term
municipal markets
None

No Interest
Expense

principal amortization may be


extended from 20 up to 30 years
(years 21-30 at unsubsidized Market
Rate)
Economies of scale in pooled bond issue
Interest Rate
Subsidy
Timing
Fees
(as a % of
SRF-Financed
project costs
unless
otherwise
noted)
Availability

Project Status

Not Available Initially,


becomes available in the
year the project score is
above a future funding line

Available from
Closing

Available from Closing

a. 1.0% Direct Expenses


b. Sliding Scale State Bond Issuance Charge
c. Maintenance charge on
outstanding balance (0.25%
if interest-subsidy is
provided)

0.6% Program
Admin Fee

c. 0.11% Maintenance charge on outstanding balance


d. 1.1% Program Admin

Ongoing, may be financed pursuant to a pool schedule.


Repayment term up to 30
Repayment term up to 20
Repayment term up to 30
years from project
years from project
years from project
completion
completion
completion
Final costs known; Project approvals in place.
Plans and Specifications, major contracts awarded, permits in place.

III-4

Available for up to 3 years or readiness for longterm financing, whichever is sooner, for a
recommended minimum term of six months.
Approved Engineering Report, environmental
review completed and other approvals as
necessary for short-term financing. Once final
costs are known, the project will be considered for
long-term financing.

ATTACHMENT IV

DRINKING WATER STATE REVOLVING FUND

LISTING FORM

(FORMERLY CALLED THE PRE-APPLICATION)

Drinking Water State Revolving Fund (DWSRF) Listing Form


Preliminary Project Schedule And Cost Estimate
For DWSRF Intended Use Plan (IUP) Listing Purposes
(Instructions on Back)

Date Prepared:
/
/

DOH Use Only


PWS I.D. No. _______________
Project Tracking No. _________
Date Received: ____/_____/___

Name of Water System: _____________________________________ PWS I.D. No.


Municipality:

County:
Construction Costs

$_________________

Engineering Fees

$_________________

____________________________________________________________________________________________

Other Expenses

$________________

Population Served by Water System:___________________Population Served by Project: ____________________

Equipment Costs

$_________________

Has this project been listed in a DWSRF Intended Use Plan (IUP)? Yes or No.

If yes, please indicate the DWSRF project tracking number: ______________________

Land Acquisition

$_________________

Are there other funding sources anticipated for the project: Yes or No.

If yes, please attach information on the source of funding, amount of funding, type of funding, and letter of confirmation.

Subtotal Project Costs

$_________________

Deduct other funding


sources (HUD, RD, etc.)

$_________________

Legislative Districts - Congressional:_________ NYS Senate:___________ NYS Assembly:


Project Description/Location:

CONTACT INFORMATION
Name of Borrower: __________________________________Consulting Engineer: __________________________

Contingencies (___% used) $_________________

Contact Person, Title: ________________________________Contact Person, Title: _________________________

Add Est. Issuance Costs


$_________________
(Estimated issuance costs are
approximately 3% of project costs)

Address: __________________________________________ Address: ___________________________________

Total Amount to Finance

$_________________

Phone #: __________________________________________ Phone #:________________________

Fax#: _____________________________________________ Fax #: __________________________

E-Mail Address: ____________________________________ E-Mail Address: _______________________________

______________________________
PROJECT SCHEDULE

DATES
(T)TARGET OR (A) ACTUAL

1. Submit Engineering Report.

( ) __________

2.When will all Technical Submittals be completed?

( ) __________

(Date)
(Date)

2. Start of construction date (date Notice to Proceed was issued)?

) __________
(Date)

3. Is this project being submitted for Refinancing? Y


es or No (circle correct response)
(Date)__________
If yes, Construction Completion Date (actual date)?

