DATA using Packed Bitumen

20mm thick Open-Graded Premix Carpet using Bituminous


(penetration grade/modified bitumen) Binder

Providing, laying and rolling of open-graded premix carpet of 20 mm


thickness composed of 13.2 mm to 5.6 mm aggregates either using
penetration grade bitumen or emulsion to required line, grade and level to
serve as wearing course on a previously prepared

Unit = sqm
Taking output = 500 sqm (10 cum)
a)
1.08

Labour
Mate

21.00 Mazdoor (Unskilled)


6.00
b)
4.00
4.00
2.00

Mazdoor (Semi-Skilled)

178.00

day

192.24

155.00

day

3255.00

173.00

day

1038.00

Machinery

4485.24

Mixall 6/10 t capacity


Bitumen boiler oil
fired1000 litre capacity
fitted with spray set
Three wheel 80-100 kN static roller

1526.05

hour

6104.20

160.00

hour

640.00

371.00

hour

742.00
7486.20

Km : 0 / 0 - 1 / 0
0.73

Bitumen (S-65) @ 14.60 kg 41800.00

Crushed stone chipping,


13.50 13.2 mm to 5.6 mm @
0.27 cum per 10 sqm

745.28 cum

30514.00
10061.28

Km : 1 / 0 - 2 / 0

Km : 2 / 0 - 2 / 1

### 30514.00 41800.00 30514.00


749.83 10122.71

754.38 10184.13

1.00

Labour

4485.24

4485.24 4485.24

4485.24

4485.24

4485.24

1.00

Machinery

7486.20

7486.20 7486.20

7486.20

7486.20

7486.20

6568.34

6576.02

6583.70

59115.06

59184.17

59253.27

118.23

118.37

118.51

Overheads @ 12.5% on (a+b+c)


Cost of 500 sqm = a+b+c+d
Rate per sqm = (a+b+c+d)/500

Page 1 of 167

Seal Coat
Providing and laying seal coat sealing the voids in a bituminous surface laid
to the specified levels, grade and cross fall using Type A, Type B and Type C
as per Technical Specification Clause 510
Unit = sqm
Taking output = 1100 sqm
a)

Labour

1.15

Mate

178.00

day

204.70

1.00

Bitumen Sprayer

107.00

day

107.00

155.00

day

3410.00

173.00

day

1038.00

22.00 Mazdoor (Unskilled)


6.00
b)

Mazdoor (Semi-Skilled)
Machinery

4759.70

2.20

Bitumen boiler oil fired, capacity 1000 litre


fitted with spray set

160.00

hour

352.00

2.20

Three wheel 80-100 kN static roller

371.00

hour

816.20
1168.20

Km : 0 / 0 - 1 / 0
1.078

Bitumen (S-65) @ 9.80 kg


41800.00
per 10 sqm

9.90

Crushed stone chipping of


6.7 mm size 100 per cent
passing 11.2 mm sieve
and retained on 2.36 mm
sieve applied @ 0.09 cum
per 10 sqm

1.00

Labour

1.00

Machinery

458.95 cum

45060.40

Km : 2 / 0 - 2 / 1

### 45060.40 41800.00 45060.40

463.50

4588.65

468.05

4633.70

4759.70

4759.70 4759.70

4759.70

4759.70

4759.70

1168.20

1168.20 1168.20

1168.20

1168.20

1168.20

6941.49

6947.12

6952.75

62473.40

62524.07

62574.75

56.79

56.84

56.89

Overheads @ 12.5% on (a+b+c)


Cost of 1100 sqm = a+b+c+d
Rate per sqm = (a+b+c+d)/1100

Page 2 of 167

4543.61

Km : 1 / 0 - 2 / 0

DATA using Bituminous Emulsion

5.1

508.2

20mm thick Open-Graded Premix Carpet using Bitumen Emulsion as


per Technical Specification clause 508.2 .
Unit = sqm
Taking output = 900 sqm (24.3 cum)

a)
0.80

Labour
Mate

18.00 Mazdoor (Unskilled)


2.00
b)

Mazdoor (Skilled)

266.00

day

212.80

231.00

day

4158.00

258.00

day

516.00

Machinery

4886.80

6.00

Concrete Mixer 0.4/0.28 Cum capacity

188.00

hour

1128.00

3.60

Three wheel 80-100 kN static roller

371.00

hour

1335.60
2463.60

c)
1.94

Material
Bitumen
Emulsion
21.50 kg per 10 sqm

Km : 0 / 0 - 1 / 0
@

43700.00

Crushed stone chipping,


24.30 13.2 mm to 5.6 mm @
0.27 cum per 10 sqm

745.28 cum

84778.00
18110.30

1.00

Labour

4886.80

4886.80

1.00

Machinery

2463.60

2463.60

Overheads @ 12.5% on (a+b+c)


Cost of 900 sqm = a+b+c+d

13779.84
###

Rate per sqm = (a+b+c+d)/900

Page 3 of 167

137.80

Seal Coat
Providing and laying seal coat sealing the voids in a bituminous surface laid
to the specified levels, grade and cross fall using Type C as per Technical
Specification Clause 510
Unit = sqm
Taking output = 2700 sqm (24.3 cum)
a)
0.80

Labour
Mate

18.00 Mazdoor (Unskilled)


2.00
b)

Mazdoor (Skilled)

178.00

day

142.40

155.00

day

2790.00

173.00

day

346.00

Machinery

3278.40

6.00

Concrete Mixer 0.4/0.28 Cum capacity

188.00

hour

1128.00

3.60

Three wheel 80-100 kN static roller

371.00

hour

1335.60
2463.60

c)
2.70

Material

Km : 0 / 0 - 1 / 0

Bitumen Emulsion @ 10 kg
43700.00
per 10 sqm

Crushed stone chipping of


6.7 mm size 100 per cent
passing 11.2 mm sieve
24.30
and retained on 2.36 mm
sieve applied @ 0.09 cum
per 10 sqm

458.95 cum

###

11152.49

1.00

Labour

3278.40

3278.40

1.00

Machinery

2463.60

2463.60

Overheads @ 12.5% on (a+b+c)


Cost of 2700 sqm = a+b+c+d

16860.56
###

Rate per sqm = (a+b+c+d)/2700

Page 4 of 167

56.20

DISTRICT RURAL DEVELOPMENT AGENCY

DINDIGUL DISTRICT

VEDASANDUR PANCHYAT UNION

Improvements to the road from Kallukottai to


Name of Work :Rajapuram. Km: 0/0-1/0.
Name of Scheme :-

NABARD - XX

Estimate Amount :-

RS:- 28.80 Lakhs

ABSTRACT ESTIMATE
Name of Work: Improvements to the road from Kallukottai to Rajapuram. Km: 0/0-1/0.
Estimate Amount: Rs. 28.80 Lakhs
Sl.
No

QTY

DESCRIPTION OF WORK

RATE

UNIT AMOUNT

1800.00

Clearing scrub jungle by uprooting including all cutting charges


and depositing of the products and clearing as directed by the
departmental officers including all incidental charges etc.
complete.Sl.No. 17(3)

2.15

Sqm

3870

1620.00

Earth work excavating and depositing on bank with an initial lead


of 10m and initial lift of 2m in hard stiff clay, stiff black cotton,
hard red earth, shales, muram, gravel stoney earth and earth
mixed with small size boulders SS 20 A including laying and
spreading in layers of 250mm loose thick each, sectioning,
watering and compacting etc.., complete as per MORT & H 301305

44.60

CUM

72252

175.62

CUM

137708

1248.36

CUM

343061

Supply & Laying of U S Gravel including cost and conveyance


of gravel from approved sources to work site including labour for
spreading, watering and compacting by power roller to achieve
the required proctor density at 100% compaction at optimum
moisture content and hire and fuel charges for power roller,
water sprinkler and all other incidental charges such as traffic
barricading and providing danger lights etc.., complete

784.12

KM: 0/0-1/0

Providing 75mm consolidated thickness WBM for Bottom


LAYER using 1 cum of Grade III metal of size 90 -22.4MM
IRCsize HBG metal (1M3 Grade III HBG = 0.025Cum of 63mm +
0.20Cum of 53mm + 0.725Cum of 45mm + 0.025Cum of
22.4mm + 0.025Cum of 11.2mm) with 0.24 cum of gravel for
10sqm including cost and conveyance of all materials from
approved quarries to roadside and stacking of materials to
departmental gauge for premeasurements including labour for
laying, spreading new metal, hand packing to camber, watering
with all leads for good water even if the season is worst drought
condition forming edge bunds and consolidation by 8 to 10 tonne
power roller and finishing to the total thickness with lines
grades and cross sections as specified in the departmental
specifications including hire charges for all T&P fuel cost and
other running charges for power roller and other tools and plants
employed and all other incidental charges etc., complete.

274.81

KM: 0/0-1/0

Sl.
No

QTY

RATE

UNIT AMOUNT

Providing 75mm consolidated thickness WBM for Top LAYER


using 1 cum of Grade III metal of size 63 -11.2MM IRCsize HBG
metal (1M3 Grade II HBG = 0.025Cum of 63mm + 0.20Cum of
53mm + 0.725Cum of 45mm + 0.025Cum of 22.4mm +
0.025Cum of 11.2mm) with 0.24 cum of gravel for 10sqm
including cost and conveyance of all materials from approved
quarries to roadside and stacking of materials to departmental
gauge for premeasurements including labour for laying,
spreading new metal, hand packing to camber, watering with all
leads for good water even if the season is worst drought
condition forming edge bunds and consolidation by 8 to 10 tonne
power roller and finishing to the total thickness with lines
grades and cross sections as specified in the departmental
specifications including hire charges for all T&P fuel cost and
other running charges for power roller and other tools and plants
employed and all other incidental charges etc., complete.

DESCRIPTION OF WORK

274.81

KM: 0/0-1/0

3664.13

Applying tack coat using 4.00kgs of 10sqm over the WBM


surfaces including cost of bituminous emulsion which will be
supplied departmentally at section stores cost of which will be
recovered herewith including conveyance of bitumen emulsion to
actual work spot handling charges for brushing cleaning and
including labour charges for preparing the surface for laying to
actual work spot handling charges for brushing cleaning and to
tack coat and labour for applying the required quantity of
bitumen emulsion including the hire charges and fuel charges for
tools and plants employed for the work including all other
incidental charges such as barricading and providing danger
lights flags etc. complete as per standard specification no 503
MOST.

1497.47

CUM

411519

37.78

Sqm

138431

Sl.
No

QTY

DESCRIPTION OF WORK

RATE

UNIT AMOUNT

KM: 0/0-1/0

214.22

Sqm

784941

Providing and laying premix carpet with seal coat type A,


20mmconsolidated thickness using IRC size machine broken
HBG metal 0.18cum of 13.2mm and 0.09cum of machine
crushed broken HBG metal of 11.20mm with 14.60kg of bitumen
for premixing for 10sqm of premix carpet and 0.09cum 0.09cum
of 6.70mm IRC size machine broken HBG metal with 9.80kgs
of bitumen for sealcoat including cost and conveyance of all
materials from approved quarry including the cost of bitumen
which will be supplied departmentally and cost will be recovered
at the rates specified in the special condition appended herewith
and including conveyance bitumen to workspot handling
charges for the same at both ends including labour charges for
heating the bitumen to required temperature and mixing the
required quantity of metal and bitumen using mini hot mix plant
conveying the mix by wheel borrow including labour charges for
spreading the mix to grades,lines and profile and consolidation
with power roller rolling etc.,including hire,fuelcharges and
running charges for mini hot mix plant,power roller and all other
tools and plants employed &all incidental charges such as
barricading, providing danger lights etc.,complete complying with
standard specification(Payment shall be made for the finished
item of work after compaction)No.509&513 of MOST.

3664.13
9

Supply and fixing of size 0.90x0.15x0.15 HM stone

170.00

Nos

680

10

Supply and fixing of size 1.65x0.45x0.15 KM stone

328.00

Nos

328

Provision for 2m span culvert at 995m

189038

Nos

189038

10

Provision for Retaining wall at 550-610m

186999

Nos

186999

10

Provision for Retaining wall at 900-1000m

311666

Nos

311666

14

L.S

Provision for SOR 2014-15 @ 10%

L.S

258049

11

L.S

Provision for Name Board

L.S

3000

12

L.S

Provision for Photographic charges

L.S

500

13

L.S

Provision for Labour welfare fund 1.00%

L.S

28385

14

L.S

Provision for difference cost of materials

L.S

6000

15

L.S

Contigencies

L.S

3572

TOTAL

2880000

Sl.
No

QTY

DESCRIPTION OF WORK

RATE

UNIT AMOUNT

DETAILED ESTIMATE
Name of Work: Improvements to the road from Kallukottai to Rajapuram. Km: 0/0-1/0.
Name of Block : Vedasandur

Scheme

: NABARD XX

Name of Panchayat: Nagayakottai

Year

: 2014-15

Estimate Amount:Rs:28.80 Lakhs.


Sl.
No.

A.S.Ref :

Description of work

Nos.

Quantity

Clearing scrub jungle by uprooting including all cutting charges and depositing of the
1 products and clearing as directed by the departmental officers including all incidental
charges etc. complete.Sl.No. 17(3)
K.M 0/0 - 1/0

1000.00

3000.00

1.50

Total Quantity

3000.00

Deduct 40% voids

1200.00

Net Quantity

1800.00

Earth work excavating and depositing on bank with an initial lead of 10m and initial lift of
2m in hard stiff clay, stiff black cotton, hard red earth, shales, muram, gravel stoney earth
2 and earth mixed with small size boulders SS 20 A including laying and spreading in layers
of 250mm loose thick each, sectioning, watering and compacting etc.., complete as per
MORT & H 301-305
K.M 0/0 - 1/0

1000.00

0.90

0.90

1620.00
1620.00

Supply & Laying of U S Gravel including cost and conveyance of gravel from approved
sources to work site including labour for spreading, watering and compacting by power
3 roller to achieve the required proctor density at 100% compaction at optimum moisture
content and hire and fuel charges for power roller, water sprinkler and all other incidental
charges such as traffic barricading and providing danger lights etc.., complete
KM: 0/0-1/0 (Side berms)

1000.00

1.20

0.10

240.00

D/F existing Causeway @550m

-1

20.00

1.20

0.10

-4.80

D/F Culvert @ 995m

-1

2.90

1.20

0.10

-0.70

Sub Base

1000.00

3.75

0.15

562.50

D/F existing Causeway @550m

-1

20.00

3.75

0.15

-11.25

D/F Culvert @ 995m

-1

2.90

3.75

0.15

-1.63
784.12

Sl.
No.

Description of work

Nos.

Quantity

Providing 75mm consolidated thickness WBM for Bottom LAYER using 1 cum of Grade
III metal of size 90 -22.4MM IRCsize HBG metal (1M3 Grade III HBG = 0.025Cum of
63mm + 0.20Cum of 53mm + 0.725Cum of 45mm + 0.025Cum of 22.4mm + 0.025Cum of
11.2mm) with 0.24 cum of gravel for 10sqm including cost and conveyance of all materials
from approved quarries to roadside and stacking of materials to departmental gauge for
premeasurements including labour for laying, spreading new metal, hand packing to
4
camber, watering with all leads for good water even if the season is worst drought
condition forming edge bunds and consolidation by 8 to 10 tonne power roller and
finishing to the total thickness with lines grades and cross sections as specified in the
departmental specifications including hire charges for all T&P fuel cost and other running
charges for power roller and other tools and plants employed and all other incidental
charges etc., complete.
K.M 0/0 - 1/0

1000.00

3.75

0.075

281.25

D/F existing Causeway @550m

-1

20.00

3.75

0.075

-5.63

D/F Culvert @ 995m

-1

2.90

3.75

0.075

-0.82
274.81

Providing 75mm consolidated thickness WBM for Top LAYER using 1 cum of Grade III
metal of size 63 -11.2MM IRCsize HBG metal (1M3 Grade II HBG = 0.025Cum of 63mm +
0.20Cum of 53mm + 0.725Cum of 45mm + 0.025Cum of 22.4mm + 0.025Cum of 11.2mm)
with 0.24 cum of gravel for 10sqm including cost and conveyance of all materials from
approved quarries to roadside and stacking of materials to departmental gauge for
premeasurements including labour for laying, spreading new metal, hand packing to
5
camber, watering with all leads for good water even if the season is worst drought
condition forming edge bunds and consolidation by 8 to 10 tonne power roller and
finishing to the total thickness with lines grades and cross sections as specified in the
departmental specifications including hire charges for all T&P fuel cost and other running
charges for power roller and other tools and plants employed and all other incidental
charges etc., complete.
K.M 0/0 - 1/0

1000.00

3.75

0.075

281.25

D/F existing Causeway @550m

-1

20.00

3.75

0.075

-5.63

D/F Culvert @ 995m

-1

2.90

3.75

0.075

-0.82
274.81

Applying tack coat using 4.00kgs of 10sqm over the WBM surfaces including cost of
bituminous emulsion which will be supplied departmentally at section stores cost of which
will be recovered herewith including conveyance of bitumen emulsion to actual work spot
handling charges for brushing cleaning and including labour charges for preparing the
6 surface for laying to actual work spot handling charges for brushing cleaning and to tack
coat and labour for applying the required quantity of bitumen emulsion including the hire
charges and fuel charges for tools and plants employed for the work including all other
incidental charges such as barricading and providing danger lights flags etc. complete as
per standard specification no 503 MOST.
K.M 0/0 - 1/0

1000.00

3.75

3750.00

Sl.
No.

Description of work

Nos.

Quantity

D/F existing Causeway @550m

-1

20.00

3.75

-75.00

D/F Culvert @ 995m

-1

2.90

3.75

-10.88
3664.13

Providing and laying premix carpet with seal coat type A, 20mmconsolidated thickness
using IRC size machine broken HBG metal 0.18cum of 13.2mm and 0.09cum of machine
crushed broken HBG metal of 11.20mm with 14.60kg of bitumen for premixing for 10sqm
of premix carpet and 0.09cum 0.09cum of 6.70mm IRC size machine broken HBG metal
with 9.80kgs of bitumen for sealcoat including cost and conveyance of all materials from
approved quarry including the cost of bitumen which will be supplied departmentally and
cost will be recovered at the rates specified in the special condition appended herewith
and including conveyance bitumen to workspot handling charges for the same at both
7
ends including labour charges for heating the bitumen to required temperature and mixing
the required quantity of metal and bitumen using mini hot mix plant conveying the mix by
wheel borrow including labour charges for spreading the mix to grades,lines and profile
and consolidation with power roller rolling etc.,including hire,fuelcharges and running
charges for mini hot mix plant,power roller and all other tools and plants employed &all
incidental charges such as barricading, providing danger lights etc.,complete complying
with standard specification(Payment shall be made for the finished item of work after
compaction)No.509&513 of MOST.
K.M 0/0 - 1/0

1000.00

3.75

3750.00

D/F existing Causeway @550m

-1

20.00

3.75

-75.00

D/F Culvert @ 995m

-1

2.90

3.75

-10.88
3664.13

8 Provision for 2m span culvert at 995m

Sub
estimate

9 Provision for Retaining wall at 550-610m and 900-1000m

Sub
estimate

10 Supply and fixing of size 0.90x0.15x0.15 HM stone

4Nos

11 Supply and fixing of size 1.65x0.45x0.15 KM stone

1No

12 Provision for Name Board

LS

13 Provision for Photographic charges

LS

14 Difference in cost of materials

LS

15 Contigencies & other unforeseen charges

LS

ABSTRACT ESTIMATE
Name of Work: Construction of Retaining wall at ch 900m - 1000m in Kallukottai to Rajapuram
road.
Sl.No.

QTY

DESCRIPTION OF WORK

RATE

UNIT

92.00

Earth Work excavation and depositing on


bank with in initial lead of 10m and lift of
2m in hard gravelly soil as per SS 20B for
foundation

83.70

Cum

7700

15.75

Cement concrete 1:4:8 mix using 40mm


ISS metal fincluding cost and conveyance
of all materials to site and all labour
charges for mixing laying and curing etc.,
completed for foundation.

2381.98

Cum

37516

114.69

Random Rubble masonry in CM 1:5mix


using rough stones and bond stones with
simultaneous pointing including cost and
conveyance of all matials to site and all
labour charges etc., complete.

2246.68

Sqm

257672

195.05

Cum

8777

45.00

Plastering 1:5 mix 20mm thickness


including cost & conveyance of all
materials to site and all labour charges
etc., complete.
TOTAL

AMOUNT

311666

DETAILED ESTIMATE
Name of Work: Construction of Retaining wall at ch 900m - 1000m in Kallukottai to Rajapuram road.
Sl.No.

Description of work

Nos.

Quantity

Earth Work excavation and depositing on bank with in initial lead of 10m and lift of
2m in hard gravelly soil as per SS 20B for foundation
1

Retaining wall

1 x 1

100.00

1.15

0.80

92.00
92.00

Cement concrete 1:4:8 mix using 40mm ISS metal fincluding cost and conveyance of
all materials to site and all labour charges for mixing laying and curing etc.,
completed for foundation.
Retaining wall

1 x 1

100.00

1.05

0.15

15.75
15.75

Random Rubble masonry in CM 1:5mix using rough stones and bond stones with
simultaneous pointing including cost and conveyance of all matials to site and all
labour charges etc., complete.
3

Retaining wall - 1st footing

1 x 1

100.00

0.93

0.23

21.39

Retaining wall - 2nd footing

1 x 1

100.00

0.84

0.45

37.80

Retaining wall -AGL

1 x 1

100.00

(0.66+0.45)/2

1.00

55.50
114.69

Total Quantity
Plastering 1:5 mix 20mm thickness including cost & conveyance of all materials to
site and all labour charges etc., complete.
4

Retaining wall - Top

1 x 1

100.00

0.45

45.00
45.00

ABSTRACT ESTIMATE
Name of Work: Construction of Retaining wall at ch 550m - 610m in Kallukottai to Rajapuram road.
Sl.No.

QTY

DESCRIPTION OF WORK

RATE

UNIT

55.20

Earth Work excavation and depositing on


bank with in initial lead of 10m and lift of
2m in hard gravelly soil as per SS 20B for
foundation

83.70

Cum

4620

9.45

Cement concrete 1:4:8 mix using 40mm


ISS metal fincluding cost and conveyance
of all materials to site and all labour
charges for mixing laying and curing etc.,
completed for foundation.

2381.98

Cum

22510

68.81

Random Rubble masonry in CM 1:5mix


using rough stones and bond stones with
simultaneous pointing including cost and
conveyance of all matials to site and all
labour charges etc., complete.

2246.68

Sqm

154603

27.00

Plastering 1:5 mix 20mm thickness


including cost & conveyance of all
materials to site and all labour charges
etc., complete.

195.05

Cum

5266

TOTAL

AMOUNT

186999

DETAILED ESTIMATE
Name of Work: Construction of Retaining wall at ch 550m - 610m in Kallukottai to Rajapuram road.
Sl.No.

Description of work

Nos.

Quantity

Earth Work excavation and depositing on bank with in initial lead of 10m and lift of
2m in hard gravelly soil as per SS 20B for foundation
1

Retaining wall

1 x 1

60.00

1.15

0.80

55.20
55.20

Cement concrete 1:4:8 mix using 40mm ISS metal fincluding cost and conveyance of
all materials to site and all labour charges for mixing laying and curing etc.,
completed for foundation.
Retaining wall

1 x 1

60.00

1.05

0.15

9.45
9.45

Random Rubble masonry in CM 1:5mix using rough stones and bond stones with
simultaneous pointing including cost and conveyance of all matials to site and all
labour charges etc., complete.
3

Retaining wall - 1st footing

1 x 1

60.00

0.93

0.23

12.83

Retaining wall - 2nd footing

1 x 1

60.00

0.84

0.45

22.68

Retaining wall -AGL

1 x 1

60.00

(0.66+0.45)/2

1.00

33.30
68.81

Total Quantity
Plastering 1:5 mix 20mm thickness including cost & conveyance of all materials to
site and all labour charges etc., complete.
4

Retaining wall - Top

1 x 1

60.00

0.45

27.00
27.00

Name of work : Consruction of culvert at 0/8 of Kudappam to Idaiveli road.

Detailed cum Abstract estimate


Estimate Amount: Rs. 189038
Sl.
No

Description of
Work

No.

Contents

Amount

25.74
11.88
37.62
83.70

3149

7.02
3.24
10.26
2381.98

24439

Earthwork excavation in all clauses of soils and


1 depositing on bank with initial lead and lift for
foundation as per ss20B
body wall
wing wall

2
4

7.80
2.00

1.50
1.35

1.10
1.10

m3 @
Rs.
Cement concrete 1:4:8 mix using 40mm ISS HBG metal
2 including cost and conveyance of all matials to site and
all labour charges etc., complete
37.62

body wall
wing wall
Total

2
4

7.80
2.00

1.50
1.35

0.30
0.30

m3 @
Rs.
RR masonry CM 1:5 mix including all cost and
3 conveyance of all matirials and all labour charges etc.,
complete
10.26

Body wall Ist


footing

7.65

1.35

0.23

4.75

wing wall Ist


footing

2.00

1.20

0.23

2.21

Body wall II nd
footing

7.50

1.20

0.45

8.10

wing wall II nd
footing

2.00

1.05

0.45

3.78

Body wall Super


structure

7.50

1.05+0.
60/2

1.20

14.85

Wing wall Super


structure

2.00

0.90+0.
45/2

1.20

6.48

parapet

2.90

0.45

0.45

1.17

41.34

m3 @
Rs.

41.34

2246.68

92885

Supply and errection steel centering for sides soffits of


all concrete Items
Bed block
Deck slab
bottam
Deck slab sides
alround

16.20

7.50

20.80

0.15
2.00

4.86
15.00

0.25

5.20
25.06

25.06

m2 @
Rs.

395.00

9899

Supplying and fabrication of steel rods including cost &


5 conveyance of steel as per std. Specification etc.,
complete.
0.50
m2 @
0.50
57214.20
Rs.
CC 1:2:4 mix using 20 mm ISS HBG metal including
cost & conveyance of all materials to site and all labour
charges etc., complete.
Bed block

7.50

0.60

0.15

28607

1.35
1.35

1.35

m3 @
Rs.

3395.51

4584

5.44
5.44
4462.39

24264

2.61
3.60
6.21
195.05

1211

RCC 1:1.5:3 mix using 20 mm ISS HBG metal including


7 cost & conveyance of all materials to site and all labour
charges etc., complete.
Deck slab

7.50

2.90

0.25

5.44

m2 @
Rs.

plastering in cm 1:5 mix 20mm thick including all cost


and conveyance of all
parapet top
Wing wall

2
4

2.90
2.00

0.45
0.45
6.21

Total for 1 Culvert

189038

ROAD METAL RATE


Name of work :

Improvements to the road from Kallukottai to Rajapuram. Km: 0/0-1/0.

