Professional Documents
Culture Documents
Number:
50860-BP-023
06/05/20
14
24/01/20
1
14
Rev Rev.
.
Date
2
Method
Statement
Client: BP
Document
Number:
N.
Dadashev
R.
Asgarov
N.
Dadashev
Prepared
Checked
QC-124-125
For approval
For approval
Approve
d
Page 1 of 16
Job
Number:
Method
Statement
50860-BP-023
Document
Number:
Client: BP
QC-124-125
Table of Contents
1.
2.
3.
4.
Scope................................................................................................................... 4
1.1.
Purpose.......................................................................................................... 4
1.2.
Definition of Scope......................................................................................... 4
1.3.
Scope Details................................................................................................. 4
1.4.
Location......................................................................................................... 4
1.5.
WO Nos.......................................................................................................... 4
1.6.
Discipline....................................................................................................... 4
Documentation.................................................................................................... 5
2.1.
Reference Documents.................................................................................... 5
2.2.
2.3.
GoC................................................................................................................ 5
Induction........................................................................................................ 6
3.2.
3.3.
3.4.
Risk Assessment............................................................................................ 7
3.5.
3.6.
Permit to Work............................................................................................... 7
3.7.
Environmental Impact....................................................................................7
3.8.
3.9.
3.10.
3.11.
Waste Management.................................................................................... 8
Requirements....................................................................................................... 9
4.1.
Personnel....................................................................................................... 9
4.2.
4.3.
4.4.
Isolations....................................................................................................... 9
Page 2 of 16
Job
Number:
4.5.
5.
Method
Statement
50860-BP-023
Document
Number:
Client: BP
QC-124-125
Responsibilities.............................................................................................. 9
Execution........................................................................................................... 10
5.1.
5.2.
Work Activities............................................................................................. 10
5.3.
Reinstatement............................................................................................. 10
Page 3 of 16
Job
Number:
Method
Statement
50860-BP-023
Document
Number:
Client: BP
QC-124-125
1. Scope
This section defines details of the scope of work that subject method statement was
prepared for.
1.1.
Purpose
1.2.
Definition of Scope
WO been raised for wrapping of soil air interface areas of 42 inlet & outlet main
lines at PSA-2 & repair the failed black wrap of soil / air interface areas of main inlet
and bypass lines at PS-05.
1.3.
Scope Details
1.4.
Location
1.5.
WO Nos.
1.6.
Discipline
Civil
Page 4 of 16
Job
Number:
Method
Statement
50860-BP-023
Document
Number:
Client: BP
QC-124-125
2. Documentation
This section defines all reference documentation, definitions & abbreviations.
1.7.
Reference Documents
Document Number:
AZSPUHSSEDOC004043
BTC-B12C-EC-2013-034
WREP-PS05-VI-2013-037
Sketch no. 1
Sketch no. 2
Sketch no. 3
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
MQSQPI011
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
STOPAQ Report
N/A
N/A
N/A
N/A
N/A
410088/00/L/PL/SP/010
1.8.
Document Description:
Azerbaijan Export Pipelines Waste Management
Procedure
External Inspection Report of Piping at PSA-2
External Inspection Report of Piping at PS-05
Excavation Layout for PSA-2
Excavation Layout for main inlet line at PS-05
Excavation Layout for bypass line at PS-05
MSDS for Stopaq Outerwrap PVC
MSDS for Stopaq Wrappingband CZH
MSDS for STOPAQ Outerglass Shield XT White
MSDS for Stopaq Paste
MSDS for Isopropyl Alcohol
MSDS for
TDS for Stopaq Wrappingband CZH
TDS for Stopaq Outerwrap PVC
TDS for Stopaq Outerglass Shield XT White
TDS for Stopaq Paste
ITP
Surface Preparation Guideline Notes (Stopaq)
Overlap of Mechanical Protection Notes (Stopaq)
Spiral Wrap Application Manual (Stopaq)
Riser Application Manual (Stopaq)
Straight Wrap Application Manual (Stopaq)
Outerglass Shield Application Manual (Stopaq)
Paste Application Manual (Stopaq)
Manning Level Chart
Stopaq Report
Calibration Certificate for Elcometer 1
Calibration Certificate for Elcometer 2
Calibration Certificate of Holiday Detector
Certification of Applicators
Certification of Inspector
Pipeline Construction Specification
Definition/Abbreviation:
ASAP
COMPANY
CONTRACTOR
GoC
QC 124, Rev.: 1, 05/11/2012
Description:
As soon as possible
Client of MQS LLC
MQS LLC
Guidance on Certification Documentation
Page 5 of 16
Job
Number:
Method
Statement
50860-BP-023
HSE
MS
N/A
Nos.
PPE
PTW
QTY
TBT
WO
1.9.
Document
Number:
Client: BP
QC-124-125
GoC
Page 6 of 16
Job
Number:
Method
Statement
50860-BP-023
Document
Number:
Client: BP
QC-124-125
1.10. Induction
Prior to start work all personnel must attend the specified HSE induction course,
conducted by the COMPANY Area Authority. All employees also shall sign the sheets
of acknowledgement with corporate Health and Safety Policy. Induction logbook
shall be properly implemented and maintained. Personnel who have not passed the
Project Induction Course shall undertake no work.
Page 7 of 16
Job
Number:
Method
Statement
50860-BP-023
Document
Number:
Client: BP
QC-124-125
performing their duties with the contrast movement of vehicle plant and personnel
within the work area. The Crew supervisors and workmen shall take special care
when working and moving near or under overhead services and buried existing
services.
