You are on page 1of 15

Price List

Ref Code

Trade Heading:

Name : PCK1

Item Description

Unit

Rate

Mark

Supp

Last

Up %

Code

Updated

O - Labour Rates
JADUAL KADAR HARGA UPAH BURUH
2002

0.00

O001

Labourer (Unskilled)

Day

45.00

05/07/2005

O001A

Semi-skilled labour

Day

70.00

26/04/2011

O001B

Skilled labour

Day

100.00

26/04/2011

O002

Drainlayer

Day

60.00

05/07/2005

O003

Concrete Leveller and Screeder

Day

65.00

05/07/2005

O004

Mason

Day

65.00

05/07/2005

O005

Bricklayer

Day

65.00

05/07/2005

O006

Carpenter and Joiner

Day

65.00

05/07/2005

O007

Steel Barbender and Fixer

Day

65.00

05/07/2005

O008

Pneumatic Tool Operator

Day

65.00

05/07/2005

O009

Fitter

Day

70.00

05/07/2005

O010

Welder

Day

70.00

05/07/2005

O011

Plumber

Day

65.00

05/07/2005

O012

Painter

Day

60.00

05/07/2005

O013

Roofer

Day

65.00

05/07/2005

O014

Glazier

Day

65.00

05/07/2005

O015

Ironworker

Day

70.00

05/07/2005

O016

Pavior/Plasterer

Day

65.00

05/07/2005

O017

Tile Fixer

Day

70.00

05/07/2005

O018

Watchman

Day

50.00

05/07/2005

O019

Labour (Skilled)

Day

65.00

05/07/2005

O020

Pipelayer

Day

60.00

05/07/2005

O021

Fence Fixer

Day

60.00

05/07/2005

O022

Labour to erect formwork

m2

22.00

26/04/2011

O023

Labour to cut, bend & fix steel bar

tonne

550.00

26/04/2011

O024

Labour to cast concrete

m3

35.00

26/04/2011

O025

Labour to lay bricks; 115 mm thick

m2

8.50

26/04/2011

O026

Labour to install lintol 100m x 100mm

9.00

26/04/2011

O027

Labour to lay damp proof course, 230mm wide

0.30

26/04/2011

O028

Labour to lay cement & sand acreed to floor;


25mm thick, steel trowel
Labour to plaster wall; cement & sand; 28mm
thick; 3 coats; external

m2

5.50

26/04/2011

m2

12.50

26/04/2011

O029

CHEW FU KEONG

Page :

of

15

Date of Printing: 21/Jul/11


Global Estimating System (32 Bit) - H

Price List
Ref Code

Trade Heading:

Name : PCK1

Item Description

Unit

Rate

O - Labour Rates

Mark

Supp

Last

Up %

Code

Updated

(Continued)

m2

8.50

26/04/2011

O031

Labour to plaster wall; cement & sand; 28mm


thick; 3 coats; internall
Labour to lay tiles; homogeneous

m2

16.00

26/04/2011

O032

Labour to fix corner beading

2.30

26/04/2011

O033

no

36.00

26/04/2011

no

39.00

26/04/2011

O035

Labour to install timber door frame for single


leaf door including sub-frame
Labour to install timber door frame for double
leaf door including sub-frame
Labour to install timber door; single leaf

no

50.00

26/04/2011

O036

Labour to install timber door; double leaves

no

70.00

26/04/2011

O030

O034

Skilled And General Workers


O037

Concretor

day

50.00

18/12/2008

O038

Concretor 'Kepala'

day

62.00

18/12/2008

O039

Steel bar bender & fixer

day

53.00

18/12/2008

O040

Bar bedber 'Kepala'

day

66.00

18/12/2008

O041

Formwork carpenter

day

54.00

18/12/2008

O042

Formwork carpenter 'Kepala'

day

68.00

18/12/2008

O043

Bricklayer

day

52.00

18/12/2008

O044

Bricklayer 'Kepala'

day

65.00

18/12/2008

O045

Blocklayer

day

57.00

18/12/2008

O046

Blocklayer 'Kepala'

day

71.00

18/12/2008

O047

Roofer

day

55.00

18/12/2008

O048

Roofer 'Kepala'

day

71.00

18/12/2008

O049

Joinery carpenter

day

57.00

18/12/2008

O050

Joinery carpenter 'Kepala'

day

82.00

18/12/2008

O051

Structural steel worker

day

65.00

18/12/2008

O052

Structural steel worker 'Kepala'