BASIC COST OF B MM TO 45 MM METAL ( WBM Grade II )


1

0.050 M3

90

mm IRC Me

322.00

16.10

0.025 M3

63

mm IRC Metal

465.00

11.63

0.450 M

63

mm IRC Me

465.00

209.25

0.200 M

53

mm IRC Metal

565.00

113.00

0.425 M3

53

mm IRC Me

565.00

240.13

0.725 M3

45

mm IRC Metal

757.00

548.83

0.050 M3

45

mm IRC Me

757.00

37.85

0.025 M3

22.40 mm IRC Metal

1061.00

26.53

0.025 M

22.40 mm IRC Met

1061.00

26.53

0.025 M

11.20 mm IRC Metal

668.00

16.70
716.69

529.86

Total

REACH

KM
Name of quarry

1.00
-

Kind of metal

0.00

Distance in KM

Total

1.00

Nature of
route for
conveyance
metalled or
unmetalled

Cost at
Quarry

Convey
ance (Plain)

Convey
ance
(Hills)

Stacking
Charges

20%
Extra
(Labour)

Total

Plains

Hills

WBM Gr II metal

529.86

62.40

0.00

3.15

0.00

595.41

--do--

WBM Gr III metal

716.69

62.40

0.00

3.15

0.00

782.24

--do--

45mm IRC metal

757.00

62.40

0.00

3.15

0.00

822.55

--do--

13.2mm IRC metal

983.00

62.40

0.00

3.15

0.00

1048.55

--do--

11.2mm IRC metal

668.00

62.40

0.00

3.15

0.00

733.55

--do--

6.7mm IRC metal

496.00

62.40

0.00

3.15

0.00

561.55

Average Lead

Gravel

130.00

7.80

0.00

3.05

0.00

140.85

Thadikombu

Sand for filling

110.00

7.80

0.00

3.05

0.00

120.85

At P.U.Store,Vedasandur

Packed bitumen

55500.00

0.00

0.00

0.00

0.00

55500.00

Emulsion

54700.00

0.00

0.00

0.00

0.00

54700.00

Vellampatty

0.00

BASIC COST OF 63 MM TO 45 MM METAL ( WBM Grade III )

--do--

9.5mm - 4.75mm Metal for GSB

519.20

62.40

0.00

3.05

0.00

584.65

Name of work Improvements to the road from Kallukottai to Rajapuram. Km: 0/0-1/0.
DATA SHEET 2013-14

Clearingthe Scrub jungle including all labour charges for burryingng and burning etc.,
Rs

2.15 /Sq.m
0.00

Add 20% Extra for Labour in hilly areas

2.15 /Sq.m
2

Earth work excavation and depositing on bank within initial lead and lift in
hard gravelly soil for Cutting sidedrain etc, complete. as per SS20 B
Rs

41.85 /Cu.m
0.00

Add 20% Extra for Labour in hilly areas

41.85 /Cu.m
2a

Earth work excavation and depositing on bank within initial lead and lift in
hard gravelly soil for Cutting sidedrain etc, complete. as per SS20 A
Rs

44.60 /Cu.m
0.00

Add 20% Extra for Labour in hilly areas

44.60 /Cu.m
3

WBM Grade II Bottom layer using 63 - 45mm IRC graded metal


-for Km

0.00

1.00

-for Km

0.00

0.00

DATA
1.00 cum

63-45mm IRC metal

595.41 /cum

595.41

0.00

0.00

0.24 cum

gravel

140.85 /cum

33.80

0.00

0.00

10.00 sqm

Hire and fuel charges

101.92 /10sqm

101.92

0.00

0.00

10.00 sqm

Labour charges

205.14 /10sqm

205.14

0.00

0.00

Add 20% Extra for Labour in hilly areas

0.00

0.00

936.27

0.00

936.27 /0.75
Rate per CUM:

0.00 /0.75
Rs

1248.36

Rs

0.00

WBM Grade III Top layer using 53-22.40mm IRC graded metal
-for Km

0.00

1.00

-for Km

0.00

0.00

DATA
1.00 cum

53-22.40mm IRC metal

782.24 /cum

782.24

0.00

0.00

0.24 cum

gravel

140.85 /cum

33.80

0.00

0.00

10.00 sqm

Hire and fuel charges

101.92 /10sqm

101.92

0.00

0.00

10.00 sqm

Labour charges

205.14 /10sqm

205.14

0.00

0.00

Add 20% Extra for Labour in hilly areas

0.00

0.00

1123.10

0.00

1123.10 /0.75
Rate per CUM:

0.00 /0.75
Rs

1497.47

Rs

0.00

Applying TACK COAT over WBM surface at 4Kg / 10 sq.m


-for Km

0.004 Mt

Emulsion bitumen

10.00 sqm

Labour charges

0.00

54700.00 /mt
144.00 /10 sqm

Add 20% Extra for Labour in hilly areas


L.S

Hire charges for bitumen sprayer

Rate per sqm

Rs

1.00

0.00

0.00

218.80

0.00

0.00

144.00

144.00

144.00

0.00

0.00

15.00

0.00

377.80

144.00

37.78

Rs

14.40

Providing and Laying Gravel to 100mm compacted thick including cost & conveyance
of gravel from approved sources to work site including labour for spreading, watering
and compacting by Power roller to achieve the required Proctor density at 100%
compaction
KM
Rate

Proctor Density

2.05

Field Density

1.77

Extra
required

Gravel

1.16

Cost of Gravel

1.00

Hire & Labour Charges

0.00 1.00
Per

Amount

0.00 0.00
Rate

Amount

Amount

m3

163.39

0.00

0.00

0.00

0.00

12.23

m3

12.23

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

road
PREMIX CARPET WITH SEAL COAT TYPE ' A Plastic
'
-for Km 0.00
-for Km
1.00

0.09 Cum
22.448 Kgs

Rate

140.85

Rate for 1 m3 = 175.62

0.18 Cum
0.09 Cum

0.00 0.00

0.16

Add 20% Extra for Labour in hilly areas

-for Km

13.2mm IRC metal


11.2 mm IRC metal
6.7 mm IRC metal
Bitumen 80/100

0.00

0.00

1048.55 /cum
733.55 /cum

188.74
66.02

0.00
0.00

0
0.00

561.55 /cum
55500.00 /Mt

50.54
1245.86

0.00
55500.00

0
1245.86

58.56

30.00
241.17

58.56

1.952 Kgs
10.00 Sqm

Plastic wastage
Hire & fuel charges for P.

30.00 Kg
241.17 /10sqm

10.00 Sqm
10.00 Sqm

Hire & fuel charges for S


Labour charges for P.C

33.34 /10sqm
193.50 /10sqm

10.00 Sqm

Labour charges for S.C


64.50 /10sqm
Add 20% Extra for Labour in hilly areas

532.51

33.34
193.50

532.51

64.50

0.00

0.00

2142.23
214.2234

1836.93
183.693

PAGE23
Name of work :

Improvements to the road from Kallukottai to Rajapuram. Km: 0/0-1/0.

Estimate Amount : Rs:


COST OF MATERIALS AT SITE
loading
Sl.No
name of materials
lead in KM
cost
conveyance unloadin
g
1
Cement
16
4560.00
74.20
0.00
2
sand for mortar
35
110.00
233.50
0.00
3
sand for filling
35
110.00
233.50
0.00
4
Rough stone
8
332.00
62.40
0.00
5
Bond stone
8
455.00
62.40
0.00
6
40mm iss metal
8
742.00
62.40
0.00
7
20mm iss metal
8
1034.00
62.40
0.00
8
10-12mm metal
8
831.50
62.40
0.00
9
steel
16
45600.00
74.20
0.00
10
6-10mm metal
8
591.50
62.40
0.00
11
25 mm metal
8
580.00
62.40
0.00
12
12 mm metal
8
958.00
62.40
0.00
13
6 mm metal
8
478.00
62.40
0.00
14
Gravel
1
130.00
7.80
0.00
SUB DATA
CEMENT MORTAR 1:1.5
0.960 MT
Cost of cement
4634.20 /MT
1.00 cum
Cost of sand
343.50 /cum

total
4634.20
343.50
343.50
394.40
517.40
804.40
1096.40
893.90
45674.20
653.90
642.40
1020.40
540.40
137.80

4448.83
343.50
4792.33

CEMENT MORTAR 1:2


0.720 MT
Cost of cement
1.00 cum
Cost of sand

4634.20 /MT
343.50 /cum

3336.62
343.50
3680.12

CEMENT MORTAR 1:4


0.360 MT
Cost of cement
1.00 cum
Cost of sand

4634.20 /MT
343.50 /cum

1668.31
343.50
2011.81
43.35
2055.16

1.00 cum

Mixing charges

43.35 /cum

CEMENT MORTAR 1:5


0.288 MT
Cost of cement
1.00 cum
Cost of sand

4634.20 /MT
343.50 /cum

1.00 cum

Qty

9.00
4.50
1.80
17.70
14.10

Mixing charges

43.35 /cum

1334.65
343.50
1678.15
43.35
1721.50

DATA
Earth work excavation and depositing on bank with in initial lead of 10 m
and initial lift of 2m in hard stiff clay, stiff black cotton soil, hard red earth,
earth mixed with small sized boulders and hard gravelly soil as per SS 20B
Rate / cum
41.85
Add 100% extra for narrow foundati
41.85
83.70 /cum
Items
Rate
Per
Amount
Cement concrete 1:4:8 mix using 40mm ISS metal including cost and
conveyance of all materials to site and all labour charges for mixing,
laying and curing etc complete for 10 cum.
cum
Cost of 40mm ISS metal
804.40 /cum
7239.60
cum
Cost of cement mortar 1:4
2011.81 /cum
9053.15
nos
Mason II class
326.00 /each
586.80
nos
Mazdoor I class
228.00 /each
4035.60
nos
Mazdoor II class
206.00 /each
2904.60

PAGE24
0.00
23819.75
RATE @ RS

2381.98 /cum

PAGE25
Cement concrete 1:2:4 mix using 20mm ISS metal including cost and
conveyance of all materials to site and all labour charges for mixing,
laying and curing etc complete for bed blocks for 10 cum
9.00
4.50
1.80
17.70
14.10

cum
cum
nos
nos
nos

20mm ISS metal


Cement mortar 1:2
Mason II class
Mazdoor I class
Mazdoor II class

10.00
1.00
3.40
7.10
10.60
14.10
14.10

Random rubble masonry in cement mortar 1:5 mix with simultaneous


pointing including cost and conveyance pf all materials to site and all
labour charges etc complete for 10 cum
cum
Rough stone
394.40 /cum
cum
Bond stone
517.40 /cum
cum
Cement mortar 1:5
1721.50 /cum
nos
Mason I class
363.00 /each
nos
Mason II class
326.00 /each
nos
Mazdoor I class
228.00 /each
nos
Mazdoor II class
206.00 /each

RATE @RS

1096.40
3680.12
326.00
228.00
206.00

/cum
/cum
/each
/each
/each

9867.60
16560.54
586.80
4035.60
2904.60
0.00
33955.14

3395.51 /cum

3944.00
517.40
5853.10
2577.30
3455.60
3214.80
2904.60
0.00
22466.80

RATE @RS
2246.68 /cum
Supplying and fabrication of steel including cost and conveyance of
steel to site and all labour charges for straightening, cutting to length,
bending to shape and tying in position and forming grills for all R.C.C works
1.00 MT
0.01 mt
35.00 nos

Cost of steel
Cost of binding wire
Fitter I class

45674.20 /mt
48000.00 /mt
316.00 /each

45674.20
480.00
11060.00
57214.20

RATE @RS 57214.20 /MT

9.00
4.50
4308.00
3.50
21.20
35.30

Reinforced cement concrete 1:1.5:3 mix using 20mm ISS metal


including cost and conveyance of all materials to site and all
labour charges for mixing, laying, and curing etc complete for 10 cum
cum
20mm ISSmetal
1096.40 /cum
cum
sand
343.50 /cum
KG
Cement
4634.20 /MT
nos
Mason II class
326.00 /each
nos
Mazdoor I class
228.00 /each
nos
Mazdoor II class
206.00 /each

9867.60
1545.75
19964.13
1141.00
4833.60
7271.80
44623.88

0.22
2.20
0.50
3.20

RATE @RS
4462.39 /cum
Plastering with cement mortar 1:5 mix to 20 mm thick including
cost and conveyance of all materials to site and all labour
charges etc complete for 10 Sqm
cum
Cement mortar 1:5
1721.50 /cum
nos
Mason I class
363.00 /each
nos
Mazdoor I class
228.00 /each
nos
Mazdoor II class
206.00 /each

378.73
798.60
114.00
659.20
1950.53

RATE @RS

195.05 /Sqm

Steel=

I
S.No

54700 54.15 50.00


45180

Ending Chainage

Kerosene & Oil

Diesel

Length of Road
Starting Chainage

55500

Emulsion

Bitumen

Rates

0.000

1.000

Hill Percentage

50 %

ROADS
Description of work

1 Clearing the light jungle

0.00

1.00 0.00

0.00

2.15

2 Earth work excavation SS 20A

44.60

3 Earth work excavation SS 20B

41.85

4 Collection and spreading of gritty gravel

175.62

4 Collection and spreading of Well gravel

97.34

0.00

5 WBM Grade II

1248.36

0.00

6 WBM Grade III

1497.47

0.00

7 Advance Patch work- 50mm tk

3454.74

0.00

8 Advance Patch work- 25mm tk

3680.74

0.00

9 TACK COAT over WBM 4Kg/10 sqm

37.78

10 TACK COAT over WBM 3Kg/10 sqm

22.80

11 PREMIX CARPET WITH SEAL COAT


12

PREMIX CARPET WITH SEAL COAT

219.20
214.2234

0.00
183.693

612.29

13 GSB

II CD WORKS

S.No

Materials

Plain

Hills

Cement & Steel

16

Sand

35

Metal

Gravel

Description of work

1 Earth work SS 20 B

Rates

83.70

2 C.C.1:4:8

2381.98

3 C : C 1: 5: 10

2231.90

4 R . R. MASONARY 1 : 5

2246.68

5 R . R. MASONARY 1 : 4

2360.12

6 C : C 1: 3: 6

using 40 mm metal

2632.22

7 C : C 1: 2: 4

using 20 mm metal

3395.51

8 R.C. C 1: 1 1/2: 3

4467.95

9 R.C. C 1: 2: 4

3963.29

10 R.C.C. 1: 2: 4

3967.45

11 Fabrication of STEEL

57214.20

12 Steel Centring

404.00

13 Steel Shuttering

202.00

14 Plastering CM 1:5 - 20mm Tk

195.05

15 Plastering CM 1:4- 20mm Tk

202.39

16 Plastering CM 1:4- 12mm Tk

102.76

16 Plastering CM 1:5- 12mm Tk

98.09

Plastering CM 1:3- 10mm Tk

113.78

17 Gravel Filling

155.55

18 Sand Filling

356.50

19 Wearing Coat

347.96

20

Dry stone masonry

1012.97

7.50

7.50

0.50

0.00

Hills

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00 0.00

0.00 0.00

0.00

Sand

Metal 13.2 - 6.70mm

Plain

Gravel

Metal 63 - 22.4 mm

Lead

0.00

12.23

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

2442.00

2442.00

0.00

0.00

2442.00

0.00

0.00

0.00
59.11

135.42
59.107

135.42

0.00

Highways Department
SCHEDULE OF RATE 2013-14

Rates for Labour

S.No.

Description

Unit

Rates in
Rupees

Bituminous work Labour

FUEL RATES
Diesel (Local Rate) Litre

Bitumen sprayer Man

Day

300.00

Furnace Oil

Litre

Bitumen raker Man

Day

312.00

Kerosene

Litre

Heat master operator

Day

312.00

Mini Hot Mix plant Operator

Day

312.00

BITUMEN

Gunnuting plant Operator

Day

261.00

Bitumen packed

MT

Gunnuting gun Operator

Day

285.00

Emulsion

MT

Road Mazdoor Grade I

Day

258.00

Road Mazdoor Grade II

Day

231.00

Road Mazdoor Grade III

Day

231.00

10

Head Mazdoor

Day

266.00

11

Mazdoor (Skilled)

228.00

12

Mazdoor (Unskilled)

206.00

II

Hire Charges for Machineries

Power roller 8 - 10 ton

Day

828.00

Water sprinkler

Day

1159.00

Mini Hot Mix Plant

Day

1674.00

Bitumen Boiler with fuel

Day

10 Sq.m

15.00

Bitumen Sprayer

Bitumen Boiler without fuel

Day

202.00

Central Mixing Plant

Day

9696.00

Vibratory Roller

Day

5428.00

Paver Finisher

Day

2447.00

10

Tipper Trucks

Day

1094.00

11

Water

12

Hydraulic Broom

hour

357.00

13

Air Compressor 210 cfm

hour

319.00

14

Loader

Day

1205.00

15

Water Tanker

Day

855.00

16

Motor Grader

Day

13533.00

17

Base Mix plant Pug mill

Day

6679.00

18

Electric Generating set 125 KVA

Day

5179.00

19

Tractor Rotovator

Day

2824.00

Kl

60.00

hour

353.00

20

Tractor

21

Tipper Trucks/Tonne Km

22

Fuel for water tanker/day

Day

25.00

23

Rotovator

hour

17.00

24

Wet Mix Plant 75 Ton Capacity

Day

8933.00

25

Bitumen Emulsion sprayer

26

Pneumatic tyred roller including hour

1243.00

27

Water Tank 6 KL capacity (GSB)

Day

2005.00

28

3 Wheeled 8-10T Static Roller per Hour

Tonne

10 Sq.m

2.00

15.00

460.00

III FUEL RATES


1

Diesel (Local Rate)

Litre

54.15

Furnace Oil

Litre

50.00

Kerosene

Litre

50.00

IV

Rates of works

Scrub jungle

Sqm

2.15

Jungle clearance

Sqm

2.35

Earth work SS 20 A

Cum

44.60

Earth work SS 20B

Cum

41.85

Earth work SDR not rg blas

Cum

62.30

Medium rock not req blasting

Cum

109.80

Hard rock req blasting

Cum

297.00

Addl one lead over 10m

Cum

5.25

Addl one lift over 2m

Cum

4.20

10

Refilling excavated earth

Cum

14.70

11

Refilling excavated sand

Cum

13.00

12

Spreading gravel (labour only)

Cum

5.16

13

Stacking metal

Cum

3.15

14

Stacking gravel

Cum

3.05

15

Stacking sand

Cum

3.05

16

Kilometre stone

each

328.00

17

Hectametre stone

each

170.00

RATES OF MATERIALS

Sl.No. Description

2013-14

Unit

Coimbatore
Circle

Hard Broken Stone IRC Standard : Hand Broken /


Machine Crushed

90mm size

one cum

322.00

ii

75mm size

one cum

360.00

iii

63mm size

one cum

465.00

iv

53mm size

one cum

565.00

46.5mm size

one cum

757.00

vi

45mm size

one cum

757.00

vii

37.5mm size

one cum

773.00

viii

26.5mm size

one cum

731.00

ix

25mm size

one cum

731.00

22.4mm size

one cum 1061.00

xi

13.2mm size

one cum

983.00

xii

11.2mm size

one cum

668.00

xiii

6.7mm size

one cum

496.00

xiv

6mm size

one cum

496.00

xv

5.6mm size

one cum

496.00

xvi

4.75mm size & below

one cum

440.00

xvii

Gravel

130.00

xviii Wellgravel

107.80

xix

110.00

Sand for filling

Bitumen packed 80/100

Mt

Emulsion

Mt

VI

Other Materials
Mt

4700.00

Sand

one cum

110.00

Sand for filling

one cum

110.00

Rough stone

one cum

332.00

Bond stone

one cum

455.00

40mm ISS metal

one cum

742.00

20mm ISS metal

one cum 1034.00

Country bricks

Cement

2 3/4"

1000 nos 3985.00

VII Conveyance Table (for PLAINS)


RATES FOR CONVEYANCE OF MATERIAL BY ROAD IN PLAINS FOR THE YEAR 2013-14
Cham
ber
Br.
Mangal
Broken
bricks
Jelly,
Country
ore
Stone
,
Distance in
Cement/Stee Wood
Bricks
Tiles
Sl.No.
Sand
Floori
Kilometre
l
work
(1000 (1000N
Gravel
ng
(one
Nos,)
os,)
3
(one m )
tiles.
3
m)
(1000
1
2
3
4
5
6
7
nos)
1
Co- efficient
1.60
1.35
1.80
2.25
1.00 1.10
2

Incidental charges

Add for every extra 1 km or part thereof

0 - 10 Kms.

4.9 5.40

7.80

6.60

8.80

11.00

10 - 20 Kms.

4.2 4.65

6.70

5.65

7.60

9.25

20 - 40 Kms.

3.7 4.10

5.90

5.00

6.70

8.35

40 - 80 Kms.

3.1 3.45

4.95

4.20

5.60

7.00

Above 80 Kms.

2.85 3.10

4.50

3.75

5.05

6.30

Loading Charges

73.1 34.90

23.90

34.35

34.35

34.35

Unloading Charges
An Adhoc extra
for inter state
works
L & UL Charges

73.1 34.90

23.90

34.35

34.35

34.35

14.55 16.00

23.25

19.60

26.15

26.15

0.00

0.00

0.00

0.00

6
7

0 0.00

VIII Conveyance Table (for HILLS)


RATES FOR CONVEYANCE OF MATERIAL BY ROAD IN

Sl.No.

Distance in
Kilometre
2

Br.
Jelly,
Cement/Stee Wood
l
work
(one
m3)
3
0.00

Broken
Stone
Sand
Gravel
(one m3)

HILLS FOR THE YEAR 2013 - 14


Mangal
Country
ore
Cham
Bricks
Tiles
ber
(1000 (1000N
bricks
Nos,)
os,)

0.00

0.00

0.00

0.00

Co- efficient

Incidental charges

Add for every extra 1 km or part thereof

0 - 10 Kms.

9.8 10.80

15.60

13.20

17.60

22.00

10 - 20 Kms.

8.4 9.30

13.40

11.30

15.20

18.50

20 - 40 Kms.

7.4 8.20

11.80

10.00

13.40

16.70

40 - 80 Kms.

6.2 6.90

9.90

8.40

11.20

14.00

Above 80 Kms.

5.7 6.20

9.00

7.50

10.10

12.60

IX.

Lumpsum Rates

1 Hire and labour charges for WBM Gr.II & III


a) Forming edge bunds

L.S.

b) Maintaining berms for traffic barricading, providing danger lights

L.S.

c) Watering and keeping the surface moist for 15days

L.S.

d) Rent for tools including baskets, sherpining, pick axes

L.S.

e) Sundries such as rope, waterpots

L.S.

2 Labour charges for Patch work with Bituminous Premix


materials for 0.625 cum of Bituminous material.
Brushing and cleaning the surface

L.S

Spreading the Bitumen for Tack coat

L.S

Prmixing chips with Bitumen in the Drum mixer and


laying of 0.625 m3 of metal with 44 Kg of Bitumen

L.S

Levelling and tamping the Premix in the patches and pot holes rolling etc

L.S

Special tools such as wire brush

L.S

Regulation of traffic

L.S

Sundries such as barricading arrangements,

L.S

3 Labour charges for WBM patch work - 1 cum


Brushing and cleaning the surface

L.S

Levelling the materials in the patches and pot holes

L.S

and tamping after blinding with water


Special tools such as wire brush

L.S

Regulation of traffic

L.S

Sundries such as barricading arrangements,

L.S

conveying water etc,.

80/100 KN
Sl.no

Road Roller Out Turn

Type of Consolidation/Compaction

Out Turn

1 Earth work Compaction

425 Cum

2 Gravel soling

425 Cum

3 Soling with 150mm cube stones

600 Cum

4 Soling with hard gravel stones

150mm Thick

5 Sand-Gravel mix soling

650 Cum
450 Cum

6 Sand-Gravel mix

150mm Thick

950 Cum

7 Water bound macadam

40mm to 50mm Thic

740 Sqm

8 Water bound macadam


9 Water bound macadam

50mm to 75mm Thic

550 Sqm

75mm Thick

450 Sqm

10 Water bound macadam

100mm Thick

350 Sqm

11 Bituminuous macadam

50mm Thick

300 Sqm

12 Bituminuous macadam

75mm Thick

225 Sqm

13 Bult-up spray grout

75mm Thick

225 Sqm

14 Asphaltic concrete

40mm Thick

300 Sqm

15 Premix Carpet

20mm Thick

500 Sqm

16 Seal Coat

1000 Sqm

17 Single coat Surface dressing

800 Sqm

18 Two coats of Surface dressing

550 Sqm

19 Mix seal surfacing

600 Sqm

20 Semi dense Carpet

400 Sqm

21 Blacktop chipping carpet with hard metal

1100 Sqm

54.15
50.00
50.00

55500.00
54700.00

FOR THE YEAR 2013-14

FOR THE YEAR 2013 - 14

1.46
1.46
1.46
1.46
1.52

4.55
3.54
17.68
6.06
2.53
2.53
0.71

2.20
5.50
2.20
2.20
0.55

Highways Department
SCHEDULE OF RATE 2013-14

Rates for Labour

S.No.

