You are on page 1of 12

ETAP

Project:

7.0.0

Location:

Page:

Date:

12-07-2013

Contract:

SN:

12345678

Engineer:

Revision:

Base

Config.:

Normal

Filename:

Study Case: LF
ATA_CHILE_EB2

Electrical Transient Analyzer Program


Load Flow Analysis
Loading Category (1):

Design

Generation Category (1):

Design

Load Diversity Factor:

None

Swing

V-Control

Load

Total

12

13

XFMR2

XFMR3

Reactor

Line/Cable

Impedance

Tie PD

Total

12

Number of Buses:

Number of Branches:

Method of Solution:

Newton-Raphson Method

Maximum No. of Iteration:

99

Precision of Solution:

0.0001000

System Frequency:

50 Hz

Unit System:

Metric

Project Filename:

ATA_CHILE_EB2

Output Filename:

B:\ETAP 700\ATA_CHILE_EB2\Untitled.lfr

ETAP

Project:

7.0.0

Location:

Page:

Date:

12-07-2013

Contract:

SN:

12345678

Engineer:

Revision:

Base

Config.:

Normal

Filename:

Study Case: LF
ATA_CHILE_EB2

Adjustments
Apply
Tolerance

Individual

Adjustments

/Global

Transformer Impedance:

Yes

Individual

Reactor Impedance:

Yes

Individual

Overload Heater Resistance:

No

Transmission Line Length:

No

Cable Length:

No

Apply

Individual

Adjustments

/Global

Transmission Line Resistance:

Yes

Individual

Cable Resistance:

Yes

Individual

Temperature Correction

Percent

Degree C

ETAP

Project:

7.0.0

Location:

Page:

Date:

12-07-2013

Contract:

SN:

12345678

Engineer:

Revision:

Base

Config.:

Normal

Filename:

Study Case: LF
ATA_CHILE_EB2

Bus Input Data


Load
Bus
ID

kV

Sub-sys

Bus3

110.000

Bus5

4.160

% Mag.

Ang.

100.0

0.0

100.0

0.0

Bus7

4.160

100.0

0.0

Bus8

4.160

100.0

0.0

Bus9

4.160

100.0

0.0

Bus13

110.000

100.0

0.0

Bus14

110.000

100.0

0.0

Bus15

4.160

100.0

0.0

Bus16

0.400

100.0

0.0
0.0

Bus ST Cerro Negro Norte

220.000

100.0

C.D.C (MC-3201)

4.160

100.0

0.0

CCM BT (MC-3102)

0.380

100.0

0.0

220.000

100.0

0.0

ST-Tapp off

Constant kVA

Initial Voltage

MW

Bus ST Cerro Negro Norte

kV
220.000

0.976

Voltage
Type

Swing

MW

Sub-sys
1

Constant I

Mvar

MW

Generic

Mvar

MW

Mvar

0.976

1.999

Generation Bus
ID

Mvar

1.999

Total Number of Buses: 13

Constant Z

0.230

0.143

0.230

0.143

Generation

% Mag.

Angle

100.0

0.0

MW

0.000

Mvar

0.000

0.000

0.000

Mvar Limits
% PF

Max

Min

0.000

0.000

ETAP

Project:

7.0.0

Location:

Page:

Date:

12-07-2013

Contract:

SN:

12345678

Engineer:

Revision:

Base

Config.:

Normal

Filename:

Study Case: LF
ATA_CHILE_EB2

Line/Cable Input Data


Ohms or Siemens/1000 m per Conductor (Cable) or per Phase (Line)
Length

Line/Cable
ID

Library

Size

Adj. (m)

% Tol.

#/Phase

T (C)

Cable B.T. (BP21V01)

0,6NCUN1

250

25.0

0.0

75

0.177493

Cable MT (MR20U01)

5,0NCUS1

500

50.0

0.0

75

0.093176

0.115103

Cable MT (MR20U02)

5,0NCUS1

25.0

0.0

75

0.636740

0.216667

Cable MT (MR20U03)

5,0NCUS1

250

30.0

0.0

75

0.179462

0.124672

Cable MT (MR20U04)

5,0NCUS1

250

25.0

0.0

75

0.179462

0.124672

Lnea AT-110 KV

115NCUS1

0.108268

500

50.0

0.0

75

0.109521

0.215989

LAT-110KV-Flint

741

66500.0

0.0

75

0.105648

0.360647

0.0000032

LAT-220KV-Flint

741

66500.0

0.0

75

0.105648

0.360647

0.0000032

Line / Cable resistances are listed at the specified temperatures.

