Professional Documents
Culture Documents
TENDER
FOR 1250 kVA DG SET FOR
UPGRATION OF KANDLA - SAMAKHAILI LPG
PIPELINE
Bid No. 05/51/23KX/GAIL/006
MECON LIMITED
MECON LIMITED
(A Govt. of India Undertaking)
Delhi, India
TENDER
FOR 1250 kVA DG SET FOR
UPGRATION OF KANDLA - SAMAKHAILI LPG
PIPELINE
Bid No. 05/51/23KX/GAIL/006
MECON LIMITED
MATERIAL REQUISTION
AND
TECHNICAL SPECIFICATION
TENDER FOR
1250 kVA DG SET FOR
UPGRADATION OF KANDLA SAMAKHIALI
LPG PIPELINE
Bid No. 05/51/23KX/GAIL/006
MECON LIMITED
MATERIAL REQUISITION
FOR
1250 kVA DG SET
MR NO.: MEC/23KX/05/21/M/001/S006
Rev.
0
Date
20.08.2008
Prepared by
Checked by
Approved by
(Vijay Singh)
DGM
(A.K. Johri)
DGM
(K.K. De)
DGM I/C
MATERIAL REQUISITION
D:\old data\Vijyant\Kandla-Samakhiali\Tender\DG Set\MR for dg set- Kandla.doc
DOC. NO.:MEC/23KX/05/21/M/001/S006
Page 2 of 4
TENDER FOR
1250 kVA DG SET FOR
UPGRADATION OF KANDLA SAMAKHIALI
LPG PIPELINE
Bid No. 05/51/23KX/GAIL/006
MECON LIMITED
MATERIAL REQUISITION
GENERAL:
GAIL (India) Limited intend to augment the capacity of its existing Kandla to
Samakhiali Pipeline Section from existing 0.5 MMTPA to 1.5 MMTPA to transport
LPG from Kandla Despatch Terminal (DT) to IPs, Samakhiali wherein it is being
projected in the suction line of Samakhiali Booster Pumps and fed into Jamnagar
Loni Pipeline (JLPL) to meet the demand of LPG bottling plants enroute JLPL.
Augmentation of Kandla Samakhiali section to 1.5 MMTPA will be met through
modification of existing Kandla Despatch Terminal. In case of grid power failure
electric power will be met from the proposed one no 1250 kVA DG set.
PROJECT
ITEM
BID NO.
CLIENT
:
:
:
:
UNIT
QTY
Destination
Nos.
Kandla
lot
Kandla
Nos.
Kandla
MATERIAL REQUISITION
D:\old data\Vijyant\Kandla-Samakhiali\Tender\DG Set\MR for dg set- Kandla.doc
DOC. NO.:MEC/23KX/05/21/M/001/S006
Page 3 of 4
TENDER FOR
1250 kVA DG SET FOR
UPGRADATION OF KANDLA SAMAKHIALI
LPG PIPELINE
Bid No. 05/51/23KX/GAIL/006
MECON LIMITED
DESCRIPTION
UNIT
QTY
Destination
Nos.
Kandla
lot
Kandla
MATERIAL REQUISITION
D:\old data\Vijyant\Kandla-Samakhiali\Tender\DG Set\MR for dg set- Kandla.doc
DOC. NO.:MEC/23KX/05/21/M/001/S006
Page 4 of 4
TENDER FOR
1250 kVA DG SET FOR
UPGRADATION OF KANDLA SAMAKHIALI
LPG PIPELINE
Bid No. 05/51/23KX/GAIL/006
MECON LIMITED
TECHNICAL SPECIFICATION
OF 1250 KVA DG SET
MECON LIMITED
CONTENTS
Sl. No
Description
1.0
2.0
Scope of work
3.0
Technical Specification
4.0
5.0
6.0
7.0
Documents to be submitted
8.0
Data sheets
9.0
10.0
SECTION-VII Page 1 of 50
2006 MECON Limited All rights reserved
Tenderers Signature with Seal
Date:
MEC/05/51/23KX GAIL/006
MECON LIMITED
1.0
1.1
1.2
1.3
1.3.1
All equipment offered shall allow adequate access to facilitate maintenance and
repair.
1.3.2
All moving parts of the equipment shall be well guarded and protected for the
operators and maintenance personnel safety.
1.4
System of units
Metric system of units shall be followed in design and manufacture of all equipment
as well as drawing documents. Name plates of equipment as well as operating I
maintenance instruction shall be in English language.
1.5
The owner I consultant reserve right to accept or reject the tender partly or fully
without assigning any reason. The quantities of each item indicated are tentative
and are subject to change. Unit rates be quoted to take care of changes in
requirements.
1.6
The tender shall be complete in all respects including data sheets duly filled without
leaving any items.
1.7
Each equipment shall be equipped with suitable lifting facilities to facilitate erection
and maintenance.
1.8
The detailed bar chart showing various activities shall be prepared by the tenderer.
The work shall be executed as per the agreed time schedule.
1.9
MEC/05/51/23KX GAIL/006
MECON LIMITED
programme.
1.10
Contractor shall submit every day report on progress of work carried out on
previous day and for each category of work.
2.0
SCOPE OF WORK
Following shall be the scope of work:
2.1
2.2.1
2.2.2
2.3
SECTION-VII Page 3 of 50
2006 MECON Limited All rights reserved
Tenderers Signature with Seal
Date:
MEC/05/51/23KX GAIL/006
MECON LIMITED
The four stroke water cooled direct coupled engine shall be capable of driving
continuously the generator to give an output of specified kVA at its alternator
terminals, its rated speed, under site condition indicated in design criteria.
Diesel engine shall be rated in accordance with BS- 5514 / ISO- 3046/1.
Engine governor shall be capable of maintaining speed within the specified limit
as per BS 5514 part 4 class A1.
Air Filter, Air Intake Manifold
Radiator type cooling system, Coolant Additive Concentrate (CAC) first fill,
Corrosion resister, Centrifugal Water Pump, Cooling water pipes from radiator
to engine
Fuel oil system with day tank (990 liters capacity) for the D.G. Set & additional
fuel piping along with filters etc.
Radiator type cooling system, Coolant Additive Concentrate (CAC) first fill,
Corrosion resister, Centrifugal Water Pump, Cooling water pipes from radiator
to engine
The engine shall be forced lubricated by shaft driven pump complete with
filters, strainers, cooler and sump of sufficient capacity for 24 hrs of
operation.
