You are on page 1of 19

TECHNO-COMMERCIAL

PROPOSAL FOR SEWAGE TREATMENT PLANT

Design, Engineering, Manufacture, and Supply of


450 m3/day Sewage Treatment Plant By

ENVIROTECH F.Z.C
P.O. Box 52088, Sharjah, UAE
E-mail : jeyakumar@envirotechuae.com
Website: www.envirotechuae.com

Process Description
The scheme proposed for the treatment of sewage is a compact and effective
Sewage Treatment Plant using the revolutionary Moving Bed Bio Reactor
(MBBR) technology. The concept underlining the Moving Bed bioreactor is
to provide continuously operating bio-film reactor, which is non-cloggable, does
not require backwashing and has a very low pressure drop. This is achieved by
growing the bio-film on smaller carrier elements that move along with the waste
water in the reactor. The air stream constantly keeps the bio media in suspension
and at the same time provides the required oxygen to the biomass.
The system uses specially designed bio-media, which provides a large surface
area for biological growth.
The bio-media is made of plastic material, which has a very long life. The media is
cylindrical in shape and provides a large surface area in the given volume. The
media provides about 500 m2 effective area for growth of the bio film per m 3 of
volume. The process has been developed in Norway and has been in use at many
installations in the UAE for treatment of sewage as well as industrial effluents.
The bio media used in these systems have been developed after years of research
in the field.
The proposed system consists of following staEnvirotech:
1. Manual Bar Screen and Grit Chamber
2. Sewage Collection and Pumping System
3. Fine Screening
4. Aerobic Treatment System
5. Filtration System
6. Disinfection System

1. Manual Bar Screen and Grit Chamber:


A coarse screen shall be provided for removal of floating debris from the sewage.
The waste water from kitchen shall be routed through oil-grease trap before it
enters the treatment plant. The coarse screen shall have spacing of 10 mm and
shall be periodically cleaned. The screen/grit chamber will be provided by
Envirotech. The grit settling in the grit chamber shall be drained periodically by
opening the drain valve. The outlet from the Screen Chamber is directed to the
collection tank.

2. Sewage Collection and Pumping System :


A Collection Tank shall be constructed by Envirotech for receiving the
raw sewage. The Collection tank shall be sized in a manner to have adequate
volume to counter the peak flow. Raw sewage transfer pumps shall pump the
sewage at a uniform rate to the aerobic treatment system. One Pump shall be on
duty and the other on stand by.
3. Fine Screening
The sewage shall be routed through a self standing inclined screen of 2mm spacing.
The inlet water fills the supply chamber and arrives up into the screen top. The
filtered water moved to the discharge chamber and then further to the aerobic
treatment system. The screened material runs along the screen and gets discharged
by gravity.
4. Aerobic Treatment System:
The proposed Aerobic Treatment System shall have the following major
components
a. MBBR Bio Reactor Units
b. Flocculation Tank
c. Tube Settler Unit
d. Aeration System

a. MBBR Bioreactors: The MBBR Aeration tanks are two in number and
are located next to each other. Each of the tanks shall be provided with
aeration pipelines at the bottom, which shall be in stainless steel and are
manifolded to cover half the periphery of the tank. Aeration tank is filled with
a specific quantity of the bio- media, which is made of plastic material with a
specific gravity just below that of water, to enable it to remain in suspension.
The inlet of the aeration tank is on the top with the sewage falling freely into
the MBBR tank. The outlet is located on the opposite side, which has a
perforated Screen mounted on it, which prevents the bio-media from flowing
out of the MBBR Tank. Both compartments are connected to each other by a
fabricated channel, which has perforated sheets on each side. The outlet of
the second MBBR is connected to the Flocculation tank.
b. Flocculation Tank: If the settleability of the sludge is poor, a mild dosage
of proprietary chemicals is dosed into the flocculation tank. The addition of
these chemicals will aid in the formation of large flocs of the sloughed off
sludge flowing in from the Bio Reactors and precipitated material. This step
also helps in de-emulsifying the emulsified oil present in the effluent and
precipitating the same along with the sludge.
c. Tube Settler Unit: Sewage from flocculation tank along with biologically
stabilized solids will flow by gravity to the Compact Tube Settler Unit. The
separation of solids from sewage is achieved by laminar flow developed
between the tubes. Due to this, heavier solids slide down along the inside of
the tubes, whereas the clear water rises up and flows out.
The sludge settling at the bottom of the tanks shall be transferred from time
to time to the sludge-holding tank. The clear water from the settling tank shall
overflow into the Filter Feed Tank.
d. Aeration System: The Aeration System consists of a pair of Air Blowers.
One Blower shall be on duty while the other shall be on stand by. The
Blowers shall be used for aeration inside the MBBR.

