Professional Documents
Culture Documents
C. ALAT BANTU
Bulldozer &
Ripper
Grader
Lubrication
truck
Water truck
Fuel truck
POWER SHOVEL
P&H KAPASITAS 15 m
HYDRAULIC SHOVEL
O&K RH-120
LIEGBHER R-992
FRONT-END LOADER
BACKHOE
Leibherr R995
DRAGLINE - 1
DRAGLINE -2
Walking dragline CQCA
di MARRION COAL
MINE AUSTRALIA
BUATAN REP.FEDERASI
JERMAN
Kapasitas output = 5.000
cum/jam
Kapasitas mangkok = 3.000
liter
Berat total = 3.500 ton
Tinggi galian = 60 m
TRUCK TAMBANG - 1
TRUCK TAMBANG
Berkekuatan besar
Kecepatan rendah
Tenaga besar
Investasi besar
Suku cadang terbatas
Hanya beroperasi di
tambang (off
highway/off road)
MAXIMUM GVW
1,034,000 lbs
469.014 kg
PAYLOAD
285 - 310 tons
258 - 281 ton
POWER @ 2000
rpm
Rate brake:
2682 hp 2000 kW
Flywheel
2500 hp 1865 kW
SPEED
40 mph 64,5 km/h
FUEL :
1200 gal 4542 lit.
LENGTH: 15,34 m
WIDTH: 8,05 m
HEIGHT: 7,26 m
TRUCK TAMBANG - 2
LIEBHERR 262
CAT 793 C
ARTICULATED TRUCK (VOLVO)
IN-MINE CONVEYOR
Shiftable conveyor
SCRAPER
Berfungsi sbg alat muat material lepas dan sekaligus
mengangkutnya
Ditinjau dari mesin penggeraknya terdapat 4 jenis
scraper: (1) conventional single engine, (2)
conventional dual engine, (3) elevating single
engine, (4) elevating dual engine
Kapasitas bak (bowl): kecil (3/4 2 cuyd), sedang (2
8 cuyd), besar (8 35 cuyd). Untuk stripping o/b
batubara mencapai 180 cuyd. (1 cuyd = 0,7646 m)
Cara efektif untuk scrape conventional dikombinasikan dengan bulldozer (pendorong) atau traktor
(penarik)
Cara lain adalah dengan push-pull operation
TIPE-TIPE SCRAPER
POLA-POLA
PENGGALIAN
SCRAPERDOZER
SC
SC
SC
SC
SC
CHAIN LOADING
B
SC
SC
SC
SHUTTLE LOADING
SC
BULLDOZER
CAT D 10 R
Cat 3412 Diesel
Engine
Gross Power: 457
kW = 613 HP
Blade capacity =
22 cum = 26.7
cuyd
RIPPER
GRADER
CAT 140 H
Merupakan salah satu
alat bantu, baik pada
kegiatan penambangan
maupun konstruksi
jalan
Pemeliharaan/perataan
jalan tambang
Menyebarkan material
utk konstruksi jalan
Membuat paritan
(drainage) di tepi jalan
WATER TRUCK
Jenis material:
Altitude:
Kapasitas alat:
Medan kerja:
Sistem
penambangan: Tambang terbuka, bawah tanah atau alluvial (placer)
Biaya investasi: Tingkat ketersediaan dana, baik sebagai modal awal,
operasional maupun pengembangan
IxH
P=Ex
C
PARAMETER PENGUKUR
EFISIENSI KERJA
TERJADWAL (SCHEDULED); S
PERAWATAN (MAINTENANCE);
M
TERSEDIA (AVAILABLE); A
JALAN (OPERATION); O
KERJA
(WORKING);
W
Kerja lancar
TERTUNDA
(DELAYED); D
Mengisi BBM
Ganti mata bor (bit)
Peledakan
Mengatur alat berat
Tunggu alat muat
Tunggu truck
Inspeksi
Semprot lubang bor
Pelumasan
Manuver alat
Pengecekan awal sbl
jalan
Membersihkan screen
Batu macet di crusher,
chute, dll
Rol conveyor lepas
Karet samping belt
conveyor rusak
Lain-lain
TERHENTI
(IDLE); I
Diminta standby
Tak ada operator
Makan & istirahat
Rapat
Hujan lebat & kabut
Salju
Lain-lain
PERBAIKAN
MENDADAK;
UM
PERAWATAN
TERJADWAL;
SM
Waktu perbaikan
Tunggu suku cadang
Lain-lain
Waktu Perbaikan
Tunggu suku cadang
Lain-lain
RUMUS-RUMUS EFISIENSI
KERJA
Efektifitas (effectiveness)
E = (W / O) x 100%
PA = (A / S) x 100%
Utilitas (utility)
U = (O / A) x 100%
opt)
= E x PA x U
Tgl.