Engine starting system with lead acid batteries for the D.G. Set including
battery stand & battery charger.
All power & control within DG set skids including all auxiliaries shall be in
vendors scope. All power and control cabling/wiring within AMF panel shall
be in vendors scope. All power and control between alternator terminal and
AMF panel shall be in vendors scope.
Owner shall supply power and control cables from owners 415 V
switchboard to AMF panel
SECTION-VII Page 4 of 50
2006 MECON Limited All rights reserved
Tenderers Signature with Seal
Date:
MEC/05/51/23KX GAIL/006
10
2.4
MECON LIMITED
Local instrument gauge panel with Starting Key, Tachometer with hour
Meter, Water Temp. Gauge, Lub Oil Pressure Gauge, Battery charging
ammeter, Lub Oil Temperature Gauge
Minor civil works like grouting chipping, making holes, Civil works for
earthing & cable laying etc. Construction of fencing, with gates, around the
DG set installation with required clearances.
2.4.1
Equipment shall be painted with two coats of epoxy based primer followed by two
final coats of epoxy based paint. Sheet metal work shall be subjected to degreasing,
pickling, and phosphating prior to painting. Exhaust pipe shall be painted with high
temp paint.
2.4..2
The equipment shall be shipped to site suitably packed to prevent any damage.
Each package shall have labels to show purchasers name, purchase order and
equipment no. suitable lifting lugs etc. shall be provided and lifting points shall to
clearly marked on the package. Packing shall be suitable for storage at site for a
minimum period of 6 months.
SECTION-VII Page 5 of 50
2006 MECON Limited All rights reserved
Tenderers Signature with Seal
Date:
MEC/05/51/23KX GAIL/006
11
MECON LIMITED
Exclusions
The following works are excluded from your scope of work
2.6
a)
b)
Battery limits
a)
b)
c)
d)
All power & control within DG set skids including all auxiliaries shall be in
vendors scope. All power and control cabling/wiring within AMF panel shall
be in vendors scope. All power and control between alternator terminal and
AMF panel shall be in vendors scope.
Owner shall supply power and control cables from owners 415 V
switchboard to AMF panel
e)
3.0
TECHNICAL SPECIFICATION
3.1
Self excited, self regulated excitation system along with fast response
governor shall ensure that the set dependably comes to full speed and
delivers rated output at 415 V, 50 Hz within 15 seconds after getting the
starting signal.
b)
Under steady state condition, the electronic voltage regulator shall keep the
voltage constant within 0.5 % of the rated voltage with full load at constant
speed (with power factor varying between 0.8 lag to unity). Further adjusting
the set voltage upto 5% of rated voltage shall be possible by the
potentiometer provided for the purpose.
c)
MEC/05/51/23KX GAIL/006
12
MECON LIMITED
shall be less than one second (assuming speed to be constant). Further the
speed drop due to such loading shall be corrected to ensure 50 Hz 1% Hz
within less than 3 seconds (momentary fluctuation in frequency shall be less
than 1 Hz). Governing system shall ensure minimum fluctuation during
load changes. Inertia constant of the rotating system shall aid the governing
system. Class A1 governing system preferably using wood ward PSG
governor shall be offered. Speed drop shall be continuously adjustable.
d)
e)
D G set shall meet the starting requirement of induction motors with VFD
drive (one no.450 kW and one no. 200KW rating) that can be started with
base loads 0%, 25%, 50%, 75% under following conditions:
i.
Current not to exceed 2 times the rated current of the Alternator for
15 seconds.
ii.
Step load BHP prime mover engine can take (transient voltage dip
for above conditions shall be furnished).
iii.
3.1.2
3.1.2.1
The control system shall be suitable for unattended operation. The control system
shall operate in fail safe mode and shall include all controls and protection
necessary for the safe operation of the package. The generator set shall function
as per the following schemes:
3.1.2.2
MEC/05/51/23KX GAIL/006
13
MECON LIMITED
brought to rated speed and generator voltage brought to rated value. All
accessories required for starting and completion of various sequence of operation
for the above purpose shall be provided. Provision for the synchronization with
existing/future D.G. Sets shall be provided.
Immediately after the generator sets reach rated speed and rated voltage, voltage
and frequency monitoring relays located in control panel shall extend an impulse
for closing generator breakers as per desired / selected priority / sequence.
3.1.2.3
3.1.2.4
3.1.2.5
Stop
Stopping of the generator set in all cases for a normal shut down shall only be done
manually by means of push button in either local control panel or purchasers
remote panel.
3.1.2.6
Starting time
The total time from the receipt of the starting impulse for the generator set till the
set reaches rated speed and generator reaches rated voltage shall not be more
than 30 seconds. If this time is exceeded, an annunciation in the local control
panel shall be provided with a facility for repeat annunciation in purchasers panel.
3.1.2.7
MEC/05/51/23KX GAIL/006
14
MECON LIMITED
power distribution board for auxiliaries shall be supplied along with the generator
sets.
All auxiliary motors shall be three phase, 415 V, 50 Hz squirrel cage type suitable
for DOL starting or DC motor operating at 110 V or 24V. Insulation class shall be
`H. All motors shall have IP-55 enclosure.
3.2
Design Criteria
3.2.1
All equipment shall be designed to operate on the following site conditions &
system.
Kandla
Location
0
Ambient
0-50 C
RH
Climate
95% max.
Tropical normal corrosion
soil
220m
SECTION-VII Page 9 of 50
2006 MECON Limited All rights reserved
Tenderers Signature with Seal
Date:
MEC/05/51/23KX GAIL/006
15
MECON LIMITED
Rating
b)
Duty
c)
d)
e)
Ref. Std.
RPM
Cooling
system
Lubrication
system
Fuel
Starting
Nature of
load
f)
g)
h)
i)
3.3
SECTION-VII Page 10 of 50
2006 MECON Limited All rights reserved
Tenderers Signature with Seal
Date:
MEC/05/51/23KX GAIL/006
16
MECON LIMITED
b)
Filter
A filter of suitable type & capacity to supply fuel oil at rated output (Duplex
filter preferred)
3.5
c)
d)
Lubrication System
Lubrication system shall include replaceable, suitable type full flow oil filter and
automatic lube oil temperature control.