5. Filtration System:
This consists of a Pressure Sand Filter that removes any remaining suspended
solids in the treated water so as to ensure its total conformance with the
discharge standards set by the regulatory authorities. The Filter is to be
backwashed from time to time with water from the Treated Water tank.
6. Disinfection System:
The Disinfection System, which comprises of a dosing system, ensures complete
removal of any remaining harmful organisms in the water. The water flowing into
the Polishing Filter Feed Tank is dosed with an oxidant from above and then
allowed to remain in the tank for a predetermined time so that there is enough
contact time for the oxidant to totally disinfect the water.

Control System:
The control system shall be used for total operation control of the Plant. The controls
of all the equipments are given in the table below.
Sl.
No.

Description

Start Control

Stop Control

Blowers

Manual / Auto

Manual / Auto

Transfer Pumps

Manual / Auto

Manual / Timer

Filter Feed Pump

Manual / Auto

Manual / Float Switch

Dosing Pumps

Manual / Auto

Manual / Auto

Sludge Drain Valve

Manual / Timer

Manual / Timer

1.0 SCOPE OF OFFER

QTY.

EQUIPMENT SPECIFICATION

One

Manhole Pump

Two

(1 duty/1standby) Sewage feed pumps

One

Inclined Screen and Coarse Screen

Two

(1 duty/1standby) Blowers

One

Aeration Tank

One Set

Aeration Manifold & sieves

One Set

Moving Bed Bio Reactor Bio Media

One

Flocculation Tank

One

Settling Tank

One

Tube Settler

One

Filter Feed Tank

Two

(1 duty/1standby) Filter feed / Backwash pumps

One

Pressure Sand Filter

One

Dosing system for Sodium Hypochlorite

One

Dosing system for Flocculant/Coagulant

One

Control Panel

One

Collection Tank & Sludge Holding Tank

1 Lot

Interconnecting Pipe work & Valves (within boundary limits)

1 Lot

Range of interconnecting cables(From the control Panel to the


equipments)

No. of Skids
Skid Size
Power

:
:
:

Two
12 m x 2.4 m
21 kW (Max)

Our scope of responsibilities will include:


- Equipment supply

- Two Sets of Operation and Maintenance Manual in English


Training of operators during commissioning
First fill of lubricant, oil and chemicals during
commissioning till handover of the plant
2.1 DESIGN DATA
Our offer is for a Sewage treatment system having 455 m3/day daily average
flow.
2.2 RAW WATER PARAMETERS
Average Daily Flow
Average Hourly Flow

: 455 m3/d
: 18.95 m3/hr

BOD5 Concentration
COD Concentration
pH
Suspended Solids
TDS
Oil & Grease

: 300 mg/l
: 500 mg/l
: 6.7-8.5
: 250 mg/l
: 1000 mg/l
: less than 5 mg/l

2.3 TREATED WATER QUALITY


BOD5 Concentration
COD Concentration
PH
Suspended Solids
TDS
Oil & Grease

: 10 mg/l
: less than 100 mg/l
: 6.5-7.5
: 10 mg/l
: 1000 mg/l
: less than 1 mg/l

3.0 EQUIPMENT SPECIFICATION


FOR 455 m3/d Sewage Treatment Plant:
3.1

Sewage Transfer Pumps ( Manhole)


Quantity

One

Type

Submersible, centrifugal

Fluid

Sewage

Duty

30 m3/hr

Total head

15-20 m TDH

Sealing arrangement

Mechanical

Motor arrangement

Closed coupled

Motor speed

2900 rpm

Motor rating

400 volt, 50 Hz, 3 ph

Motor Protection

IP-68-TEFC

Motor Insulation

Class F

Starter

DOL

Accessories

Pressure gauge

Shaft & Impeller MOC

SS 316

Make

ABS/Ebara/Homa/Equivalent

3.2 Sewage Transfer Pumps


Quantity

Two (1 duty +1 standby)