day

94.00

18/12/2008

O053

Welder

day

71.00

18/12/2008

O054

Welder 'Kepala'

day

101.00

18/12/2008

O055

Plumber

day

61.00

18/12/2008

O056

Plumber 'Kepala'

day

83.00

18/12/2008

O057

Plasterer

day

57.00

18/12/2008

O058

Plasterer 'Kepala'

day

75.00

18/12/2008

O059

Tiler

day

61.00

18/12/2008

O060

Tiler 'Kepala'

day

85.00

18/12/2008

O061

Painter

day

55.00

18/12/2008

CHEW FU KEONG

Page :

of

15

Date of Printing: 21/Jul/11


Global Estimating System (32 Bit) - H

Price List
Ref Code

Trade Heading:

Name : PCK1

Item Description

Unit

Rate

O - Labour Rates

Mark

Supp

Last

Up %

Code

Updated

(Continued)

O062

Painter 'Kepala'

day

70.00

18/12/2008

O063

General worker (Male)

day

40.00

18/12/2008

O064

General worker (Female)

day

35.00

18/12/2008

Piling
OO01

Sheet pile

OO01A

Handle, pitch and drive

O065

FSP 3A, 12m lenght

pcs

80.00

16/12/2008

O066

FSP 3A, 9m lenght

pcs

70.00

05/11/2008

OO02

Extracting

O067

FSP 3A, 12m lenght

pcs

70.00

05/11/2008

O068

FSP 3A, 9m lenght

pcs

60.00

05/11/2008

OO03

600mm diameter pretensioned spun concrete


pile
Allow for the provision of all necessary injection
piling equipment, plant, tools and ancillary
equipment (for the execution of all piling work
in this contract) and for their transportation to
site handling, assembling, erecting, dismantling
and removal on completion of the work for any
idle standing time
Allow for moving and handling piling
equiment, plant, tools, and ancillary equipment
about the site as often and whenever necessary
for the execution of the whole piling operation
(as covered under this contract) including any
excavation and filling required for moving the
plant, tools and ancillary equipment from
differing places and levels of the site, erection
of any staging required and dismantling and
removal on completion.
Handle, transport and pitch 600mm Diameter
spun pile; 12.00m long
Drive only by injection method 600mm
Diameter spun pile; 12.00m long (In No. 766)
12.70mm (overall) Butt weld connection
1884mm girth between edges of mild steel
extension head and base cap plates including
coated heavily with bituminous compound.
Cut off 600mm diameter pre-tensionedspun
concrete pile to be required level and roughen
the inner surface to detail.
Allow for Pile Dynamic Analysis (PDA) test and
submission of analysis.
500mm diameter prestressed spun concrete
pile

Item

42,250.00

04/03/2009

Item

9,833.33

04/03/2009

No

44.00

04/03/2009

45.67

04/03/2009

No

58.00

04/03/2009

No

59.25

04/03/2009

No

1,700.00

04/03/2009

O069

O070

O071

O072

O073

O074

O075

OO04

CHEW FU KEONG

Page :

of

15

Date of Printing: 21/Jul/11


Global Estimating System (32 Bit) - H

Price List
Ref Code

Trade Heading:

Name : PCK1

Item Description

Unit

Rate

O - Labour Rates

Mark

Supp

Last

Up %

Code

Updated

(Continued)

Item

O079

Allow for mobilisation of labour, plants and


hydraulic hammer piling equipment to site,
moving around and demobilisation from site
Handle, sling and pitch initial and extension
vertical piles not exceeding 12m long
Handle, sling and pitch initial and extension
raked 1:4 piles not exceeding 12m long
Drive vertical pile to the required depth

O080

18,000.00

16/12/2008

no

64.00

16/12/2008

no

80.00

16/12/2008

45.00

16/12/2008

Drive raked 1:4 piles to the required depth

60.00

16/12/2008

O081

Fillet weld vertical extension pile joints

no

97.50

16/12/2008

O082

Cut off piles to the required level and roughen


inner surface of pile
Provide labours, plants, temporary staging,
kentledge, testing equipment and load 500mm
diameter test pile to 1200KN
Subsequent load test

no

120.00

16/12/2008

no

15,000.00

10/12/2008

no

10,000.00

10/12/2008

Item

14,666.67

23/12/2008

no

33.20

23/12/2008

13.93

23/12/2008

no

36.00

23/12/2008

Cut off pile head, strip concrete and exposed


reinforcement to a length of 600mm including
bending and binding exposed reinforced rods to
the reinforcement in the pile cap
Supply and fix 'concrete plug'