Description

Unit

Rates in
Rupees

Bituminous work Labour

FUEL RATES
Diesel (Local Rate)

Litre

Bitumen sprayer Man

Day

300.00

Furnace Oil

Litre

Bitumen raker Man

Day

312.00

Kerosene

Litre

Heat master operator

Day

312.00

Mini Hot Mix plant Operator

Day

312.00

BITUMEN

Gunnuting plant Operator

Day

261.00

Bitumen packed

MT

Gunnuting gun Operator

Day

285.00

Emulsion

MT

Road Mazdoor Grade I

Day

258.00

Road Mazdoor Grade II

Day

231.00

Road Mazdoor Grade III

Day

231.00

10

Head Mazdoor

Day

266.00

11

Mazdoor (Skilled)

228.00

12

Mazdoor (Unskilled)

206.00

II

Hire Charges for Machineries


Bitumen emulsion pressure

828.00 distributor @ 1750 sqm per

Power roller 8 - 10 ton

Day

Water sprinkler

Day

hour
1159.00 Water tanker 6 kl - 1 trip per h

Mini Hot Mix Plant

Day

1674.00 Mixall 6/10 t capacity

Bitumen Boiler with fuel

Day

10 Sq.m

Bitumen boiler oil fired1000


litre capacity fitted with spray
set
15.00 Three wheel 80-100 kN static ro

Bitumen Sprayer

Bitumen Boiler without fuel

Day

Central Mixing Plant

Day

9696.00

Vibratory Roller

Day

5428.00

Paver Finisher

Day

2447.00

10

Tipper Trucks

Day

1094.00

11

Water

12

Hydraulic Broom

hour

357.00

13

Air Compressor 210 cfm

hour

319.00

14

Loader

Day

1205.00

15

Water Tanker

Day

855.00

16

Motor Grader

Day

###

17

Base Mix plant Pug mill

Day

6679.00

18

Electric Generating set 125 K

Day

5179.00

19

Tractor Rotovator

Day

2824.00

20

Tractor

hour

363.00

Kl

202.00 Bitumen Sprayer per day

60.00

Tonne

2.00

21

Tipper Trucks/Tonne Km

22

Fuel for water tanker/day

Day

25.00

23

Rotovator

hour

17.00

24

Wet Mix Plant 75 Ton Capacity

Day

8933.00

25

Bitumen Emulsion sprayer

26

Pneumatic tyred roller includin

hour

1243.00

27

Water Tank 6 KL capacity (GSB

Day

2005.00

III

FUEL RATES

Diesel (Local Rate)

Litre

49.40

Furnace Oil

Litre

50.00

Kerosene

Litre

30.00

IV

10 Sq.m

15.00

Rates of works

Scrub jungle

Sqm

2.15

Jungle clearance

Sqm

2.35

Earth work SS 20 A

Cum

44.60

23.2

Earth work SS 20B

Cum

41.85

21.1

Earth work SDR not rg blas

Cum

62.30

Medium rock not req blasting

Cum

109.80

Hard rock req blasting

Cum

297.00

Addl one lead over 10m

Cum

5.25

Addl one lift over 2m

Cum

4.20

10

Refilling excavated earth

Cum

14.70

11

Refilling excavated sand

Cum

13.00

12

Spreading gravel (labour only)

Cum

5.16

13

Stacking metal

Cum

3.15

14

Stacking gravel

Cum

3.05

15

Stacking sand

Cum

3.05

16

Kilometre stone

each

328.00

17

Hectametre stone

each

165.00

26.4

RATES OF MATERIALS

Sl.No. Description

2013-14

Unit

Coimbatore
Circle

Hard Broken Stone IRC Standard : Hand Broken /


Machine Crushed

90mm size

one cum

322.00

ii

75mm size

one cum

360.00

iii

63mm size

one cum

465.00

iv

53mm size

one cum

565.00

46.5mm size

one cum

757.00

vi

45mm size

one cum

757.00

242.55

vii

37.5mm size

one cum

773.00

242.55

viii

26.5mm size

one cum

731.00

242.55

ix

25mm size

one cum

731.00

22.4mm size

one cum

1061.00

xi

13.2mm size

one cum

983.00

xii

11.2mm size

one cum

668.00

xiii

6.7mm size

one cum

496.00

xiv

6mm size

one cum

496.00

xv

5.6mm size

one cum

496.00

xvi

4.75mm size & below

one cum

440.00

xvii

Gravel

130.00

xviii Wellgravel

107.80

xix

110.00

Sand for filling

Bitumen packed 80/100

Mt

Emulsion

Mt

VI

Other Materials
Mt

4700.00

Sand

one cum

110.00

Sand for filling

one cum

110.00

Rough stone

one cum

332.00

Bond stone

one cum

455.00

40mm ISS metal

one cum

742.00

20mm ISS metal

one cum

1034.00

Country bricks

1000 nos

3985.00

25mm ISS metal

Cement

2 3/4"

one cum

638.00

519.2

420

VII

2013-14

Conveyance Table (for PLAINS)

RATES FOR CONVEYANCE OF MATERIAL BY ROAD IN PLAINS FOR THE YEAR 2013-14

Sl.No.

Distance in Kilometre

Br. Jelly,
Wood work
(one m3)

Broken
Stone
Sand
Gravel
(one m3)

Mangalo Chamber
Country
re Tiles
bricks,
Bricks
(1000No Flooring
(1000
s,)
tiles.
Nos,)
(1000nos)

1.10

1.60

1.35

1.80

2.25

Co- efficient

Incidental charges

Add for every extra 1 km or part thereof

0 - 10 Kms.

5.40

7.80

6.60

8.80

11.00

10 - 20 Kms.

4.65

6.70

5.65

7.60

9.25

20 - 40 Kms.

4.10

5.90

5.00

6.70

8.35

40 - 80 Kms.

3.45

4.95

4.20

5.60

7.00

Above 80 Kms.

3.10

4.50

3.75

5.05

6.30

Loading Charges

34.90

23.90

34.35

34.35

34.35

Unloading Charges

34.90

23.90

34.35

34.35

34.35

An Adhoc extra for inter state

16.00

23.25

19.60

26.15

32.70

L & UL Charges

0.00

0.00

0.00

0.00

0.00

VIII Conveyance Table (for HILLS)


RATES FOR CONVEYANCE OF MATERIAL BY ROAD IN

Sl.No.

Distance in Kilometre

HILLS FOR THE YEAR 2013 - 14

Br. Jelly,
Wood work
(one m3)

Broken
Stone
Sand
Gravel
(one m3)

Mangalo
Country
re Tiles
Bricks
Chamber
(1000No
(1000
bricks
s,)
Nos,)

0.00

0.00

0.00

0.00

0.00

10.80

15.60

13.20

17.60

22.00

Co- efficient

Incidental charges

Add for every extra 1 km or part thereof

0 - 10 Kms.

10 - 20 Kms.

9.30

13.40

11.30

15.20

18.50

20 - 40 Kms.

8.20

11.80

10.00

13.40

16.70

40 - 80 Kms.

6.90

9.90

8.40

11.20

14.00

Above 80 Kms.

6.20

9.00

7.50

10.10

12.60

IX.

Lumpsum Rates

1 Hire and labour charges for WBM Gr.II & III


a) Forming edge bunds

L.S.

b) Maintaining berms for traffic barricading, providing danger lights

L.S.

c) Watering and keeping the surface moist for 15days

L.S.

d) Rent for tools including baskets, sherpining, pick axes

L.S.

e) Sundries such as rope, waterpots

L.S.

2 Labour charges for Patch work with Bituminous Premix


materials for 0.625 cum of Bituminous material.
Brushing and cleaning the surface

L.S

Spreading the Bitumen for Tack coat

L.S

Prmixing chips with Bitumen in the Drum mixer and


laying of 0.625 m3 of metal with 44 Kg of Bitumen

L.S

Levelling and tamping the Premix in the patches and pot holes rolling etc.

L.S

Special tools such as wire brush

L.S

Regulation of traffic

L.S

Sundries such as barricading arrangements,

L.S

3 Labour charges for WBM patch work - 1 cum


Brushing and cleaning the surface

L.S

Levelling the materials in the patches and pot holes

L.S

and tamping after blinding with water


Special tools such as wire brush

L.S

Regulation of traffic

L.S

Sundries such as barricading arrangements,

L.S

conveying water etc,.

80/100 KN
Sl.no

Road Roller Out Turn

Type of Consolidation/Compaction

Out Turn

1 Earth work Compaction

425 Cum

2 Gravel soling

425 Cum

3 Soling with 150mm cube stones

600 Cum

4 Soling with hard gravel stones 150mm Thick

650 Cum

5 Sand-Gravel mix soling

450 Cum

6 Sand-Gravel mix

150mm Thick

950 Cum

7 Water bound macadam

40mm to 50mm Thick

740 Sqm

8 Water bound macadam


9 Water bound macadam

50mm to 75mm Thick

550 Sqm

75mm Thick

450 Sqm

10 Water bound macadam

100mm Thick

350 Sqm

11 Bituminuous macadam

50mm Thick

300 Sqm

12 Bituminuous macadam

75mm Thick

225 Sqm

13 Bult-up spray grout

75mm Thick

225 Sqm

14 Asphaltic concrete

40mm Thick

300 Sqm

15 Premix Carpet

20mm Thick

500 Sqm

16 Seal Coat

1000 Sqm

17 Single coat Surface dressing

800 Sqm

18 Two coats of Surface dressing

550 Sqm

19 Mix seal surfacing

600 Sqm

20 Semi dense Carpet

400 Sqm

21 Blacktop chipping carpet with hard metal

1100 Sqm

49.40
50.00
30.00

49486.00
44320.00

645.00
250.00
1526.05
160.00
178.78
107.00

979.95
845.41
642.55

THE YEAR 2013-14

Bitumen

8
0.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

THE YEAR 2013 - 14

Bitumen

8
0.00

0.00
0.00
0.00
0.00
0.00

1.46
1.46
1.46
1.46
1.52

4.55
3.54
17.68
6.06
2.53
2.53
0.71

2.20
5.50

2.20
2.20
0.55

Name of work Improvements to the road from Kallukottai to Rajapuram. Km: 0/0-1/0.

Starting

Ending

0.000

1.000

Scheme :
Year : 2012-13

KM
From

To

Working
milage
0.00

KM

0.00 - 0.00

Hills
Plain
Total
0.00

KM

0.00 - 0.00

Hills
Plain
Total
0.00

KM

0.00 - 0.00

Hills
Plain
Total
0.00

KM

0.00 - 0.00

Hills
Plain
Total
0.00

KM

Bitumen

Gravel

Sand

1.00
or
0.00
0.00
0.00
1.00
or
0.00
0.00
0.00
1.00
or
0.00
0.00
0.00
1.00
or
0.00
0.00
0.00
1.00

1.50

0.00
0.00
1.00
1.50

1.00
or
0.00
0.00
0.00
1.00
or
0.00
0.00
0.00
1.00
or
0.00
0.00
0.00
1.00
or
0.00
0.00
0.00
1.00

0.00
0.00
0.00
1.50
0.00
0.00
0.00
1.50
0.00
0.00
0.00
1.50

or
0.00

or
0.00

or
0.00

0.00

or
0.00

0.00
0.00

0.00
0.00

0.00
0.00

0.00
1.00

0.00
0.00

8.00
or
0.00
8.00
8.00

8.00
or
0.00
8.00
8.00

0.50
or
0.00
1.00
1.00

1.00
0.00
1.00
1.00

0.50
or
0.00
1.00
1.00

HILLS

0.00

0.00

0.00

0.00

0.00

PLAINS

7.50

7.50

0.00

0.50

0.00

Bitumen

Gravel

Sand

0.00 - 0.00

Hills
Plain
Total
0.50

KM

Metal
63-22.4
13.2-6.7
8.50
8.50
or
or
0.00
0.00
0.00
0.00
0.00
0.00
8.50
8.50
or
or
0.00
0.00
0.00
0.00
0.00
0.00
8.50
8.50
or
or
0.00
0.00
0.00
0.00
0.00
0.00
8.50
8.50
or
or
0.00
0.00
0.00
0.00
0.00
0.00
8.50
8.50

0.00 - 1.00

Hills
Plain
Total

63-22.4 13.2-6.7
Metal

Metal

Name of work Improvements to the road from Kallukottai to Rajapuram. Km: 0/0-1/0.

Name of Quarry

63 - 22.4 Metal : Vellampatty


13.2 - 6.7

Metal : Vellampatty
Bitumen : At P.U.Store,Vedasandur

Emulsion : At P.U.Store,Vedasandur
Gravel : Average Lead
Sand : Thadikombu

I do hereby certified that


i.the distance noted herein are correct and shortest to the best of
my knowledge
ii.the quarry founded are correct
iii.the rates shown are as per S.O.R 2012-13
iv.the materials can be easily carried.
v.the discription of variety of materials is correct.

LEAD STATEMENT

Plain

HILLS

( Kms)

Cement /
Steel

Sand

Rough
stone, &
Metal

Country
Bricks

Brickjelly

Lime stone

16

35

10

10

0.00

Schedule of Rates 2013 -14

xxx

PWD Rates

xxx

Collector's appd rates

Rates of Labour

II

1 Carpenter I class

355.00 c

2 Carpenter II class

326.00

Rates of Material ( contd..)

III

Lime and cement

c
1

3 Fitter I class

316

322.00

1 Cement

4700.00

4 Fitter II class

293

300.00

2 Shell lime

1180.00

5 Floor polisher

281.00

3 Lime stone

869.00

6 Mason I class for BW

363.00

4 Grinding mortor

105.90

7 Mason II class for BW

326.00

5 Mixing mortor

8 Mazdoor I class

228.00

9 Mazdoor II class

206.00

1 PCC

26.20

10 Painter I Class

293.00

2 RCC

35.25

11 Painter II Class

271.00 d

12 Plumber I class

316.00

1 CW scantling

< 4m

28790.00

13 Plumber II class

293.00

2 CW scantling

(raft)

30250.00

14 Stone Cutter I class

280.00

3 CW planks

15 Stone Cutter II class

258.00

4 CW reepers-50x25

29.00

16 Wodder

236.00

5 CW reepers-50x12

21.10

17 Mazdoor I cl. For roads

207.00

6 Palmyrah rafter

41.65

18 Mason I class(stone wo

363.00

7 Casu. poles

13-15

27.80

19 Mason II class(stone w

326.00

8 Casu. poles

10-13

21.10

9 Casu. poles

8-10

16.25

5-8

13.85

13060

II

Rates of Material

Bricks and Tile product


1 Country bricks ( 2 3/4" )

43.35

Concrete Vibrators

Timber and Roofing materials

10 Casu. poles
3985.00

33030.00 d

11 Silver oak scantlings

2 Brick Jelly- 40 mm

495.00

3 --do--

550.00

10

20mm

4 Pressed Tiles.(20x20)
5 --do-6 Mang. Tiles

(23x23)

8710.00 e
12340.00

class AA

8.30

7 Mosaic (Grey)25x25

10980.00

8 Mosaic (Grey)20x20

6995.00

9 Ceiling tiles 20x20x2


10 Country bricks ( 2

1/4" )

Metal and Iron works


1 Steel rods

5.00
3140.00
f

11
47700.00

2 MS plate

kg

48.00

3 MS Angle

kg

48.00

4 Binding wire Mt

48.00

12
13

5 GI sheet 300x1.6mm/1Sqm
335.00

/m2

6 Iron works ( lab)

/kg

RCC Hume Pipes

19.25
&

1 900 mm dia 2.5m

###

2 900 mm dia 1.0m

###

coller n
200.00

1
2

Stone and Road materials

3 600 mm dia 2.5m

###

4 600 mm dia 1.0m

700.00

170.00

V
1

332.00 III

Rates of works

2 Roughstone ( revet )

288.00 a

Clearing the site

3 Bond stones

455.00

1 Roughstone

4 Stoneslab

(masonry)

(3 face 1 ln) ab 1.2 m

3115.00

5 Km stone1.65 x 0.45 x

328.00

6 Hm stone 0.75 x0.23

170.00 b

7 Guard stone 0.23x0.23

130.00

8 Cut stone roughly dres

3265.00

ISS Metal
8 40mm metal

742.00

9 20mm metal

1034.00

10 12mm metal

1 Lighjungle

2.35

2 Scrub jungle

2.15

5
6

Dismanling

7
8

1 Brick/stone

in clay

25.65

2 Brick/stone

in lime

78.65

10

3 Brick/stone

in cement

96.40

11

4 Lime concrete

122.10

958.00

5 Cement concrete

165.60

13

11 10mm metal

705.00

6 RCC

2515.00

14

12 6mm metal

478.00

7 Chipping concrete

13.90 /m2

15

13 Gravel

130.00

8 Pres.tiles & WC

16.00 /m2

16

14 Well gravel

107.80

15 Sand for mortor

110.00 IV

16 Sand for filling

110.00

19

28.60

20

17 Clay for puddle & masonry

17

Electrification

18

18 Cuddapah slab

50mm

342.00

1 Light & Fan Pt(21)

19 Cuddapah slab

38/40

330.00

2 Plug point

20 Cuddapah slab

20/30

304.00

3 16 amp DPICSI 136 358.55 /pt

1815.00

4 Meter board SI120 127.80 /pt

580

5 GI serv. Pipe SI 67 200.25 /m

6 Serv.main

SI 62

25.10 /m

SI 124

21 Granite slab sqm


22

IRC Metal

456.80 /pt

SI 34 340.05 /pt

21

VI

1 45 mm metal

757.00

7 Arial Fuse

99.90 /pt

2 25 mm metal

731.00

8 4x40W tube SI 83 371.15 /no

3 11.2 mm metal

668.00

4 6 mm metal

496.00

9 Ceiling.Fan SI 106

### /no

10 BH Fitting

SI 80 307.85 /no

11 40W bulb

SI 77

77.20 /no

CONVEYANCE TABLE FOR THE YEAR 2013-14 FOR PLAINS

Sl.No.

Lime
stone,
Steel 1.00MT brick jelly,
woodwork
(1Cum)

Cement
Distance in
1 M.T

Rough stone,
Metal, sand,
gravel,surki,
earth (1Cum)

Country bricks

Co-efficient

1.00

1.00

1.10

1.60

1.35

Incidental c

0.00

0.00

0.00

0.00

0.00

Add for every extra 1 km & part there of

0 -10 Kms

4.90

4.90

5.40

7.80

6.60

10 - 20 Kms

4.20

4.20

4.65

6.70

5.65

20 - 40 Kms

3.70

3.70

4.10

5.90

5.00

40 - 80 Kms

3.10

3.10

3.45

4.95

4.20

above 80 Km

2.85

2.85

3.10

4.50

3.75

Loading cha

73.10

73.10

34.90

23.90

34.35

Unloading c

73.10

73.10

34.90

23.90

34.35

Add above ex

14.55

14.55

16.00

23.25

19.60

inter state works

CONVEYANCE TABLE
KM 0-10
KM
I

I.C

KM 10-20

KM

rate

amt KM

10

4.90 ###

KM 20-40

rate

amt

KM

rate

4.20

25.20

3.70

Buildings
1 Cement

16 0.00

2 Rough stone

8 0.00

7.80 ###

6.70

0.00

5.90

3 Bond stone

8 0.00

7.80 ###

6.70

0.00

5.90

4 40mm iss m

8 0.00

7.80 ###

6.70

0.00

5.90

5 20mm iss m

8 0.00

7.80 ###

6.70

0.00

5.90

6 10-12mm me

8 0.00

7.80 ###

6.70

0.00

5.90

7 6-10mm met

8 0.00

7.80 ###

6.70

0.00

5.90

8 sand for mor

35 0.00

10

7.80 ###

10

6.70

67.00

15

5.90

9 sand for filli

35 0.00

10

7.80 ###

10

6.70

67.00

15

5.90

10 steel

16 0.00

10

4.90 ###

4.20

25.20

3.70

11 country bric

10 0.00

10

6.60 ###

5.65

0.00

5.00

12 brick jelly

10 0.00

10

5.40 ###

4.65

0.00

4.10

13 shell lime

1 0.00

5.40 5.40

4.65

0.00

4.10

14 Lime stone

1 0.00

5.40 5.40

4.65

0.00

4.10

15 pressed tiles

1 0.00

8.80 8.80

7.60

0.00

4.60

16 CW planks

1 0.00

5.40 5.40

4.65

0.00

4.10

17 CW scantling

1 0.00

5.40 5.40

4.65

0.00

4.10

18 Gravel

1 0.00

7.80 7.80

6.70

0.00

5.90

19 cutstone rou

8 0.00

7.80 ###

6.70

0.00

5.90

20 25mm IRC m

8 0.00

7.80 ###

6.70

0.00

5.90

21 11.2mm IRC

8 0.00

7.80 ###

6.70

0.00

5.90

22 6mm IRC me

8 0.00

7.80 ###

6.70

0.00

5.90

23 45mm IRC m

8 0.00

7.80 ###

6.70

0.00

5.90

CONVEYANCE FOR THE YEAR 2012-13 FOR HILLS

Sl.No.

Distance in

Cement
M.T

Lime
stone,
brick jelly,
1
woodwork
(1Cum)
Steel 1.00MT

Rough stone,
Metal, sand,
gravel,surki,
earth (1Cum)

Country bricks

Co-efficient

1.00

1.00

1.10

1.60

1.35

Incidental c

0.00

0.00

0.00

0.00

0.00

Add for every extra 1 km & part there of

0 -10 Kms

9.80

9.80

10.80

15.60

13.20

10 - 20 Kms

8.40

8.40

9.30

13.40

11.30

20 - 40 Kms

7.40

7.40

8.20

11.80

10.00

40 - 80 Kms

6.20

6.20

6.90

9.90

8.40

above 80 Km

5.70

5.70

6.20

9.00

7.50

Shell lime

M.Tiles &
Pressed
Tiles

Wood

xxx

Highways sh. rates

xxx

Local Rates

Rates of works ( Contd..)

Quarrying and blasting


Hard rock

297.00

blasting & Stack

Wedging hard rock

594.00

Medium rock blasting

152.00

Drilling holes 50mm

133.95

Drilling holes 40 mm

96.30

Lift Gharges

Gr.
Floor

Addl.
Floor

Concrete

###

89.00

Brk/stone masny

59.40

Below GL

###
1.5m
4.5m

Concrete

###

88.35

Brk/stone masny

###

59.40

20b

30.75

4.5m9.00m

Earth work
Ordinary soil
Gravelly soil SS 20 A

44.60

Gravelly soil SS 20 b

41.85

SDR

62.30

MR & DMR

109.80

EW addl. Lead 10mts

5.25

EW addl. Lift 1mts

4.20

Refilling ( Sand )

13.00

Refilling ( Earth )

14.70

Spreading gravel

/sqm

4.14

Stacking metal

/m3

3.15

Stacking gravel

/m3

3.05

Stacking sand

/m3

3.05

Laying of RCC pipes


600 to 900mm dia

45.35

300 to 600mm dia

28.75

up to 300 mm dia

17.75

Labour wrought put up Door/W


Frames/cum
Shutters/sqm

5117.00
577.30

Miscellaneous (Local Rates)


Rural sanitay pan
Indian water closet
Wash basin 550x400 mm
Paint

160.00
1089.00
1510.00

lit

242.55

Wood primer paint

156.75

Red oxide paint

145.50

Cement paint

53.10

Plastic emulsion
Distember

kg

White cement (kg)


AC Sheet

sqm

Crude oil

kg

Glass tiles 0.15x0.15


--do-- 0.30x0.20
Ceramic tiles 0.20x0.20

315.15
78.50
23.00
175.50
15.00
11.40
24.00
22.35

--do-- 0.305x0.305

50.80

--do-- 0.400x0.400

64.00

Hollow block 16"x4"x8"

10.00

Hollow block 16"x6"x8"

14.00

Hollow block 16"x8"x8"

17.00

Water proofing compound

42.35

Steel Doors & Ventilators


Two leaf 'W' 0.90x1.20m

1454.00

Steel Gate

1398.00

1.20x1.80

Single leaf 'D' 0.90x2.00m 1050.00


Two leaf 'D' 1.10x2.00m

953.00

Two leaf 'W' 0.90x1.20m

1457.00

Zinc door 0.75x1.80m

648.00

Ventilator 0.90x0.45m

1000.00

TV Shutter 0.90x0.75

1398.00

PD shop count 0.45x0.60

1759.00

2013-14 FOR PLAINS

M.Tiles(1000),
pressed tiles(2000)

Brick I & II
class,
Chamber
bricks

1.80

2.25

0.00

0.00

8.80

11.00

7.60

9.25

6.70

8.35

5.60

7.00

5.05

6.30

34.35

34.35

34.35

34.35

26.15

32.70

2013-2014

KM 20-40

KM 40-80

KM above 80

amt

KM

rate

amt

KM

0.00

3.10

0.00

0.00

4.95

0.00

0.00

4.95

0.00

0.00

4.95

0.00

0.00

4.95

0.00

0.00

4.95

0.00

0.00

4.95

0.00

88.50

4.95

0.00

88.50

4.95

0.00

0.00

3.10

0.00

0.00

4.20

0.00

0.00

3.45

0.00

0.00

3.45

0.00

0.00

3.45

0.00

0.00

5.60

0.00

0.00

3.45

0.00

0.00

3.45

0.00

0.00

4.95

0.00

0.00

4.95

0.00

0.00

4.95

0.00

0.00

4.95

0.00

0.00

4.95

0.00

0.00

4.95

0.00

12-13 FOR HILLS

M.Tiles(1000),
pressed tiles(2000)

Brick I & II
class,
Chamber
bricks

1.80

2.25

0.00

0.00

17.60

22.00

15.20

18.50

13.40

16.70

11.20

14.00

10.10

12.60

Grave
l

colour cement(Kg)

/Sqm
/Sqm
/Sqm
/Sqm
/Sqm
/Sqm

26.65

/Sqm
/Sqm
/Sqm

KM above 80
rate

amt

TOTAL L &UL

2.85

0.00

74.20

0.00

4.50

0.00

62.40

0.00

4.50

0.00

62.40

0.00

4.50

0.00

62.40

0.00

4.50

0.00

62.40

0.00

4.50

0.00

62.40

0.00

4.50

0.00

62.40

0.00

4.50

0.00

233.50

0.00

4.50

0.00

233.50

0.00

2.85

0.00

74.20

0.00

3.75

0.00

66.00

0.00

3.10

0.00

54.00

0.00

3.10

0.00

5.40

0.00

3.10

0.00

5.40

0.00

5.05

0.00

8.80

0.00

3.10

0.00

5.40

0.00

3.10

0.00

5.40

0.00

4.50

0.00

7.80

0.00

4.50

0.00

62.40

0.00

4.50

0.00

62.40

0.00

4.50

0.00

62.40

0.00

4.50

0.00

62.40

0.00

4.50

0.00

62.40

0.00

2011-12

PAGE86

NAME OF WORK:

COST OF MATERIALS AT SITE


Sl.No

Name of materials

1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21

Cement
sand for mortar
sand for filling
Rough stone
Bond stone
40mm iss metal
20mm iss metal
10-12mm metal
6-10mm metal
Rough stone for revet
Cutstone roughly dres
steel
country bricks ( 23/4")
country bricks ( 21/4")
brick jelly 20 mm
shell lime
Lime stone
pressed tiles
Country wood planks
--do-- scantlings
Gravel

lead in KM
Plains
Hills
16
0
35
0
35
0
8
0.00
8
0
8
0
8
0
8
0
8
0
8
0
8
0
16
0
10
0
10
0
10
0
1
0
1
0
1
0
1
0
1
0
1
0

25mm iss metal


8
SUB DATA
8
11.2mm metal
8
CEMENT MORTAR 1:1.5
0.960 MT
Cost of cement
1.00 cum
Cost of sand
9

6mm metal
10
CEMENT MORTAR 1:2
0.720 MT
Cost of cement
1.00 cum
Cost of sand

CEMENT MORTAR 1:3


0.480 MT
Cost of cement
1.00 cum
Cost of sand
1.00 cum

Mixing charges
Add for 20% on labour

Cost

Conveyan Conveyan
c ( Plains ) c ( Hills )

Total

4700.00
110.00
110.00
332.00
455.00
742.00
1034.00
831.50
538.00
288.00
3265.00
48783.00
3985.00
3140.00
550.00
1180.00
869.00
8710.00
33030.00
13060.00
130.00

61.60
209.90
209.90
31.20
31.20
31.20
31.20
31.20
31.20
31.20
31.20
61.60
39.60
39.60
32.40
0.00
0.00
55.40
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

4761.60
319.90
319.90
363.20
486.20
773.20
1065.20
862.70
569.20
319.20
3296.20
48844.60
4024.60
3179.60
582.40
1180.00
869.00
8765.40
33030.00
13060.00
130.00

638.00

62.40

0.00

700.40

705.00

62.40

0.00

767.40

334.60

4571.14
319.90
4891.04
863.60

4761.60 /MT
319.90 /cum
27

451.00

78.00

4761.60 /MT
319.90 /cum

3428.35
319.90
3748.25

4761.60 /MT
319.90 /cum

2285.57
319.90
2605.47
43.35
17.34
2666.16

43.35 /cum
17.34 /cum

PAGE87

CEMENT MORTAR 1:4


0.360 MT
Cost of cement
1.00 cum
Cost of sand
1.00 cum

Mixing charges
Add for 20% on labour

CEMENT MORTAR 1:5


0.288 MT
Cost of cement
1.00 cum
Cost of sand
1.00 cum

Mixing charges
Add for 20% on labour

CEMENT MORTAR 1:6


0.240 MT
Cost of cement
1.00 cum
Cost of sand
1.00 cum

Mixing charges
Add for 20% on labour

LIME MORTAR 1:2


0.5 cum
Lime
1.00 cum
Cost of sand
1.00 cum
Grinding mortor
Add for 20% on labour