Please return completed form to:


New York State Department of Health
Bureau of Water Supply Protection
547 River Street,Flanigan Square, Room 400
Troy, New York 12180
Phone: (518) 402-7650

Fax:
(518) 402-7659

INSTRUCTIONS
LISTING FORM (FORMERLY CALLED THE PRE-APPLICATION), DWSRF PROJECT SCHEDULE AND COST ESTIMATE
This form is used to gather preliminary schedule and cost information about your project. It will help us to determine
project eligibility and a target date for providing your DWSRF loan. New York State Department of Health (DOH) staff
may call you to verify this information and to develop a more detailed schedule for completion of all activities needed
for a complete loan application. You should confer with your engineer and financial advisor regarding the schedule and
cost estimate. If you have questions regarding the Listing Form (Formerly called the pre-application) form, please call
DOH at 1-800-458-1158 (within NYS State) or (518) 402-7650 for assistance.
PROJECT INFORMATION
This section of the form should include the Name of the Water System, Name of the Municipality serviced by the
water system, and the County and Legislative Districts in which the project is located. A Project Description and the
Location of the project should also be included (e.g., Construct new water treatment plant at 69 Mill Road in Village of
Waterburgh). The applicant should provide information regarding the Population Served by the Water System and
the Population Served by the Project.
Has the project been listed in a previous DWSRF Intended Use Plan (IUP)? If a Listing Form (Formerly called the
pre-application) has previously been submitted it is not necessary to complete an additional application form. If project
information, contact information, actual or targeted activity dates, or project cost estimates previously submitted have
changed, the applicant may wish to submit a revised Listing Form (Formerly called the pre-application) form. If so,
please include the DWSRF project tracking number.
Indicate if other funding sources (i.e., Rural Development, Housing and Urban Development, etc.) are available for the
project. If other sources of funding are available please attach a separate sheet of paper and include the funding source,
funding amount, type of funding (i.e., grant, low interest loan), and date the funding was granted (letter of confirmation).
CONTACT INFORMATION
DOH will be using the contact information provided on the Listing Form (Formerly called the pre-application) form to
identify the borrower, the consulting engineer, and other key project contacts (if applicable). Individuals listed on this
portion of the Listing Form (Formerly called the pre-application) form may be contacted directly by DOH staff to
answer technical questions.
PROJECT COST ESTIMATE
The accuracy of project costs will vary depending on the stage of project development. Please use the best available
estimate when completing the form. Cost estimates should be provided for Construction Costs, Engineering Fees
(planning fees, design fees, and construction fees), Other Expenses (legal expenses, bond counsel costs, force account
costs, fiscal expenses, interest during construction, and miscellaneous expenses), Equipment Costs, Land Acquisition
Costs, and Contingencies. Financial assistance anticipated from other Funding Sources (Rural Utilities, Housing
and Urban Development, etc.) should be subtracted from the Subtotal Project Costs of the above listed cost estimates.
The Estimated Issuance Cost (approximately 3% of project costs) should be added to the subtotal to determine Total
Amount to Finance. If certain cost elements are unknown and cannot be reasonably estimated, please indicate on the
form. Estimates for all expenses will eventually be needed so that sufficient monies for the project are included in the
IUP.
PROJECT SCHEDULE
1. Provide the date (targeted or actual) when an approvable Engineering Report and all Technical Submittals will be
completed. Required Technical Submittals include environmental review documents and findings, final plans and
specifications, engineers certification of technical requirements, certification of title to project sites, Minority &
Womens Business Enterprise - Equal Opportunity (M/WBE-EEO) program documents. Additionally, the borrower
should contact DOH and other responsible permitting agencies (e.g., New York State Department of Environmental
Conservation) for anticipated review and issuance times. Please contact EFC for applicable loan application
deadlines and anticipated loan closing dates.
2. Provide the date (targeted or actual) of Start of Construction (i.e., date Notice to Proceed was issued). Although the
construction schedule may be very tentative when you complete the Listing Form (Formerly called the preapplication), it is important to set target dates as they indicate when DWSRF financing will be needed.
3. Indicate if the project is being submitted for Refinancing. If the project is being refinanced, include the actual date
of Construction Completion.