Type

Submersible, centrifugal

Fluid

Sewage

Duty

19 m3/hr

Total head

10 -15 m TDH

Sealing arrangement

Mechanical

Motor arrangement

Closed coupled

Motor speed

2900 rpm

Motor rating

400 volt, 50 Hz, 3 ph

Motor Protection

IP-68-TEFC

Motor Insulation

Class F

Starter

DOL

Accessories

Pressure gauge

Make

ABS/Ebara/Homa/Equivalent

Quantity

One

Duty

Coarse

Type

Manual

Fluid Depth

0.5 m

Material

Mild Steel with Epoxy coating

Make

Envirotech Fzc

3.3 Bar Screen

3.4 Inclined Screen

3.5

Quantity

One

Duty

Fine

Type

Self standing

Material

Stainless Steel AISI 304

Make

Sereco/ Equivalent

Quantity

One

Material

Mild steel with Epoxy coating

Size

8 m X 2.4 m

Fluid depth

3m

Free Board

0.5 m

Make

Envirotech FZC

Aeration Tank

3.5.1 Aeration Manifold and sieves


Distributor pipe MOC

Stainless Steel

Type

Coarse bubble

Fluid depth

3m

Make

Envirotech FZC

3.6

Air Blowers
The air blowers are designed to operate on a (1 duty + 1 standby) basis
and provide air for the aeration tank
Quantity

Two (1 duty +1 standby)

Duty

540 m3/hr @ 0.4 bar

Filter

At inlet

Silencer

At exhaust

Motor arrangement

Close coupled

Protection

IP 55 TEFC

Insulation

Class F

Starter

DOL

Valves

Isolation & Pressure relief valve

Finish

Manufacturers standard enamel

Make

Mapro Italy/Equivalent

Quantity

28 m3

Material

Polyethylene

Type

K1/ K3

Make

AnoxKaldnes, Norway

Quantity

One

Material

Mild steel with Epoxy coating

Size

1.9 m x 1.9 m x 2.5 m

Accessories

Stirrer

Make

Envirotech FZC

3.7 Bio Media

3.8

Flocculation Tank

3.9

Settling Tank
Quantity

One

Material

Mild steel with Epoxy coating

Size

2.4 m x 2.4 m x 2.5 m

Make

Envirotech Fzc FZC

Quantity

One set

Material

PVC

Type

TUBE dek FS 41.80

Make

Munters, Germany

Quantity

One

Material

Mild steel with Epoxy coating

Size

2 m x 2 m x 2.5 m

Make

Envirotech FZC

Quantity

One

Material

Mild steel with Epoxy coating

Volume

3 m 2.4 m 2.5 m

Make

Envirotech Fzc FZC

3.9.1 Tube Settlers

3.9.2 Flocculation Tank

3.10

Filter Feed Tank

3.11

Filter Feed Pump


Quantity

Two (1 duty +1 standby))

Type

Horizontal, centrifugal

Duty

19 m3/hr @ 30 m TDH

Starter

DOL

Sealing arrangement

Mechanical

Motor arrangement

Closed coupled

Motor speed

2900 rpm

Motor rating

400 volt, 50 Hz, 3 ph

Motor Protection

IP-55-TEFC

Motor Insulation

Class F

Make

Ebara/ Lowara/Equivalent

3.12

Pressure Sand Filter


Quantity

One

Type

Vertical, circular

Application

Reduction of suspended solids

Diameter

1600 mm

Height of Straight

1500 mm

Operating pressure

1.5 bar

Material

PA

Filtration rate

10 m3/ m2/hr

Media type

Sand/ Gravel

Accessories

Complete with frontal piping,


header, lateral, media, inlet, outlet,
backwash inlet & outlet valves, drain
valve, pressure gauge, etc.