4761.60 /MT
319.90 /cum
43.35 /cum
17.34 /cum

4761.60 /MT
319.90 /cum
43.35 /cum
17.34 /cum

4761.60 /MT
319.90 /cum
43.35 /cum
17.34 /cum

4761.60
319.90
105.90
42.36

/cum
/cum
/cum
/cum

1714.18
319.90
2034.08
43.35
17.34
2094.77

1371.34
319.90
1691.24
43.35
17.34
1751.93

1142.78
319.90
1462.68
43.35
17.34
1523.37

2380.80
319.90
105.90
42.36
2848.96

DATA
Earth work excavation and depositing on bank with in initial lead of 10 m
and initial lift of 2m in hard stiff clay, stiff black cotton soil, hard red earth,
earth mixed with small sized boulders and hard gravelly soil as per SS 20B
Rate / cum
36.40
Add 100% extra for narrow foundation
36.40
72.80
Add for 20% on labour
29.12
101.92 /cum
Cement concrete 1:6:12 mix using 40mm ISS metal including cost and
conveyance of all materials to site and all labour charges for mixing,
laying and curing etc complete for 10 cum.
9.00
4.50
1.80
17.70

cum
cum
nos
nos

Cost of 40mm ISS metal


cement mortar 1:6
Mason II class
Mazdoor I class

773.20
1462.68
261.00
183.00

/cum
/cum
/each
/each

6958.80
6582.06
469.80
3239.10

PAGE88

14.10 nos

Mazdoor II class
Add for 20% on labour

RATE @ RS

165.00 /each

2326.50
2414.16
0.00
21990.42

2199.04 /cum

Cement concrete 1:5:10 mix using 40mm ISS metal including cost and
conveyance of all materials to site and all labour charges for mixing,
laying and curing etc complete for 10 cum.
9.00
4.50
1.80
17.70
14.10

cum
cum
nos
nos
nos

Cost of 40mm ISS metal


cement mortar 1:5
Mason II class
Mazdoor I class
Mazdoor II class
Add for 20% on labour

RATE @ RS

773.20
1691.24
261.00
183.00
165.00

/cum
/cum
/each
/each
/each

6958.80
7610.58
469.80
3239.10
2326.50
2414.16
0.00
23018.94

2301.89 /cum

Cement concrete 1:4:8 mix using 40mm ISS metal including cost and
conveyance of all materials to site and all labour charges for mixing,
laying and curing etc complete for 10 cum.
9.00
4.50
1.80
17.70
14.10

cum
cum
nos
nos
nos

Cost of 40mm ISS metal


Cost of cement mortar 1:4
Mason II class
Mazdoor I class
Mazdoor II class
Add for 20% on labour

RATE @ RS

773.20
2034.08
261.00
183.00
165.00

/cum
/cum
/each
/each
/each

6958.80
9153.36
469.80
3239.10
2326.50
2414.16
0.00
24561.72

2456.17 /cum

Cement concrete 1:3:6 mix using 40mm ISS metal including cost and
conveyance of all materials to site and all labour charges for mixing,
laying and curing etc complete for 10 cum.
9.00
4.50
1.80
17.70
14.10

cum
cum
nos
nos
nos

Cost of 40mm ISS metal


Cost of cement mortar 1:3
Mason II class
Mazdoor I class
Mazdoor II class
Add for 20% on labour

RATE @ RS

773.20
2605.47
261.00
183.00
165.00

/cum
/cum
/each
/each
/each

2713.30 /cum

Cement concrete 1:2:4 mix using 20mm ISS metal including cost and
conveyance of all materials to site and all labour charges for mixing,

6958.80
11724.62
469.80
3239.10
2326.50
2414.16
0.00
27132.98

PAGE89

laying and curing etc complete for bed blocks for 10 cum
9.00
4.50
1.80
17.70
14.10

cum
cum
nos
nos
nos

20mm ISS metal


Cement mortar 1:2
Mason II class
Mazdoor I class
Mazdoor II class
Add for 20% on labour

RATE @RS

1065.20
3748.25
261.00
183.00
165.00

/cum
/cum
/each
/each
/each

9586.80
16867.13
469.80
3239.10
2326.50
2414.16
0.00
34903.49

3490.35 /cum

Cement concrete 1:3:6 mix using 20mm ISS metal including cost and
conveyance of all materials to site and all labour charges for mixing,
laying and curing etc complete for bed blocks for 10 cum
9.00
4.50
1.80
17.70
14.10

cum
cum
nos
nos
nos

20mm ISS metal


Cement mortar 1:3
Mason II class
Mazdoor I class
Mazdoor II class
Add for 20% on labour

RATE @RS

1065.20
2605.47
261.00
183.00
165.00

/cum
/cum
/each
/each
/each

9586.80
11724.62
469.80
3239.10
2326.50
2414.16
0.00
29760.98

2976.10 /cum

Random rubble masonry in cement mortar 1:5 mix with simultaneous


pointing including cost and conveyance pf all materials to site and all
labour charges etc complete for 10 cum
10.00
1.00
3.40
7.10
10.60
14.10
14.10

cum
cum
cum
nos
nos
nos
nos

Rough stone
Bond stone
Cement mortar 1:5
Mason I class
Mason II class
Mazdoor I class
Mazdoor II class
Add for 20% on labour

RATE @RS

363.20
486.20
1751.93
291.00
261.00
183.00
165.00

/cum
/cum
/cum
/each
/each
/each
/each

3632.00
486.20
5956.56
2066.10
2766.60
2580.30
2326.50
3895.80
0.00
23710.06

2371.01 /cum

Random rubble masonry in cement mortar 1:4mix with simultaneous


pointing including cost and conveyance pf all materials to site and all
labour charges etc complete for 10 cum
10.00 cum
1.00 cum
3.40 cum

Rough stone
Bond stone
Cement mortar 1:4

363.20 /cum
486.20 /cum
2094.77 /cum

3632.00
486.20
7122.22

PAGE90

7.10
10.60
14.10
14.10

nos
nos
nos
nos

Mason I class
Mason II class
Mazdoor I class
Mazdoor II class
Add for 20% on labour

291.00
261.00
183.00
165.00

RATE @RS

/each
/each
/each
/each

2066.10
2766.60
2580.30
2326.50
3895.80
0.00
24875.72

2487.57 /cum

Random rubble masonry in clay including cost and conveyance of all


materials to site and all labour charges etc complete for 10 cum
10.00
1.00
4.00
3.50
10.60
10.60
10.60

cum
cum
cum
nos
nos
nos
nos

Rough stone
Bond stone
clay
Mason I class
Mason II class
Mazdoor I class
Mazdoor II class
Add for 20% on labour

363.20
486.20
26.00
291.00
261.00
183.00
165.00

RATE @RS

/cum
/cum
/cum
/each
/each
/each
/each

3632.00
486.20
104.00
1018.50
2766.60
1939.80
1749.00
2989.56
0.00
14685.66

1468.57 /cum

Dry stone masonry for Retainingwall -10cum including cost and conveyance
of all materials and all labour charges etc complete for 10 cum
12.00
3.50
7.10
7.10
3.50

cum
nos
nos
nos
nos

Rough stone ( incl. selected headers)


Mason I class
Mason II class
Mazdoor I class
Mazdoor II class
Add for 20% on labour

RATE @RS

319.20
291.00
261.00
183.00
165.00

/cum
/each
/each
/each
/each

3830.40
1018.50
1853.10
1299.30
577.50
1899.36
0.00
10478.16

1047.82 /cum

Brick work in cement mortar 1:5 mix using country bricks 83/4"x43/8"x23/4"
and conveyance of all materials to site and all labour charges etc complete -10 cum
4590
2.50
3.50
10.60
7.10
21.20

nos
cum
nos
nos
nos
nos

Country bricks
8
Cement mortar 1:5
Mason I class
Mason II class
Mazdoor I class
Mazdoor II class
Add for 20% on labour

3/4"

x4

3/8"

RATE @RS

x2

3/4"

4024.60
1751.93
291.00
261.00
183.00
165.00

3315.16 /cum

/1000nos
/cum
/each
/each
/each
/each

18472.91
4379.83
1018.50
2766.60
1299.30
3498.00
1716.48
0.00
33151.62

PAGE91

Brick work in cement mortar 1:5 mix using country bricks 83/4"x41/4"x21/4"
and conveyance of all materials to site and all labour charges etc complete
6010
2.80
3.50
7.10
7.10
14.10

nos
cum
nos
nos
nos
nos

Country bricks
8
Cement mortar 1:5
Mason I class
Mason II class
Mazdoor I class
Mazdoor II class
Add for 20% on labour

3/4"

x4

1/4"

RATE @RS

x2

1/4"

3179.60
1751.93
291.00
261.00
183.00
165.00

/1000nos
/cum
/each
/each
/each
/each

19109.40
4905.40
1018.50
1853.10
1299.30
2326.50
1299.48
0.00
31811.68

3181.17 /cum

Collection and supply of sand and filling in to the basement including cost and
conveyance to the siteand all labour charges for filling
as per standard speecifications
1.00 cum
1.00 cum

sand for filling


Labour charges for filling
Add for 20% on labour
RATE @RS

319.90 /cum
11.30 /cum

319.90
11.30
4.52
335.72

335.72 /cum

Collection and supply of gritty gravel from appd quarry including cost and
conveyance of all materials to site including all labour charges for filling
etc.complete,
1.00 cum
1.00 cum
1.00 cum

Gravel for filling


Stacking charges
Labour charges for filling
Add for 20% on labour
RATE @RS

130.00 /cum
3.05 /cum
12.80 /cum

130.00
3.05
12.80
6.34
152.19

152.19 /cum

Collection and supply of Well gravel from appd quarry including cost and
conveyance of all materials to site including all labour charges for filling
etc.complete,
1.00 cum
1.00 cum
1.00 cum

Wellgravel
Stacking charges
Labour charges for filling
Add for 20% on labour
RATE @RS

98.00 /cum
3.05 /cum
12.80 /cum

120.19 /cum

Refilling the basement with excavated earth other than sand complying the
Standard specification
RATE @RS
12.80 /cum

98.00
3.05
12.80
6.34
120.19

PAGE92

Add for 20% on labour

5.12
17.92 /cum

Supplying and erecting centering shuttering including necessary supports for plane
surface in foundation and basement and in all floors for R C C column footing
column plinth beam, beams, roof slabs, staircase steps, bed blocks, critical pier etc
using mild steel sheets of size 90 x 60 cm and 10 guage stiffened, welded with mild
steel angles of size 25mmx25mmx3mm for boarding laid over silver oak (country
wood) scantlings of size 10cm x 6.5cm spaced of about 90cm centre to centre and
supported by casurina props of 10cm to 13cm dia spaced at 75cm centre to centre
complete complying with standard specifications and as directed by departmental
officers including conveyance of all materials to site and proper centering etc complete.
Sub Data I
Cost of MS sheets & angles for each set
Weight of MS sheet B.G 10 Gauge size 90x60cm x 3.175 mm
3.175 x 7850/1000 = 24.924 kg/m 2
24.924 Kg/m2 x 0.54 m2 = 13.46 Kg.
Weight of MS angle size 25 x 25 x 3 mm
3.6 x 1.1 Kg/m = 4.00 Kg
13.46 kgs
Cost of MS sheet
4 kgs
Cost of MS angle
L.S
Cutting,bending,welding,etc

48.00 /kg
48.00 /kg

646.08
192.00
21.63
859.71

Sub Data 2
Cost of MS sheets and angles and CW joists and casurina props - 10 Sqm
19 Nos
Cost of strutting
0.12 cum
98.5 Rm

Cost of MS sheet and angle


silver oak
Casurina props 10 to 13cm dia

Rate per one operation for MS sheet & angle


Rate per one operation for strutting

859.71 /each

16334.49

10340.00 /cum
19.20 /Rm

1240.80
1891.20
3132.00

16334.49 /40
3132.00 /5

408.36
626.40

Main data for one use for 10 Sqm

3.80 nos
5.40 nos
1 nos
L.S
L.S

MS sheet rate per one operation


props rate per one operation
Carpenter I class
Mazdoor I class
Fitter II class
Add for 20% on labour
wedges
periodical cleaning and painting etc

i] Rate for roof slab, lintel, beam

408.36
626.40
284.00
183.00
160.00

/each
/each
/each
/each
/each

417.41 /Sqm

408.36
626.40
1079.20
988.20
160.00
890.96
10.00
10.94
4174.06

PAGE93

ii] Rate for sunshade


Add 10% above rate
RATE @RS

417.41
41.74
459.15 /Sqm

iii] Rate for column post


98.5 Nos
0.3 Nos
0.3 Nos

Casurina props 10 -13


Carpenter I class
Mazdoor I class
Add for 20% on labour

19.20

1891.20 /5
284.00 /each
183.00 /each

4174.06 -574.38
RATE @RS
iv] Centering below Ground level
50% of the above rate

359.97 /Sqm

417.41 /2
RATE @RS

378.24
85.20
54.90
56.04
574.38
3599.68

208.70

208.70 /Sqm

Supplying and fabrication of steel including cost and conveyance of


steel to site and all labour charges for straightening, cutting to length,
bending to shape and tying in position and forming grills for all R.C.C works
1.00 MT
0.01 mt
35.00 nos

Cost of steel
Cost of binding wire
Fitter I class
Add for 20% on labour

48844.60 /mt
48.00 /mt
253.00 /each

48844.60
0.48
8855.00
3542.00
0.00
61242.08

RATE @RS 61242.08 /MT

9.00
4.50
3.50
21.20
35.30

Reinforced cement concrete 1:2:4 mix using 20mm ISS metal


including cost and conveyance of all materials to site and all
labour charges for mixing, laying, and curing etc complete for 10 cum
cum
20mm ISSmetal
1065.20 /cum
cum
Cement mortar 1:2
3748.25 /cum
nos
Mason II class
261.00 /each
nos
Mazdoor I class
183.00 /each
nos
Mazdoor II class
165.00 /each
Add for 20% on labour

RATE @RS

9586.80
16867.13
913.50
3879.60
5824.50
4247.04
0.00
41318.57

4131.86 /cum

Reinforced cement concrete 1:2:4 mix using 20mm ISS metal 1445.85
including cost and conveyance of all materials to site and all
labour charges for mixing, laying, and curing etc complete for 10 cum
9.00 cum
20mm ISSmetal
1065.20 /cum
4.50 cum
sand
319.90 /cum

9586.80
1439.55

PAGE94

###
3.50
21.20
35.30

Kg
nos
nos
nos

cement
Mason II class
Mazdoor I class
Mazdoor II class
Add for 20% on labour

RATE @RS

9.00
4.50
3.50
21.20
35.30

/kg
/each
/each
/each

15384.73
913.50
3879.60
5824.50
4247.04
0.00
41275.72

4127.57 /cum

Reinforced cement concrete 1:1.5:3 mix using 20mm ISS metal


including cost and conveyance of all materials to site and all
labour charges for mixing, laying, and curing etc complete for 10 cum
cum
20mm ISSmetal
1065.20 /cum
cum
Cement mortar 1:1.5
4891.04 /cum
nos
Mason II class
261.00 /each
nos
Mazdoor I class
183.00 /each
nos
Mazdoor II class
165.00 /each
Add for 20% on labour

RATE @RS

9.00
4.50
###
1.80
17.70
14.10

4.76
261.00
183.00
165.00

9586.80
22009.68
913.50
3879.60
5824.50
4247.04
0.00
46461.12

4646.11 /cum

Reinforced cement concrete 1:1.5:3 mix using 20mm ISS metal


including cost and conveyance of all materials to site and all
labour charges for mixing, laying, and curing etc complete for 10 cum
cum
20mm ISSmetal
1065.20 /cum
cum
sand
319.90 /cum
KG
Cement
4761.60 /MT
nos
Mason II class
261.00 /each
nos
Mazdoor I class
183.00 /each
nos
Mazdoor II class
165.00 /each
Add for 20% on labour

9586.80
1439.55
20512.97
469.80
3239.10
2326.50
2414.16
0.00
39988.88

RATE @RS 3998.89 /cum

0.10
1.10
1.10
1.10

Plastering with cement mortar 1:3 mix to 10 mm thick including


cost and conveyance of all materials to site and all labour
charges etc complete for 10 Sqm
cum
Cement mortar 1:3
2666.16 /cum
nos
Mason I class
291.00 /each
nos
Mazdoor I class
183.00 /each
nos
Mazdoor II class
165.00 /each
Add for 20% on labour

RATE @RS

111.01 /Sqm

Plastering with cement mortar 1:3 mix to 20 mm thick including


cost and conveyance of all materials to site and all labour

266.62
320.10
201.30
181.50
140.58
0.00
1110.10

PAGE95

0.22
2.20
0.50
3.20

charges etc complete for 10 Sqm


cum
Cement mortar 1:3
nos
Mason I class
nos
Mazdoor I class
nos
Mazdoor II class
Add for 20% on labour

RATE @RS

0.22
2.20
0.50
3.20

/cum
/each
/each
/each

460.85
640.20
91.50
528.00
503.88
0.00
2224.43

222.44 /Sqm

Plastering with cement mortar 1:5 mix to 20 mm thick including


cost and conveyance of all materials to site and all labour
charges etc complete for 10 Sqm
cum
Cement mortar 1:5
1751.93 /cum
nos
Mason I class
291.00 /each
nos
Mazdoor I class
183.00 /each
nos
Mazdoor II class
165.00 /each
Add for 20% on labour

RATE @RS

586.56
640.20
91.50
528.00
251.94
0.00
2098.20

209.82 /Sqm

Plastering with cement mortar 1:4 mix to 20 mm thick including


cost and conveyance of all materials to site and all labour
charges etc complete for 10 Sqm
cum
Cement mortar 1:4
2094.77 /cum
nos
Mason I class
291.00 /each
nos
Mazdoor I class
183.00 /each
nos
Mazdoor II class
165.00 /each
Add for 20% on labour

RATE @RS

0.22
2.20
0.50
3.20

2666.16
291.00
183.00
165.00

385.42
640.20
91.50
528.00
503.88
0.00
2149.00

214.90 /Sqm

Plastering with cement mortar 1:3 mix to 12mm thick including


cost and conveyance of all materials to site and all labour charges etc
0.14
1.10
0.50
1.10

cum
nos
nos
nos

Cement mortar 1:3


Mason I class
Mazdoor I class
Mazdoor II class
Add for 20% on labour

RATE @RS

2666.16
291.00
183.00
165.00

/cum
/each
/each
/each

373.26
320.10
91.50
181.50
118.62
0.00
1084.98

108.50 /Sqm

Plastering with cement mortar 1:4 mix to 12mm thick including


cost and conveyance of all materials to site and all labour charges etc
0.14 cum

Cement mortar 1:4

2094.77 /cum

293.27

PAGE96

1.10 nos
0.50 nos
1.10 nos

Mason I class
Mazdoor I class
Mazdoor II class
Add for 20% on labour

RATE @RS

291.00 /each
183.00 /each
165.00 /each

320.10
91.50
181.50
237.24
0.00
1123.61

112.36 /Sqm

Plastering with cement mortar 1:5 mix to 12mm thick including


cost and conveyance of all materials to site and all labour charges etc
0.14
1.10
0.50
1.10

cum
nos
nos
nos

Cement mortar 1:5


Mason I class
Mazdoor I class
Mazdoor II class
Add for 20% on labour

RATE @RS

1751.93
291.00
183.00
165.00

/cum
/each
/each
/each

245.27
320.10
91.50
181.50
237.24
0.00
1075.61

107.56 /Sqm

Damp proof course in cement mortor CM1:3 - 20mm thick with water proofing
compound at 5% by wt of cement
0.21
1.10
1.10
2.20
1.10

cum
nos
nos
nos
nos

5.00 kg

cement mortar 1:3 mix


Mason I class
Mason II class
Mazdoor I class
Mazdoor II class
Add for 20% on labour
Crude oil

RATE @RS

2666.16
291.00
261.00
183.00
165.00

/cum
/each
/each
/each
/each

15.00 / kg

559.89
320.10
287.10
402.60
181.50
238.26
75.00
0.00
2064.45

206.45 /Sqm

Damp proof course in cement mortor CM1:3 - 12mm thick with water proofing
compound at 2 % by wt of cement
0.14
1.10
0.50
1.10

cum
nos
nos
nos

1.00 kg

cement mortar 1:3 mix


Mason I class
Mazdoor I class
Mazdoor II class
Add for 20% on labour
water proofing compound

RATE @RS

2666.16
291.00
183.00
165.00

/cum
/each
/each
/each

38.50 / kg

373.26
320.10
91.50
181.50
118.62
38.50
0.00
1123.48

112.35 /Sqm

Providing granolethic floor finish in cement concrete 1:2:4 mix using 10-12mm
ISS metal to 25mm thick including cost and conveyance of all materials to site
and all labour charges for mixing, laying, curing etc complete for 10 cum

PAGE97

9.00
4.50
1.80
17.70
14.10

cum
cum
nos
nos
nos

25mm Tk

10-12mm ISS metal


Cement mortar 1:2
Mason II class
Mazdoor I class
Mazdoor II class
Add for 20% on labour

3187.39

862.70
3748.25
261.00
183.00
165.00

RATE @RS

3187.39 /cum

x 0.025 =

79.68 /Sqm

/cum
/cum
/each
/each
/each

7764.30
16867.13
469.80
3239.10
2326.50
1207.08
0.00
31873.91

Ellispattern Ist sort -20mm thick including cost and conveyance of all
materials to site and all labour charges etc complete
0.24
0.117
0.50
1.10
4.30

nos
mt
nos
nos
nos

6 to 10mm chips
Cost of cement
Mason I class
Mazdoor I class
Mazdoor II class
Add for 20% on labour

RATE @RS

569.20
4761.60
291.00
183.00
165.00

/cum
/mt
/each
/each
/each

136.61
557.11
145.50
201.30
709.50
211.26
0.00
1961.28

196.13 /Sqm

Flooring with red cement plaster polished surface and thread lined -10 Sqm
10.00 Sqm
0.80 kg
1.10 Nos

Plastering with CM 1:5 20mmthick


Red Oxide
Mason I class
Add for 20% on labour
sundries
RATE @RS

214.90 Sqm
20.00 kg
291.00 cum

2149.00
16.00
320.10
64.02
0.00
2549.12

254.91 /Sqm

Flooring with gravel 100mm thick -10Sqm


1.70 cum
1.10 No
0.50 No

Gravel
Mazdoor I Class
Mazdoor II class
Add for 20% on labour
sundries
RATE @RS

130.00 cum
183.00 E
165.00 E

221.00
201.30
82.50
56.76
0.00
561.56

56.16 /Sqm

Dadooing of walls with glazed tiles of size 15 cm x15cmx6mm laid in


CM 1:2, 10mm thick & pointing with white cement using 0.4kg/cm 2
-10Sqm
450 Nos
Glazed tiles
10.00 /each

4500.00

PAGE98

0.10
4.00
1.10
4.10
2.70
3.30

cum
kg
nos
nos
nos
nos

cement mortar 1:2 mix


White cement
Mason I class
Mason II class
Mazdoor I class
Mazdoor II class
Add for 20% on labour

RATE @RS

3748.25
20.95
291.00
261.00
183.00
165.00

/cum
/kg
/each
/each
/each
/each

374.83
83.80
320.10
1070.10
494.10
544.50
485.76
0.00
7873.19

787.32 /Sqm

Dadooing of walls with colour glazed tiles of size 300x200x6 mm of best quality
including cost and conveyance of all materials to site and all labour charges etc
complete.
167
0.10
4.00
1.10
4.10
2.70
3.30

Nos
cum
kg
nos
nos
nos
nos

Glazed tiles
cement mortar 1:2 mix
Colour cement
Mason I class
Mason II class
Mazdoor I class
Mazdoor II class
Add for 20% on labour

RATE @RS

24.00
3748.25
20.95
291.00
261.00
183.00
165.00

/each
/cum
/kg
/each
/each
/each
/each

4008.00
374.83
83.80
320.10
1070.10
494.10
544.50
485.76
0.00
7381.19

738.12 /Sqm

Floor finishing with ceromic tiles of size 20cmx20cm including cost


and conveyance of all materials to site and all labour charges etc complete
250
0.21
1.10
1.10
2.20
2.20

Nos
cum
nos
nos
nos
nos

Ceromic tiles
cement mortar 1:3 mix
Mason I class
Mason II class
Mazdoor I class
Mazdoor II class
Add for 20% on labour

RATE @RS

20.35
2666.16
291.00
261.00
183.00
165.00

/each
/cum
/each
/each
/each
/each

5087.50
559.89
320.10
287.10
402.60
363.00
274.56
0.00
7294.75

729.48 /Sqm

Paving the Floor with scratch proof ceromic tiles of size 305x305x6mm including
cost and conveyance of all materials to site and all labour charges etc complete
112
0.21
1.20
1.00
1.00

Nos
cum
nos
no
no

Design colour Ceromic tiles


Cement mortar 1:3 mix
Mason I class
Mason II class
Mazdoor I class

305x305x6

46.20
2666.16
291.00
261.00
183.00

/each
/cum
/each
/each
/each

5174.40
559.89
349.20
261.00
183.00

PAGE99

1.00 no
0.50 no
0.50 Kg
3.0 Kg

Mazdoor II class
Stone cutter I class
Add for 20% on labour
Cotton waste
Colour cement
Sundries

165.00 /each
224.00 /each
10.00 /Kg
20.95 /Kg
LS

RATE @RS

165.00
112.00
214.04
5.00
62.85
0.00
7086.38

708.64 /Sqm

Paving the Floor with scratch proof ceromic tiles of size 400x400x7mm including
cost and conveyance of all materials to site and all labour charges etc complete
63
0.21
1.20
1.00
1.00
1.00
0.50

Nos
cum
nos
no
no
no
no

0.50 Kg
3.0 Kg

Design colour Ceromic tiles


Cement mortar 1:3 mix
Mason I class
Mason II class
Mazdoor I class
Mazdoor II class
Stone cutter I class
Add for 20% on labour
Cotton waste
Colour cement
Sundries

400x400x7

RATE @RS

64.00
2666.16
291.00
261.00
183.00
165.00
224.00

/each
/cum
/each
/each
/each
/each
/each

10.00 /Kg
20.95 /Kg
LS

4032.00
559.89
349.20
261.00
183.00
165.00
112.00
214.04
5.00
62.85
0.00
5943.98

594.40 /Sqm

Supplying & fixing of Granite slab of 20mm thick with nosing, cutting and bedding
laidover in CM 1 : 2 20mm thick - 10 Sqm
10
0.21
1.10
2.00
2.20
1.10