ETAP

Project:

7.0.0

Location:

Page:

Date:

12-07-2013

Contract:

SN:

12345678

Engineer:

Revision:

Base

Config.:

Normal

Filename:

Study Case: LF
ATA_CHILE_EB2

2-Winding Transformer Input Data

Transformer
ID
Trafo (TF-3201)

Rating
MVA
7.000

Trafo (TF-3202)
TR-Tap Off

Prim. kV
110.000

Sec. kV
4.160

Z Variation
%Z
8.50

X/R

% Tap Setting

+ 5%

- 5%

% Tol.

Prim.

Sec.

13.55

Adjusted
%Z

Phase Shift
Type

Angle

8.5000

Std Pos. Seq.

0.000

0.300

4.160

0.400

4.80

4.70

4.8000

Std Pos. Seq.

0.000

20.000

220.000

110.000

10.00

18.60

10.0000

Std Pos. Seq.

0.000

2-Winding Transformer Load Tap Changer (LTC) Settings


Transformer Load Tap Changer Setting
Transformer
ID

Connected Buses ("*" LTC Side)


Primary Bus ID

Secondary Bus ID

% Min.
Tap

% Max.
Tap

% Step

Regulated Bus ID

%V

kV

ETAP

Project:

7.0.0

Location:

Page:

Date:

12-07-2013

Contract:

SN:

12345678

Engineer:

Revision:

Base

Config.:

Normal

Filename:

Study Case: LF
ATA_CHILE_EB2

Branch Connections
CKT/Branch

Connected Bus ID

ID

Type

From Bus

% Impedance, Pos. Seq., 100 MVA Base


To Bus

Trafo (TF-3201)

2W XFMR

Bus14

Bus5

Trafo (TF-3202)

2W XFMR

Bus15

Bus16

TR-Tap Off

2W XFMR

ST-Tapp off

Bus3

Cable B.T. (BP21V01)

Cable

Bus16

CCM BT (MC-3102)

Cable MT (MR20U01)

Cable

Bus5

Cable MT (MR20U02)

Cable

Cable MT (MR20U03)

Cable

Cable MT (MR20U04)

8.94

121.10

121.43

332.97

1564.97

1600.00

2.68

49.93

50.00

138.67

84.58

162.43

C.D.C (MC-3201)

1.35

1.66

2.14

C.D.C (MC-3201)

Bus15

9.20

3.13

9.72

Bus7

Bus8

1.56

1.08

1.89

Cable

Bus7

Bus9

2.59

1.80

3.16

Lnea AT-110 KV

Cable

Bus13

Bus14

0.00

0.00

0.01

LAT-110KV-Flint

Line

Bus13

Bus3

5.81

19.82

20.65

2.5805200

LAT-220KV-Flint

Line

ST-Tapp off

Bus ST Cerro Negro Norte

1.45

4.96

5.16

10.3220800

Disyuntor bombas (52)

Tie Breakr

C.D.C (MC-3201)

Bus7

ETAP

Project:

7.0.0

Location:

Page:

Date:

12-07-2013

Contract:

SN:

12345678

Engineer:

Revision:

Base

Config.:

Normal

Filename:

Study Case: LF
ATA_CHILE_EB2

LOAD FLOW REPORT

Bus
ID
Bus3

Voltage
kV

% Mag.