no

39.00

23/12/2008

no

70.00

23/12/2008

Provide all equipments, hydraulic jack,


deflection gauge, kentledge and other related
items for initial load testing to a vertical load of
130 ton or 1300KN
Subsequent load test

no

13,333.33

23/12/2008

no

6,933.33

23/12/2008

40,000.00

23/12/2008

40.00

23/12/2008

no

27.67

23/12/2008

no

37.50

23/12/2008

no

14,500.00

23/12/2008

O076

O077

O078

O083

O084
OO05

O085

O086

O087

O088
O089

O090
O091

O092
OO06

O093

O094

O095
O096

O097

CHEW FU KEONG

350mm diameter prestressed spun concrete


pile
Allow for mobilisation of labour, plants and
hydraulic hammer piling equipment to site,
moving around and demobilisation from site
Handle, transport and pitch initial and extension
pile not exceeding 12m long
Drive initial and extension pile to the required
depth
Fillet weld pile joint

300mm diameter prestressed spun concrete


pile
Allow for mobilisation of labour, plants and
jacked -in piling equipment to site, moving
around and demobilisation from site
Handle, transport, pitch and drive initial and
extension pile to the required depth
Fillet weld pile joint

Item

Cut off and remove surplus length and strip off


pile head, bend back reinforcement for
connection
Initial pile test to 1100KN

Page :

of

15

Date of Printing: 21/Jul/11


Global Estimating System (32 Bit) - H

Price List
Ref Code

Trade Heading:

Name : PCK1

Item Description

Unit

Rate

O - Labour Rates

Mark

Supp

Last

Up %

Code

Updated

(Continued)

O098

Subsequent load test

no

7,166.67

23/12/2008

O099

PDA test

no

1,450.00

23/12/2008

OO07

350 x 350mm R.C Pile

O100

Allow for the provision of necessary hydraulic


hammer piling equipment, plant and tools and
for their transportation to the site, handling,
assembling and removal after the completion of
operation
Allow for moving and handling piling
equipment about the site
Allow for submission of records of all piles

Item

15,000.00

19/02/2009

Item

3,000.00

19/02/2009

Item

3,700.00

19/02/2009

Allow for the provision of necessary testing


equipment, plant and tools and for their
transportation to the site, handling, assembling
and removal after completion including all
idling and standing time
Handle, transport, pitch and drive initial and
extension pile to the required depth
Fillet weld pile joint

Item

4,750.00

19/02/2009

16.50

19/02/2009

no

34.00

19/02/2009

no

35.80

19/02/2009

O107

Cut off pile head to required level, strip off


concrete to expose reinforcement, bend the pile
reinforcement excess length to dispose to
Contractor's own dump site
Initial pile test to twice working load of 1500KN

no

29,030.00

19/02/2009

O108

Subsequent load test

no

18,720.00

19/02/2009

O109

PDA test including preparation of pile head,


submission of test report
300 x 300mm R.C Pile

no

960.00

19/02/2009

Item

13,666.67

16/12/2008

Item

4,000.00

16/12/2008

O112

Mobilisation & Demobilisation of hydraulic


hammer piling frame and equipment
Moving and handling piling equipment, plant
and tools about the site
As built survey

Item

4,000.00

16/12/2008

O113

Submission of piling record

Item

1,500.00

16/12/2008

O114

no

43.00

16/12/2008

O115

Handle, transport and pitch only, 12m long


initial/extension pile
Drive only initial/extension pile

14.50

16/12/2008

O116

Filler weld pile joint

no

30.00

16/12/2008

O117

no

35.00

16/12/2008

O118

Cut off pile head and cart away surplus length


from site
Preliminary load test 2 x 1000KN

no

14,166.67

16/12/2008

O119

PDA test

no

1,333.33

16/12/2008

OO09

250 250mm R.C Pile

O101

O102
O103

O104

O105
O106

OO08
O110

O111

CHEW FU KEONG

Page :

of

15

Date of Printing: 21/Jul/11


Global Estimating System (32 Bit) - H

Price List
Ref Code

Trade Heading:

Name : PCK1

Item Description

Unit

Rate

O - Labour Rates

Mark

Supp

Last

Up %

Code

Updated

(Continued)