Sqm
cum
nos
no
no
no

4.0
1.60
0.50
1.10

Kg
no
no
no

Granite slab 20 mm thick


Cement mortar 1:2 mix
Mason I class
Mason II class
Mazdoor I class
Mazdoor II class
Add for 20% on labour
Pointing with Colour cement
Colour cement
Mason II class
Mazdoor I class
Mazdoor II class
Add for 20% on labour
Sundries
RATE @RS

1800.00
3748.25
291.00
261.00
183.00
165.00

20.95
261.00
183.00
165.00

/each
/cum
/each
/each
/each
/each

18000.00
787.13
320.10
522.00
402.60
181.50
285.24

/Kg
/each
/each
/each

83.80
417.60
91.50
181.50
138.12
0.00
21411.09

LS
2141.11 /Sqm

Pointing with cement mortor 1:3 cuddapah slab & paving stone to full depth - 10 Sqm
0.01 cum
1.60 nos

Cement mortar 1:3


Mason II class

2666.16 /cum
261.00 /each

26.66
417.60

PAGE100

0.50 nos
1.10 nos

Mazdoor I class
Mazdoor II class
Add for 20% on labour

RATE @RS

10.50
0.12
1.00
10.00
1.10
2.10
2.20
1.10

183.00 /each
165.00 /each

85.54 /Sqm

Flooring with cuddapah slabs 50mm thick over a bed of concrete 100mm
thick and pointed with cement mortar 1:3 -10 Sqm
Sqm
Cuddapah slabs (50mm thick)
311.00 Sqm
cum
cement mortar1:3
2666.16 cum
cum
Cement Concrete 1:6:12
2199.04 cum
Sqm
Pointing with CM 1:3
85.54 cum
No
Mason I class
291.00 cum
No
Mason IIclass
261.00 /each
No
Mazdoor I Class
183.00 /each
No
Mazdoor II class
165.00 /each
Add for 20% on labour
sundries
RATE @RS

91.50
181.50
138.12
0.00
855.38

3265.50
319.94
2199.04
855.38
320.10
548.10
402.60
181.50
290.46
0.00
8382.62

838.26 /Sqm

White washing two coats using shell lime including cost and conveyance of
all materials to site and all labour charges etc comoplete for 100 Sqm
0.07
1.60
0.50
2.70

cum
nos
nos
nos

cost of shell lime


Mason II class
Mazdoor I class
Mazdoor II class
Add for 20% on labour

RATE @RS

1180.00
261.00
183.00
165.00

/cum
/each
/each
/each

82.60
417.60
91.50
445.50
190.92
0.00
1228.12

12.28 /Sqm

Colour washing two coats using approved colour pigments including cost
and conveyance of all materials to site and all labour charges etc complete
1 Sqm

rate for white washing


ADD 50% extra for colour pigments
RATE @Rs

12.28
6.14
18.42
18.42 /Sqm

Distembering two coats with best approved distember including cost


and conveyance of all materials to site and all labour charges etc complete
1.34
0.50
0.50
0.80

Kg
No
No
No

Distember
Painter I Class
Mazdoor I Class
Mazdoor II Class
Add for 20% on labour

71.40
235.00
183.00
165.00

/Kg
/each
/each
/each

95.68
117.50
91.50
132.00
136.40

PAGE101

Ls

Sundriries for brushes


RATE @RS

LS

0.00
573.08

57.31 /Sqm

Priming coat for new iron with ready mixed primer of approved quality 10Sqm
1.33 kg
Red Oxide
132.50 kg
176.23
0.70 No
Painter-I class
235.00 /each
164.50
Add for 20% on labour
32.90
sundries
including brushes, soaps.putty etc
0.37
374.00
RATE @RS
37.40 /Sqm
Priming coat on new wood work with ready mixed primer of approved quality-10 Sqm
1.44 kg
0.70 No

Ready mixed primer


142.50 kg
Painter-I class
235.00 /each
Add for 20% on labour
sundries
including brushes, soaps.putty etc
RATE @Rs

205.20
164.50
32.90
0.00
402.60

40.26 /Sqm

Painting two coats over new iron works using ready mixed enamel paint
including cost and conveyance of paint and all labour charges etc complete
2.22 Lit
1.10 nos

Cost of paint
220.50 /lit
Painter I class
235.00 /each
Add for 20% on labour
sundries
including brushes, soaps.putty etc
RATE @Rs

489.51
258.50
103.40
0.59
852.00

85.20 /Sqm

Painting two coats over new wood works using ready mixed enamel paint
including cost and conveyance of paint and all labour charges etc complete
2.55 Lit
1.20 nos

Cost of paint
220.50 /lit
Painter I class
235.00 /each
Add for 20% on labour
sundries
including brushes, soaps.putty etc
RATE @Rs

562.28
282.00
56.40
0.32
901.00

90.10 /Sqm

Painting two coats over old iron works using ready mixed enamel paint
including cost and conveyance of paint and all labour charges etc complete
1.89 Lit
1.10 nos

Cost of paint
220.50 /lit
Painter I class
235.00 /each
Add for 20% on labour
sundries
including brushes, soaps.putty etc
RATE @Rs

72.70 /Sqm

416.75
258.50
51.70
0.05
727.00

PAGE102

Painting two coats over old wood works using ready mixed enamel paint
including cost and conveyance of paint and all labour charges etc complete
2.22 Lit
1.20 nos

Cost of paint
220.50 /lit
Painter I class
235.00 /each
Add for 20% on labour
sundries
including brushes, soaps.putty etc
RATE @Rs

489.51
282.00
56.40
2.09
830.00

83.00 /Sqm

Pointing the RR Masonry with cement mortar 1:3 mix


including cost and conveyance of all materials to site and all labour
charges etc complete for 10 Sqm
0.09
1.60
0.50
1.10

cum
nos
nos
nos

Cement mortar 1:3


Mason II class
Mazdoor I class
Mazdoor II class
Add for 20% on labour

RATE @RS

2666.16
261.00
183.00
165.00

/cum
/each
/each
/each

239.95
417.60
91.50
181.50
138.12
0.00
1068.67

106.87 /Sqm

Pointing with cement mortar 1:3 flush pointing for brickwork including cost
and conveyance of all materialsand all labour charges etc complete for 10 Sqm
0.06
1.60
0.50
1.10

cum
nos
nos
nos

Cement mortar 1:3


Mason II class
Mazdoor I class
Mazdoor II class
Add for 20% on labour

RATE @RS

2666.16
261.00
183.00
165.00

/cum
/each
/each
/each

159.97
417.60
91.50
181.50
138.12
0.00
988.69

98.87 /Sqm

Pointing with cement mortar 1:3 to full depth of tiles using crudeoil 10% by
weight of cement including cost and conveyance of all materials to site
and all labour charges etc complete for 10 Sqm
0.04
2.20
0.50
1.10

cum
nos
nos
nos

Cement mortar 1:3


Mason II class
Mazdoor I class
Mazdoor II class
Add for 20% on labour

RATE @RS

2666.16
261.00
183.00
165.00

/cum
/each
/each
/each

112.33 /cum

Brick jelly lime concrete using 20mm brick jelly with slacked lime in the ratio

106.65
574.20
91.50
181.50
169.44
0.00
1123.29

PAGE103

of 32:12.5 including cost and conveyance of all materials to site and all labour
charges for mixing , laying ,and finishing etc complete for 10 cum
12.80
5.00
1.80
17.70
14.10

cum
cum
nos
nos
nos

Brick jelly 20mm


slacked lime
Mason II class
Mazdoor I class
Mazdoor II class
Add for 20% on labour

RATE @RS

582.40
869.00
261.00
183.00
165.00

/cum
/cum
/each
/each
/each

7454.72
4345.00
469.80
3239.10
2326.50
1207.08
0.00
19042.20

1904.22 /cum

Weathering course with brick jelly lime concrete using 20mm brick jelly with
pure slacked lime over R.C.C. roof slab in the proportion of 32:12.5 and
finshed with one course of pressed tiles of size 23x23x2cm with cement
mortar 1:3 mix and pointed with the same oiled mortar including cost and
conveyance of all materials to site and all labour charges etc complete for 10 Sqm
0.80
189
0.12
5.80
10.00
1.10
2.10
2.20
1.10

cum
nos
cum
kg
Sqm
nos
nos
nos
nos

Brick jelly lime concrete


pressed tiles
cement mortar 1:3 mix
crude oil
pointing with cement mortar 1:3
Mason I class
Mason II class
Mazdoor I class
Mazdoor II class
Add for 20% on labour

RATE @RS

1904.22
8765.40
2666.16
15.00
112.33
291.00
261.00
183.00
165.00

/cum
/1000 nos
/cum
/kg
/Sqm
/each
/each
/each
/each

1523.38
1656.66
319.94
87.00
1123.29
320.10
548.10
402.60
181.50
290.46
0.00
6453.03

645.30 /Sqm

Weathering course with brick jelly lime concrete using 20mm brick jelly with
pure slacked lime over R.C.C. roof slab in the proportion of 32:12.5 and
finshed with Cement mortor 1:4 -20mm thick plastering including cost and
conveyance of all materials to site and all labour charges etc complete for 10 Sqm
0.80
5.80
0.22
2.20
0.50
3.20

cum
kg
cum
nos
nos
nos

Brick jelly lime concrete


crude oil
Cement mortar 1:4
Mason I class
Mazdoor I class
Mazdoor II class
Add for 20% on labour

RATE @RS

1904.22
15.00
2094.77
291.00
183.00
165.00

/cum
/kg
/cum
/each
/each
/each

1523.38
87.00
460.85
640.20
91.50
528.00
251.94
0.00
3582.87

358.29 /Sqm

Honey comb brick work with class III country bricks including cost and conveyance

PAGE104

of all materials to site and all labour charges etc complete


0.64
0.70
3.20
6.50
2.20
5.40

x1000Nos Country bricks

cum
nos
nos
nos
nos

cement mortar 1:3 mix


Mason I class
Mason II class
Mazdoor I class
Mazdoor II class
Add for 20% on labour

RATE @RS

4024.60
2666.16
291.00
261.00
183.00
165.00

/1000Nos
/cum
/each
/each
/each
/each

2575.74
1866.31
931.20
1696.50
402.60
891.00
784.26
0.00
9147.61

914.76 /Sqm

Dry Brick work using country bricks 83/4"x41/4"x23/4" including cost and
conveyance of all materials to site and all labour charges etc complete
4.59
3.50
7.20
7.10
14.10

x1000nos

nos
nos
nos
nos

Country bricks
Mason I class
Mason II class
Mazdoor I class
Mazdoor II class
Add for 20% on labour

RATE @RS

4024.60
291.00
261.00
183.00
165.00

/1000nos
/each
/each
/each
/each

18472.91
1018.50
1879.20
1299.30
2326.50
1304.70
0.00
26301.11

2630.11 /cum

Dry Brick work using country bricks 83/4"x41/4"x21/4" including cost and
conveyance of all materials to site and all labour charges etc complete
6.01
3.50
7.20
7.10
14.10

x1000nos Country bricks

nos
nos
nos
nos

Mason I class
Mason II class
Mazdoor I class
Mazdoor II class
Add for 20% on labour

RATE @RS

4024.60
291.00
261.00
183.00
165.00

/1000nos
/each
/each
/each
/each

24187.85
1018.50
1879.20
1299.30
2326.50
1304.70
0.00
32016.05

3201.61 /cum

Gravel backing for revetments including cost and


conveyance and all labour charges etc complete - 10 cum.
11.60 cum
7.10 No
3.50 No

Gravel
Mazdoor I Class
Mazdoor II class
Add for 20% on labour
sundries
RATE @RS

130.00 cum
183.00 /each
165.00 /each

376.02 /Sqm

1508.00
1299.30
577.50
375.36
0.00
3760.16

PAGE105

Rough stone dry packing for aprons and revetments including cost and
conveyance and all labour charges etc complete
11.00
3.50
10.60
7.10

cum
nos
nos
nos

Rough stone
Wodders
Mazdoor I class
Mazdoor II class
Add for 20% on labour

319.20
189.00
183.00
165.00

RATE @RS

/cum
/each
/each
/each

3511.20
661.50
1939.80
1171.50
754.56
0.00
8038.56

803.86 /Sqm

Drystone masonry for retainingwall including cost and


conveyance and all labour charges etc complete (Statistical Inspector 214)
12.00
3.50
7.10
7.10
3.50

cum
nos
nos
nos
nos

Rough stone
Mason I class
Mason II class
Mazdoor I class
Mazdoor II class
Add for 20% on labour

319.20
291.00
261.00
183.00
165.00

RATE @RS

/cum
/each
/each
/each
/each

3830.40
1018.50
1853.10
1299.30
577.50
1899.36
0.00
10478.16

1047.82 /Sqm

Removing old revetment and repacking with old stones -1 cum


3.50 No
10.60 No
7.10 No
Ls

Wodders
Mazdoor I Class
Mazdoor II class
Add for 20% on labour
Labour Charges for removing &
clearing the old stones
RATE @RS

302
0.21
2.00
1.00
1.00

189.00 /each
183.00 /each
165.00 /each

Ls

661.50
1939.80
1171.50
754.56
2.64
4530.00

453.00 /cum

Precast Hollow Block Masonry with C.m.1:5 mix using hollow in size
of 0,40x0.10mx0.20m
for 2.56 Cum
nos
Hollow Block
10.00
cum
CM 1:5
1751.93
nos
Mason ii class
261.00
nos
mazdoor I class
183.00
nos
mazdoor ii class
165.00
Add for 20% on labour

each
each
each
each
each

for 2.56 Cum


=

4431.91 /2.56

RATE @RS

1731.21 /cum

3020.00
367.91
522.00
183.00
165.00
174.00
0.00
4431.91

PAGE106

151
0.21
2.00
1.00
1.00

Precast Hollow Block Masonry with C.m.1:5 mix using hollow in size
of 0,40x0.20mx0.20m
for 2.56 Cum
nos
Hollow Block
17.00
cum
CM 1:5
1751.93
nos
Mason ii class
261.00
nos
mazdoor I class
183.00
nos
mazdoor ii class
165.00
Add for 20% on labour

each
each
each
each
each

for 2.56 Cum


=

3978.91 /2.56

RATE @RS

1554.26 /cum

2567.00
367.91
522.00
183.00
165.00
174.00
0.00
3978.91

Roofing with AC corrugated sheet 6mm thick including cost of " J " bolts
and bitumen washer etc.complete. -10 Sqm
11.00
2.20
1.10
3.20

Sqm
Nos
Nos
Nos

20.00 Nos
20.00 Nos
LS

AC sheets 6mm thick


Fitter II class
Carpenter I class
Mazdoor I class
Add for 20% on labour
Adj. J bolt
Bitumenwasher
Sundries for white lead
RATE @RS

159.60
235.00
284.00
183.00

/Sqm
/each
/each
/each

2.50 /each
0.50 /each
LS
352.00 /Sqm

Best tiled roofing with Mangalore tiles, including CW reepers


160.00
36.00
0.49
0.09
0.50
0.50
1.10
2.20

Nos
m
kg
cum
No
No
No
No

-10Sqm

Mangalore tiles
7.55 /each
CW,reepers 50x25mm
26.40 /mtr
Reeper nails 50mm long
48.00 /kg
Lime mortar
2848.96 /cum
Carpenter I class
284.00 /each
Mason IIclass
261.00 /each
Mazdoor I Class
183.00 /each
Mazdoor II class
165.00 /each
Add for 20% on labour
Sundries
including wind-ties,screws,washers etc
RATE @RS

1755.60
517.00
312.40
585.60
283.00
50.00
10.00
6.40
3520.00

1207.20
950.40
23.52
256.41
142.00
130.50
201.30
363.00
167.36
8.31
3450.00

345.00 /Sqm

Best tiled roofing with Mangalore tiles,over ceiling tiles of best quality
including CW reepers -10Sqm
160.00 Nos
250.00 Nos
36.00 m

Mangalore tiles
Ceiling tiles 20x20x2 cm
CW,reepers 50x25mm

7.55 /each
4.55 /each
26.40 /mtr

1207.20
1136.25
950.40

PAGE107

0.49
0.09
0.50
1.00
1.10
3.30

kg
cum
No
No
Nos
Nos

Reeper nails 50mm long


48.00 /kg
Lime mortar
2848.96 /cum
Carpenter I class
284.00 /each
Mason IIclass
261.00 /each
Mazdoor I Class
183.00 /each
Mazdoor II class
165.00 /each
Add for 20% on labour
Sundries
including wind-ties,screws,washers etc
RATE @RS

23.52
256.41
142.00
261.00
201.30
544.50
229.76
0.00
4952.34

495.23 /Sqm

Removing and adjusting mangalore roofing tiles ( Labour only )- 10 Sqm


0.40 No
0.50 Nos
0.30 Nos

Mason IIclass
Mazdoor I Class
Mazdoor II class
Add for 20% on labour
Sundries
RATE @RS

261.00 /each
183.00 /each
165.00 /each

104.40
91.50
49.50
49.08
0.00
294.48

29.45 /Sqm

Supplying & Fixing in position of Indian type Water closet 580x440mm of


approved quality
1.00
0.60
0.45
0.11
1.00
0.25
1.00
1.00

no
m
m3
m3
no
no
no
no

1.00 kg
0.006 mt
0.40 kg

Indian type water closet


100mm dia PVC pipe
Sand filling
Brick jelly concrete
Plumber I class
Plumber II class
Mason I class
Mazdoor I class
Add for 20% on labour
White Cement
Cement
Spun yarn

RATE @RS

750.00
125.00
319.90
1904.22
253.00
235.00
291.00
183.00

/1 no
/1m
/cum
/cum
/each
/each
/each
/each

20.95 /kg
4761.60 /mt
6.00 /kg

750.00
75.00
143.96
209.46
253.00
58.75
291.00
183.00
157.15
20.95
28.57
2.40
0.76
2174.00

2174.00 /each

Supplying and Fixing inposition of best quality make White glazed wash
basin of size 550x 400mm - 1 No.
1.00
1.00
0.10
0.50
1.00

No
No
No
No
No

Cost of wash hand basin


Plumber I class
Plumber II class
Mason I class
Mazdoor II class
Add for 20% on labour

1375.00
253.00
235.00
291.00
165.00

/each
/each
/each
/each
/each

1375.00
253.00
23.50
145.50
165.00
117.40

PAGE108

6.00 Set
10.00 g
0.25 No

Tapering wooden plug with


38mm brass Surews
Shellac
Thread ball

RATE @RS

5.00
Set
8.00
100g
1.50 /each

30.00
0.80
0.38
0.00
2110.58

2110.58 /each

Supplying and fixing P.V.C rainwater down fall pipe of 100mm dia
with necessary shoes, bends,& clamps etc.,
3.00
1.00
1.00
1.00
1.00
L.S

m
No
No
No
No

100 mm dia PVC pipe


100 mm dia PVC shoe
100 mm dia PVC Bend
100 mm dia GI Clamp
Fitter I class
Add for 20% on labour
sundries for conveyance
RATE @RS

125.00
30.00
30.00
9.00
253.00

/Rm
/each
/each
/each
/each

L.S
For 3 Rm
249.20 /Rm

375.00
30.00
30.00
9.00
253.00
50.60
0.00
747.60

PAGE109

Wearing Coat with CC 1 : 1.5 : 3 mix using 65% of 25mm, 25%


of 12mm, and10% of 6mm IRC metal including cost of all
materials and labour charges for mixing, laying, compacting and
curing etc. complete. - 75mm uniform thickness
0.445
0.17
0.07
0.34
331.20
1.88
1.08
0.08
0.43
0.36
10.00
LS
LS
LS
LS

cum
cum
cum
cum
kg
nos
nos
nos
nos
nos
Sq.m

25mm IRC metal


12mm IRC chips
6mm IRC chips
Sand
Cement
Mazdoor I class
Mazdoor II class
Mazdoor III class
Carpenter I class
Mason I class
Cost of curing
Premoulded expansion joints
Extra conveyance of water
Hire charges for T & P

700.40
767.40
863.60
319.90
4.7616
112.00
101.00
101.00
284.00
179.00

Add for 20% on labour


Sundries
RATE @R 277.27 /Sqm

/cum
/cum
/cum
/cum
/kg
/each
/each
/each
/each
/each
LS
LS
LS
LS

311.68
130.46
60.45
108.77
1577.04
210.56
109.08
8.08
122.12
64.44
25.00
25.00
10.00
10.00
0.00

LS

0.00
2772.68

PAGE110

PAGE111

PAGE112

PAGE113

PAGE114

PAGE115

Name of work :
Estimate Amount : Rs:
COST OF MATERIALS AT SITE
Sl.No

Name of materials

1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21

Cement
sand for mortar
sand for filling
Rough stone
Bond stone
40mm iss metal
20mm iss metal
10-12mm metal
6-10mm metal
Rough stone for revet
Cutstone roughly dres
steel
country bricks ( 23/4")
country bricks ( 21/4")
brick jelly 20 mm
shell lime
Lime stone
pressed tiles
Country wood planks
--do-- scantlings
Gravel

lead in KM
Plains
Hills
16
0
35
0
35
0
8
0
8
0
8
0
8
0
8
0
8
0
8
0
8
0
16
0
10
0
10
0
10
0
10
0
10
0
1
0
1
0
1
0
1
0

25mm iss metal


8
SUB DATA
8
11.2mm metal
8
CEMENT MORTAR 1:1.5
0.960 MT
Cost of cement
1.00 cum
Cost of sand
9

6mm metal
8
CEMENT MORTAR 1:2
0.720 MT
Cost of cement
1.00 cum
Cost of sand

CEMENT MORTAR 1:3


0.480 MT
Cost of cement
1.00 cum
Cost of sand
1.00 cum

Mixing charges
Add for 20% on labour

Cost

Conveyan Conveyan
c ( Plains ) c ( Hills )

Total

4700.00
110.00
110.00
332.00
455.00
742.00
1034.00
831.50
591.50
288.00
3265.00
33500.00
3985.00
3140.00
550.00
0.00
0.00
12340.00
33030.00
28790.00
130.00

74.20
233.50
233.50
62.40
62.40
62.40
62.40
62.40
62.40
62.40
62.40
74.20
66.00
66.00
54.00
54.00
54.00
5.40
5.40
5.40
7.80

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

4774.20
343.50
343.50
394.40
517.40
804.40
1096.40
893.90
653.90
350.40
3327.40
33574.20
4051.00
3206.00
604.00
54.00
54.00
12345.40
33035.40
28795.40
137.80

731.00

62.40

0.00

793.40

553.00

62.40

0.00

615.40

0.00

4583.23
343.50
4926.73
558.40

4774.20 /MT
343.50 /cum
0

496.00

62.40
4774.20 /MT
343.50 /cum

3437.42
343.50
3780.92

4774.20 /MT
343.50 /cum

2291.62
343.50
2635.12
43.35
0.00
2678.47

43.35 /cum
0.00 /cum

PAGE116

CEMENT MORTAR 1:4


0.360 MT
Cost of cement
1.00 cum
Cost of sand
1.00 cum

Mixing charges
Add for 20% on labour

CEMENT MORTAR 1:5


0.288 MT
Cost of cement
1.00 cum
Cost of sand
1.00 cum

Mixing charges
Add for 20% on labour

CEMENT MORTAR 1:6


0.240 MT
Cost of cement
1.00 cum
Cost of sand
1.00 cum

Mixing charges
Add for 20% on labour

LIME MORTAR 1:2


0.5 cum
Lime
1.00 cum
Cost of sand
1.00 cum
Grinding mortor
Add for 20% on labour

4774.20 /MT
343.50 /cum
43.35 /cum
0.00 /cum

4774.20 /MT
343.50 /cum
43.35 /cum
0.00 /cum

4774.20 /MT
343.50 /cum
43.35 /cum
0.00 /cum

4774.20
343.50
105.90
0.00

/cum
/cum
/cum
/cum

1718.71
343.50
2062.21
43.35
0.00
2105.56

1374.97
343.50
1718.47
43.35
0.00
1761.82

1145.81
343.50
1489.31
43.35
0.00
1532.66

2387.10
343.50
105.90
0.00
2836.50

DATA
Earth work excavation and depositing on bank with in initial lead of 10 m
and initial lift of 2m in hard stiff clay, stiff black cotton soil, hard red earth,
earth mixed with small sized boulders and hard gravelly soil as per SS 20B
Rate / cum
41.85
Add 100% extra for narrow foundation
41.85
83.70
Add for 20% on labour
0.00
83.70 /cum
Cement concrete 1:6:12 mix using 40mm ISS metal including cost and
conveyance of all materials to site and all labour charges for mixing,
laying and curing etc complete for 10 cum.
9.00
4.50
1.80
17.70

cum
cum
nos
nos

Cost of 40mm ISS metal


cement mortar 1:6
Mason II class
Mazdoor I class

804.40
1489.31
326.00
228.00

/cum
/cum
/each
/each

7239.60
6701.90
586.80
4035.60

PAGE117

14.10 nos

Mazdoor II class
Add for 20% on labour

206.00 /each

2904.60
0.00
21468.50

RATE @ RS

2146.85 /cum

Cement concrete 1:5:10 mix using 40mm ISS metal including cost and
conveyance of all materials to site and all labour charges for mixing,
laying and curing etc complete for 10 cum.
9.00
4.50
1.80
17.70
14.10

cum
cum
nos
nos
nos

Cost of 40mm ISS metal


cement mortar 1:5
Mason II class
Mazdoor I class
Mazdoor II class
Add for 20% on labour

804.40
1718.47
326.00
228.00
206.00

/cum
/cum
/each
/each
/each

7239.60
7733.12
586.80
4035.60
2904.60
0.00
22499.72

RATE @ RS

2249.97 /cum

Cement concrete 1:4:8 mix using 40mm ISS metal including cost and
conveyance of all materials to site and all labour charges for mixing,
laying and curing etc complete for 10 cum.
9.00
4.50
1.80
17.70
14.10

cum
cum
nos
nos
nos

Cost of 40mm ISS metal


Cost of cement mortar 1:4
Mason II class
Mazdoor I class
Mazdoor II class
Add for 20% on labour

RATE @ RS

804.40
2062.21
326.00
228.00
206.00

/cum
/cum
/each
/each
/each

7239.60
9279.95
586.80
4035.60
2904.60
0.00
0.00
24046.55

2404.66 /cum

Cement concrete 1:3:6 mix using 40mm ISS metal including cost and
conveyance of all materials to site and all labour charges for mixing,
laying and curing etc complete for 10 cum.
9.00
4.50
1.80
17.70
14.10

cum
cum
nos
nos
nos

Cost of 40mm ISS metal


Cost of cement mortar 1:3
Mason II class
Mazdoor I class
Mazdoor II class
Add for 20% on labour

RATE @ RS

804.40
2635.12
326.00
228.00
206.00

/cum
/cum
/each
/each
/each

2662.46 /cum

Cement concrete 1:2:4 mix using 20mm ISS metal including cost and
conveyance of all materials to site and all labour charges for mixing,

7239.60
11858.04
586.80
4035.60
2904.60
0.00
0.00
26624.64

PAGE118

laying and curing etc complete for bed blocks for 10 cum
9.00
4.50
1.80
17.70
14.10

cum
cum
nos
nos
nos

20mm ISS metal


Cement mortar 1:2
Mason II class
Mazdoor I class
Mazdoor II class
Add for 20% on labour