The lubrication system shall be self contained with the following equipment.
a)
Sump: To store sufficient oil for circulation, sump of sufficient capacity for
24 hours continuous operation.
b)
c)
d)
e)
Interconnecting piping.
SECTION-VII Page 11 of 50
2006 MECON Limited All rights reserved
Tenderers Signature with Seal
Date:
MEC/05/51/23KX GAIL/006
17
MECON LIMITED
Air Intake
The air intake shall be ensure sufficient clean air to the engine. It shall
incorporate the following.
a)
b)
Suction filter
Turbo -charger
:
:
3.7
Exhaust System
3.7.1
The hot exhaust gases shall be let off with suitable exhaust system. All the hot
parts located shall be insulated. The exhaust system shall include:
a)
Exhaust
manifold
Spark
arrestor
Silencer
d)
Expansion
joint
e)
Exhaust pipe
f)
Insulation
b)
c)
3.7.2
Structural work
3.7.2.1
SECTION-VII Page 12 of 50
2006 MECON Limited All rights reserved
Tenderers Signature with Seal
Date:
MEC/05/51/23KX GAIL/006
18
MECON LIMITED
The steel structures shall broadly be designed to support the Exhaust pipe, The
Structure may consist of Column & Column bracing, cat ladders with caging,
landing platform and handrails
Intermediate landing shall be provided to cat ladders at an interval not more
than 5.0m
3.7.2.2
The primary load cases & load combinations on the structures as per relevant IS Code
b.
c.
d.
3.7.2.3
Preparation and submission of hard & soft copies of Design calculations & drawings
for approval of the Purchaser.
f.
Preparation and submission of design calculations for typical connection details etc.
for approval of the Purchaser.
Design Basis & Considerations for Structures
Structural members shall be designed such that they are economical and safe and
meet the functional and service requirement of the technological process for which
they are designed.
a) All dead loads shall be considered in accordance with IS: 875
(Part-1) -1987.
b) All live loads shall be considered in accordance with IS: 875
(Part-2)-1987. (Also refer clause 4.04)
c) Wind loads shall be in accordance with IS: 875(Part-3)-1987
and any other consideration specific to the site.
d) Seismic loads shall be in accordance with IS: 1893 2002.
e)
In absence of any suitable provision for design loads, any
other recognized code of practice may be followed
f)
Design of steel structures shall be done in accordance with
IS: 800-1984.
g) The fabrication and erection of steel structure shall be in
accordance with IS: 800 1984
SECTION-VII Page 13 of 50
2006 MECON Limited All rights reserved
Tenderers Signature with Seal
Date:
MEC/05/51/23KX GAIL/006
19
MECON LIMITED
3.7.2.5
3.8
Acoustic Enclosure
Suitable acoustic enclosure / insulation shall be provided for maintaining the sound
level. Outer Noise level should be below 75db (A) @ 1 Metre under Free field
condition. Clearance from Central Pollution Control Board (CPCB) should be
obtained and submitted. High quality Fire Resistant insulation material (IS 8183) for
maximum sound absorption should be used. Heat resistant Neoprene Gasket
should be provided for perfect noise and weather scaling. This enclosure shall
conform the requirement of the pollution control norms of respective locations.
Lighting arrangement inside the enclosure shall be done. The thickness of sheet
steel shall not be less than 2mm. Enclosure should be forced ventilated to maintain
acceptable temperature and must provide sufficient air for engine breathing and
cooling
3.9
SECTION-VII Page 14 of 50
2006 MECON Limited All rights reserved
Tenderers Signature with Seal
Date:
MEC/05/51/23KX GAIL/006
20
MECON LIMITED
3.10.1
The alternator shall be revolving field, salient pole, brushless type, screen
protected drip proof sheet steel enclosure conforming to IP-23 degree of
protection as per IS 4691 (Terminal Box shall conform to IP 55). Generator
set is intended for outdoor installation & with acoustic enclosure.
b)
Laminated low loss silicon steel stator core with copper winding in class H
insulation firmly wedged in slots and braced to withstand mechanical forces,
high vibration impact stresses etc. Temperature rise limited to that for Class
F insulation.
c)
Laminated core salient poles within copper field coils (class H insulation)
firmly assembled on rotor, dynamically (balanced over the entire operating
speed range including over speed due to prime mover) to operate with
minimum vibration and provided with damping cage winding on pole shoes.
Temperature rise limited to that for Class F insulation.
d)
Exciter and pilot exciter assembled with integral with the main machine to
provide self excited, self regulated brushless excitation system, with class H
insulation. The excitation system shall comprise of excitation equipment,
automatic voltage regulator, voltage adjustor, AVR voltage failure release
(alarm). Temperature rise limited to that for Class F insulation.
e)
f)
Suitable terminal box with double compression type cable glands and tinned
copper lugs for terminating multiple (8-10) runs of 3.5 x 300 mm PVC
insulated armoured Cu/Al cables and shall be located on the free end or
side of the machine. Top terminal Box shall be provided.
g)
h)
SECTION-VII Page 15 of 50
2006 MECON Limited All rights reserved
Tenderers Signature with Seal
Date:
MEC/05/51/23KX GAIL/006
21
MECON LIMITED
i)
Ball and roller shall have re-greasing facility by grease gun, inherently
protected against over greasing, with seals to prevent in-grease of grease
into the machine winding. Bearing shall be anti-friction type.
j)
k)
l)
m)
n)
3.10.2
A)
withstand
c)
Mounting
d)
e)
Excitation
Voltage
:
:
f)
Insulation
g)
h)
Space heaters
Heater with controls
:
:
SECTION-VII Page 16 of 50
2006 MECON Limited All rights reserved
Tenderers Signature with Seal
Date:
MEC/05/51/23KX GAIL/006
22
3.11
3.11.1
MECON LIMITED
a)
Cubicle type free standing, floor mounted, Fabricated with 2mm thick CRCA
sheet steel construction, dust and vermin proof with IP 54 degree of
protection as per IS 2147 (Intended for indoor installation). The maximum
and minimum operating height shall be 1800 mm and 300 mm respectively.
b)
c)
d)
e)
f)
Switch fuse units (HP rated / heavy duty SFUs), starter units for DG
auxiliary drives shall be fixed execution with door interlocks. All live
terminals shall be properly shrouded to prevent inadvertent contact by
operating personnel. Feeder designation shall be clearly marked on each
cubicle. All meters shall be flush mounted on the cubicle doors (Max. size
96 mm x 96 mm). Separate module shall be provided for each motor starter.
g)
3.11.2
Battery station
a)
Set of 24 V lead acid battery / bank of adequate ampere hour capacity for
the DG set (at 10 hours discharge rate for supplying control power to control
panel and starting power to engine starting motor) complete with connecting
SECTION-VII Page 17 of 50
2006 MECON Limited All rights reserved
Tenderers Signature with Seal
Date:
MEC/05/51/23KX GAIL/006
23
MECON LIMITED
leads first charging and routine check instruments including hydrometer and
cell tester, teak wood stand, floor insulators, cell supporting insulators, etc.