Allow for moving and handling jacked-in piling


equipment, plants, tools at the site as often and
whenever necessary for the operation of the
whole piling operation including for moving the
plants, tools and ancillary equipment from
different levels of the site and all necessary
staging, platform and any idling standing time.
Handle, transport, pitch and drive initial and
extension pile to the required depth
Fillet weld pile joint

no

42,500.00

23/12/2008

29.50

23/12/2008

no

22.75

23/12/2008

no

29.50

23/12/2008

O124

Cut off and remove surplus length and strip off


pile head, bend back reinforcement for
connection
Initial load test to 660KN

no

10,350.00

23/12/2008

O125

Subsequent load test

no

8,750.00

23/12/2008

O126

PDA test

no

1,187.50

23/12/2008

OO10

200 x 200mm R.C pile

O127

no

9.00

16/12/2008

O128

Handle, transport and pitch, 6m long


initial/extension pile
Drive initial/extension pile to the required depth

4.50

16/12/2008

O129

Fillet weld pile joint

no

8.00

16/12/2008

O130

Cut off pile head and cart away surplus length


from site
150 x 150mm R.C pile

no

Allow for the provision of necessary hydraulic


hammer piling equipment, plant and tools and
for their transportation to the site, handling,
assembling and removal after the completion of
operation
Allow for moving and handling piling
equipment about the site
Allow for submission of records of all piles

Item

4,500.00

19/02/2009

Item

1,000.00

02/01/2009

Item

2,000.00

02/01/2009

Allow for the provision of necessary testing


equipment, plant and tools and for their
transportation to the site, handling, assembling
and removal after completion including all
idling and standing time
Handle, transport, pitch and drive initial and
extension pile to the required depth
Fillet weld pile joint

Item

10,000.00

02/01/2009

4.38

19/02/2009

no

8.83

19/02/2009

Cut off pile head to required level, strip off


concrete to expose reinforcement, bend the pile
reinforcement, excess length to dispose to
Contractor own dump site
Subsequent load test to twice working load of
400KN

no

16.83

19/02/2009

no

5,250.00

19/02/2009

O120

O121

O122
O123

OO11
O131

O132

O133
O134

O135

O136
O137

O138

CHEW FU KEONG

Page :

of

15

Date of Printing: 21/Jul/11


Global Estimating System (32 Bit) - H

Price List
Ref Code

Trade Heading:
O139

Name : PCK1

Item Description

Unit

Rate

O - Labour Rates

Mark

Supp

Last

Up %

Code

Updated

(Continued)

PDA test including preparation of pile head,


submission of test report

no

958.33

19/02/2009

Concretor
O140

Concretor

m3

16.00

13/02/2009

O141

Lean Concrete

m3

16.00

26/02/2009

OO12

O144

Lean concrete, 50mm thick including


necessary trimming base of excavation
To underside of pile cap, footing, ground beam,
apron slab, ground floor slab, trench beam,
trench slab, pit slab and the like
Reinforced concrete including vibrating and
trowelling to a smooth and uniform level in
Pile cap, footing, column stump, ground beam,
trench beam and lift pit
Column

O145

03/12/2008

m2

1.50

17/02/2009

m3

19.00

03/12/2008

m3

20.00

03/12/2008

Stiffener and lintol

m3

21.00

03/12/2008

O146

Roof beam

m3

20.00

03/12/2008

O147

150mm thick ground floor slab and apron slab

m3

19.00

03/12/2008

O148

m3

19.00

03/12/2008

O149

150mm thick suspended floor slab and


suspended floor beam
150mm thick roof slab

m3

19.00

03/12/2008

O150

200mm thick wall

m3

20.00

03/12/2008

330.00

13/02/2009

O142

OO13

O143

Bar Bender
O151

Bar-Bender

tonne

O152

Fabric BRC

m2

1.35

24/10/2008

OO14

O153

Rods, 12mm, 16mm, 20mm, 25mm, 32mm and


40mm diameter
In foundation

kg

0.33

03/12/2008

O154

In column

kg

0.33

03/12/2008

O155

In beam

kg

0.33

03/12/2008

O156

In wall

kg

0.33

03/12/2008

OO15

Strirrups and Links

O157

6mm, 10mm and 12mm diameter

kg

0.33

03/12/2008

OO16

BRC Fabric

O158

In ground floor slab, apron slab, trench slab,


suspended floor slab and roof slab

m2

1.30

03/12/2008

m2

13.00

13/02/2009

Formwork
O158A

CHEW FU KEONG

Formwork
Page :

of

15

Date of Printing: 21/Jul/11


Global Estimating System (32 Bit) - H

Price List
Ref Code

Trade Heading:
OO17

Name : PCK1

Item Description

Unit

Rate

O - Labour Rates

Mark

Supp

Last

Up %

Code

Updated

(Continued)

