You are on page 1of 24

PROPOSAL

ENERGY
EFFICIENCY
INITIATIVE

ABOUT LOTUS WEST


Lotus West Sdn. Bhd. was incorporated as a
private limited company on 31st March 1994.
The company has ventured into
telecommunication activity with a full pledge
products and services. Over the years we have
grown to become more focus in our application
development and products, and more exposed
to customizing solutions to meet the needs of
our clients. The company comprises of young
and proficient technopreneurs who are well
equipped with the state-of-the-art-technology
and fervent to seize opportunities along with
seeking business niches.

Lotus West focus and specializes in


provisioning of telecommunications test,
support & services and professional training for
Malaysias telecommunication industry. Since
its inception Lotus West have served many big
corporations on their telecommunication and
energy saving needs.
Lotus West mark a new chapter in 2014 when
awarded a 10 year contract for supplying,
commissioning and monitoring energy saving
solution for a giant telecommunication company
though a shared-saving scheme.

ENERGY SAVING
IN MALAYSIA
Prudent and efficient use of electricity is not only
kinder to the environment; it is also kinder to
your business, saving you money and bringing
you more profits.
Reducing your business
electricity consumption requires surprisingly
minor changes in your daily work habits, and
perhaps some wiser decision when choosing
and installing new equipment.

The government of Malaysia under the Eight


Malaysian Plan and the Ten Year Outline
Perspective Plan (OP3) recognized energy
efficiency as an important measure to increase
the competitiveness of the countrys goods and
services.
Since 2002, the government has introduced a
series of initiatives to tackle the energy
efficiency implementation barriers in the country.
The Malaysian Industrial Energy Efficiency
Improvement Project (MIEEIP) was developed
as a comprehensive plan to remove barriers to
the efficient use of energy by the industrial
sector, in total, eight components ranging from
bench marking program, energy auditing
program to ESCO support program and
financial institutions participation programs were
included in the MIEEIP.

LOTUS WEST
ENERGY SAVING SOLUTION
ENERGY AUDIT
We offer detailed inspection,
survey, measurement and
analysis of energy flow of a built
environment. Results and reports
from the audit can determine the
present practice, areas of high
energy consumption, strengths
and weaknesses, and
recommendations to improve
energy efficiency of a building or
equipment without compromising
the safety, efficiency and comfort
of the workspace environment.
PROPOSAL
This proposal will include:
Implementing systems or
combinations of systems.
A comprehensive plan that
promotes good energy
usage practices.

Modifications to existing
equipment-usage
schedules.
Modifying current
powered systems
and/or components.
Budgetary data

ENERGY MANAGEMENT GOLD


STANDARD
The EMGS rating is awarded to
companies that have
implemented the energy
management system, upon an
audit by AEMAS auditors. Such
companies have an energy
manager, a company-wide
energy management committee,
and have implemented the entire
energy management system.

INSTALLATION &
COMMISSIONING
As with all engineering
endeavours, good planning lays
the foundation for a successful
energy savings initiative. We will
work closely with vendors and
product representatives who
know better of the capabilities
and limitations of their equipment.
MONITORING & MAINTENANCE
Energy monitoring is a proven
solution that delivers a visible
impact to the bottom line. All the
information and analysis will
allows us to understand your
organisations energy use, take
appropriate action, and
continually improve energy
efficiency and building
performance.

LOTUS WEST
MILESTONES PROJECTS
2014

Awarded energy saving initiatives contract by Telekom Malaysia


(Project Value: RM103,513,250)

2013

Provision of Maxis Home Connect Services awarded by Maxis


(Project Value: RM4,576,910)

2012

Civil, mechanical & electrical services for Perkhidmatan 1Bestari


awarded by YTL Corporation (Project Value: RM1,758,830)

2011

Contract for the supply and delivery of Unifi service installation


awarded by Telekom Malaysia (Project Value: RM10,000,000)

2010

Contract for supply and installation of outdoor microduct for HSBB


awarded by Telekom Malaysia (Project Value: RM5,120,807)