It shall be possible to start the engine three times in immediate succession
without appreciable drop in DC Voltage. The battery shall have a sufficient
capacity to start the engine more than 4 times consecutively.
b)
3.11.3
Meters and components in the DG control panel shall consist, but not limited to
following minimum items.
a) Voltmeter (144 Sq. mm) to read line to line main voltage and DC voltage with
selector switches (as per IS 1248).
b) Ammeter (144 Sq. mm) to read line current (as per IS 1248) with selector switch.
c) Frequency meter (45 Hz to 55 Hz).
d) Power factor meter (0.5 lag to 0.5 lead).
e) Kilo-watt meter.
f) Kilo-watt hour meter, with hour meter to record total hours of operation (Hour
meter shall have resent tool) shall be integrated / digital type micro processor
based similar to Enercon 3360.
g) Tachometer to measure engine speed.
h) PTs and CTs required for above meters.
i) Auto-Off-Manual selector switches (for varying engine speed wherever engine
governors are provided with motorized heads).
j) Push buttons, Engine start / stop, generator breaker close/trip, control system off,
etc. indicating lamps, lamps shall have translucent colored covered red, green,
white, amber etc., lamps with series resistors) shall indicate the following:
i)
DG set on-off.
SECTION-VII Page 18 of 50
2006 MECON Limited All rights reserved
Tenderers Signature with Seal
Date:
MEC/05/51/23KX GAIL/006
24
MECON LIMITED
ii)
iii)
DG supply on-off.
iv)
ii)
Low DG voltage.
iii)
iv)
ACB tripped
v)
Fault in alternator
vi)
vii)
(Further fault if any shall also be included as per Mfg, Standard or as will be
finalized during approval of drgs)
3.11.4
k)
Protective relay for tripping DG Set ACB for over current, short circuits earth
fault with flag indications. CDV62 relay with PS class CT shall be provided.
I)
Relays, timers, contactors etc for controlling and interlocking of engine fault
and for operating the engine from DG control panel.
Air circuit breaker in separate cubicle in draw out execution shall have following
features:
a) Four pole direct acting, ambient compensated, continuous adjustable thermal
release with setting range from 50% to 150% of rated current of the DG set.
b) 3 pole direct acting, current independent, continuous adjustable short circuit
release, with timer, current range 2 to 4 times the rated current of DG set (time
setting 0.1 to 0.3 seconds).
(Note: ACB with microprocessor based relays will also be considered)
SECTION-VII Page 19 of 50
2006 MECON Limited All rights reserved
Tenderers Signature with Seal
Date:
MEC/05/51/23KX GAIL/006
25
MECON LIMITED
c)
Under voltage relay with timer for giving, closing impulse to the breaker.
d)
e)
f)
g)
h)
i)
i)
a)
Alternators shall be protected for over current, short circuits and earth fault.
b)
The thermal releases and direct acting magnetic releases of the circuit
breakers shall be accurately selected based on the rating of the alternator
and the short circuit releases shall be adjusted based on the maximum
sustained value of over current the machine can develop due to short
circuit.
c)
Thermistors connected to special thermistor relay shall trip the air circuit
breaker and stop the engine in case of excessive temperature of the
winding of Alternators.
d)
e)
All the engine and alternator faults shall shut off the engine in addition to
tripping the breaker.
f)
All the DG auxiliary drive (if applicable) motors shall be protected by HRC
fuses and bimetal thermal over load relays (of proper ratings), with inherent
single phasing protection. Each drive motor shall have its individual isolator
and control MCB.
SECTION-VII Page 20 of 50
2006 MECON Limited All rights reserved
Tenderers Signature with Seal
Date:
MEC/05/51/23KX GAIL/006
26
MECON LIMITED
g)
h)
i)
All the field sensor elements like temperature, pressure switches etc. shall
be connected to protection circuits in a fail safe manner so that machine is
not subjected to harmful effects of temperature, pressure etc., due to
malfunctioning of the instruments.
3.11.5
General
All power and control cables supplied shall be as per relevant IS standards.
All LT power cables shall be 1.1 kV grade, circular / sector shaped,
stranded 3 , 4 core electrical purity Cu conductor PVC insulated, round /
flat steel strip armoured and extruded PVC inner and outer sheathed as per
relevant standards and suitable for 415V neutral solidly earthed system.
The PVC insulation used shall be suitable for continuous conductor
temperature of 85 0C.
The insulation of phase conductors shall be coloured red, yellow and blue
and the neutral black.
1.1 kV grade control cables shall be of circular stranded electrolytic grade
high conductivity annealed copper conductor with a minimum size of 2.5
sq.mm PVC insulated, round wire armoured and PVC overall sheathed.
All cores of control cables shall be continuously identified by tracer numbers
i.e. tracer numbers either embossed or printed continuously on each
individual core.
Armouring for power and control cables shall consist of galvanised steel
strips / galvanised round steel wires.
All cables shall be suitable for system particulars, site conditions and
environment conditions specified.
b)
Specification
1.1 kV heavy duty power cable multi-cores with standard sector shaped or
with compact circular stranded Cu conductors as applicable. PVC insulated
SECTION-VII Page 21 of 50
2006 MECON Limited All rights reserved
Tenderers Signature with Seal
Date:
MEC/05/51/23KX GAIL/006
27
MECON LIMITED
Selection
Size and type of cables for specific applications shall be selected giving due
Consideration for the following
Ambient conditions.
SECTION-VII Page 22 of 50
2006 MECON Limited All rights reserved
Tenderers Signature with Seal
Date:
MEC/05/51/23KX GAIL/006
28
MECON LIMITED
Sequential length marking shall be provided in outer sheath of all power and
control cables.