Timber formwork fabrication, fixing and


striking not exceeding 3.50m high
To sides of pile cap, footing, column stump,
ground beam, trench beam and lift pit
To sides of column and stiffener

m2

13.00

03/12/2008

m2

13.00

03/12/2008

m2

13.00

03/12/2008

O162

To sides and soffits of suspended floor beam and


roof beam
To sides and soffits of suspended floor slab

m2

13.00

03/12/2008

O163

To sloping soffit of staircase

m2

13.00

03/12/2008

m2

3.43

26/02/2009

m2

5.00

26/02/2009

m2

3.80

26/02/2009

O159

O160
O161

Precast prestressed hollow core slab, plank


and precast beam
Installation & Grouting Works

O166

Installation (Labour Only NOT inclusive


cranage)
Hollow core slabs & planks in thickness 300mm
& below
Hollow core slabs & planks in thickness 300mm
& above
Hollow core slabs & planks in thickness 325mm

O167

Hollow core slabs & planks in thickness 360mm

m2

4.60

26/02/2009

O168

Precast beams, L < 10m

no

103.13

26/02/2009

O169

Precast beams, 10m < L < 15m

no

178.00

26/02/2009

O170

Precast column, 1 tier in one length

no

152.50

26/02/2009

O171

Precast column, 2 tiers in one length

no

200.00

26/02/2009

O172

Precast staircase flight

no

108.80

26/02/2009

O173

Precast landing slab

no

132.00

17/02/2009

O174

Precast wall, 2400 x 1800 x 150mm thick

no

100.00

31/12/2008

O175

Precast wall, 2250 x 1800 x 150mm thick

no

132.00

26/02/2009

OO19

Grouting Works to Precast System (Labour &


Materials)
Grouting to beam dowels connection

no

52.56

26/02/2009

no

104.99

26/02/2009

no

102.74

26/02/2009

O179

Grouting to beam & column gap including


formwork
Grouting to BSF connection gap including
formwork
Grouting to HCS/Plank shearkey joint
(E.mix) to
AV5 - 265

9.13

26/02/2009

O180

EV4-325

14.30

26/02/2009

O181

EV4-460

19.60

26/02/2009

O182

Plank 110

5.90

17/02/2009

OO18

O164

O165

O176
O177

O178

OO20

CHEW FU KEONG

Page :

of

15

Date of Printing: 21/Jul/11


Global Estimating System (32 Bit) - H

Price List
Ref Code

Trade Heading:

Name : PCK1

Item Description

Unit

Rate

O - Labour Rates

Mark

Supp

Last

Up %

Code

Updated

(Continued)

O183

WV6 - 205

5.00

31/12/2008

OO21

O184

Grouting to column base, 50mm in gap in


between; column to pile cap & column to
column
500 x 500mm

no

97.90

26/02/2009

O185

450 x 600mm

no

100.10

17/02/2009

O186

300 x 700mm

no

68.33

26/02/2009

O187

300 x 300mm

no

82.50

17/02/2009

OO22

Grouting to column corrugated connection

O188

4 dowels (300 x 300)

no

138.60

17/02/2009

O189

6 dowels

no

156.25

26/02/2009

O190

8 dowels (500 x 500)

no

278.30

26/02/2009

OO23

O191

Grouting to column corrugated connection at


beam top rebar
2 tiers

no

55.00

17/02/2009

O192

Grouting to staircase flight

no

121.00

17/02/2009

O193

Grouting to landing slab

no

121.00

17/02/2009

O194

Grouting to wall

no

69.75

26/02/2009

OO24

Associated Works On Site

O195

Concrete G30 to topping, 75mm thick

m3

310.00

17/02/2009

O196

Concrete G40 to beam infill & beam top

m3

340.00

31/12/2008

O197

Concrete G40 to beam-column junction

m3

340.00

31/12/2008

O198

Rebar to beam top, span & support

kg

3.25

17/02/2009

O199

Rebar to topping, EB/PB

kg

3.25

17/02/2009

O200

RD6 mesh to topping, 4.44kg/m2, measure nett,


allow lap in rate
Formwork to underside of hcs at perimeter beam
end
Formwork to edge of topping