RATE @RS

1096.40
3780.92
326.00
228.00
206.00

/cum
/cum
/each
/each
/each

9867.60
17014.14
586.80
4035.60
2904.60
0.00
0.00
34408.74

3440.87 /cum

Cement concrete 1:3:6 mix using 20mm ISS metal including cost and
conveyance of all materials to site and all labour charges for mixing,
laying and curing etc complete for bed blocks for 10 cum
9.00
4.50
1.80
17.70
14.10

cum
cum
nos
nos
nos

20mm ISS metal


Cement mortar 1:3
Mason II class
Mazdoor I class
Mazdoor II class
Add for 20% on labour

RATE @RS

1096.40
2635.12
326.00
228.00
206.00

/cum
/cum
/each
/each
/each

9867.60
11858.04
586.80
4035.60
2904.60
0.00
0.00
29252.64

2925.26 /cum

Random rubble masonry in cement mortar 1:5 mix with simultaneous


pointing including cost and conveyance pf all materials to site and all
labour charges etc complete for 10 cum
10.00
1.00
3.40
7.10
10.60
14.10
14.10

cum
cum
cum
nos
nos
nos
nos

Rough stone
Bond stone
Cement mortar 1:5
Mason I class
Mason II class
Mazdoor I class
Mazdoor II class
Add for 20% on labour

RATE @RS

394.40
517.40
1761.82
363.00
326.00
228.00
206.00

/cum
/cum
/cum
/each
/each
/each
/each

3944.00
517.40
5990.19
2577.30
3455.60
3214.80
2904.60
0.00
0.00
22603.89

2260.39 /cum

Random rubble masonry in cement mortar 1:4mix with simultaneous


pointing including cost and conveyance pf all materials to site and all
labour charges etc complete for 10 cum
10.00 cum
1.00 cum
3.40 cum

Rough stone
Bond stone
Cement mortar 1:4

394.40 /cum
517.40 /cum
2105.56 /cum

3944.00
517.40
7158.90

PAGE119

7.10
10.60
14.10
14.10

nos
nos
nos
nos

Mason I class
Mason II class
Mazdoor I class
Mazdoor II class
Add for 20% on labour

363.00
326.00
228.00
206.00

RATE @RS

/each
/each
/each
/each

2577.30
3455.60
3214.80
2904.60
0.00
0.00
23772.60

2377.26 /cum

Random rubble masonry in clay including cost and conveyance of all


materials to site and all labour charges etc complete for 10 cum
10.00
1.00
4.00
3.50
10.60
10.60
10.60

cum
cum
cum
nos
nos
nos
nos

Rough stone
Bond stone
clay
Mason I class
Mason II class
Mazdoor I class
Mazdoor II class
Add for 20% on labour

394.40
517.40
28.60
363.00
326.00
228.00
206.00

RATE @RS

/cum
/cum
/cum
/each
/each
/each
/each

3944.00
517.40
114.40
1270.50
3455.60
2416.80
2183.60
0.00
0.00
13902.30

1390.23 /cum

Dry stone masonry for Retainingwall -10cum including cost and conveyance
of all materials and all labour charges etc complete for 10 cum
12.00
3.50
7.10
7.10
3.50

cum
nos
nos
nos
nos

Rough stone ( incl. selected headers)


Mason I class
Mason II class
Mazdoor I class
Mazdoor II class
Add for 20% on labour

RATE @RS

350.40
363.00
326.00
228.00
206.00

/cum
/each
/each
/each
/each

4204.80
1270.50
2314.60
1618.80
721.00
0.00
0.00
10129.70

1012.97 /cum

Brick work in cement mortar 1:5 mix using country bricks 83/4"x43/8"x23/4"
and conveyance of all materials to site and all labour charges etc complete -10 cum
4590
2.50
3.50
10.60
7.10
21.20

nos
cum
nos
nos
nos
nos

Country bricks
8
Cement mortar 1:5
Mason I class
Mason II class
Mazdoor I class
Mazdoor II class
Add for 20% on labour

3/4"

x4

3/8"

RATE @RS

x2

3/4"

4051.00
1761.82
363.00
326.00
228.00
206.00

3371.07 /cum

/1000nos
/cum
/each
/each
/each
/each

18594.09
4404.55
1270.50
3455.60
1618.80
4367.20
0.00
0.00
33710.74

PAGE120

Brick work in cement mortar 1:5 mix using country bricks 83/4"x41/4"x21/4"
and conveyance of all materials to site and all labour charges etc complete
6010
2.80
3.50
7.10
7.10
14.10

nos
cum
nos
nos
nos
nos

Country bricks
8
Cement mortar 1:5
Mason I class
Mason II class
Mazdoor I class
Mazdoor II class
Add for 20% on labour

3/4"

x4

1/4"

RATE @RS

x2

1/4"

3206.00
1761.82
363.00
326.00
228.00
206.00

/1000nos
/cum
/each
/each
/each
/each

19268.06
4933.10
1270.50
2314.60
1618.80
2904.60
0.00
0.00
32309.66

3230.97 /cum

Collection and supply of sand and filling in to the basement including cost and
conveyance to the siteand all labour charges for filling
as per standard speecifications
1.00 cum
1.00 cum

sand for filling


Labour charges for filling
Add for 20% on labour
RATE @RS

343.50 /cum
13.00 /cum

343.50
13.00
0.00
356.50

356.50 /cum

Collection and supply of gritty gravel from appd quarry including cost and
conveyance of all materials to site including all labour charges for filling
etc.complete,
1.00 cum
1.00 cum
1.00 cum

Gravel for filling


Stacking charges
Labour charges for filling
Add for 20% on labour
RATE @RS

137.80 /cum
3.05 /cum
14.70 /cum

137.80
3.05
14.70
0.00
155.55

155.55 /cum

Collection and supply of Well gravel from appd quarry including cost and
conveyance of all materials to site including all labour charges for filling
etc.complete,
1.00 cum
1.00 cum
1.00 cum

Wellgravel
Stacking charges
Labour charges for filling
Add for 20% on labour
RATE @RS

107.80 /cum
3.05 /cum
14.70 /cum

125.55 /cum

Refilling the basement with excavated earth other than sand complying the
Standard specification
RATE @RS
14.70 /cum

107.80
3.05
14.70
0.00
125.55

PAGE121

Add for 20% on labour

0.00
14.70 /cum

Supplying and erecting centering shuttering including necessary supports for plane
surface in foundation and basement and in all floors for R C C column footing
column plinth beam, beams, roof slabs, staircase steps, bed blocks, critical pier etc
using mild steel sheets of size 90 x 60 cm and 10 guage stiffened, welded with mild
steel angles of size 25mmx25mmx3mm for boarding laid over silver oak (country
wood) scantlings of size 10cm x 6.5cm spaced of about 90cm centre to centre and
supported by casurina props of 10cm to 13cm dia spaced at 75cm centre to centre
complete complying with standard specifications and as directed by departmental
officers including conveyance of all materials to site and proper centering etc complete.
Sub Data I
Cost of MS sheets & angles for each set
Weight of MS sheet B.G 10 Gauge size 90x60cm x 3.175 mm
3.175 x 7850/1000 = 24.924 kg/m 2
24.924 Kg/m2 x 0.54 m2 = 13.46 Kg.
Weight of MS angle size 25 x 25 x 3 mm
3.6 x 1.1 Kg/m = 4.00 Kg
13.46 kgs
Cost of MS sheet
4 kgs
Cost of MS angle
L.S
Cutting,bending,welding,etc

48.00 /kg
48.00 /kg

646.08
192.00
21.63
859.71

Sub Data 2
Cost of MS sheets and angles and CW joists and casurina props - 10 Sqm
19 Nos
Cost of strutting
0.12 cum
98.5 Rm

Cost of MS sheet and angle


silver oak
Casurina props 10 to 13cm dia

Rate per one operation for MS sheet & angle


Rate per one operation for strutting

859.71 /each

16334.49

10340.00 /cum
21.10 /Rm

1240.80
2078.35
3319.15

16334.49 /40
3319.15 /5

408.36
663.83

Main data for one use for 10 Sqm

3.80 nos
5.40 nos
1 nos
L.S
L.S

MS sheet rate per one operation


props rate per one operation
Carpenter I class
Mazdoor I class
Fitter II class
Add for 20% on labour
wedges
periodical cleaning and painting etc

i] Rate for roof slab, lintel, beam

408.36
663.83
355.00
228.00
293.00

/each
/each
/each
/each
/each

396.64 /Sqm

408.36
663.83
1349.00
1231.20
293.00
0.00
10.46
10.55
3966.40

PAGE122

ii] Rate for sunshade


Add 10% above rate
RATE @RS

396.64
39.66
436.30 /Sqm

iii] Rate for column post


98.5 Nos
0.3 Nos
0.3 Nos

Casurina props 10 -13


Carpenter I class
Mazdoor I class
Add for 20% on labour

21.10

2078.35 /5
355.00 /each
228.00 /each

3966.40 -590.57
RATE @RS
iv] Centering below Ground level
50% of the above rate

337.58 /Sqm

396.64 /2
RATE @RS

415.67
106.50
68.40
0.00
590.57
3375.83

198.32

198.32 /Sqm

Supplying and fabrication of steel including cost and conveyance of


steel to site and all labour charges for straightening, cutting to length,
bending to shape and tying in position and forming grills for all R.C.C works
1.00 MT
0.01 mt
35.00 nos

Cost of steel
Cost of binding wire
Fitter I class
Add for 20% on labour

33574.20 /mt
48.00 /mt
322.00 /each

33574.20
0.48
11270.00
0.00
0.00
44844.68

RATE @RS 44844.68 /MT

9.00
4.50
3.50
21.20
35.30

Reinforced cement concrete 1:2:4 mix using 20mm ISS metal


including cost and conveyance of all materials to site and all
labour charges for mixing, laying, and curing etc complete for 10 cum
cum
20mm ISSmetal
1096.40 /cum
cum
Cement mortar 1:2
3780.92 /cum
nos
Mason II class
326.00 /each
nos
Mazdoor I class
228.00 /each
nos
Mazdoor II class
206.00 /each
Add for 20% on labour

RATE @RS

9867.60
17014.14
1141.00
4833.60
7271.80
0.00
0.00
40128.14

4012.81 /cum

Reinforced cement concrete 1:2:4 mix using 20mm ISS metal 1445.85
including cost and conveyance of all materials to site and all
labour charges for mixing, laying, and curing etc complete for 10 cum
9.00 cum
20mm ISSmetal
1096.40 /cum
4.50 cum
sand
343.50 /cum

9867.60
1545.75

PAGE123

###
3.50
21.20
35.30

Kg
nos
nos
nos

cement
Mason II class
Mazdoor I class
Mazdoor II class
Add for 20% on labour

RATE @RS

9.00
4.50
3.50
21.20
35.30

/kg
/each
/each
/each

15425.44
1141.00
4833.60
7271.80
0.00
0.00
40085.19

4008.52 /cum

Reinforced cement concrete 1:1.5:3 mix using 20mm ISS metal


including cost and conveyance of all materials to site and all
labour charges for mixing, laying, and curing etc complete for 10 cum
cum
20mm ISSmetal
1096.40 /cum
cum
Cement mortar 1:1.5
4926.73 /cum
nos
Mason II class
326.00 /each
nos
Mazdoor I class
228.00 /each
nos
Mazdoor II class
206.00 /each
Add for 20% on labour

RATE @RS

9.00
4.50
###
3.50
21.20
35.30

4.77
326.00
228.00
206.00

9867.60
22170.29
1141.00
4833.60
7271.80
0.00
0.00
45284.29

4528.43 /cum

Reinforced cement concrete 1:1.5:3 mix using 20mm ISS metal


including cost and conveyance of all materials to site and all
labour charges for mixing, laying, and curing etc complete for 10 cum
cum
20mm ISSmetal
1096.40 /cum
cum
sand
343.50 /cum
KG
Cement
4774.20 /MT
nos
Mason II class
326.00 /each
nos
Mazdoor I class
228.00 /each
nos
Mazdoor II class
206.00 /each
Add for 20% on labour

9867.60
1545.75
20567.25
1141.00
4833.60
7271.80
0.00
0.00
45227.00

RATE @RS 4522.70 /cum

0.10
1.10
1.10
1.10

Plastering with cement mortar 1:3 mix to 10 mm thick including


cost and conveyance of all materials to site and all labour
charges etc complete for 10 Sqm
cum
Cement mortar 1:3
2678.47 /cum
nos
Mason I class
363.00 /each
nos
Mazdoor I class
228.00 /each
nos
Mazdoor II class
206.00 /each
Add for 20% on labour

RATE @RS

114.46 /Sqm

Plastering with cement mortar 1:3 mix to 20 mm thick including


cost and conveyance of all materials to site and all labour

267.85
399.30
250.80
226.60
0.00
0.00
1144.55

PAGE124

0.22
2.20
0.50
3.20

charges etc complete for 10 Sqm


cum
Cement mortar 1:3
nos
Mason I class
nos
Mazdoor I class
nos
Mazdoor II class
Add for 20% on labour

RATE @RS

0.22
2.20
0.50
3.20

/cum
/each
/each
/each

463.22
798.60
114.00
659.20
0.00
0.00
2035.02

203.50 /Sqm

Plastering with cement mortar 1:5 mix to 20 mm thick including


cost and conveyance of all materials to site and all labour
charges etc complete for 10 Sqm
cum
Cement mortar 1:5
1761.82 /cum
nos
Mason I class
363.00 /each
nos
Mazdoor I class
228.00 /each
nos
Mazdoor II class
206.00 /each
Add for 20% on labour

RATE @RS

589.26
798.60
114.00
659.20
0.00
0.00
2161.06

216.11 /Sqm

Plastering with cement mortar 1:4 mix to 20 mm thick including


cost and conveyance of all materials to site and all labour
charges etc complete for 10 Sqm
cum
Cement mortar 1:4
2105.56 /cum
nos
Mason I class
363.00 /each
nos
Mazdoor I class
228.00 /each
nos
Mazdoor II class
206.00 /each
Add for 20% on labour

RATE @RS

0.22
2.20
0.50
3.20

2678.47
363.00
228.00
206.00

387.60
798.60
114.00
659.20
0.00
0.00
1959.40

195.94 /Sqm

Plastering with cement mortar 1:3 mix to 12mm thick including


cost and conveyance of all materials to site and all labour charges etc
0.14
1.10
0.50
1.10

cum
nos
nos
nos

Cement mortar 1:3


Mason I class
Mazdoor I class
Mazdoor II class
Add for 20% on labour

RATE @RS

2678.47
363.00
228.00
206.00

/cum
/each
/each
/each

374.99
399.30
114.00
226.60
0.00
0.00
1114.89

111.49 /Sqm

Plastering with cement mortar 1:4 mix to 12mm thick including


cost and conveyance of all materials to site and all labour charges etc
0.14 cum

Cement mortar 1:4

2105.56 /cum

294.78

PAGE125

1.10 nos
0.50 nos
1.10 nos

Mason I class
Mazdoor I class
Mazdoor II class
Add for 20% on labour

RATE @RS

363.00 /each
228.00 /each
206.00 /each

399.30
114.00
226.60
0.00
0.00
1034.68

103.47 /Sqm

Plastering with cement mortar 1:5 mix to 12mm thick including


cost and conveyance of all materials to site and all labour charges etc
0.14
1.10
0.50
1.10

cum
nos
nos
nos

Cement mortar 1:5


Mason I class
Mazdoor I class
Mazdoor II class
Add for 20% on labour

RATE @RS

1761.82
363.00
228.00
206.00

/cum
/each
/each
/each

246.65
399.30
114.00
226.60
0.00
0.00
986.55

98.66 /Sqm

Damp proof course in cement mortor CM1:3 - 20mm thick with water proofing
compound at 5% by wt of cement
0.21
1.10
1.10
2.20
1.10

cum
nos
nos
nos
nos

5.00 kg

cement mortar 1:3 mix


Mason I class
Mason II class
Mazdoor I class
Mazdoor II class
Add for 20% on labour
Crude oil

RATE @RS

2678.47
363.00
326.00
228.00
206.00

/cum
/each
/each
/each
/each

15.00 / kg

562.48
399.30
358.60
501.60
226.60
0.00
75.00
0.00
2123.58

212.36 /Sqm

Damp proof course in cement mortor CM1:3 - 12mm thick with water proofing
compound at 2 % by wt of cement
0.14
1.10
0.50
1.10

cum
nos
nos
nos

1.00 kg

cement mortar 1:3 mix


Mason I class
Mazdoor I class
Mazdoor II class
Add for 20% on labour
water proofing compound

RATE @RS

2678.47
363.00
228.00
206.00

/cum
/each
/each
/each

42.35 / kg

374.99
399.30
114.00
226.60
0.00
42.35
0.00
1157.24

115.72 /Sqm

Providing granolethic floor finish in cement concrete 1:2:4 mix using 10-12mm
ISS metal to 25mm thick including cost and conveyance of all materials to site
and all labour charges for mixing, laying, curing etc complete for 10 cum

PAGE126

9.00
4.50
1.80
17.70
14.10

cum
cum
nos
nos
nos

25mm Tk

10-12mm ISS metal


Cement mortar 1:2
Mason II class
Mazdoor I class
Mazdoor II class
Add for 20% on labour

3258.62

893.90
3780.92
326.00
228.00
206.00

RATE @RS

3258.62 /cum

x 0.025 =

81.47 /Sqm

/cum
/cum
/each
/each
/each

8045.10
17014.14
586.80
4035.60
2904.60
0.00
0.00
32586.24

Ellispattern Ist sort -20mm thick including cost and conveyance of all
materials to site and all labour charges etc complete
0.24
0.117
0.50
1.10
4.30

nos
mt
nos
nos
nos

6 to 10mm chips
Cost of cement
Mason I class
Mazdoor I class
Mazdoor II class
Add for 20% on labour

RATE @RS

653.90
4774.20
363.00
228.00
206.00

/cum
/mt
/each
/each
/each

156.94
558.58
181.50
250.80
885.80
0.00
0.00
2033.62

203.36 /Sqm

Flooring with red cement plaster polished surface and thread lined -10 Sqm
10.00 Sqm
0.80 kg
1.10 Nos

Plastering with CM 1:5 20mmthick


Red Oxide
Mason I class
Add for 20% on labour
sundries
RATE @RS

195.94 Sqm
20.00 kg
363.00 cum

1959.40
16.00
399.30
0.00
0.00
2374.70

237.47 /Sqm

Flooring with gravel 100mm thick -10Sqm


1.70 cum
1.10 No
0.50 No

Gravel
Mazdoor I Class
Mazdoor II class
Add for 20% on labour
sundries
RATE @RS

137.80 cum
228.00 E
206.00 E

234.26
250.80
103.00
0.00
0.00
588.06

58.81 /Sqm

Dadooing of walls with glazed tiles of size 15 cm x15cmx6mm laid in


CM 1:2, 10mm thick & pointing with white cement using 0.4kg/cm 2
-10Sqm
450 Nos
Glazed tiles
11.40 /each

5130.00

PAGE127

0.10
4.00
1.10
4.10
2.70
3.30

cum
kg
nos
nos
nos
nos

cement mortar 1:2 mix


White cement
Mason I class
Mason II class
Mazdoor I class
Mazdoor II class
Add for 20% on labour

RATE @RS

3780.92
23.00
363.00
326.00
228.00
206.00

/cum
/kg
/each
/each
/each
/each

378.09
92.00
399.30
1336.60
615.60
679.80
0.00
0.00
8631.39

863.14 /Sqm

Dadooing of walls with colour glazed tiles of size 300x200x6 mm of best quality
including cost and conveyance of all materials to site and all labour charges etc
complete.
167
0.10
4.00
1.10
4.10
2.70
3.30

Nos
cum
kg
nos
nos
nos
nos

Glazed tiles
cement mortar 1:2 mix
Colour cement
Mason I class
Mason II class
Mazdoor I class
Mazdoor II class
Add for 20% on labour

RATE @RS

24.00
3780.92
26.65
363.00
326.00
228.00
206.00

/each
/cum
/kg
/each
/each
/each
/each

4008.00
378.09
106.60
399.30
1336.60
615.60
679.80
0.00
0.00
7523.99

752.40 /Sqm

Floor finishing with ceromic tiles of size 20cmx20cm including cost


and conveyance of all materials to site and all labour charges etc complete
250
0.21
1.10
1.10
2.20
2.20

Nos
cum
nos
nos
nos
nos

Ceromic tiles
cement mortar 1:3 mix
Mason I class
Mason II class
Mazdoor I class
Mazdoor II class
Add for 20% on labour

RATE @RS

22.35
2678.47
363.00
326.00
228.00
206.00

/each
/cum
/each
/each
/each
/each

5587.50
562.48
399.30
358.60
501.60
453.20
0.00
0.00
7862.68

786.27 /Sqm

Paving the Floor with scratch proof ceromic tiles of size 305x305x6mm including
cost and conveyance of all materials to site and all labour charges etc complete
112
0.21
1.20
1.00
1.00

Nos
cum
nos
no
no

Design colour Ceromic tiles


Cement mortar 1:3 mix
Mason I class
Mason II class
Mazdoor I class

305x305x6

50.80
2678.47
363.00
326.00
228.00

/each
/cum
/each
/each
/each

5689.60
562.48
435.60
326.00
228.00

PAGE128

1.00 no
0.50 no
0.50 Kg
3.0 Kg

Mazdoor II class
Stone cutter I class
Add for 20% on labour
Cotton waste
Colour cement
Sundries

206.00 /each
280.00 /each
9.20 /Kg
26.65 /Kg
LS

RATE @RS

206.00
140.00
0.00
4.60
79.95
0.00
7672.23

767.22 /Sqm

Paving the Floor with scratch proof ceromic tiles of size 400x400x7mm including
cost and conveyance of all materials to site and all labour charges etc complete
63
0.21
1.20
1.00
1.00
1.00
0.50

Nos
cum
nos
no
no
no
no

0.50 Kg
3.0 Kg

Design colour Ceromic tiles


Cement mortar 1:3 mix
Mason I class
Mason II class
Mazdoor I class
Mazdoor II class
Stone cutter I class
Add for 20% on labour
Cotton waste
Colour cement
Sundries

400x400x7

RATE @RS

64.00
2678.47
363.00
326.00
228.00
206.00
280.00

/each
/cum
/each
/each
/each
/each
/each

9.20 /Kg
26.65 /Kg
LS

4032.00
562.48
435.60
326.00
228.00
206.00
140.00
0.00
4.60
79.95
0.00
6014.63

601.46 /Sqm

Supplying & fixing of Granite slab of 20mm thick with nosing, cutting and bedding
laidover in CM 1 : 2 20mm thick - 10 Sqm
10
0.21
1.10
2.00
2.20
1.10

Sqm
cum
nos
no
no
no

4.0
1.60
0.50
1.10

Kg
no
no
no

Granite slab 20 mm thick


Cement mortar 1:2 mix
Mason I class
Mason II class
Mazdoor I class
Mazdoor II class
Add for 20% on labour
Pointing with Colour cement
Colour cement
Mason II class
Mazdoor I class
Mazdoor II class
Add for 20% on labour
Sundries
RATE @RS

1815.00
3780.92
363.00
326.00
228.00
206.00

23.00
326.00
228.00
206.00

/each
/cum
/each
/each
/each
/each

18150.00
793.99
399.30
652.00
501.60
226.60
0.00

/Kg
/each
/each
/each

92.00
521.60
114.00
226.60
0.00
0.00
21677.69

LS
2167.77 /Sqm

Pointing with cement mortor 1:3 cuddapah slab & paving stone to full depth - 10 Sqm
0.01 cum
1.60 nos

Cement mortar 1:3


Mason II class

2678.47 /cum
326.00 /each

26.78
521.60

PAGE129

0.50 nos
1.10 nos

Mazdoor I class
Mazdoor II class
Add for 20% on labour

RATE @RS

10.50
0.12
1.00
10.00
1.10
2.10
2.20
1.10

228.00 /each
206.00 /each

88.90 /Sqm

Flooring with cuddapah slabs 50mm thick over a bed of concrete 100mm
thick and pointed with cement mortar 1:3 -10 Sqm
Sqm
Cuddapah slabs (50mm thick)
342.00 Sqm
cum
cement mortar1:3
2678.47 cum
cum
Cement Concrete 1:6:12
2146.85 cum
Sqm
Pointing with CM 1:3
88.90 cum
No
Mason I class
363.00 cum
No
Mason IIclass
326.00 /each
No
Mazdoor I Class
228.00 /each
No
Mazdoor II class
206.00 /each
Add for 20% on labour
sundries
RATE @RS

114.00
226.60
0.00
0.00
888.98

3591.00
321.42
2146.85
888.98
399.30
684.60
501.60
226.60
0.00
0.00
8760.35

876.04 /Sqm

White washing two coats using shell lime including cost and conveyance of
all materials to site and all labour charges etc comoplete for 100 Sqm
0.07
1.60
0.50
2.70

cum
nos
nos
nos

cost of shell lime


Mason II class
Mazdoor I class
Mazdoor II class
Add for 20% on labour

RATE @RS

54.00
326.00
228.00
206.00

/cum
/each
/each
/each

3.78
521.60
114.00
556.20
0.00
0.00
1195.58

11.96 /Sqm

Colour washing two coats using approved colour pigments including cost
and conveyance of all materials to site and all labour charges etc complete
1 Sqm

rate for white washing


ADD 50% extra for colour pigments
RATE @Rs

11.96
5.98
17.93
17.93 /Sqm

Distembering two coats with best approved distember including cost


and conveyance of all materials to site and all labour charges etc complete
1.34
0.50
0.50
0.80

Kg
No
No
No

Distember
Painter I Class
Mazdoor I Class
Mazdoor II Class
Add for 20% on labour

78.50
293.00
228.00
206.00

/Kg
/each
/each
/each

105.19
146.50
114.00
164.80
0.00

PAGE130

Ls

Sundriries for brushes


RATE @RS

LS

0.00
530.49

53.05 /Sqm

Priming coat for new iron with ready mixed primer of approved quality 10Sqm
1.33 kg
Red Oxide
145.50 kg
193.52
0.70 No
Painter-I class
293.00 /each
205.10
Add for 20% on labour
0.00
sundries
including brushes, soaps.putty etc
0.38
399.00
RATE @RS
39.90 /Sqm
Priming coat on new wood work with ready mixed primer of approved quality-10 Sqm
1.44 kg
0.70 No

Ready mixed primer


156.75 kg
Painter-I class
293.00 /each
Add for 20% on labour
sundries
including brushes, soaps.putty etc
RATE @Rs

225.72
205.10
0.00
0.18
431.00

43.10 /Sqm

Painting two coats over new iron works using ready mixed enamel paint
including cost and conveyance of paint and all labour charges etc complete
2.22 Lit
1.10 nos

Cost of paint
242.55 /lit
Painter I class
293.00 /each
Add for 20% on labour
sundries
including brushes, soaps.putty etc
RATE @Rs

538.46
322.30
0.00
0.24
861.00

86.10 /Sqm

Painting two coats over new wood works using ready mixed enamel paint
including cost and conveyance of paint and all labour charges etc complete
2.55 Lit
1.20 nos

