Standard Procedure

PAINTING PROCEDURE

Responsible
Department

Procedure No.

Engineering

SPP.011.FGS.06

Revision No.

SURFACE PREPARATION AND PAINTING PROCEDURE


OF
PIPING

0
Rev

20 Apr 06
Date of
Issue

259940252.doc

For Approval
Status

Christopel
Prepared

Budi
Checked

Mukhlis
Approved

Page 1 of 4

PT. FAJAR GEMILANG SEMESTA


Standard Procedure

PAINTING PROCEDURE

Responsible
Department

Engineering

Procedure No.

SPP.011.FGS.06

Revision No.

1. General.
This specification covers the minimum requirements of surface preparation and painting of out side
surface of Carbon Steel Piping fabricated at workshop.
2. References.
2.1. Customer Specification
2.2. SPCC-SP5
3. Applicable Items
ALLS
4. Procedure
4.1. Surface Preparation.
4.1.1. Surface preparation shall be done in accordance with the Steel Structure Painting
Council Specification (SSPC-SP) 10 (near white metal blast cleaning).
4.1.2. Before abrasive blasting, all surfaces shall be dry and free from deposit of oil, grease, or
other contaminant.
4.1.3. The abrasive shall be clean and dry.
4.1.4. Blast cleaning shall not be carried out in conditions, which are caused to surface
condensation.
4.1.5. All blast cleaned surface shall be primed coat before rusting.
4.1.6. Welded areas shall be blast cleaned or ground to prevent sharp rough areas. Weld
reinforcement shall not be removed. And base metal shall not be ground below the
surface.
4.2. Painting condition.
4.2.1. Surfaces that will be coated shall be free of all dust, oil, grease and other contaminants.
4.2.2. Coating shall not be applied when ambient temperature, steel temperature and coating
material temperature are out of the range recommended by the paint manufacturer.
4.3. Painting application.
4.3.1. Paint application shall be in accordance with Paint Manufacturers recommendation.
4.3.2. Various factors such as painting interval, temperature, relative humidity, necessary
drying time, mixing, thinning ratio, and other technical matters are to be in accordance
259940252.doc

Page 2 of 4

PT. FAJAR GEMILANG SEMESTA


Standard Procedure

PAINTING PROCEDURE

Responsible
Department

Engineering

Procedure No.

SPP.011.FGS.06

Revision No.

with the Paint Manufacturers technical instruction and recommendation. Painting shall
be applied within 4 (four) hours after surface preparation.
4.3.3. Airless spray shall be applied, however un-spray portion such as corner, hole and touchup for damage portion are to be applied by brush.
4.3.4. Painting work shall be performed in accordance with following condition:
4.3.4.1. Temperature of area minimum 10C and maximum 38C.
4.3.4.2. Relative humidity of area maximum 80 %.
4.3.5. Painting work shall not be carried out under following condition:
4.3.5.1. Raining, strong wind, and dust condition.
4.3.5.2. Relative humidity is over than 80 %.
4.3.5.3. Temperature below than 10C or over than 38C.
4.3.6. Painting application shall refer to attached painting schedule.
4.4. Inspection and Quality Control.
4.4.1. Before to painting, visually inspect of all surfaces are performed to ensure that the
proper surface condition necessary for painting exist.
4.4.2. Confirm that environmental requirement for blast cleaning is met.
4.4.2.1. Verify surface preparation and surface profile.
4.4.2.2. Verify that cleaned surface have been kept free of contamination.
4.4.3. Just before painting, again inspect surface cleanliness and profile to ensure that
moisture, other contaminants and surface imperfections are not present.
4.4.4. Verify that storage, mixing, thinning and application of primers, intermediates, and
finished surfaces are in accordance with paint manufacturers instruction.
4.4.5. Verify that surfaces not to be coated are masked off or otherwise protected prior to
painting of adjacent surfaces.
4.4.6. Verify dry film thickness of primer, intermediate, and finish coats.

259940252.doc

Page 3 of 4

PT. FAJAR GEMILANG SEMESTA


Standard Procedure

PAINTING PROCEDURE

Responsible
Department

Engineering

Procedure No.

SPP.011.FGS.06

Revision No.

4.5. Painting Summary


Table 1
Grade of surface preparation
Area prepared and coated
Surface profile
Methode of surface preparation
Type of abrasive
Test requirement
Paint manufacture

SA 2.5
All of external surfaces.
1-2 mils
Manual Blasting
Sand Blast
Dry film thickness check
Jotun

Table 2
Description
Name of coat
Type of coat
Application method
Recoating interval
Touch dry after
Thinner
Volume of thinner
Dry film thickness
Color
Orifice nozzle
Applicable pressure
Dry air temperature
Pot life

259940252.doc

Primer coat
Cromoprimer
Zinc Chromate
Airless spray
8 hours at 21oC
1 hour at 21oC
No. 2
As manufacture spec
75 micron (min)
Max 40 oC
24 hours at 20 oC

Intermediate coat

Finish coat

Page 4 of 4