ISl marking at every metre of cable length shall be provided.
Cores of multi-core control cables shall be serially numbered.
d)
Tests
Copies of type test certificates as per relevant IS carried out on similar
cables shall be furnished.
All routine tests & acceptance tests as per relevant IS shall be carried out
on every cable size in presence of owner or his representative if specified in
QAP.
3.11.6
Protection devices
For the safety of DG set following annunciation and tripping scheme shall
be provided.
a)
Audio visual alarm only, for the fault conditions in case of:
MEC/05/51/23KX GAIL/006
29
b)
3.11.7
MECON LIMITED
Over speed.
Starting fault,
In addition to the common specification listed in for DG control panel in 2.2 the
following additional features shall be provided as given below for the Panel.
a)
3.11.8
Foundation frame
Suitable foundation frame (common with generator with foundation bolts and nuts
shall be provided.
SECTION-VII Page 24 of 50
2006 MECON Limited All rights reserved
Tenderers Signature with Seal
Date:
MEC/05/51/23KX GAIL/006
30
MECON LIMITED
Coupling shall be suitable for type and speeds of equipment to be coupled. It shall
ensure minimum vibration in operation due to possible misalignment and
unbalances.
3.11.9
3.11.10
Preferred makes
Engine
Pipes
Alternator
:
:
:
:
:
:
:
:
:
:
:
Annunciators
Power Factor relay
Indicating Meters
:
:
:
Integrating meters
Brass / GI compression type
cable glands
Tinned copper lugs
Indicating lamps & Push
buttons
:
:
:
:
Dowells/ Electropowerke/
GE / Siemens / L & T/ BCH
MEC/05/51/23KX GAIL/006
31
MECON LIMITED
: 5
: 4691
IS
IS
: 4722
: 4728
IS
: 4889
IS
: 12065
IS
IS
: 12075
: 12802
IEC
IEC
: 34 series
: 72
BS
: 649
BS
BS
: 4999
: 5000
BS
ISO
: 6121
: 3046-4
SECTION-VII Page 26 of 50
2006 MECON Limited All rights reserved
Tenderers Signature with Seal
Date:
MEC/05/51/23KX GAIL/006
32
MECON LIMITED
4.0
4.1
4.2
4.2.1
The equipment shall be inspected by the Purchaser and / or their Inspection Agency at the
manufacturers works prior to despatch. The equipment will be inspected as per the tests
pre-identified in the approved QAP to ensure conformity of the same with relevant
approved drawings, data sheets, technical specification, National/International Standard.
4.2.2
The contractor shall finalise the QAP within the stipulated schedule mentioned in the
Purchase Order and the QAP shall be submitted in four sets (Blank QAP formats enclosed
shall be adopted). In case of any sub-contracting, the QAP shall be prepared by the
contractor in consultation with his sub-contractor to avoid any lapse in quality and disputes
and misunderstanding.
4.2.3
The contractor shall provide full and free access of the Inspection Agency to the
manufacturers works to carry out any stage inspection to ensure the quality of the
equipment being manufactured.
4.2.4
Only on readiness of the equipment and approval of all relevant drawings & QAP, the
contractor shall give Inspection Call to the Purchaser & the Inspection Agency with a
clear notice of 10 days for inspection. The Inspection Call shall be accompanied by the
manufacturers internal inspection report, test certificates, purchase order, sub-purchase
order, technical specification, approved QAP and approved drawings / data sheets. The
Inspection Call without above documents shall be ignored. In case of any approved subcontracting, only the main contractor shall give the Inspection Call enclosing internal
inspection/ test reports of the sub-contractor duly verified by the main contractor. In case
the equipment offered for inspection is found not ready, all the cost of the visit of the
Inspection personnels shall be borne by the contractor.
4.2.5
The contractor shall furnish all relevant documents and test certificates as required by
the Inspection Agency during inspection. Materials shall be tested only in recognised
Test House/Laboratory.
SECTION-VII Page 27 of 50
2006 MECON Limited All rights reserved
Tenderers Signature with Seal
Date:
MEC/05/51/23KX GAIL/006
33
MECON LIMITED
4.2.6
4.2.7
No equipment shall be offered for inspection in the painted condition unless otherwise
agreed to the purchaser.
4.2.8
The contractor shall ensure that the equipment and materials once rejected by the
Inspection Agency are not reused in the manufacture of plant and equipment. Where
parts rejected by the inspection Agency have been rectified as per pre-agreed
procedure, such parts shall be segregated for separate inspection and approval before
being used in the work.
4.2.9
The contractor shall carry out their internal inspection and obtain clearance from
Statutory bodies, like IBR, CCE, TAC, Weights & Measures, Safety, IE Rules, etc., as
required for the equipment prior to offering any such equipment for Purchasers
inspection.
4.2.10
The contractor shall provide all required instruments, tools, necessary testing and
inspection facilities free of cost to carry out the inspection. These instruments and
testing machines shall be calibrated by an agency of National/ International recognition
and the calibration shall be valid during inspection period.
4.2.11
The inspection Agency shall have the right to demand for re-testing of any material recalibration of the instrument and testing machine & the charges for the above will be
borne by the contractor.
4.2.12
4.2.14
In case of waiver category items, the same shall be pre-identified in the QAP itself. For
such items, the contractor shall furnish necessary certificate, test reports, etc., as agreed
upon and indicated in the QAP. For these items also the contractor shall obtain
Inspection Waiver Certificate and despatch clearance from the purchaser Inspection
Agency before effecting despatch of equipment.
4.2.15
The issue of Inspection Certificate / Waiver Certificate for any equipment or component
thereof does not absolve the contractor from his contractual obligations towards
subsequent satisfactory performance of the equipment at site. Should any equipment
be found defective, In whole or part thereof after receipt at site or during erection/
commissioning and testing shall be made good by the contractor free of cost.
