successful commissioning of 500 MLD water treatment plant including clear water
pumping station & recycling plant adjacent to existing water treatment plant,
Parvati, Pune followed by 5 years O & M of all above works.
On completion of the work, the site shall be cleaned as directed by Engineer at no extra
cost to Owner.
5.47. Dewatering
All excavations shall be kept free of water. Grading in the vicinity of excavations shall be,
controlled to prevent surface water running into excavated areas. The Contractor shall
remove by pumping or other means approved by Engineer-in-Charge any water inclusive
of rain water and sub-soil water accumulated in excavation and keep all excavations de-
watered until the foundation work is completed and back filled. Sumps made for
dewatering must be kept clear of the excavations/trenches required for further work.
Method of pumping shall be approved by Engineer-in-Charge; but in any case, the
pumping arrangement shall be such that there shall be no movement of sub-soil or
blowing in due to differential head of water during pumping. Pumping arrangements shall
by adequate to ensure no delays in construction.
The rates for excavation are inclusive of dewatering by any means and no extra payment
is allowed for excavation in wet condition