2009

Contract for fibre optic cabling works awarded by Telekom Malaysia


(Project Value: RM6,000,000)

2007

Awarded contract for supply of spares and after sales service for digital
local loop by TM Net (Project Value: RM2,946,000)

2005

Awarded contract for supply of synchronisation equipment and provision


of work by Telekom Malaysia (Project Value: RM11,279,517)

2002

Awarded contract for supply and support service of multipurpose digital


transmission tester by Telekom Malaysia (Project Value: RM22,125,000)

LICENSE
& ACCREDITATION
GREENTECH MALAYSIA
Certified Energy Manager
Hasan Suyut <CEM-MY-643-1114>
Mohamad Azlie Mohamad Yusof <CEM-MY-642-1114>
KEMENTERIAN KEWANGAN MALAYSIA
No. Rujukan Pendaftaran: 357-01003338
No. Sijil Bumiputera:
BP20852045481024417

PUSAT KHIDMAT KONTRAKTOR


KEMENTERIAN KERJA RAYA MALAYSIA
No. Sijil Pendaftaran: 0120090305-SL122374
Gred Pendaftaran: G7 (Bumiputera)

CIDB MALAYSIA
No. Pendaftaran: 0120090305-SL122374
Gred, kategori dan pengkhususan berdaftar:
G7 CE CE24 CE31
|
G7 ME E07 E02 M20 M15 E03
TELEKOM MALAYSIA BERHAD
Certificate No.: 1018249508
Supplier No.: 1002431
Product Category: 43191500
TENAGA NASIONAL BERHAD
Kontraktor Kerja Awam
Pembekal & Kontraktor Perkhidmatan
No. Pendaftaran TNB: 3013685

BOARD OF DIRECTORS
& MANAGEMENT TEAM
BOARD OF DIRECTORS

MANAGEMENT

Muhammad Rikhan bin Muhammad Shah


Managing Director
Shareholder

Hasan Suyut
Chief Operating Officer

Muhammad Zaki bin Muhammad Shah


Executive Director
Shareholder

Fauziah Ahmad
Chief Financial Officer
Mohd Azlie Yusof
Chief Technology Officer
Hanafiah Ghazali
General Manager, Sales & Marketing
Towfek Alias
Abdul Latib Takimin
Technical & Project Advisor

WHY ENERGY SAVING?


5%-14% SAVING ON
TOTAL ELECTRICITY BILL
INCREASE LIFE SPAN OF
ELECTRICAL EQUIPMENT

CO2 & GLOBAL WARMING


REDUCTION

KESECO LIFE SPAN MORE

THAN 10 YEARS.

ELECTRIC CONDITION
IN MALAYSIA
3-phase supply 415V
Alu
m

inum

Volt
ag

pow
e

Generally Power TNB Supply Higher


Voltage Than 415V
3-Phase Supply415V

r cab
les

e Dr
ops
Due
t

+5% ! 436V
-10% ! 373V

oD
ista
nce

SUB STATION
380V

390V
400V
410V
420V
430V
440V

LOWER
ELECTRICITY BILL
LONGER
LIFE SPAN OF EQUIPMENT

HIGHER
SHORTER

TARIFF REVIEWS
1997 - 2014

TARIFF INCREMENT
FOR NEXT 5 YEARS

30%

23%

Expected tari increment


for the next 5 years is
about 20%.

15%

8%

0%
2015

2016

2017

2018

Increments

2019

2020

LOTUS WEST
ENERGY SAVING SOLUTION

WHY ULTRA?
Global electricity consumption and costs are continuing to increase
year after year.