110.000

100.919

Generation

Ang.
-0.8

MW

Load

Mvar
0

MW
0

Load Flow
Mvar

ID
0

Bus13
ST-Tapp off

Bus5

Bus7

Bus8
Bus9

4.160

4.160

4.160

99.188

99.138

99.096

-2.5

-2.5

-2.5

1.999

0.976

C.D.C (MC-3201)

MW

XFMR
Mvar

Amp

% PF

2.246

-1.403

13.8

-84.8

-2.246

1.403

13.8

-84.8

2.237

1.135

351.0

89.2

Bus14

-2.237

-1.135

351.0

89.2

Bus8

2.000

0.976

311.5

89.9

Bus9

0.000

0.000

0.0

0.0

C.D.C (MC-3201)

-2.000

-0.976

311.5

89.9

Bus7

-1.999

-0.976

311.5

89.9

4.160

99.138

-2.5

Bus7

0.000

0.000

0.0

0.0

Bus13

110.000

100.809

-1.0

Bus14

2.243

1.212

13.3

88.0

Bus3

-2.243

-1.212

13.3

88.0

Bus14

110.000

100.809

-1.0

Bus13

-2.243

-1.212

13.3

88.0

Bus15

4.160

99.111

-2.5

C.D.C (MC-3201)

Bus5

Bus16
Bus16

0.400

95.886

-4.4

CCM BT (MC-3102)
Bus15

* Bus ST Cerro Negro Norte


C.D.C (MC-3201)

CCM BT (MC-3102)
ST-Tapp off

220.000

100.000

0.0

2.254

-11.698

ST-Tapp off

4.160

99.138

-2.5

Bus5

0.380

100.443

-4.4

0.232

0.144

220.000

100.291

-0.1

# Indicates a bus with a load mismatch of more than 0.1 MVA

1.212

13.3

88.0

-0.157

39.7

83.2

0.236

0.157

39.7

83.2
85.0

0.233

0.145

413.2

-0.233

-0.145

413.2

85.0

2.254

-11.698

31.3

-18.9

-2.236

-1.134

351.0

89.2
83.2

Bus15

0.236

0.157

39.7

Bus7

2.000

0.976

311.5

89.9

Bus16

-0.232

-0.144

413.2

85.0

Bus ST Cerro Negro Norte

-2.247

1.369

6.9

-85.4

2.247

-1.369

6.9

-85.4

Bus3
* Indicates a voltage regulated bus ( voltage controlled or swing type machine connected to it)

2.243
-0.236

% Tap

ETAP

Project:

7.0.0

Location:

Page:

Date:

12-07-2013

Contract:

SN:

12345678

Engineer:

Revision:

Base

Config.:

Normal

Filename:

Study Case: LF
ATA_CHILE_EB2

Bus Loading Summary Report

Directly Connected Load


Constant kVA

Bus
ID

kV

Rated Amp

MW

Constant Z

Mvar

MW

Total Bus Load

Constant I

Mvar

MW

Generic

Mvar

MW

Mvar

MVA

% PF

Amp

Bus3

110.000

2.648

84.8

13.8

Bus5

4.160

2.508

89.2

351.0

Bus7

4.160

2.225

89.9

311.5

Bus8

4.160

1.999

0.976

2.225

89.9

311.5

Bus9

4.160

0.0

0.0

Bus13

110.000

2.549

88.0

13.3

Bus14

110.000

2.549

88.0

13.3

Bus15

4.160

0.284

83.2

39.7

Bus16

0.400

0.274

85.0

413.2

220.000

11.913

18.9

31.3

4.160

2.507

89.2

351.0

0.380

0.232

0.144

0.273

85.0

413.2

220.000

2.632

85.4

6.9

Bus ST Cerro Negro Norte


C.D.C (MC-3201)
CCM BT (MC-3102)
ST-Tapp off

* Indicates operating load of a bus exceeds the bus critical limit ( 100.0% of the Continuous Ampere rating).
# Indicates operating load of a bus exceeds the bus marginal limit ( 95.0% of the Continuous Ampere rating).

Percent
Loading

ETAP

Project:

7.0.0

Location:

Page:

Date:

12-07-2013

Contract:

SN:

12345678

Engineer:

Revision:

Base

Config.:

Normal

Filename:

Study Case: LF
ATA_CHILE_EB2

Branch Loading Summary Report

Transformer
CKT / Branch
ID

Cable & Reactor


Type

Ampacity
(Amp)

Loading
Amp

Cable B.T. (BP21V01)

Cable

449.99

413.19

91.82

Cable MT (MR20U01)

Cable

994.55

350.96

35.29

Cable MT (MR20U03)

Cable

549.57

311.55

56.69

994.55

13.27

1.33

Capability
(MVA)

Loading (input)
MVA

Loading (output)

MVA

Lnea AT-110 KV

Cable

Trafo (TF-3201)

Transformer

7.000

2.549

36.4

2.508

35.8

Trafo (TF-3202)

Transformer

0.300

0.284

94.6

0.274

91.5

TR-Tap Off

Transformer

20.000

2.648

13.2

2.632

13.2

* Indicates a branch with operating load exceeding the branch capability.