4.3
Performance Guarantee
The tenderer shall furnish the following guaranteed parameters, When operating under site
conditions at maximum continuous rating as defined in BS 5514 (ISO 3046). The
SECTION-VII Page 28 of 50
2006 MECON Limited All rights reserved
Tenderers Signature with Seal
Date:
MEC/05/51/23KX GAIL/006
34
MECON LIMITED
performance test of the DG set shall be carried out at manufacturers work. Performance
tests of any particular equipment which cannot be conducted / demonstrated either
partially or wholly at the manufacturers works, shall be conducted after erection at site in
the presence of Purchaser and their Inspection Agency. In all the cases, prior approval of
the Purchaser shall be obtained. However, arranging all testing facilities including load
shall be in the scope of supplier. Following tests shall be conducted in the presence of
purchasers representative at manufacturers work;
i)
Functional tests, continuity tests and high voltage test on control panel to
establish the performance called for in the specification.
ii)
iii)
iv)
v)
Vibration test
vi)
vii)
i)
ii)
iii)
iv)
Percentage Loading
110%
Engine output
Electrical output at the generator
terminals (KVA)
Fuel consumption
Lubricating oil consumption
100%
50%
25%
vii)
viii)
5.0
5.1
Scope work under this section includes site work of installation & commissioning of
engine, generator assembly, electrical panels battery station, associated cabling,
including cables between DG Control panel grid breaker panel, earthing, piping,
fuel pumps, fuel tanks, safety appliances (like rubber mats, first aid boxes, carbon
extinguishers etc). Necessary erection materials such as cable racks, trays, angles,
chemicals etc required DG Set & necessary statutory approvals are included in the
scope of work.
SECTION-VII Page 29 of 50
2006 MECON Limited All rights reserved
Tenderers Signature with Seal
Date:
MEC/05/51/23KX GAIL/006
35
MECON LIMITED
5.2
The installation shall comply with relevant Indian Standards, Indian Electricity Rules
and statutory regulations that are in force in the place of installation.
5.3
b)
c)
d)
e)
f)
Applying touch paints for finish painted equipments and finish painting of
site fabricated steel work after pretreatment like de-rusting, degreasing,
primer coating etc.
g)
All pre-wired panels shall be checked for correctness as per final approved
wiring diagrams.
h)
i)
Tightness of all bolts joints in busbars, motors, generator, engine etc., shall
be checked.
j)
k)
I)
MEC/05/51/23KX GAIL/006
36
MECON LIMITED
plant earth grid at minimum two points for DG Set to be provided by the
contractor as per IS 3043.
5.4
a)
b)
All the piping to the engine shall be done strictly as per manufacturers
drawings. Wherever piping involves joining by welding the same shall be as
per relevant statutory regulations (compressed air lines etc.). Unions /
couplings of pipelines shall be done as per manufacturers instruction
/drawings, wherever welding is not preferred or permitted. All piping shall be
checked for leak proof by conducting tests as per instruction manuals of
manufacturer.
c)
Coupling of the engine and alternator shall be done after checking and
correcting alignment of shaft axes within permitted tolerances. Shaft levels
shall be checked and adjusted to be within permitted tolerances.
d)
All the power cables between DG Control panel and alternator shall be
done as per approved layout drawings. Further all control cables to start
and shut-off solenoids, temperature switches, level switches etc., shall be
separately installed and terminated with ferrule numbers as per
manufacturers wiring diagrams. Wherever control cables have to run near
engine casing thermal insulations shall be used to prevent damage due to
excess temperature. Flexible conduits shall be used to protect control
cabling near the engine. All the power and control cables shall be laid
separately and in cable trenches / cable channels between generator and
DG Control panel in the building as per approved drawing. Vacant spaces in
used and unused conduits should be plugged using M-seal monoplast filling
compound. All cables shall be neatly dressed and clamped in fabricated
cable trays.
e)
DG set auxiliaries like lube oil prime pump, fuel oil pump, fuel transfer
pumps, shall be run and checked using grid supply. Similarly batteries shall
be charged through charger installed, using grid supply. First filling of
lubrication oil, grease, fuel oil (into tank) etc., shall be done by the
contractor as per manufacturers instructions.
f)
MEC/05/51/23KX GAIL/006
37
g)
5.5
MECON LIMITED
When installation is completely ready for starting, following tests shall be done in
addition to all test prescribed by the manufacturer / I.S. Standards.
a)
b)
c)
d)
e)
f)
g)
h)
Checking annunciator windows for all the faults simulated during testing.
i)
Continuous full load test as specified, by starting all the motor loads
sequentially.
j)
5.6
5.7
Important notes
a)
b)
SECTION-VII Page 32 of 50
2006 MECON Limited All rights reserved
Tenderers Signature with Seal
Date:
MEC/05/51/23KX GAIL/006
38
5.8
MECON LIMITED
c)
Contractor shall ensure that no tests are applied which may stress the
equipment above the limits recommended for field testing, by the
manufacturer.
d)
Contractor shall be responsible for any damage that may occur to personnel
/ equipment resulting from improper testing procedures.
e)
Insulation tester
Make
:
Type
:
SI. No.
2 Earth tester
Make
:
Type
:
SI. No
3 Any other instruments
Make
:
Type
:
4 Particular works
A Cables
:
a)
Total length of underground :
cable and its size
b)
No. of joints
: End joints
Tee joints
Straight / through joints
B Earthing
a)Description of earth electrode
:
b) No. of earth electrode
: NA
c) Size of main earthing lead
:
5 Test result
a) Insulation resistance
:
SECTION-VII Page 33 of 50
2006 MECON Limited All rights reserved
Tenderers Signature with Seal
Date:
MEC/05/51/23KX GAIL/006
39
Sl.
No
Length
MECON LIMITED
: Mega-ohms
:
:
: Mega-ohms
: Mega-ohms
: Mega-ohms
:
: Mega-ohms
: Mega-ohms
: Mega-ohms
: Ohms
:
:
:
:
Ohms
Ohms
Ohms
Ohms
SECTION-VII Page 34 of 50
2006 MECON Limited All rights reserved
Tenderers Signature with Seal
Date:
MEC/05/51/23KX GAIL/006
40
g)
Before commissioning
i)
Whether high voltage test
conducted
ii)
If conducted, system of
supply test voltage at
iii)
Duration
iv)
Results
v)
If not conducted,
Voltage of megger used
Earth temperature
Results of megger testing
Between R & Y
Between Y & B
Between B & R
Between R & N
Between Y & N
Between B & N
Between R & E
Between Y & E
Between B & E
MECON LIMITED
YES / NO
KV
:
:
Mins
Satisfactory / unsatisfactory
:
:
:
:
:
:
:
:
:
:
:
:
SIGNATURE OF SUPERVISOR
SIGNATURE OF CONTRACTOR
CONTRACTORS LICENCE
6.0
One lot of spares is the quantity of spares as mentioned below and shall be ordered and
considered for price comparison. List of Mandatory spare prices to be enclosed in Priced Bid
Envelope.