Kerja
Terjadwal
Rusak
mendadak
Terhenti
Efisiensi Kerja, %
Operasi
Tertunda
Kerja
Efektifitas
Ketersediaan
Fisik
Optimum
Utilitas
G=
F/(E+F)
H=
(D+E+F)/
B
I=
(E+F)/ J=
(D+E+F) (GxHxI)
F = BC-D-E
1-Jul-00
16
4.00
3.00
9.00
75.00
100.00
75.00
56.25
2-Jul-00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
3-Jul-00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
4-Jul-00
16
1.00
4.00
11.00
73.33
100.00
93.75
68.75
A
K
H
I
R
5-Jul-00
16
2.00
1.00
13.00
92.86
100.00
87.50
81.25
6-Jul-00
16
5.00
4.00
7.00
63.64
100.00
68.75
43.75
7-Jul-00
15
2.00
3.00
10.00
76.92
100.00
86.67
66.67
B
U
L
A
N
8-Jul-00
15
0.00
5.00
7.00
58.33
75.00
100.00
43.75
TOTAL
460
12.5
32.50
93.25
321.75
77.53
97.28
92.75
69.95
H
A
R
I
A
N
Volume material
Vi
SF =
Vl
x 100%
% swell =
Vi
Vl
100%
LF =
100% + %swell
factor)
-1
ccm
x 100%
bcm
KECEPATAN
TEORITIS
TRUCK 789
CAT
ENAGATENAGA
KENDARAAN (2)
ENAGA TERSEDIA (TS)
POWER AVAILABLE)
BKG,kg x TT x V, mph
=
375
CONTOH PERHITUNGAN
PRODUKSI POWER SHOVEL
Densitas material (insitu)
= 2,40 ton/m3
Densitas material (loose) =
1,83 ton/m3
Faktor berai = 76,25%
Kap.mangkok = 13 m3
Faktor pengisian
(estimasi) = 0,85
Waktu edar rata2 = 28 det
Eff.kerja & availabilitas =
83%
Produksi shovel =
0,83 x 0,85 x 13 x 1,83 x 3600
= 2.157,92 to
28
Bila faktor muat = 85%, maka:
Produksi shovel nyata = 1.834,23 ton
CONTOH PERHITUNGAN
KUALITASDRAGLINE
PENGANGKUTAN
PRODUKSI
Faktor
berai =kualitas
0,80
Acuan
pengangkutan adalah
Faktor pengisian = 0,90
menjaga kestabilan distribusi ukuran butir
Faktor mangkok = 0,80 x 0,90 =
Produksi / jam operasi =
dan kuantitas material
0,72
49,80 x 35,78 = 1.782,04 bcm/jam
kap.
Mangkok
=
49,70
m
3
Dipengaruhi oleh kondisi jalan, jarak
Produksi / siklus = 0,72 x 49,70
angkut,
= 35,78
bcm jenis alat angkut, sifat fisik
Produksi / tahun:
Waktu
edar
=
1
menit
material
Tot jam kerja / thn = 7.104
Effisiensi kerja = 0,83
jam/thn
Jam operasi = 0,83 x 60 = 49,80
Availabilitas dragline = 0,90
Prod / thn = 0,90 x 7.104 x
men/jam
1.782,04
Siklus / jam operasi = 49,80 x 1
n ton/thn
= 11.393.671,40
= 49,80 siklus / jam IxH
x Loose
P=Ex
C
P Opt= ( P + x )
i=1