ATTACHMENT V

DRINKING WATER STATE REVOLVING FUND

PUBLICALY OWNED APPLICATION CHECKLIST

The application checklist includes a list of all application items that may apply to a
DWSRF project. The checklist includes boxes to indicate which items have been
submitted to DOH and EFC. There are two (2) application checklists: one for publicly
owned projects, which follows, and one for privately owned projects. The checklists are
also available on the EFC web site at www.nysefc.org and click on "Drinking Water State
Revolving Fund", then "Application Process" then DWSRF Application Materials for
either: Publicly-Owned Municipal Systems or Privately-Owned Systems

New York State Environmental Facilities Corporation


625 Broadway Albany, New York 12207-2997
(800) 882-9721 within New York State
(518) 402-6971 Fax (518) 402-6972

APPLICATION CHECKLIST PUBLICLY-OWNED SYSTEMS


NEW YORK DRINKING WATER STATE REVOLVING FUND
This document lists items that relate to applying for financing through the Drinking Water State
Revolving Fund (DWSRF). The type of financing and the status of the project to be financed will
determine which items will be required to be submitted as part of a DWSRF financing
application. Since all items may not be required to apply for financing, it is important that
an Environmental Facilities Corporation (EFC) representative confirm with you which
items do apply. If someone has not reviewed this Checklist with you, please contact EFC
at (800) 882-9721 or (518) 402-7085. This will save you time and effort.
Part I details the minimum requirements to obtain a DWSRF short-term financing
commitment. Part II details the requirements that may be necessary to release DWSRF
short-term funds or obtain a DWSRF long-term financing commitment. Items in Part II of
this Checklist may be submitted to EFC if they are available when submitting Part I items.
Please keep a copy of the completed form for your reference.
An explanation of each of these items is provided in the Description of Application
Components, found in the paper version of the application package and on EFCs website at
www.efc.ny.gov (Click on Drinking Water State Revolving Fund, then Application Process).
DWSRF application Forms and Guidance are also available on EFCs website.
Please Note: The following important steps should have been accomplished. If not,
please contact EFC before proceeding to work on the financing application.
1. Your project is listed on the Project Readiness List, as published in the current
DWSRF Intended Use Plan (IUP). An engineering report or construction plans and
specifications for your project should have previously been submitted to the
Department of Health (DOH) for your project to be listed on the Readiness List.
2. DOH has approved your engineering report or construction plans and
specifications, or the report is under review by DOH.
3. The potential adverse environmental and historic preservation impacts of the
project have been assessed in the manner prescribed by the DWSRF.
4. A water district has been established or expanded, or the maximum amount to be
expended for such district increased, and Office of the State Comptroller (OSC)
approval obtained, as needed (this is only applicable to towns and counties).

5. A bond resolution has been adopted establishing the legal authority to issue debt
for the project.

DWSRF Application Checklist


PUBLICLY-OWNED

Page 1

10/14/11

Applicant Name:

DWSRF Project No.:

Date Prepared:

APPLICATION CHECKLIST PUBLICLY-OWNED SYSTEMS


Please call EFC to review the Checklist at the beginning of the application process.
DOH/EFC Project Team Members
DOH Engineering:

EFC Finance:

EFC Legal:

EFC MWBE:

(Team member names will be provided after your application is submitted.)

PART I Items Necessary Prior to Short-Term Financing Commitment


Please submit items in Part I in order to close a DWSRF Short-Term financing.
Items in Part II can be submitted with Part I items if they are currently available.
Check the appropriate boxes below.
Submitted Earlier
No.

Checklist Item

1.

Application Form 1

2.

Municipal Bond Resolution(s)


a) Bond Resolution (Certified Copy)
b) Proof of Publication of Permissive Referendum (if applicable)
c) Proof of Publication of Estoppel Notice

3.

Environmental Review Documents and Findings 2


(see SEQR/SERP guidance in the Environmental Review
Requirements )

Submitted with
this Application

OPRHP / SHPO Project Review Letter 2

(Initial or Final Letter)

4.