Cost of paint
242.55 /lit
Painter I class
293.00 /each
Add for 20% on labour
sundries
including brushes, soaps.putty etc
RATE @Rs

618.50
351.60
0.00
0.90
971.00

97.10 /Sqm

Painting two coats over old iron works using ready mixed enamel paint
including cost and conveyance of paint and all labour charges etc complete
1.89 Lit
1.10 nos

Cost of paint
242.55 /lit
Painter I class
293.00 /each
Add for 20% on labour
sundries
including brushes, soaps.putty etc
RATE @Rs

78.10 /Sqm

458.42
322.30
0.00
0.28
781.00

PAGE131

Painting two coats over old wood works using ready mixed enamel paint
including cost and conveyance of paint and all labour charges etc complete
2.22 Lit
1.20 nos

Cost of paint
242.55 /lit
Painter I class
293.00 /each
Add for 20% on labour
sundries
including brushes, soaps.putty etc
RATE @Rs

538.46
351.60
0.00
9.94
900.00

90.00 /Sqm

Pointing the RR Masonry with cement mortar 1:3 mix


including cost and conveyance of all materials to site and all labour
charges etc complete for 10 Sqm
0.09
1.60
0.50
1.10

cum
nos
nos
nos

Cement mortar 1:3


Mason II class
Mazdoor I class
Mazdoor II class
Add for 20% on labour

RATE @RS

2678.47
326.00
228.00
206.00

/cum
/each
/each
/each

241.06
521.60
114.00
226.60
0.00
0.00
1103.26

110.33 /Sqm

Pointing with cement mortar 1:3 flush pointing for brickwork including cost
and conveyance of all materialsand all labour charges etc complete for 10 Sqm
0.06
1.60
0.50
1.10

cum
nos
nos
nos

Cement mortar 1:3


Mason II class
Mazdoor I class
Mazdoor II class
Add for 20% on labour

RATE @RS

2678.47
326.00
228.00
206.00

/cum
/each
/each
/each

160.71
521.60
114.00
226.60
0.00
0.00
1022.91

102.29 /Sqm

Pointing with cement mortar 1:3 to full depth of tiles using crudeoil 10% by
weight of cement including cost and conveyance of all materials to site
and all labour charges etc complete for 10 Sqm
0.04
2.20
0.50
1.10

cum
nos
nos
nos

Cement mortar 1:3


Mason II class
Mazdoor I class
Mazdoor II class
Add for 20% on labour

RATE @RS

2678.47
326.00
228.00
206.00

/cum
/each
/each
/each

116.49 /cum

Brick jelly lime concrete using 20mm brick jelly with slacked lime in the ratio

107.14
717.20
114.00
226.60
0.00
0.00
1164.94

PAGE132

of 32:12.5 including cost and conveyance of all materials to site and all labour
charges for mixing , laying ,and finishing etc complete for 10 cum
12.80
5.00
1.80
17.70
14.10

cum
cum
nos
nos
nos

Brick jelly 20mm


slacked lime
Mason II class
Mazdoor I class
Mazdoor II class
Add for 20% on labour

RATE @RS

604.00
54.00
326.00
228.00
206.00

/cum
/cum
/each
/each
/each

7731.20
270.00
586.80
4035.60
2904.60
0.00
0.00
15528.20

1552.82 /cum

Weathering course with brick jelly lime concrete using 20mm brick jelly with
pure slacked lime over R.C.C. roof slab in the proportion of 32:12.5 and
finshed with one course of pressed tiles of size 23x23x2cm with cement
mortar 1:3 mix and pointed with the same oiled mortar including cost and
conveyance of all materials to site and all labour charges etc complete for 10 Sqm
0.80
189
0.12
5.80
10.00
1.10
2.10
2.20
1.10

cum
nos
cum
kg
Sqm
nos
nos
nos
nos

Brick jelly lime concrete


pressed tiles
cement mortar 1:3 mix
crude oil
pointing with cement mortar 1:3
Mason I class
Mason II class
Mazdoor I class
Mazdoor II class
Add for 20% on labour

RATE @RS

1552.82
12345.40
2678.47
15.00
116.49
363.00
326.00
228.00
206.00

/cum
/1000 nos
/cum
/kg
/Sqm
/each
/each
/each
/each

1242.26
2333.28
321.42
87.00
1164.94
399.30
684.60
501.60
226.60
0.00
0.00
6961.00

696.10 /Sqm

Weathering course with brick jelly lime concrete using 20mm brick jelly with
pure slacked lime over R.C.C. roof slab in the proportion of 32:12.5 and
finshed with Cement mortor 1:4 -20mm thick plastering including cost and
conveyance of all materials to site and all labour charges etc complete for 10 Sqm
0.80
5.80
0.22
2.20
0.50
3.20

cum
kg
cum
nos
nos
nos

Brick jelly lime concrete


crude oil
Cement mortar 1:4
Mason I class
Mazdoor I class
Mazdoor II class
Add for 20% on labour

RATE @RS

1552.82
15.00
2105.56
363.00
228.00
206.00

/cum
/kg
/cum
/each
/each
/each

1242.26
87.00
463.22
798.60
114.00
659.20
0.00
0.00
3364.28

336.43 /Sqm

Honey comb brick work with class III country bricks including cost and conveyance

PAGE133

of all materials to site and all labour charges etc complete


0.64
0.70
3.20
6.50
2.20
5.40

x1000Nos Country bricks

cum
nos
nos
nos
nos

cement mortar 1:3 mix


Mason I class
Mason II class
Mazdoor I class
Mazdoor II class
Add for 20% on labour

RATE @RS

4051.00
2678.47
363.00
326.00
228.00
206.00

/1000Nos
/cum
/each
/each
/each
/each

2592.64
1874.93
1161.60
2119.00
501.60
1112.40
0.00
0.00
9362.17

936.22 /Sqm

Dry Brick work using country bricks 83/4"x41/4"x23/4" including cost and
conveyance of all materials to site and all labour charges etc complete
4.59
3.50
7.20
7.10
14.10

x1000nos

nos
nos
nos
nos

Country bricks
Mason I class
Mason II class
Mazdoor I class
Mazdoor II class
Add for 20% on labour

RATE @RS

4051.00
363.00
326.00
228.00
206.00

/1000nos
/each
/each
/each
/each

18594.09
1270.50
2347.20
1618.80
2904.60
0.00
0.00
26735.19

2673.52 /cum

Dry Brick work using country bricks 83/4"x41/4"x21/4" including cost and
conveyance of all materials to site and all labour charges etc complete
6.01
3.50
7.20
7.10
14.10

x1000nos Country bricks

nos
nos
nos
nos

Mason I class
Mason II class
Mazdoor I class
Mazdoor II class
Add for 20% on labour

RATE @RS

4051.00
363.00
326.00
228.00
206.00

/1000nos
/each
/each
/each
/each

24346.51
1270.50
2347.20
1618.80
2904.60
0.00
0.00
32487.61

3248.76 /cum

Gravel backing for revetments including cost and


conveyance and all labour charges etc complete - 10 cum.
11.60 cum
7.10 No
3.50 No

Gravel
Mazdoor I Class
Mazdoor II class
Add for 20% on labour
sundries
RATE @RS

137.80 cum
228.00 /each
206.00 /each

393.83 /Sqm

1598.48
1618.80
721.00
0.00
0.00
3938.28

PAGE134

Rough stone dry packing for aprons and revetments including cost and
conveyance and all labour charges etc complete
11.00
3.50
10.60
7.10

cum
nos
nos
nos

Rough stone
Wodders
Mazdoor I class
Mazdoor II class
Add for 20% on labour

RATE @RS

350.40
236.00
228.00
206.00

/cum
/each
/each
/each

3854.40
826.00
2416.80
1462.60
0.00
0.00
8559.80

855.98 /Sqm

Drystone masonry for retainingwall including cost and


conveyance and all labour charges etc complete (Statistical Inspector 214)
12.00
3.50
7.10
7.10
3.50

cum
nos
nos
nos
nos

Rough stone
Mason I class
Mason II class
Mazdoor I class
Mazdoor II class
Add for 20% on labour

RATE @RS

350.40
363.00
326.00
228.00
206.00

/cum
/each
/each
/each
/each

4204.80
1270.50
2314.60
1618.80
721.00
0.00
0.00
10129.70

1012.97 /Sqm

Removing old revetment and repacking with old stones -1 cum


3.50 No
10.60 No
7.10 No
Ls

Wodders
Mazdoor I Class
Mazdoor II class
Add for 20% on labour
Labour Charges for removing &
clearing the old stones
RATE @RS

236.00 /each
228.00 /each
206.00 /each

Ls

4.60
4710.00

471.00 /cum

Wearing Coat with CC 1 : 1.5 : 3 mix using 65% of 25mm, 25%


of 12mm, and10% of 6mm IRC metal including cost of all
materials and labour charges for mixing, laying, compacting and
curing etc. complete. - 75mm uniform thickness
0.445
0.17
0.07
0.34
331.20
1.88
1.08
0.08
0.43
0.36
10.00
LS
LS

cum
cum
cum
cum
kg
nos
nos
nos
nos
nos
Sq.m

25mm ISS metal


12mm ISS metal
6mm ISS metal
Sand
Cement
Mazdoor I class
Mazdoor II class
Mazdoor III class
Carpenter I class
Mason I class
Cost of curing
Premoulded expansion joints
Extra conveyance of water

793.40
615.40
558.40
343.50
4.7742
228.00
206.00
206.00
355.00
363.00

/cum
/cum
/cum
/cum
/kg
/each
/each
/each
/each
/each
LS
LS
LS

826.00
2416.80
1462.60
0.00

353.06
104.62
39.09
116.79
1581.22
428.64
222.48
16.48
152.65
130.68
25.00
25.00
10.00

Picking 5 cm to 10 cm old metalled surface and sectioning - 1 sq.m


Mazdoor class I

=1/4 x 1.08 Nos

258.00
Rate / Sq.m

69.66

6.97

Soling with 150mm cube stones - 10Sq.m


(i)Labour charges

Mazdoor II for preparing

1/6 No

231.00

38.50

Mazdoor II for watering

1 No

231.00

231.00

Mazdoor I for packing

3 No

258.00

774.00

1/6 No

231.00

38.50

Mazdoor II for blinding gravel

1082.00
Rate per 1Sq.m

108.20

(ii)Hire Charges

Taking out put

600 Sq.m

Hire charges for power roller per day


Fuel charges/day

2.5 litres

828.00

8 Hours

54.15

1083.00
1911.00

Total hire charges including fuel


Total hire charges and Labour charges

1911.00 /600x10 =
(i)+(ii)

31.85

Rate per Sq.m

140.05

Spreading Gravel and consolidation with power roller rolling excluding cost of Gravel
(i) Hire charges for Machineries

Water sprinkler excluding fuel charges


Fuel charges / day

3.25 litres

1159.00
R 54.15

/ litre

8 lit

1407.90
2566.90

Daily out turn

1000 cum

Hire charges for per cum

2.57

(ii) Power roller 8-10 ton capacity

Hire charges for per day


Fuel charges / day

828.00
20 litres

R 54.15

per litre

1083.00
1911.00

Daily out turn

425 cum

Hire charges for per cum

4.50

(iii) Labour charges for spreading 100cum of gravel


Mazdoor class I

2 Nos.

Labour charges per Cum


Total hire charges and Labour charges per Cum

Laying well gravel

Labour Charges for the area of 100 cum.

258.00

516.00
5.16

(i)+(ii)+(iii)

12.23

Mazdoor I class

2 Nos.

258.00

516.00

Rate per Cu.m

5.16

Laying U.S. Gravel

Labour Charges for the area of 100 cum.


Mazdoor I class

2 Nos.

258.00

516.00

Rate per Cu.m

5.16

Labour charges for WBM patch work - 1 cum

Picking the metal surface 2" to 3" deep


In patches and cutting

Maz I

1.08x1/6

258.00

46.44

collection of metal & gravel andMaz I

1.08x1/8

258.00

34.83

Removal of picked up stuff and


conveying the same to site
Brushing and cleaning the surface

L.S

2.20

Levelling the materials in the patches and pot holes

L.S

5.50

Special tools such as wire brush

L.S

2.20

Regulation of traffic

L.S

2.20

Sundries such as barricading arrangements,

L.S

0.55

Rate per Cu.m

93.92

and tamping after blinding with water

conveying water etc,.

Forming embankment with earth work excavation from borrow pits and
compaction by power roller

100 % Compaction

(i) Hire charges and labour charges for earthwork compaction

Hire charges for Machinery


(i) Water sprinkler
Hire charges excluding fuel charges/day
Fuel charges / day

3.25 litres

1159.00
54.15 / litre

Total hire charges / day

1407.90
2566.90

Daily out turn

1000 cum

Hire charges per cum

2.57

(ii) Power roller


Hire charges excluding fuel charges/day
Fuel charges / day

2.5 litres

828.00
54.15 / litre

Total hire charges / day


Daily out turn
Hire charges per cum
Total hire charges for Machiner (i)+(ii)
(iii) Labour charges for 100 cum

1083.00
1911.00

425 cum
4.50

1911.00 /425

2.57

4.50

7.07

Mazdoor I class

2 Nos

258.00

Labour charges per cum

516.00
5.16

Hire and Labour charges per M3 (i)+(ii)+(iii)

7.07

12.23

5.16

Forming embankment with earth work excavation from borrow pits and
compaction by power roller

97% Compaction

Hire charges and labour charges for earthwork compaction

Hire charges for Machinery


(i) Water srinkler
Hire charges excluding fuel charges/day
Fuel charges / day

3.25 litres

1159.00
54.15 / litre

Total hire charges / day

1407.90
2566.90

Daily out turn

1000 cum

Hire charges per cum

2.57

(ii) Power roller


Hire charges excluding fuel charges/day
Fuel charges / day

2.5 litres

828.00
54.15 / litre

Total hire charges / day

1083.00
1911.00

Daily out turn

500 cum

Hire charges per cum

3.82

Total hire charges for Machinery (i)+(ii)

2.57

3.82

6.39

(iii) Labour charges for 100 cum


Mazdoor I class

2 Nos

258.00

Labour charges per cum

516.00
5.16

Hire and Labour charges / M3 (i)+(ii)+(iii)

6.39

11.55

5.16

Providing and laying Granular sub-base compaction 100mm thick


by power roller - Hire charges and labour charges for GSB -10 Sq.m
(i) Hire charges for Machinery
Water srinkler
Hire charges excluding fuel charges/day
Fuel charges / day

3.25 litres

1159.00
54.15 / litre

Total hire charges / day

1407.90
2566.90

Daily out turn

1000 cum

Hire charges per 10Sq.m

2.57

2566.90 /1000

Power roller
Hire charges excluding fuel charges/day
Fuel charges / day

2.5 litres

828.00
54.15 / litre

1083.00

Total hire charges / day


Daily out turn
Hire charges per 10 Sq.m
Total hire charges for Machinery/10 sqm

1911.00
950 Sq.m of 100mm thick
20.12

1911.00 /950x10

2.57

20.12

22.69

(ii) Labour charges (for mixing 950 Sq.m)


Mazdoor I class

6 Nos

258.00

1548.00

Mazdoor II class

24 Nos

231.00

5544.00
7092.00

Labour charges per 10 Sq.m

7092.00

74.65

/950x10

For spreading 100cum


Mazdoor I class

4 Nos

Labour charges for spreading

258.00

1032.00

Per 1 Cum or 10 Sq.m

Total Labour charges for 10 Sq.m

10.32

74.65

10.32

84.97

22.69

84.97

107.66

Hire charges for Machinery and Labour charges


10 Sq.m of 100mm tk

(i)+(ii)

Providing WBM Grade II & Grade III 75mm thick


Hire charges and labour charges for WBM Gr.II & III
Hire charges for Machinery
Water srinkler
Hire charges excluding fuel charges/day
Fuel charges / day

3.50 litres

1159.00
54.15

1516.20

Total hire charges / day

2675.20

Daily out turn

450 Sq.m of 75mm thick

Hire charges per 10Sq.m

59.45

2675.20 /450x10

Power roller
Hire charges excluding fuel charges/day
Fuel charges / day

2.5 litres

828.00
54.15 / litre

1083.00

Total hire charges / day

1911.00

Daily out turn

450 Sq.m of 75mm thick

Hire charges per 10Sq.m

Total hire charges for Machinery / 10M2

42.47

1911.00 /450x10

59.45

101.92

42.47

Labour charges (for spreading 10sq.m 75mm thick)


1.08x3/16 Nos

Mazdoor I class

258.00

52.25

1.08x1/4 Nos

Mazdoor II class

231.00

62.37

1.08x1/3 Nos

Mazdoor III class

231.00

83.16

a) Forming edge bunds

L.S.

1.46

b) Maintaining berms for traffic barricading, providing danger light

L.S.

1.46

c) Watering and keeping the surface moist for 15days

L.S.

1.46

d) Rent for tools including baskets, sherpining, pick axes

L.S.

1.46

e) Sundries such as rope, waterpots

L.S.

1.52

Labour charges per 10 Sq.m

205.14

Hire charges for Machinery and Labour charges


10 Sq.m of 75mm tk

(i)+(ii)

101.92

205.14

307.06

Applying Tack coat over WBM surface at 4Kg / 10 sq.m


Labour charges for 500 Sq.m
For preparing the surface
10 Nos

Mazdoor I class

258.00

2580.00

16 Nos

Mazdoor II class

231.00

3696.00

231.00

924.00

For preparing Tack coat


4 Nos

Mazdoor II class

7200.00
40% for labour
(i) Labour charges per 10 Sq.m
(ii) Hire charges for Bitumen Sprayer per 10 sqm

Rate for Labour and Machinery per 1 Sq.m

144.00

7200.00 /500x10

L.S.

15.00

15.90

(i)+(ii)/10=

Applying Prime coat over Un primed WBM surface at 7Kg / 10 sq.m


Labour charges for 500 Sq.m
For preparing the surface
10 Nos

Mazdoor I class

258.00

2580.00

16 Nos

Mazdoor II class

231.00

3696.00

Mazdoor II class

231.00

1617.00

For Applying Prime coat


7 Nos

7893.00
(i) Labour charges per 10 Sq.m
(ii) Hire charges for Bitumen Sprayer

Rate for Labour and Machinery per 1 Sq.m

157.86

7893.00 /500x10

L.S.

15.00

17.29

(i)+(ii)/10=

Applying Tack coat over Primed WBM surface at 2.50 Kg / 10 sq.m


For Applying Tack coat - 500 sqm
2.5 Nos

Mazdoor Iclass

(i) Labour charges per 10 Sq.m

258.00

Rate for Labour and Machinery per 1 Sq.m

12.90

645.00 /500x10

(ii) Hire charges for Bitumen Sprayer

L.S.

(i)+(ii)/10=

645.00

15.00

2.79

Applying Tack coat over WBM/BT surface at 3Kg / 10 sq.m


Labour charges for 500 Sq.m
For preparing the surface
5 Nos

Mazdoor I class

258.00

1290.00

Mazdoor II class

231.00

1155.00

For preparing Tack coat


5 Nos

2445.00
(i) Labour charges per 10 Sq.m

48.90

2445.00 /500x10

(ii) Hire charges for Bitumen Sprayer

L.S.

Rate for Labour and Machinery per 1 Sq.m

15.00

6.39

(i)+(ii)/10=

Premix carpet with seal coat


Premix Carpet
(i) Mini Hot mix plant
Hire charges excluding fuel charges/Hour

1674.00 / 8

209.25

Fuel charges for running plant

15 lit / Hour

1.00

54.15

812.25

For heating the aggregate (oil)

45 lit / Hour

1.00

50.00

2250.00

Outturn/hour -

180sqm

3271.50

Hire charges for 10 Sq.m

181.75

3271.50 / 180x10

(ii) Power roller


Hire charges excluding fuel charges/day of 8Hour
Fuel charges -Diesel oil

828.00

2.5 lit / Hour

8.00

54.15

Daily out turn for PC = 500 Sq.m


Hire charges for 10 Sq.m

1083.00
1911.00

38.22

1911.00 x10/500

(iii) Bitumen Boiler


Hire charges for bitumen boiler including fuel (Kerosene) / day
202.00 + 25 lit x 50.00
Hire charges / hour

1452.00 / 8

1452
181.50

Out turn per Hour = 125Kg


Hire charges per kg of bitumen
Bitumen for PC per 10 sqm

181.50

125 kg

14.60 Kg x

1.452

1.452

21.20

Total Hire & fuel charges for PC 20mm thick -10 sqm (i)+(ii)+(iii)
(i) Mini Hot mix plant

181.75 /10 sqm

(ii) Roller

38.22 /10 sqm

(iii) Bitumen Boiler

21.20 /10 sqm

241.17

241.17 /10 sqm


Labour charges per 10 sqm
0.75 No.

Mazdoor I class

258.00

193.50

Hire and Labour charges Rate / 10 Sq.m

241.17

193.50

434.67

Seal coat - Type 'A'


Machinery
(i) Power roller Hire charges excluding fuel charges/day of 8Hour
Fuel charges -Diesel oil

2.5 lit / Hour

828.00

8.00

54.15

Power roller including fuel charges per day

1083.00
1911.00

Daily out turn for seal coat = 1000 Sq.m


Hire charges for 10 Sq.m

19.11

1911.00 x10/1000

(ii) Bitumen Boiler


Hire charges for bitumen boiler including fuel (Kerosene) / day
202.00 + 25 lit x 50.00
Hire charges / hour

1452.00 / 8

1452
181.50

Out turn per Hour = 125Kg


Hire charges per kg of bitumen
Bitumen for Seal coat Type A

181.50 / 125kg

1.452

9.80 Kg / 10 Sq.m

14.23

Total Hire & fuel charges for Sealcoat type "A" -10 sqm (i)+(ii)
(i) Roller

19.11 /10 sqm

(ii) Bitumen Boiler

14.23 /10 sqm

33.34

33.34 /10 sqm


Labour charges
0.25 No

Mazdoor I class

258.00

64.50

Seal coat Type'A'


Hire and Labour charges Rate / 10 Sq.m

33.34

64.50

97.84

Seal coat - Type 'B'


Machinery
(i) Bitumen Boiler
Hire charges for bitumen boiler including fuel (Kerosene) / day
202.00 + 25 lit x 50.00
Hire charges / hour

1452.00 / 8

1452
181.50

Out turn per Hour = 125Kg


Hire charges per kg of bitumen
Bitumen for Seal coat Type B

181.50 / 125kg

1.450

6.80 Kg / 10 Sq.m

9.86

(ii) Mini Hot mix plant


Hire charges excluding fuel charges/Hour

1674.00 / 8

209.25

Fuel charges for running plant

15 lit / Hour

1.00

54.15

812.25

For heating the aggregate (oil)

45 lit / Hour

1.00

50.00

2250.00

Outturn/hour -

664 sqm

Hire charges for 10 Sq.m

3271.50

3271.50 / 664x10

49.27

(iii) Power roller Hire charges excluding fuel charges/day of 8Hour

828.00

Fuel charges -Diesel oil

2.5 lit / Hour

8.00

54.15

1083.00

Power roller including fuel charges per day

1911.00

Daily out turn for seal coat = 1000 Sq.m


Hire charges for 10 Sq.m

19.11

1911.00 x10/1000

Total Hire & fuel charges for Sealcoat type "B" -10 sqm (i)+(ii)+(iii)
(i) Bitumen Boiler

9.86 /10 sqm

(ii) Mini Hot mix plant

49.27 /10 sqm

(iii) Roller

19.11 /10 sqm

78.24

78.24 /10 sqm


Labour charges
0.25 No

Mazdoor I class

258.00

64.50

Seal coat Type 'B'


Hire and Labour charges Rate / 10 Sq.m

78.24

64.50

142.74

Labour charges for Patch work with Bituminous Premix materials for 0.625
cum of Bituminous material.
Picking the road surface 2" to 3" deep
In patches and cutting

Mazd I

1.08 x 1/6

258.00

46.44

Removal of picked up stMazd I

1.08 x 1/8

258.00

34.83

Brushing and cleaning the surface

L.S

4.55

Spreading the Bitumen for Tack coat

L.S

3.54

L.S

17.68

Prmixing chips with Bitumen in the Drum mixer and laying of


0.625 m3 of metal with 56 Kg of Bitumen

Levelling and tamping the Premix in the patches and pot holes rolling etc.,

6.06

Special tools such as wire brush

L.S

2.53

Regulation of traffic

L.S

2.53

L.S

0.71

Sundries such as barricading arrangements,


Labour charges for laying 0.625 m of Bituminous Material

118.87

Labour charges for laying 1.00 m3 of Bituminous material

118.87

Hire and Labour Charges

Rate

/ 0.625

190.19

Unit

6.97 / Sq.m

Picking 5 cm to 10 cm old metalled surface and sectioning - 1 sq.m

Soling with 150mm cube stones - 10Sq.m

Spreading Gravel and consolidation with power roller rolling


excluding cost of Gravel

Laying well gravel

5.16 / cum

Laying U.S. Gravel

5.16 / cum

Labour charges for WBM patch work

140.05 / Sq.m
12.23 /cum

93.92 / cum

7a.

Forming embankment with earth work

100 %

7b.

Forming embankment with earth work

97 %

Compaction

Compaction

12.23 /cum
11.55 /cum

Providing and laying Granular sub-base compaction by power roller


-100 mm thick

107.66

Providing WBM Grade II & Grade III 75mm thick

307.06 / 10 Sq.m

/ 10 Sq.m

15.90 / Sq.m.

10

Applying Tack coat over WBM surface at 4Kg / 10 sq.m

11

Applying Tack coat over BT surface at 3Kg / 10 sq.m

12

Premix carpet with seal coat type A

532.51 / 10 Sq.m

12b

Premix carpet with seal coat type B

577.41 / 10 Sq.m

13

Premix Carpet

434.67 / 10 Sq.m

14

Seal coat - Type 'A'

97.84 / 10 Sq.m

15

Applying Prime coat over Un primed WBM surface at 7Kg / 10 sq.m

17.29 / 10 Sq.m

16

Applying Tack coat over Primed WBM surface at 2.50 Kg / 10 sq.m

14b
15

6.39 / Sq.m.

2.79 / 10 Sq.m

Seal coat - Type 'B'

142.74 / 10 Sq.m

Labour charges for Bituminous Premix Patch work

190.19 / cum

Picking 5 cm to 10 cm old metalled surface and sectioning - 1 sq.m


Mazdoor class I

=1/4 x 1.08 Nos

258.00
Rate / Sq.m

69.66

6.97

Soling with 150mm cube stones - 10Sq.m


(i)Labour charges

Mazdoor II for preparing

1/6 No

231.00

38.50

Mazdoor II for watering

1 No

231.00

231.00

Mazdoor I for packing

3 No

258.00

774.00

1/6 No

231.00

38.50

Mazdoor II for blinding gravel

1082.00
Rate per 10Sq.m

108.20

(ii)Hire Charges

Taking out put

600 Sq.m

Hire charges for power roller per day


Fuel charges/day

2.5 litres

828.00

8 Hours

54.15

1083.00
1911.00

Total hire charges including fuel


Total hire charges and Labour charges

1911.00

/600x10 =

(i)+(ii)

31.85

Rate per Sq.m

140.05

Spreading Gravel and consolidation with power roller rolling excluding cost of Gravel
(i) Hire charges for Machineries

Water sprinkler including fuel charges


Fuel charges / day

3.25 litres

1159.00
54.15

/ litre

8 lit

1407.90
2566.90

Daily out turn

1000 cum

Hire charges for per cum

2.57

(ii) Power roller 8-10 ton capacity

Hire charges for per day


Fuel charges / day

828.00
20 litres

54.15

per litre

1083.00
1911.00

Daily out turn

425 cum

Hire charges for per cum

4.50

(iii) Labour charges for spreading 100cum of gravel


Mazdoor class I

2 Nos.

258.00

Labour charges per Cum


Total hire charges and Labour charges per Cum

Laying well gravel

Labour Charges for the area of 100 cum.

