FOAM SYSTEM
:
automatic manual
:
NFPA -
WATER SYSTEM
:
AUTOMATIC
FHC
) ( NFPA
:
class of stand pipe
class A :FHC 2.5
residual pressure
" 2.5
=7
4,5
250
) (250 GPM
:
) (
shutter door
travel distance
45.7 throw
35
NFPA14
OVER LAP
: 1.5 "class II :FHC
1.5
:
: Q P TRAVEL
DISTANCE
1.5 :
Q =100 GPM & P =4.5 bar & T.D = 35 M with throw , take
it 30 m to be safe
:
:
2.5
1.5
:
siffco & bavaria :
:
1.5 1
2.5 landing
valve
1.5 ball valve
class III
) 1.5 2.5+
( 2.5
rack
hose reel hose rack
fire station CLASS I
CLASS II
1-
4.2
1.5 2-
residual pressure 6.9
4 3 -
main riser
4-
combined system 6 )(main riser
5-
hydraulic calculation
4
:
pipe schedule
hydraulic calculation
NFPA 14
mep
water system &gas
:system
manual systems
:&automatic systems
manual system of water system
Siamese connection )breaching inlet
2.5
), (automatic system
)(standpipe system
fire department
connection , nfpa14
) ))( fire hydrant
,, private & local
fire hydrant :
4
50
private hydrant
local hydrant
Q=250gpm
2.5
6
pump
) (
8
Siamese connection
nfpa13E
stand pipe
:
standpipe system-1
) (
--2 90 150
-3 2.5
4 ."4
5 6.9 "2.5 ,
4.5 "1.5 )
,(NFPA 14 ) (
"2.5 6.9
4.5
6 4.5 )
(.
7 6.9 ,"1.5 12.1 "2.5
8 12.1
6.9 "1.5 12.1 ."2.5
9 24.1. Siamese connection
457)"18( 1219) "45(.
"4 .
stand pipe & NFPA14
1 24 standpipe system
- 2 2.5 12.1
4.5
- 3 1.5 6.9
4.5
4 2.5 250 4.5 ) (
5 1.5 100 4.5 ) (
nfpa 14
) (
.stand pipe sys
water sprinkler
system
:
:
) (
1- )(NFPA13
) 40 (
) ( thickness )
)
):
( NFPA
2 sprinkler
1
-2
-3
-4
)(fm200&co2
-5
Head + flow rate (H,Q)..f
A ), ( wet-dry -deluge-pre.action
B Hazard 100
)
(
) (light -ordinary:G1+G2 -extra :G1+G2
)
(
:
max.area protection for sprinkler (As) -1 ) :
minimum area protection during fire (operation area or design :
area)A0,Ad- 2
most remote area
head
M.R.A
( Most Demand Area
)
:
head Q
...
Head
, Q )
)
Ns -3:
) AO/AS
)
MAX.FLOOR AREA PROTECTED BY ONE RISER - 4 :
NFPA13
MAX. DISTANCE BETWEEN SPRINKLERS - 5 :
) .........
)
6
V=Q*T*3.785/1000
) 3.785
1000 (3 T
C
1
2 = 1.8 INTER COOLING
3 :
4 4 102
8
9
1.25 )
(
D ) (pipe sizing PIPE
SCHEDULE METHOD
e