Engineering Services Contract


a) Executed Contract (for eligibility review)
b) MWBE Utilization Plan or Good Faith Effort Documentation
for Contract (for MWBE approval)

5.

Financial Information
(Only for Applicants other than counties, cities, towns and
villages)
Financial statements (audited if available) for the three (3) most
recent fiscal years.

DWSRF Application Checklist


PUBLICLY-OWNED

Page 2

10/14/11

No.

Checklist Item

Submitted
Earlier

6.

Intermunicipal Agreements
(draft or final agreements critical to the project)

7.

Co-funding Documentation
a) Awarded Grants
b) Closed Third Party Loans
c) Co-funding Cost Documentation

Submitted
with this
Application

Not
Applicable

Please call EFC to review the Checklist at the beginning of the application process since
all items listed below in Part II may not apply to your specific project.

PART II Items That May Be Necessary Prior to Funds Disbursement or for


Long-Term Financing
Some of the items in Part II will be needed by EFC after closing a short-term financing to allow
release of DWSRF funds and later to roll your project into DWSRF long-term financing. The
type of financing and the projects schedule and status at the time of application will determine
which of the following items are required for release of disbursements and as part of a complete
application for DWSRF long-term financing.
The disbursement of funds will be contingent upon satisfactory completion of the following
items, as deemed applicable by EFC. Timely availability of DWSRF funds will be dependent, in
part, upon the accuracy and completeness of these submissions, within a reasonable time
frame for EFC to review and comment or request clarification, as necessary. For this reason,
applicants are strongly encouraged to develop and submit these materials as soon as
practicable, to avoid delayed release of disbursement requests.
Please call EFC to discuss which of the following items apply.
Check the appropriate boxes below.
Submitted Earlier
No.
1.

Checklist Item
Completed Application Checklist 1

2.

Supplemental Municipal Bond Resolution (if needed)


a) Supplemental Bond Resolution (Certified Copy)
b) Proof of Publication of Permissive Referendum
(if applicable)
c) Proof of Publication of Estoppel Notice

3.

Financial Information
Current Adopted Capital and Operating Budgets

4.

OPRHP / SHPO Final Project Review Letter 2

DWSRF Application Checklist


PUBLICLY-OWNED

Page 3

Submitted with this


Application

10/14/11

No.

Checklist Item

Submitted
Earlier

5.

Capacity Development Form1


(for small community water systems serving a population
of 3,300 or less)

6.

Consolidation Plan, Agreements and Approval

7.

Construction Plans and Specifications

8.

Agreements for Professional Services


a) Engineering Planning Services
b) Engineering Design Services
c) Engineering Construction Services
d) Local Counsel
e) Bond Counsel
f)
Financial
g) Other (please specify)

9.

Certification as to Title to Project Site1

10.

Lease Agreement to Project Site

11.

Municipal Service Agreements


a) Intermunicipal Agreements (final agreements)
b) Private Operating Agreements
c) Private Use Agreements

12.

Work Force Documentation 1


a) Technical Certification & Proposal
b) Administrative Proposal

13.

Executed Construction Contracts


Contract Change Orders

14.

MWBE Utilization Plan or Good Faith Effort Documentation


(for executed construction contracts)

15.

Notice to Proceed

16.

For Reimbursement of Interfund Borrowings:


a) Interfund Borrowing Resolution (Copy)
b) Cost Documentation (Interfund Borrowings)

17.

For refinancing of existing debt, please attach the following


supporting documents as applicable:
a) Municipal Resolution Authorizing Debt (Original)
b) Bond Anticipation Note (BAN)
c) Opinion of Bond Counsel
d) Official Statement
e) Refunding Resolution (Copy)
f)
Proof of Publication of Estoppel Notice for Resolution
g) Cost Documentation (Refinancing)
h) Statement Specifying Net Interest Earned or Anticipated

Submitted
with this
Application

Not
Applicable

Questions regarding engineering and technical items should be addressed to DOH at (800) 4581158 ext. 27650 or (518) 402-7650.
1
2

Form included in Application Package.