516.00
5.16

(i)+(ii)+(iii)

12.23

Mazdoor I class

2 Nos.

258.00

516.00

Rate per Cu.m

5.16

Laying U.S. Gravel

Labour Charges for the area of 100 cum.


Mazdoor I class

2 Nos.

258.00

516.00

Rate per Cu.m

5.16

Labour charges for WBM patch work - 1 cum

Picking the metal surface 2" to 3" deep


In patches and cutting

Maz I

1.08x1/6

258.00

46.44

collection of metal & gravel andMaz I

1.08x1/8

258.00

34.83

Removal of picked up stuff and


conveying the same to site
Brushing and cleaning the surface

L.S

2.20

Levelling the materials in the patches and pot holes

L.S

5.50

Special tools such as wire brush

L.S

2.20

Regulation of traffic

L.S

2.20

Sundries such as barricading arrangements,

L.S

0.55

Rate per Cu.m

93.92

and tamping after blinding with water

conveying water etc,.

Forming embankment with earth work excavation from borrow pits and
compaction by power roller

100 % Compaction

(i) Hire charges and labour charges for earthwork compaction

Hire charges for Machinery


(i) Water sprinkler
Hire charges excluding fuel charges/day
Fuel charges / day

3.25 litres

1159.00
54.15 / litre

Total hire charges / day

1407.90
2566.90

Daily out turn

1000 cum

Hire charges per cum

2.57

(ii) Power roller


Hire charges excluding fuel charges/day
Fuel charges / day

2.5 litres

828.00
54.15 / litre

Total hire charges / day


Daily out turn
Hire charges per cum
Total hire charges for Machiner (i)+(ii)
(iii) Labour charges for 100 cum

1083.00
1911.00

425 cum
4.50

1911.00 /425

2.57

4.50

7.07

Mazdoor I class

2 Nos

258.00

Labour charges per cum

516.00
5.16

Hire and Labour charges per M3 (i)+(ii)+(iii)

7.07

12.23

5.16

Forming embankment with earth work excavation from borrow pits and
compaction by power roller

97% Compaction

Hire charges and labour charges for earthwork compaction

Hire charges for Machinery


(i) Water srinkler
Hire charges excluding fuel charges/day
Fuel charges / day

3.25 litres

1159.00
54.15 / litre

Total hire charges / day

1407.90
2566.90

Daily out turn

1000 cum

Hire charges per cum

2.57

(ii) Power roller


Hire charges excluding fuel charges/day
Fuel charges / day

2.5 litres

828.00
54.15 / litre

Total hire charges / day

1083.00
1911.00

Daily out turn

500 cum

Hire charges per cum

3.82

Total hire charges for Machinery (i)+(ii)

2.57

3.82

6.39

(iii) Labour charges for 100 cum


Mazdoor I class

2 Nos

258.00

Labour charges per cum

516.00
5.16

Hire and Labour charges / M3 (i)+(ii)+(iii)

6.39

11.55

5.16

Providing and laying Granular sub-base compaction 100mm thick


by power roller - Hire charges and labour charges for GSB -10 Sq.m
(i) Hire charges for Machinery
Water srinkler
Hire charges excluding fuel charges/day
Fuel charges / day

3.25 litres

1159.00
54.15 / litre

Total hire charges / day

1407.90
2566.90

Daily out turn

1000 cum

Hire charges per 10Sq.m

2.57

2566.90 /1000

Power roller
Hire charges excluding fuel charges/day
Fuel charges / day

2.5 litres

828.00
54.15 / litre

1083.00

Total hire charges / day


Daily out turn
Hire charges per 10 Sq.m
Total hire charges for Machinery/10 sqm

1911.00
950 Sq.m of 100mm thick
20.12

1911.00 /950x10

2.57

20.12

22.69

(ii) Labour charges (for mixing 950 Sq.m)


Mazdoor I class

6 Nos

258.00

1548.00

Mazdoor II class

24 Nos

231.00

5544.00
7092.00

Labour charges per 10 Sq.m

7092.00

74.65

/950x10

For spreading 100cum


Mazdoor I class

4 Nos

Labour charges for spreading

258.00

1032.00

Per 1 Cum or 10 Sq.m

Total Labour charges for 10 Sq.m

10.32

74.65

10.32

84.97

22.69

84.97

107.66

Hire charges for Machinery and Labour charges


10 Sq.m of 100mm tk

(i)+(ii)

Providing WBM Grade II & Grade III 75mm thick


Hire charges and labour charges for WBM Gr.II & III
Hire charges for Machinery
Water srinkler
Hire charges excluding fuel charges/day
Fuel charges / day

1159.00

3.50 litres

54.15

1516.20

Total hire charges / day

2675.20

Daily out turn

450 Sq.m of 75mm thick

Hire charges per 10Sq.m

59.45

2675.20 /450x10

Power roller
Hire charges excluding fuel charges/day
Fuel charges / day

828.00

2.5 litres

54.15 / litre

1083.00

Total hire charges / day

1911.00

Daily out turn

450 Sq.m of 75mm thick

Hire charges per 10Sq.m

42.47

1911.00 /450x10

Total hire charges for Machinery / 10M2

59.45

101.92

42.47

Labour charges (for spreading 10sq.m 75mm thick)


1.08x3/16 Nos

Mazdoor I class

258.00

52.25

1.08x1/4 Nos

Mazdoor II class

231.00

62.37

1.08x1/3 Nos

Mazdoor III class

231.00

83.16

a) Forming edge bunds

L.S.

1.46

b) Maintaining berms for traffic barricading, providing danger ligh

L.S.

1.46

c) Watering and keeping the surface moist for 15days

L.S.

1.46

d) Rent for tools including baskets, sherpining, pick axes

L.S.

1.46

e) Sundries such as rope, waterpots

L.S.

1.52

Labour charges per 10 Sq.m

205.14

Hire charges for Machinery and Labour charges


10 Sq.m of 75mm tk

(i)+(ii)

101.92

205.14

307.06

Applying Tack coat over WBM surface at 4Kg / 10 sq.m


Labour charges for 500 Sq.m
For preparing the surface
10 Nos

Mazdoor I class

258.00

2580.00

16 Nos

Mazdoor II class

231.00

3696.00

231.00

924.00

For preparing Tack coat


4 Nos

Mazdoor II class

7200.00
40% for labour
(i) Labour charges per 10 Sq.m
(ii) Hire charges for Bitumen Sprayer per 10 sqm

Rate for Labour and Machinery per 1 Sq.m

144.00

7200.00 /500x10

L.S.

15.00

15.90

(i)+(ii)/10=

Applying Prime coat over Un primed WBM surface at 7Kg / 10 sq.m


Labour charges for 500 Sq.m
For preparing the surface
10 Nos

Mazdoor I class

258.00

2580.00

16 Nos

Mazdoor II class

231.00

3696.00

Mazdoor II class

231.00

1617.00

For Applying Prime coat


7 Nos

7893.00
(i) Labour charges per 10 Sq.m
(ii) Hire charges for Bitumen Sprayer

Rate for Labour and Machinery per 1 Sq.m

157.86

7893.00 /500x10

L.S.

15.00

17.29

(i)+(ii)/10=

Applying Tack coat over Primed WBM surface at 2.50 Kg / 10 sq.m


For Applying Tack coat - 500 sqm
2.5 Nos

Mazdoor Iclass

(i) Labour charges per 10 Sq.m

258.00

Rate for Labour and Machinery per 1 Sq.m

12.90

645.00 /500x10

(ii) Hire charges for Bitumen Sprayer

L.S.

(i)+(ii)/10=

645.00

15.00

2.79

Applying Tack coat over WBM/BT surface at 3Kg / 10 sq.m


Labour charges for 500 Sq.m
For preparing the surface
5 Nos

Mazdoor I class

258.00

1290.00

Mazdoor II class

231.00

1155.00

For preparing Tack coat


5 Nos

2445.00
(i) Labour charges per 10 Sq.m

48.90

2445.00 /500x10

(ii) Hire charges for Bitumen Sprayer

L.S.

Rate for Labour and Machinery per 1 Sq.m

15.00

6.39

(i)+(ii)/10=

Premix carpet with seal coat


Premix Carpet
(i) Mini Hot mix plant
Hire charges excluding fuel charges/Hour

1674.00 / 8

209.25

Fuel charges for running plant

15 lit / Hour

1.00

54.15

812.25

For heating the aggregate (oil)

45 lit / Hour

1.00

50.00

2250.00

Outturn/hour -

180sqm

3271.50

Hire charges for 10 Sq.m

181.75

3271.50 / 180x10

(ii) Power roller


Hire charges excluding fuel charges/day of 8Hour
Fuel charges -Diesel oil

828.00

2.5 lit / Hour

8.00

54.15

Daily out turn for PC = 500 Sq.m


Hire charges for 10 Sq.m

1083.00
1911.00

38.22

1911.00 x10/500

(iii) Bitumen Boiler

+ 25 lit x 50.00
Hire charges for bitumen boiler including fuel (Kerosene) / 202.00
day
Hire charges / hour

1452.00 / 8

1452
181.50

Out turn per Hour = 125Kg


Hire charges per kg of bitumen
Bitumen for PC per 10 sqm

181.50

125 kg

14.60 Kg x

1.452

1.452

21.20

Total Hire & fuel charges for PC 20mm thick -10 sqm (i)+(ii)+(iii)
(i) Mini Hot mix plant

181.75 /10 sqm

(ii) Roller

38.22 /10 sqm

(iii) Bitumen Boiler

21.20 /10 sqm

241.17

241.17 /10 sqm


Labour charges per 10 sqm
0.75 No.

Mazdoor I class

258.00

193.50

Hire and Labour charges Rate / 10 Sq.m

241.17

193.50

434.67

Seal coat - Type 'A'


Machinery
(i) Power roller Hire charges excluding fuel charges/day of 8Hour
Fuel charges -Diesel oil

2.5 lit / Hour

828.00

8.00

54.15

Power roller including fuel charges per day

1083.00
1911.00

Daily out turn for seal coat = 1000 Sq.m


Hire charges for 10 Sq.m

19.11

1911.00 x10/1000

(ii) Bitumen Boiler

+ 25 lit x 50.00
Hire charges for bitumen boiler including fuel (Kerosene) / 202.00
day
Hire charges / hour

1452.00 / 8

1452
181.50

Out turn per Hour = 125Kg


Hire charges per kg of bitumen

181.50 / 125kg

Bitumen for Seal coat Type A

1.452

9.80 Kg / 10 Sq.m

14.23

Total Hire & fuel charges for Sealcoat type "A" -10 sqm (i)+(ii)
(i) Roller

19.11 /10 sqm

(ii) Bitumen Boiler

14.23 /10 sqm

33.34

33.34 /10 sqm


Labour charges
0.25 No

Mazdoor I class

258.00

64.50

Seal coat Type'A'


Hire and Labour charges Rate / 10 Sq.m

33.34

64.50

97.84

Labour charges for Patch work with Bituminous Premix materials for 0.625
cum of Bituminous material.
Picking the road surface 2" to 3" deep
In patches and cutting

Mazd I

1.08 x 1/6

258.00

46.44

Removal of picked up stMazd I

1.08 x 1/8

258.00

34.83

Brushing and cleaning the surface

L.S

4.55

Spreading the Bitumen for Tack coat

L.S

3.54

L.S

17.68

Levelling and tamping the Premix in the patches and pot holes rolling etc.,

6.06

Special tools such as wire brush

L.S

2.53

Regulation of traffic

L.S

2.53

L.S

0.71

Prmixing chips with Bitumen in the Drum mixer and laying of


0.625 m3 of metal with 56 Kg of Bitumen

Sundries such as barricading arrangements,


Labour charges for laying 0.625 m of Bituminous Material

118.87

Labour charges for laying 1.00 m3 of Bituminous material

118.87

Hire and Labour Charges

/ 0.625

Rate

190.19

Unit

6.97 / Sq.m

Picking 5 cm to 10 cm old metalled surface and sectioning - 1 sq.m

Soling with 150mm cube stones - 10Sq.m

Spreading Gravel and consolidation with power roller rolling


excluding cost of Gravel

Laying well gravel

5.16 / cum

Laying U.S. Gravel

5.16 / cum

Labour charges for WBM patch work

140.05 / Sq.m
12.23 /cum

93.92 / cum

7a.

Forming embankment with earth work

100 %

7b.

Forming embankment with earth work

97 %

Compaction

Compaction

12.23 /cum
11.55 /cum

Providing and laying Granular sub-base compaction by power roller


-100 mm thick

107.66

Providing WBM Grade II & Grade III 75mm thick

307.06 / 10 Sq.m

/ 10 Sq.m

15.90 / Sq.m.

10

Applying Tack coat over WBM surface at 4Kg / 10 sq.m

11

Applying Tack coat over BT surface at 3Kg / 10 sq.m

12

Premix carpet with seal coat type A

532.51 / 10 Sq.m

12b

Premix carpet with seal coat type B

575.71 / 10 Sq.m

13

Premix Carpet

434.67 / 10 Sq.m

14

Seal coat - Type 'A'

97.84 / 10 Sq.m

15

Applying Prime coat over Un primed WBM surface at 7Kg / 10 sq.m

17.29 / 10 Sq.m

16

Applying Tack coat over Primed WBM surface at 2.50 Kg / 10 sq.m

6.39 / Sq.m.

2.79 / 10 Sq.m

Seal coat - Type 'B'

141.04 / 10 Sq.m

15

Labour charges for Bituminous Premix Patch work

190.19 / cum

16

Premix carpet with seal coat type A (Paver)

606.10 / cum

14b

10

PREMIX CARPET WITH SEAL COAT TYPE ' A '

0.00

-for Km
0.18 Cum

13.2mm IRC metal

0.09 Cum
0.09 Cum

1.00

1048.55 /cum

188.74

11.2 mm IRC metal

733.55 /cum

66.02

6.7 mm IRC metal

561.55 /cum

50.54

24.40 Kgs

Bitumen 60/70

55500.00 /Mt

10.00 Sqm

Hire & fuel charges for P.C

10.00 Sqm

Hire & fuel charges for SC

10.00 Sqm

Labour charges for P.C

10.00 Sqm

Labour charges for S.C

1354.20

/10sqm
606.10

/10sqm
/10sqm

606.10

/10sqm

Add 20% Extra for Labour in hilly areas

0.00
2265.60

Rate per sqm

10

Rs

226.56

PREMIX CARPET WITH SEAL COAT TYPE ' A '


-for Km

2.00

3.00

0.18 Cum

13.2mm IRC metal

0.00 /cum

0.09 Cum

11.2 mm IRC metal

0.00 /cum

0.09 Cum

6.7 mm IRC metal

0.00 /cum

24.40
10.00
10.00
10.00
10.00

Kgs
Sqm
Sqm
Sqm
Sqm

Bitumen 60/70
55500.00 /Mt
Hire & fuel charges for P.C
/10sqm
Hire & fuel charges for SC
/10sqm
606.10
Labour charges for P.C
/10sqm
Labour charges for S.C
/10sqm
Add 20% Extra for Labour in hilly areas
Rate per sqm

10

PREMIX CARPET WITH SEAL COAT TYPE ' A '


-for Km
4.00

0.18
0.09
0.09
24.40
10.00
10.00
10.00
10.00

Cum
Cum
Cum
Kgs
Sqm
Sqm
Sqm
Sqm

10

13.2mm IRC metal


0.00 /cum
11.2 mm IRC metal
0.00 /cum
6.7 mm IRC metal
0.00 /cum
Bitumen 60/70
55500.00 /Mt
Hire & fuel charges for P.C
/10sqm
Hire & fuel charges for SC
/10sqm
606.10
Labour charges for P.C
/10sqm
Labour charges for S.C
/10sqm
Add 20% Extra for Labour in hilly areas
Rate per sqm

1354.20
606.10
0.00
1960.30

196.03

5.00
0
0
0
1354.20
606.10
0.00

1960.30
196.03

PREMIX CARPET WITH SEAL COAT TYPE ' A ' plastic road
-for Km
0.00
1.00

0.18 Cum

13.2mm IRC metal

1048.55 /cum

188.74

0.09 Cum

11.2 mm IRC metal

733.55 /cum

66.02

0.09 Cum

6.7 mm IRC metal

561.55 /cum

50.54

21.96 Kgs
2.44 Kgs

Bitumen 60/70
Plastic waste

10.00 Sqm

Hire & fuel charges for P.C

10.00 Sqm

Hire & fuel charges for SC

10.00 Sqm

Labour charges for P.C

10.00 Sqm

Labour charges for S.C

55500.00 /Mt

1218.78

30.00 /Kg

73.20

/10sqm
606.10

/10sqm
/10sqm

606.10

/10sqm

Add 20% Extra for Labour in hilly areas

0.00
2203.38

Rate per sqm

Rs

220.34

10

PREMIX CARPET WITH SEAL COAT TYPE ' A ' plastic road
-for Km
2.00 3.00

0.18
0.09
0.09
21.96
2.44
10.00
10.00
10.00
10.00

Cum
Cum
Cum
Kgs
Kgs
Sqm
Sqm
Sqm
Sqm

13.2mm IRC metal


0.00 /cum
11.2 mm IRC metal
0.00 /cum
6.7 mm IRC metal
0.00 /cum
Bitumen 60/70
55500.00 /Mt
Plastic waste
30.00 /Kg
Hire & fuel charges for P.C
/10sqm
Hire & fuel charges for SC
/10sqm
606.10
Labour charges for P.C
/10sqm
Labour charges for S.C
/10sqm
Add 20% Extra for Labour in hilly areas

Rate per sqm

Rs

0
0
0
1218.78
73.20
606.10
0.00
1898.08

189.81

10

PREMIX CARPET WITH SEAL COAT TYPE ' A ' plastic road
-for Km
4.00 5.00

0.18
0.09
0.09
21.96
2.44
10.00
10.00
10.00
10.00

Cum
Cum
Cum
Kgs
Kgs
Sqm
Sqm
Sqm
Sqm

13.2mm IRC metal


0.00 /cum
11.2 mm IRC metal
0.00 /cum
6.7 mm IRC metal
0.00 /cum
Bitumen 60/70
55500.00 /Mt
Plastic waste
30.00 /Kg
Hire & fuel charges for P.C
/10sqm
Hire & fuel charges for SC
/10sqm
606.10
Labour charges for P.C
/10sqm
Labour charges for S.C
/10sqm
Add 20% Extra for Labour in hilly areas

0
0
0
1218.78
73.20
606.10
0.00
1898.08

Rate per sqm

Rs

189.81

10

PREMIX CARPET WITH SEAL COAT TYPE ' A '

1.00

-for Km

2.00

0.18 Cum

13.2mm IRC metal

0.00 /cum

0.09 Cum

11.2 mm IRC metal

0.00 /cum

0.09 Cum

6.7 mm IRC metal

0.00 /cum

24.40 Kgs

Bitumen 60/70

### /Mt

10.00 Sqm

Hire & fuel charges f

10.00 Sqm

Hire & fuel charges

10.00 Sqm

Labour charges for

10.00 Sqm

Labour charges for

1354.20

/10sqm
606.10

/10sqm

606.10

/10sqm
/10sqm

Add 20% Extra for Labour in hilly areas

0.00
1960.30

Rate per sqm

10

Rs

196.03

PREMIX CARPET WITH SEAL COAT TYPE ' A '


-for Km

3.00

4.00

0.18 Cum

13.2mm IRC metal

0.00 /cum

0.09 Cum

11.2 mm IRC metal

0.00 /cum

0.09 Cum

6.7 mm IRC metal

0.00 /cum

24.40
10.00
10.00
10.00
10.00

Kgs
Sqm
Sqm
Sqm
Sqm

Bitumen 60/70
### /Mt
Hire & fuel charges f
/10sqm
Hire & fuel charges
/10sqm
606.10
Labour charges for
/10sqm
Labour charges for
/10sqm
Add 20% Extra for Labour in hilly areas
Rate per sqm

1354.20
606.10
0.00
1960.30

196.03

10

PREMIX CARPET WITH SEAL COAT TYPE ' A '


-for Km
5.00 6.00

0.18
0.09
0.09
24.40
10.00
10.00
10.00
10.00

Cum
Cum
Cum
Kgs
Sqm
Sqm
Sqm
Sqm

10

13.2mm IRC metal


0.00 /cum
11.2 mm IRC metal
0.00 /cum
6.7 mm IRC metal
0.00 /cum
Bitumen 60/70
### /Mt
Hire & fuel charges f
/10sqm
Hire & fuel charges
/10sqm
606.10
Labour charges for
/10sqm
Labour charges for
/10sqm
Add 20% Extra for Labour in hilly areas
Rate per sqm

0
0
0
1354.20
606.10
0.00

###
196.03

PREMIX CARPET WITH SEAL COAT TYPE ' A ' plastic road
-for Km
1.00 2.00

0.18 Cum

13.2mm IRC metal

0.00 /cum

0.09 Cum

11.2 mm IRC metal

0.00 /cum

0.09 Cum

6.7 mm IRC metal

0.00 /cum

Bitumen 60/70

### /Mt

1218.78

30.00 /Kg

73.20

21.96 Kgs
2.44 Kgs

Plastic waste

10.00 Sqm

Hire & fuel charges f

10.00 Sqm

Hire & fuel charges

10.00 Sqm

Labour charges for

10.00 Sqm

Labour charges for

/10sqm
606.10

/10sqm
/10sqm

606.10

/10sqm

Add 20% Extra for Labour in hilly areas

0.00
1898.08

Rate per sqm

Rs

189.81

10

PREMIX CARPET WITH SEAL COAT TYPE ' A ' plastic road
-for Km
3.00 4.00

0.18
0.09
0.09
21.96
2.44
10.00
10.00
10.00
10.00

Cum
Cum
Cum
Kgs
Kgs
Sqm
Sqm
Sqm
Sqm

13.2mm IRC metal


0.00 /cum
11.2 mm IRC metal
0.00 /cum
6.7 mm IRC metal
0.00 /cum
Bitumen 60/70
### /Mt
Plastic waste
30.00 /Kg
Hire & fuel charges f
/10sqm
Hire & fuel charges
/10sqm
606.10
Labour charges for
/10sqm
Labour charges for
/10sqm
Add 20% Extra for Labour in hilly areas

Rate per sqm

Rs

0
0
0
1218.78
73.20
606.10
0.00
1898.08

189.81

10

PREMIX CARPET WITH SEAL COAT TYPE ' A ' plastic road
-for Km
5.00 6.00

0.18
0.09
0.09
21.96
2.44
10.00
10.00
10.00
10.00

Cum
Cum
Cum
Kgs
Sqm
Sqm
Sqm
Sqm

13.2mm IRC metal


0.00 /cum
11.2 mm IRC metal
0.00 /cum
6.7 mm IRC metal
0.00 /cum
Bitumen 60/70
### /Mt
Plastic waste
30.00 /Kg
Hire & fuel charges f
/10sqm
Hire & fuel charges
/10sqm
606.10
Labour charges for
/10sqm
Labour charges for
/10sqm
Add 20% Extra for Labour in hilly areas

0
0
0
1218.78
73.20
606.10
0.00
1898.08

Rate per sqm

Rs

189.81

Premix Carpet with seal coat


I. Hire charges for Machineries :
1 Central Hot mix Plant:
Hire charges excluding fuel charges per
day
Hire charges excluding fuel charges per
Hour
Fuel charges for running the Plant (30 lit
diesel x54.15) 30 x 43.00
For heating the Bitumen (Furnace oil)
For heating the aggregate (Furnace oil)
Hire charges including fuel charges /
Hour:
Out turn of CMP per Hour for PC with
Seal coat in Sq.m
Hire charges for CMP per 10 Sq.m =
10557.40 x 10

9696
9696.00/8

1212

1624.5
25 lit x 50
170 lit x 50

1250
8500
Total:

12587

325.00 Sq.m
387.2769

387.28
2 Bitumen Boiler :
Since Bitumen Boiler is attached with CMP site, hire charges for separate bitumen boiler is not necessary.
3 Power Roller 80-100 KN :
Hire charges excluding fuel charges per
day
828.00
Fuel charges ( Diesel ) per day = 54.15 x
2.50 lit x 8 Hours
1083

54.15
50

1212
1624.5
1250
8500
12586.5
387.2769

387.28

necessary.

828
1083

10

PREMIX CARPET WITH SEAL COAT TYPE ' A '


-for Km

0.18 Cum

13.2mm IRC metal

1025.00 /cum

184.5

0.09 Cum

11.2 mm IRC metal

739.00 /cum

66.51

0.09 Cum

6.7 mm IRC metal

582.00 /cum

52.38

24.40 Kgs

Bitumen 60/70

50000.00 /Mt

10.00 Sqm

Hire & fuel charges for P.

10.00 Sqm

Hire & fuel charges for SC

10.00 Sqm

Labour charges for P.C

10.00 Sqm

Labour charges for S.C

1220.00

/10sqm
492.70

/10sqm
/10sqm

492.70

/10sqm
2016.09

Rate per sqm

Rs

201.61

Data for WMM


45 to 22.4 metal average rate.
1.00

45.00 mm Metal

689.00

689.00

1.00

37.50 mm Metal

703.00

703.00

1.00

26.50 mm Metal

665.00

665.00

1.00

25.00 mm Metal

665.00

665.00

1.00

22.40 mm Metal

965.00

965.00

Total for 5 cum

3687.00

Average rate per cum

737.40

Basic cost

737.40

Conveyance

131.00

Total

868.40

22.4 to 2.36 mm metal average rate.


1.00

22.40 mm Metal

965.00

965.00

1.00

13.20 mm Metal

894.00

894.00

1.00

11.20 mm Metal

608.00

608.00

1.00

6.70 mm Metal

451.00

451.00

1.00

6.00 mm Metal

451.00

451.00

1.00

5.60 mm Metal

451.00

451.00

400.00

400.00

1.00 4.75 & below

Total for 8 cum

4220.00

Average rate per cum

602.86

Basic cost

602.86

Conveyance to plant

131.00

Total

733.86

2.36 mm and below metal


average rate.
Basic Cost

400.00

Conveyance to plant

131.00
531.00

Qty

Main data
Main Data

Rate

Amount

Rate
###

0.396 45 to 22.4

868.40

343.89

0.528 22.4--2.36

733.86

387.48

0.396 2.36 and below

531.00

210.28

313.45

313.45

Labour and Hire charges

Rate for1 cum

1255.10