Make

ENVIROTECH FZC

3.13

Chlorine Dosing System


Reagent

Sodium Hypochlorite

Quantity

One

Type

Positive displacement, diaphragm


type, adjustable stroke length

Duty

4 LPH @ 10 bar

Liquid end material

PVC

Tank material

Polyethylene

Mode of adjustment

Manual

Tank capacity

100 Liters

Make

Tank Ecoplast
Pump Aqua/Prominent/LMI

3.14

Flocculant/Coagulant Dosing System


Reagent

Flocculant/Coagulant

Quantity

One

Type

Positive displacement, diaphragm


type, adjustable stroke length

Duty

4 LPH @ 10 bar

Liquid end material

PVC

Tank material

Polyethylene

Mode of adjustment

Manual

Tank capacity

100 Liters

Make

Tank Ecoplast
Pump Aqua/Prominent/LMI

3.15

Control Panel
Type

Control panel assembled, tested at


The factory. Form 2 Panel made of
Sheet steel suitable for outdoor
installation,

which shall be also

suitable for indoor use in a humid,


50 Deg. C ambient temperature to IP
55 standard.
Mountings

The panel shall include all push


buttons, fuses, selector switches,
contactors, relays, indicating lights,
timers, etc. to form a local central
control station.

Cabling

Wiring shall be labeled and


identified in accordance with wiring
diagram

Nameplates

All push buttons and selector


switches shall be appropriately
tagged.

Finish

All steel work shall be given


Appropriate, treatment before
priming and painting with polyester
/RAL/7032 with Powder Coating
(Grey )

Lights

Alarms, indicator lights and other


auxiliaries shall be suitable for 220V,
50 Hz

Indication Lights

L.E.D.

Main power supply

400 Volt, 3 Phase, 50 Cycle

Enclosure

Weatherproof

Components Make

Merlin Gerlin/Telemechanique/Isolator
(ABB)

Enclosure Make

Himel

Tanks:
3.16

3.17

4.0

Collection Tank
Quantity

One

Material

GLS

Volume

150 m3

Quantity

One

Volume

15000 gallons

Sludge removal frequency

Once a week

Sludge Holding Tank

BATTERY LIMIT

Our battery limit will be as follows:


-

Inlet of the Collection tank

Treated waste water at the outlet of the filter

Power at an Isolator nearest to the ENVIROTECH control panel

Chemicals at the individual chemical dosing tanks

Water at any predetermined location within our battery limit

5.0 PRICE AND COMMERCIAL TERMS


5.1

Price
ENVIROTECH FZC offers to supply delivered to site, installed and
commissioned the Package plant of 455 m3/day capacity as described
here in our offer, for a total price of AED. 1,130,000 (AED One million
One hundred and Thirty thousand only)

5.2

Delivery
The equipment offered above will be provided in 16 weeks from the date of
receipt of your written order, completion of financial arrangements and
technical submittal approval whichever comes later

5.3

Validity
This offer is open, and valid for acceptance, for a period of 30 days from the
date of this document.

5.4

Warranty
The performance warranty of the proposed plant is for one year from the
date of commissioning/18 months from the date of supply whichever is
earlier.

5.5

Exclusions

Any item not specifically described in ENVIROTECH specification

Any civil or structural works

Product water tank

Any consumables such as spare parts, water, power, chemicals, lubricants,


fuels for the erection, commissioning

or running of the plant after

handover (except where explicitly included herein)

Sludge collection and disposal once a week

Material Handling at Site during unloading at site

Safety of equipment at site

Insurance for Equipment after handover

Fresh water and waste water during start up and commissioning

Power supply to ENVIROTECH Control Panel

PRICE BREAK UP:


Sl. No
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33

Description
Raw Sewage Pumps
Bar Screen
Inclined Screen
Aeration Tank
Aeration manifold & sieves
Air Blowers
Bio media
Flocculant Tank
Stirrer
Settling Tank
Tube settlers
Motorized valves
Chlorine Contact Tank
Filter Feed Pumps
Multimedia Filters
Motorized Valves for Auto B/W
Flocculant dosing system
Hypochlorite dosing system
Control Panel
Instruments
Interconnecting Piping & Fitting
Skid
Labor
Electrical
Local Handling & chemicals
Installation & Commissioning
Transportation
Manhole Pump
Collection Tank
Sludge Holding Tank
By pass valve with compressor
Chemicals for three months
Site Handling

TOTAL

Quantity
2
1
1
1
1
2
1
1
1
2
1
1
1
2
1
5
1
1
1
1
Set
2
1
1
1
1
1
1
1
1
1
Lot
1

Total Price AED


15,000
7,000
130,000
30,000
25,000
15,000
25,000
5,000
10,000
70,000
5,000
5,000
5,000
18,000
25,000
5,000
20,000
30,000
110,000
20,000
5,000
5,000

AED 1,130,000

(AED One Million One Hundred and Thirty Thousand Only)


Note : This is an indicative price break not valid for individual take off.