Page 8 of 16
Job
Number:
Method
Statement
50860-BP-023
Document
Number:
Client: BP
QC-124-125
1.20.
Waste Management
Page 9 of 16
Job
Number:
Method
Statement
50860-BP-023
Client: BP
Document
Number:
QC-124-125
4. Requirements
This section describes personnel, tools, equipment etc. requirements. It also
describes impacts on operational process, required isolations and responsibilities of
client.
1.21.
Personnel
Trade
Site Supervisor/Performing
Authority (for excavation)
Civil Technician
Labour
Site Supervisor/Performing
Authority (for coating)
Tradesman
Coating Inspector
Tradesman
1.22.
QT
Y
Duration
47 days
1
5
16 days
46 days
14 days
1
1
2
14 days
12 days
12 days
The following tools and equipment are required to perform the work scope as
minimum:
Description
Pick-up Vehicle for Excavation
PA
Pick-up Vehicle for Excavation
Team
Pick-up Vehicle for Coating PA
Pick-up Vehicle for Coating
Team
Pick-up for Civil Technician
Power Hand Tools
Compactor
Water Pump
DFT Gauge
Dew Point Meter
Holiday Detector
Welding Rods Quiver
Compaction Test Equipment
Scissors
Knife
Measuring tape
Fitters Hand Tools (Set)
Abrading pads
QC 124, Rev.: 1, 05/11/2012
QT
Y
1
2
1
2
3
1
2
1
1
1
1
1
1
1
1
2
Duration
3 days
46 days
6 days
12 days
16 days
14 days
12 days
47 days
14 days
14 days
14 days
14 days
16 days
As required
As required
As required
As required
As required
Page 10 of 16
Job
Number:
Method
Statement
50860-BP-023
Wire brushes
Isopropanol
1.23.
Document
Number:
Client: BP
QC-124-125
As required
As required
N/A
1.24.
Isolations
N/A
1.25.
Responsibilities
Page 11 of 16
Job
Number:
Method
Statement
50860-BP-023
Document
Number:
Client: BP
QC-124-125
5. Execution
This section defines work activities implementation.
1.26.
Repair
1.27.
Work Activities
Task
No.
5.2.1
5.2.2
5.2.3
5.2.4
5.2.5
5.2.6
5.2.7
5.2.8
5.2.9
5.2.1
0
5.2.1
1
5.2.1
2
5.2.1
3
Task Steps
On arrival at site contact the site representative BP and identity all
MQS personnel involved in work activities.
The supervisor will request a permit to work.
Identify work locations.
Ensure all personnel involved in work activities take part in BP risk
assessment prior to work commencing.
Carry out tool box, ensuring that personnel are clearly understood
SOW and their own responsibilities.
Check all equipment is in place prior to work commencement.
Transfer all equipment and materials to work location taking care
not to obstruct any emergency escape routes, or cause any
obstruction or disruption to operations.
Erect signs and barriers at work location.
MQS Supervisor and Site Authority to identify area to be
manual/hand excavated.
MQS is to check and verify with site representatives and site
engineer location and condition of any underground services and
identify area where none exist prior to commencing to the works.
Scanning for underground services to be arranged by COMPANY.
Identify locations approved by site representative for storing top
soil, manual/hand excavated soil and unexpected materials.
Ensure that top soil, manual/hand excavated soil and unexpected
materials are placed separately.
Company Representative will confirm at which location
manual/hand excavation shall start and Contractor shall install
marker tapes parallel to the pipeline 1m either side of the
centreline.
Task
Durati
on
See
mannin
g level
chart
for
duratio
ns
Page 12 of 16
Job
Number:
5.2.1
4
5.2.1
5
5.2.1
6
5.2.1
7
5.2.1
8
5.2.1
9
5.2.2
0
5.2.2
1
5.2.2
2
5.2.2
3
5.2.2
4
5.2.2
5
5.2.2
6
5.2.2
7
5.2.2
8
Method
Statement
50860-BP-023
Document
Number:
Client: BP
QC-124-125
See
mannin
g level
chart
for
duratio
ns
Page 13 of 16
Job
Number:
Method
Statement
50860-BP-023
Document
Number:
Client: BP
QC-124-125
5.2.2
9
5.2.3
0
5.2.3
1
5.2.3
2
5.2.3
3
5.2.3
4
5.2.3
5
See
mannin
g level
chart
for
duratio
ns
For backfilling around the defect fine sand or original soil free of
stones and rock used. No PE tape is required. Wrapping repair
location with PE tape to protect against mechanical defects is only
recommended.
Prior commencement to backfilling MQS Supervisor to carry out
survey to ensure that trench is free of water and any unexpected
materials (stones etc.). Excavation shall not be backfilled without
approval of COMPANY. MQS Supervisor shall ensure that all
damage to the protective coating and wrapping has been repaired
and has had sufficient time to thoroughly cure and has been
Page 14 of 16
Job
Number:
5.2.3
6
5.2.3
7
5.2.3
8
5.2.3
9
5.2.4
0
5.2.4
1
5.2.4
2
Method
Statement
50860-BP-023
Document
Number:
Client: BP
QC-124-125
5.1.
Page 15 of 16
Job
Number:
Method
Statement
50860-BP-023
Document
Number:
Client: BP
QC-124-125
After Installation
5.2.
Reinstatement
Ensure work area is left clean and tidy and al derbies removed from site and
disposed of in the correct location
Remove all plant and equipment from site and close out permit to work
Upon completion ensure all relevant documentation and timesheets are
signed and approved by client