m2

13.00

17/02/2009

18.00

31/12/2008

18.00

31/12/2008

O201

O202

Bricklayer
O203

Bricklayer

pcs

0.15

24/10/2008

O204

Hoisting brick

pcs

0.02

15/11/2008

OO25

Lay cement and sand brick

O205

110mm thick wall

m2

8.05

03/12/2008

OO26

Lay clay brick

O206

115mm thick wall

m2

8.05

03/12/2008

OO27

Lay hollow concrete block

CHEW FU KEONG

Page :

of

15

Date of Printing: 21/Jul/11


Global Estimating System (32 Bit) - H

Price List
Ref Code

Trade Heading:
O207

Name : PCK1

Item Description

Unit

Rate

O - Labour Rates

Mark

Supp

Last

Up %

Code

Updated

(Continued)

200mm thick wall

m2

8.50

13/01/2009

Plasterer
O208

External

m2

7.53

13/02/2009

O209

Internal

m2

6.99

13/02/2009

OO28

Plaster including mortar mixer, wheel barrow


and trowelling tools and erection of working
platform to a working height of not more than
3.0m high
19mm thick with wood float or sponge finish
in two (2) coats
Brickwall and concrete surface; externally

m2

8.00

04/12/2008

19mm thick with steel trowelled finish in two


(2) coats
Brickwall and concrete surface; internally

m2

7.00

04/12/2008

OO29

O210
OO30

O211

Door
O212

Lintol Small

no

5.00

27/11/2008

O213

Lintol Big

no

15.00

27/11/2008

O214

Lintol Arch

no

100.00

27/11/2008

OO31

Timber/Metal Frame

O215

Door Frame, SL

no

10.00

24/10/2008

O216

Door Frame, DL

no

15.00

24/10/2008

OO32

Timber window frame fixing

O217

Overall size 300mm x 300mm high

no

10.00

04/12/2008

O218

Overall size 1200mm x 1200mm high

no

13.00

04/12/2008

OO33

Timber door frame fixing

O219

Overall size 900mm x 2100mm high

no

13.00

04/12/2008

O220

Overall size 1800mm x 2100mm high

no

19.00

04/12/2008

OO34

Metal door frame fixing

O221

Overall size 900mm x 2100mm high

no

13.00

04/12/2008

O222

Overall size 1800mm x 2100mm high

no

19.00

04/12/2008

OO35

Timber Leaf Including Ironmongery

O223

Door Leaf including ironmongery, SL

no

15.00

24/10/2008

O224

Door Leaf including ironmongery, DL

no

30.00

24/10/2008

OO36

Fire Leaf Including Ironmongery

O225

Door Leaf including ironmongery, SL

no

40.00

24/10/2008

O226

Door Leaf including ironmongery, DL

no

80.00

24/10/2008

CHEW FU KEONG

Page :

10

of

15

Date of Printing: 21/Jul/11


Global Estimating System (32 Bit) - H

Price List
Ref Code

Trade Heading:

Name : PCK1

Item Description

Unit

Rate

O - Labour Rates

Mark

Supp

Last

Up %

Code

Updated

(Continued)

OO37

Partition Leaf Including Ironmongery

O227

Door Leaf including ironmongery, SL

no

10.00

24/10/2008

O228

Door Leaf including ironmongery, DL

no

20.00

24/10/2008

OO38

PVC Leaf

O229

Door Leaf, SL

no

7.00

27/11/2008

OO39

no

17.00

04/12/2008

pair

28.00

04/12/2008

no

30.00

04/12/2008

pair

54.00

04/12/2008

no

42.00

04/12/2008

pair

74.00

04/12/2008

OO42

Timber hollow core door fixing with hinges


and normal/standard lockset
Standard hollow core flush door faced both sides
with plywood; overall size 900mm x 2100mm
high x 40mm thick
Standard double leaf hollow core flush door
faced both sides with plywood; overall size
1800mm x 2100mm high x 40mm thick
Timber solid core door fixing with hinges and
normal/standard lockset
Standard solid core flush door faced both sides
with plywood; overall size 900mm x 2100mm
high x 42mm thick
Standard double leaf solid core flush door faced
both sides with plywood; overall size 1800mm x
2100mm high x 42mm thick
Timber fire door fixing with hinges and
normal/standard lockset
Standard one (1) hour fire-rated door; overall
size 1070mm x 2100mm high x 50mm thick
Standard double leaf one (1) hour fire-rated
door; overall size 1800mm x 2100mm high x
50mm thick
Ironmongery fixing

