MM Certification Questions
1. Which of the following are examples of Organizasional elements in SAP?
1A Company Code
1B Material
1C Vendor
1D Purchase Organisation
1E Plant
A D E
MASTER DATA
2. A material master has been created for material 1234 in Plant 1000. You want
to extend the
material master to Plant 1100 for Purchasing, Storage and Accounting. Which tra
nsaction would you use?
3. You wish to procure a material using a Purchase Order. You wish to take deliv
ery of the material
at different times. A graduated discount scale exists for the material. How do
you proceed if you wish to
take advantage of the discount arrangement?
3A Enter several order items with the same material number and different deliver
y dates.
3B Enter one order item with the material number and assign the material to diff
erent accounts.
3C Enter an order item with the material number and create a number of schedule
lines.
3D Enter a number of purchase orders for the material and specify different deli
very dates.
3E Enter an order item with the material number and in the Purchase order header
text field you specify the delivery dates and discount scales.
4. To view the most up to date planning data (available stock, orders, reservati
ons, etc.) on
a material, use the:
(more than one answer can be correct)
4A
4B
4C
4D
4E
4A 4D
5. A material forecast can be used by the following MRP types:
(Only one answer is correct)
5A
5B
5C
5D
5E
5c 5d
6. Materials planning can be set to automatically generate:
6A
6B
6C
6D
Contracts.
Purchase Requisitions.
Purchase Orders.
Planned Orders.
6E Delivery Schedules.
BDE
7. The following are lot sizing rules available for SAP R/3:
7A
7B
7C
7D
7E
ABCD
PURCHASING
8A
8B
8C
8D
8E
Purchase Requisitions.
Purchase Orders.
Quotations.
Contracts.
Source Lists.
8C 8D 8B
9. Which of the following apply to Purchase Orders?
10A
10B
10C
10D
10E
Material Group.
Purchase Requisition.
Sales Order.
Release Code.
G/L Account
CE
11. Which of the following are Item Categories?
11A
11B
11C
11D
11E
Consignment.
Service.
Manufacturing.
Cost Centre.
Subcontracting.
ABE
12. Which of the following documents can be subject to release (approval) proced
ure?
12A
12B
12C
12D
12E
Planned Order.
Purchase Requisition.
Scheduling Agreement.
Purchase Order.
RFQ.
BCDE
13. In Source lists the following can be sources of supply:
13A
13B
13C
13D
13E
Vendor.
Contract.
Scheduling Agreement.
Quotation.
Quota Arrangement.
ABCE
14. With automatic source determination, in which sequence does the SAP R/3 syst
em
search for possible sources of supply?
14A
14B
14C
14D
14E
14C
15A
15B
15C
15D
15E
RFQ.
Purchase Order.
Service Entry Sheet.
Purchase requisition.
Contract.
ABDE
16. Which of the following document types can appear in the purchase order histo
ry for a purchase order line item?
16A
16B
16C
16D
16E
BCD
17. in which ways can purchase requisitions be created?
17A
17B
17C
17D
17E
From contracts.
From source lists.
From material requirements planning.
Manually.
From delivery schedules.
CD
18. A vendor has agreed to give your company a discount on all purchases during
the festive season.
What would be the quickest way of specifying this discount?
18A Maintain the pricing conditions in all information records with the vendor t
o indicate the discount.
18B Maintain the pricing condition in all contracts with the vendor to indicate
the discount.
18C Maintain the pricing conditions in the vendor master record to indicate the
discount.
18D Maintain all source lists that uses the vendor to indicate the discount.
18E Maintain extended conditions against the vendor to indicate the discount.
18E
19. A purchase order has been placed with a vendor for 100 pieces of material 12
34.
An over delivery tolerance of 5% has been specified for the material. The vendo
r has
already delivered 20 pieces of material 1234 against the purchase order. When p
osting the
next goods receipt against the purchase order, the SAP system will propose the f
ollowing
quantities of material 1234 for goods receipt:
19A
19B
19C
19D
19E
0 pieces.
85 pieces.
20 pieces.
100 pieces.