Improve
Reduce
Save

Organizations are increasingly faced with an urgent need to reduce


energy consumption and costs while ensuring key business processes
remain unaffected - ULTRA provides a simple solution that delivers
financial savings and reduces your environmental impact. Decreasing
energy consumption is now not only a moral responsibility in terms of
protecting the environment, but with energy prices rising rapidly it is an

REVOLUTIONARY
TECHNOLOGY
The Premier Electric Current Optimization System
Compensates the loss from resistance

ULTRA Industrial Series

Explores the potential electron movement

KESECO ULTRA

ULTRA is the premier Electric Current Optimization system that


compensates for energy that is normally lost in Alternating Current (AC)
systems without dropping voltage. The main reactions within ULTRA
occur between ceramic coatings, the ULTRA composite and the
presence of the Alternating Magnetic Field (AMF) that accompanies all
AC systems.
Far Infrared Ray that is emitted from the ceramic coatings activates
the electrons in the ULTRA composite through Resonance Absorption.
A Magnetic Interaction occurs between the activated electrons of the
ULTRA composite and the AMF. This magnetic interaction generates
magnetic wave energy and supplies it to the AC circuit.

HOW DOES
ULTRA WORK?

KESECO ULTRA
CASE STUDY 1
800000
700000

90000

600000

85000

80000
t Location: IKEA, Cyprus
t Type of Business: Commercial
t75000
Date of Installation: January 9, 77097
2012
t Model Number: U-1000, U-500
t70000
Saving Rate: 13.7%

500000
400000
300000
200000

87622

Jan

Mar

Apr

May

Jun

Jul

Aug

NO ULTRA

320320

318750 363880

347400 401500

478980

578900

631320

ULTRA

304440

286990 311720

300760 354290

430630

466580

514430

An IKEA retail store in Cyprus installed a U-1000 and two U-500


units in their facilities on January 9, 2012. The stores kWh usage
was monitored from January to August after the installation and
compared with the kWh usage from the same period of the
previous year. The store used 13.7% less energy after the
installation of ULTRA.

NO ULTRA

ULTRA

3750000
3500000

3441050

13.7%

3250000
3000000

2969840

2750000

NO ULTRA

ULTRA

KESECO ULTRA
CASE STUDY 2
800

22000

750

20000

700

18000

650
t Location: CALTEX, Australia 642.2
t Type of Business: Commercial
600
t Date
of Installation: April 19, 2012
t Model Number: UC-50
t Saving Rate: 11.9%
ULTRA
NO ULTRA

16000
14000
12000

762.2

Mar

Apr

May

Jun

Jul

Aug

Sep

NO ULTRA

19947

18429

18422

18311

17536

16786

16567

ULTRA

19869

18247

16099

15001

15381

15625

14991

Caltex is an international oil company with a branch in Australia.


This Caltex station in Australia installed a UC-50 on April 19, 2012.
Electricity consumption data was collected for a 5 month period
prior to the installation and compared with data that was
collected after the installation of the UC-50. The results show
that the site used 11.9% less kWh after the installation of ULTRA.

90000
85000

87622

11.9%

80000
75000

77097

70000

NO ULTRA

ULTRA

KESECO ULTRA
BENEFITS
0QUJNVN6L53"QFSGPSNBODFDBOCFBDIJevFEJO
tLPBETXIFSFUIFUIFEFNBOEGBDUPSexDFFET
tLPDBUJPOTXIFSFUIFMPBEGBDUPSexDFFET7
t*OEVDUJvFMPBETXIFSFVDUVBUJOHDVSSFOUSFTVMUTJOJODSFBTFESFTJTUBODe.

UL53"PQFSBUFTNPTUFffFDUJvFMZJOMPDBUJPOTVTJOHBIJHIFS
QFSDFOUBHFPG*OEVDUJvFMPBET

tPSNPSFPGJOEVDUJvFMPBEVTBHFSFTVMUTJOHSeBUFSFDJFODZBOE
TBWJOHSBUe.
t*OEVDUJvFMPBETJODMVEFFRVJQNFOUMJke SFGSJHFSBUPST NPUPST DPNQSeTTPST
BJSDPOEJUJPOFST wBTIJOHNBDIJOFTBOENPSe.

UL53"CFOFUTPOCPNQMex LPBET

t&OFSHZDPOTVNQUJPOXJMMCFBUMFBTUMPXeS.
t.PTUGBDJMJUJFTVTFDPNQMeYMPBETPDFCVJMEJOHT GBDUPSJFT TVQFSNBSkFUT 
EPNFTUJDSFTJEFODFTBOENPSe.