Price of mandatory spares shall be loaded for evaluation purpose
SECTION-VII Page 35 of 50
2006 MECON Limited All rights reserved
Tenderers Signature with Seal
Date:
MEC/05/51/23KX GAIL/006
41
MECON LIMITED
1 set means the quantity installed in one machine (BIDDERS TO SPECIFY ITEMWISE IN THEIR
OFFER DOCUMENT)
S.No.
3
4
5
6
7
9
10
10
11
Part Description
Part
No.
ALL
ENGINE
BEARING/BUSHES
(MAIN
CONNECTING
ROD
BIG
END
CONNECTING
ROD
SMALL END ETC )
PISTON
ASSY.
INCLUDING
PISTON,
PISTON
RINGS
&
CONNECTING RODS &
CONNECTING
ROD
BOLTS ETC
PISTON RINGS (ALL
TYPES)
Liners
INLET VALVE &
EXHAUST VALVE
GASKETS & O RINGS
(SET)
5% SET OF NUTS,
WASHERS & BOLTS
(SET)
CARTRIDGE/ELEMENTS
FOR PRIMARY AND
SECONDARY FUEL OIL
FILTER
LUBE FILTERS
CARTRIDGE/ELEMENT
SET OF BEARING (LUBE
OIL PUMP)
SET OF BEARING FOR
ALTERNATOR
PREVENTIVE
MAINTENANCE KIT FOR
1000 HRS. OF
OPERATION
Qty. Reqd.
by purchaser
Price
Unit
Total
1 lot
1 lot
1 lot
1 lot
1 lot
1 lot
1 lot
1 lot
1 lot
1 lot
1 lot
1 lot
SECTION-VII Page 36 of 50
2006 MECON Limited All rights reserved
Tenderers Signature with Seal
Date:
MEC/05/51/23KX GAIL/006
42
MECON LIMITED
7.0
7.1
c)
d)
e)
Single line diagram of generator control panel, MCC etc., indicating make
and rating of each equipment.
f)
g)
h)
i)
j)
k)
Total time required for the DG set to deliver rated power after
starting from cold conditions.
ii.
iii.
7.2
Biggest size of motor that can be started on DG set with voltage dip
limited to 20% at alternator terminals.
After placement of order
1.
MEC/05/51/23KX GAIL/006
43
7.3
MECON LIMITED
2.
The outline of the foundations of all the equipment, accessories etc. under
the scope of his supply indicating the location of anchor bolt conduits and
other inserts to be built in the foundations etc. with corresponding level.
3.
2.
Scheme and piping layout drawings for fuel oil, lube oil systems.
3.
4.
5.
6.
7.
GA drawing of generator.
8.
8.0
8.1
I.
1.
2.
3.
4.
5.
6.
Base plates
:
Cylinder block
:
Cylinder head
:
Cylinder
:
Piston
:
Nos. and material of compression :
rings
Cylinder liner
Piston rod
:
Crankshaft
:
7.
8.
9.
SECTION-VII Page 38 of 50
2006 MECON Limited All rights reserved
Tenderers Signature with Seal
Date:
MEC/05/51/23KX GAIL/006
44
II.
A)
1.
2.
3.
4.
5.
6.
7.
8.
9.
10.
11.
12.
13.
14.
15.
16.
17.
18.
Crank pins
Connecting rod big end bearing
Connecting rod small end bearing
Frame
Valve seat
Valve holder
Valve guards
Valve plate
Valve spring
Main bearing
Pin shaft bearing
Tie rod
Rocker arm
Rocker valve
Cam
Roller guide
Timing rod
MECON LIMITED
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
;
:
Particulars of DG Set
Diesel engine
Name of manufacturer
:
Type and engine no.
:
Standard rating BHP
:
Rating for site conditions
:
Rated speed (RPM)
:
Direction of rotation
:
No. of strokes
:
No. of cylinders
:
Arrangement of cylinders
:
Dia. of cylinders DORE.
:
Piston stroke
:
Total piston placement
:
Mean speed of piston at rated :
speed
Compression ratio
:
Type of cylinder valves
:
a) Suction
b) Exhaust
Coolant
Firing order of cylinders
FUEL oil consumption
:
:
:
SECTION-VII Page 39 of 50
2006 MECON Limited All rights reserved
Tenderers Signature with Seal
Date:
MEC/05/51/23KX GAIL/006
45
MECON LIMITED
a) at rated load
b) at 75% load
c) at 50% load
19.
20.
21.
B)
1.
2.
3.
a)
b)
c)
4
a)
b)
5
a)
b)
d)
e)
f)
6
a)
b)
c)
d)
e)
f)
g)
h)
i)
j)
k)
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
SECTION-VII Page 40 of 50
2006 MECON Limited All rights reserved
Tenderers Signature with Seal
Date:
MEC/05/51/23KX GAIL/006
46
C.
1
2
a)
b)
c)
d)
e)
f)
g)
h)
3
a)
4
a)
5
a)
6
7
8
a)
b)
c)
d)
9
10
a)
b)
c)
11
12
1
a)
b)
c)
d)
Air filter
Air filter
Make
Type
Size of filtering particle
MECON LIMITED
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
SECTION-VII Page 41 of 50
2006 MECON Limited All rights reserved
Tenderers Signature with Seal
Date:
MEC/05/51/23KX GAIL/006
47
1
a)
b)
c)
2
a)
b)
3
Manifold
Location
Type
Material
Silencer
Make
Type
Exhaust piping details
1
2
3
4
5
6
Make
Type
Output
Speed
Suction pressure
Exhaust pressure
Coupling
1
2
Type
Bolting details
H
1
2
3
I
1
2
3
4
J
1
2
3
4
MECON LIMITED
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
Pyrometer equipment
Make
Location on engine
No. of points monitored
:
:
:
Dimension
Length
Width
Height
Free over head space required to
pull piston and rod assembly
Details of acoustical enclosures
Make
Size
Sound Level
Constructional details
:
:
:
:
:
:
:
:
SECTION-VII Page 42 of 50
2006 MECON Limited All rights reserved
Tenderers Signature with Seal
Date:
MEC/05/51/23KX GAIL/006
48
1
2
3
4
Type of connections
Material & thickness
Size
List of instruments
Weights
1
2
iii.