80 pieces.
19E
20. A purchase order has been placed with a vendor for 100 pieces of material 12
34.
An over delivery tolerance of 5% has been specified for the material. The vendor
has already delivered 95 pieces of material 1234 against the purchase order.
The delivery complete indicator has been set for the material in the purchase o
rder.
When posting the next goods receipt against the purchase order, the SAP
system will propose the following quantities of material 1234 for goods receipt:
(Only one answer is correct)
20A
20B
20C
20D
20E
0 pieces.
100 pieces.
10 pieces.
5 pieces.
No goods receipt will be allowed against the purchase order.
20D
Rest of questions in next post
Last edited by SAPman : 11-27-2005 at 12:13 PM.
Reply With Quote
SAPman
View Public Profile
Send a private message to SAPman
Visit SAPman s homepage!
Find all posts by SAPman
#2
Old 11-27-2005
SAPman SAPman is offline
Willem Hoek
21A
21B
21C
21D
21E
The
The
The
The
The
22A Contracts.
22B Purchase orders.
22C Source lists.
INVENTORY MANAGEMENT
23A
23B
23C
23D
23E
24. Stocks can be withdrawn from the stores for consumption to a cost centre:
24A
24B
24C
24D
24E
From
From
From
From
From
25. Normal stock items that are received with reference to a purchase order can
be received into:
25A
25B
25C
25D
25E
26. Which of the following stocks belong to a vendor, but are stored on your com
pany s premises?
26A
26B
26C
26D
26E
27. Which of the following stock types can be counted through Physical Inventory
procedure?
27A
27B
27C
27D
27E
28. A cost centre has reserved a quantity of a stock item for issue. When issuin
g the stock with reference to the reservation, the following quantity is propose
d:
28A
28B
28C
28D
28E
MATERIAL VALUATION
29. Which of the following cab possibly influence the valuation price of a movin
g average priced material?
29A
29B
29C
29D
29E
REPORTS
30A
30B
30C
30D
30E
Define default report formats such as column width and sort sequence.
Save reports.
Automatically execute reports.
Combine multiple reports into a summarized report.
Store user defined selection criteria for reports and analysis.
31A
31B
31C
31D
31E
Plant.
Material.
Order quantity.
Month.
Total stock value.
GENERAL
32. In the SAP system a user can operate in the following hierarchies.
32B
32C
32D
32E
Application level.
Main menu level.
Month.
Total stock value.
ORGANIZATIONAL STRUCTURES
33. In cross plant procurement a purchase organisation procures material and ser
vices for:
33A
33B
33C
33D
33E
34A
34B
34C
34D
34E
35A
35B
35C
35D
35E
CLASSIFICATION
36A
36B
36C
36D
36E
Object value.
Class.
Item.
Object.
Characteristic value.
MATERIALS PLANNING
37A
37B
37C
37D
37E
The
The
The
The
The
38A
38B
38C
38D
38E
It
It
It
It
It
can
can
can
can
can
only be converted
be converted into
only be converted
be converted into
be converted into
in to a production order.
a purchase order.
into a purchase requisition.
a purchase requisition or purchase order.
a purchase requisition or production order.
39. Which of the following are true about Consumption Base Planning?
39A
39B
39C
39D
39E
40. Your planning department is using a Forecast Model for materials planning. I
t has been established that while demand for the particular material is projecte
d to increase steadily as market share is increased, the fluctuating tourist dem
and will affect the overall requirements. Which forecast model will best address
this requirement?
40A
40B
40C
40D
40E
The
The
The
The
The
Constant model.
Constant trend model.
Seasonal trend model.
Fluctuating trend model.
Seasonal model.
41A
41B
41C
41D
41E
PURCHASING
42. Which of the following statements are true with regard to RFQ s and Quotations
?
42A
42B
42C
42D
42E
43. In the SAP system, the reference document used in the purchasing cycle is th
e:
SAP PI Interview Questions and SAP PI Tutorials
SAP PI Interview Questions and SAP PI Tutorials
43A
43B
43C
43D
43E
Purchase requisition.
Info record.