O236

Door closer

no

9.00

04/12/2008

O237

Lockset

no

5.00

18/02/2009

O230

O231

OO40

O232

O233

OO41

O234

O235

Pavior
OO43

Mason

O238

Rendering, 25mm thick

m2

5.38

13/02/2009

O239

Rendering, 50mm thick

m2

5.92

13/02/2009

OO44

To floor

O240

25mm thick cement and sand render with steel


trowelled finish to a smooth and level surface
20mm thick cement and sand base screed with
steel trowelled finish to a smooth and level
surface to receive finishing

m2

5.40

04/12/2008

m2

5.40

04/12/2008

O241

Tiling

CHEW FU KEONG

Page :

11

of

15

Date of Printing: 21/Jul/11


Global Estimating System (32 Bit) - H

Price List
Ref Code

Trade Heading:

Name : PCK1

Item Description

Unit

Rate

O - Labour Rates

Mark

Supp

Last

Up %

Code

Updated

(Continued)

OO46

Wall tile including preparation and laying of


cement and sand backing screed
To wall

O242

200mm x 200mm ceramic tile

m2

17.00

04/12/2008

O243

450mm x 450mm granite slab

m2

54.00

04/12/2008

O244

450mm x 450mm marble slab

m2

43.00

04/12/2008

OO47

OO48

Floor tile including preparation and laying of


cement and sand backing screed
To floor

O245

300mm x 300mm ceramic tile

m2

17.00

04/12/2008

O246

300mm x 300mm homogeneous tile

m2

17.50

04/12/2008

O247

600mm x 600mm granite slab

m2

48.00

04/12/2008

O248

600mm x 600mm marble slab

m2

43.00

04/12/2008

OO49

Wall & Floor Finishes

O249

Power float

m2

3.60

24/10/2008

O250

Wall tile

m2

17.22

06/01/2009

O251

Floor tile

m2

17.76

06/01/2009

O252

Skirting

5.25

06/01/2009

O253

Wall tile menara TM Melaka

m2

34.43

24/10/2008

O254

Floor tile Menara TM Melaka

m2

34.43

24/10/2008

O255

Floor tile skirting Menara TM Melaka

2.40

24/10/2008

O256

Carpet tile

m2

9.70

26/11/2008

O257

Carpet roll

m2

14.00

26/11/2008

kg

0.90

04/12/2008

kg

1.00

04/12/2008

kg

0.90

04/12/2008

OO45

Roofer

OO51

Structural steelwork fabrication, erection and


fixing including cranage
Heavy section

O258

Universal beam and universal column

OO52

Hollow section

O259

Square, rectangular and circular hollow sections

OO53

Attached connection

O260

Cleats, stiffeners and plates and the like

OO54

Roof truss

O261

Up to 10.0m span

kg

0.90

04/12/2008

O262

Above 10.0m span

kg

0.90

04/12/2008

OO55

Roofer

OO50

CHEW FU KEONG

Page :

12

of

15

Date of Printing: 21/Jul/11


Global Estimating System (32 Bit) - H

Price List
Ref Code

Trade Heading:

Name : PCK1

Item Description

Unit

Rate

O - Labour Rates

Mark

Supp

Last

Up %

Code

Updated

(Continued)