Guidance included in Application Package.

DWSRF Application Checklist


PUBLICLY-OWNED

Page 4

10/14/11

ATTACHMENT VI

OUTPUT AND OUTCOME MEASURES

Environmental Results Grant Requirements

As required by EPA Order 5700.7, Environmental Results under EPA Assistance Agreements,
New York will provide the following output and outcome measures in its DWSRF
Biennial/Annual Reports. NIMS, and the IUP:
NATIONAL REPORTABLE OUTPUTS/OUTCOMES FOR DWSRF
1. The annual percentage of assistance agreements to bring entities into compliance.
2. Fund utilization rate [cumulative financing agreement dollars to the cumulative funds
available for projects] for the DWSRF.
3. Return on Federal Investment [cumulative dollar amount of assistance disbursements to
projects divided by cumulative federal outlays for projects].
4. The cumulative number of project completions.
ANTICIPATED OUTPUTS FOR DWSRF
1.
2.
3.
4.
5.
6.

Number of binding commitments (20).


Number of financing agreements (20).
Number of assistance agreements for system compliance (30).
Number, dollar amounts, and/or population served of projects financed (50/$150M).
Our fund utilization rate remaining higher than the national average.
Our rate at which projects progressed as measured by disbursements as a percent of assistance
provided remaining at or higher than the national average.

ANTICIPATED OUTCOMES (SHORT-TERM/LONG-TERM) FOR DWSRF


1. Number of projects initiating operation resulting in improved compliance (15).
2. Improved compliance for systems receiving DWSRF assistance.
ANTICIPATED OUTPUTS FOR SET-ASIDES
1. Small System Technical Assistance
Number of systems receiving training (600).
Number of systems receiving on-site technical assistance (100).
2. State Program Management
Data management system maintained.
State required updates to primacy made.
3. Source Water Protection Program
Number of source water strategies in place and implemented (15).
4. Capacity Development Program
Implement statewide strategy.
ANTICIPATED OUTCOMES (SHORT-TERM/LONG-TERM) FOR SET-ASIDES
1.
2.
3.
4.

Improved compliance for systems receiving Technical Assistance.


Attainment of primacy for new rules.
Improved data quality.
Improvement to capacity development baseline.
VI-1

ATTACHMENT VII

Public Hearing and Public Comment Information


Public Meeting and Hearing:
A joint public meeting and hearing to review the draft FFY 2013 CWSRF IUP and

DWSRF IUP will be held on Tuesday, August 14, 2012, at 10:00 a.m. in the Stedman

Room of the William K. Sanford Town Library in the Town of Colonie, Albany County.

The Library is located at 629 Albany Shaker Road, approximately mile east of Exit 4

off I-87. Pre-registration is not required. Reasonable accommodations will be provided

for disabled persons if requested in advance.

Webinar:

NYS EFC and NYS DOH will host a webinar on Wednesday, August 15, 2012,

at 10:00 a.m.. This event will present an overview of the 2013 IUPs for the CWSRF and

the DWSRF and will provide an opportunity for the public to ask questions about the

IUPs and the program.

Log-on instructions for this webinar will be posted on NYS EFC's website at:
www.efc.ny.gov.

Public Comment Instructions:


The NYS DOH will accept comments on the FFY 2013 Draft DWSRF IUP until
September 10, 2012, 5:00 p.m. EST.
Comments should be sent to:
Mr. Michael Montysko, P.E.
Design Section Chief, Bureau of Water Supply Protection
NYS Department of Health
Flanigan Square, 547 River Street, Room 400
Troy, New York 12180-2216
FAX: 518-402-7659
bpwsp@notes.health.ny.us
(If comments are sent by email please reference 2013 Draft IUP comments in the subject line)

ATTACHMENT VIII

NYSDOH Central Office DWSRF Contacts