Source list.
Purchase Order.
None of the above.
44. Which of the following statements are true about SAP purchasing documents?
44A
44B
44C
44D
44E
45A Only purchase requisitions, purchase orders, RFQ s and contracts can be blocke
d.
45B Blocked purchase orders can be sent to vendors but the order cannot be recei
pted.
45C More than one user may be required to release the document.
45D Blocked documents can be released collectively or individually.
46A An info record, quotation and outline agreement conditions are master condit
ions.
46B Conditions are item specific.
46C Master conditions can be set for a future date.
46D Conditions determine the effective price of a material.
46E A special anniversary discount from a vendor could be an extended condition.
47. In SAP purchasing contracts, which of the following statements are true?
47A A value contract has a validity period but a quantity contract has not.
47B Contracts can only be created referencing an RFQ, another contract or requis
ition.
47C Item category M (material unknown) cannot be used for value contracts.
47D When creating a release order, item categories M and W must be deleted.
47E A centrally agreed contract can be used to negotiate better prices from a ve
ndor.
48. As of SAP release 4.0, the following are true for scheduling agreements:
48A
48B
48C
48D
48E
49A
49B
49C
49D
49E
Manually.
While creating a contract.
Automatically.
With reference to a purchase order.
from another source list.
50A
50B
50C
50D
s.
50E
51. Your organisation has purchasing agreements with more than one supplier of a
particular material. When using automatic source determination on SAP system:
51A
51B
51C
51D
51E
52. Your system is configured to support your buying department in automatic sou
rce determination. Which of the following statements are true?
52A
52B
52C
52D
52E
53. Purchase requisition 0100000023 has been created. You wish the system to con
vert this requisition automatically into a purchase order. After running the tra
nsaction you receive an error. What are the possible reasons for the error.
53A
53B
53C
53D
53E
54A
54B
54C
54D
54E
55. When creating a vendor master record, the account group determines, among ot
her things:
55A
55B
55C
55D
55E
56. When creating a purchase order for a material with a material master record:
56A
56B
56C
ny.
56D
56E
INVENTORY MANAGEMENT
57. In the SAP system, which of the following activities are covered by inventor
y Management?
57A
57B
57C
57D
57E
Goods issues.
Goods Receipts.
Reservations.
Consignment.
Subcontracting.
58. A delivery arrives at your warehouse for which no purchase order exists. In
the SAP system, which of the following options are available to you:
58A depending on the movement type, the system can generate a purchase order.
58B The item can only be received if the goods are non valuated.
58C You have to return the goods as a PO must be referenced with a goods receipt
.
58D Receive the goods to block stock if the value is indicated on the delivery n
ote.
58E The goods are received into GR blocked stock.
PURCHASING
59A
59B
59C
59D
59E
60A
60B
60C
60D
60E
Purchase requisition.
Outline agreement.
Purchase Order.
Master Service Schedule.
Invoice.
ANSWERS
1. A, D, E
2. B
3. C
4. C
5. B,C,D
6. B,D,E
7. A,B,C,D,E
8. B,C,D
9. A,B,E
10. C
11. A,B,E
12. B,C,D,E
13. A,B,C
14. C
15. A,B,C,E
16. B,C,D
17. C,D
18. E
19. E
20. A
21. B
22. A,B,D
23. B,C
24. D
25. A,B,C,D
26. B,C
27. A,B,C,D
28. D
29. A,C
30. D? (I think E)
31.
32.
33.
34.
35.
36.
37.
38.
39.
40.
41.
42.
43.
44.
45.
46.
47.
48.
49.
50.
51.
52.
53.
54.
55.
56.
57.
58.
59.
60.
A,B,D
B,C,E
C (and B ?)
A,C
A,B,C
B,D,E
D
E
A,B
C
E
C,D,E
D
B,C,D
A,C,D (for A, what about Service entry sheets)
A,C,D,E
D,E
B,E
A,B,C,E
C,E (why not A?)
E
E
A,D,E
A,C,E
B,C (I think also A & D)
C, D
A,B,C,D
A
B,C,E
C