O263

Lay aluminium foil

m2

2.38

29/10/2008

O264

Lay chicken wire netting

m2

1.81

26/04/2008

O265

Fix fascia board

6.29

26/04/2008

O266

Fix valley gutter

5.58

18/02/2009

O267

Lay concrete roof tile

pc

0.50

24/10/2008

O268

Lay concrete roof tile to pitch not exceeding 30


degree
Lay metal deck to pitch not exceeding 30 degree

m2

6.00

03/12/2008

m2

5.00

03/12/2008

Lay 50mm thick fibre wool insulation & wire


mesh netting to slope
Lay sisalation to slope

m2

1.50

03/12/2008

m2

1.00

03/12/2008

O269
O270

O271

Ceiling Installer
O272

Ceiling board and frame

m2

6.50

13/02/2009

O273

Skim coat

m2

2.00

24/10/2008

OO56

O274

Ceiling framing & finishing fixing


non-suspended ceiling
1200mm x 600mm x 3.2mm thick ceiling board

m2

6.00

04/12/2008

O275

1200mm x 600mm x 4.5mm thick ceiling board

m2

6.50

04/12/2008

Sanitary
O276

Squatting w.c complete set

no

52.50

02/01/2009

O277

Closed coupled sitting w.c complete set

no

52.50

02/01/2009

O278

Table top wash basin complete set

no

42.50

02/01/2009

O279

Wall hung handicap wash basin complete set

no

45.00

24/12/2008

O280

Sink

no

40.00

02/01/2009

O281

Urinal

no

50.00

02/01/2009

O282

Wall mounted pillar tap

no

15.00

24/12/2008

O283

Hand bidet with flexible hose complete set

no

20.00

24/12/2008

O284

Surface mounted stainless steel paper holder

no

15.00

24/12/2008

O285

Stainless steel vertical liquid soap dispenser


complete set
Single robe hook with door stopper

no

25.00

24/12/2008

no

15.00

24/12/2008

Stainless steel floor trap complete with insect


cage, size 150mm x 150mm
40mm diameter stainless steel grab rail for OKU

no

10.00

24/12/2008

no

35.00

24/12/2008

O286
O287

O288

CHEW FU KEONG

Page :

13

of

15

Date of Printing: 21/Jul/11


Global Estimating System (32 Bit) - H

Price List
Ref Code

Trade Heading:
O289

Name : PCK1

Item Description

Unit

Rate

O - Labour Rates

Mark

Supp

Last

Up %

Code

Updated

(Continued)

On completion of the installation of sanitary


fittings, test all fittings, make good any defects
and leave in perfect working order to the entire
satisfaction of the Architect

Item

500.00

24/12/2008

No

400.00

02/03/2009

No

340.00

02/03/2009

frame

6.00

27/11/2008

frame

3.00

27/11/2008

no

6.00

27/11/2008

no

4.00

27/11/2008

no

3.00

27/11/2008

no

2.00

27/11/2008

no

4.00

27/11/2008

no

2.00

27/11/2008

pc

10.00

27/11/2008

pc

6.00

27/11/2008

WATER TANK
OO57

O290

O291

Approved FRP water storage tank square


type as described complete with cover and all
necessary fixing accessories
3520 Gallons; Ditto; overall size 4000mm x
2000mm x 2000mm high approximately 20m
above ground level
2200 Gallons; Ditto; overall size 5000mm x
2000mm x 1000mm high approximately
600mm above ground level

Scaffolder
O292

O293

O294

O295

O296

O297

O298

O299

O300

O301

Erect frame including cross braces, base plate


and joint pin
Dismantle frame, cross braces, base plate &
joint pin including stacking up properly directed
on site
Fix 6.0m g.i pipe bracing including all
accessories and coupler
Dismantle 6.0m g.i pipe bracing & accessories
and coupler including stacking up properly as
directed on site
Fix 3.0m g.i pipe bracing including all
accessories and coupler
Dismantle 3.0m g.i pipe bracing & accessories
and coupler including stacking up properly as
directed on site
Fix wall tie including drilling hole for anchor
bolt (bolt by Main Contractor)
Dismantle wall tie including making good bolt
hole
Fix netting size 6'0"x17'0" including tying in
position by wires
Dismantle netting including rolling up properly
and return to store as directed
Drainage

OO58

Surface Water

O302

Concrete base & P.C half round drain

18.00

27/11/2008

O303

230mm thick brickwall & plastering

m2

23.50

27/11/2008

O304

R.C Strut

no

10.00

27/11/2008

O305

Brickwall sump including R.C base

no

150.00

27/11/2008

CHEW FU KEONG

Page :

14

of

15

Date of Printing: 21/Jul/11


Global Estimating System (32 Bit) - H

Price List
Ref Code

Trade Heading:

Name : PCK1

Item Description

Unit

Rate

O - Labour Rates

Mark

Supp

Last

Up %

Code

Updated

(Continued)

O306

600mm diameter pipe culvert

75.00

27/11/2008

O307

225mm SGW pipe

no

5.00

27/11/2008

O308

Precast road kerb

no

5.00

27/11/2008

OO59

Rain Water Down Pipe

O309

100mm diameter

10.66

23/12/2008

O310

150mm diameter

10.66

23/12/2008

OO60

Gutter

O311

Galvanised iron

18.05

23/12/2008

8.50

10/12/2008

Road furniture
O312

CHEW FU KEONG

Install single beam highway guardrail

Page :

15

of

15

Date of Printing: 21/Jul/11


Global Estimating System (32 Bit) - H

You might also like