MITG Group Sdn. Bhd.

BILL B2 - KUARTERS KELAS E


Item

Description

Unit

Qty

ELEMENT NO. 2 - WORK BELOW LOWEST FLOOR


FINISH
Excavate commencing from formation level and
get out, part return, fill in and ram and deposit
and spread in making up levels where directed
within the site and remainder load and cart
away:A

Reduce level

M3

50

Excavate pit for pad footing

M3

44

Trench for ground beam

M3

Extra Over rock excavation

M3

Rate Only

M2

130

--------------------------------------E
150mm (Consolidated thickness) bed of hardcore as
described, spread, leveled and well consolidated to
received blinding (measured separately)
Lean concrete Grade 15 as described:F

50mm Thick blinding screed, spread and leveled under


pad footing

M2

33

50mm Thick ditto under ground beam

M2

12

50mm Thick ditto under concrete bed

M2

79

50mm Thick ditto under apron slab

M2

64

Vibrated reinforced concrete Grade 30 as


described filled into formwork and well packed
around reinforcement in:K

In pad footing

M3

In column stump

M3

Ground beam

M3

125mm Thick in concrete bed

M2

79

125mm Thick in apron slab

M2

64

1914 Balai Polis Pangkor

B2/2/1

Rate
(RM)

MITG Group Sdn. Bhd.


BILL B2 - KUARTERS KELAS E
Item

Description

Unit

Qty

Column Stump
6mm Diameter as links

Kg

31

10mm Diameter ditto

Kg

20

Ground beam
6mm Diameter as stirrups

Kg

104

Pad Footing
12mm Diameter

Kg

625

Column Stump
12mm Diameter

Kg

115

16mm Diameter

Kg

36

20mm Diameter

Kg

75

Ground Beam
12mm Diameter

Kg

296

M2

277

ELEMENT NO. 2 - WORK BELOW LOWEST FLOOR


FINISH (CONT'D)
Mild steel rod reinforcement to B.S. 4449 as
described in:-

High tensile rod reinforcement to B.S. 4449 as


described in:-

Steel fabric reinforcement to M.S. 145:1973 or


BS4483:1985 as described with side and end laps
including cutting, bedding and notching around
obstructions and embedded into concrete slab
(measured net- not allowance for laps)
J

BRC A8 or other equal and approved in apron and


ground slab
Sawn formwork as described to:-

Sides of pad footing

M2

11

Sides of column stump

M2

24

Sides of ground beam

M2

55

Edge of bed exceeding


200mm high

58

1914 Balai Polis Pangkor

100mm but not exceeding

B2/2/2

Rate
(RM)
To Collection

MITG Group Sdn. Bhd.


BILL B2 - KUARTERS KELAS E
Item

Description

Unit

Qty

Rate
(RM)

To Collection

ELEMENT NO. 2 - WORK BELOW LOWEST FLOOR


FINISH (CONT'D)
A

Approved anti-termite chemical soil treatment to substructure works with approved chemicals all in
accordance with the manufacturer's instruction (Works
to be executed by a licensed pest control company and
the Contractor shall submit certificates/Warranty to
provide a guarantee for a period of five (5) years
effective from date of Anti Termite Application including
periodic inspection for every six (6) month during
warranty period (Approximately 155 m2)

230mm Half-round earthen ware glazed drain laid to fall


in concrete bed including all excavation, blinding
screed, hardcore and hand packing hardcore to slope
on one side

Item

62

M2

143

Damp proof membrane


C

A layer of heavy duty polythene sheet 0.25mm thick or


other equal and approval damp proof membrane well
lapped at joint laid on hardcore (measured nett-no
allowance made for laps)

1914 Balai Polis Pangkor

B2/2/3

MITG Group Sdn. Bhd.


BILL B2 - KUARTERS KELAS E
Item

Description

Unit

Qty

Rate
(RM)

To Collection

ELEMENT NO. 2 - WORK BELOW LOWEST FLOOR


FINISH (CONT'D)

COLLECTION
1

From Page B2/2/1

...

From Page B2/2/2

...

From Page B2/2/3

...

4
5
6
7
8
9
10
11
12
13
14
15
16

17
18
20

1914 Balai Polis Pangkor

B2/2/4

MITG Group Sdn. Bhd.


BILL B2 - KUARTERS KELAS E
Item

Description

Unit

Qty

Rate
(RM)

22
23
TOTAL ELEMENT NO. 2 - WORK BELOW LOWEST FLOOR FINISH
CARRIED TO BILL B2 - KUARTERS KELAS E SUMMARY (PAGE B2/SUM/1)

1914 Balai Polis Pangkor

B2/2/5

MITG Group Sdn. Bhd.

Amount
(RM)

1914 Balai Polis Pangkor

B2/2/6

MITG Group Sdn. Bhd.

Amount
(RM)

1914 Balai Polis Pangkor

B2/2/7

MITG Group Sdn. Bhd.

Amount
(RM)

1914 Balai Polis Pangkor

B2/2/8

MITG Group Sdn. Bhd.

Amount
(RM)

1914 Balai Polis Pangkor

B2/2/9

MITG Group Sdn. Bhd.

Amount
(RM)

1914 Balai Polis Pangkor

B2/2/10

You might also like