ULTRA Industrial Series

Inductive Load: Minimum 11% savings rate

Resistive Load: Increase of Illumination intensity


Complex Load (Inductive + Resistive):
Minimum 8% savings rate

KESECO ULTRA
ACCREDITATION & CERTIFICATES
PATENT

SAFETY

Optimization of Power Supply


Patent

Patent

Patent

UL 508

TUV

Reduced Electricity Consumption

ETC.

Lower Expenses

ISO

PL

RoHS

CE-EMC

CE-LVD

Increased Productivity

PERFORMANCE
Maximization of Profit

TUV

TGM

SGS

S_Mark

KC_Mark

KESECO ULTRA
SPECIFICATION
INDUSTRIAL
MODEL NO.
U-1500
U-1000
U- 700
U- 500
U- 300

INPUT

VOLTAGE

100~600V

Hz

50~60Hz

SIZE

(W x L x H cm)

40 x 60 x 25
40 x 60 x 20
35 x 52 x 15
35 x 45 x 15
30 x 40 x 10

WEIGHT
(kg)

50
40
27
25
15

CAPACITY
(KVA-AC)

1500
1000
700
500
300

COMMERCIAL
MODEL NO.
UC-200
UC-100
UC- 50

INPUT
3

VOLTAGE
100~600V

Hz
50~60Hz

SIZE

(W x L x H cm)

25 x 35 x 08
22 x 30 x 08
18 x 25 x 06

WEIGHT
(kg)

11
8
5

CAPACITY
(KVA-AC)

200
100
50

REGULAR
SIZE

MODEL NO.

INPUT

VOLTAGE

Hz

(W x L x H cm)

UR-30

3, 1

100~600V

50~60Hz

14 x 20 x 06

WEIGHT
(kg)

3.5

CAPACITY
(KVA-AC)

30

MODULE
MODEL NO.
UM-1
UM-0.5

INPUT
1

SIZE

VOLTAGE

Hz

(W x L x H cm)

100~600V

50~60Hz

08 x 11 x 03
06 x 10.3 x 03

WEIGHT
(kg)

0.8
0.6

* The product specification is able to be changed in the reason of improvement without notice.

CAPACITY
(KVA-AC)

1
0.5

KESECO ULTRA
ADVANTAGES
POWER SAVING
SOLUTIONS

RAPID
ROI

EASY
INSTALLATION

ULTRA

ECOFRIENDLY

LOW
MAINTENANCE

KESECO

REVOLUTIONARY
TECHNOLOGY

SUPERIOR
SAFETY

EXCELLENT
ELECTRICITY
SAVING

Your electricity bills pay


!
e
iv
t
ia
it
in
y
c
n
ie
c

e
y
rg
e
n
for this e
Before Energy Saving

Your Monthly Electricity Bills

RETURN-ON-INVESTMENT

ROI Period

Saving

5% - 14%
electricity
bill
saving*

After Energy Efficiency Initiative

12 - 24 months

Lifespan more than 10 years


*Assumption based on historical data.

WHY SHOULD YOU SAVE ENERGY?


Saves your money
Increase life span of electrical equipment
Improves the economy
Helps the environment i.e. reduce CO2 and global
warming
Enhances quality of life especially for future
generation

IT COST YOU NOTHING


YET SAVE YOUR MONEY!

Please contact our representative


for free consultation or
presentation on how we can
help you save your money.

Get the maximum output with the minimum input

ENERGY EFFICIENCY | TELECOMMUNICATION | SYSTEM INTEGRATION

LOTUS WEST SDN. BHD. (293189-X)


No. 2-G & 2-1, Jalan Zapin K/KU5, Bandar Bukit Raja,
41050 Klang, Selangor, MALAYSIA
Tel: +603-3342-4525 / 4526 Fax: +603-3342-4523
E-mail: info@lotuswest.com.my

You might also like