ETAP

Project:

7.0.0

Location:

Page:

10

Date:

12-07-2013

Contract:

SN:

12345678

Engineer:

Revision:

Base

Config.:

Normal

Filename:

Study Case: LF
ATA_CHILE_EB2

Branch Losses Summary Report

CKT / Branch
ID
LAT-110KV-Flint
TR-Tap Off
Cable MT (MR20U01)
Trafo (TF-3201)
Cable MT (MR20U03)

From-To Bus Flow


MW

Mvar

To-From Bus Flow

From

To

2.9

-2615.5

100.9

100.8

0.11

1.403

2.247

-1.369

1.8

34.4

100.9

100.3

0.63

1.135

-2.236

-1.134

0.9

1.1

99.2

99.1

0.05

2.243

1.212

5.7

77.4

99.2

100.8

1.62

-1.999

-0.976

0.8

0.5

99.1

99.1

0.04

99.1

99.1

0.00

-2.246
2.237
-2.237

-1.135

2.000

0.976

kW

kvar

Cable MT (MR20U04)
Lnea AT-110 KV

Vd
% Drop
in Vmag

-1.212

-1.403

Mvar

% Bus Voltage

-2.243

2.246

MW

Losses

2.243

1.212

-2.243

-1.212

0.0

0.0

100.8

100.8

0.00

-0.236

-0.157

0.236

0.157

0.1

0.0

99.1

99.1

0.03

Trafo (TF-3202)

0.236

0.157

-0.233

-0.145

2.7

12.8

99.1

95.9

3.23

Cable B.T. (BP21V01)

0.233

0.145

-0.232

-0.144

1.1

0.7

95.9

100.4

0.46

LAT-220KV-Flint

2.254

-11.698

-2.247

1.369

6.9

-10328.5

100.0

100.3

0.29

23.0

-12817.0

Cable MT (MR20U02)

ETAP

Project:

7.0.0

Location:

Page:

11

Date:

12-07-2013

Contract:

SN:

12345678

Engineer:

Revision:

Base

Config.:

Normal

Filename:

Study Case: LF
ATA_CHILE_EB2

Alert Summary Report


% Alert Settings
Marginal

Critical
Loading
Bus

100.0

95.0

Cable

100.0

95.0

Reactor

100.0

95.0

Line

100.0

95.0

Transformer

100.0

95.0

Panel

100.0

95.0

Protective Device

100.0

95.0

Generator

100.0

95.0

OverVoltage

105.0

102.0

UnderVoltage

95.0

98.0

OverExcited (Q Max.)

100.0

95.0

UnderExcited (Q Min.)

100.0

Bus Voltage

Generator Excitation

Marginal Report
Device ID
Bus16

Type
Bus

Condition
Under Voltage

Rating/Limit
0.400

Unit
kV

Operating
0.384

% Operating
95.9

Phase Type
3-Phase

ETAP

Project:

7.0.0

Location:

Page:

12

Date:

12-07-2013

Contract:

SN:

12345678

Engineer:

Revision:

Base

Config.:

Normal

Filename:

Study Case: LF
ATA_CHILE_EB2

SUMMARY OF TOTAL GENERATION , LOADING & DEMAND

MW

Mvar

MVA

% PF

Source (Swing Buses):

2.254

-11.698

11.913

Source (Non-Swing Buses):

0.000

0.000

0.000

Total Demand:

2.254

-11.698

11.913

18.92 Leading

Total Motor Load:

1.999

0.976

2.225

89.87 Lagging

Total Static Load:

0.232

0.144

0.273

85.00 Lagging

Total Constant I Load:

0.000

0.000

0.000

Total Generic Load:

0.000

0.000

0.000

Apparent Losses:

0.023

-12.817

System Mismatch:

0.000

0.000

Number of Iterations: 3

18.92 Leading

You might also like