You are on page 1of 5

Lonkar Well Testing

Ltd.
Procedures

Review Date:

March 6, 2006

Reviewed By:

E.Vokes

Section:
Subject: Chemical Injection Pumps Procedures

Purpose:
Chemical injection pumps are a simple pneumatic device which can utilize a wide range
of supply pressures to pump chemical.

Potential Hazards:

Pressure release
Gas release
Chemical spray
Injection line parting
Environmental damage

Action:
1 Inspect Injection pump and make sure all
regulators and gauges are in place.

Information:
1 This will ensure the pump does not get over
pressured and have adequate supplied pressure.

2 Make sure lubricating oil is on the plunger shaft


and should be topped periodically.(NOTE) If it is
a oil less, do not fill reservoir with oil,

2 This will ensure that all mechanical parts do not


rust. (NOTE) oil less has a flat box actuator.

3 Connect suction line to a filter to keep sand and


grease out of the check valves.

3 This will keep all sand and oil from plugging your
check valves.

4 Make sure all methanol and chemical is clean


before rigging in suction line.

4 This will ensure that check valves will continue to


be clean when injecting.

5 Connect the discharge line and follow the fill line


for chemical pump procedure.

5 This will guide you on proper filling lines and


prevents hose damage.

6 (Note) The use of Daniels grease is not


recommended to be used in the Grease Jack
Assembly.

6 The proper grease is TA-3179, Daniels grease


breaks down and plugs the check valves.

CHEMICAL INJECTION PUMP PROCEDURES

7 Connect the power gas line. First blow power


gas line clear of all loose rust, slag and sand
particles.

7 This will prevent any particles from entering your


regulators.

8 (CAUTION) The TB-40 regulator mounted on the


pump as a standard component does not reduce
the main gas supply pressure down to 50 psig,
which is the maximum allowable for operating the
Series 5000 pump. It is factory set at 12 psig to
prevent over-pressuring the TB-37 master valve.

8 If the main gas supply pressure to the pump is


over 50 psig, it must be reduced to 50 pounds.
This can be done by installing another TB-40
regulator and TA-129 gauge. (NOTE) The
maximum allowable inlet pressure to a TB-40
regulator for installing in the main gas supply is
1500 psig.

9 Adjust for desired volume by speed control valve.


Different volumes can be achieved by short or
long strokes setting.

9 The pump is assembled with Item 47 plunger


travel adjusting pin inserted in the hole of the
plunger nearest the plunger packing gland nut.
This is the position of longest stroke. To shorten
the stroke, place the pin in the other hole.

1 Start the pump by slowly opening the TA-22 inlet


0 valve. Prime the pump head by opening the TA123 priming valve. After the pump discharges
fluid without bubbles, close the priming valve for
normal operation.

1 Pages of attached diagram will follow the


0 procedures.

CHEMICAL INJECTION PUMP PROCEDURES

CHEMICAL INJECTION PUMP PROCEDURES

CHEMICAL INJECTION PUMP PROCEDURES

CHEMICAL INJECTION PUMP PROCEDURES