A
a)
b)
c)
d)
e)
f)
g)
h)
B
a)
b)
c)
d)
e)
C
a)
b)
c)
D)
E)
F)
a)
b)
G)
MECON LIMITED
:
:
:
:
:
:
ELECTRICS
Generator
Make
Type
Continuous Rating
Over load capacity
Speed
Over speed capacity
Critical speed
Short circuit ratio of the machine
Unsaturated direct air synchronous
Reactances.
Sub-transient
Transient
Steady stage
Zero sequence reactance
Negative sequence reactance
Short circuit time constant
Sub-transient
Transient
Inertia constant of the machine in
seconds
Zero power factor ( lagging) rating
at nominal voltage
Field current (over excitation)
Voltage regulation
50% Load thrown off
100 % Load thrown off
Sustained Short circuit current
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
SECTION-VII Page 43 of 50
2006 MECON Limited All rights reserved
Tenderers Signature with Seal
Date:
MEC/05/51/23KX GAIL/006
49
iv.
MECON LIMITED
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
MEC/05/51/23KX GAIL/006
50
MECON LIMITED
O)
a)
b)
c)
d)
e)
P)
a)
b)
c)
d)
e)
f)
:
:
:
:
:
:
:
:
:
:
Busbars
Material
Dimension R.Y.B. Neutral, Earth
Whether PVC slewing provided
Air clearance: phase to phase &
phase to earth (min. reqd, 25mm,
16mm)
Busbar
supports:
material
&
dimensions
Temperature rise (Min. 40 deg c rise
above 45 deg C ambient)
:
:
:
:
:
:
:
:
SECTION-VII Page 45 of 50
2006 MECON Limited All rights reserved
Tenderers Signature with Seal
Date:
MEC/05/51/23KX GAIL/006
51
Q)
a)
b)
c)
d)
e)
Battery
Make
Type & AH rating
Discharge rate
Charging rate
Teakwood stand
insulator provided
R)
a)
b)
c)
d)
e)
f)
Battery charger
Type
Make
Whether diode or S.C.R.
Whether D.C. Output voltage constant
Type of over voltage protection
Suitability for quick & trickle charging
:
:
:
:
:
:
:
S)
a)
b)
c)
d)
e)
f)
:
:
:
:
:
:
:
T)
a)
b)
c)
d)
e)
f)
g)
h)
i)
Power/Control/Instrument cables
Type
Voltage class
No. of course
IS
Current rating
Laying factors
Insulation details
Armour details
Technical catalogues
:
:
:
:
:
:
:
:
:
:
with
MECON LIMITED
:
:
:
:
:
porcelain :
SECTION-VII Page 46 of 50
2006 MECON Limited All rights reserved
Tenderers Signature with Seal
Date:
MEC/05/51/23KX GAIL/006
52
MECON LIMITED
S. No. a)Description
Diesel Engine
a)
b)
c)
d)
e)
f)
g)
h).
7.
a)
Auxiliary piping
b)
8.
Spares
a)
SECTION-VII Page 47 of 50
2006 MECON Limited All rights reserved
Tenderers Signature with Seal
Date:
MEC/05/51/23KX GAIL/006
53
MECON LIMITED
b)
c)
d)
e)
f)
g)
ERECTION, TESTING,
AND HANDING OVER.
COMMISSIONING
DESCRIPTTION
SUPPLY / ERECTION /
TESTING /
COMMISSIONING
CABLING
BETWEEN
THE
PACKAGE
EQUIPMENT AND BETWEEN PURCHASERS
SECTION-VII Page 48 of 50
2006 MECON Limited All rights reserved
Tenderers Signature with Seal
Date:
MEC/05/51/23KX GAIL/006
54
MECON LIMITED
FOR
OF
9
10.
11.
12.
13.
SECTION-VII Page 49 of 50
2006 MECON Limited All rights reserved
Tenderers Signature with Seal
Date:
MEC/05/51/23KX GAIL/006
55
10.0
S
No.
MECON LIMITED
Tender
Deviation taken
Specification
Certified that, only the above-mentioned deviations have been taken against this tender.
Name of the bidder
Signature
SECTION-VII Page 50 of 50
2006 MECON Limited All rights reserved
Tenderers Signature with Seal
Date:
MEC/05/51/23KX GAIL/006
56
TENDER
FOR 1250 kVA DG SET FOR
UPGRATION OF KANDLA - SAMAKHAILI LPG
PIPELINE
Bid No. 05/51/23KX/GAIL/006
MECON LIMITED
DRAWINGS
57
TENDER FOR
1250 kVA DG SET FOR
UPGRADATION OF KANDLA SAMAKHIALI
LPG PIPELINE
Bid No. 05/51/23KX/GAIL/006
MECON LIMITED
TABLE OF CONTENT
Sl.
Description of Drawings
No.
1 Main Single Line Diagram of Existing
Electrical Panels Despatch of Kandla
2 AMF Panel for DG Set.
3 AMF Panel for DG Set.
MATERIAL REQUISITION
Drawings No.
MEC/23KX/05/E9/SLD/002, R-0
(Sheet 1 of 2)
MEC/SD/05/E9/006/001, R-0
MEC/23KX/E9/006/001, R-0
DOC. NO.:MEC/23KX/05/21/M/001/S006
Page 2 of 5
58
TENDER FOR
1250 kVA DG SET FOR
UPGRADATION OF KANDLA SAMAKHIALI
LPG PIPELINE
Bid No. 05/51/23KX/GAIL/006
MATERIAL REQUISITION
MECON LIMITED
DOC. NO.:MEC/23KX/05/21/M/001/S006
Page 3 of 5
59
TENDER FOR
1250 kVA DG SET FOR
UPGRADATION OF KANDLA SAMAKHIALI
LPG PIPELINE
Bid No. 05/51/23KX/GAIL/006
MATERIAL REQUISITION
MECON LIMITED
DOC. NO.:MEC/23KX/05/21/M/001/S006
Page 4 of 5
60
TENDER FOR
1250 kVA DG SET FOR
UPGRADATION OF KANDLA SAMAKHIALI
LPG PIPELINE
Bid No. 05/51/23KX/GAIL/006
MECON LIMITED
MATERIAL REQUISITION
DOC. NO.:MEC/23KX/05/21/M/001/S006
Page 5 of 5
61